# number_of_header_lines: 70 # comment: # comment: ************ USE OF ESRL GMD DATA **************** # comment: # comment: These data are made freely available to the public and the # comment: scientific community in the belief that their wide dissemination # comment: will lead to greater understanding and new scientific insights. # comment: The availability of these data does not constitute publication # comment: of the data. NOAA relies on the ethics and integrity of the user to # comment: ensure that GML receives fair credit for their work. If the data # comment: are obtained for potential use in a publication or presentation, # comment: GML should be informed at the outset of the nature of this work. # comment: If the GML data are essential to the work, or if an important # comment: result or conclusion depends on the GML data, co-authorship # comment: may be appropriate. This should be discussed at an early stage in # comment: the work. Manuscripts using the GML data should be sent to GML # comment: for review before they are submitted for publication so we can # comment: ensure that the quality and limitations of the data are accurately # comment: represented. # comment: Please see accompanying README file, if available, for citation text. # comment: # comment: Every effort is made to produce the most accurate and precise # comment: measurements possible. However, we reserve the right to make # comment: corrections to the data based on recalibration of standard gases # comment: or for other reasons deemed scientifically justified. # comment: # comment: We are not responsible for results and conclusions based on use # comment: of these data without regard to this warning. # comment: # contact_parameter: CO2 CCGG (Individual Flasks) # contact_name: Ed Dlugokencky # contact_telephone: (303) 497-6228 # contact_email: Ed.Dlugokencky@noaa.gov # comment: # comment: ************ COLLABORATORS *************** # comment: # comment: NOAA thanks the following collaborators without # comment: whom these measurements would not be possible. # comment: # collaborator_name: Beth Anderson/ NWS Cooperative Observer [NWS # collaborator_name: COOP] # comment: # comment: ************ RECIPROCITY AGREEMENT *************** # comment: # comment: Use of these data implies an agreement to reciprocate. # comment: Laboratories making similar measurements agree to make their # comment: own data available to the general public and to the scientific # comment: community in an equally complete and easily accessible form. # comment: Modelers are encouraged to make available to the community, # comment: upon request, their own tools used in the interpretation # comment: of the GML data, namely well documented model code, transport # comment: fields, and additional information necessary for other # comment: scientists to repeat the work and to run modified versions. # comment: Model availability includes collaborative support for new # comment: users of the models. # comment: # comment: ************ DATA DESCRIPTION *************** # comment: # description_site-code: uta # description_project-abbr: ccg_surface # description_strategy-abbr: flask # description_sample-constraints: me:-H~date:1900-01-01,2020-12-31 # description_creation-time: 2021-07-30 09:30:06 # comment: # comment: ************ DATA DOCUMENTATION *************** # comment: # comment: Please refer to the species-specific README file in the # comment: appropriate directory folder at ftp://aftp.cmdl.noaa.gov/data/trace_gases/. # comment: # data_fields: sample_site_code sample_year sample_month sample_day sample_hour sample_minute sample_seconds sample_id sample_method parameter_formula analysis_group_abbr analysis_value analysis_uncertainty analysis_flag analysis_instrument analysis_year analysis_month analysis_day analysis_hour analysis_minute analysis_seconds sample_latitude sample_longitude sample_altitude sample_elevation sample_intake_height event_number UTA 1993 05 06 17 50 00 289-91 P co2 CCGG 359.830 0.116 ... S1 1993 05 28 10 24 00 39.9018 -113.7181 1332.00 1327.00 5.00 160539 UTA 1993 05 06 17 50 00 290-91 P co2 CCGG 359.390 0.116 ... S1 1993 05 28 10 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 160540 UTA 1993 05 11 00 25 00 365-91 P co2 CCGG 360.040 0.116 ... S1 1993 05 21 08 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 160541 UTA 1993 05 11 00 25 00 366-91 P co2 CCGG 360.100 0.116 ... S1 1993 05 21 08 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 160542 UTA 1993 05 20 21 05 00 83-91 P co2 CCGG 356.590 0.116 -.. S1 1993 06 11 08 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 160543 UTA 1993 05 20 21 05 00 84-91 P co2 CCGG 358.120 0.116 +.. S1 1993 06 11 08 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 160544 UTA 1993 05 25 00 02 00 363-91 P co2 CCGG 360.710 0.116 +.. S1 1993 06 11 08 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 160545 UTA 1993 05 25 00 02 00 364-91 P co2 CCGG 360.010 0.116 -.. S1 1993 06 11 08 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 160546 UTA 1993 06 02 00 12 00 167-91 P co2 CCGG 359.480 0.116 +.. S1 1993 06 21 09 24 00 39.9018 -113.7181 1332.00 1327.00 5.00 160547 UTA 1993 06 02 00 12 00 168-91 P co2 CCGG 358.940 0.116 -.. S1 1993 06 21 09 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 160548 UTA 1993 06 08 12 30 00 351-91 P co2 CCGG 367.020 0.116 -.. S1 1993 06 21 09 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 160549 UTA 1993 06 08 12 30 00 352-91 P co2 CCGG 368.360 0.116 +.. S1 1993 06 21 09 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 160550 UTA 1993 06 16 16 15 00 91-91 P co2 CCGG 354.840 0.116 ... S1 1993 06 30 09 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 160551 UTA 1993 06 22 01 30 00 385-91 P co2 CCGG 358.730 0.116 ... S1 1993 06 30 08 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 160552 UTA 1993 06 22 01 30 00 386-91 P co2 CCGG 358.740 0.116 ... S1 1993 06 30 08 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 160553 UTA 1993 06 29 14 00 00 355-91 P co2 CCGG 353.170 0.116 ... S1 1993 07 14 10 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 160554 UTA 1993 06 29 14 00 00 356-91 P co2 CCGG 353.020 0.116 ... S1 1993 07 14 10 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 160555 UTA 1993 07 05 14 34 00 349-91 P co2 CCGG 349.300 0.116 +.. S1 1993 07 14 10 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 160556 UTA 1993 07 05 14 34 00 350-91 P co2 CCGG 348.300 0.116 -.. S1 1993 07 14 10 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 160557 UTA 1993 07 13 01 15 00 41-91 P co2 CCGG 353.570 0.116 ... S1 1993 08 04 10 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 160558 UTA 1993 07 13 01 15 00 42-91 P co2 CCGG 353.400 0.116 ... S1 1993 08 04 10 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 160559 UTA 1993 07 20 14 23 00 275-91 P co2 CCGG 353.600 0.116 ... S1 1993 08 04 10 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 160560 UTA 1993 07 20 14 23 00 276-91 P co2 CCGG 353.870 0.116 ... S1 1993 08 04 10 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 160561 UTA 1993 07 27 00 05 00 277-91 P co2 CCGG 350.770 0.116 ... S1 1993 08 12 08 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 160562 UTA 1993 07 27 00 05 00 278-91 P co2 CCGG 350.480 0.116 ... S1 1993 08 12 08 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 160563 UTA 1993 08 01 13 28 00 7-91 P co2 CCGG 353.810 0.116 ... S1 1993 08 12 08 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 160564 UTA 1993 08 01 13 28 00 8-91 P co2 CCGG 353.530 0.116 ... S1 1993 08 12 08 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 160565 UTA 1993 08 09 14 40 00 381-91 P co2 CCGG -999.990 -999.990 *.. S1 1993 08 27 09 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 160566 UTA 1993 08 09 14 40 00 382-91 P co2 CCGG -999.990 -999.990 *.. S1 1993 08 27 09 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 160567 UTA 1993 08 15 21 50 00 55-91 P co2 CCGG 349.570 0.116 ... S1 1993 08 27 09 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 160568 UTA 1993 08 15 21 50 00 56-91 P co2 CCGG 349.670 0.116 ... S1 1993 08 27 09 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 160569 UTA 1993 08 22 14 13 00 365-91 P co2 CCGG 353.640 0.116 ... S1 1993 09 10 10 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 160570 UTA 1993 08 22 14 13 00 366-91 P co2 CCGG 353.610 0.116 ... S1 1993 09 10 10 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 160571 UTA 1993 08 30 02 35 00 71-91 P co2 CCGG 356.430 0.116 ... S1 1993 09 10 10 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 160572 UTA 1993 08 30 02 35 00 72-91 P co2 CCGG 355.940 0.116 ... S1 1993 09 10 10 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 160573 UTA 1993 09 06 14 50 00 67-91 P co2 CCGG 352.380 0.116 ... S1 1993 10 05 08 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 160574 UTA 1993 09 06 14 50 00 68-91 P co2 CCGG 351.980 0.116 ... S1 1993 10 05 08 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 160575 UTA 1993 09 14 01 15 00 333-91 P co2 CCGG 353.660 0.116 ... S1 1993 10 05 08 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 160576 UTA 1993 09 14 01 15 00 334-91 P co2 CCGG 353.560 0.116 ... S1 1993 10 05 08 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 160577 UTA 1993 09 21 01 36 00 283-91 P co2 CCGG 355.450 0.116 ... S1 1993 10 08 09 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 160578 UTA 1993 09 21 01 36 00 284-91 P co2 CCGG 355.350 0.116 ... S1 1993 10 08 09 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 160579 UTA 1993 09 28 01 25 00 285-91 P co2 CCGG 366.550 0.116 N.. S1 1993 10 22 10 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 160580 UTA 1993 10 07 14 06 00 295-91 P co2 CCGG 359.670 0.116 ... S1 1993 10 22 08 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 160581 UTA 1993 10 07 14 06 00 296-91 P co2 CCGG 359.550 0.116 ... S1 1993 10 22 08 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 160582 UTA 1993 10 11 17 30 00 353-91 P co2 CCGG 355.970 0.116 ... S1 1993 10 22 09 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 160583 UTA 1993 10 11 17 30 00 354-91 P co2 CCGG 355.780 0.116 ... S1 1993 10 22 09 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 160584 UTA 1993 10 18 16 30 00 31-91 P co2 CCGG 357.100 0.116 ... S1 1993 11 16 11 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 160585 UTA 1993 10 18 16 30 00 32-91 P co2 CCGG 356.890 0.116 ... S1 1993 11 16 11 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 160586 UTA 1993 10 28 00 40 00 307-91 P co2 CCGG 367.740 0.116 .X. S1 1993 11 16 11 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 160587 UTA 1993 10 28 00 40 00 308-91 P co2 CCGG 368.230 0.116 .X. S1 1993 11 16 11 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 160588 UTA 1993 11 02 22 48 00 441-91 P co2 CCGG 357.000 0.116 ... S1 1993 11 30 08 24 00 39.9018 -113.7181 1332.00 1327.00 5.00 160589 UTA 1993 11 02 22 48 00 442-91 P co2 CCGG 356.960 0.116 ... S1 1993 11 30 08 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 160590 UTA 1993 11 12 14 22 00 351-91 P co2 CCGG 359.760 0.116 ... S1 1993 12 02 10 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 160591 UTA 1993 11 12 14 22 00 352-91 P co2 CCGG 359.730 0.116 ... S1 1993 12 02 10 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 160592 UTA 1993 11 17 23 21 00 371-91 P co2 CCGG 359.810 0.116 ... S1 1993 12 09 11 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 160593 UTA 1993 11 17 23 21 00 372-91 P co2 CCGG 359.810 0.116 ... S1 1993 12 09 11 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 160594 UTA 1993 11 22 19 11 00 71-91 P co2 CCGG 357.770 0.116 ... S1 1993 12 09 11 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 160595 UTA 1993 11 22 19 11 00 72-91 P co2 CCGG 357.930 0.116 ... S1 1993 12 09 11 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 160596 UTA 1993 11 30 18 20 00 283-91 P co2 CCGG 363.960 0.116 ... S1 1993 12 17 08 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 160597 UTA 1993 11 30 18 20 00 284-91 P co2 CCGG 363.860 0.116 ... S1 1993 12 17 08 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 160598 UTA 1993 12 06 21 26 00 297-91 P co2 CCGG 359.490 0.116 ... S1 1993 12 17 08 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 160599 UTA 1993 12 06 21 26 00 298-91 P co2 CCGG 359.420 0.116 ... S1 1993 12 17 08 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 160600 UTA 1993 12 12 00 46 00 503-91 P co2 CCGG 358.980 0.116 +.. S1 1994 01 07 10 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 160601 UTA 1993 12 12 00 46 00 504-91 P co2 CCGG 358.420 0.116 -.. S1 1994 01 07 10 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 160602 UTA 1993 12 21 14 26 00 441-91 P co2 CCGG 361.890 0.116 ... S1 1994 01 07 10 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 160603 UTA 1993 12 21 14 26 00 442-91 P co2 CCGG 362.110 0.116 ... S1 1994 01 07 10 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 160604 UTA 1993 12 27 18 15 00 65-91 P co2 CCGG 363.350 0.116 ... S1 1994 01 13 11 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 160605 UTA 1993 12 27 18 15 00 66-91 P co2 CCGG 363.560 0.116 ... S1 1994 01 13 11 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 160606 UTA 1994 01 03 17 16 00 281-91 P co2 CCGG 359.640 0.116 ... S1 1994 01 28 08 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 160607 UTA 1994 01 03 17 16 00 282-91 P co2 CCGG 359.620 0.116 ... S1 1994 01 28 08 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 160608 UTA 1994 01 11 00 50 00 275-91 P co2 CCGG 360.470 0.116 ... S1 1994 01 28 08 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 160609 UTA 1994 01 11 00 50 00 276-91 P co2 CCGG 360.010 0.116 ... S1 1994 01 28 08 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 160610 UTA 1994 01 17 19 26 00 319-91 P co2 CCGG 360.080 0.116 ... S1 1994 02 14 08 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 160611 UTA 1994 01 17 19 26 00 320-91 P co2 CCGG 360.180 0.116 ... S1 1994 02 14 08 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 160612 UTA 1994 01 25 14 31 00 121-91 P co2 CCGG 365.820 0.116 -.. S1 1994 02 14 08 24 00 39.9018 -113.7181 1332.00 1327.00 5.00 160613 UTA 1994 01 25 14 31 00 122-91 P co2 CCGG 366.520 0.116 +.. S1 1994 02 14 08 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 160614 UTA 1994 02 03 23 20 00 71-91 P co2 CCGG 362.670 0.116 ... S1 1994 02 22 08 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 160615 UTA 1994 02 03 23 20 00 72-91 P co2 CCGG 362.780 0.116 ... S1 1994 02 22 08 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 160616 UTA 1994 02 07 19 45 00 443-91 P co2 CCGG 361.900 0.116 ... S1 1994 02 22 08 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 160617 UTA 1994 02 07 19 45 00 444-91 P co2 CCGG 361.950 0.116 ... S1 1994 02 22 08 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 160618 UTA 1994 02 14 00 30 00 253-91 P co2 CCGG 363.790 0.116 ... S1 1994 03 04 14 24 00 39.9018 -113.7181 1332.00 1327.00 5.00 160619 UTA 1994 02 14 00 30 00 254-91 P co2 CCGG 363.700 0.116 ... S1 1994 03 04 14 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 160620 UTA 1994 02 20 23 25 00 251-91 P co2 CCGG 362.580 0.116 ... S1 1994 03 04 14 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 160621 UTA 1994 02 20 23 25 00 252-91 P co2 CCGG 362.590 0.116 ... S1 1994 03 04 14 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 160622 UTA 1994 02 27 14 15 00 275-91 P co2 CCGG 363.720 0.116 ... S1 1994 03 18 08 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 160623 UTA 1994 02 27 14 15 00 276-91 P co2 CCGG 363.600 0.116 ... S1 1994 03 18 08 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 160624 UTA 1994 03 06 14 25 00 325-91 P co2 CCGG 363.130 0.116 ... S1 1994 03 18 09 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 160625 UTA 1994 03 06 14 25 00 326-91 P co2 CCGG 363.180 0.116 ... S1 1994 03 18 09 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 160626 UTA 1994 03 12 15 35 00 239-91 P co2 CCGG 363.280 0.116 ... S1 1994 04 06 16 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 160627 UTA 1994 03 12 15 35 00 240-91 P co2 CCGG 363.260 0.116 ... S1 1994 04 06 16 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 160628 UTA 1994 03 20 13 40 00 383-91 P co2 CCGG 365.710 0.116 ... S1 1994 04 06 09 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 160629 UTA 1994 03 20 13 40 00 384-91 P co2 CCGG 365.690 0.116 ... S1 1994 04 06 09 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 160630 UTA 1994 03 29 02 22 00 149-91 P co2 CCGG 371.890 0.116 -.. S1 1994 04 21 08 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 160631 UTA 1994 03 29 02 22 00 150-91 P co2 CCGG 372.910 0.116 +.. S1 1994 04 21 08 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 160632 UTA 1994 04 04 17 41 00 75-91 P co2 CCGG 363.040 0.116 ... S1 1994 04 21 09 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 160633 UTA 1994 04 04 17 41 00 76-91 P co2 CCGG 362.950 0.116 ... S1 1994 04 21 09 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 160634 UTA 1994 04 08 16 16 00 275-91 P co2 CCGG 363.100 0.116 ... S1 1994 04 26 10 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 160635 UTA 1994 04 08 16 16 00 276-91 P co2 CCGG 362.930 0.116 ... S1 1994 04 26 10 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 160636 UTA 1994 04 16 22 42 00 325-91 P co2 CCGG 361.090 0.116 ... S1 1994 04 26 10 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 160637 UTA 1994 04 16 22 42 00 326-91 P co2 CCGG 361.240 0.116 ... S1 1994 04 26 10 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 160638 UTA 1994 04 24 13 40 00 441-91 P co2 CCGG 363.690 0.116 ... S1 1994 05 19 13 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 160639 UTA 1994 04 24 13 40 00 442-91 P co2 CCGG 363.660 0.116 ... S1 1994 05 19 13 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 160640 UTA 1994 04 30 14 36 00 49-91 P co2 CCGG 362.470 0.116 ... S1 1994 05 24 09 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 160641 UTA 1994 04 30 14 36 00 50-91 P co2 CCGG 362.520 0.116 ... S1 1994 05 24 09 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 160642 UTA 1994 05 08 12 50 00 221-91 P co2 CCGG 381.140 0.116 +.. S1 1994 05 24 09 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 160643 UTA 1994 05 08 12 50 00 222-91 P co2 CCGG 376.260 0.116 -.. S1 1994 05 24 09 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 160644 UTA 1994 05 15 13 30 00 169-91 P co2 CCGG 363.530 0.116 ... S1 1994 06 09 08 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 160645 UTA 1994 05 15 13 30 00 170-91 P co2 CCGG 363.510 0.116 ... S1 1994 06 09 08 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 160646 UTA 1994 05 22 13 40 00 15-91 P co2 CCGG 361.890 0.116 ... S1 1994 06 09 10 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 160647 UTA 1994 05 22 13 40 00 16-91 P co2 CCGG 362.050 0.116 ... S1 1994 06 09 10 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 160648 UTA 1994 05 31 00 20 00 23-91 P co2 CCGG 361.490 0.116 ... S1 1994 06 21 10 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 160649 UTA 1994 05 31 00 20 00 24-91 P co2 CCGG 361.200 0.116 ... S1 1994 06 21 10 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 160650 UTA 1994 06 06 11 40 00 683-91 P co2 CCGG 365.210 0.116 ... S1 1994 06 21 10 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 160651 UTA 1994 06 06 11 40 00 684-91 P co2 CCGG 365.240 0.116 ... S1 1994 06 21 10 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 160652 UTA 1994 06 12 13 45 00 31-91 P co2 CCGG 355.270 0.116 -.. S1 1994 06 30 10 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 160653 UTA 1994 06 12 13 45 00 32-91 P co2 CCGG 356.620 0.116 +.. S1 1994 06 30 10 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 160654 UTA 1994 06 20 03 30 00 21-91 P co2 CCGG 370.870 0.116 +.. S1 1994 06 30 11 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 160655 UTA 1994 06 20 03 30 00 22-91 P co2 CCGG 369.390 0.116 -.. S1 1994 06 30 11 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 160656 UTA 1994 06 27 15 05 00 27-91 P co2 CCGG 356.640 0.116 .X. S1 1994 07 20 10 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 160657 UTA 1994 06 27 15 05 00 28-91 P co2 CCGG 356.320 0.116 .X. S1 1994 07 20 10 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 160658 UTA 1994 07 03 03 12 00 313-91 P co2 CCGG 364.230 0.116 ... S1 1994 07 20 10 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 160659 UTA 1994 07 03 03 12 00 314-91 P co2 CCGG 364.120 0.116 ... S1 1994 07 20 10 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 160660 UTA 1994 07 12 17 50 00 15-91 P co2 CCGG 352.820 0.116 +.. S1 1994 08 05 08 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 160661 UTA 1994 07 12 17 50 00 16-91 P co2 CCGG 352.150 0.116 -.. S1 1994 08 05 08 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 160662 UTA 1994 07 18 20 00 00 859-91 P co2 CCGG 349.770 0.116 -.. S1 1994 08 05 08 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 160663 UTA 1994 07 18 20 00 00 860-91 P co2 CCGG 351.410 0.116 +.. S1 1994 08 05 08 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 160664 UTA 1994 07 25 15 05 00 677-91 P co2 CCGG 357.000 0.116 +.. S1 1994 08 18 08 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 160665 UTA 1994 07 25 15 05 00 678-91 P co2 CCGG 355.820 0.116 -.. S1 1994 08 18 08 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 160666 UTA 1994 07 30 17 55 00 21-91 P co2 CCGG 353.890 0.116 -.. S1 1994 08 18 08 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 160667 UTA 1994 07 30 17 55 00 22-91 P co2 CCGG 354.440 0.116 +.. S1 1994 08 18 08 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 160668 UTA 1994 08 08 14 22 00 89-91 P co2 CCGG 360.680 0.116 ... S1 1994 09 07 08 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 160669 UTA 1994 08 08 14 22 00 90-91 P co2 CCGG 360.670 0.116 ... S1 1994 09 07 08 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 160670 UTA 1994 08 17 19 45 00 281-91 P co2 CCGG 354.430 0.116 ... S1 1994 09 07 08 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 160671 UTA 1994 08 17 19 45 00 282-91 P co2 CCGG 354.670 0.116 ... S1 1994 09 07 08 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 160672 UTA 1994 08 22 01 40 00 387-91 P co2 CCGG 359.470 0.116 ... S1 1994 09 21 09 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 160673 UTA 1994 08 22 01 40 00 388-91 P co2 CCGG 359.590 0.116 ... S1 1994 09 21 09 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 160674 UTA 1994 08 30 16 10 00 75-91 P co2 CCGG 351.970 0.116 ... S1 1994 09 14 09 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 160675 UTA 1994 08 30 16 10 00 76-91 P co2 CCGG 351.540 0.116 ... S1 1994 09 14 09 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 160676 UTA 1994 09 05 17 32 00 325-91 P co2 CCGG 348.840 0.116 -.. S1 1994 09 21 09 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 160677 UTA 1994 09 05 17 32 00 326-91 P co2 CCGG 350.110 0.116 +.. S1 1994 09 21 09 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 160678 UTA 1994 09 11 13 35 00 103-91 P co2 CCGG 356.280 0.116 -.. S1 1994 09 21 09 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 160679 UTA 1994 09 11 13 35 00 104-91 P co2 CCGG 357.280 0.116 +.. S1 1994 09 21 09 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 160680 UTA 1994 09 19 19 00 00 691-91 P co2 CCGG 353.860 0.116 +.. S1 1994 10 06 09 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 160681 UTA 1994 09 19 19 00 00 692-91 P co2 CCGG 351.860 0.116 -.. S1 1994 10 06 09 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 160682 UTA 1994 09 28 13 50 00 725-91 P co2 CCGG 356.580 0.116 -.. S1 1994 10 06 09 24 00 39.9018 -113.7181 1332.00 1327.00 5.00 160683 UTA 1994 09 28 13 50 00 726-91 P co2 CCGG 357.660 0.116 +.. S1 1994 10 06 09 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 160684 UTA 1994 10 02 15 12 00 135-91 P co2 CCGG 363.760 0.116 .X. S1 1994 10 17 09 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 160685 UTA 1994 10 02 15 12 00 136-91 P co2 CCGG 363.840 0.116 .X. S1 1994 10 17 09 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 160686 UTA 1994 10 12 22 35 00 195-91 P co2 CCGG 357.650 0.116 ... S1 1994 11 03 12 36 00 39.9018 -113.7181 1332.00 1327.00 5.00 160687 UTA 1994 10 12 22 35 00 196-91 P co2 CCGG 357.500 0.116 ... S1 1994 11 03 12 38 00 39.9018 -113.7181 1332.00 1327.00 5.00 160688 UTA 1994 10 19 21 47 00 233-91 P co2 CCGG 360.330 0.116 ... S1 1994 11 03 12 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 160689 UTA 1994 10 19 21 47 00 234-91 P co2 CCGG 360.120 0.116 ... S1 1994 11 03 12 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 160690 UTA 1994 10 25 19 45 00 357-91 P co2 CCGG 358.940 0.116 ... S1 1994 11 09 12 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 160691 UTA 1994 10 25 19 45 00 358-91 P co2 CCGG 358.810 0.116 ... S1 1994 11 09 12 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 160692 UTA 1994 10 30 15 55 00 257-91 P co2 CCGG 358.940 0.116 ... S1 1994 11 09 12 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 160693 UTA 1994 10 30 15 55 00 258-91 P co2 CCGG 358.830 0.116 ... S1 1994 11 09 12 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 160694 UTA 1994 11 07 00 40 00 543-91 P co2 CCGG 363.090 0.116 ... S1 1994 11 21 08 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 160695 UTA 1994 11 07 00 40 00 544-91 P co2 CCGG 363.120 0.116 ... S1 1994 11 21 08 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 160696 UTA 1994 11 12 00 10 00 153-91 P co2 CCGG 360.950 0.116 ... S1 1994 11 21 08 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 160697 UTA 1994 11 12 00 10 00 154-91 P co2 CCGG 360.720 0.116 ... S1 1994 11 21 08 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 160698 UTA 1994 11 20 15 25 00 1179-91 P co2 CCGG 363.470 0.116 -.. S1 1994 12 09 13 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 160699 UTA 1994 11 20 15 25 00 1180-91 P co2 CCGG 364.950 0.116 +.. S1 1994 12 09 13 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 160700 UTA 1994 11 26 22 55 00 1173-91 P co2 CCGG 361.910 0.116 ... S1 1994 12 09 13 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 160701 UTA 1994 11 26 22 55 00 1174-91 P co2 CCGG 361.830 0.116 ... S1 1994 12 09 13 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 160702 UTA 1994 12 05 18 10 00 527-91 P co2 CCGG 359.950 0.116 ... S1 1995 01 05 09 24 00 39.9018 -113.7181 1332.00 1327.00 5.00 160703 UTA 1994 12 05 18 10 00 528-91 P co2 CCGG 359.890 0.116 ... S1 1995 01 05 09 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 160704 UTA 1994 12 11 23 47 00 171-91 P co2 CCGG 367.090 0.116 ... S1 1995 01 05 09 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 160705 UTA 1994 12 11 23 47 00 172-91 P co2 CCGG 367.040 0.116 ... S1 1995 01 05 09 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 160706 UTA 1994 12 19 20 25 00 659-91 P co2 CCGG 363.030 0.116 ... S1 1995 01 17 08 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 160707 UTA 1994 12 19 20 25 00 660-91 P co2 CCGG 362.980 0.116 ... S1 1995 01 17 08 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 160708 UTA 1994 12 25 23 07 00 159-91 P co2 CCGG 369.020 0.116 ... S1 1995 01 17 09 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 160709 UTA 1995 01 06 17 20 00 43-91 P co2 CCGG 365.550 0.116 ... S1 1995 01 27 09 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 160710 UTA 1995 01 06 17 20 00 44-91 P co2 CCGG 365.430 0.116 ... S1 1995 01 27 09 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 160711 UTA 1995 01 13 18 10 00 17-91 P co2 CCGG 363.690 0.116 ... S1 1995 02 09 08 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 160712 UTA 1995 01 13 18 10 00 18-91 P co2 CCGG 363.580 0.116 ... S1 1995 02 09 08 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 160713 UTA 1995 01 18 16 35 00 1271-91 P co2 CCGG 364.510 0.116 ... S1 1995 02 16 14 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 160714 UTA 1995 01 18 16 35 00 1272-91 P co2 CCGG 364.550 0.116 ... S1 1995 02 16 14 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 160715 UTA 1995 01 26 18 05 00 1269-91 P co2 CCGG 363.960 0.116 ... S1 1995 02 16 14 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 160716 UTA 1995 01 26 18 05 00 1270-91 P co2 CCGG 363.900 0.116 ... S1 1995 02 16 14 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 160717 UTA 1995 01 31 23 25 00 151-91 P co2 CCGG 365.830 0.116 ... S1 1995 02 22 09 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 160718 UTA 1995 01 31 23 25 00 152-91 P co2 CCGG 365.950 0.116 ... S1 1995 02 22 09 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 160719 UTA 1995 02 09 00 13 00 513-91 P co2 CCGG 364.030 0.116 ... S1 1995 02 22 09 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 160720 UTA 1995 02 09 00 13 00 514-91 P co2 CCGG 363.830 0.116 ... S1 1995 02 22 09 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 160721 UTA 1995 02 13 18 15 00 217-91 P co2 CCGG 363.000 0.116 ... S1 1995 03 03 08 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 160722 UTA 1995 02 13 18 15 00 218-91 P co2 CCGG 363.050 0.116 ... S1 1995 03 03 08 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 160723 UTA 1995 02 19 22 30 00 381-91 P co2 CCGG 364.540 0.116 ... S1 1995 03 03 08 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 160724 UTA 1995 02 19 22 30 00 382-91 P co2 CCGG 364.520 0.116 ... S1 1995 03 03 08 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 160725 UTA 1995 02 27 20 55 00 3-91 P co2 CCGG 362.270 0.116 ... S1 1995 03 15 10 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 160726 UTA 1995 02 27 20 55 00 4-91 P co2 CCGG 362.250 0.116 ... S1 1995 03 15 10 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 160727 UTA 1995 03 08 22 25 00 333-91 P co2 CCGG 362.710 0.116 ... S1 1995 03 15 10 24 00 39.9018 -113.7181 1332.00 1327.00 5.00 160728 UTA 1995 03 08 22 25 00 334-91 P co2 CCGG 362.700 0.116 ... S1 1995 03 15 10 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 160729 UTA 1995 03 18 16 15 00 179-91 P co2 CCGG 362.510 0.116 ... S1 1995 04 06 08 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 160730 UTA 1995 03 18 16 15 00 180-91 P co2 CCGG 362.350 0.116 ... S1 1995 04 06 08 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 160731 UTA 1995 03 22 17 05 00 181-91 P co2 CCGG 363.820 0.116 ... S1 1995 04 06 09 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 160732 UTA 1995 03 22 17 05 00 182-91 P co2 CCGG 363.890 0.116 ... S1 1995 04 06 09 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 160733 UTA 1995 03 29 17 30 00 153-91 P co2 CCGG 366.080 0.116 ... S1 1995 04 21 09 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 160734 UTA 1995 03 29 17 30 00 154-91 P co2 CCGG 365.930 0.116 ... S1 1995 04 21 09 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 160735 UTA 1995 04 03 01 05 00 1247-91 P co2 CCGG 363.060 0.116 ... S1 1995 04 21 09 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 160736 UTA 1995 04 03 01 05 00 1248-91 P co2 CCGG 363.040 0.116 ... S1 1995 04 21 09 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 160737 UTA 1995 04 10 20 00 00 189-91 P co2 CCGG 365.090 0.116 ... S1 1995 05 03 09 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 160738 UTA 1995 04 10 20 00 00 190-91 P co2 CCGG 365.150 0.116 ... S1 1995 05 03 09 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 160739 UTA 1995 04 17 17 15 00 361-91 P co2 CCGG 363.190 0.116 ... S1 1995 05 03 09 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 160740 UTA 1995 04 17 17 15 00 362-91 P co2 CCGG 363.020 0.116 ... S1 1995 05 03 09 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 160741 UTA 1995 04 24 22 50 00 109-91 P co2 CCGG 362.870 0.116 ... S1 1995 05 18 09 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 160742 UTA 1995 04 24 22 50 00 110-91 P co2 CCGG 362.740 0.116 ... S1 1995 05 18 09 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 160743 UTA 1995 05 04 21 15 00 533-91 P co2 CCGG 357.190 0.116 -.. S1 1995 05 18 09 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 160744 UTA 1995 05 04 21 15 00 534-91 P co2 CCGG 358.190 0.116 +.. S1 1995 05 18 09 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 160745 UTA 1995 05 10 17 20 00 753-91 P co2 CCGG 359.540 0.116 ... S1 1995 06 05 12 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 160746 UTA 1995 05 10 17 20 00 754-91 P co2 CCGG 359.180 0.116 ... S1 1995 06 05 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 160747 UTA 1995 05 19 01 25 00 81-91 P co2 CCGG 369.100 0.116 .X. S1 1995 06 05 11 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 160748 UTA 1995 05 19 01 25 00 82-91 P co2 CCGG 369.590 0.116 .X. S1 1995 06 05 11 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 160749 UTA 1995 05 22 01 15 00 387-91 P co2 CCGG 363.590 0.116 ... S1 1995 06 13 09 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 160750 UTA 1995 05 22 01 15 00 388-91 P co2 CCGG 363.440 0.116 ... S1 1995 06 13 09 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 160751 UTA 1995 05 28 21 50 00 15-91 P co2 CCGG 358.830 0.116 ... S1 1995 06 13 08 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 160752 UTA 1995 05 28 21 50 00 16-91 P co2 CCGG 358.490 0.116 ... S1 1995 06 13 08 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 160753 UTA 1995 06 05 17 11 00 365-91 P co2 CCGG 357.780 0.116 ... S1 1995 06 26 08 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 160754 UTA 1995 06 05 17 11 00 366-91 P co2 CCGG 357.780 0.116 ... S1 1995 06 26 08 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 160755 UTA 1995 06 12 01 55 00 523-91 P co2 CCGG 363.590 0.116 ... S1 1995 06 26 08 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 160756 UTA 1995 06 12 01 55 00 524-91 P co2 CCGG 363.150 0.116 ... S1 1995 06 26 08 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 160757 UTA 1995 06 21 05 45 00 1307-91 P co2 CCGG 361.280 0.116 ... S1 1995 07 06 11 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 160758 UTA 1995 06 21 05 45 00 1308-91 P co2 CCGG 361.210 0.116 ... S1 1995 07 06 11 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 160759 UTA 1995 06 28 15 15 00 515-91 P co2 CCGG 363.510 0.116 ... S1 1995 07 31 09 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 160760 UTA 1995 06 28 15 15 00 516-91 P co2 CCGG 363.700 0.116 ... S1 1995 07 31 09 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 160761 UTA 1995 07 08 21 45 00 447-91 P co2 CCGG 361.180 0.116 ... S1 1995 07 31 08 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 160762 UTA 1995 07 08 21 45 00 448-91 P co2 CCGG 361.130 0.116 ... S1 1995 07 31 08 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 160763 UTA 1995 07 17 19 50 00 205-91 P co2 CCGG 353.300 0.116 -.. S1 1995 08 16 10 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 160764 UTA 1995 07 17 19 50 00 206-91 P co2 CCGG 354.140 0.116 +.. S1 1995 08 16 10 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 160765 UTA 1995 07 24 03 15 00 631-91 P co2 CCGG 369.870 0.116 -.. S1 1995 08 16 10 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 160766 UTA 1995 07 24 03 15 00 632-91 P co2 CCGG 370.460 0.116 +.. S1 1995 08 16 10 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 160767 UTA 1995 07 31 01 15 00 461-91 P co2 CCGG 355.650 0.116 ... S1 1995 08 24 10 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 160768 UTA 1995 07 31 01 15 00 462-91 P co2 CCGG 355.600 0.116 ... S1 1995 08 24 10 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 160769 UTA 1995 08 06 13 30 00 345-91 P co2 CCGG 364.040 0.116 -.. S1 1995 08 24 10 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 160770 UTA 1995 08 06 13 30 00 346-91 P co2 CCGG 365.000 0.116 +.. S1 1995 08 24 10 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 160771 UTA 1995 08 07 14 50 00 730-91 P co2 CCGG 360.880 0.116 ... S1 1995 09 07 08 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 160772 UTA 1995 08 19 20 35 00 173-91 P co2 CCGG 350.620 0.116 .X. S1 1995 09 05 10 36 00 39.9018 -113.7181 1332.00 1327.00 5.00 160773 UTA 1995 08 19 20 35 00 174-91 P co2 CCGG 350.270 0.116 .X. S1 1995 09 05 10 38 00 39.9018 -113.7181 1332.00 1327.00 5.00 160774 UTA 1995 08 20 21 40 00 127-91 P co2 CCGG 356.890 0.116 ... S1 1995 09 21 09 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 160775 UTA 1995 08 20 21 40 00 128-91 P co2 CCGG 357.150 0.116 ... S1 1995 09 21 09 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 160776 UTA 1995 09 01 01 30 00 114-91 P co2 CCGG 363.220 0.116 .X. S1 1995 09 18 08 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 160777 UTA 1995 09 02 17 05 00 625-91 P co2 CCGG 358.040 0.116 +.. S1 1995 09 25 09 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 160778 UTA 1995 09 02 17 05 00 626-91 P co2 CCGG 357.340 0.116 -.. S1 1995 09 25 09 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 160779 UTA 1995 09 04 16 15 00 3-91 P co2 CCGG 358.380 0.116 +.. S1 1995 09 25 09 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 160780 UTA 1995 09 04 16 15 00 4-91 P co2 CCGG 357.850 0.116 -.. S1 1995 09 25 09 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 160781 UTA 1995 09 15 22 35 00 75-91 P co2 CCGG 354.250 0.116 +.. S1 1995 09 27 11 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 160782 UTA 1995 09 15 22 35 00 76-91 P co2 CCGG 353.390 0.116 -.. S1 1995 09 27 11 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 160783 UTA 1995 09 20 19 10 00 527-91 P co2 CCGG 352.060 0.116 ... S1 1995 10 03 09 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 160784 UTA 1995 09 20 19 10 00 528-91 P co2 CCGG 351.580 0.116 ... S1 1995 10 03 09 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 160785 UTA 1995 09 30 21 30 00 593-91 P co2 CCGG 358.240 0.116 -.. S1 1995 10 17 09 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 160786 UTA 1995 09 30 21 30 00 594-91 P co2 CCGG 359.020 0.116 +.. S1 1995 10 17 09 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 160787 UTA 1995 10 04 23 17 00 455-91 P co2 CCGG 358.560 0.116 ... S1 1995 10 17 09 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 160788 UTA 1995 10 04 23 17 00 456-91 P co2 CCGG 358.570 0.116 ... S1 1995 10 17 09 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 160789 UTA 1995 10 21 16 55 00 185-91 P co2 CCGG 357.880 0.116 -.. S1 1995 11 06 09 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 160790 UTA 1995 10 21 16 55 00 186-91 P co2 CCGG 358.760 0.116 +.. S1 1995 11 06 09 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 160791 UTA 1995 10 26 19 12 00 489-91 P co2 CCGG 358.850 0.116 ... S1 1995 11 06 09 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 160792 UTA 1995 10 26 19 12 00 490-91 P co2 CCGG 358.820 0.116 ... S1 1995 11 06 09 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 160793 UTA 1995 11 04 22 10 00 55-91 P co2 CCGG 363.800 0.116 ... S1 1995 11 30 09 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 160794 UTA 1995 11 04 22 10 00 56-91 P co2 CCGG 363.540 0.116 ... S1 1995 11 30 09 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 160795 UTA 1995 11 10 18 25 00 271-91 P co2 CCGG 362.100 0.116 ... S1 1995 11 30 09 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 160796 UTA 1995 11 10 18 25 00 272-91 P co2 CCGG 361.990 0.116 ... S1 1995 11 30 09 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 160797 UTA 1995 11 21 20 41 00 11-91 P co2 CCGG 362.910 0.116 ... S1 1995 12 12 08 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 160798 UTA 1995 11 21 20 41 00 12-91 P co2 CCGG 362.710 0.116 ... S1 1995 12 12 08 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 160799 UTA 1995 11 25 22 17 00 853-91 P co2 CCGG 360.630 0.116 ... S1 1995 12 12 08 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 160800 UTA 1995 11 25 22 17 00 854-91 P co2 CCGG 360.680 0.116 ... S1 1995 12 12 08 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 160801 UTA 1995 12 08 20 16 00 981-91 P co2 CCGG 365.470 0.116 ... S1 1996 01 10 08 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 160802 UTA 1995 12 08 20 16 00 982-91 P co2 CCGG 365.100 0.116 ... S1 1996 01 10 08 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 160803 UTA 1995 12 16 21 14 00 365-91 P co2 CCGG 364.940 0.116 ... S1 1996 01 10 08 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 160804 UTA 1995 12 16 21 14 00 366-91 P co2 CCGG 364.820 0.116 ... S1 1996 01 10 08 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 160805 UTA 1995 12 22 20 55 00 173-91 P co2 CCGG 365.760 0.116 ... S1 1996 01 18 08 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 160806 UTA 1995 12 22 20 55 00 174-91 P co2 CCGG 365.680 0.116 ... S1 1996 01 18 08 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 160807 UTA 1995 12 29 23 29 00 315-91 P co2 CCGG 367.080 0.116 ... S1 1996 01 18 08 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 160808 UTA 1995 12 29 23 29 00 316-91 P co2 CCGG 366.980 0.116 ... S1 1996 01 18 08 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 160809 UTA 1996 01 05 21 25 00 161-91 P co2 CCGG 364.510 0.116 ... S1 1996 01 26 09 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 160810 UTA 1996 01 05 21 25 00 162-91 P co2 CCGG 364.590 0.116 ... S1 1996 01 26 09 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 160811 UTA 1996 01 13 23 38 00 637-91 P co2 CCGG 366.420 0.116 ... S1 1996 02 01 09 24 00 39.9018 -113.7181 1332.00 1327.00 5.00 160812 UTA 1996 01 13 23 38 00 638-91 P co2 CCGG 366.370 0.116 ... S1 1996 02 01 09 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 160813 UTA 1996 01 21 23 20 00 203-91 P co2 CCGG 365.070 0.116 ... S1 1996 02 13 08 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 160814 UTA 1996 01 21 23 20 00 204-91 P co2 CCGG 364.840 0.116 ... S1 1996 02 13 08 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 160815 UTA 1996 01 27 23 29 00 491-91 P co2 CCGG 364.760 0.116 ... S1 1996 02 13 08 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 160816 UTA 1996 01 27 23 29 00 492-91 P co2 CCGG 364.770 0.116 ... S1 1996 02 13 08 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 160817 UTA 1996 02 02 18 08 00 581-91 P co2 CCGG 367.970 0.116 +.. S1 1996 03 08 08 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 160818 UTA 1996 02 02 18 08 00 582-91 P co2 CCGG 367.390 0.116 -.. S1 1996 03 08 08 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 160819 UTA 1996 02 08 23 30 00 1511-91 P co2 CCGG 370.940 0.116 +.. S1 1996 03 08 08 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 160820 UTA 1996 02 08 23 30 00 1512-91 P co2 CCGG 370.440 0.116 -.. S1 1996 03 08 08 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 160821 UTA 1996 02 16 21 48 00 1795-91 P co2 CCGG 372.710 0.116 .X. S1 1996 03 12 08 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 160822 UTA 1996 02 16 21 48 00 1796-91 P co2 CCGG 372.770 0.116 .X. S1 1996 03 12 08 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 160823 UTA 1996 02 22 17 55 00 1793-91 P co2 CCGG 366.490 0.116 ... S1 1996 03 12 09 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 160824 UTA 1996 02 22 17 55 00 1794-91 P co2 CCGG 366.460 0.116 ... S1 1996 03 12 09 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 160825 UTA 1996 03 01 20 18 00 1319-91 P co2 CCGG 367.000 0.116 ... S1 1996 03 22 09 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 160826 UTA 1996 03 01 20 18 00 1320-91 P co2 CCGG 366.830 0.116 ... S1 1996 03 22 09 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 160827 UTA 1996 03 09 20 00 00 829-91 P co2 CCGG 367.280 0.116 ... S1 1996 04 08 14 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 160828 UTA 1996 03 09 20 00 00 830-91 P co2 CCGG 367.330 0.116 ... S1 1996 04 08 14 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 160829 UTA 1996 03 16 23 34 00 565-91 P co2 CCGG 366.930 0.116 ... S1 1996 03 28 10 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 160830 UTA 1996 03 16 23 34 00 566-91 P co2 CCGG 366.700 0.116 ... S1 1996 03 28 10 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 160831 UTA 1996 03 22 22 32 00 357-91 P co2 CCGG 366.350 0.116 ... S1 1996 04 05 08 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 160832 UTA 1996 03 22 22 32 00 358-91 P co2 CCGG 366.340 0.116 ... S1 1996 04 05 08 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 160833 UTA 1996 03 28 17 35 00 1247-91 P co2 CCGG 365.230 0.116 ... S1 1996 04 05 08 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 160834 UTA 1996 03 28 17 35 00 1248-91 P co2 CCGG 365.170 0.116 ... S1 1996 04 05 08 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 160835 UTA 1996 04 06 00 19 00 261-91 P co2 CCGG 365.500 0.116 ... S1 1996 05 06 12 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 160836 UTA 1996 04 06 00 19 00 262-91 P co2 CCGG 365.610 0.116 ... S1 1996 05 06 12 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 160837 UTA 1996 04 13 15 49 00 619-91 P co2 CCGG 366.250 0.116 ... S1 1996 05 06 13 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 160838 UTA 1996 04 13 15 49 00 620-91 P co2 CCGG 366.240 0.116 ... S1 1996 05 06 13 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 160839 UTA 1996 04 20 15 38 00 259-91 P co2 CCGG 366.850 0.116 ... S1 1996 05 06 09 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 160840 UTA 1996 04 20 15 38 00 260-91 P co2 CCGG 366.700 0.116 ... S1 1996 05 06 09 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 160841 UTA 1996 04 26 16 13 00 1303-91 P co2 CCGG 364.180 0.116 ... S1 1996 05 06 08 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 160842 UTA 1996 04 26 16 13 00 1304-91 P co2 CCGG 364.000 0.116 ... S1 1996 05 06 08 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 160843 UTA 1996 05 02 23 38 00 1815-91 P co2 CCGG 363.990 0.116 ... S1 1996 05 23 11 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 160844 UTA 1996 05 02 23 38 00 1816-91 P co2 CCGG 363.990 0.116 ... S1 1996 05 23 11 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 160845 UTA 1996 05 09 20 20 00 1563-91 P co2 CCGG 362.360 0.116 ... S1 1996 05 23 11 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 160846 UTA 1996 05 09 20 20 00 1564-91 P co2 CCGG 362.580 0.116 ... S1 1996 05 23 11 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 160847 UTA 1996 05 17 23 28 00 1319-91 P co2 CCGG 366.700 0.116 ... S1 1996 06 12 09 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 160848 UTA 1996 05 17 23 28 00 1320-91 P co2 CCGG 366.530 0.116 ... S1 1996 06 12 09 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 160849 UTA 1996 05 25 02 10 00 1429-91 P co2 CCGG 368.270 0.116 ... S1 1996 06 12 09 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 160850 UTA 1996 05 25 02 10 00 1430-91 P co2 CCGG 368.200 0.116 ... S1 1996 06 12 09 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 160851 UTA 1996 06 05 19 52 00 1267-91 P co2 CCGG 363.940 0.116 ... S1 1996 06 24 10 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 160852 UTA 1996 06 05 19 52 00 1268-91 P co2 CCGG 363.690 0.116 ... S1 1996 06 24 10 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 160853 UTA 1996 06 13 23 53 00 1497-91 P co2 CCGG 364.710 0.116 ... S1 1996 06 28 08 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 160854 UTA 1996 06 13 23 53 00 1498-91 P co2 CCGG 364.740 0.116 ... S1 1996 06 28 08 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 160855 UTA 1996 06 21 23 00 00 363-91 P co2 CCGG 364.530 0.116 ... S1 1996 07 12 08 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 160856 UTA 1996 06 21 23 00 00 364-91 P co2 CCGG 364.270 0.116 ... S1 1996 07 12 08 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 160857 UTA 1996 06 27 19 40 00 27-91 P co2 CCGG 360.350 0.116 ... S1 1996 07 12 08 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 160858 UTA 1996 06 27 19 40 00 28-91 P co2 CCGG 360.690 0.116 ... S1 1996 07 12 08 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 160859 UTA 1996 07 04 19 23 00 1509-91 P co2 CCGG 362.790 0.116 ... S1 1996 07 26 08 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 160860 UTA 1996 07 04 19 23 00 1510-91 P co2 CCGG 363.130 0.116 ... S1 1996 07 26 08 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 160861 UTA 1996 07 14 00 35 00 1351-91 P co2 CCGG 361.140 0.116 ... S1 1996 07 26 08 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 160862 UTA 1996 07 14 00 35 00 1352-91 P co2 CCGG 361.050 0.116 ... S1 1996 07 26 08 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 160863 UTA 1996 07 19 00 56 00 1845-91 P co2 CCGG 362.330 0.116 ... S1 1996 08 09 09 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 160864 UTA 1996 07 19 00 56 00 1846-91 P co2 CCGG 362.390 0.116 ... S1 1996 08 09 09 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 160865 UTA 1996 07 27 18 20 00 1847-91 P co2 CCGG 359.250 0.116 +.. S1 1996 08 09 09 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 160866 UTA 1996 07 27 18 20 00 1848-91 P co2 CCGG 358.660 0.116 -.. S1 1996 08 09 09 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 160867 UTA 1996 08 04 14 05 00 87-91 P co2 CCGG 357.730 0.116 ... S1 1996 08 21 08 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 160868 UTA 1996 08 04 14 05 00 88-91 P co2 CCGG 357.760 0.116 ... S1 1996 08 21 08 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 160869 UTA 1996 08 11 16 05 00 467-91 P co2 CCGG 357.930 0.116 ... S1 1996 08 21 08 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 160870 UTA 1996 08 11 16 05 00 468-91 P co2 CCGG 357.590 0.116 ... S1 1996 08 21 08 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 160871 UTA 1996 08 19 19 15 00 1119-91 P co2 CCGG 356.070 0.116 ... S1 1996 09 24 09 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 160872 UTA 1996 08 19 19 15 00 1120-91 P co2 CCGG 356.130 0.116 ... S1 1996 09 24 09 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 160873 UTA 1996 08 27 00 25 00 5-91 P co2 CCGG 361.130 0.116 ... S1 1996 09 24 08 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 160874 UTA 1996 08 27 00 25 00 6-91 P co2 CCGG 361.060 0.116 ... S1 1996 09 24 08 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 160875 UTA 1996 09 01 22 20 00 1169-91 P co2 CCGG 360.160 0.116 ... S1 1996 09 20 15 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 160876 UTA 1996 09 01 22 20 00 1170-91 P co2 CCGG 360.230 0.116 ... S1 1996 09 20 15 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 160877 UTA 1996 09 08 20 40 00 827-91 P co2 CCGG 358.080 0.116 ... S1 1996 09 20 15 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 160878 UTA 1996 09 08 20 40 00 828-91 P co2 CCGG 358.410 0.116 ... S1 1996 09 20 15 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 160879 UTA 1996 09 17 22 30 00 1953-91 P co2 CCGG 354.960 0.116 ... S1 1996 10 02 15 24 00 39.9018 -113.7181 1332.00 1327.00 5.00 160880 UTA 1996 09 17 22 30 00 1954-91 P co2 CCGG 354.710 0.116 ... S1 1996 10 02 15 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 160881 UTA 1996 09 23 20 00 00 1523-91 P co2 CCGG 356.080 0.116 ... S1 1996 10 02 15 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 160882 UTA 1996 09 23 20 00 00 1524-91 P co2 CCGG 355.620 0.116 ... S1 1996 10 02 15 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 160883 UTA 1996 10 04 16 35 00 559-91 P co2 CCGG 353.330 0.116 ... S1 1996 10 22 15 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 160884 UTA 1996 10 04 16 35 00 560-91 P co2 CCGG 353.220 0.116 ... S1 1996 10 22 15 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 160885 UTA 1996 10 10 16 10 00 103-91 P co2 CCGG 360.030 0.116 ... S1 1996 10 22 15 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 160886 UTA 1996 10 10 16 10 00 104-91 P co2 CCGG 360.000 0.116 ... S1 1996 10 22 15 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 160887 UTA 1996 10 18 19 00 00 100-91 P co2 CCGG 360.000 0.116 ... S1 1996 11 05 15 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 160889 UTA 1996 10 18 19 00 00 99-91 P co2 CCGG 359.790 0.116 ... S1 1996 11 05 15 17 00 39.9018 -113.7181 1332.00 1327.00 5.00 160888 UTA 1996 10 23 17 25 00 75-91 P co2 CCGG 360.890 0.116 ... S1 1996 11 05 15 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 160890 UTA 1996 10 23 17 25 00 76-91 P co2 CCGG 360.760 0.116 ... S1 1996 11 05 15 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 160891 UTA 1996 10 30 21 35 00 2035-91 P co2 CCGG 363.010 0.116 ... S1 1996 11 25 14 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 160892 UTA 1996 10 30 21 35 00 2036-91 P co2 CCGG 362.750 0.116 ... S1 1996 11 25 14 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 160893 UTA 1996 11 07 16 25 00 203-91 P co2 CCGG 363.010 0.116 ... S1 1996 11 25 14 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 160894 UTA 1996 11 07 16 25 00 204-91 P co2 CCGG 362.850 0.116 ... S1 1996 11 25 14 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 160895 UTA 1996 11 15 20 35 00 1555-91 P co2 CCGG 363.790 0.116 ... S1 1996 12 05 15 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 160896 UTA 1996 11 15 20 35 00 1556-91 P co2 CCGG 364.060 0.116 ... S1 1996 12 05 15 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 160897 UTA 1996 11 21 21 05 00 1035-91 P co2 CCGG 363.090 0.116 ... S1 1996 12 05 15 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 160898 UTA 1996 11 21 21 05 00 1036-91 P co2 CCGG 362.950 0.116 ... S1 1996 12 05 15 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 160899 UTA 1996 11 30 23 00 00 723-91 P co2 CCGG 365.630 0.116 ... S1 1996 12 19 12 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 160900 UTA 1996 11 30 23 00 00 724-91 P co2 CCGG 365.520 0.116 ... S1 1996 12 19 12 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 160901 UTA 1996 12 05 20 25 00 1465-91 P co2 CCGG 365.020 0.116 ... S1 1996 12 19 12 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 160902 UTA 1996 12 05 20 25 00 1466-91 P co2 CCGG 365.050 0.116 ... S1 1996 12 19 12 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 160903 UTA 1996 12 12 17 10 00 1159-91 P co2 CCGG 364.790 0.116 ... S1 1996 12 31 12 19 00 39.9018 -113.7181 1332.00 1327.00 5.00 160904 UTA 1996 12 12 17 10 00 1160-91 P co2 CCGG 364.620 0.116 ... S1 1996 12 31 12 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 160905 UTA 1996 12 19 20 05 00 4143-91 P co2 CCGG 367.460 0.116 ... S1 1996 12 31 10 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 160906 UTA 1996 12 19 20 05 00 4144-91 P co2 CCGG 367.410 0.116 ... S1 1996 12 31 11 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 160907 UTA 1996 12 27 18 00 00 4165-91 P co2 CCGG 364.580 -999.990 ... S1 1997 01 16 16 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 160908 UTA 1996 12 27 18 00 00 4166-91 P co2 CCGG 364.590 -999.990 ... S1 1997 01 16 16 17 00 39.9018 -113.7181 1332.00 1327.00 5.00 160909 UTA 1997 01 03 18 10 00 445-91 P co2 CCGG 366.980 -999.990 ... S1 1997 01 21 14 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 160910 UTA 1997 01 03 18 10 00 446-91 P co2 CCGG 366.710 -999.990 ... S1 1997 01 21 14 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 160911 UTA 1997 01 11 18 55 00 1769-91 P co2 CCGG 366.980 -999.990 ... S1 1997 02 03 15 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 160912 UTA 1997 01 11 18 55 00 1770-91 P co2 CCGG 366.750 -999.990 ... S1 1997 02 03 15 41 00 39.9018 -113.7181 1332.00 1327.00 5.00 160913 UTA 1997 01 18 23 30 00 579-91 P co2 CCGG 374.680 -999.990 .X. S1 1997 02 03 15 38 00 39.9018 -113.7181 1332.00 1327.00 5.00 160914 UTA 1997 01 18 23 30 00 580-91 P co2 CCGG 374.480 -999.990 .X. S1 1997 02 03 15 39 00 39.9018 -113.7181 1332.00 1327.00 5.00 160915 UTA 1997 01 27 20 35 00 1019-91 P co2 CCGG 367.010 -999.990 ... S1 1997 02 11 12 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 160916 UTA 1997 01 27 20 35 00 1020-91 P co2 CCGG 366.990 -999.990 ... S1 1997 02 11 12 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 160917 UTA 1997 02 05 18 20 00 4301-91 P co2 CCGG 368.240 -999.990 ... S1 1997 02 27 11 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 160918 UTA 1997 02 05 18 20 00 4302-91 P co2 CCGG 368.150 -999.990 ... S1 1997 02 27 11 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 160919 UTA 1997 02 10 23 00 00 1362-91 P co2 CCGG 373.190 -999.990 .X. S1 1997 03 13 11 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 160920 UTA 1997 02 19 16 49 00 247-91 P co2 CCGG 367.000 -999.990 ... S1 1997 03 13 14 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 160921 UTA 1997 02 19 16 49 00 248-91 P co2 CCGG 366.980 -999.990 ... S1 1997 03 13 14 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 160922 UTA 1997 02 26 21 24 00 1123-91 P co2 CCGG 367.910 -999.990 ... S1 1997 03 13 14 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 160923 UTA 1997 02 26 21 24 00 1124-91 P co2 CCGG 368.120 -999.990 ... S1 1997 03 13 14 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 160924 UTA 1997 03 05 16 45 00 1269-91 P co2 CCGG 368.910 -999.990 -.. S1 1997 06 13 15 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 160925 UTA 1997 03 05 16 45 00 1270-91 P co2 CCGG 445.480 -999.990 +.. S1 1997 06 13 15 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 160926 UTA 1997 03 12 13 10 00 1199-91 P co2 CCGG 367.350 -999.990 +.. S1 1997 06 13 15 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 160927 UTA 1997 03 12 13 10 00 1200-91 P co2 CCGG 366.660 -999.990 -.. S1 1997 06 13 15 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 160928 UTA 1997 03 20 20 25 00 4175-91 P co2 CCGG 366.200 -999.990 ... S1 1997 04 07 13 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 160929 UTA 1997 03 20 20 25 00 4176-91 P co2 CCGG 366.390 -999.990 ... S1 1997 04 07 13 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 160930 UTA 1997 03 26 18 50 00 1257-91 P co2 CCGG 366.910 -999.990 ... S1 1997 04 07 13 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 160931 UTA 1997 03 26 18 50 00 1258-91 P co2 CCGG 366.680 -999.990 ... S1 1997 04 07 13 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 160932 UTA 1997 04 02 17 00 00 1027-91 P co2 CCGG 369.850 -999.990 ... S1 1997 05 15 13 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 160933 UTA 1997 04 02 17 00 00 1028-91 P co2 CCGG 369.870 -999.990 ... S1 1997 05 15 13 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 160934 UTA 1997 05 01 16 05 00 1085-91 P co2 CCGG 366.440 -999.990 ... S1 1997 05 15 13 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 160935 UTA 1997 05 01 16 05 00 1086-91 P co2 CCGG 366.150 -999.990 ... S1 1997 05 15 13 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 160936 UTA 1997 05 09 19 30 00 1907-91 P co2 CCGG 363.840 -999.990 ... S1 1997 06 13 15 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 160937 UTA 1997 05 09 19 30 00 1908-91 P co2 CCGG 363.700 -999.990 ... S1 1997 06 13 15 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 160938 UTA 1997 05 23 19 26 00 1555-91 P co2 CCGG 363.630 -999.990 ... S1 1997 06 13 15 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 160939 UTA 1997 05 23 19 26 00 1556-91 P co2 CCGG 363.960 -999.990 ... S1 1997 06 13 15 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 160940 UTA 1997 05 30 21 00 00 2033-91 P co2 CCGG 362.890 -999.990 ... S1 1997 06 23 15 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 160941 UTA 1997 05 30 21 00 00 2034-91 P co2 CCGG 362.580 -999.990 ... S1 1997 06 23 15 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 160942 UTA 1997 06 07 00 30 00 4015-91 P co2 CCGG 365.800 -999.990 ... S1 1997 06 23 15 51 00 39.9018 -113.7181 1332.00 1327.00 5.00 160943 UTA 1997 06 07 00 30 00 4016-91 P co2 CCGG 365.630 -999.990 ... S1 1997 06 23 15 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 160944 UTA 1997 06 13 18 30 00 7-91 P co2 CCGG 363.160 -999.990 ... S1 1997 07 03 13 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 160945 UTA 1997 06 13 18 30 00 8-91 P co2 CCGG 363.150 -999.990 ... S1 1997 07 03 13 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 160946 UTA 1997 06 20 01 00 00 53-91 P co2 CCGG 364.400 -999.990 ... S1 1997 07 03 13 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 160947 UTA 1997 06 20 01 00 00 54-91 P co2 CCGG 364.500 -999.990 ... S1 1997 07 03 13 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 160948 UTA 1997 06 26 23 00 00 4585-91 P co2 CCGG 361.040 -999.990 ... S1 1997 07 24 13 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 160949 UTA 1997 06 26 23 00 00 4586-91 P co2 CCGG 361.390 -999.990 ... S1 1997 07 24 13 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 160950 UTA 1997 07 05 18 30 00 479-91 P co2 CCGG 358.770 -999.990 ... S1 1997 07 28 15 33 00 39.9018 -113.7181 1332.00 1327.00 5.00 160951 UTA 1997 07 05 18 30 00 480-91 P co2 CCGG 359.110 -999.990 ... S1 1997 07 28 15 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 160952 UTA 1997 07 10 22 20 00 113-91 P co2 CCGG 359.490 -999.990 ... S1 1997 07 28 16 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 160953 UTA 1997 07 10 22 20 00 114-91 P co2 CCGG 359.450 -999.990 ... S1 1997 07 28 16 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 160954 UTA 1997 07 18 01 10 00 1555-91 P co2 CCGG 364.730 -999.990 ... S1 1997 07 28 16 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 160955 UTA 1997 07 18 01 10 00 1556-91 P co2 CCGG 364.700 -999.990 ... S1 1997 07 28 16 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 160956 UTA 1997 08 01 14 35 00 1743-91 P co2 CCGG 365.190 0.073 ... L3 1997 08 27 15 17 00 39.9018 -113.7181 1332.00 1327.00 5.00 160957 UTA 1997 08 01 14 35 00 1744-91 P co2 CCGG 365.590 0.073 ... L3 1997 08 27 15 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 160958 UTA 1997 08 12 20 45 00 1637-91 P co2 CCGG 360.990 0.073 -.. L3 1997 08 27 15 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 160959 UTA 1997 08 12 20 45 00 1638-91 P co2 CCGG 361.800 0.073 +.. L3 1997 08 27 15 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 160960 UTA 1997 08 19 23 00 00 4619-91 P co2 CCGG 359.780 0.073 ... L3 1997 09 11 16 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 160961 UTA 1997 08 19 23 00 00 4620-91 P co2 CCGG 359.680 0.073 ... L3 1997 09 11 16 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 160962 UTA 1997 09 02 19 30 00 4665-91 P co2 CCGG 361.460 0.073 ... L3 1997 09 11 16 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 160963 UTA 1997 09 02 19 30 00 4666-91 P co2 CCGG 361.890 0.073 ... L3 1997 09 11 16 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 160964 UTA 1997 09 10 16 00 00 4637-91 P co2 CCGG 361.590 0.073 ... L3 1997 09 26 08 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 160965 UTA 1997 09 10 16 00 00 4638-91 P co2 CCGG 361.620 0.073 ... L3 1997 09 26 08 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 160966 UTA 1997 09 18 20 32 00 4635-91 P co2 CCGG 358.940 0.073 ... L3 1997 09 26 09 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 160967 UTA 1997 09 18 20 32 00 4636-91 P co2 CCGG 358.760 0.073 ... L3 1997 09 26 09 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 160968 UTA 1997 09 26 20 25 00 251-91 P co2 CCGG 362.200 0.073 ... L3 1997 10 10 14 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 160969 UTA 1997 09 26 20 25 00 252-91 P co2 CCGG 362.170 0.073 ... L3 1997 10 10 14 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 160970 UTA 1997 10 02 21 30 00 1569-91 P co2 CCGG 362.680 0.073 +.. L3 1997 10 28 09 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 160971 UTA 1997 10 02 21 30 00 1570-91 P co2 CCGG 360.380 0.073 -.. L3 1997 10 28 09 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 160972 UTA 1997 10 13 22 30 00 4487-91 P co2 CCGG 362.020 0.073 ... L3 1997 10 28 10 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 160973 UTA 1997 10 13 22 30 00 4488-91 P co2 CCGG 362.210 0.073 ... L3 1997 10 28 11 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 160974 UTA 1997 10 24 23 20 00 4675-91 P co2 CCGG 365.980 0.073 ... L3 1997 11 12 14 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 160975 UTA 1997 10 24 23 20 00 4676-91 P co2 CCGG 365.910 0.073 ... L3 1997 11 12 15 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 160976 UTA 1997 10 31 20 30 00 4391-91 P co2 CCGG 363.930 0.073 ... L3 1997 11 13 10 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 160977 UTA 1997 10 31 20 30 00 4392-91 P co2 CCGG 363.920 0.073 ... L3 1997 11 13 11 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 160978 UTA 1997 11 13 20 55 00 4705-91 P co2 CCGG 367.290 0.073 ... L3 1997 12 10 09 39 00 39.9018 -113.7181 1332.00 1327.00 5.00 160979 UTA 1997 11 13 20 55 00 4706-91 P co2 CCGG 367.500 0.073 ... L3 1997 12 10 09 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 160980 UTA 1997 11 18 21 30 00 1199-91 P co2 CCGG 366.040 0.073 ... L3 1997 12 09 16 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 160981 UTA 1997 11 18 21 30 00 1200-91 P co2 CCGG 365.660 0.073 ... L3 1997 12 09 16 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 160982 UTA 1997 11 25 17 30 00 4755-91 P co2 CCGG 364.130 0.073 ... L3 1997 12 16 13 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 160983 UTA 1997 11 25 17 30 00 4756-91 P co2 CCGG 364.200 0.073 ... L3 1997 12 16 13 17 00 39.9018 -113.7181 1332.00 1327.00 5.00 160984 UTA 1997 12 01 21 45 00 4757-91 P co2 CCGG 367.680 0.073 ... L3 1997 12 16 11 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 160985 UTA 1997 12 01 21 45 00 4758-91 P co2 CCGG 367.670 0.073 ... L3 1997 12 16 11 57 00 39.9018 -113.7181 1332.00 1327.00 5.00 160986 UTA 1997 12 08 21 45 00 4765-91 P co2 CCGG 365.990 0.073 ... L3 1998 01 08 10 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 160987 UTA 1997 12 08 21 45 00 4766-91 P co2 CCGG 366.020 0.073 ... L3 1998 01 08 10 39 00 39.9018 -113.7181 1332.00 1327.00 5.00 160988 UTA 1997 12 15 18 40 00 1843-91 P co2 CCGG 373.940 0.073 .X. L3 1998 01 08 09 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 160989 UTA 1997 12 15 18 40 00 1844-91 P co2 CCGG 374.230 0.073 .X. L3 1998 01 08 10 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 160990 UTA 1997 12 21 18 00 00 4637-91 P co2 CCGG 368.570 0.073 ... L3 1998 01 14 10 25 00 39.9018 -113.7181 1332.00 1327.00 5.00 160991 UTA 1997 12 21 18 00 00 4638-91 P co2 CCGG 368.680 0.073 ... L3 1998 01 14 10 39 00 39.9018 -113.7181 1332.00 1327.00 5.00 160992 UTA 1997 12 29 18 15 00 523-91 P co2 CCGG 367.260 0.073 ... L3 1998 01 14 10 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 160993 UTA 1997 12 29 18 15 00 524-91 P co2 CCGG 367.340 0.073 ... L3 1998 01 14 11 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 160994 UTA 1998 01 05 23 20 00 185-91 P co2 CCGG 368.030 0.073 ... L3 1998 01 23 10 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 160995 UTA 1998 01 05 23 20 00 186-91 P co2 CCGG 368.120 0.073 ... L3 1998 01 23 10 19 00 39.9018 -113.7181 1332.00 1327.00 5.00 160996 UTA 1998 01 12 21 05 00 1367-91 P co2 CCGG 368.920 0.073 ... L3 1998 01 23 09 38 00 39.9018 -113.7181 1332.00 1327.00 5.00 160997 UTA 1998 01 12 21 05 00 1368-91 P co2 CCGG 368.710 0.073 ... L3 1998 01 23 09 51 00 39.9018 -113.7181 1332.00 1327.00 5.00 160998 UTA 1998 01 19 17 40 00 1797-91 P co2 CCGG 367.490 0.073 ... L3 1998 02 13 11 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 160999 UTA 1998 01 19 17 40 00 1798-91 P co2 CCGG 367.560 0.073 ... L3 1998 02 13 11 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 161000 UTA 1998 01 30 22 20 00 4633-91 P co2 CCGG 368.430 0.073 ... L3 1998 02 13 11 55 00 39.9018 -113.7181 1332.00 1327.00 5.00 161001 UTA 1998 01 30 22 20 00 4634-91 P co2 CCGG 368.570 0.073 ... L3 1998 02 13 12 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 161002 UTA 1998 02 07 21 10 00 727-91 P co2 CCGG 368.480 0.073 ... L3 1998 02 24 14 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 161003 UTA 1998 02 07 21 10 00 728-91 P co2 CCGG 368.490 0.073 ... L3 1998 02 24 14 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 161004 UTA 1998 02 12 19 00 00 1461-91 P co2 CCGG 369.370 0.073 ... L3 1998 02 24 14 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 161005 UTA 1998 02 12 19 00 00 1462-91 P co2 CCGG 369.280 0.073 ... L3 1998 02 24 14 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 161006 UTA 1998 02 19 20 45 00 4237-91 P co2 CCGG 369.760 0.073 ... L3 1998 02 25 13 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 161007 UTA 1998 02 19 20 45 00 4238-91 P co2 CCGG 369.690 0.073 ... L3 1998 02 25 13 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 161008 UTA 1998 03 02 17 15 00 621-91 P co2 CCGG 369.850 0.073 ... L3 1998 03 19 10 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 161009 UTA 1998 03 02 17 15 00 622-91 P co2 CCGG 370.170 0.073 ... L3 1998 03 19 10 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 161010 UTA 1998 03 09 17 15 00 609-91 P co2 CCGG 371.260 0.073 ... L3 1998 03 18 11 19 00 39.9018 -113.7181 1332.00 1327.00 5.00 161011 UTA 1998 03 09 17 15 00 610-91 P co2 CCGG 371.120 0.073 ... L3 1998 03 18 11 33 00 39.9018 -113.7181 1332.00 1327.00 5.00 161012 UTA 1998 03 18 23 15 00 4723-91 P co2 CCGG 370.070 0.073 ... L3 1998 04 01 14 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 161013 UTA 1998 03 18 23 15 00 4724-91 P co2 CCGG 370.100 0.073 ... L3 1998 04 01 14 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 161014 UTA 1998 03 24 20 40 00 4529-91 P co2 CCGG 367.850 0.073 ... L3 1998 04 01 15 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 161015 UTA 1998 03 24 20 40 00 4530-91 P co2 CCGG 367.820 0.073 ... L3 1998 04 01 15 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 161016 UTA 1998 04 05 23 50 00 4351-91 P co2 CCGG 369.290 0.073 ... L3 1998 04 20 10 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 161017 UTA 1998 04 05 23 50 00 4352-91 P co2 CCGG 369.340 0.073 ... L3 1998 04 20 10 33 00 39.9018 -113.7181 1332.00 1327.00 5.00 161018 UTA 1998 04 13 01 20 00 1727-91 P co2 CCGG 371.800 0.073 ... L3 1998 04 20 10 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 161019 UTA 1998 04 13 01 20 00 1728-91 P co2 CCGG 371.790 0.073 ... L3 1998 04 20 11 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 161020 UTA 1998 04 19 16 25 00 269-91 P co2 CCGG 367.810 0.073 ... L3 1998 05 06 12 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 161021 UTA 1998 04 19 16 25 00 270-91 P co2 CCGG 367.650 0.073 ... L3 1998 05 06 12 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 161022 UTA 1998 04 28 02 20 00 139-91 P co2 CCGG 371.510 0.073 ... L3 1998 05 06 12 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 161023 UTA 1998 04 28 02 20 00 140-91 P co2 CCGG 371.420 0.073 ... L3 1998 05 06 13 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 161024 UTA 1998 05 01 17 30 00 1227-91 P co2 CCGG 365.570 0.073 ... L3 1998 05 15 10 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 161025 UTA 1998 05 01 17 30 00 1228-91 P co2 CCGG 365.900 0.073 ... L3 1998 05 15 11 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 161026 UTA 1998 05 08 23 30 00 75-91 P co2 CCGG 363.480 0.073 +.. L3 1998 05 15 09 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 161027 UTA 1998 05 08 23 30 00 76-91 P co2 CCGG 362.790 0.073 -.. L3 1998 05 15 09 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 161028 UTA 1998 05 20 00 12 00 623-91 P co2 CCGG 366.720 0.073 ... L3 1998 06 02 12 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 161029 UTA 1998 05 20 00 12 00 624-91 P co2 CCGG 366.510 0.073 ... L3 1998 06 02 12 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 161030 UTA 1998 05 27 16 30 00 4075-91 P co2 CCGG 365.490 0.073 ... L3 1998 06 22 10 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 161031 UTA 1998 05 27 16 30 00 4076-91 P co2 CCGG 365.500 0.073 ... L3 1998 06 22 11 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 161032 UTA 1998 06 05 17 00 00 1639-91 P co2 CCGG 365.930 0.073 ... L3 1998 06 22 10 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 161033 UTA 1998 06 05 17 00 00 1640-91 P co2 CCGG 366.160 0.073 ... L3 1998 06 22 10 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 161034 UTA 1998 06 13 18 40 00 5-91 P co2 CCGG 364.920 0.073 +.. L3 1998 06 25 16 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 161035 UTA 1998 06 13 18 40 00 6-91 P co2 CCGG 364.090 0.073 -.. L3 1998 06 25 16 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 161036 UTA 1998 06 19 21 15 00 663-91 P co2 CCGG 365.300 0.073 ... L3 1998 06 25 15 37 00 39.9018 -113.7181 1332.00 1327.00 5.00 161037 UTA 1998 06 19 21 15 00 664-91 P co2 CCGG 364.800 0.073 ... L3 1998 06 25 15 51 00 39.9018 -113.7181 1332.00 1327.00 5.00 161038 UTA 1998 06 27 16 10 00 621-91 P co2 CCGG 361.020 0.073 -.. L3 1998 07 21 12 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 161039 UTA 1998 06 27 16 10 00 622-91 P co2 CCGG 361.860 0.073 +.. L3 1998 07 21 12 24 00 39.9018 -113.7181 1332.00 1327.00 5.00 161040 UTA 1998 07 13 18 10 00 4427-91 P co2 CCGG 366.580 0.073 ... L3 1998 07 21 11 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 161041 UTA 1998 07 13 18 10 00 4428-91 P co2 CCGG 366.650 0.073 ... L3 1998 07 21 11 57 00 39.9018 -113.7181 1332.00 1327.00 5.00 161042 UTA 1998 07 21 00 30 00 1727-91 P co2 CCGG 370.340 0.073 .X. L3 1998 08 05 14 39 00 39.9018 -113.7181 1332.00 1327.00 5.00 161043 UTA 1998 07 21 00 30 00 1728-91 P co2 CCGG 370.430 0.073 .X. L3 1998 08 05 14 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 161044 UTA 1998 07 27 01 50 00 353-91 P co2 CCGG 364.030 0.073 ... L3 1998 08 05 15 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 161045 UTA 1998 07 27 01 50 00 354-91 P co2 CCGG 364.280 0.073 ... L3 1998 08 05 15 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 161046 UTA 1998 08 11 23 30 00 1141-91 P co2 CCGG 361.150 0.073 ... L3 1998 08 28 12 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 161047 UTA 1998 08 11 23 30 00 1142-91 P co2 CCGG 361.360 0.073 ... L3 1998 08 28 12 24 00 39.9018 -113.7181 1332.00 1327.00 5.00 161048 UTA 1998 08 19 23 25 00 1501-91 P co2 CCGG 364.040 0.073 ... L3 1998 08 28 14 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 161049 UTA 1998 08 19 23 25 00 1502-91 P co2 CCGG 364.330 0.073 ... L3 1998 08 28 14 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 161050 UTA 1998 08 25 15 00 00 1949-91 P co2 CCGG 358.130 0.073 ... L3 1998 09 14 11 21 00 39.9018 -113.7181 1332.00 1327.00 5.00 161051 UTA 1998 08 25 15 00 00 1950-91 P co2 CCGG 357.970 0.073 ... L3 1998 09 14 11 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 161052 UTA 1998 09 08 00 35 00 4407-91 P co2 CCGG 366.070 0.073 ... L3 1998 09 14 13 41 00 39.9018 -113.7181 1332.00 1327.00 5.00 161053 UTA 1998 09 08 00 35 00 4408-91 P co2 CCGG 366.180 0.073 ... L3 1998 09 14 13 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 161054 UTA 1998 09 16 20 00 00 1711-91 P co2 CCGG 363.350 0.073 -.. L3 1998 10 02 13 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 161055 UTA 1998 09 16 20 00 00 1712-91 P co2 CCGG 364.320 0.073 +.. L3 1998 10 02 13 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 161056 UTA 1998 09 25 21 35 00 199-91 P co2 CCGG 363.640 0.073 ... L3 1998 10 02 13 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 161057 UTA 1998 09 25 21 35 00 200-91 P co2 CCGG 363.790 0.073 ... L3 1998 10 02 13 17 00 39.9018 -113.7181 1332.00 1327.00 5.00 161058 UTA 1998 10 05 17 30 00 4015-91 P co2 CCGG 362.910 0.073 -.. L3 1998 10 21 11 39 00 39.9018 -113.7181 1332.00 1327.00 5.00 161059 UTA 1998 10 05 17 30 00 4016-91 P co2 CCGG 363.450 0.073 +.. L3 1998 10 21 11 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 161060 UTA 1998 10 15 17 00 00 1753-91 P co2 CCGG 365.760 0.073 ... L3 1998 10 21 11 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 161061 UTA 1998 10 15 17 00 00 1754-91 P co2 CCGG 365.680 0.073 ... L3 1998 10 21 11 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 161062 UTA 1998 10 21 15 20 00 525-91 P co2 CCGG 367.030 0.073 ... L3 1998 11 10 11 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 161063 UTA 1998 10 21 15 20 00 526-91 P co2 CCGG 367.120 0.073 ... L3 1998 11 10 11 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 161064 UTA 1998 10 30 00 30 00 457-91 P co2 CCGG 369.060 0.073 ... L3 1998 11 10 12 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 161065 UTA 1998 10 30 00 30 00 458-91 P co2 CCGG 369.330 0.073 ... L3 1998 11 10 13 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 161066 UTA 1998 11 05 22 10 00 1451-91 P co2 CCGG 366.410 0.073 ... L3 1998 11 23 09 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 161067 UTA 1998 11 05 22 10 00 1452-91 P co2 CCGG 366.310 0.073 ... L3 1998 11 23 09 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 161068 UTA 1998 11 13 23 55 00 841-91 P co2 CCGG 369.660 0.073 ... L3 1998 11 23 11 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 161069 UTA 1998 11 13 23 55 00 842-91 P co2 CCGG 369.720 0.073 ... L3 1998 11 23 12 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 161070 UTA 1998 11 22 22 05 00 1587-91 P co2 CCGG 367.940 0.073 ... L3 1998 12 10 09 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 161071 UTA 1998 11 22 22 05 00 1588-91 P co2 CCGG 367.810 0.073 ... L3 1998 12 10 09 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 161072 UTA 1998 12 01 18 30 00 1617-91 P co2 CCGG 368.490 0.073 ... L3 1998 12 10 09 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 161073 UTA 1998 12 01 18 30 00 1618-91 P co2 CCGG 368.530 0.073 ... L3 1998 12 10 09 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 161074 UTA 1998 12 12 21 45 00 1735-91 P co2 CCGG 371.640 0.073 ... L3 1999 01 05 14 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 161075 UTA 1998 12 12 21 45 00 1736-91 P co2 CCGG 371.880 0.073 ... L3 1999 01 05 15 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 161076 UTA 1998 12 21 18 45 00 1921-91 P co2 CCGG 374.470 0.073 ... L3 1999 01 05 15 17 00 39.9018 -113.7181 1332.00 1327.00 5.00 161077 UTA 1998 12 21 18 45 00 1922-91 P co2 CCGG 374.370 0.073 ... L3 1999 01 05 15 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 161078 UTA 1998 12 29 23 25 00 1237-91 P co2 CCGG 369.140 0.073 ... L3 1999 01 20 14 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 161079 UTA 1998 12 29 23 25 00 1238-91 P co2 CCGG 369.230 0.073 ... L3 1999 01 20 14 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 161080 UTA 1999 01 04 17 15 00 1081-91 P co2 CCGG 371.480 0.073 ... L3 1999 01 20 14 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 161081 UTA 1999 01 04 17 15 00 1082-91 P co2 CCGG 371.590 0.073 ... L3 1999 01 20 15 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 161082 UTA 1999 01 11 16 15 00 107-98 P co2 CCGG 370.760 0.073 ... L3 1999 02 01 15 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 161083 UTA 1999 01 11 16 15 00 108-98 P co2 CCGG 370.740 0.073 ... L3 1999 02 01 15 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 161084 UTA 1999 01 20 00 10 00 25-98 P co2 CCGG 371.720 0.073 ... L3 1999 02 01 15 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 161085 UTA 1999 01 20 00 10 00 26-98 P co2 CCGG 371.690 0.073 ... L3 1999 02 01 15 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 161086 UTA 1999 01 25 17 40 00 35-98 P co2 CCGG 376.000 0.073 ... L3 1999 02 11 11 55 00 39.9018 -113.7181 1332.00 1327.00 5.00 161087 UTA 1999 01 25 17 40 00 36-98 P co2 CCGG 375.920 0.073 ... L3 1999 02 11 12 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 161088 UTA 1999 02 03 17 40 00 1429-91 P co2 CCGG 372.500 0.073 ... L3 1999 02 11 14 41 00 39.9018 -113.7181 1332.00 1327.00 5.00 161089 UTA 1999 02 03 17 40 00 1430-91 P co2 CCGG 372.610 0.073 ... L3 1999 02 11 14 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 161090 UTA 1999 02 08 18 00 00 4101-91 P co2 CCGG 371.810 0.073 ... L3 1999 02 25 11 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 161091 UTA 1999 02 08 18 00 00 4102-91 P co2 CCGG 371.850 0.073 ... L3 1999 02 25 11 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 161092 UTA 1999 02 17 17 35 00 4435-91 P co2 CCGG 371.740 0.073 ... L3 1999 02 25 13 36 00 39.9018 -113.7181 1332.00 1327.00 5.00 161093 UTA 1999 02 17 17 35 00 4436-91 P co2 CCGG 371.750 0.073 ... L3 1999 02 25 13 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 161094 UTA 1999 02 24 17 20 00 1911-91 P co2 CCGG 371.770 0.073 ... L3 1999 03 16 11 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 161095 UTA 1999 02 24 17 20 00 1912-91 P co2 CCGG 371.800 0.073 ... L3 1999 03 16 11 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 161096 UTA 1999 03 03 17 20 00 1919-91 P co2 CCGG 372.070 0.073 ... L3 1999 03 16 09 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 161097 UTA 1999 03 03 17 20 00 1920-91 P co2 CCGG 372.060 0.073 ... L3 1999 03 16 09 41 00 39.9018 -113.7181 1332.00 1327.00 5.00 161098 UTA 1999 03 10 18 00 00 1039-91 P co2 CCGG 372.620 0.073 ... L3 1999 03 25 12 51 00 39.9018 -113.7181 1332.00 1327.00 5.00 161099 UTA 1999 03 10 18 00 00 1040-91 P co2 CCGG 372.560 0.073 ... L3 1999 03 25 13 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 161100 UTA 1999 03 17 18 20 00 4001-91 P co2 CCGG 372.440 0.073 ... L3 1999 03 25 14 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 161101 UTA 1999 03 17 18 20 00 4002-91 P co2 CCGG 372.390 0.073 ... L3 1999 03 25 14 27 00 39.9018 -113.7181 1332.00 1327.00 5.00 161102 UTA 1999 03 24 17 00 00 55-91 P co2 CCGG 373.130 0.073 ... L3 1999 04 08 15 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 161103 UTA 1999 03 24 17 00 00 56-91 P co2 CCGG 373.270 0.073 ... L3 1999 04 08 15 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 161104 UTA 1999 04 01 23 05 00 37-98 P co2 CCGG 373.990 0.073 ... L3 1999 04 08 14 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 161105 UTA 1999 04 01 23 05 00 38-98 P co2 CCGG 374.230 0.073 ... L3 1999 04 08 14 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 161106 UTA 1999 04 07 15 35 00 69-91 P co2 CCGG 373.380 0.073 ... L3 1999 04 20 09 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 161107 UTA 1999 04 07 15 35 00 70-91 P co2 CCGG 373.270 0.073 ... L3 1999 04 20 09 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 161108 UTA 1999 04 13 23 30 00 1193-91 P co2 CCGG 371.840 0.073 ... L3 1999 04 20 10 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 161109 UTA 1999 04 13 23 30 00 1194-91 P co2 CCGG 371.700 0.073 ... L3 1999 04 20 10 23 00 39.9018 -113.7181 1332.00 1327.00 5.00 161110 UTA 1999 04 19 16 20 00 100-98 P co2 CCGG 370.030 0.073 ... L3 1999 05 11 13 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 161112 UTA 1999 04 19 16 20 00 99-98 P co2 CCGG 370.040 0.073 ... L3 1999 05 11 13 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 161111 UTA 1999 04 27 17 05 00 1911-91 P co2 CCGG 370.350 0.073 ... L3 1999 05 11 12 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 161113 UTA 1999 04 27 17 05 00 1912-91 P co2 CCGG 370.640 0.073 ... L3 1999 05 11 12 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 161114 UTA 1999 05 03 16 05 00 4105-91 P co2 CCGG 371.220 0.073 ... L3 1999 05 21 13 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 161115 UTA 1999 05 03 16 05 00 4106-91 P co2 CCGG 371.710 0.073 ... L3 1999 05 21 14 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 161116 UTA 1999 05 10 15 00 00 761-91 P co2 CCGG 371.580 0.073 ... L3 1999 05 21 12 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 161117 UTA 1999 05 10 15 00 00 762-91 P co2 CCGG 371.910 0.073 ... L3 1999 05 21 12 39 00 39.9018 -113.7181 1332.00 1327.00 5.00 161118 UTA 1999 05 18 16 40 00 4199-91 P co2 CCGG 367.700 0.073 ... L3 1999 06 04 15 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 161119 UTA 1999 05 18 16 40 00 4200-91 P co2 CCGG 368.010 0.073 ... L3 1999 06 04 15 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 161120 UTA 1999 05 24 17 25 00 53-98 P co2 CCGG 369.800 0.073 ... L3 1999 06 07 10 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 161121 UTA 1999 06 02 03 35 00 1709-91 P co2 CCGG 373.690 0.073 ... L3 1999 06 14 15 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 161122 UTA 1999 06 02 03 35 00 1710-91 P co2 CCGG 373.660 0.073 ... L3 1999 06 14 15 39 00 39.9018 -113.7181 1332.00 1327.00 5.00 161123 UTA 1999 06 08 15 25 00 4315-91 P co2 CCGG 368.010 0.073 ... L3 1999 06 14 15 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 161124 UTA 1999 06 08 15 25 00 4316-91 P co2 CCGG 368.410 0.073 ... L3 1999 06 14 16 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 161125 UTA 1999 06 13 22 55 00 4239-91 P co2 CCGG 363.000 0.073 -.. L3 1999 07 07 09 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 161126 UTA 1999 06 13 22 55 00 4240-91 P co2 CCGG 363.680 0.073 +.. L3 1999 07 07 09 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 161127 UTA 1999 06 21 17 35 00 1843-91 P co2 CCGG 369.030 0.073 ... L3 1999 07 07 09 17 00 39.9018 -113.7181 1332.00 1327.00 5.00 161128 UTA 1999 06 21 17 35 00 1844-91 P co2 CCGG 369.450 0.073 ... L3 1999 07 07 09 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 161129 UTA 1999 06 28 19 20 00 1923-91 P co2 CCGG 361.230 0.073 -.. L3 1999 07 16 15 27 00 39.9018 -113.7181 1332.00 1327.00 5.00 161130 UTA 1999 06 28 19 20 00 1924-91 P co2 CCGG 361.850 0.073 +.. L3 1999 07 16 15 41 00 39.9018 -113.7181 1332.00 1327.00 5.00 161131 UTA 1999 07 06 02 40 00 215-91 P co2 CCGG 378.680 0.073 .X. L3 1999 07 16 14 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 161132 UTA 1999 07 06 02 40 00 216-91 P co2 CCGG 378.680 0.073 .X. L3 1999 07 16 14 17 00 39.9018 -113.7181 1332.00 1327.00 5.00 161133 UTA 1999 07 13 22 00 00 1035-91 P co2 CCGG 360.080 0.073 -.. L3 1999 08 02 11 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 161134 UTA 1999 07 13 22 00 00 1036-91 P co2 CCGG 362.230 0.073 +.. L3 1999 08 02 12 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 161135 UTA 1999 07 19 20 00 00 4237-91 P co2 CCGG 367.350 0.073 ... L3 1999 08 02 09 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 161136 UTA 1999 07 19 20 00 00 4238-91 P co2 CCGG 367.240 0.073 ... L3 1999 08 02 09 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 161137 UTA 1999 07 30 18 20 00 309-91 P co2 CCGG 367.040 0.073 ... L3 1999 08 20 15 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 161138 UTA 1999 07 30 18 20 00 310-91 P co2 CCGG 367.030 0.073 ... L3 1999 08 20 15 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 161139 UTA 1999 08 12 01 45 00 1757-91 P co2 CCGG 372.060 0.073 ... L3 1999 08 20 15 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 161140 UTA 1999 08 12 01 45 00 1758-91 P co2 CCGG 371.880 0.073 ... L3 1999 08 20 15 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 161141 UTA 1999 08 18 22 30 00 1487-91 P co2 CCGG 366.160 0.073 +.. L3 1999 09 02 13 49 00 39.9018 -113.7181 1332.00 1327.00 5.00 161142 UTA 1999 08 18 22 30 00 1488-91 P co2 CCGG 365.430 0.073 -.. L3 1999 09 02 14 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 161143 UTA 1999 08 25 06 50 00 313-91 P co2 CCGG 366.510 0.073 ... L3 1999 09 02 13 21 00 39.9018 -113.7181 1332.00 1327.00 5.00 161144 UTA 1999 08 25 06 50 00 314-91 P co2 CCGG 366.070 0.073 ... L3 1999 09 02 13 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 161145 UTA 1999 09 03 15 45 00 271-91 P co2 CCGG 360.970 0.073 +.. L3 1999 09 13 15 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 161146 UTA 1999 09 03 15 45 00 272-91 P co2 CCGG 360.360 0.073 -.. L3 1999 09 13 15 17 00 39.9018 -113.7181 1332.00 1327.00 5.00 161147 UTA 1999 09 13 20 20 00 731-91 P co2 CCGG 358.240 0.073 ... L3 1999 10 01 14 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 161148 UTA 1999 09 13 20 20 00 732-91 P co2 CCGG 358.120 0.073 ... L3 1999 10 01 14 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 161149 UTA 1999 09 21 15 40 00 1183-91 P co2 CCGG 365.850 0.073 +.. L3 1999 10 01 15 39 00 39.9018 -113.7181 1332.00 1327.00 5.00 161150 UTA 1999 09 21 15 40 00 1184-91 P co2 CCGG 364.970 0.073 -.. L3 1999 10 01 15 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 161151 UTA 1999 09 30 22 35 00 44-98 P co2 CCGG 363.270 0.073 ... L3 1999 10 21 11 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 161152 UTA 1999 10 10 21 10 00 97-98 P co2 CCGG 365.250 0.073 ... L3 1999 10 21 09 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 161153 UTA 1999 10 10 21 10 00 98-98 P co2 CCGG 365.300 0.073 ... L3 1999 10 21 09 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 161154 UTA 1999 10 18 23 50 00 1725-91 P co2 CCGG 367.260 0.073 ... L3 1999 11 02 10 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 161155 UTA 1999 10 18 23 50 00 1726-91 P co2 CCGG 366.930 0.073 ... L3 1999 11 02 10 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 161156 UTA 1999 10 24 20 55 00 189-98 P co2 CCGG 366.150 0.073 ... L3 1999 11 02 09 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 161157 UTA 1999 10 24 20 55 00 190-98 P co2 CCGG 366.200 0.073 ... L3 1999 11 02 09 49 00 39.9018 -113.7181 1332.00 1327.00 5.00 161158 UTA 1999 11 04 00 38 00 4513-91 P co2 CCGG 369.700 0.073 ... L3 1999 11 23 14 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 161159 UTA 1999 11 04 00 38 00 4514-91 P co2 CCGG 369.240 0.073 ... L3 1999 11 23 14 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 161160 UTA 1999 11 10 23 30 00 139-98 P co2 CCGG 369.710 0.073 ... L3 1999 11 23 13 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 161161 UTA 1999 11 10 23 30 00 140-98 P co2 CCGG 369.640 0.073 ... L3 1999 11 23 14 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 161162 UTA 1999 11 18 00 00 00 4611-91 P co2 CCGG 369.290 0.073 ... L3 1999 12 14 12 49 00 39.9018 -113.7181 1332.00 1327.00 5.00 161163 UTA 1999 11 18 00 00 00 4612-91 P co2 CCGG 369.340 0.073 ... L3 1999 12 14 13 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 161164 UTA 1999 11 23 21 10 00 4237-91 P co2 CCGG 371.760 0.073 ... L3 1999 12 14 11 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 161165 UTA 1999 11 23 21 10 00 4238-91 P co2 CCGG 371.510 0.073 ... L3 1999 12 14 11 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 161166 UTA 1999 11 30 19 52 00 189-98 P co2 CCGG 368.800 0.073 ... L3 1999 12 21 12 57 00 39.9018 -113.7181 1332.00 1327.00 5.00 161167 UTA 1999 11 30 19 52 00 190-98 P co2 CCGG 368.760 0.073 ... L3 1999 12 21 13 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 161168 UTA 1999 12 06 17 20 00 1569-91 P co2 CCGG 371.090 0.073 ... L3 1999 12 21 10 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 161169 UTA 1999 12 06 17 20 00 1570-91 P co2 CCGG 371.050 0.073 ... L3 1999 12 21 11 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 161170 UTA 1999 12 13 22 20 00 4331-91 P co2 CCGG 371.660 0.073 ... L3 1999 12 28 11 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 161171 UTA 1999 12 13 22 20 00 4332-91 P co2 CCGG 371.440 0.073 ... L3 1999 12 28 11 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 161172 UTA 1999 12 20 00 25 00 4623-91 P co2 CCGG 373.820 0.073 ... L3 1999 12 28 11 55 00 39.9018 -113.7181 1332.00 1327.00 5.00 161173 UTA 1999 12 20 00 25 00 4624-91 P co2 CCGG 373.730 0.073 ... L3 1999 12 28 12 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 161174 UTA 1999 12 27 20 35 00 1043-91 P co2 CCGG 373.620 0.073 ... L3 2000 01 20 14 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 161175 UTA 1999 12 27 20 35 00 1044-91 P co2 CCGG 373.410 0.073 ... L3 2000 01 20 14 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 161176 UTA 2000 01 06 00 15 00 191-98 P co2 CCGG 371.210 0.073 ... L3 2000 01 20 13 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 161177 UTA 2000 01 06 00 15 00 192-98 P co2 CCGG 371.180 0.073 ... L3 2000 01 20 13 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 161178 UTA 2000 01 11 22 20 00 597-91 P co2 CCGG 369.650 0.073 ... L3 2000 01 26 13 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 161179 UTA 2000 01 11 22 20 00 598-91 P co2 CCGG 369.710 0.073 ... L3 2000 01 26 13 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 161180 UTA 2000 01 19 18 40 00 165-98 P co2 CCGG 372.340 0.073 ... L3 2000 01 26 13 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 161181 UTA 2000 01 19 18 40 00 166-98 P co2 CCGG 372.510 0.073 ... L3 2000 01 26 13 57 00 39.9018 -113.7181 1332.00 1327.00 5.00 161182 UTA 2000 01 27 17 05 00 1663-91 P co2 CCGG 372.920 0.073 ... L3 2000 02 15 11 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 161183 UTA 2000 01 27 17 05 00 1664-91 P co2 CCGG 373.030 0.073 ... L3 2000 02 15 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 161184 UTA 2000 02 04 16 50 00 1993-91 P co2 CCGG 374.830 0.073 ... L3 2000 02 15 10 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 161185 UTA 2000 02 04 16 50 00 1994-91 P co2 CCGG 374.890 0.073 ... L3 2000 02 15 11 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 161186 UTA 2000 02 09 21 00 00 2041-91 P co2 CCGG 374.990 0.073 ... L3 2000 02 25 09 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 161187 UTA 2000 02 09 21 00 00 2042-91 P co2 CCGG 374.830 0.073 ... L3 2000 02 25 10 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 161188 UTA 2000 02 17 17 50 00 373-91 P co2 CCGG 374.570 0.073 ... L3 2000 02 25 10 25 00 39.9018 -113.7181 1332.00 1327.00 5.00 161189 UTA 2000 02 17 17 50 00 374-91 P co2 CCGG 374.510 0.073 ... L3 2000 02 25 10 38 00 39.9018 -113.7181 1332.00 1327.00 5.00 161190 UTA 2000 02 25 22 33 00 113-98 P co2 CCGG 374.110 0.073 ... L3 2000 03 13 12 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 161191 UTA 2000 02 25 22 33 00 114-98 P co2 CCGG 373.960 0.073 ... L3 2000 03 13 12 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 161192 UTA 2000 03 03 21 05 00 4709-91 P co2 CCGG 374.150 0.073 ... L3 2000 03 13 13 37 00 39.9018 -113.7181 1332.00 1327.00 5.00 161193 UTA 2000 03 03 21 05 00 4710-91 P co2 CCGG 374.150 0.073 ... L3 2000 03 13 13 51 00 39.9018 -113.7181 1332.00 1327.00 5.00 161194 UTA 2000 03 11 22 25 00 94-98 P co2 CCGG 374.330 0.073 ... L3 2000 03 29 12 17 00 39.9018 -113.7181 1332.00 1327.00 5.00 161195 UTA 2000 03 20 18 10 00 1131-91 P co2 CCGG 375.000 0.073 ... L3 2000 03 29 10 25 00 39.9018 -113.7181 1332.00 1327.00 5.00 161196 UTA 2000 03 20 18 10 00 1132-91 P co2 CCGG 374.920 0.073 ... L3 2000 03 29 10 38 00 39.9018 -113.7181 1332.00 1327.00 5.00 161197 UTA 2000 03 28 17 26 00 1683-91 P co2 CCGG 373.430 0.073 ... L3 2000 04 12 14 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 161198 UTA 2000 03 28 17 26 00 1684-91 P co2 CCGG 373.420 0.073 ... L3 2000 04 12 14 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 161199 UTA 2000 04 04 20 30 00 1317-91 P co2 CCGG 373.480 0.073 ... L3 2000 04 12 15 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 161200 UTA 2000 04 04 20 30 00 1318-91 P co2 CCGG 373.520 0.073 ... L3 2000 04 12 15 19 00 39.9018 -113.7181 1332.00 1327.00 5.00 161201 UTA 2000 04 11 20 25 00 4069-91 P co2 CCGG 372.270 0.073 ... L3 2000 04 27 14 23 00 39.9018 -113.7181 1332.00 1327.00 5.00 161202 UTA 2000 04 11 20 25 00 4070-91 P co2 CCGG 372.270 0.073 ... L3 2000 04 27 14 36 00 39.9018 -113.7181 1332.00 1327.00 5.00 161203 UTA 2000 04 17 20 45 00 1631-91 P co2 CCGG 371.850 0.073 ... L3 2000 04 27 14 49 00 39.9018 -113.7181 1332.00 1327.00 5.00 161204 UTA 2000 04 17 20 45 00 1632-91 P co2 CCGG 371.860 0.073 ... L3 2000 04 27 15 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 161205 UTA 2000 04 28 16 45 00 123-91 P co2 CCGG 372.670 0.073 ... L3 2000 05 18 12 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 161206 UTA 2000 04 28 16 45 00 124-91 P co2 CCGG 372.440 0.073 ... L3 2000 05 18 12 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 161207 UTA 2000 05 08 15 45 00 4023-91 P co2 CCGG 373.330 0.073 ... L3 2000 05 18 11 19 00 39.9018 -113.7181 1332.00 1327.00 5.00 161208 UTA 2000 05 08 15 45 00 4024-91 P co2 CCGG 372.930 0.073 ... L3 2000 05 18 11 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 161209 UTA 2000 05 23 17 00 00 553-91 P co2 CCGG 367.640 0.073 +.. L3 2000 06 06 12 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 161210 UTA 2000 05 23 17 00 00 554-91 P co2 CCGG 366.880 0.073 -.. L3 2000 06 06 12 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 161211 UTA 2000 05 29 15 15 00 4939-91 P co2 CCGG 371.700 0.073 ... L3 2000 06 06 13 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 161212 UTA 2000 05 29 15 15 00 4940-91 P co2 CCGG 371.650 0.073 ... L3 2000 06 06 14 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 161213 UTA 2000 06 06 22 30 00 1003-91 P co2 CCGG 370.400 0.073 ... L3 2000 06 21 12 49 00 39.9018 -113.7181 1332.00 1327.00 5.00 161214 UTA 2000 06 06 22 30 00 1004-91 P co2 CCGG 370.410 0.073 ... L3 2000 06 21 13 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 161215 UTA 2000 06 13 00 00 00 1511-91 P co2 CCGG 368.920 0.073 +.. L3 2000 06 21 13 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 161216 UTA 2000 06 13 00 00 00 1512-91 P co2 CCGG 368.190 0.073 -.. L3 2000 06 21 13 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 161217 UTA 2000 06 20 22 15 00 4129-91 P co2 CCGG 363.190 0.073 -.. L3 2000 07 10 12 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 161218 UTA 2000 06 20 22 15 00 4130-91 P co2 CCGG 364.280 0.073 +.. L3 2000 07 10 12 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 161219 UTA 2000 07 01 17 15 00 4139-91 P co2 CCGG 371.540 0.073 ... L3 2000 07 10 10 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 161220 UTA 2000 07 01 17 15 00 4140-91 P co2 CCGG 371.790 0.073 ... L3 2000 07 10 10 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 161221 UTA 2000 07 10 02 00 00 4045-91 P co2 CCGG 369.910 0.073 ... L3 2000 07 21 13 41 00 39.9018 -113.7181 1332.00 1327.00 5.00 161222 UTA 2000 07 10 02 00 00 4046-91 P co2 CCGG 370.230 0.073 ... L3 2000 07 21 13 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 161223 UTA 2000 07 17 02 30 00 4313-91 P co2 CCGG 372.790 0.073 ... L3 2000 07 21 14 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 161224 UTA 2000 07 17 02 30 00 4314-91 P co2 CCGG 372.760 0.073 ... L3 2000 07 21 14 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 161225 UTA 2000 07 31 01 15 00 1179-91 P co2 CCGG 369.030 0.073 ... L3 2000 08 17 10 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 161226 UTA 2000 07 31 01 15 00 1180-91 P co2 CCGG 368.880 0.073 ... L3 2000 08 17 11 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 161227 UTA 2000 08 07 21 30 00 4559-91 P co2 CCGG 368.770 0.073 ... L3 2000 08 17 11 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 161228 UTA 2000 08 07 21 30 00 4560-91 P co2 CCGG 368.410 0.073 ... L3 2000 08 17 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 161229 UTA 2000 08 16 17 30 00 1725-91 P co2 CCGG 368.540 0.073 ... L3 2000 09 05 15 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 161230 UTA 2000 08 16 17 30 00 1726-91 P co2 CCGG 368.190 0.073 ... L3 2000 09 05 15 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 161231 UTA 2000 08 23 20 10 00 131-98 P co2 CCGG 365.280 0.073 ... L3 2000 09 05 14 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 161232 UTA 2000 08 23 20 10 00 132-98 P co2 CCGG 365.400 0.073 ... L3 2000 09 05 15 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 161233 UTA 2000 09 01 23 40 00 4731-91 P co2 CCGG 366.590 0.073 ... L3 2000 09 15 10 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 161234 UTA 2000 09 01 23 40 00 4732-91 P co2 CCGG 366.670 0.073 ... L3 2000 09 15 10 41 00 39.9018 -113.7181 1332.00 1327.00 5.00 161235 UTA 2000 09 07 00 00 00 1901-91 P co2 CCGG 361.480 0.073 ... L3 2000 09 15 11 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 161236 UTA 2000 09 14 16 40 00 4707-91 P co2 CCGG 368.170 0.073 ... L3 2000 09 28 14 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 161237 UTA 2000 09 14 16 40 00 4708-91 P co2 CCGG 368.500 0.073 ... L3 2000 09 28 14 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 161238 UTA 2000 09 21 22 00 00 4139-91 P co2 CCGG 364.540 0.073 ... L3 2000 09 28 14 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 161239 UTA 2000 09 21 22 00 00 4140-91 P co2 CCGG 364.630 0.073 ... L3 2000 09 28 14 19 00 39.9018 -113.7181 1332.00 1327.00 5.00 161240 UTA 2000 09 28 16 50 00 1267-91 P co2 CCGG 366.280 0.073 +.. L3 2000 10 12 12 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 161241 UTA 2000 09 28 16 50 00 1268-91 P co2 CCGG 364.550 0.073 -.. L3 2000 10 12 12 57 00 39.9018 -113.7181 1332.00 1327.00 5.00 161242 UTA 2000 10 04 16 40 00 613-91 P co2 CCGG 364.940 0.073 ... L3 2000 10 12 11 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 161243 UTA 2000 10 04 16 40 00 614-91 P co2 CCGG 365.300 0.073 ... L3 2000 10 12 11 39 00 39.9018 -113.7181 1332.00 1327.00 5.00 161244 UTA 2000 10 10 19 15 00 1027-91 P co2 CCGG 367.430 0.073 ... L3 2000 10 30 11 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 161245 UTA 2000 10 10 19 15 00 1028-91 P co2 CCGG 367.570 0.073 ... L3 2000 10 30 11 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 161246 UTA 2000 10 20 16 40 00 93-91 P co2 CCGG 368.570 0.073 ... L3 2000 10 30 10 49 00 39.9018 -113.7181 1332.00 1327.00 5.00 161247 UTA 2000 10 20 16 40 00 94-91 P co2 CCGG 368.480 0.073 ... L3 2000 10 30 11 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 161248 UTA 2000 10 26 17 40 00 663-91 P co2 CCGG 370.140 0.073 ... L3 2000 11 10 13 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 161249 UTA 2000 10 26 17 40 00 664-91 P co2 CCGG 370.160 0.073 ... L3 2000 11 10 13 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 161250 UTA 2000 11 02 21 00 00 4291-91 P co2 CCGG 371.160 0.073 ... L3 2000 11 10 10 39 00 39.9018 -113.7181 1332.00 1327.00 5.00 161251 UTA 2000 11 02 21 00 00 4292-91 P co2 CCGG 371.190 0.073 ... L3 2000 11 10 10 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 161252 UTA 2000 11 08 17 00 00 965-91 P co2 CCGG 372.980 0.073 ... L3 2000 11 21 13 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 161253 UTA 2000 11 08 17 00 00 966-91 P co2 CCGG 372.830 0.073 ... L3 2000 11 21 13 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 161254 UTA 2000 11 14 18 25 00 403-91 P co2 CCGG 372.860 0.073 ... L3 2000 11 21 13 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 161255 UTA 2000 11 14 18 25 00 404-91 P co2 CCGG 372.790 0.073 ... L3 2000 11 21 14 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 161256 UTA 2000 11 21 20 30 00 655-91 P co2 CCGG 375.620 0.073 ... L3 2000 12 06 13 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 161257 UTA 2000 11 21 20 30 00 656-91 P co2 CCGG 375.680 0.073 ... L3 2000 12 06 13 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 161258 UTA 2000 11 27 16 20 00 1467-91 P co2 CCGG 376.420 0.073 +.. L3 2000 12 06 12 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 161259 UTA 2000 11 27 16 20 00 1468-91 P co2 CCGG 375.710 0.073 -.. L3 2000 12 06 12 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 161260 UTA 2000 12 04 17 15 00 1025-91 P co2 CCGG 374.860 0.073 ... L3 2000 12 20 14 55 00 39.9018 -113.7181 1332.00 1327.00 5.00 161261 UTA 2000 12 04 17 15 00 1026-91 P co2 CCGG 374.820 0.073 ... L3 2000 12 20 15 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 161262 UTA 2000 12 12 21 15 00 4447-91 P co2 CCGG 373.660 0.073 ... L3 2000 12 20 14 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 161263 UTA 2000 12 12 21 15 00 4448-91 P co2 CCGG 373.690 0.073 ... L3 2000 12 20 14 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 161264 UTA 2000 12 18 20 35 00 1947-91 P co2 CCGG 374.370 0.073 ... L3 2001 01 10 08 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 161265 UTA 2000 12 18 20 35 00 1948-91 P co2 CCGG 374.360 0.073 ... L3 2001 01 10 08 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 161266 UTA 2000 12 29 19 20 00 1731-91 P co2 CCGG 377.240 0.073 ... L3 2001 01 10 10 55 00 39.9018 -113.7181 1332.00 1327.00 5.00 161267 UTA 2000 12 29 19 20 00 1732-91 P co2 CCGG 377.380 0.073 ... L3 2001 01 10 11 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 161268 UTA 2001 01 05 23 20 00 1861-91 P co2 CCGG 377.730 0.073 ... L3 2001 01 18 13 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 161269 UTA 2001 01 05 23 20 00 1862-91 P co2 CCGG 377.750 0.073 ... L3 2001 01 18 14 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 161270 UTA 2001 01 10 16 30 00 1229-91 P co2 CCGG 378.280 0.073 ... L3 2001 01 18 13 27 00 39.9018 -113.7181 1332.00 1327.00 5.00 161271 UTA 2001 01 10 16 30 00 1230-91 P co2 CCGG 378.330 0.073 ... L3 2001 01 18 13 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 161272 UTA 2001 01 20 18 50 00 4731-91 P co2 CCGG 374.230 0.073 ... L3 2001 02 06 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 161273 UTA 2001 01 20 18 50 00 4732-91 P co2 CCGG 374.230 0.073 ... L3 2001 02 06 12 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 161274 UTA 2001 01 26 16 30 00 1681-91 P co2 CCGG 375.440 0.073 ... L3 2001 02 06 11 36 00 39.9018 -113.7181 1332.00 1327.00 5.00 161275 UTA 2001 01 26 16 30 00 1682-91 P co2 CCGG 375.590 0.073 ... L3 2001 02 06 11 49 00 39.9018 -113.7181 1332.00 1327.00 5.00 161276 UTA 2001 02 02 20 05 00 278-99 P co2 CCGG 375.300 0.073 ... L3 2001 02 27 15 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 161277 UTA 2001 02 02 20 05 00 279-99 P co2 CCGG 375.320 0.073 ... L3 2001 02 27 15 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 161278 UTA 2001 02 09 16 45 00 277-99 P co2 CCGG 376.940 0.073 ... L3 2001 02 27 14 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 161279 UTA 2001 02 09 16 45 00 280-99 P co2 CCGG 377.030 0.073 ... L3 2001 02 27 14 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 161280 UTA 2001 02 16 18 10 00 361-91 P co2 CCGG 375.850 0.073 ... L3 2001 03 09 16 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 161281 UTA 2001 02 16 18 10 00 362-91 P co2 CCGG 375.650 0.073 ... L3 2001 03 09 16 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 161282 UTA 2001 02 25 00 20 00 93-91 P co2 CCGG 375.120 0.073 -.. L3 2001 03 09 15 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 161283 UTA 2001 02 25 00 20 00 94-91 P co2 CCGG 375.960 0.073 +.. L3 2001 03 09 15 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 161284 UTA 2001 03 06 00 50 00 1809-91 P co2 CCGG 375.130 0.073 ... L3 2001 03 23 11 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 161285 UTA 2001 03 06 00 50 00 1810-91 P co2 CCGG 375.360 0.073 ... L3 2001 03 23 11 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 161286 UTA 2001 03 14 23 00 00 221-99 P co2 CCGG 375.450 0.073 ... L3 2001 03 26 15 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 161287 UTA 2001 03 14 23 00 00 222-99 P co2 CCGG 375.470 0.073 ... L3 2001 03 26 15 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 161288 UTA 2001 03 21 19 10 00 555-91 P co2 CCGG 375.120 0.073 -.. L3 2001 04 05 11 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 161289 UTA 2001 03 21 19 10 00 556-91 P co2 CCGG 375.690 0.073 +.. L3 2001 04 05 11 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 161290 UTA 2001 03 28 16 40 00 1041-91 P co2 CCGG 374.400 0.073 ... L3 2001 04 05 09 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 161291 UTA 2001 03 28 16 40 00 1042-91 P co2 CCGG 374.330 0.073 ... L3 2001 04 05 10 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 161292 UTA 2001 04 03 16 45 00 1771-91 P co2 CCGG 374.910 0.073 ... L3 2001 04 20 10 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 161293 UTA 2001 04 03 16 45 00 1772-91 P co2 CCGG 375.010 0.073 ... L3 2001 04 20 10 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 161294 UTA 2001 04 09 16 00 00 2015-91 P co2 CCGG 376.430 0.073 ... L3 2001 04 20 09 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 161295 UTA 2001 04 09 16 00 00 2016-91 P co2 CCGG 376.490 0.073 ... L3 2001 04 20 10 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 161296 UTA 2001 04 14 17 00 00 4245-91 P co2 CCGG 374.290 0.073 ... L3 2001 04 30 15 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 161297 UTA 2001 04 14 17 00 00 4246-91 P co2 CCGG 374.470 0.073 ... L3 2001 04 30 15 19 00 39.9018 -113.7181 1332.00 1327.00 5.00 161298 UTA 2001 04 20 19 10 00 4163-91 P co2 CCGG 374.850 0.073 ... L3 2001 04 30 15 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 161299 UTA 2001 04 20 19 10 00 4164-91 P co2 CCGG 374.750 0.073 ... L3 2001 04 30 15 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 161300 UTA 2001 04 27 02 20 00 4277-91 P co2 CCGG 381.840 0.073 .X. L3 2001 05 11 10 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 161301 UTA 2001 04 27 02 20 00 4278-91 P co2 CCGG 382.290 0.073 .X. L3 2001 05 11 10 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 161302 UTA 2001 05 02 15 25 00 1319-91 P co2 CCGG 374.020 0.073 ... L3 2001 05 11 11 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 161303 UTA 2001 05 02 15 25 00 1320-91 P co2 CCGG 373.850 0.073 ... L3 2001 05 11 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 161304 UTA 2001 05 10 02 15 00 377-99 P co2 CCGG 377.940 0.073 ... L3 2001 05 24 13 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 161305 UTA 2001 05 10 02 15 00 378-99 P co2 CCGG 377.710 0.073 ... L3 2001 05 24 13 23 00 39.9018 -113.7181 1332.00 1327.00 5.00 161306 UTA 2001 05 15 17 20 00 375-99 P co2 CCGG 371.700 0.073 ... L3 2001 05 24 11 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 161307 UTA 2001 05 15 17 20 00 376-99 P co2 CCGG 371.680 0.073 ... L3 2001 05 24 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 161308 UTA 2001 05 22 13 20 00 1145-91 P co2 CCGG 402.770 0.073 +.. L3 2001 06 05 13 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 161309 UTA 2001 05 22 13 20 00 1146-91 P co2 CCGG 397.990 0.073 -.. L3 2001 06 05 13 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 161310 UTA 2001 05 29 15 30 00 85-98 P co2 CCGG 370.580 0.073 +.. L3 2001 06 05 12 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 161311 UTA 2001 05 29 15 30 00 86-98 P co2 CCGG 370.020 0.073 -.. L3 2001 06 05 12 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 161312 UTA 2001 06 04 15 35 00 171-98 P co2 CCGG 373.670 0.073 ... L3 2001 06 25 11 36 00 39.9018 -113.7181 1332.00 1327.00 5.00 161313 UTA 2001 06 04 15 35 00 172-98 P co2 CCGG 373.720 0.073 ... L3 2001 06 25 11 49 00 39.9018 -113.7181 1332.00 1327.00 5.00 161314 UTA 2001 06 12 21 10 00 4163-91 P co2 CCGG 371.320 0.073 ... L3 2001 06 25 11 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 161315 UTA 2001 06 12 21 10 00 4164-91 P co2 CCGG 371.300 0.073 ... L3 2001 06 25 11 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 161316 UTA 2001 06 21 21 45 00 353-91 P co2 CCGG 367.170 0.073 ... L3 2001 08 28 10 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 161317 UTA 2001 06 21 21 45 00 354-91 P co2 CCGG 366.770 0.073 ... L3 2001 08 28 11 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 161318 UTA 2001 06 30 15 45 00 1953-91 P co2 CCGG 371.270 0.073 +.. L3 2001 08 28 11 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 161319 UTA 2001 06 30 15 45 00 1954-91 P co2 CCGG 369.970 0.073 -.. L3 2001 08 28 11 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 161320 UTA 2001 07 09 15 50 00 1033-91 P co2 CCGG 383.920 0.073 .X. L3 2001 07 25 12 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 161321 UTA 2001 07 09 15 50 00 1034-91 P co2 CCGG 383.570 0.073 .X. L3 2001 07 25 13 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 161322 UTA 2001 07 17 18 35 00 4455-91 P co2 CCGG 363.860 0.073 +.. L3 2001 07 25 14 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 161323 UTA 2001 07 17 18 35 00 4456-91 P co2 CCGG 361.790 0.073 -.. L3 2001 07 25 14 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 161324 UTA 2001 07 24 16 10 00 1505-91 P co2 CCGG 367.810 0.073 ... L3 2001 08 07 16 37 00 39.9018 -113.7181 1332.00 1327.00 5.00 161325 UTA 2001 07 30 18 05 00 127-98 P co2 CCGG 368.390 0.073 ... L3 2001 08 07 16 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 161326 UTA 2001 07 30 18 05 00 128-98 P co2 CCGG 368.510 0.073 ... L3 2001 08 07 16 24 00 39.9018 -113.7181 1332.00 1327.00 5.00 161327 UTA 2001 08 07 00 15 00 423-99 P co2 CCGG 369.100 0.073 +.. L3 2001 08 27 17 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 161328 UTA 2001 08 07 00 15 00 424-99 P co2 CCGG 367.120 0.073 -.. L3 2001 08 27 17 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 161329 UTA 2001 08 19 01 00 00 425-99 P co2 CCGG 370.700 0.073 ... L3 2001 08 27 16 39 00 39.9018 -113.7181 1332.00 1327.00 5.00 161330 UTA 2001 08 19 01 00 00 426-99 P co2 CCGG 370.780 0.073 ... L3 2001 08 27 16 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 161331 UTA 2001 08 25 16 20 00 4713-91 P co2 CCGG 361.730 0.073 -.. L3 2001 09 19 13 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 161332 UTA 2001 08 25 16 20 00 4714-91 P co2 CCGG 362.390 0.073 +.. L3 2001 09 19 13 55 00 39.9018 -113.7181 1332.00 1327.00 5.00 161333 UTA 2001 09 05 18 55 00 1573-91 P co2 CCGG 364.790 0.073 +.. L3 2001 09 19 13 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 161334 UTA 2001 09 05 18 55 00 1574-91 P co2 CCGG 363.160 0.073 -.. L3 2001 09 19 13 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 161335 UTA 2001 09 10 19 35 00 4861-91 P co2 CCGG 365.710 0.073 ... L3 2001 09 26 09 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 161336 UTA 2001 09 10 19 35 00 4862-91 P co2 CCGG 365.420 0.073 ... L3 2001 09 26 09 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 161337 UTA 2001 09 17 16 00 00 4889-91 P co2 CCGG 367.640 0.073 +.. L3 2001 09 26 09 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 161338 UTA 2001 09 17 16 00 00 4890-91 P co2 CCGG 366.850 0.073 -.. L3 2001 09 26 09 57 00 39.9018 -113.7181 1332.00 1327.00 5.00 161339 UTA 2001 09 25 15 50 00 1473-91 P co2 CCGG 368.500 0.073 ... L3 2001 10 11 16 57 00 39.9018 -113.7181 1332.00 1327.00 5.00 161340 UTA 2001 09 25 15 50 00 1474-91 P co2 CCGG 368.390 0.073 ... L3 2001 10 11 17 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 161341 UTA 2001 10 02 15 35 00 1577-91 P co2 CCGG 358.470 0.073 -.. L3 2001 10 11 16 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 161342 UTA 2001 10 02 15 35 00 1578-91 P co2 CCGG 361.170 0.073 +.. L3 2001 10 11 16 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 161343 UTA 2001 10 11 16 00 00 4849-91 P co2 CCGG 368.530 0.073 ... L3 2001 10 25 16 23 00 39.9018 -113.7181 1332.00 1327.00 5.00 161344 UTA 2001 10 11 16 00 00 4850-91 P co2 CCGG 368.460 0.073 ... L3 2001 10 25 16 36 00 39.9018 -113.7181 1332.00 1327.00 5.00 161345 UTA 2001 10 18 01 06 00 403-91 P co2 CCGG 372.640 0.073 ... L3 2001 10 25 15 57 00 39.9018 -113.7181 1332.00 1327.00 5.00 161346 UTA 2001 10 18 01 06 00 404-91 P co2 CCGG 372.940 0.073 ... L3 2001 10 25 16 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 161347 UTA 2001 10 23 16 00 00 257-99 P co2 CCGG 366.400 0.073 ... L3 2001 11 14 10 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 161348 UTA 2001 10 23 16 00 00 258-99 P co2 CCGG 366.280 0.073 ... L3 2001 11 14 10 23 00 39.9018 -113.7181 1332.00 1327.00 5.00 161349 UTA 2001 10 29 16 45 00 4913-91 P co2 CCGG 368.080 0.073 ... L3 2001 11 14 10 37 00 39.9018 -113.7181 1332.00 1327.00 5.00 161350 UTA 2001 10 29 16 45 00 4914-91 P co2 CCGG 368.060 0.073 ... L3 2001 11 14 10 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 161351 UTA 2001 11 06 22 40 00 4393-91 P co2 CCGG 369.500 0.073 ... L3 2001 11 20 15 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 161352 UTA 2001 11 06 22 40 00 4394-91 P co2 CCGG 369.400 0.073 ... L3 2001 11 20 15 27 00 39.9018 -113.7181 1332.00 1327.00 5.00 161353 UTA 2001 11 13 19 45 00 577-91 P co2 CCGG 371.740 0.073 ... L3 2001 11 20 16 33 00 39.9018 -113.7181 1332.00 1327.00 5.00 161354 UTA 2001 11 13 19 45 00 578-91 P co2 CCGG 371.500 0.073 ... L3 2001 11 20 16 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 161355 UTA 2001 11 19 16 30 00 1627-91 P co2 CCGG 373.180 0.073 ... L3 2001 12 07 14 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 161356 UTA 2001 11 19 16 30 00 1628-91 P co2 CCGG 372.980 0.073 ... L3 2001 12 07 14 41 00 39.9018 -113.7181 1332.00 1327.00 5.00 161357 UTA 2001 11 26 23 30 00 4657-91 P co2 CCGG 375.480 0.073 ... L3 2001 12 07 13 36 00 39.9018 -113.7181 1332.00 1327.00 5.00 161358 UTA 2001 11 26 23 30 00 4658-91 P co2 CCGG 375.470 0.073 ... L3 2001 12 07 13 49 00 39.9018 -113.7181 1332.00 1327.00 5.00 161359 UTA 2001 12 05 19 30 00 4637-91 P co2 CCGG 374.600 0.073 ... L3 2002 01 02 11 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 161360 UTA 2001 12 05 19 30 00 4638-91 P co2 CCGG 374.640 0.073 ... L3 2002 01 02 12 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 161361 UTA 2001 12 14 23 00 00 4987-91 P co2 CCGG 376.600 0.073 ... L3 2001 12 28 15 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 161362 UTA 2001 12 14 23 00 00 4988-91 P co2 CCGG 376.940 0.073 ... L3 2001 12 28 16 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 161363 UTA 2001 12 28 17 40 00 443-91 P co2 CCGG 380.130 0.073 ... L3 2002 01 14 11 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 161364 UTA 2001 12 28 17 40 00 444-91 P co2 CCGG 380.290 0.073 ... L3 2002 01 14 12 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 161365 UTA 2002 01 05 17 25 00 497-99 P co2 CCGG 349.860 0.073 N.. L3 2002 01 14 11 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 161366 UTA 2002 01 05 17 25 00 497-99 P co2 CCGG 376.270 0.073 ... L3 2002 01 14 13 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 161366 UTA 2002 01 05 17 25 00 498-99 P co2 CCGG 376.350 0.073 ... L3 2002 01 14 11 17 00 39.9018 -113.7181 1332.00 1327.00 5.00 161367 UTA 2002 01 19 21 10 00 1037-91 P co2 CCGG 376.260 0.073 ... L3 2002 02 04 09 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 161368 UTA 2002 01 19 21 10 00 1038-91 P co2 CCGG 376.240 0.073 ... L3 2002 02 04 09 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 161369 UTA 2002 01 23 16 15 00 4073-91 P co2 CCGG 379.350 0.073 +.. L3 2002 02 04 09 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 161370 UTA 2002 01 23 16 15 00 4074-91 P co2 CCGG 378.420 0.073 -.. L3 2002 02 04 10 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 161371 UTA 2002 01 30 19 40 00 1845-91 P co2 CCGG 377.130 0.073 ... L3 2002 02 19 16 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 161372 UTA 2002 01 30 19 40 00 1846-91 P co2 CCGG 377.000 0.073 ... L3 2002 02 19 16 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 161373 UTA 2002 02 05 16 45 00 617-91 P co2 CCGG 379.220 0.073 ... L3 2002 02 20 10 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 161374 UTA 2002 02 05 16 45 00 618-91 P co2 CCGG 379.230 0.073 ... L3 2002 02 20 11 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 161375 UTA 2002 02 11 19 50 00 1009-91 P co2 CCGG 378.050 0.073 ... L3 2002 03 12 11 25 00 39.9018 -113.7181 1332.00 1327.00 5.00 161376 UTA 2002 02 11 19 50 00 1010-91 P co2 CCGG 378.030 0.073 ... L3 2002 03 12 11 38 00 39.9018 -113.7181 1332.00 1327.00 5.00 161377 UTA 2002 02 19 16 45 00 1723-91 P co2 CCGG 378.020 0.073 ... L3 2002 03 12 10 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 161378 UTA 2002 02 19 16 45 00 1724-91 P co2 CCGG 378.070 0.073 ... L3 2002 03 12 11 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 161379 UTA 2002 02 26 20 00 00 4275-91 P co2 CCGG 378.180 0.073 ... L3 2002 03 19 13 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 161380 UTA 2002 02 26 20 00 00 4276-91 P co2 CCGG 378.220 0.073 ... L3 2002 03 19 13 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 161381 UTA 2002 03 04 19 45 00 1145-91 P co2 CCGG 378.500 0.073 ... L3 2002 03 19 12 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 161382 UTA 2002 03 04 19 45 00 1146-91 P co2 CCGG 378.500 0.073 ... L3 2002 03 19 12 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 161383 UTA 2002 03 13 17 00 00 1187-91 P co2 CCGG 377.200 0.073 ... L3 2002 03 26 13 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 161384 UTA 2002 03 13 17 00 00 1188-91 P co2 CCGG 377.230 0.073 ... L3 2002 03 26 13 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 161385 UTA 2002 03 20 00 35 00 523-99 P co2 CCGG 378.160 0.073 ... L3 2002 03 26 12 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 161386 UTA 2002 03 20 00 35 00 524-99 P co2 CCGG 378.270 0.073 ... L3 2002 03 26 13 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 161387 UTA 2002 03 25 18 30 00 4735-91 P co2 CCGG 377.060 0.073 ... L3 2002 04 09 13 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 161388 UTA 2002 03 25 18 30 00 4736-91 P co2 CCGG 377.140 0.073 ... L3 2002 04 09 13 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 161389 UTA 2002 04 02 19 00 00 283-91 P co2 CCGG 375.740 0.073 ... L3 2002 04 09 12 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 161390 UTA 2002 04 02 19 00 00 284-91 P co2 CCGG 375.720 0.073 ... L3 2002 04 09 13 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 161391 UTA 2002 04 08 23 30 00 1769-91 P co2 CCGG 374.680 0.073 ... L3 2002 05 01 15 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 161392 UTA 2002 04 08 23 30 00 1770-91 P co2 CCGG 374.840 0.073 ... L3 2002 05 01 15 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 161393 UTA 2002 04 19 18 50 00 399-91 P co2 CCGG 377.490 0.073 ... L3 2002 05 01 13 51 00 39.9018 -113.7181 1332.00 1327.00 5.00 161394 UTA 2002 04 19 18 50 00 400-91 P co2 CCGG 377.580 0.073 ... L3 2002 05 01 14 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 161395 UTA 2002 04 26 12 34 56 4211-91 P co2 CCGG 375.620 0.073 ... L3 2002 05 14 13 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 161396 UTA 2002 04 26 12 34 56 4212-91 P co2 CCGG 375.390 0.073 ... L3 2002 05 14 14 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 161397 UTA 2002 05 03 21 20 00 4743-91 P co2 CCGG 373.160 0.073 ... L3 2002 05 14 14 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 161398 UTA 2002 05 03 21 20 00 4744-91 P co2 CCGG 373.110 0.073 ... L3 2002 05 14 14 55 00 39.9018 -113.7181 1332.00 1327.00 5.00 161399 UTA 2002 05 09 17 50 00 1977-91 P co2 CCGG 377.450 0.073 ... L3 2002 05 30 10 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 161400 UTA 2002 05 09 17 50 00 1978-91 P co2 CCGG 377.450 0.073 ... L3 2002 05 30 11 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 161401 UTA 2002 05 14 23 30 00 4849-91 P co2 CCGG 374.710 0.073 ... L3 2002 05 30 10 33 00 39.9018 -113.7181 1332.00 1327.00 5.00 161402 UTA 2002 05 14 23 30 00 4850-91 P co2 CCGG 374.870 0.073 ... L3 2002 05 30 10 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 161403 UTA 2002 05 20 16 20 00 4402-91 P co2 CCGG 375.910 0.073 ... L3 2002 06 10 10 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 161404 UTA 2002 05 27 17 40 00 763-91 P co2 CCGG 373.510 0.073 ... L3 2002 06 10 11 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 161405 UTA 2002 05 27 17 40 00 764-91 P co2 CCGG 373.370 0.073 ... L3 2002 06 10 11 17 00 39.9018 -113.7181 1332.00 1327.00 5.00 161406 UTA 2002 06 03 17 45 00 981-91 P co2 CCGG 369.830 0.073 ... L3 2002 06 25 15 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 161407 UTA 2002 06 03 17 45 00 982-91 P co2 CCGG 369.690 0.073 ... L3 2002 06 25 15 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 161408 UTA 2002 06 11 19 45 00 2013-91 P co2 CCGG 371.290 0.073 +.. L3 2002 06 25 15 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 161409 UTA 2002 06 11 19 45 00 2014-91 P co2 CCGG 369.870 0.073 -.. L3 2002 06 25 15 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 161410 UTA 2002 06 17 21 15 00 1093-91 P co2 CCGG 374.490 0.073 ... L3 2002 07 05 10 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 161411 UTA 2002 06 17 21 15 00 1094-91 P co2 CCGG 374.180 0.073 ... L3 2002 07 05 10 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 161412 UTA 2002 06 24 19 25 00 603-99 P co2 CCGG 372.310 0.073 ... L3 2002 07 05 11 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 161413 UTA 2002 06 24 19 25 00 604-99 P co2 CCGG 372.270 0.073 ... L3 2002 07 05 11 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 161414 UTA 2002 06 30 22 50 00 4683-91 P co2 CCGG 376.730 0.073 +.. L3 2002 07 18 11 23 00 39.9018 -113.7181 1332.00 1327.00 5.00 161415 UTA 2002 06 30 22 50 00 4684-91 P co2 CCGG 373.860 0.073 -.. L3 2002 07 18 11 36 00 39.9018 -113.7181 1332.00 1327.00 5.00 161416 UTA 2002 07 08 17 10 00 249-99 P co2 CCGG 371.560 0.073 ... L3 2002 07 18 11 49 00 39.9018 -113.7181 1332.00 1327.00 5.00 161417 UTA 2002 07 08 17 10 00 250-99 P co2 CCGG 371.730 0.073 ... L3 2002 07 18 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 161418 UTA 2002 07 19 16 40 00 6553-66 P co2 CCGG 376.190 0.073 ... L3 2002 08 20 11 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 161419 UTA 2002 07 19 16 40 00 6554-66 P co2 CCGG 376.150 0.073 ... L3 2002 08 20 12 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 161420 UTA 2002 07 25 16 50 00 6445-66 P co2 CCGG 374.880 0.073 ... L3 2002 08 20 11 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 161421 UTA 2002 07 25 16 50 00 6446-66 P co2 CCGG 374.580 0.073 ... L3 2002 08 20 11 17 00 39.9018 -113.7181 1332.00 1327.00 5.00 161422 UTA 2002 08 04 00 35 00 1179-91 P co2 CCGG 372.940 0.073 ... L3 2002 08 21 11 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 161423 UTA 2002 08 04 00 35 00 1180-91 P co2 CCGG 373.010 0.073 ... L3 2002 08 21 11 25 00 39.9018 -113.7181 1332.00 1327.00 5.00 161424 UTA 2002 08 13 17 15 00 343-99 P co2 CCGG 364.840 0.073 .X. L3 2002 08 21 11 38 00 39.9018 -113.7181 1332.00 1327.00 5.00 161425 UTA 2002 08 13 17 15 00 344-99 P co2 CCGG 364.380 0.073 .X. L3 2002 08 21 11 51 00 39.9018 -113.7181 1332.00 1327.00 5.00 161426 UTA 2002 08 19 21 50 00 685-99 P co2 CCGG 370.630 0.073 ... L3 2002 09 04 14 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 161427 UTA 2002 08 19 21 50 00 686-99 P co2 CCGG 370.490 0.073 ... L3 2002 09 04 14 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 161428 UTA 2002 08 26 17 40 00 691-99 P co2 CCGG 367.210 0.073 ... L3 2002 09 04 14 19 00 39.9018 -113.7181 1332.00 1327.00 5.00 161429 UTA 2002 08 26 17 40 00 692-99 P co2 CCGG 367.550 0.073 ... L3 2002 09 04 14 33 00 39.9018 -113.7181 1332.00 1327.00 5.00 161430 UTA 2002 09 03 16 30 00 449-91 P co2 CCGG 369.030 0.073 ... L3 2002 09 25 13 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 161431 UTA 2002 09 03 16 30 00 450-91 P co2 CCGG 369.060 0.073 ... L3 2002 09 25 14 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 161432 UTA 2002 09 09 19 05 00 4381-91 P co2 CCGG 371.610 0.073 ... L3 2002 09 25 14 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 161433 UTA 2002 09 09 19 05 00 4382-91 P co2 CCGG 371.310 0.073 ... L3 2002 09 25 14 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 161434 UTA 2002 09 16 16 05 00 4859-91 P co2 CCGG 371.570 0.073 ... L3 2002 09 30 13 21 00 39.9018 -113.7181 1332.00 1327.00 5.00 161435 UTA 2002 09 16 16 05 00 4860-91 P co2 CCGG 371.640 0.073 ... L3 2002 09 30 13 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 161436 UTA 2002 09 24 15 30 00 291-99 P co2 CCGG 359.210 0.073 -.. L3 2002 09 30 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 161437 UTA 2002 09 24 15 30 00 292-99 P co2 CCGG 360.470 0.073 +.. L3 2002 09 30 12 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 161438 UTA 2002 10 02 16 00 00 11-98 P co2 CCGG 371.810 0.073 ... L3 2002 10 21 11 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 161439 UTA 2002 10 02 16 00 00 12-98 P co2 CCGG 371.610 0.073 ... L3 2002 10 21 11 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 161440 UTA 2002 10 08 15 45 00 697-91 P co2 CCGG 374.080 0.073 ... L3 2002 10 21 10 41 00 39.9018 -113.7181 1332.00 1327.00 5.00 161441 UTA 2002 10 08 15 45 00 698-91 P co2 CCGG 374.140 0.073 ... L3 2002 10 21 10 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 161442 UTA 2002 10 16 00 15 00 235-99 P co2 CCGG 374.900 0.073 ... L3 2002 10 31 12 36 00 39.9018 -113.7181 1332.00 1327.00 5.00 161443 UTA 2002 10 16 00 15 00 236-99 P co2 CCGG 375.190 0.073 ... L3 2002 10 31 12 49 00 39.9018 -113.7181 1332.00 1327.00 5.00 161444 UTA 2002 10 22 00 50 00 1453-91 P co2 CCGG 379.840 0.073 +.. L3 2002 10 31 13 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 161445 UTA 2002 10 22 00 50 00 1454-91 P co2 CCGG 379.190 0.073 -.. L3 2002 10 31 13 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 161446 UTA 2002 10 28 00 54 00 537-99 P co2 CCGG 375.490 0.073 ... L3 2002 11 12 11 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 161447 UTA 2002 10 28 00 54 00 538-99 P co2 CCGG 375.750 0.073 ... L3 2002 11 12 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 161448 UTA 2002 11 04 20 25 00 1947-91 P co2 CCGG 376.170 0.073 ... L3 2002 11 12 11 27 00 39.9018 -113.7181 1332.00 1327.00 5.00 161449 UTA 2002 11 04 20 25 00 1948-91 P co2 CCGG 376.200 0.073 ... L3 2002 11 12 11 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 161450 UTA 2002 11 11 21 50 00 885-91 P co2 CCGG 375.150 0.073 ... L3 2002 11 27 11 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 161451 UTA 2002 11 11 21 50 00 886-91 P co2 CCGG 375.040 0.073 ... L3 2002 11 27 11 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 161452 UTA 2002 11 20 17 45 00 593-91 P co2 CCGG 375.880 0.073 ... L3 2002 11 27 11 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 161453 UTA 2002 11 20 17 45 00 594-91 P co2 CCGG 375.860 0.073 ... L3 2002 11 27 11 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 161454 UTA 2002 11 25 19 06 00 125-99 P co2 CCGG 377.630 0.073 ... L3 2002 12 11 15 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 161455 UTA 2002 11 25 19 06 00 126-99 P co2 CCGG 377.570 0.073 ... L3 2002 12 11 15 23 00 39.9018 -113.7181 1332.00 1327.00 5.00 161456 UTA 2002 12 04 16 40 00 329-99 P co2 CCGG 376.720 0.073 ... L3 2002 12 11 15 38 00 39.9018 -113.7181 1332.00 1327.00 5.00 161457 UTA 2002 12 04 16 40 00 330-99 P co2 CCGG 376.960 0.073 ... L3 2002 12 11 15 51 00 39.9018 -113.7181 1332.00 1327.00 5.00 161458 UTA 2002 12 10 16 20 00 11-98 P co2 CCGG 378.760 0.073 ... L3 2002 12 26 15 19 00 39.9018 -113.7181 1332.00 1327.00 5.00 161459 UTA 2002 12 10 16 20 00 12-98 P co2 CCGG 378.690 0.073 ... L3 2002 12 26 15 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 161460 UTA 2002 12 17 00 40 00 4275-91 P co2 CCGG 377.410 0.073 ... L3 2002 12 26 15 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 161461 UTA 2002 12 17 00 40 00 4276-91 P co2 CCGG 377.260 0.073 ... L3 2002 12 26 15 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 161462 UTA 2002 12 26 20 45 00 4133-91 P co2 CCGG 377.600 0.073 ... L3 2003 01 16 11 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 161463 UTA 2002 12 26 20 45 00 4134-91 P co2 CCGG 377.470 0.073 ... L3 2003 01 16 11 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 161464 UTA 2003 01 03 16 35 00 817-99 P co2 CCGG 377.940 0.073 ... L3 2003 01 16 11 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 161465 UTA 2003 01 03 16 35 00 818-99 P co2 CCGG 378.100 0.073 ... L3 2003 01 16 11 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 161466 UTA 2003 01 13 16 00 00 807-99 P co2 CCGG 385.520 0.073 .Z. L3 2003 01 31 14 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 161467 UTA 2003 01 13 16 00 00 808-99 P co2 CCGG 385.810 0.073 .Z. L3 2003 01 31 14 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 161468 UTA 2003 01 19 23 30 00 1131-91 P co2 CCGG 379.150 0.073 ... L3 2003 01 31 15 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 161469 UTA 2003 01 19 23 30 00 1132-91 P co2 CCGG 379.080 0.073 ... L3 2003 01 31 15 27 00 39.9018 -113.7181 1332.00 1327.00 5.00 161470 UTA 2003 01 27 00 30 00 339-91 P co2 CCGG 380.550 0.073 ... L3 2003 02 06 13 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 161471 UTA 2003 01 27 00 30 00 340-91 P co2 CCGG 380.910 0.073 ... L3 2003 02 06 14 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 161472 UTA 2003 02 01 19 25 00 871-99 P co2 CCGG 376.290 0.073 ... L3 2003 02 06 16 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 161473 UTA 2003 02 01 19 25 00 872-99 P co2 CCGG 376.150 0.073 ... L3 2003 02 06 16 39 00 39.9018 -113.7181 1332.00 1327.00 5.00 161474 UTA 2003 02 08 21 30 00 517-91 P co2 CCGG 380.040 0.073 ... L3 2003 03 03 13 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 161475 UTA 2003 02 08 21 30 00 518-91 P co2 CCGG 380.130 0.073 ... L3 2003 03 03 13 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 161476 UTA 2003 02 14 19 40 00 4429-91 P co2 CCGG 379.290 0.073 ... L3 2003 03 03 12 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 161477 UTA 2003 02 14 19 40 00 4430-91 P co2 CCGG 379.010 0.073 ... L3 2003 03 03 12 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 161478 UTA 2003 02 21 22 20 00 1031-99 P co2 CCGG 377.920 0.073 ... L3 2003 03 07 11 57 00 39.9018 -113.7181 1332.00 1327.00 5.00 161479 UTA 2003 02 21 22 20 00 1032-99 P co2 CCGG 377.970 0.073 ... L3 2003 03 07 12 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 161480 UTA 2003 02 27 20 15 00 4691-91 P co2 CCGG 379.030 0.073 ... L3 2003 03 07 11 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 161481 UTA 2003 02 27 20 15 00 4692-91 P co2 CCGG 379.070 0.073 ... L3 2003 03 07 11 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 161482 UTA 2003 03 06 01 40 00 4133-91 P co2 CCGG 380.290 0.073 ... L3 2003 03 25 13 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 161483 UTA 2003 03 06 01 40 00 4134-91 P co2 CCGG 380.170 0.073 ... L3 2003 03 25 13 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 161484 UTA 2003 03 12 16 00 00 817-99 P co2 CCGG 378.860 0.073 ... L3 2003 03 25 14 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 161485 UTA 2003 03 12 16 00 00 818-99 P co2 CCGG 379.170 0.073 ... L3 2003 03 25 14 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 161486 UTA 2003 03 19 23 40 00 641-99 P co2 CCGG 379.110 0.073 ... L3 2003 04 03 14 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 161487 UTA 2003 03 19 23 40 00 642-99 P co2 CCGG 379.190 0.073 ... L3 2003 04 03 14 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 161488 UTA 2003 03 24 20 10 00 1575-91 P co2 CCGG 379.170 0.073 ... L3 2003 04 03 14 41 00 39.9018 -113.7181 1332.00 1327.00 5.00 161489 UTA 2003 03 24 20 10 00 1576-91 P co2 CCGG 379.170 0.073 ... L3 2003 04 03 14 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 161490 UTA 2003 03 31 22 20 00 13-99 P co2 CCGG 378.080 0.073 ... L3 2003 04 15 15 27 00 39.9018 -113.7181 1332.00 1327.00 5.00 161491 UTA 2003 03 31 22 20 00 14-99 P co2 CCGG 378.080 0.073 ... L3 2003 04 15 15 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 161492 UTA 2003 04 07 15 15 00 1981-91 P co2 CCGG 380.310 0.073 ... L3 2003 04 15 15 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 161493 UTA 2003 04 07 15 15 00 1982-91 P co2 CCGG 380.280 0.073 ... L3 2003 04 15 15 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 161494 UTA 2003 04 14 15 15 00 1245-99 P co2 CCGG 379.470 0.073 ... L3 2003 05 06 09 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 161495 UTA 2003 04 14 15 15 00 1246-99 P co2 CCGG 379.290 0.073 ... L3 2003 05 06 10 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 161496 UTA 2003 04 20 23 06 00 1247-99 P co2 CCGG 379.540 0.073 ... L3 2003 05 06 09 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 161497 UTA 2003 04 20 23 06 00 1248-99 P co2 CCGG 379.580 0.073 ... L3 2003 05 06 09 39 00 39.9018 -113.7181 1332.00 1327.00 5.00 161498 UTA 2003 04 28 00 40 00 4339-91 P co2 CCGG 380.050 0.073 ... L3 2003 05 28 13 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 161499 UTA 2003 04 28 00 40 00 4340-91 P co2 CCGG 380.150 0.073 ... L3 2003 05 28 13 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 161500 UTA 2003 05 07 21 25 00 4785-91 P co2 CCGG 378.440 0.073 ... L3 2003 05 28 15 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 161501 UTA 2003 05 07 21 25 00 4786-91 P co2 CCGG 378.170 0.073 ... L3 2003 05 28 15 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 161502 UTA 2003 05 21 16 50 00 1963-91 P co2 CCGG 377.510 0.073 ... L3 2003 06 10 09 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 161503 UTA 2003 05 21 16 50 00 1964-91 P co2 CCGG 377.640 0.073 ... L3 2003 06 10 09 17 00 39.9018 -113.7181 1332.00 1327.00 5.00 161504 UTA 2003 05 26 01 05 00 1467-91 P co2 CCGG 373.700 0.073 +.. L3 2003 06 09 15 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 161505 UTA 2003 05 26 01 05 00 1468-91 P co2 CCGG 373.140 0.073 -.. L3 2003 06 09 15 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 161506 UTA 2003 05 31 02 35 00 1321-99 P co2 CCGG 388.620 0.073 .Z. L3 2003 06 16 11 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 161507 UTA 2003 05 31 02 35 00 1322-99 P co2 CCGG 388.280 0.073 .Z. L3 2003 06 16 11 25 00 39.9018 -113.7181 1332.00 1327.00 5.00 161508 UTA 2003 06 03 03 25 00 1351-99 P co2 CCGG 383.600 0.073 +.. L3 2003 06 16 11 38 00 39.9018 -113.7181 1332.00 1327.00 5.00 161509 UTA 2003 06 03 03 25 00 1352-99 P co2 CCGG 383.080 0.073 -.. L3 2003 06 16 11 51 00 39.9018 -113.7181 1332.00 1327.00 5.00 161510 UTA 2003 06 06 03 30 00 1575-91 P co2 CCGG 390.160 0.073 -.. L3 2003 06 20 09 37 00 39.9018 -113.7181 1332.00 1327.00 5.00 161511 UTA 2003 06 06 03 30 00 1576-91 P co2 CCGG 392.790 0.073 +.. L3 2003 06 20 09 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 161512 UTA 2003 06 08 22 20 00 1287-91 P co2 CCGG 368.160 0.073 -.. L3 2003 06 20 09 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 161513 UTA 2003 06 08 22 20 00 1288-91 P co2 CCGG 370.670 0.073 +.. L3 2003 06 20 09 24 00 39.9018 -113.7181 1332.00 1327.00 5.00 161514 UTA 2003 06 14 00 50 00 1077-99 P co2 CCGG 376.870 0.073 ... L3 2003 06 27 10 38 00 39.9018 -113.7181 1332.00 1327.00 5.00 161515 UTA 2003 06 14 00 50 00 1078-99 P co2 CCGG 376.630 0.073 ... L3 2003 06 27 10 51 00 39.9018 -113.7181 1332.00 1327.00 5.00 161516 UTA 2003 06 17 16 50 00 397-91 P co2 CCGG 373.870 0.073 -.. L3 2003 06 27 10 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 161517 UTA 2003 06 17 16 50 00 398-91 P co2 CCGG 375.280 0.073 +.. L3 2003 06 27 10 24 00 39.9018 -113.7181 1332.00 1327.00 5.00 161518 UTA 2003 06 20 22 00 00 949-99 P co2 CCGG 376.250 0.073 ... L3 2003 07 02 14 38 00 39.9018 -113.7181 1332.00 1327.00 5.00 161519 UTA 2003 06 20 22 00 00 950-99 P co2 CCGG 376.660 0.073 ... L3 2003 07 02 14 51 00 39.9018 -113.7181 1332.00 1327.00 5.00 161520 UTA 2003 06 23 16 50 00 253-99 P co2 CCGG 366.670 0.073 -.. L3 2003 07 02 13 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 161521 UTA 2003 06 23 16 50 00 254-99 P co2 CCGG 367.200 0.073 +.. L3 2003 07 02 13 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 161522 UTA 2003 06 27 02 50 00 1405-99 P co2 CCGG 376.160 0.073 ... L3 2003 07 15 16 21 00 39.9018 -113.7181 1332.00 1327.00 5.00 161523 UTA 2003 06 27 02 50 00 1406-99 P co2 CCGG 376.260 0.073 ... L3 2003 07 15 16 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 161524 UTA 2003 06 30 15 30 00 167-98 P co2 CCGG 376.790 0.073 ... L3 2003 07 15 16 49 00 39.9018 -113.7181 1332.00 1327.00 5.00 161525 UTA 2003 06 30 15 30 00 168-98 P co2 CCGG 376.650 0.073 ... L3 2003 07 15 17 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 161526 UTA 2003 07 12 01 40 00 4967-91 P co2 CCGG 378.290 0.073 ... L3 2003 07 31 11 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 161527 UTA 2003 07 12 01 40 00 4968-91 P co2 CCGG 378.290 0.073 ... L3 2003 07 31 11 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 161528 UTA 2003 07 17 19 15 00 1439-91 P co2 CCGG 374.580 0.073 ... L3 2003 07 31 11 55 00 39.9018 -113.7181 1332.00 1327.00 5.00 161529 UTA 2003 07 17 19 15 00 1440-91 P co2 CCGG 374.600 0.073 ... L3 2003 07 31 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 161530 UTA 2003 07 23 21 00 00 1521-99 P co2 CCGG 376.190 0.073 ... L3 2003 08 13 11 36 00 39.9018 -113.7181 1332.00 1327.00 5.00 161531 UTA 2003 07 23 21 00 00 1522-99 P co2 CCGG 375.720 0.073 ... L3 2003 08 13 11 49 00 39.9018 -113.7181 1332.00 1327.00 5.00 161532 UTA 2003 07 30 01 15 00 1519-99 P co2 CCGG 375.300 0.073 ... L3 2003 08 08 15 38 00 39.9018 -113.7181 1332.00 1327.00 5.00 161533 UTA 2003 07 30 01 15 00 1520-99 P co2 CCGG 375.510 0.073 ... L3 2003 08 08 15 51 00 39.9018 -113.7181 1332.00 1327.00 5.00 161534 UTA 2003 08 06 15 30 00 1629-91 P co2 CCGG 376.250 0.073 ... L3 2003 08 20 09 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 161535 UTA 2003 08 06 15 30 00 1630-91 P co2 CCGG 376.000 0.073 ... L3 2003 08 20 09 23 00 39.9018 -113.7181 1332.00 1327.00 5.00 161536 UTA 2003 08 12 17 00 00 1837-91 P co2 CCGG 373.850 0.073 ... L3 2003 08 20 09 36 00 39.9018 -113.7181 1332.00 1327.00 5.00 161537 UTA 2003 08 12 17 00 00 1838-91 P co2 CCGG 373.710 0.073 ... L3 2003 08 20 09 49 00 39.9018 -113.7181 1332.00 1327.00 5.00 161538 UTA 2003 08 18 15 45 00 273-91 P co2 CCGG 363.590 0.073 -.. L3 2003 09 04 11 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 161539 UTA 2003 08 18 15 45 00 274-91 P co2 CCGG 364.500 0.073 +.. L3 2003 09 04 11 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 161540 UTA 2003 08 24 23 25 00 2023-91 P co2 CCGG 377.160 0.073 ... L3 2003 09 04 10 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 161541 UTA 2003 08 24 23 25 00 2024-91 P co2 CCGG 377.130 0.073 ... L3 2003 09 04 10 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 161542 UTA 2003 09 02 01 55 00 6717-66 P co2 CCGG 379.870 0.073 .X. L3 2003 09 18 09 38 00 39.9018 -113.7181 1332.00 1327.00 5.00 161543 UTA 2003 09 02 01 55 00 6718-66 P co2 CCGG 379.920 0.073 .X. L3 2003 09 18 09 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 161544 UTA 2003 09 07 23 45 00 1541-99 P co2 CCGG 374.190 0.073 ... L3 2003 09 18 08 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 161545 UTA 2003 09 07 23 45 00 1542-99 P co2 CCGG 374.230 0.073 ... L3 2003 09 18 08 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 161546 UTA 2003 09 15 15 40 00 1433-99 P co2 CCGG 363.560 0.073 +.. L3 2003 10 07 09 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 161547 UTA 2003 09 15 15 40 00 1434-99 P co2 CCGG 362.740 0.073 -.. L3 2003 10 07 09 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 161548 UTA 2003 09 22 00 40 00 1531-99 P co2 CCGG 371.230 0.073 ... L3 2003 10 06 15 57 00 39.9018 -113.7181 1332.00 1327.00 5.00 161549 UTA 2003 09 22 00 40 00 1532-99 P co2 CCGG 371.250 0.073 ... L3 2003 10 06 16 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 161550 UTA 2003 09 28 23 30 00 4875-91 P co2 CCGG 372.120 0.073 ... L3 2003 10 15 11 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 161551 UTA 2003 09 28 23 30 00 4876-91 P co2 CCGG 372.200 0.073 ... L3 2003 10 15 12 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 161552 UTA 2003 10 07 15 05 00 335-91 P co2 CCGG 374.620 0.073 ... L3 2003 10 15 13 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 161553 UTA 2003 10 07 15 05 00 336-91 P co2 CCGG 374.730 0.073 ... L3 2003 10 15 13 27 00 39.9018 -113.7181 1332.00 1327.00 5.00 161554 UTA 2003 10 13 16 40 00 1337-99 P co2 CCGG 373.560 0.073 ... L3 2003 10 30 16 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 161555 UTA 2003 10 13 16 40 00 1338-99 P co2 CCGG 373.460 0.073 ... L3 2003 10 30 16 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 161556 UTA 2003 10 21 01 10 00 977-99 P co2 CCGG 376.270 0.073 ... L3 2003 10 30 16 17 00 39.9018 -113.7181 1332.00 1327.00 5.00 161557 UTA 2003 10 21 01 10 00 978-99 P co2 CCGG 376.090 0.073 ... L3 2003 10 30 16 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 161558 UTA 2003 10 27 01 00 00 1199-99 P co2 CCGG 373.010 0.073 ... L3 2003 11 13 16 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 161559 UTA 2003 10 27 01 00 00 1200-99 P co2 CCGG 372.970 0.073 ... L3 2003 11 13 16 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 161560 UTA 2003 11 03 18 25 00 687-99 P co2 CCGG 379.580 0.073 ... L3 2003 11 13 15 39 00 39.9018 -113.7181 1332.00 1327.00 5.00 161561 UTA 2003 11 03 18 25 00 688-99 P co2 CCGG 379.260 0.073 ... L3 2003 11 13 15 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 161562 UTA 2003 11 10 22 10 00 1973-99 P co2 CCGG 376.450 0.073 ... L3 2003 12 04 13 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 161563 UTA 2003 11 10 22 10 00 1974-99 P co2 CCGG 376.520 0.073 ... L3 2003 12 04 14 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 161564 UTA 2003 11 17 00 40 00 4209-91 P co2 CCGG 384.910 0.073 .X. L3 2003 12 04 13 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 161565 UTA 2003 11 17 00 40 00 4210-91 P co2 CCGG 384.880 0.073 .X. L3 2003 12 04 13 41 00 39.9018 -113.7181 1332.00 1327.00 5.00 161566 UTA 2003 11 22 15 50 00 105-91 P co2 CCGG 378.750 0.073 ... L3 2003 12 05 14 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 161567 UTA 2003 11 22 15 50 00 106-91 P co2 CCGG 378.760 0.073 ... L3 2003 12 05 14 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 161568 UTA 2003 11 28 21 55 00 161-91 P co2 CCGG 380.670 0.073 ... L3 2003 12 05 14 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 161569 UTA 2003 11 28 21 55 00 162-91 P co2 CCGG 380.840 0.073 ... L3 2003 12 05 15 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 161570 UTA 2003 12 05 17 30 00 1789-99 P co2 CCGG 380.150 0.073 ... L3 2004 01 06 11 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 161571 UTA 2003 12 05 17 30 00 1790-99 P co2 CCGG 380.190 0.073 ... L3 2004 01 06 11 25 00 39.9018 -113.7181 1332.00 1327.00 5.00 161572 UTA 2003 12 13 21 15 00 1337-99 P co2 CCGG 378.330 0.073 ... L3 2004 01 06 11 38 00 39.9018 -113.7181 1332.00 1327.00 5.00 161573 UTA 2003 12 13 21 15 00 1338-99 P co2 CCGG 378.340 0.073 ... L3 2004 01 06 11 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 161574 UTA 2003 12 22 23 20 00 923-99 P co2 CCGG 383.000 0.073 +.. L3 2004 01 07 11 27 00 39.9018 -113.7181 1332.00 1327.00 5.00 161575 UTA 2003 12 22 23 20 00 924-99 P co2 CCGG 382.240 0.073 -.. L3 2004 01 07 11 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 161576 UTA 2003 12 28 16 35 00 1209-99 P co2 CCGG 380.760 0.073 ... L3 2004 01 09 13 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 161577 UTA 2003 12 28 16 35 00 1210-99 P co2 CCGG 380.790 0.073 ... L3 2004 01 09 13 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 161578 UTA 2004 01 05 18 30 00 4603-91 P co2 CCGG 381.000 0.073 ... L3 2004 01 26 11 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 161579 UTA 2004 01 05 18 30 00 4604-91 P co2 CCGG 380.870 0.073 ... L3 2004 01 26 11 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 161580 UTA 2004 01 12 16 30 00 4637-91 P co2 CCGG 382.260 0.073 ... L3 2004 01 26 09 55 00 39.9018 -113.7181 1332.00 1327.00 5.00 161581 UTA 2004 01 12 16 30 00 4638-91 P co2 CCGG 382.240 0.073 ... L3 2004 01 26 10 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 161582 UTA 2004 01 20 01 00 00 2499-99 P co2 CCGG 383.530 0.073 ... L3 2004 02 09 10 39 00 39.9018 -113.7181 1332.00 1327.00 5.00 161583 UTA 2004 01 20 01 00 00 2500-99 P co2 CCGG 383.750 0.073 ... L3 2004 02 09 10 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 161584 UTA 2004 01 25 23 45 00 2497-99 P co2 CCGG 381.050 0.073 ... L3 2004 02 09 09 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 161585 UTA 2004 01 25 23 45 00 2498-99 P co2 CCGG 380.960 0.073 ... L3 2004 02 09 10 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 161586 UTA 2004 02 01 22 40 00 165-99 P co2 CCGG 381.300 0.073 ... L3 2004 02 19 13 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 161587 UTA 2004 02 01 22 40 00 166-99 P co2 CCGG 381.330 0.073 ... L3 2004 02 19 14 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 161588 UTA 2004 02 10 17 10 00 2507-99 P co2 CCGG 382.380 0.073 ... L3 2004 02 19 14 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 161589 UTA 2004 02 10 17 10 00 2508-99 P co2 CCGG 382.330 0.073 ... L3 2004 02 19 14 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 161590 UTA 2004 02 16 01 00 00 529-99 P co2 CCGG 384.690 0.073 ... L3 2004 03 01 16 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 161591 UTA 2004 02 16 01 00 00 530-99 P co2 CCGG 384.680 0.073 ... L3 2004 03 01 16 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 161592 UTA 2004 02 20 18 10 00 525-99 P co2 CCGG 393.150 0.073 +.. L3 2004 03 01 14 55 00 39.9018 -113.7181 1332.00 1327.00 5.00 161593 UTA 2004 02 20 18 10 00 526-99 P co2 CCGG 382.250 0.073 -.. L3 2004 03 01 15 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 161594 UTA 2004 02 26 17 20 00 1769-99 P co2 CCGG 382.350 0.073 ... L3 2004 03 10 13 21 00 39.9018 -113.7181 1332.00 1327.00 5.00 161595 UTA 2004 02 26 17 20 00 1770-99 P co2 CCGG 382.420 0.073 ... L3 2004 03 10 13 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 161596 UTA 2004 03 03 23 05 00 2075-99 P co2 CCGG 384.310 0.073 ... L3 2004 03 10 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 161597 UTA 2004 03 03 23 05 00 2076-99 P co2 CCGG 384.470 0.073 ... L3 2004 03 10 12 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 161598 UTA 2004 03 09 16 35 00 2715-99 P co2 CCGG 381.840 0.073 ... L3 2004 03 25 15 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 161599 UTA 2004 03 09 16 35 00 2716-99 P co2 CCGG 381.710 0.073 ... L3 2004 03 25 15 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 161600 UTA 2004 03 17 21 30 00 2721-99 P co2 CCGG 381.280 0.073 ... L3 2004 03 25 15 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 161601 UTA 2004 03 17 21 30 00 2722-99 P co2 CCGG 381.060 0.073 ... L3 2004 03 25 15 33 00 39.9018 -113.7181 1332.00 1327.00 5.00 161602 UTA 2004 03 23 17 05 00 2957-99 P co2 CCGG 382.280 0.073 ... L3 2004 04 07 10 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 161603 UTA 2004 03 23 17 05 00 2958-99 P co2 CCGG 382.190 0.073 ... L3 2004 04 07 11 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 161604 UTA 2004 03 30 16 25 00 2897-99 P co2 CCGG 380.450 0.073 ... L3 2004 04 07 12 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 161605 UTA 2004 03 30 16 25 00 2898-99 P co2 CCGG 380.550 0.073 ... L3 2004 04 07 12 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 161606 UTA 2004 04 06 19 00 00 1981-99 P co2 CCGG 380.620 0.073 ... L3 2004 04 21 17 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 161607 UTA 2004 04 06 19 00 00 1982-99 P co2 CCGG 380.140 0.073 ... L3 2004 04 21 17 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 161608 UTA 2004 04 13 01 20 00 2591-99 P co2 CCGG 380.790 0.073 ... L3 2004 04 20 17 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 161609 UTA 2004 04 13 01 20 00 2592-99 P co2 CCGG 380.880 0.073 ... L3 2004 04 20 17 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 161610 UTA 2004 04 19 01 25 00 3187-99 P co2 CCGG 391.380 0.073 +.. L3 2004 05 04 11 33 00 39.9018 -113.7181 1332.00 1327.00 5.00 161611 UTA 2004 04 19 01 25 00 3188-99 P co2 CCGG 387.130 0.073 -.. L3 2004 05 04 11 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 161612 UTA 2004 04 27 19 55 00 3191-99 P co2 CCGG 379.910 0.073 ... L3 2004 05 04 11 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 161613 UTA 2004 04 27 19 55 00 3192-99 P co2 CCGG 379.780 0.073 ... L3 2004 05 04 11 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 161614 UTA 2004 05 03 20 15 00 3295-99 P co2 CCGG 378.630 0.073 ... L3 2004 05 20 15 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 161615 UTA 2004 05 03 20 15 00 3296-99 P co2 CCGG 378.700 0.073 ... L3 2004 05 20 15 17 00 39.9018 -113.7181 1332.00 1327.00 5.00 161616 UTA 2004 05 10 17 25 00 3297-99 P co2 CCGG 379.810 0.073 ... L3 2004 05 20 15 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 161617 UTA 2004 05 10 17 25 00 3298-99 P co2 CCGG 380.180 0.073 ... L3 2004 05 20 15 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 161618 UTA 2004 05 17 00 00 00 893-99 P co2 CCGG 378.180 0.073 ... L3 2004 05 28 13 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 161619 UTA 2004 05 17 00 00 00 894-99 P co2 CCGG 378.660 0.073 ... L3 2004 05 28 13 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 161620 UTA 2004 05 23 01 55 00 699-99 P co2 CCGG 385.010 0.073 ... L3 2004 05 28 14 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 161621 UTA 2004 05 23 01 55 00 700-99 P co2 CCGG 385.020 0.073 ... L3 2004 05 28 14 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 161622 UTA 2004 05 31 01 25 00 3515-99 P co2 CCGG 379.750 0.073 ... L3 2004 06 17 12 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 161623 UTA 2004 05 31 01 25 00 3516-99 P co2 CCGG 379.610 0.073 ... L3 2004 06 17 12 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 161624 UTA 2004 06 08 03 20 00 3513-99 P co2 CCGG 384.330 0.073 ... L3 2004 06 17 12 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 161625 UTA 2004 06 08 03 20 00 3514-99 P co2 CCGG 384.250 0.073 ... L3 2004 06 17 13 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 161626 UTA 2004 06 14 18 50 00 3579-99 P co2 CCGG 374.840 0.073 +.. L3 2004 07 08 13 27 00 39.9018 -113.7181 1332.00 1327.00 5.00 161627 UTA 2004 06 14 18 50 00 3580-99 P co2 CCGG 374.110 0.073 -.. L3 2004 07 08 13 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 161628 UTA 2004 06 22 03 10 00 3587-99 P co2 CCGG 383.370 0.073 +.. L3 2004 07 08 13 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 161629 UTA 2004 06 22 03 10 00 3588-99 P co2 CCGG 382.110 0.073 -.. L3 2004 07 08 13 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 161630 UTA 2004 06 28 00 30 00 1903-99 P co2 CCGG 380.000 0.073 ... L3 2004 07 27 10 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 161631 UTA 2004 06 28 00 30 00 1904-99 P co2 CCGG 380.080 0.073 ... L3 2004 07 27 10 41 00 39.9018 -113.7181 1332.00 1327.00 5.00 161632 UTA 2004 07 02 20 05 00 1925-99 P co2 CCGG 377.250 0.073 ... L3 2004 07 27 10 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 161633 UTA 2004 07 02 20 05 00 1926-99 P co2 CCGG 377.360 0.073 ... L3 2004 07 27 10 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 161634 UTA 2004 07 09 03 20 00 3753-99 P co2 CCGG 379.780 0.073 ... L3 2004 08 03 13 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 161635 UTA 2004 07 09 03 20 00 3754-99 P co2 CCGG 379.780 0.073 ... L3 2004 08 03 13 55 00 39.9018 -113.7181 1332.00 1327.00 5.00 161636 UTA 2004 07 15 19 40 00 3751-99 P co2 CCGG 376.730 0.073 -.. L3 2004 08 03 13 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 161637 UTA 2004 07 15 19 40 00 3752-99 P co2 CCGG 377.290 0.073 +.. L3 2004 08 03 13 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 161638 UTA 2004 07 23 03 20 00 1523-99 P co2 CCGG 380.610 0.073 -.. L3 2004 08 16 10 24 00 39.9018 -113.7181 1332.00 1327.00 5.00 161639 UTA 2004 07 23 03 20 00 1524-99 P co2 CCGG 381.200 0.073 +.. L3 2004 08 16 10 37 00 39.9018 -113.7181 1332.00 1327.00 5.00 161640 UTA 2004 07 28 00 35 00 2981-99 P co2 CCGG 374.460 0.073 ... L3 2004 08 16 09 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 161641 UTA 2004 07 28 00 35 00 2982-99 P co2 CCGG 374.430 0.073 ... L3 2004 08 16 09 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 161642 UTA 2004 08 04 15 00 00 799-99 P co2 CCGG 383.090 0.073 .X. L3 2004 08 25 09 38 00 39.9018 -113.7181 1332.00 1327.00 5.00 161643 UTA 2004 08 04 15 00 00 800-99 P co2 CCGG 382.980 0.073 .X. L3 2004 08 25 09 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 161644 UTA 2004 08 11 15 35 00 1181-99 P co2 CCGG 370.370 0.073 +.. L3 2004 08 25 09 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 161645 UTA 2004 08 11 15 35 00 1182-99 P co2 CCGG 369.190 0.073 -.. L3 2004 08 25 09 25 00 39.9018 -113.7181 1332.00 1327.00 5.00 161646 UTA 2004 08 17 23 00 00 2681-99 P co2 CCGG 375.940 0.073 ... L3 2004 09 20 11 38 00 39.9018 -113.7181 1332.00 1327.00 5.00 188732 UTA 2004 08 17 23 00 00 2682-99 P co2 CCGG 375.720 0.073 ... L3 2004 09 20 11 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 188733 UTA 2004 08 24 15 30 00 3305-99 P co2 CCGG 371.880 0.073 ... L3 2004 09 20 13 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 188734 UTA 2004 08 24 15 30 00 3306-99 P co2 CCGG 372.020 0.073 ... L3 2004 09 20 13 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 188735 UTA 2004 09 01 15 00 00 645-99 P co2 CCGG 374.350 0.073 ... L3 2004 10 05 09 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 188931 UTA 2004 09 01 15 00 00 646-99 P co2 CCGG 374.230 0.073 ... L3 2004 10 05 09 19 00 39.9018 -113.7181 1332.00 1327.00 5.00 188932 UTA 2004 09 09 14 25 00 391-99 P co2 CCGG 359.580 0.073 -.. L3 2004 10 05 09 33 00 39.9018 -113.7181 1332.00 1327.00 5.00 188929 UTA 2004 09 09 14 25 00 392-99 P co2 CCGG 361.150 0.073 +.. L3 2004 10 05 09 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 188930 UTA 2004 09 16 19 00 00 3579-99 P co2 CCGG 370.480 0.073 ... L3 2004 10 05 19 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 189611 UTA 2004 09 16 19 00 00 3580-99 P co2 CCGG 370.460 0.073 ... L3 2004 10 05 19 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 189612 UTA 2004 09 22 14 40 00 3711-99 P co2 CCGG 378.800 0.073 ... L3 2004 10 05 18 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 189613 UTA 2004 09 22 14 40 00 3712-99 P co2 CCGG 379.060 0.073 ... L3 2004 10 05 18 19 00 39.9018 -113.7181 1332.00 1327.00 5.00 189614 UTA 2004 09 28 15 00 00 2735-99 P co2 CCGG 375.460 0.073 +.. L3 2004 10 19 14 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 190295 UTA 2004 09 28 15 00 00 2736-99 P co2 CCGG 374.690 0.073 -.. L3 2004 10 19 14 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 190296 UTA 2004 10 04 21 40 00 333-99 P co2 CCGG 373.000 0.073 -.. L3 2004 10 19 13 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 190293 UTA 2004 10 04 21 40 00 334-99 P co2 CCGG 373.690 0.073 +.. L3 2004 10 19 14 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 190294 UTA 2004 10 12 21 15 00 2299-99 P co2 CCGG 375.760 0.073 ... L3 2004 11 02 17 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 190824 UTA 2004 10 12 21 15 00 2300-99 P co2 CCGG 375.850 0.073 ... L3 2004 11 02 17 24 00 39.9018 -113.7181 1332.00 1327.00 5.00 190825 UTA 2004 10 18 16 20 00 1385-99 P co2 CCGG 375.990 0.073 ... L3 2004 10 29 15 37 00 39.9018 -113.7181 1332.00 1327.00 5.00 190822 UTA 2004 10 18 16 20 00 1386-99 P co2 CCGG 376.020 0.073 ... L3 2004 10 29 15 51 00 39.9018 -113.7181 1332.00 1327.00 5.00 190823 UTA 2004 10 25 00 35 00 3565-99 P co2 CCGG 382.410 0.073 ... L3 2004 11 04 13 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 191380 UTA 2004 10 25 00 35 00 3566-99 P co2 CCGG 382.070 0.073 ... L3 2004 11 04 13 23 00 39.9018 -113.7181 1332.00 1327.00 5.00 191381 UTA 2004 10 30 17 30 00 1759-99 P co2 CCGG 378.340 0.073 ... L3 2004 11 04 13 37 00 39.9018 -113.7181 1332.00 1327.00 5.00 191378 UTA 2004 10 30 17 30 00 1760-99 P co2 CCGG 378.550 0.073 ... L3 2004 11 04 13 51 00 39.9018 -113.7181 1332.00 1327.00 5.00 191379 UTA 2004 11 08 23 32 00 3491-99 P co2 CCGG 384.710 0.073 ... L3 2004 11 23 15 27 00 39.9018 -113.7181 1332.00 1327.00 5.00 192117 UTA 2004 11 08 23 32 00 3492-99 P co2 CCGG 384.570 0.073 ... L3 2004 11 23 15 41 00 39.9018 -113.7181 1332.00 1327.00 5.00 192118 UTA 2004 11 15 17 50 00 3367-99 P co2 CCGG 380.960 0.073 ... L3 2004 11 23 14 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 192115 UTA 2004 11 15 17 50 00 3368-99 P co2 CCGG 381.230 0.073 ... L3 2004 11 23 15 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 192116 UTA 2004 11 24 16 40 00 1271-99 P co2 CCGG 379.390 0.073 ... L3 2004 12 07 11 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 192550 UTA 2004 11 24 16 40 00 1272-99 P co2 CCGG 379.230 0.073 ... L3 2004 12 07 11 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 192551 UTA 2004 11 30 21 45 00 4181-99 P co2 CCGG 382.700 0.073 ... L3 2004 12 07 11 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 192552 UTA 2004 11 30 21 45 00 4182-99 P co2 CCGG 382.540 0.073 ... L3 2004 12 07 11 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 192553 UTA 2004 12 07 14 50 00 3711-99 P co2 CCGG 381.780 0.073 ... L3 2004 12 16 11 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 192986 UTA 2004 12 07 14 50 00 3712-99 P co2 CCGG 381.810 0.073 ... L3 2004 12 16 12 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 192987 UTA 2004 12 12 22 50 00 2727-99 P co2 CCGG 383.300 0.073 ... L3 2004 12 16 12 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 192984 UTA 2004 12 12 22 50 00 2728-99 P co2 CCGG 383.290 0.073 ... L3 2004 12 16 12 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 192985 UTA 2004 12 20 17 00 00 277-99 P co2 CCGG 382.290 0.073 ... L3 2005 01 07 10 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 193559 UTA 2004 12 20 17 00 00 278-99 P co2 CCGG 382.210 0.073 ... L3 2005 01 07 11 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 193560 UTA 2004 12 27 00 30 00 3539-99 P co2 CCGG 387.200 0.073 -.. L3 2005 01 06 14 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 193561 UTA 2004 12 27 00 30 00 3540-99 P co2 CCGG 387.980 0.073 +.. L3 2005 01 06 15 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 193562 UTA 2005 01 03 23 40 00 4147-99 P co2 CCGG 383.220 0.073 ... L3 2005 01 18 10 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 193987 UTA 2005 01 03 23 40 00 4148-99 P co2 CCGG 382.810 0.073 ... L3 2005 01 18 10 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 193988 UTA 2005 01 10 00 00 00 3149-99 P co2 CCGG 383.060 0.073 ... L3 2005 01 18 09 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 193985 UTA 2005 01 10 00 00 00 3150-99 P co2 CCGG 383.070 0.073 ... L3 2005 01 18 09 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 193986 UTA 2005 01 17 00 40 00 187-99 P co2 CCGG 376.150 0.073 .Z. L3 2005 02 01 14 19 00 39.9018 -113.7181 1332.00 1327.00 5.00 194591 UTA 2005 01 17 00 40 00 188-99 P co2 CCGG 376.210 0.073 .Z. L3 2005 02 01 14 33 00 39.9018 -113.7181 1332.00 1327.00 5.00 194592 UTA 2005 01 23 23 30 00 6043-66 P co2 CCGG 383.180 0.073 +.. L3 2005 02 01 13 51 00 39.9018 -113.7181 1332.00 1327.00 5.00 194589 UTA 2005 01 23 23 30 00 6044-66 P co2 CCGG 376.110 0.073 -.. L3 2005 02 01 14 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 194590 UTA 2005 01 31 18 40 00 3367-99 P co2 CCGG 382.930 0.073 ... L3 2005 02 15 10 37 00 39.9018 -113.7181 1332.00 1327.00 5.00 195103 UTA 2005 01 31 18 40 00 3368-99 P co2 CCGG 383.020 0.073 ... L3 2005 02 15 10 51 00 39.9018 -113.7181 1332.00 1327.00 5.00 195104 UTA 2005 02 08 20 40 00 3991-99 P co2 CCGG 383.000 0.073 ... L3 2005 02 15 09 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 195102 UTA 2005 02 08 20 40 00 3992-99 P co2 CCGG 383.010 0.073 ... L3 2005 02 15 09 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 195105 UTA 2005 02 19 16 30 00 3963-99 P co2 CCGG 384.880 0.073 ... L3 2005 03 10 10 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 196275 UTA 2005 02 19 16 30 00 3964-99 P co2 CCGG 384.900 0.073 ... L3 2005 03 10 10 49 00 39.9018 -113.7181 1332.00 1327.00 5.00 196276 UTA 2005 02 25 19 35 00 184-99 P co2 CCGG 384.440 0.073 ... L3 2005 03 10 11 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 196274 UTA 2005 03 04 17 35 00 4155-99 P co2 CCGG 383.820 0.073 ... L3 2005 03 15 15 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 196613 UTA 2005 03 04 17 35 00 4156-99 P co2 CCGG 383.750 0.073 ... L3 2005 03 15 16 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 196614 UTA 2005 03 10 17 35 00 2683-99 P co2 CCGG 383.000 0.073 ... L3 2005 03 15 15 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 196611 UTA 2005 03 10 17 35 00 2684-99 P co2 CCGG 383.000 0.073 ... L3 2005 03 15 15 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 196612 UTA 2005 03 16 20 40 00 1333-99 P co2 CCGG 382.330 0.073 ... L3 2005 03 29 10 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 197056 UTA 2005 03 16 20 40 00 1334-99 P co2 CCGG 382.350 0.073 ... L3 2005 03 29 10 27 00 39.9018 -113.7181 1332.00 1327.00 5.00 197057 UTA 2005 03 22 16 45 00 3068-99 P co2 CCGG 350.920 0.073 N.. L3 2005 03 30 14 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 197058 UTA 2005 03 29 22 13 00 2281-99 P co2 CCGG 383.680 0.073 ... L3 2005 04 14 10 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 197668 UTA 2005 03 29 22 13 00 2282-99 P co2 CCGG 383.760 0.073 ... L3 2005 04 14 11 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 197669 UTA 2005 04 06 15 45 00 2259-99 P co2 CCGG 385.220 0.073 ... L3 2005 04 14 11 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 197666 UTA 2005 04 06 15 45 00 2260-99 P co2 CCGG 385.160 0.073 ... L3 2005 04 14 11 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 197667 UTA 2005 04 15 17 20 00 2933-99 P co2 CCGG 384.350 0.073 ... L3 2005 04 29 13 51 00 39.9018 -113.7181 1332.00 1327.00 5.00 198067 UTA 2005 04 15 17 20 00 2934-99 P co2 CCGG 384.010 0.073 ... L3 2005 04 29 14 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 198068 UTA 2005 04 22 02 40 00 3891-99 P co2 CCGG 387.310 0.073 ... L3 2005 04 29 13 23 00 39.9018 -113.7181 1332.00 1327.00 5.00 198065 UTA 2005 04 22 02 40 00 3892-99 P co2 CCGG 387.570 0.073 ... L3 2005 04 29 13 37 00 39.9018 -113.7181 1332.00 1327.00 5.00 198066 UTA 2005 04 27 15 00 00 4077-99 P co2 CCGG 383.080 0.073 ... L3 2005 05 23 10 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 198818 UTA 2005 04 27 15 00 00 4078-99 P co2 CCGG 382.780 0.073 ... L3 2005 05 23 10 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 198819 UTA 2005 05 04 19 30 00 2853-99 P co2 CCGG 379.900 0.073 ... L3 2005 05 23 11 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 198816 UTA 2005 05 04 19 30 00 2854-99 P co2 CCGG 379.430 0.073 ... L3 2005 05 23 11 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 198817 UTA 2005 05 11 20 20 00 2989-99 P co2 CCGG 376.650 0.073 -.. L3 2005 06 08 12 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 199594 UTA 2005 05 11 20 20 00 2990-99 P co2 CCGG 379.510 0.073 +.. L3 2005 06 08 13 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 199595 UTA 2005 05 18 15 00 00 2639-99 P co2 CCGG 380.770 0.073 ... L3 2005 06 08 12 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 199592 UTA 2005 05 18 15 00 00 2640-99 P co2 CCGG 380.640 0.073 ... L3 2005 06 08 12 33 00 39.9018 -113.7181 1332.00 1327.00 5.00 199593 UTA 2005 05 25 01 15 00 681-99 P co2 CCGG 378.510 0.073 ... L3 2005 06 20 10 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 200137 UTA 2005 05 25 01 15 00 682-99 P co2 CCGG 378.640 0.073 ... L3 2005 06 20 10 23 00 39.9018 -113.7181 1332.00 1327.00 5.00 200138 UTA 2005 05 30 19 30 00 2663-99 P co2 CCGG 373.880 0.073 +.. L3 2005 06 20 09 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 200135 UTA 2005 05 30 19 30 00 2664-99 P co2 CCGG 372.850 0.073 -.. L3 2005 06 20 09 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 200136 UTA 2005 06 06 01 25 00 273-99 P co2 CCGG 383.340 0.073 ... L3 2005 07 12 11 38 00 39.9018 -113.7181 1332.00 1327.00 5.00 201098 UTA 2005 06 06 01 25 00 274-99 P co2 CCGG 383.230 0.073 ... L3 2005 07 12 11 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 201099 UTA 2005 06 14 23 45 00 1045-99 P co2 CCGG 379.640 0.073 ... L3 2005 07 12 11 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 201096 UTA 2005 06 14 23 45 00 1046-99 P co2 CCGG 379.500 0.073 ... L3 2005 07 12 11 24 00 39.9018 -113.7181 1332.00 1327.00 5.00 201097 UTA 2005 06 21 00 10 00 613-99 P co2 CCGG 381.260 0.073 -.. L3 2005 07 19 11 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 201823 UTA 2005 06 21 00 10 00 614-99 P co2 CCGG 381.850 0.073 +.. L3 2005 07 19 11 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 201824 UTA 2005 06 26 23 40 00 616-99 P co2 CCGG 377.300 0.073 ... L3 2005 07 19 12 39 00 39.9018 -113.7181 1332.00 1327.00 5.00 201822 UTA 2005 07 03 00 00 00 1393-99 P co2 CCGG 381.070 0.073 ... L3 2005 07 27 14 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 202461 UTA 2005 07 03 00 00 00 1394-99 P co2 CCGG 381.070 0.073 ... L3 2005 07 27 14 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 202462 UTA 2005 07 09 15 30 00 3167-99 P co2 CCGG 377.920 0.073 ... L3 2005 07 27 14 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 202459 UTA 2005 07 09 15 30 00 3168-99 P co2 CCGG 377.850 0.073 ... L3 2005 07 27 15 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 202460 UTA 2005 07 19 01 40 00 6217-66 P co2 CCGG 384.640 0.073 .X. L3 2005 08 16 12 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 203323 UTA 2005 07 19 01 40 00 6218-66 P co2 CCGG 384.690 0.073 .X. L3 2005 08 16 12 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 203324 UTA 2005 07 25 03 10 00 2041-99 P co2 CCGG 388.290 0.073 -.. L3 2005 08 16 12 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 203321 UTA 2005 07 25 03 10 00 2042-99 P co2 CCGG 393.170 0.073 +.. L3 2005 08 16 13 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 203322 UTA 2005 07 30 23 45 00 2657-99 P co2 CCGG 374.910 0.073 -.. L3 2005 08 23 08 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 203828 UTA 2005 07 30 23 45 00 2658-99 P co2 CCGG 375.580 0.073 +.. L3 2005 08 23 09 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 203829 UTA 2005 08 05 21 05 00 1755-99 P co2 CCGG 376.660 0.073 ... L3 2005 08 23 09 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 203826 UTA 2005 08 05 21 05 00 1756-99 P co2 CCGG 376.700 0.073 ... L3 2005 08 23 09 36 00 39.9018 -113.7181 1332.00 1327.00 5.00 203827 UTA 2005 08 14 02 55 00 3165-99 P co2 CCGG 413.400 0.073 -.. L3 2005 09 09 09 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 204743 UTA 2005 08 14 02 55 00 3166-99 P co2 CCGG 414.180 0.073 +.. L3 2005 09 09 10 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 204744 UTA 2005 08 20 02 00 00 3065-99 P co2 CCGG 395.060 0.073 +.. L3 2005 09 09 10 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 204745 UTA 2005 08 20 02 00 00 3066-99 P co2 CCGG 393.360 0.073 -.. L3 2005 09 09 10 36 00 39.9018 -113.7181 1332.00 1327.00 5.00 204746 UTA 2005 08 26 14 25 00 981-99 P co2 CCGG 372.520 0.073 +.. L3 2005 09 20 13 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 205398 UTA 2005 08 26 14 25 00 982-99 P co2 CCGG 371.510 0.073 -.. L3 2005 09 20 13 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 205399 UTA 2005 09 01 17 30 00 401-99 P co2 CCGG 370.480 0.073 ... L3 2005 09 20 12 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 205396 UTA 2005 09 01 17 30 00 402-99 P co2 CCGG 370.170 0.073 ... L3 2005 09 20 13 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 205397 UTA 2005 09 07 16 50 00 2987-99 P co2 CCGG 376.050 0.073 ... L3 2005 10 05 08 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 206267 UTA 2005 09 07 16 50 00 2988-99 P co2 CCGG 376.030 0.073 ... L3 2005 10 05 08 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 206268 UTA 2005 09 14 19 40 00 2825-99 P co2 CCGG 370.600 0.073 -.. L3 2005 10 05 09 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 206269 UTA 2005 09 14 19 40 00 2826-99 P co2 CCGG 371.200 0.073 +.. L3 2005 10 05 09 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 206270 UTA 2005 09 21 20 10 00 515-99 P co2 CCGG 375.010 0.073 -.. L3 2005 10 20 13 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 206969 UTA 2005 09 21 20 10 00 516-99 P co2 CCGG 375.870 0.073 +.. L3 2005 10 20 13 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 206970 UTA 2005 09 28 16 30 00 2591-99 P co2 CCGG 376.500 0.073 ... L3 2005 10 20 13 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 206967 UTA 2005 09 28 16 30 00 2592-99 P co2 CCGG 376.190 0.073 ... L3 2005 10 20 13 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 206968 UTA 2005 10 05 14 45 00 6339-66 P co2 CCGG 383.520 0.073 .X. L3 2005 10 28 13 37 00 39.9018 -113.7181 1332.00 1327.00 5.00 207372 UTA 2005 10 05 14 45 00 6340-66 P co2 CCGG 383.670 0.073 .X. L3 2005 10 28 13 51 00 39.9018 -113.7181 1332.00 1327.00 5.00 207373 UTA 2005 10 11 15 10 00 871-99 P co2 CCGG 378.180 0.073 ... L3 2005 10 28 11 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 207374 UTA 2005 10 11 15 10 00 872-99 P co2 CCGG 378.140 0.073 ... L3 2005 10 28 11 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 207375 UTA 2005 10 17 15 10 00 1269-99 P co2 CCGG 380.320 0.073 ... L3 2005 11 08 14 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 208016 UTA 2005 10 17 15 10 00 1270-99 P co2 CCGG 380.240 0.073 ... L3 2005 11 08 14 21 00 39.9018 -113.7181 1332.00 1327.00 5.00 208017 UTA 2005 10 24 00 55 00 1419-99 P co2 CCGG 378.950 0.073 ... L3 2005 11 08 13 39 00 39.9018 -113.7181 1332.00 1327.00 5.00 208014 UTA 2005 10 24 00 55 00 1420-99 P co2 CCGG 379.090 0.073 ... L3 2005 11 08 13 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 208015 UTA 2005 10 31 19 50 00 1229-99 P co2 CCGG 378.550 0.073 ... L3 2005 11 21 15 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 209126 UTA 2005 10 31 19 50 00 1230-99 P co2 CCGG 378.770 0.073 ... L3 2005 11 21 15 36 00 39.9018 -113.7181 1332.00 1327.00 5.00 209127 UTA 2005 11 06 22 35 00 1399-99 P co2 CCGG 378.660 0.073 ... L3 2005 11 21 15 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 209128 UTA 2005 11 06 22 35 00 1400-99 P co2 CCGG 378.920 0.073 ... L3 2005 11 21 16 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 209129 UTA 2005 11 12 21 10 00 1775-99 P co2 CCGG 382.440 0.073 ... L3 2005 11 28 13 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 209233 UTA 2005 11 12 21 10 00 4308-99 P co2 CCGG 382.370 0.073 ... L3 2005 11 28 14 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 209234 UTA 2005 11 19 19 15 00 1031-99 P co2 CCGG 381.650 0.073 ... L3 2005 12 06 14 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 209755 UTA 2005 11 19 19 15 00 1528-99 P co2 CCGG 381.670 0.073 ... L3 2005 12 06 14 36 00 39.9018 -113.7181 1332.00 1327.00 5.00 209756 UTA 2005 11 26 21 20 00 1145-99 P co2 CCGG 382.300 0.073 ... L3 2005 12 06 13 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 209757 UTA 2005 11 26 21 20 00 3656-99 P co2 CCGG 382.400 0.073 ... L3 2005 12 06 14 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 209758 UTA 2005 12 06 23 45 00 3825-99 P co2 CCGG 383.300 0.073 ... L3 2005 12 23 10 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 210634 UTA 2005 12 06 23 45 00 934-99 P co2 CCGG 383.090 0.073 ... L3 2005 12 23 09 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 210635 UTA 2005 12 12 22 35 00 1649-99 P co2 CCGG 387.980 0.073 ... L3 2005 12 23 12 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 210632 UTA 2005 12 12 22 35 00 2300-99 P co2 CCGG 387.980 0.073 ... L3 2005 12 23 12 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 210633 UTA 2005 12 19 23 30 00 1795-99 P co2 CCGG 391.600 0.073 -.. L3 2006 01 13 13 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 211167 UTA 2005 12 19 23 30 00 1796-99 P co2 CCGG 393.410 0.073 +.. L3 2006 01 13 13 55 00 39.9018 -113.7181 1332.00 1327.00 5.00 211168 UTA 2005 12 26 16 40 00 2135-99 P co2 CCGG 391.630 0.073 .X. L3 2006 01 13 14 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 211165 UTA 2005 12 26 16 40 00 2136-99 P co2 CCGG 391.970 0.073 .X. L3 2006 01 13 14 23 00 39.9018 -113.7181 1332.00 1327.00 5.00 211166 UTA 2005 12 31 21 25 00 3547-99 P co2 CCGG 383.520 0.073 ... L3 2006 01 27 13 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 211712 UTA 2005 12 31 21 25 00 4298-99 P co2 CCGG 383.050 0.073 ... L3 2006 01 27 14 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 211713 UTA 2006 01 06 16 15 00 2556-99 P co2 CCGG 387.960 0.073 ... L3 2006 01 27 14 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 211710 UTA 2006 01 06 16 15 00 2607-99 P co2 CCGG 388.320 0.073 ... L3 2006 01 27 14 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 211711 UTA 2006 01 12 18 40 00 2803-99 P co2 CCGG 385.220 0.073 ... L3 2006 02 06 10 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 212021 UTA 2006 01 12 18 40 00 2804-99 P co2 CCGG 385.460 0.073 ... L3 2006 02 06 10 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 212022 UTA 2006 01 18 19 00 00 337-99 P co2 CCGG 384.840 0.073 ... L3 2006 02 06 11 23 00 39.9018 -113.7181 1332.00 1327.00 5.00 212019 UTA 2006 01 18 19 00 00 338-99 P co2 CCGG 384.620 0.073 ... L3 2006 02 06 11 37 00 39.9018 -113.7181 1332.00 1327.00 5.00 212020 UTA 2006 01 24 16 20 00 3671-99 P co2 CCGG 385.380 0.073 ... L3 2006 02 13 14 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 212439 UTA 2006 01 24 16 20 00 3672-99 P co2 CCGG 385.420 0.073 ... L3 2006 02 13 14 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 212440 UTA 2006 01 30 16 15 00 437-99 P co2 CCGG 385.970 0.073 ... L3 2006 02 13 13 39 00 39.9018 -113.7181 1332.00 1327.00 5.00 212437 UTA 2006 01 30 16 15 00 438-99 P co2 CCGG 385.780 0.073 ... L3 2006 02 13 13 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 212438 UTA 2006 02 05 23 10 00 6084-66 P co2 CCGG 389.350 0.073 ... L3 2006 02 28 14 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 213048 UTA 2006 02 11 18 35 00 2477-99 P co2 CCGG 385.450 0.073 ... L3 2006 02 24 15 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 213049 UTA 2006 02 11 18 35 00 2478-99 P co2 CCGG 385.350 0.073 ... L3 2006 02 24 15 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 213050 UTA 2006 02 18 18 40 00 6215-66 P co2 CCGG 389.160 0.073 ... L3 2006 03 13 14 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 213824 UTA 2006 02 18 18 40 00 6216-66 P co2 CCGG 389.100 0.073 ... L3 2006 03 13 14 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 213825 UTA 2006 03 05 00 25 00 4491-99 P co2 CCGG 386.650 0.073 ... L3 2006 03 13 14 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 213822 UTA 2006 03 05 00 25 00 4492-99 P co2 CCGG 386.690 0.073 ... L3 2006 03 13 15 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 213823 UTA 2006 03 11 00 45 00 2521-99 P co2 CCGG 388.180 0.073 ... L3 2006 03 23 12 25 00 39.9018 -113.7181 1332.00 1327.00 5.00 214250 UTA 2006 03 11 00 45 00 2522-99 P co2 CCGG 387.910 0.073 ... L3 2006 03 23 12 39 00 39.9018 -113.7181 1332.00 1327.00 5.00 214251 UTA 2006 03 17 22 35 00 4111-99 P co2 CCGG 387.400 0.073 ... L3 2006 03 23 11 57 00 39.9018 -113.7181 1332.00 1327.00 5.00 214248 UTA 2006 03 17 22 35 00 4112-99 P co2 CCGG 387.130 0.073 ... L3 2006 03 23 12 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 214249 UTA 2006 03 24 16 25 00 751-99 P co2 CCGG 387.710 0.073 ... L3 2006 04 10 14 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 215128 UTA 2006 03 24 16 25 00 752-99 P co2 CCGG 388.100 0.073 ... L3 2006 04 10 15 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 215129 UTA 2006 03 31 17 35 00 947-99 P co2 CCGG 387.130 0.073 ... L3 2006 04 10 15 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 215126 UTA 2006 03 31 17 35 00 948-99 P co2 CCGG 386.870 0.073 ... L3 2006 04 10 15 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 215127 UTA 2006 04 06 16 15 00 1805-99 P co2 CCGG 385.960 0.073 -.. L3 2006 04 19 09 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 215502 UTA 2006 04 06 16 15 00 1806-99 P co2 CCGG 387.030 0.073 +.. L3 2006 04 19 10 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 215503 UTA 2006 04 13 01 20 00 2331-99 P co2 CCGG 386.470 0.073 ... L3 2006 04 19 10 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 215496 UTA 2006 04 13 01 20 00 2332-99 P co2 CCGG 386.420 0.073 ... L3 2006 04 19 10 33 00 39.9018 -113.7181 1332.00 1327.00 5.00 215497 UTA 2006 04 19 01 15 00 2905-99 P co2 CCGG 387.220 0.073 ... L3 2006 05 10 13 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 216300 UTA 2006 04 19 01 15 00 2906-99 P co2 CCGG 387.200 0.073 ... L3 2006 05 10 14 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 216301 UTA 2006 04 24 21 45 00 1573-99 P co2 CCGG 385.240 0.073 +.. L3 2006 05 10 14 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 216298 UTA 2006 04 24 21 45 00 1574-99 P co2 CCGG 362.830 0.073 -.. L3 2006 05 10 14 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 216299 UTA 2006 05 01 00 00 00 2573-99 P co2 CCGG 385.970 0.073 ... L3 2006 05 22 09 55 00 39.9018 -113.7181 1332.00 1327.00 5.00 216796 UTA 2006 05 01 00 00 00 2574-99 P co2 CCGG 385.870 0.073 ... L3 2006 05 22 10 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 216797 UTA 2006 05 08 01 10 00 4011-99 P co2 CCGG 385.570 0.073 ... L3 2006 05 22 09 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 216798 UTA 2006 05 08 01 10 00 4012-99 P co2 CCGG 385.610 0.073 ... L3 2006 05 22 09 41 00 39.9018 -113.7181 1332.00 1327.00 5.00 216799 UTA 2006 05 15 21 07 00 379-99 P co2 CCGG 382.310 0.073 ... L3 2006 06 08 09 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 217441 UTA 2006 05 15 21 07 00 380-99 P co2 CCGG 382.650 0.073 ... L3 2006 06 08 09 49 00 39.9018 -113.7181 1332.00 1327.00 5.00 217442 UTA 2006 05 22 17 35 00 343-99 P co2 CCGG 383.030 0.073 ... L3 2006 06 08 10 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 217439 UTA 2006 05 22 17 35 00 344-99 P co2 CCGG 383.050 0.073 ... L3 2006 06 08 10 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 217440 UTA 2006 05 29 22 25 00 927-99 P co2 CCGG 380.280 0.073 ... L3 2006 06 30 10 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 218205 UTA 2006 06 05 03 15 00 4133-99 P co2 CCGG 400.840 0.073 .Z. L3 2006 06 27 10 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 218203 UTA 2006 06 05 03 15 00 4134-99 P co2 CCGG 401.240 0.073 .Z. L3 2006 06 27 10 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 218204 UTA 2006 06 13 19 35 00 601-99 P co2 CCGG 383.470 0.073 +.. L3 2006 07 17 09 25 00 39.9018 -113.7181 1332.00 1327.00 5.00 218996 UTA 2006 06 13 19 35 00 602-99 P co2 CCGG 382.910 0.073 -.. L3 2006 07 17 09 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 218997 UTA 2006 06 24 22 40 00 1475-99 P co2 CCGG 381.480 0.073 ... L3 2006 07 17 08 57 00 39.9018 -113.7181 1332.00 1327.00 5.00 218994 UTA 2006 06 24 22 40 00 1476-99 P co2 CCGG 381.310 0.073 ... L3 2006 07 17 09 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 218995 UTA 2006 06 30 15 15 00 2767-99 P co2 CCGG 383.750 0.073 ... L3 2006 07 24 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 219473 UTA 2006 06 30 15 15 00 2768-99 P co2 CCGG 383.700 0.073 ... L3 2006 07 24 12 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 219474 UTA 2006 07 07 18 10 00 903-99 P co2 CCGG 384.990 0.073 ... L3 2006 07 24 11 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 219475 UTA 2006 07 07 18 10 00 904-99 P co2 CCGG 384.990 0.073 ... L3 2006 07 24 11 49 00 39.9018 -113.7181 1332.00 1327.00 5.00 219476 UTA 2006 07 15 22 35 00 6157-66 P co2 CCGG 379.290 0.073 -.. L3 2006 08 07 09 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 220139 UTA 2006 07 15 22 35 00 6158-66 P co2 CCGG 379.870 0.073 +.. L3 2006 08 07 09 57 00 39.9018 -113.7181 1332.00 1327.00 5.00 220140 UTA 2006 07 24 02 06 00 451-99 P co2 CCGG 385.440 0.073 ... L3 2006 08 07 09 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 220137 UTA 2006 07 24 02 06 00 452-99 P co2 CCGG 385.500 0.073 ... L3 2006 08 07 09 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 220138 UTA 2006 07 31 00 35 00 3057-99 P co2 CCGG 382.240 0.073 ... L3 2006 08 23 09 39 00 39.9018 -113.7181 1332.00 1327.00 5.00 220842 UTA 2006 07 31 00 35 00 3058-99 P co2 CCGG 382.160 0.073 ... L3 2006 08 23 09 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 220843 UTA 2006 08 04 16 00 00 4477-99 P co2 CCGG 381.100 0.073 ... L3 2006 08 23 09 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 220844 UTA 2006 08 04 16 00 00 4478-99 P co2 CCGG 381.280 0.073 ... L3 2006 08 23 09 25 00 39.9018 -113.7181 1332.00 1327.00 5.00 220845 UTA 2006 08 13 02 35 00 3823-99 P co2 CCGG 383.400 0.073 ... L3 2006 08 25 13 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 221002 UTA 2006 08 13 02 35 00 3824-99 P co2 CCGG 383.180 0.073 ... L3 2006 08 25 13 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 221003 UTA 2006 08 20 15 50 00 3207-99 P co2 CCGG 374.160 0.073 +.. L3 2006 09 07 14 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 221766 UTA 2006 08 20 15 50 00 3208-99 P co2 CCGG 373.530 0.073 -.. L3 2006 09 07 14 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 221767 UTA 2006 08 28 01 50 00 4105-99 P co2 CCGG 388.020 0.073 .X. L3 2006 09 07 13 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 221764 UTA 2006 08 28 01 50 00 4106-99 P co2 CCGG 388.330 0.073 .X. L3 2006 09 07 14 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 221765 UTA 2006 09 04 22 50 00 1033-99 P co2 CCGG 378.000 0.073 ... L3 2006 09 28 15 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 222626 UTA 2006 09 04 22 50 00 4298-99 P co2 CCGG 378.150 0.073 ... L3 2006 09 28 15 27 00 39.9018 -113.7181 1332.00 1327.00 5.00 222627 UTA 2006 09 12 23 10 00 4133-99 P co2 CCGG 376.740 0.073 ... L3 2006 09 29 09 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 222628 UTA 2006 09 12 23 10 00 5198-99 P co2 CCGG 376.800 0.073 ... L3 2006 09 29 09 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 222629 UTA 2006 09 18 15 35 00 6195-66 P co2 CCGG 374.010 0.073 +.. L3 2006 10 11 09 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 223339 UTA 2006 09 18 15 35 00 6196-66 P co2 CCGG 373.350 0.073 -.. L3 2006 10 11 09 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 223340 UTA 2006 09 25 16 00 00 1251-99 P co2 CCGG 379.850 0.073 ... L3 2006 10 11 08 49 00 39.9018 -113.7181 1332.00 1327.00 5.00 223337 UTA 2006 09 25 16 00 00 1252-99 P co2 CCGG 379.630 0.073 ... L3 2006 10 11 09 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 223338 UTA 2006 10 02 01 05 00 6839-66 P co2 CCGG 382.400 0.073 ... L3 2006 10 23 09 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 223800 UTA 2006 10 02 01 05 00 6840-66 P co2 CCGG 381.990 0.073 ... L3 2006 10 23 09 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 223801 UTA 2006 10 07 23 55 00 2799-99 P co2 CCGG 381.160 0.073 ... L3 2006 10 23 09 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 223802 UTA 2006 10 07 23 55 00 2800-99 P co2 CCGG 381.550 0.073 ... L3 2006 10 23 09 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 223803 UTA 2006 10 15 23 00 00 6559-66 P co2 CCGG 381.450 0.073 ... L3 2006 11 06 10 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 224372 UTA 2006 10 15 23 00 00 6560-66 P co2 CCGG 381.580 0.073 ... L3 2006 11 06 11 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 224373 UTA 2006 10 21 21 30 00 3221-99 P co2 CCGG 384.400 0.073 ... L3 2006 11 06 11 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 224374 UTA 2006 10 21 21 30 00 3222-99 P co2 CCGG 384.140 0.073 ... L3 2006 11 06 11 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 224375 UTA 2006 10 31 00 15 00 3441-99 P co2 CCGG 382.860 0.073 ... L3 2006 11 27 10 25 00 39.9018 -113.7181 1332.00 1327.00 5.00 225174 UTA 2006 10 31 00 15 00 3442-99 P co2 CCGG 382.450 0.073 ... L3 2006 11 27 10 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 225175 UTA 2006 11 06 17 55 00 3163-99 P co2 CCGG 381.840 0.073 ... L3 2006 11 27 09 57 00 39.9018 -113.7181 1332.00 1327.00 5.00 225176 UTA 2006 11 06 17 55 00 3164-99 P co2 CCGG 381.880 0.073 ... L3 2006 11 27 10 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 225177 UTA 2006 11 13 18 15 00 3585-99 P co2 CCGG 382.980 0.073 ... L3 2006 12 05 09 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 225633 UTA 2006 11 13 18 15 00 3586-99 P co2 CCGG 382.930 0.073 ... L3 2006 12 05 09 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 225634 UTA 2006 11 20 17 20 00 1445-99 P co2 CCGG 381.980 0.073 ... L3 2006 12 05 09 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 225631 UTA 2006 11 20 17 20 00 1446-99 P co2 CCGG 382.040 0.073 ... L3 2006 12 05 10 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 225632 UTA 2006 11 27 00 20 00 1765-99 P co2 CCGG 385.400 0.073 ... L3 2006 12 19 10 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 226275 UTA 2006 11 27 00 20 00 1766-99 P co2 CCGG 385.530 0.073 ... L3 2006 12 19 10 57 00 39.9018 -113.7181 1332.00 1327.00 5.00 226276 UTA 2006 12 02 21 35 00 3207-99 P co2 CCGG 385.860 0.073 ... L3 2006 12 19 11 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 226277 UTA 2006 12 02 21 35 00 3208-99 P co2 CCGG 385.980 0.073 ... L3 2006 12 19 11 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 226278 UTA 2006 12 09 00 05 00 1953-99 P co2 CCGG 394.340 0.073 .X. L3 2007 01 11 14 38 00 39.9018 -113.7181 1332.00 1327.00 5.00 226737 UTA 2006 12 09 00 05 00 1954-99 P co2 CCGG 393.860 0.073 .X. L3 2007 01 11 14 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 226738 UTA 2006 12 14 16 30 00 4075-99 P co2 CCGG 384.060 0.073 ... L3 2007 01 11 14 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 226739 UTA 2006 12 14 16 30 00 4076-99 P co2 CCGG 384.150 0.073 ... L3 2007 01 11 14 24 00 39.9018 -113.7181 1332.00 1327.00 5.00 226740 UTA 2006 12 21 21 10 00 2037-99 P co2 CCGG 387.840 0.073 ... L3 2007 01 24 12 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 227145 UTA 2006 12 21 21 10 00 2038-99 P co2 CCGG 387.810 0.073 ... L3 2007 01 24 13 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 227146 UTA 2006 12 28 18 15 00 1595-99 P co2 CCGG 387.630 0.073 ... L3 2007 01 24 13 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 227143 UTA 2006 12 28 18 15 00 1596-99 P co2 CCGG 387.660 0.073 ... L3 2007 01 24 13 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 227144 UTA 2007 01 03 17 00 00 977-99 P co2 CCGG 389.720 0.073 -.. L3 2007 02 05 12 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 228145 UTA 2007 01 03 17 00 00 978-99 P co2 CCGG 390.540 0.073 +.. L3 2007 02 05 12 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 228146 UTA 2007 01 09 17 56 00 4617-99 P co2 CCGG 387.910 0.073 ... L3 2007 02 05 12 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 228143 UTA 2007 01 09 17 56 00 4618-99 P co2 CCGG 387.860 0.073 ... L3 2007 02 05 12 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 228144 UTA 2007 01 15 23 45 00 2923-99 P co2 CCGG 390.180 0.073 ... L3 2007 02 08 11 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 228605 UTA 2007 01 15 23 45 00 2924-99 P co2 CCGG 389.870 0.073 ... L3 2007 02 08 11 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 228606 UTA 2007 01 21 23 03 00 2913-99 P co2 CCGG 388.310 0.073 ... L3 2007 02 08 10 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 228603 UTA 2007 01 21 23 03 00 2914-99 P co2 CCGG 388.440 0.073 ... L3 2007 02 08 10 49 00 39.9018 -113.7181 1332.00 1327.00 5.00 228604 UTA 2007 01 29 19 52 00 3223-99 P co2 CCGG 393.020 0.073 ... L3 2007 03 05 10 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 230019 UTA 2007 01 29 19 52 00 3224-99 P co2 CCGG 393.080 0.073 ... L3 2007 03 05 11 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 230020 UTA 2007 02 09 17 22 00 3201-99 P co2 CCGG 389.180 0.073 ... L3 2007 03 05 11 19 00 39.9018 -113.7181 1332.00 1327.00 5.00 230021 UTA 2007 02 09 17 22 00 3202-99 P co2 CCGG 389.310 0.073 ... L3 2007 03 05 11 33 00 39.9018 -113.7181 1332.00 1327.00 5.00 230022 UTA 2007 02 15 23 53 00 75-99 P co2 CCGG 387.380 0.073 ... L3 2007 03 15 12 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 230465 UTA 2007 02 15 23 53 00 76-99 P co2 CCGG 387.100 0.073 ... L3 2007 03 15 12 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 230466 UTA 2007 02 21 21 24 00 3275-99 P co2 CCGG 388.530 0.073 ... L3 2007 03 15 13 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 230463 UTA 2007 02 21 21 24 00 3276-99 P co2 CCGG 388.440 0.073 ... L3 2007 03 15 13 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 230464 UTA 2007 02 28 20 08 00 67-99 P co2 CCGG 388.810 0.073 ... L3 2007 03 22 11 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 231019 UTA 2007 02 28 20 08 00 68-99 P co2 CCGG 388.790 0.073 ... L3 2007 03 22 11 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 231020 UTA 2007 03 06 20 15 00 2473-99 P co2 CCGG 390.210 0.073 ... L3 2007 03 22 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 231017 UTA 2007 03 06 20 15 00 2474-99 P co2 CCGG 390.090 0.073 ... L3 2007 03 22 12 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 231018 UTA 2007 03 13 18 45 00 4165-99 P co2 CCGG 388.100 0.073 ... L3 2007 04 11 10 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 231833 UTA 2007 03 13 18 45 00 4166-99 P co2 CCGG 388.060 0.073 ... L3 2007 04 11 10 17 00 39.9018 -113.7181 1332.00 1327.00 5.00 231834 UTA 2007 03 19 21 11 00 943-99 P co2 CCGG 386.560 0.073 ... L3 2007 04 11 10 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 231831 UTA 2007 03 19 21 11 00 944-99 P co2 CCGG 386.510 0.073 ... L3 2007 04 11 10 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 231832 UTA 2007 03 26 19 33 00 233-99 P co2 CCGG 386.750 0.073 ... L3 2007 04 18 14 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 232435 UTA 2007 03 26 19 33 00 234-99 P co2 CCGG 386.790 0.073 ... L3 2007 04 18 14 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 232436 UTA 2007 04 02 02 25 00 49-99 P co2 CCGG 387.610 0.073 ... L3 2007 04 18 14 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 232437 UTA 2007 04 02 02 25 00 50-99 P co2 CCGG 387.430 0.073 ... L3 2007 04 18 14 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 232438 UTA 2007 04 08 23 10 00 3043-99 P co2 CCGG 387.820 0.073 ... L3 2007 05 01 11 55 00 39.9018 -113.7181 1332.00 1327.00 5.00 233096 UTA 2007 04 08 23 10 00 3044-99 P co2 CCGG 387.500 0.073 ... L3 2007 05 01 12 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 233097 UTA 2007 04 16 01 20 00 3315-99 P co2 CCGG 387.830 0.073 ... L3 2007 05 01 10 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 233094 UTA 2007 04 16 01 20 00 3316-99 P co2 CCGG 387.700 0.073 ... L3 2007 05 01 10 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 233095 UTA 2007 04 21 19 34 00 133-99 P co2 CCGG 388.790 0.073 ... L3 2007 05 15 09 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 233919 UTA 2007 04 21 19 34 00 134-99 P co2 CCGG 388.760 0.073 ... L3 2007 05 15 09 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 233920 UTA 2007 04 27 15 00 00 2845-99 P co2 CCGG 385.610 0.073 ... L3 2007 05 15 10 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 233917 UTA 2007 04 27 15 00 00 2846-99 P co2 CCGG 385.900 0.073 ... L3 2007 05 15 11 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 233918 UTA 2007 05 03 17 00 00 3-99 P co2 CCGG 388.120 0.070 ... L8 2007 05 21 14 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 234219 UTA 2007 05 03 17 00 00 4-99 P co2 CCGG 388.050 0.070 ... L8 2007 05 21 15 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 234220 UTA 2007 05 10 02 15 00 4419-99 P co2 CCGG 408.460 0.070 -.. L8 2007 05 21 15 19 00 39.9018 -113.7181 1332.00 1327.00 5.00 234217 UTA 2007 05 10 02 15 00 4420-99 P co2 CCGG 410.490 0.070 +.. L8 2007 05 21 15 33 00 39.9018 -113.7181 1332.00 1327.00 5.00 234218 UTA 2007 05 17 15 50 00 2115-99 P co2 CCGG 387.660 0.073 +.. L3 2007 06 12 09 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 235340 UTA 2007 05 17 15 50 00 2116-99 P co2 CCGG 387.110 0.073 -.. L3 2007 06 12 10 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 235341 UTA 2007 05 24 19 35 00 2343-99 P co2 CCGG 382.110 0.073 ... L3 2007 06 12 09 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 235338 UTA 2007 05 24 19 35 00 2344-99 P co2 CCGG 381.920 0.073 ... L3 2007 06 12 09 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 235339 UTA 2007 05 30 16 10 00 3872-99 P co2 CCGG 383.330 0.073 ... L3 2007 06 20 11 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 236016 UTA 2007 05 30 16 10 00 967-99 P co2 CCGG 383.590 0.073 ... L3 2007 06 20 11 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 236015 UTA 2007 06 05 16 50 00 2515-99 P co2 CCGG 385.280 0.073 ... L3 2007 06 20 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 236014 UTA 2007 06 05 16 50 00 510-99 P co2 CCGG 385.690 0.073 ... L3 2007 06 20 11 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 236013 UTA 2007 06 14 00 32 00 1801-99 P co2 CCGG 384.030 0.073 ... L3 2007 06 29 13 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 237139 UTA 2007 06 14 00 32 00 1802-99 P co2 CCGG 383.540 0.073 ... L3 2007 06 29 14 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 237140 UTA 2007 06 21 21 40 00 1447-99 P co2 CCGG 385.370 0.070 ... L8 2007 06 29 09 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 237153 UTA 2007 06 27 19 15 00 1977-99 P co2 CCGG 385.180 0.073 ... L3 2007 07 11 14 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 237869 UTA 2007 06 27 19 15 00 1978-99 P co2 CCGG 384.910 0.073 ... L3 2007 07 11 14 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 237870 UTA 2007 07 04 19 51 00 2013-99 P co2 CCGG 379.610 0.073 +.. L3 2007 07 11 14 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 237871 UTA 2007 07 04 19 51 00 2014-99 P co2 CCGG 378.720 0.073 -.. L3 2007 07 11 14 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 237872 UTA 2007 07 11 23 43 00 3459-99 P co2 CCGG 385.960 0.073 ... L3 2007 07 26 15 51 00 39.9018 -113.7181 1332.00 1327.00 5.00 238798 UTA 2007 07 11 23 43 00 3460-99 P co2 CCGG 385.880 0.073 ... L3 2007 07 26 16 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 238799 UTA 2007 07 17 15 45 00 4383-99 P co2 CCGG 384.260 0.073 ... L3 2007 07 26 15 23 00 39.9018 -113.7181 1332.00 1327.00 5.00 238796 UTA 2007 07 17 15 45 00 4384-99 P co2 CCGG 384.240 0.073 ... L3 2007 07 26 15 37 00 39.9018 -113.7181 1332.00 1327.00 5.00 238797 UTA 2007 07 25 17 05 00 1250-99 P co2 CCGG 382.550 0.073 ... L3 2007 08 08 16 39 00 39.9018 -113.7181 1332.00 1327.00 5.00 239601 UTA 2007 07 25 17 05 00 2323-99 P co2 CCGG 382.650 0.073 ... L3 2007 08 08 16 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 239602 UTA 2007 08 01 02 05 00 3670-99 P co2 CCGG 390.350 0.073 .X. L3 2007 08 10 11 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 239603 UTA 2007 08 01 02 05 00 4209-99 P co2 CCGG 390.440 0.073 .X. L3 2007 08 10 11 25 00 39.9018 -113.7181 1332.00 1327.00 5.00 239604 UTA 2007 08 07 19 40 00 3755-99 P co2 CCGG 377.900 0.073 ... L3 2007 08 21 11 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 240288 UTA 2007 08 07 19 40 00 3756-99 P co2 CCGG 378.380 0.073 ... L3 2007 08 21 12 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 240289 UTA 2007 08 13 22 27 00 2393-99 P co2 CCGG 380.690 0.073 +.. L3 2007 08 21 11 27 00 39.9018 -113.7181 1332.00 1327.00 5.00 240286 UTA 2007 08 13 22 27 00 2394-99 P co2 CCGG 379.150 0.073 -.. L3 2007 08 21 11 41 00 39.9018 -113.7181 1332.00 1327.00 5.00 240287 UTA 2007 08 19 23 31 00 4167-99 P co2 CCGG 379.910 0.073 ... L3 2007 09 10 10 27 00 39.9018 -113.7181 1332.00 1327.00 5.00 241119 UTA 2007 08 19 23 31 00 4168-99 P co2 CCGG 379.550 0.073 ... L3 2007 09 10 10 41 00 39.9018 -113.7181 1332.00 1327.00 5.00 241120 UTA 2007 08 27 17 40 00 3961-99 P co2 CCGG 380.720 0.073 +.. L3 2007 09 10 10 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 241117 UTA 2007 08 27 17 40 00 3962-99 P co2 CCGG 379.400 0.073 -.. L3 2007 09 10 11 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 241118 UTA 2007 09 04 21 20 00 3149-99 P co2 CCGG 380.060 0.073 ... L3 2007 09 20 13 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 241926 UTA 2007 09 04 21 20 00 3150-99 P co2 CCGG 379.840 0.073 ... L3 2007 09 20 13 37 00 39.9018 -113.7181 1332.00 1327.00 5.00 241927 UTA 2007 09 12 02 01 00 1675-99 P co2 CCGG 394.680 0.073 +.. L3 2007 09 20 14 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 241924 UTA 2007 09 12 02 01 00 1676-99 P co2 CCGG 388.110 0.073 -.. L3 2007 09 20 15 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 241925 UTA 2007 09 18 00 55 00 2829-99 P co2 CCGG 381.670 0.073 ... L3 2007 10 03 09 41 00 39.9018 -113.7181 1332.00 1327.00 5.00 242633 UTA 2007 09 18 00 55 00 2830-99 P co2 CCGG 381.500 0.073 ... L3 2007 10 03 09 55 00 39.9018 -113.7181 1332.00 1327.00 5.00 242634 UTA 2007 09 24 15 40 00 2171-99 P co2 CCGG 379.810 0.073 ... L3 2007 10 03 10 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 242631 UTA 2007 09 24 15 40 00 2172-99 P co2 CCGG 379.350 0.073 ... L3 2007 10 03 10 23 00 39.9018 -113.7181 1332.00 1327.00 5.00 242632 UTA 2007 09 28 21 40 00 2119-99 P co2 CCGG 381.110 0.073 ... L3 2007 10 10 14 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 243003 UTA 2007 09 28 21 40 00 2120-99 P co2 CCGG 381.320 0.073 ... L3 2007 10 10 15 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 243004 UTA 2007 10 04 19 30 00 1235-99 P co2 CCGG 381.930 0.073 ... L3 2007 10 10 14 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 243001 UTA 2007 10 04 19 30 00 1236-99 P co2 CCGG 382.020 0.073 ... L3 2007 10 10 14 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 243002 UTA 2007 10 10 17 25 00 893-99 P co2 CCGG 381.040 0.073 ... L3 2007 10 25 16 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 243768 UTA 2007 10 10 17 25 00 894-99 P co2 CCGG 381.470 0.073 ... L3 2007 10 25 16 38 00 39.9018 -113.7181 1332.00 1327.00 5.00 243769 UTA 2007 10 17 22 55 00 3161-99 P co2 CCGG 383.180 0.073 ... L3 2007 10 25 16 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 243766 UTA 2007 10 17 22 55 00 3162-99 P co2 CCGG 383.560 0.073 ... L3 2007 10 25 16 24 00 39.9018 -113.7181 1332.00 1327.00 5.00 243767 UTA 2007 10 24 00 05 00 2115-99 P co2 CCGG 383.650 0.073 ... L3 2007 11 07 12 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 244510 UTA 2007 10 24 00 05 00 4103-99 P co2 CCGG 383.730 0.073 ... L3 2007 11 07 12 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 244511 UTA 2007 10 29 23 10 00 4278-99 P co2 CCGG 385.490 0.073 ... L3 2007 11 07 13 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 244509 UTA 2007 10 29 23 10 00 4829-99 P co2 CCGG 385.030 0.073 ... L3 2007 11 07 12 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 244508 UTA 2007 11 07 16 32 00 67-99 P co2 CCGG 385.800 0.073 ... L3 2007 11 26 13 19 00 39.9018 -113.7181 1332.00 1327.00 5.00 245350 UTA 2007 11 07 16 32 00 68-99 P co2 CCGG 386.130 0.073 ... L3 2007 11 26 13 33 00 39.9018 -113.7181 1332.00 1327.00 5.00 245351 UTA 2007 11 14 00 05 00 3181-99 P co2 CCGG 386.780 0.073 ... L3 2007 11 26 13 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 245348 UTA 2007 11 14 00 05 00 3182-99 P co2 CCGG 386.370 0.073 ... L3 2007 11 26 14 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 245349 UTA 2007 11 19 21 24 00 3223-99 P co2 CCGG 384.420 0.073 ... L3 2007 12 11 13 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 245936 UTA 2007 11 19 21 24 00 3224-99 P co2 CCGG 384.430 0.073 ... L3 2007 12 11 13 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 245937 UTA 2007 11 27 22 19 00 4487-99 P co2 CCGG 385.710 0.073 ... L3 2007 12 11 13 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 245934 UTA 2007 11 27 22 19 00 4488-99 P co2 CCGG 385.730 0.073 ... L3 2007 12 11 13 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 245935 UTA 2007 12 03 21 55 00 675-99 P co2 CCGG 387.770 0.073 ... L3 2007 12 31 13 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 246974 UTA 2007 12 03 21 55 00 676-99 P co2 CCGG 387.740 0.073 ... L3 2007 12 31 13 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 246975 UTA 2007 12 10 17 25 00 3269-99 P co2 CCGG 391.460 0.073 ... L3 2007 12 31 12 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 246972 UTA 2007 12 10 17 25 00 3270-99 P co2 CCGG 391.280 0.073 ... L3 2007 12 31 12 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 246973 UTA 2007 12 17 23 52 00 3651-99 P co2 CCGG 393.090 0.073 ... L3 2008 01 14 11 27 00 39.9018 -113.7181 1332.00 1327.00 5.00 247578 UTA 2007 12 17 23 52 00 3652-99 P co2 CCGG 393.200 0.073 ... L3 2008 01 14 11 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 247579 UTA 2007 12 23 21 55 00 4311-99 P co2 CCGG 388.390 0.073 ... L3 2008 01 14 12 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 247576 UTA 2007 12 23 21 55 00 4312-99 P co2 CCGG 388.270 0.073 ... L3 2008 01 14 13 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 247577 UTA 2007 12 31 20 06 00 3297-99 P co2 CCGG 388.600 0.070 ... L8 2008 01 25 12 49 00 39.9018 -113.7181 1332.00 1327.00 5.00 248217 UTA 2007 12 31 20 06 00 4299-99 P co2 CCGG 388.320 0.070 ... L8 2008 01 25 13 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 248218 UTA 2008 01 06 23 35 00 2054-99 P co2 CCGG 389.370 0.070 ... L8 2008 01 25 12 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 248215 UTA 2008 01 06 23 35 00 3816-99 P co2 CCGG 389.330 0.070 ... L8 2008 01 25 12 33 00 39.9018 -113.7181 1332.00 1327.00 5.00 248216 UTA 2008 01 14 23 45 00 67-99 P co2 CCGG 389.810 0.070 ... L8 2008 02 01 14 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 248796 UTA 2008 01 14 23 45 00 68-99 P co2 CCGG 389.430 0.070 ... L8 2008 02 01 14 19 00 39.9018 -113.7181 1332.00 1327.00 5.00 248797 UTA 2008 01 22 23 10 00 4265-99 P co2 CCGG 391.120 0.070 ... L8 2008 02 01 14 37 00 39.9018 -113.7181 1332.00 1327.00 5.00 248795 UTA 2008 01 22 23 10 00 4266-99 P co2 CCGG 391.050 0.070 ... L8 2008 02 01 14 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 248794 UTA 2008 01 28 18 13 00 4913-99 P co2 CCGG 389.530 0.070 ... L8 2008 02 20 11 57 00 39.9018 -113.7181 1332.00 1327.00 5.00 249377 UTA 2008 01 28 18 13 00 4914-99 P co2 CCGG 389.670 0.070 ... L8 2008 02 20 12 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 249378 UTA 2008 02 03 23 05 00 4915-99 P co2 CCGG 388.680 0.070 ... L8 2008 02 20 12 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 249379 UTA 2008 02 03 23 05 00 4916-99 P co2 CCGG 388.560 0.070 ... L8 2008 02 20 13 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 249380 UTA 2008 02 11 23 02 00 2935-99 P co2 CCGG 388.940 0.070 ... L8 2008 02 28 12 49 00 39.9018 -113.7181 1332.00 1327.00 5.00 250076 UTA 2008 02 11 23 02 00 2936-99 P co2 CCGG 388.750 0.070 ... L8 2008 02 28 13 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 250077 UTA 2008 02 18 23 20 00 5057-99 P co2 CCGG 391.030 0.070 ... L8 2008 02 28 12 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 250074 UTA 2008 02 18 23 20 00 5058-99 P co2 CCGG 391.100 0.070 ... L8 2008 02 28 12 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 250075 UTA 2008 02 26 01 00 00 3515-99 P co2 CCGG 391.990 0.070 -.. L8 2008 03 17 13 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 250922 UTA 2008 02 26 01 00 00 3516-99 P co2 CCGG 392.500 0.070 +.. L8 2008 03 17 13 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 250923 UTA 2008 03 03 18 12 00 1633-99 P co2 CCGG 391.530 0.070 ... L8 2008 03 17 14 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 250920 UTA 2008 03 03 18 12 00 1634-99 P co2 CCGG 391.660 0.070 ... L8 2008 03 17 14 17 00 39.9018 -113.7181 1332.00 1327.00 5.00 250921 UTA 2008 03 10 01 15 00 1483-99 P co2 CCGG 391.130 0.073 ... L3 2008 03 26 10 17 00 39.9018 -113.7181 1332.00 1327.00 5.00 251509 UTA 2008 03 10 01 15 00 1484-99 P co2 CCGG 390.920 0.073 ... L3 2008 03 26 10 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 251510 UTA 2008 03 16 00 16 00 577-99 P co2 CCGG 390.320 0.073 ... L3 2008 03 26 10 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 251507 UTA 2008 03 16 00 16 00 578-99 P co2 CCGG 390.400 0.073 ... L3 2008 03 26 11 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 251508 UTA 2008 03 24 23 50 00 3737-99 P co2 CCGG 387.930 0.073 ... L3 2008 04 11 14 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 252325 UTA 2008 03 24 23 50 00 3738-99 P co2 CCGG 387.790 0.073 ... L3 2008 04 11 15 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 252326 UTA 2008 03 31 20 05 00 4687-99 P co2 CCGG 391.440 0.073 ... L3 2008 04 11 15 24 00 39.9018 -113.7181 1332.00 1327.00 5.00 252323 UTA 2008 03 31 20 05 00 4688-99 P co2 CCGG 391.400 0.073 ... L3 2008 04 11 15 39 00 39.9018 -113.7181 1332.00 1327.00 5.00 252324 UTA 2008 04 08 00 24 00 3619-99 P co2 CCGG 390.810 0.073 ... L3 2008 04 28 14 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 253069 UTA 2008 04 08 00 24 00 3620-99 P co2 CCGG 390.820 0.073 ... L3 2008 04 28 14 21 00 39.9018 -113.7181 1332.00 1327.00 5.00 253070 UTA 2008 04 14 02 30 00 17-99 P co2 CCGG 391.960 0.073 ... L3 2008 05 01 15 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 253405 UTA 2008 04 14 02 30 00 18-99 P co2 CCGG 391.880 0.073 ... L3 2008 05 01 15 25 00 39.9018 -113.7181 1332.00 1327.00 5.00 253406 UTA 2008 04 21 01 50 00 2323-99 P co2 CCGG 392.260 0.070 ... L8 2008 05 07 12 23 00 39.9018 -113.7181 1332.00 1327.00 5.00 253904 UTA 2008 04 21 01 50 00 2939-99 P co2 CCGG 392.160 0.070 ... L8 2008 05 07 12 38 00 39.9018 -113.7181 1332.00 1327.00 5.00 253905 UTA 2008 04 26 23 15 00 4006-99 P co2 CCGG 390.650 0.070 ... L8 2008 05 07 11 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 253902 UTA 2008 04 26 23 15 00 4404-99 P co2 CCGG 390.630 0.070 ... L8 2008 05 07 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 253903 UTA 2008 05 06 02 10 00 3057-99 P co2 CCGG 390.950 0.070 ... L8 2008 05 28 10 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 254750 UTA 2008 05 06 02 10 00 3058-99 P co2 CCGG 390.880 0.070 ... L8 2008 05 28 10 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 254751 UTA 2008 05 14 17 16 00 2367-99 P co2 CCGG 387.520 0.070 ... L8 2008 05 28 11 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 254748 UTA 2008 05 14 17 16 00 2368-99 P co2 CCGG 387.330 0.070 ... L8 2008 05 28 11 21 00 39.9018 -113.7181 1332.00 1327.00 5.00 254749 UTA 2008 05 19 15 47 00 5057-99 P co2 CCGG 389.290 0.073 ... L3 2008 06 10 15 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 255296 UTA 2008 05 19 15 47 00 5058-99 P co2 CCGG 389.400 0.073 ... L3 2008 06 10 15 21 00 39.9018 -113.7181 1332.00 1327.00 5.00 255297 UTA 2008 05 27 19 30 00 2041-99 P co2 CCGG 389.540 0.073 ... L3 2008 06 10 14 38 00 39.9018 -113.7181 1332.00 1327.00 5.00 255294 UTA 2008 05 27 19 30 00 2042-99 P co2 CCGG 389.520 0.073 ... L3 2008 06 10 14 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 255295 UTA 2008 06 02 20 05 00 3069-99 P co2 CCGG 384.510 0.070 -.. L8 2008 06 19 11 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 256017 UTA 2008 06 02 20 05 00 3070-99 P co2 CCGG 385.680 0.070 +.. L8 2008 06 19 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 256018 UTA 2008 06 02 23 45 00 1011-99 P co2 CCGG 386.350 0.070 ... L8 2008 07 21 13 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 257666 UTA 2008 06 02 23 45 00 1012-99 P co2 CCGG 386.670 0.070 ... L8 2008 07 21 13 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 257667 UTA 2008 06 09 16 35 00 4637-99 P co2 CCGG 385.420 0.070 ... L8 2008 06 19 12 21 00 39.9018 -113.7181 1332.00 1327.00 5.00 256015 UTA 2008 06 09 16 35 00 4638-99 P co2 CCGG 385.190 0.070 ... L8 2008 06 19 12 36 00 39.9018 -113.7181 1332.00 1327.00 5.00 256016 UTA 2008 06 20 00 55 00 4807-99 P co2 CCGG 384.860 0.073 ... L3 2008 07 09 10 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 257072 UTA 2008 06 20 00 55 00 4808-99 P co2 CCGG 384.870 0.073 ... L3 2008 07 09 10 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 257073 UTA 2008 06 25 21 35 00 2697-99 P co2 CCGG 387.700 0.073 ... L3 2008 07 09 10 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 257070 UTA 2008 06 25 21 35 00 2698-99 P co2 CCGG 387.950 0.073 ... L3 2008 07 09 10 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 257071 UTA 2008 07 09 19 05 00 2851-99 P co2 CCGG 379.520 0.070 .X. L8 2008 07 21 12 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 257664 UTA 2008 07 09 19 05 00 2852-99 P co2 CCGG 379.870 0.070 .X. L8 2008 07 21 12 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 257665 UTA 2008 07 16 00 34 00 3739-99 P co2 CCGG 385.600 0.070 ... L8 2008 08 04 13 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 258522 UTA 2008 07 16 00 34 00 3740-99 P co2 CCGG 385.790 0.070 ... L8 2008 08 04 13 41 00 39.9018 -113.7181 1332.00 1327.00 5.00 258523 UTA 2008 07 21 16 15 00 1055-99 P co2 CCGG 389.290 0.070 +.. L8 2008 08 04 11 23 00 39.9018 -113.7181 1332.00 1327.00 5.00 258520 UTA 2008 07 21 16 15 00 1056-99 P co2 CCGG 388.630 0.070 -.. L8 2008 08 04 11 39 00 39.9018 -113.7181 1332.00 1327.00 5.00 258521 UTA 2008 07 27 23 25 00 2029-99 P co2 CCGG 385.800 0.070 ... L8 2008 08 18 15 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 258989 UTA 2008 07 27 23 25 00 2030-99 P co2 CCGG 385.800 0.070 ... L8 2008 08 18 15 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 258990 UTA 2008 08 02 17 10 00 4589-99 P co2 CCGG 382.360 0.070 ... L8 2008 08 15 14 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 258988 UTA 2008 08 11 15 25 00 3151-99 P co2 CCGG 377.700 0.070 ... L8 2008 09 02 12 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 259940 UTA 2008 08 11 15 25 00 3152-99 P co2 CCGG 377.790 0.070 ... L8 2008 09 02 12 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 259941 UTA 2008 08 18 21 56 00 965-99 P co2 CCGG 381.940 0.070 +.. L8 2008 09 02 12 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 259938 UTA 2008 08 18 21 56 00 966-99 P co2 CCGG 381.400 0.070 -.. L8 2008 09 02 12 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 259939 UTA 2008 08 25 00 50 00 1213-99 P co2 CCGG 390.220 0.073 +.. L3 2008 09 16 11 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 260787 UTA 2008 08 25 00 50 00 1214-99 P co2 CCGG 389.550 0.073 -.. L3 2008 09 16 11 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 260788 UTA 2008 09 01 17 10 00 1507-99 P co2 CCGG 375.190 0.073 ... L3 2008 09 16 12 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 260785 UTA 2008 09 01 17 10 00 1508-99 P co2 CCGG 375.520 0.073 ... L3 2008 09 16 12 27 00 39.9018 -113.7181 1332.00 1327.00 5.00 260786 UTA 2008 09 11 00 20 00 3999-99 P co2 CCGG 381.580 0.070 ... L8 2008 09 24 14 51 00 39.9018 -113.7181 1332.00 1327.00 5.00 261397 UTA 2008 09 11 00 20 00 4000-99 P co2 CCGG 381.340 0.070 ... L8 2008 09 24 15 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 261398 UTA 2008 09 17 01 35 00 4937-99 P co2 CCGG 386.460 0.073 +.. L3 2008 09 25 10 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 261395 UTA 2008 09 17 01 35 00 4938-99 P co2 CCGG 385.360 0.073 -.. L3 2008 09 25 10 41 00 39.9018 -113.7181 1332.00 1327.00 5.00 261396 UTA 2008 09 24 19 05 00 4751-99 P co2 CCGG 379.590 0.070 ... L8 2008 10 13 11 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 262261 UTA 2008 09 24 19 05 00 4752-99 P co2 CCGG 379.650 0.070 ... L8 2008 10 13 12 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 262262 UTA 2008 10 01 00 20 00 1169-99 P co2 CCGG 380.190 0.070 ... L8 2008 10 13 13 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 262259 UTA 2008 10 01 00 20 00 1170-99 P co2 CCGG 380.280 0.070 ... L8 2008 10 13 13 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 262260 UTA 2008 10 07 20 55 00 3065-99 P co2 CCGG 382.820 0.070 ... L8 2008 10 28 10 57 00 39.9018 -113.7181 1332.00 1327.00 5.00 262936 UTA 2008 10 07 20 55 00 3066-99 P co2 CCGG 382.820 0.070 ... L8 2008 10 28 11 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 262937 UTA 2008 10 13 21 38 00 875-99 P co2 CCGG 385.490 0.070 ... L8 2008 10 28 10 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 262938 UTA 2008 10 13 21 38 00 876-99 P co2 CCGG 385.650 0.070 ... L8 2008 10 28 10 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 262939 UTA 2008 10 20 19 05 00 153-99 P co2 CCGG 383.950 0.070 ... L8 2008 11 06 13 23 00 39.9018 -113.7181 1332.00 1327.00 5.00 263624 UTA 2008 10 20 19 05 00 154-99 P co2 CCGG 383.950 0.070 ... L8 2008 11 06 13 39 00 39.9018 -113.7181 1332.00 1327.00 5.00 263625 UTA 2008 10 27 20 40 00 3483-99 P co2 CCGG 386.290 0.070 ... L8 2008 11 06 12 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 263622 UTA 2008 10 27 20 40 00 3484-99 P co2 CCGG 385.930 0.070 ... L8 2008 11 06 13 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 263623 UTA 2008 11 03 23 20 00 3455-99 P co2 CCGG 387.920 0.070 ... L8 2008 11 24 16 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 264330 UTA 2008 11 03 23 20 00 3456-99 P co2 CCGG 388.160 0.070 ... L8 2008 11 24 16 23 00 39.9018 -113.7181 1332.00 1327.00 5.00 264331 UTA 2008 11 10 18 50 00 1031-99 P co2 CCGG 389.850 0.070 ... L8 2008 11 24 16 39 00 39.9018 -113.7181 1332.00 1327.00 5.00 264328 UTA 2008 11 10 18 50 00 1032-99 P co2 CCGG 389.990 0.070 ... L8 2008 11 24 16 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 264329 UTA 2008 11 18 23 00 00 5041-99 P co2 CCGG 387.890 0.070 ... L8 2008 12 08 15 25 00 39.9018 -113.7181 1332.00 1327.00 5.00 265053 UTA 2008 11 18 23 00 00 5042-99 P co2 CCGG 388.040 0.070 ... L8 2008 12 08 15 41 00 39.9018 -113.7181 1332.00 1327.00 5.00 265054 UTA 2008 11 24 22 35 00 1331-99 P co2 CCGG 387.640 0.070 ... L8 2008 12 08 15 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 265051 UTA 2008 11 24 22 35 00 1332-99 P co2 CCGG 387.860 0.070 ... L8 2008 12 08 16 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 265052 UTA 2008 12 01 00 05 00 1793-99 P co2 CCGG 392.500 0.073 ... L3 2008 12 22 11 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 265897 UTA 2008 12 01 00 05 00 1794-99 P co2 CCGG 392.490 0.073 ... L3 2008 12 22 12 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 265896 UTA 2008 12 06 23 20 00 1491-99 P co2 CCGG 389.950 0.070 ... L8 2008 12 19 13 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 265898 UTA 2008 12 06 23 20 00 1492-99 P co2 CCGG 389.720 0.070 ... L8 2008 12 19 14 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 265899 UTA 2008 12 14 00 00 00 1433-99 P co2 CCGG 390.570 0.073 ... L3 2009 01 05 15 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 266776 UTA 2008 12 14 00 00 00 1434-99 P co2 CCGG 390.250 0.073 ... L3 2009 01 05 15 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 266777 UTA 2008 12 21 23 45 00 4471-99 P co2 CCGG 394.650 0.073 -.. L3 2009 01 05 15 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 266778 UTA 2008 12 21 23 45 00 4472-99 P co2 CCGG 395.720 0.073 +.. L3 2009 01 05 15 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 266779 UTA 2009 01 01 00 06 00 3873-99 P co2 CCGG 390.170 0.070 ... L8 2009 01 20 16 17 00 39.9018 -113.7181 1332.00 1327.00 5.00 267732 UTA 2009 01 01 00 06 00 3874-99 P co2 CCGG 389.980 0.070 ... L8 2009 01 20 16 33 00 39.9018 -113.7181 1332.00 1327.00 5.00 267733 UTA 2009 01 07 00 35 00 763-99 P co2 CCGG 390.980 0.073 ... L3 2009 01 20 15 21 00 39.9018 -113.7181 1332.00 1327.00 5.00 267770 UTA 2009 01 07 00 35 00 764-99 P co2 CCGG 391.380 0.073 ... L3 2009 01 20 15 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 267771 UTA 2009 01 12 17 30 00 3483-99 P co2 CCGG 390.480 0.073 ... L3 2009 02 04 11 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 268573 UTA 2009 01 12 17 30 00 3484-99 P co2 CCGG 390.280 0.073 ... L3 2009 02 04 11 17 00 39.9018 -113.7181 1332.00 1327.00 5.00 268574 UTA 2009 01 19 00 05 00 5033-99 P co2 CCGG 394.970 0.073 ... L3 2009 02 04 11 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 268571 UTA 2009 01 19 00 05 00 5034-99 P co2 CCGG 395.070 0.073 ... L3 2009 02 04 11 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 268572 UTA 2009 01 26 17 30 00 2737-99 P co2 CCGG 395.310 0.070 ... L8 2009 02 17 13 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 269445 UTA 2009 01 26 17 30 00 2738-99 P co2 CCGG 395.230 0.070 ... L8 2009 02 17 13 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 269446 UTA 2009 02 03 00 20 00 2079-99 P co2 CCGG 396.010 0.070 +.. L8 2009 02 17 13 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 269443 UTA 2009 02 03 00 20 00 2080-99 P co2 CCGG 394.760 0.070 -.. L8 2009 02 17 13 19 00 39.9018 -113.7181 1332.00 1327.00 5.00 269444 UTA 2009 02 09 00 45 00 3917-99 P co2 CCGG 392.540 0.070 ... L8 2009 02 25 14 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 270307 UTA 2009 02 09 00 45 00 3918-99 P co2 CCGG 392.550 0.070 ... L8 2009 02 25 15 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 270308 UTA 2009 02 15 23 30 00 3959-99 P co2 CCGG 391.560 0.070 ... L8 2009 02 25 14 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 270305 UTA 2009 02 15 23 30 00 3960-99 P co2 CCGG 391.330 0.070 ... L8 2009 02 25 14 41 00 39.9018 -113.7181 1332.00 1327.00 5.00 270306 UTA 2009 02 22 01 20 00 3101-99 P co2 CCGG 395.980 0.070 ... L8 2009 03 07 13 55 00 39.9018 -113.7181 1332.00 1327.00 5.00 270983 UTA 2009 02 22 01 20 00 3102-99 P co2 CCGG 395.840 0.070 ... L8 2009 03 07 14 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 270984 UTA 2009 03 01 00 20 00 1491-99 P co2 CCGG 392.680 0.070 ... L8 2009 03 07 14 25 00 39.9018 -113.7181 1332.00 1327.00 5.00 270981 UTA 2009 03 01 00 20 00 1492-99 P co2 CCGG 392.730 0.070 ... L8 2009 03 07 14 41 00 39.9018 -113.7181 1332.00 1327.00 5.00 270982 UTA 2009 03 04 18 40 00 2759-99 P co2 CCGG 391.390 0.070 ... L8 2009 03 25 14 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 272129 UTA 2009 03 04 18 40 00 2760-99 P co2 CCGG 391.350 0.070 ... L8 2009 03 25 14 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 272130 UTA 2009 03 12 01 10 00 4127-99 P co2 CCGG 393.290 0.070 ... L8 2009 03 25 14 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 272127 UTA 2009 03 12 01 10 00 4128-99 P co2 CCGG 393.320 0.070 ... L8 2009 03 25 14 57 00 39.9018 -113.7181 1332.00 1327.00 5.00 272128 UTA 2009 03 17 15 35 00 4639-99 P co2 CCGG 390.760 0.070 ... L8 2009 04 06 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 272851 UTA 2009 03 17 15 35 00 4640-99 P co2 CCGG 390.830 0.070 ... L8 2009 04 06 12 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 272852 UTA 2009 03 24 16 15 00 1125-99 P co2 CCGG 391.490 0.070 ... L8 2009 04 06 11 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 272849 UTA 2009 03 24 16 15 00 1126-99 P co2 CCGG 391.500 0.070 ... L8 2009 04 06 11 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 272850 UTA 2009 03 30 00 35 00 3296-99 P co2 CCGG 392.430 0.070 ... L8 2009 04 17 11 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 273936 UTA 2009 03 30 00 35 00 3345-99 P co2 CCGG 392.460 0.070 ... L8 2009 04 17 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 273937 UTA 2009 04 05 00 10 00 1496-99 P co2 CCGG 393.190 0.070 ... L8 2009 04 17 11 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 273934 UTA 2009 04 05 00 10 00 1961-99 P co2 CCGG 393.450 0.070 ... L8 2009 04 17 11 37 00 39.9018 -113.7181 1332.00 1327.00 5.00 273935 UTA 2009 04 10 21 00 00 3477-99 P co2 CCGG 391.360 0.073 ... L3 2009 05 04 15 21 00 39.9018 -113.7181 1332.00 1327.00 5.00 274657 UTA 2009 04 10 21 00 00 3478-99 P co2 CCGG 391.430 0.073 ... L3 2009 05 04 15 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 274658 UTA 2009 04 22 15 45 00 4085-99 P co2 CCGG 390.280 0.073 ... L3 2009 05 04 14 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 274659 UTA 2009 04 22 15 45 00 4086-99 P co2 CCGG 389.970 0.073 ... L3 2009 05 04 15 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 274660 UTA 2009 04 27 17 05 00 1633-99 P co2 CCGG 390.370 0.070 ... L8 2009 05 16 11 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 275296 UTA 2009 04 27 17 05 00 2348-99 P co2 CCGG 390.220 0.070 ... L8 2009 05 16 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 275297 UTA 2009 05 03 21 34 00 643-99 P co2 CCGG 390.940 0.070 ... L8 2009 05 16 11 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 275294 UTA 2009 05 03 21 34 00 644-99 P co2 CCGG 390.930 0.070 ... L8 2009 05 16 11 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 275295 UTA 2009 05 09 19 05 00 267-99 P co2 CCGG 390.420 0.070 ... L8 2009 06 03 11 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 276035 UTA 2009 05 09 19 05 00 268-99 P co2 CCGG 390.520 0.070 ... L8 2009 06 03 11 24 00 39.9018 -113.7181 1332.00 1327.00 5.00 276036 UTA 2009 05 14 19 50 00 55-99 P co2 CCGG 389.310 0.070 ... L8 2009 06 03 09 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 276033 UTA 2009 05 14 19 50 00 56-99 P co2 CCGG 389.100 0.070 ... L8 2009 06 03 09 49 00 39.9018 -113.7181 1332.00 1327.00 5.00 276034 UTA 2009 05 20 22 00 00 1389-99 P co2 CCGG 389.760 0.070 ... L10 2009 06 22 15 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 276960 UTA 2009 05 20 22 00 00 1390-99 P co2 CCGG 389.910 0.070 ... L10 2009 06 22 15 51 00 39.9018 -113.7181 1332.00 1327.00 5.00 276961 UTA 2009 05 27 17 55 00 1611-99 P co2 CCGG 386.030 0.070 ... L10 2009 06 22 15 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 276958 UTA 2009 05 27 17 55 00 1612-99 P co2 CCGG 385.800 0.070 ... L10 2009 06 22 15 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 276959 UTA 2009 06 02 21 00 00 3735-99 P co2 CCGG 389.640 0.073 ... L3 2009 07 07 13 37 00 39.9018 -113.7181 1332.00 1327.00 5.00 277805 UTA 2009 06 02 21 00 00 3736-99 P co2 CCGG 389.360 0.073 ... L3 2009 07 07 13 51 00 39.9018 -113.7181 1332.00 1327.00 5.00 277806 UTA 2009 06 09 00 00 00 2511-99 P co2 CCGG 386.630 0.073 ... L3 2009 07 07 12 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 277803 UTA 2009 06 09 00 00 00 2512-99 P co2 CCGG 386.210 0.073 ... L3 2009 07 07 12 25 00 39.9018 -113.7181 1332.00 1327.00 5.00 277804 UTA 2009 06 16 17 10 00 1071-99 P co2 CCGG 384.880 0.070 +.. L10 2009 07 14 10 57 00 39.9018 -113.7181 1332.00 1327.00 5.00 278506 UTA 2009 06 16 17 10 00 1072-99 P co2 CCGG 384.230 0.070 -.. L10 2009 07 14 11 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 278507 UTA 2009 06 22 22 10 00 427-99 P co2 CCGG 387.240 0.070 ... L10 2009 07 14 10 27 00 39.9018 -113.7181 1332.00 1327.00 5.00 278504 UTA 2009 06 22 22 10 00 428-99 P co2 CCGG 387.210 0.070 ... L10 2009 07 14 10 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 278505 UTA 2009 06 29 01 10 00 3291-99 P co2 CCGG 381.770 0.073 .X. L3 2009 07 21 12 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 279276 UTA 2009 06 29 01 10 00 3292-99 P co2 CCGG 381.780 0.073 .X. L3 2009 07 21 13 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 279277 UTA 2009 07 04 23 30 00 2681-99 P co2 CCGG 391.060 0.073 .X. L3 2009 07 21 12 27 00 39.9018 -113.7181 1332.00 1327.00 5.00 279274 UTA 2009 07 04 23 30 00 2682-99 P co2 CCGG 391.280 0.073 .X. L3 2009 07 21 12 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 279275 UTA 2009 07 11 16 45 00 643-99 P co2 CCGG 387.670 0.073 ... L3 2009 07 30 16 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 280299 UTA 2009 07 11 16 45 00 644-99 P co2 CCGG 387.500 0.073 ... L3 2009 07 30 17 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 280300 UTA 2009 07 18 00 15 00 2333-99 P co2 CCGG 385.680 0.073 ... L3 2009 08 03 10 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 280297 UTA 2009 07 18 00 15 00 2334-99 P co2 CCGG 385.210 0.073 ... L3 2009 08 03 11 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 280298 UTA 2009 07 23 18 00 00 3919-99 P co2 CCGG 384.200 0.070 ... L10 2009 08 07 11 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 280873 UTA 2009 07 23 18 00 00 3920-99 P co2 CCGG 384.300 0.070 ... L10 2009 08 07 12 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 280874 UTA 2009 07 29 22 40 00 453-99 P co2 CCGG 381.870 0.070 ... L10 2009 08 10 11 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 280872 UTA 2009 07 29 22 40 00 454-99 P co2 CCGG 381.740 0.070 ... L10 2009 08 10 11 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 280871 UTA 2009 08 05 16 12 00 131-99 P co2 CCGG 386.250 0.070 ... L10 2009 08 24 16 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 281706 UTA 2009 08 05 16 12 00 132-99 P co2 CCGG 386.120 0.070 ... L10 2009 08 24 16 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 281707 UTA 2009 08 13 02 05 00 611-99 P co2 CCGG 387.210 0.070 -.. L10 2009 08 24 16 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 281704 UTA 2009 08 13 02 05 00 612-99 P co2 CCGG 388.380 0.070 +.. L10 2009 08 24 16 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 281705 UTA 2009 08 18 17 30 00 71-99 P co2 CCGG 374.710 0.070 .X. L10 2009 09 01 14 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 282479 UTA 2009 08 18 17 30 00 72-99 P co2 CCGG 374.660 0.070 .X. L10 2009 09 01 15 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 282480 UTA 2009 08 24 19 55 00 4059-99 P co2 CCGG 383.800 0.073 ... L3 2009 09 01 15 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 282477 UTA 2009 08 24 19 55 00 4060-99 P co2 CCGG 383.760 0.073 ... L3 2009 09 01 15 21 00 39.9018 -113.7181 1332.00 1327.00 5.00 282478 UTA 2009 09 01 22 55 00 3635-99 P co2 CCGG 383.640 0.070 ... L10 2009 09 21 13 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 283537 UTA 2009 09 01 22 55 00 3636-99 P co2 CCGG 383.890 0.070 ... L10 2009 09 21 14 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 283538 UTA 2009 09 09 20 30 00 1121-99 P co2 CCGG 379.040 0.070 ... L10 2009 09 21 13 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 283535 UTA 2009 09 09 20 30 00 1122-99 P co2 CCGG 378.700 0.070 ... L10 2009 09 21 13 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 283536 UTA 2009 09 14 20 05 00 2871-99 P co2 CCGG 384.080 0.070 ... L10 2009 09 28 15 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 284110 UTA 2009 09 14 20 05 00 2872-99 P co2 CCGG 384.010 0.070 ... L10 2009 09 28 16 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 284111 UTA 2009 09 21 16 45 00 441-99 P co2 CCGG 378.780 0.070 ... L10 2009 09 28 16 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 284108 UTA 2009 09 21 16 45 00 442-99 P co2 CCGG 378.880 0.070 ... L10 2009 09 28 16 33 00 39.9018 -113.7181 1332.00 1327.00 5.00 284109 UTA 2009 09 29 21 35 00 163-99 P co2 CCGG 383.590 0.070 ... L10 2009 10 16 16 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 285090 UTA 2009 09 29 21 35 00 164-99 P co2 CCGG 383.540 0.070 ... L10 2009 10 16 16 24 00 39.9018 -113.7181 1332.00 1327.00 5.00 285091 UTA 2009 10 08 00 30 00 553-99 P co2 CCGG 388.370 0.070 ... L10 2009 10 16 15 38 00 39.9018 -113.7181 1332.00 1327.00 5.00 285088 UTA 2009 10 08 00 30 00 554-99 P co2 CCGG 388.380 0.070 ... L10 2009 10 16 15 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 285089 UTA 2009 10 13 14 50 00 2397-99 P co2 CCGG 384.980 0.070 ... L10 2009 11 05 16 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 285647 UTA 2009 10 13 14 50 00 2398-99 P co2 CCGG 385.040 0.070 ... L10 2009 11 05 16 37 00 39.9018 -113.7181 1332.00 1327.00 5.00 285648 UTA 2009 10 19 19 35 00 4015-99 P co2 CCGG 386.510 0.070 -.. L10 2009 11 05 16 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 285645 UTA 2009 10 19 19 35 00 4016-99 P co2 CCGG 387.020 0.070 +.. L10 2009 11 05 17 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 285646 UTA 2009 10 26 15 20 00 1243-99 P co2 CCGG 385.800 0.070 ... L10 2009 11 20 16 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 286343 UTA 2009 10 26 15 20 00 1244-99 P co2 CCGG 385.760 0.070 ... L10 2009 11 20 16 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 286344 UTA 2009 11 02 22 20 00 2341-99 P co2 CCGG 388.340 0.070 ... L10 2009 11 20 16 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 286341 UTA 2009 11 02 22 20 00 2342-99 P co2 CCGG 388.330 0.070 ... L10 2009 11 20 16 17 00 39.9018 -113.7181 1332.00 1327.00 5.00 286342 UTA 2009 11 09 22 10 00 4085-99 P co2 CCGG 388.290 0.070 ... L10 2009 12 05 11 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 287104 UTA 2009 11 09 22 10 00 4086-99 P co2 CCGG 388.330 0.070 ... L10 2009 12 05 11 38 00 39.9018 -113.7181 1332.00 1327.00 5.00 287105 UTA 2009 11 16 22 45 00 385-99 P co2 CCGG 389.740 0.070 ... L10 2009 12 05 11 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 287102 UTA 2009 11 16 22 45 00 386-99 P co2 CCGG 389.730 0.070 ... L10 2009 12 05 12 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 287103 UTA 2009 11 24 22 05 00 3755-99 P co2 CCGG 389.210 0.070 ... L10 2009 12 23 15 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 287849 UTA 2009 11 24 22 05 00 3756-99 P co2 CCGG 389.030 0.070 ... L10 2009 12 23 15 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 287850 UTA 2009 11 30 20 45 00 881-99 P co2 CCGG 390.040 0.070 ... L10 2009 12 23 14 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 287847 UTA 2009 11 30 20 45 00 882-99 P co2 CCGG 389.910 0.070 ... L10 2009 12 23 14 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 287848 UTA 2009 12 07 23 05 00 321-99 P co2 CCGG 395.930 0.070 ... L10 2010 01 19 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 288509 UTA 2009 12 07 23 05 00 322-99 P co2 CCGG 395.920 0.070 ... L10 2010 01 19 12 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 288510 UTA 2009 12 13 23 00 00 3485-99 P co2 CCGG 391.200 0.070 ... L10 2010 01 19 12 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 288507 UTA 2009 12 13 23 00 00 3486-99 P co2 CCGG 390.990 0.070 ... L10 2010 01 19 12 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 288508 UTA 2009 12 20 23 30 00 1165-99 P co2 CCGG 394.170 0.070 ... L10 2010 01 27 12 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 289043 UTA 2009 12 20 23 30 00 1166-99 P co2 CCGG 393.930 0.070 ... L10 2010 01 27 12 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 289044 UTA 2009 12 29 17 50 00 4015-99 P co2 CCGG 393.800 0.070 ... L10 2010 01 27 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 289041 UTA 2009 12 29 17 50 00 4016-99 P co2 CCGG 393.640 0.070 ... L10 2010 01 27 12 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 289042 UTA 2010 01 06 21 10 00 317-99 P co2 CCGG 392.460 0.070 ... L10 2010 02 11 15 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 289831 UTA 2010 01 06 21 10 00 318-99 P co2 CCGG 392.520 0.070 ... L10 2010 02 11 15 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 289832 UTA 2010 01 13 23 50 00 711-99 P co2 CCGG 399.600 0.070 ... L10 2010 02 11 14 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 289829 UTA 2010 01 13 23 50 00 712-99 P co2 CCGG 399.530 0.070 ... L10 2010 02 11 14 55 00 39.9018 -113.7181 1332.00 1327.00 5.00 289830 UTA 2010 01 19 18 10 00 2181-99 P co2 CCGG 392.750 0.070 -.. L10 2010 02 26 10 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 290495 UTA 2010 01 19 18 10 00 2182-99 P co2 CCGG 393.560 0.070 +.. L10 2010 02 26 11 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 290496 UTA 2010 01 28 00 50 00 3943-99 P co2 CCGG 393.510 0.070 ... L10 2010 02 26 10 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 290493 UTA 2010 01 28 00 50 00 3944-99 P co2 CCGG 393.490 0.070 ... L10 2010 02 26 10 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 290494 UTA 2010 02 04 00 50 00 2775-99 P co2 CCGG 409.360 0.070 +.. L10 2010 03 09 11 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 291430 UTA 2010 02 04 00 50 00 2776-99 P co2 CCGG 408.200 0.070 -.. L10 2010 03 09 11 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 291431 UTA 2010 02 10 21 10 00 3023-99 P co2 CCGG 395.000 0.070 ... L10 2010 03 09 10 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 291428 UTA 2010 02 10 21 10 00 3024-99 P co2 CCGG 394.740 0.070 ... L10 2010 03 09 10 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 291429 UTA 2010 02 15 21 45 00 3163-99 P co2 CCGG 394.440 0.070 ... L10 2010 03 25 15 55 00 39.9018 -113.7181 1332.00 1327.00 5.00 292265 UTA 2010 02 15 21 45 00 3164-99 P co2 CCGG 394.310 0.070 ... L10 2010 03 25 16 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 292266 UTA 2010 02 22 00 20 00 2577-99 P co2 CCGG 395.060 0.070 ... L10 2010 03 25 15 25 00 39.9018 -113.7181 1332.00 1327.00 5.00 292263 UTA 2010 02 22 00 20 00 2578-99 P co2 CCGG 395.500 0.070 ... L10 2010 03 25 15 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 292264 UTA 2010 02 28 23 55 00 1723-99 P co2 CCGG 393.700 0.070 ... L10 2010 04 01 11 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 292772 UTA 2010 02 28 23 55 00 1724-99 P co2 CCGG 393.670 0.070 ... L10 2010 04 01 12 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 292773 UTA 2010 03 08 22 00 00 5081-99 P co2 CCGG 394.260 0.070 ... L10 2010 04 01 12 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 292770 UTA 2010 03 08 22 00 00 5082-99 P co2 CCGG 394.250 0.070 ... L10 2010 04 01 12 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 292771 UTA 2010 03 18 21 15 00 1187-99 P co2 CCGG 393.680 0.070 ... L10 2010 04 12 15 36 00 39.9018 -113.7181 1332.00 1327.00 5.00 293547 UTA 2010 03 18 21 15 00 1188-99 P co2 CCGG 393.330 0.070 ... L10 2010 04 12 15 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 293548 UTA 2010 03 24 19 55 00 5159-99 P co2 CCGG 394.180 0.070 ... L8 2010 04 12 15 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 293549 UTA 2010 03 24 19 55 00 5160-99 P co2 CCGG 394.000 0.070 ... L8 2010 04 12 15 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 293550 UTA 2010 03 29 16 55 00 755-99 P co2 CCGG 393.430 0.070 ... L8 2010 04 14 15 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 294253 UTA 2010 03 29 16 55 00 756-99 P co2 CCGG 393.420 0.070 ... L8 2010 04 14 15 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 294254 UTA 2010 04 03 15 25 00 3013-99 P co2 CCGG 394.320 0.070 ... L8 2010 04 14 15 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 294251 UTA 2010 04 03 15 25 00 3014-99 P co2 CCGG 394.310 0.070 ... L8 2010 04 14 16 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 294252 UTA 2010 04 09 17 15 00 981-99 P co2 CCGG 394.320 0.070 ... L10 2010 04 21 14 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 295046 UTA 2010 04 09 17 15 00 982-99 P co2 CCGG 394.370 0.070 ... L10 2010 04 21 14 21 00 39.9018 -113.7181 1332.00 1327.00 5.00 295047 UTA 2010 04 15 21 50 00 4879-99 P co2 CCGG 392.570 0.070 ... L10 2010 04 21 13 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 295044 UTA 2010 04 15 21 50 00 4880-99 P co2 CCGG 393.060 0.070 ... L10 2010 04 21 13 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 295045 UTA 2010 04 21 02 10 00 107-99 P co2 CCGG 393.240 0.070 ... L8 2010 05 06 11 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 295938 UTA 2010 04 21 02 10 00 1753-99 P co2 CCGG 393.010 0.070 ... L8 2010 05 06 11 57 00 39.9018 -113.7181 1332.00 1327.00 5.00 295939 UTA 2010 04 28 02 45 00 1561-99 P co2 CCGG 393.310 0.070 ... L8 2010 05 06 12 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 295940 UTA 2010 04 28 02 45 00 2734-99 P co2 CCGG 393.410 0.070 ... L8 2010 05 06 12 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 295941 UTA 2010 05 03 22 10 00 1079-99 P co2 CCGG 391.970 0.070 +.. L10 2010 05 26 13 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 296819 UTA 2010 05 03 22 10 00 1080-99 P co2 CCGG 391.030 0.070 -.. L10 2010 05 26 13 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 296820 UTA 2010 05 12 23 10 00 4197-99 P co2 CCGG 391.000 0.070 ... L10 2010 05 26 12 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 296821 UTA 2010 05 12 23 10 00 4198-99 P co2 CCGG 390.820 0.070 ... L10 2010 05 26 13 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 296822 UTA 2010 05 18 00 10 00 129-99 P co2 CCGG 392.360 0.070 ... L8 2010 06 04 11 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 297578 UTA 2010 05 18 00 10 00 130-99 P co2 CCGG 392.330 0.070 ... L8 2010 06 04 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 297579 UTA 2010 05 25 23 20 00 401-99 P co2 CCGG 389.530 0.070 -.. L8 2010 06 04 11 24 00 39.9018 -113.7181 1332.00 1327.00 5.00 297580 UTA 2010 05 25 23 20 00 402-99 P co2 CCGG 390.110 0.070 +.. L8 2010 06 04 11 39 00 39.9018 -113.7181 1332.00 1327.00 5.00 297581 UTA 2010 06 02 17 05 00 3303-99 P co2 CCGG 397.540 0.070 +.. L8 2010 06 14 16 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 298408 UTA 2010 06 02 17 05 00 3304-99 P co2 CCGG 394.980 0.070 -.. L8 2010 06 14 16 27 00 39.9018 -113.7181 1332.00 1327.00 5.00 298409 UTA 2010 06 08 19 20 00 3421-99 P co2 CCGG 390.790 0.070 ... L8 2010 06 14 15 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 298406 UTA 2010 06 08 19 20 00 3422-99 P co2 CCGG 390.540 0.070 ... L8 2010 06 14 15 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 298407 UTA 2010 06 16 20 40 00 3797-99 P co2 CCGG 388.860 0.070 ... L8 2010 06 30 14 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 299360 UTA 2010 06 16 20 40 00 3798-99 P co2 CCGG 388.660 0.070 ... L8 2010 06 30 14 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 299361 UTA 2010 06 23 22 50 00 4801-99 P co2 CCGG 385.680 0.070 ... L8 2010 06 30 15 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 299358 UTA 2010 06 23 22 50 00 4802-99 P co2 CCGG 385.570 0.070 ... L8 2010 06 30 15 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 299359 UTA 2010 06 30 16 35 00 201-99 P co2 CCGG 390.560 0.070 -.. L10 2010 07 13 11 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 300130 UTA 2010 06 30 16 35 00 202-99 P co2 CCGG 391.100 0.070 +.. L10 2010 07 13 11 51 00 39.9018 -113.7181 1332.00 1327.00 5.00 300131 UTA 2010 07 07 23 30 00 1729-99 P co2 CCGG 383.880 0.070 ... L10 2010 07 13 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 300132 UTA 2010 07 07 23 30 00 1730-99 P co2 CCGG 383.830 0.070 ... L10 2010 07 13 12 21 00 39.9018 -113.7181 1332.00 1327.00 5.00 300133 UTA 2010 07 16 03 10 00 6193-66 P co2 CCGG 390.930 0.070 ... L10 2010 08 02 15 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 300934 UTA 2010 07 16 03 10 00 6194-66 P co2 CCGG 391.050 0.070 ... L10 2010 08 02 15 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 300935 UTA 2010 07 22 01 50 00 5213-99 P co2 CCGG 392.700 0.070 ... L10 2010 08 02 15 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 300932 UTA 2010 07 22 01 50 00 5214-99 P co2 CCGG 392.870 0.070 ... L10 2010 08 02 15 51 00 39.9018 -113.7181 1332.00 1327.00 5.00 300933 UTA 2010 07 26 22 05 00 3357-99 P co2 CCGG 388.650 0.070 ... L10 2010 08 09 14 17 00 39.9018 -113.7181 1332.00 1327.00 5.00 301588 UTA 2010 07 26 22 05 00 3358-99 P co2 CCGG 388.510 0.070 ... L10 2010 08 09 14 33 00 39.9018 -113.7181 1332.00 1327.00 5.00 301589 UTA 2010 08 05 23 15 00 495-99 P co2 CCGG 391.110 0.070 ... L10 2010 08 09 15 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 301574 UTA 2010 08 05 23 15 00 496-99 P co2 CCGG 390.850 0.070 ... L10 2010 08 09 15 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 301575 UTA 2010 08 12 15 15 00 21-99 P co2 CCGG 382.270 0.070 +.. L8 2010 08 24 14 38 00 39.9018 -113.7181 1332.00 1327.00 5.00 302449 UTA 2010 08 12 15 15 00 22-99 P co2 CCGG 381.500 0.070 -.. L8 2010 08 24 14 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 302450 UTA 2010 08 18 23 15 00 1185-99 P co2 CCGG 387.990 0.070 ... L8 2010 08 24 14 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 302447 UTA 2010 08 18 23 15 00 1186-99 P co2 CCGG 387.910 0.070 ... L8 2010 08 24 14 24 00 39.9018 -113.7181 1332.00 1327.00 5.00 302448 UTA 2010 08 26 17 25 00 661-99 P co2 CCGG 385.460 0.070 ... L8 2010 09 13 13 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 303551 UTA 2010 08 26 17 25 00 662-99 P co2 CCGG 385.070 0.070 ... L8 2010 09 13 14 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 303552 UTA 2010 09 06 22 45 00 3881-99 P co2 CCGG 380.860 0.070 ... L8 2010 09 13 13 27 00 39.9018 -113.7181 1332.00 1327.00 5.00 303549 UTA 2010 09 06 22 45 00 3882-99 P co2 CCGG 381.120 0.070 ... L8 2010 09 13 13 41 00 39.9018 -113.7181 1332.00 1327.00 5.00 303550 UTA 2010 09 15 16 15 00 3507-99 P co2 CCGG 385.060 0.070 ... L10 2010 10 01 16 24 00 39.9018 -113.7181 1332.00 1327.00 5.00 304838 UTA 2010 09 15 16 15 00 4929-99 P co2 CCGG 384.820 0.070 ... L10 2010 10 01 16 39 00 39.9018 -113.7181 1332.00 1327.00 5.00 304839 UTA 2010 09 22 15 20 00 3549-99 P co2 CCGG 387.240 0.070 ... L10 2010 10 01 15 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 304836 UTA 2010 09 22 15 20 00 3624-99 P co2 CCGG 386.970 0.070 ... L10 2010 10 01 16 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 304837 UTA 2010 09 30 22 35 00 811-99 P co2 CCGG 387.380 0.070 ... L10 2010 10 15 13 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 305685 UTA 2010 09 30 22 35 00 812-99 P co2 CCGG 386.970 0.070 ... L10 2010 10 15 13 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 305686 UTA 2010 10 06 16 55 00 3199-99 P co2 CCGG 388.890 0.070 ... L10 2010 10 15 13 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 305687 UTA 2010 10 06 16 55 00 3200-99 P co2 CCGG 388.780 0.070 ... L10 2010 10 15 14 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 305688 UTA 2010 10 13 15 50 00 2511-99 P co2 CCGG 388.940 0.070 ... L10 2010 10 27 16 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 306533 UTA 2010 10 13 15 50 00 2512-99 P co2 CCGG 389.230 0.070 ... L10 2010 10 27 16 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 306534 UTA 2010 10 20 20 00 00 441-99 P co2 CCGG 388.250 0.070 -.. L10 2010 10 27 17 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 306531 UTA 2010 10 20 20 00 00 442-99 P co2 CCGG 388.760 0.070 +.. L10 2010 10 27 17 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 306532 UTA 2010 10 27 00 20 00 1697-99 P co2 CCGG 390.840 0.070 ... L10 2010 11 05 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 307069 UTA 2010 10 27 00 20 00 2174-99 P co2 CCGG 390.990 0.070 ... L10 2010 11 05 12 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 307070 UTA 2010 11 02 20 15 00 1015-99 P co2 CCGG 391.490 0.070 ... L10 2010 11 05 11 36 00 39.9018 -113.7181 1332.00 1327.00 5.00 307071 UTA 2010 11 02 20 15 00 1432-99 P co2 CCGG 391.470 0.070 ... L10 2010 11 05 11 51 00 39.9018 -113.7181 1332.00 1327.00 5.00 307072 UTA 2010 11 09 18 35 00 5083-99 P co2 CCGG 390.100 0.070 ... L8 2010 11 23 11 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 308093 UTA 2010 11 09 18 35 00 5084-99 P co2 CCGG 389.780 0.070 ... L8 2010 11 23 11 24 00 39.9018 -113.7181 1332.00 1327.00 5.00 308094 UTA 2010 11 16 20 50 00 5055-99 P co2 CCGG 391.400 0.070 ... L8 2010 11 23 11 39 00 39.9018 -113.7181 1332.00 1327.00 5.00 308091 UTA 2010 11 16 20 50 00 5056-99 P co2 CCGG 391.560 0.070 ... L8 2010 11 23 11 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 308092 UTA 2010 11 22 17 10 00 2087-99 P co2 CCGG 393.230 0.070 ... L8 2010 12 21 13 23 00 39.9018 -113.7181 1332.00 1327.00 5.00 309531 UTA 2010 11 22 17 10 00 2088-99 P co2 CCGG 393.210 0.070 ... L8 2010 12 21 13 38 00 39.9018 -113.7181 1332.00 1327.00 5.00 309532 UTA 2010 12 06 20 00 00 3339-99 P co2 CCGG 395.650 0.070 ... L8 2010 12 21 13 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 309533 UTA 2010 12 06 20 00 00 3340-99 P co2 CCGG 395.520 0.070 ... L8 2010 12 21 14 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 309534 UTA 2010 12 14 21 35 00 3543-99 P co2 CCGG 391.710 0.070 ... L10 2010 12 30 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 310112 UTA 2010 12 14 21 35 00 3544-99 P co2 CCGG 391.430 0.070 ... L10 2010 12 30 12 19 00 39.9018 -113.7181 1332.00 1327.00 5.00 310113 UTA 2010 12 23 22 20 00 2859-99 P co2 CCGG 400.230 0.070 ... L10 2010 12 30 12 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 310110 UTA 2010 12 23 22 20 00 2860-99 P co2 CCGG 400.490 0.070 ... L10 2010 12 30 12 51 00 39.9018 -113.7181 1332.00 1327.00 5.00 310111 UTA 2010 12 29 23 15 00 317-99 P co2 CCGG 394.440 0.070 ... L10 2011 01 19 15 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 311080 UTA 2010 12 29 23 15 00 772-99 P co2 CCGG 394.460 0.070 ... L10 2011 01 19 15 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 311081 UTA 2011 01 11 22 05 00 1315-99 P co2 CCGG 397.660 0.070 ... L10 2011 01 19 14 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 311078 UTA 2011 01 11 22 05 00 3227-99 P co2 CCGG 397.740 0.070 ... L10 2011 01 19 14 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 311079 UTA 2011 01 18 17 10 00 5383-99 P co2 CCGG 395.180 0.070 ... L10 2011 02 14 13 25 00 39.9018 -113.7181 1332.00 1327.00 5.00 312190 UTA 2011 01 18 17 10 00 5384-99 P co2 CCGG 395.100 0.070 ... L10 2011 02 14 13 41 00 39.9018 -113.7181 1332.00 1327.00 5.00 312191 UTA 2011 01 28 00 10 00 5385-99 P co2 CCGG 397.900 0.070 -.. L10 2011 02 14 13 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 312188 UTA 2011 01 28 00 10 00 5386-99 P co2 CCGG 399.000 0.070 +.. L10 2011 02 14 14 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 312189 UTA 2011 01 31 22 40 00 1210-99 P co2 CCGG 394.570 0.070 ... L10 2011 02 24 09 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 312896 UTA 2011 01 31 22 40 00 1837-99 P co2 CCGG 394.510 0.070 ... L10 2011 02 24 10 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 312897 UTA 2011 02 07 22 30 00 2891-99 P co2 CCGG 393.860 0.070 ... L10 2011 02 24 10 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 312898 UTA 2011 02 07 22 30 00 6156-66 P co2 CCGG 393.760 0.070 ... L10 2011 02 24 10 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 312899 UTA 2011 02 15 00 20 00 2694-99 P co2 CCGG 394.580 0.070 ... L10 2011 03 03 12 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 313528 UTA 2011 02 15 00 20 00 2933-99 P co2 CCGG 395.010 0.070 ... L10 2011 03 03 12 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 313529 UTA 2011 02 22 17 40 00 4629-99 P co2 CCGG 396.690 0.070 ... L10 2011 03 03 13 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 313526 UTA 2011 02 22 17 40 00 4694-99 P co2 CCGG 396.680 0.070 ... L10 2011 03 03 13 17 00 39.9018 -113.7181 1332.00 1327.00 5.00 313527 UTA 2011 02 26 18 35 00 4701-99 P co2 CCGG 397.910 0.070 ... L8 2011 03 15 16 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 314116 UTA 2011 02 26 18 35 00 4702-99 P co2 CCGG 397.600 0.070 ... L8 2011 03 15 16 17 00 39.9018 -113.7181 1332.00 1327.00 5.00 314117 UTA 2011 03 07 23 20 00 5167-99 P co2 CCGG 395.960 0.070 ... L10 2011 03 15 16 21 00 39.9018 -113.7181 1332.00 1327.00 5.00 314114 UTA 2011 03 07 23 20 00 5168-99 P co2 CCGG 395.900 0.070 ... L10 2011 03 15 16 37 00 39.9018 -113.7181 1332.00 1327.00 5.00 314115 UTA 2011 03 13 23 00 00 2720-99 P co2 CCGG 395.440 0.070 ... L8 2011 03 31 11 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 314901 UTA 2011 03 13 23 00 00 3833-99 P co2 CCGG 395.610 0.070 ... L8 2011 03 31 11 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 314902 UTA 2011 03 21 00 30 00 1426-99 P co2 CCGG 394.500 0.070 ... L8 2011 03 31 10 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 314899 UTA 2011 03 21 00 30 00 1470-99 P co2 CCGG 394.500 0.070 ... L8 2011 03 31 10 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 314900 UTA 2011 03 28 00 20 00 1136-99 P co2 CCGG 395.870 0.070 ... L10 2011 04 07 13 27 00 39.9018 -113.7181 1332.00 1327.00 5.00 315493 UTA 2011 03 28 00 20 00 589-99 P co2 CCGG 395.880 0.070 ... L10 2011 04 07 13 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 315492 UTA 2011 04 04 01 10 00 3600-99 P co2 CCGG 397.130 0.070 ... L10 2011 04 07 12 38 00 39.9018 -113.7181 1332.00 1327.00 5.00 315490 UTA 2011 04 04 01 10 00 4265-99 P co2 CCGG 397.230 0.070 ... L10 2011 04 07 12 55 00 39.9018 -113.7181 1332.00 1327.00 5.00 315491 UTA 2011 04 11 15 45 00 2925-99 P co2 CCGG 396.720 0.070 ... L8 2011 04 27 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 316558 UTA 2011 04 11 15 45 00 2926-99 P co2 CCGG 396.820 0.070 ... L8 2011 04 27 12 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 316559 UTA 2011 04 16 22 30 00 3215-99 P co2 CCGG 395.960 0.070 ... L8 2011 04 27 11 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 316556 UTA 2011 04 16 22 30 00 3216-99 P co2 CCGG 395.900 0.070 ... L8 2011 04 27 11 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 316557 UTA 2011 04 25 15 15 00 6529-66 P co2 CCGG 394.640 0.070 ... L10 2011 05 09 14 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 317322 UTA 2011 04 25 15 15 00 6530-66 P co2 CCGG 394.470 0.070 ... L10 2011 05 09 15 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 317323 UTA 2011 05 01 23 50 00 2391-99 P co2 CCGG 396.520 0.070 -.. L10 2011 05 09 15 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 317320 UTA 2011 05 01 23 50 00 2392-99 P co2 CCGG 397.090 0.070 +.. L10 2011 05 09 15 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 317321 UTA 2011 05 09 16 50 00 1337-99 P co2 CCGG 395.380 0.070 ... L10 2011 05 20 15 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 317914 UTA 2011 05 09 16 50 00 1754-99 P co2 CCGG 395.310 0.070 ... L10 2011 05 20 15 57 00 39.9018 -113.7181 1332.00 1327.00 5.00 317915 UTA 2011 05 15 21 20 00 2498-99 P co2 CCGG 392.970 0.070 ... L10 2011 05 20 15 24 00 39.9018 -113.7181 1332.00 1327.00 5.00 317913 UTA 2011 05 15 21 20 00 510-99 P co2 CCGG 392.920 0.070 ... L10 2011 05 20 15 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 317912 UTA 2011 05 23 16 35 00 2910-99 P co2 CCGG 391.740 0.070 ... L10 2011 06 06 14 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 318685 UTA 2011 05 23 16 35 00 912-99 P co2 CCGG 391.320 0.070 ... L10 2011 06 06 14 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 318684 UTA 2011 05 31 01 20 00 4992-99 P co2 CCGG 392.920 0.070 ... L10 2011 06 06 13 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 318686 UTA 2011 05 31 01 20 00 6258-66 P co2 CCGG 393.360 0.070 ... L10 2011 06 06 13 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 318687 UTA 2011 06 06 16 00 00 1778-99 P co2 CCGG 393.900 0.070 ... L10 2011 06 16 16 36 00 39.9018 -113.7181 1332.00 1327.00 5.00 319254 UTA 2011 06 06 16 00 00 235-99 P co2 CCGG 393.800 0.070 ... L10 2011 06 16 16 19 00 39.9018 -113.7181 1332.00 1327.00 5.00 319255 UTA 2011 06 13 03 05 00 1835-99 P co2 CCGG 402.350 0.070 -.. L10 2011 06 16 15 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 319253 UTA 2011 06 13 03 05 00 2534-99 P co2 CCGG 403.560 0.070 +.. L10 2011 06 16 16 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 319252 UTA 2011 06 20 03 15 00 2929-99 P co2 CCGG 394.080 0.070 ... L8 2011 07 07 12 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 320118 UTA 2011 06 20 03 15 00 2930-99 P co2 CCGG 394.090 0.070 ... L8 2011 07 07 12 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 320119 UTA 2011 06 28 23 30 00 43-99 P co2 CCGG 394.550 0.070 ... L8 2011 07 07 12 57 00 39.9018 -113.7181 1332.00 1327.00 5.00 320116 UTA 2011 06 28 23 30 00 44-99 P co2 CCGG 394.630 0.070 ... L8 2011 07 07 13 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 320117 UTA 2011 07 06 03 20 00 115-99 P co2 CCGG 396.730 0.070 ... L8 2011 07 28 15 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 321350 UTA 2011 07 06 03 20 00 116-99 P co2 CCGG 396.670 0.070 ... L8 2011 07 28 15 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 321351 UTA 2011 07 18 16 30 00 987-99 P co2 CCGG 391.270 0.070 ... L8 2011 07 28 14 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 321348 UTA 2011 07 18 16 30 00 988-99 P co2 CCGG 390.990 0.070 ... L8 2011 07 28 15 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 321349 UTA 2011 07 23 16 30 00 6139-66 P co2 CCGG 383.300 0.070 +.. L10 2011 08 08 12 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 321771 UTA 2011 07 23 16 30 00 6140-66 P co2 CCGG 382.750 0.070 -.. L10 2011 08 08 12 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 321772 UTA 2011 08 01 00 00 00 4889-99 P co2 CCGG 391.760 0.070 ... L10 2011 08 08 12 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 321773 UTA 2011 08 01 00 00 00 4890-99 P co2 CCGG 392.000 0.070 ... L10 2011 08 08 12 27 00 39.9018 -113.7181 1332.00 1327.00 5.00 321774 UTA 2011 08 02 22 10 00 705-99 P co2 CCGG 389.720 0.070 -.. L10 2011 08 18 16 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 322302 UTA 2011 08 02 22 10 00 706-99 P co2 CCGG 390.300 0.070 +.. L10 2011 08 18 17 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 322303 UTA 2011 08 08 22 35 00 3339-99 P co2 CCGG 380.640 0.070 -.. L10 2011 08 18 16 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 322304 UTA 2011 08 08 22 35 00 3340-99 P co2 CCGG 383.870 0.070 +.. L10 2011 08 18 16 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 322305 UTA 2011 08 20 01 40 00 2341-99 P co2 CCGG 390.200 0.070 ... L10 2011 09 06 13 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 323101 UTA 2011 08 20 01 40 00 2342-99 P co2 CCGG 389.830 0.070 ... L10 2011 09 06 13 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 323102 UTA 2011 08 30 17 30 00 1825-99 P co2 CCGG 387.830 0.070 +.. L10 2011 09 06 14 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 323099 UTA 2011 08 30 17 30 00 1826-99 P co2 CCGG 386.750 0.070 -.. L10 2011 09 06 14 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 323100 UTA 2011 09 05 21 25 00 5189-99 P co2 CCGG 389.030 0.070 ... L8 2011 09 21 09 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 323837 UTA 2011 09 05 21 25 00 5190-99 P co2 CCGG 388.900 0.070 ... L8 2011 09 21 09 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 323838 UTA 2011 09 10 01 30 00 5359-99 P co2 CCGG 390.270 0.070 ... L8 2011 09 21 09 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 323839 UTA 2011 09 10 01 30 00 5360-99 P co2 CCGG 390.140 0.070 ... L8 2011 09 21 10 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 323840 UTA 2011 09 15 16 40 00 565-99 P co2 CCGG 388.540 0.070 ... L10 2011 10 03 11 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 324391 UTA 2011 09 15 16 40 00 566-99 P co2 CCGG 388.960 0.070 ... L10 2011 10 03 11 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 324392 UTA 2011 09 23 18 10 00 3267-99 P co2 CCGG 387.690 0.070 ... L10 2011 10 03 12 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 324389 UTA 2011 09 23 18 10 00 3268-99 P co2 CCGG 387.750 0.070 ... L10 2011 10 03 12 17 00 39.9018 -113.7181 1332.00 1327.00 5.00 324390 UTA 2011 10 05 18 10 00 3977-99 P co2 CCGG 387.940 0.070 +.. L8 2011 11 02 12 51 00 39.9018 -113.7181 1332.00 1327.00 5.00 325571 UTA 2011 10 05 18 10 00 5059-99 P co2 CCGG 387.150 0.070 -.. L8 2011 11 02 13 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 325572 UTA 2011 10 14 17 45 00 222-99 P co2 CCGG 387.190 0.070 ... L8 2011 11 02 12 36 00 39.9018 -113.7181 1332.00 1327.00 5.00 325574 UTA 2011 10 14 17 45 00 304-99 P co2 CCGG 387.210 0.070 ... L8 2011 11 02 12 21 00 39.9018 -113.7181 1332.00 1327.00 5.00 325573 UTA 2011 10 18 21 45 00 3631-99 P co2 CCGG 391.810 0.070 ... L8 2011 11 09 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 326177 UTA 2011 10 18 21 45 00 3710-99 P co2 CCGG 391.550 0.070 ... L8 2011 11 09 11 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 326176 UTA 2011 10 24 18 40 00 4268-99 P co2 CCGG 386.920 0.070 ... L8 2011 11 09 11 33 00 39.9018 -113.7181 1332.00 1327.00 5.00 326179 UTA 2011 10 24 18 40 00 665-99 P co2 CCGG 386.530 0.070 ... L8 2011 11 09 11 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 326178 UTA 2011 11 02 19 45 00 5041-99 P co2 CCGG 393.150 0.070 ... L8 2011 11 17 11 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 326857 UTA 2011 11 02 19 45 00 5042-99 P co2 CCGG 393.260 0.070 ... L8 2011 11 17 11 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 326858 UTA 2011 11 09 23 30 00 2409-99 P co2 CCGG 393.820 0.070 ... L8 2011 11 17 10 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 326859 UTA 2011 11 09 23 30 00 2410-99 P co2 CCGG 393.670 0.070 ... L8 2011 11 17 10 49 00 39.9018 -113.7181 1332.00 1327.00 5.00 326860 UTA 2011 11 18 20 55 00 3367-99 P co2 CCGG 391.920 0.070 ... L10 2011 12 16 12 55 00 39.9018 -113.7181 1332.00 1327.00 5.00 327820 UTA 2011 11 18 20 55 00 3368-99 P co2 CCGG 391.920 0.070 ... L10 2011 12 16 13 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 327821 UTA 2011 11 28 23 50 00 4473-99 P co2 CCGG 400.750 0.070 +.. L10 2011 12 16 13 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 327822 UTA 2011 11 28 23 50 00 4474-99 P co2 CCGG 399.840 0.070 -.. L10 2011 12 16 13 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 327823 UTA 2011 12 06 00 15 00 3003-99 P co2 CCGG 400.070 0.070 ... L8 2012 01 09 11 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 328778 UTA 2011 12 06 00 15 00 5397-99 P co2 CCGG 399.850 0.070 ... L8 2012 01 09 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 328779 UTA 2011 12 17 20 20 00 1499-99 P co2 CCGG 397.440 0.070 ... L8 2012 01 09 11 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 328781 UTA 2011 12 17 20 20 00 65-99 P co2 CCGG 397.270 0.070 ... L8 2012 01 09 11 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 328780 UTA 2011 12 22 17 10 00 311-99 P co2 CCGG 397.950 0.070 ... L10 2012 01 09 15 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 328868 UTA 2011 12 22 17 10 00 940-99 P co2 CCGG 397.970 0.070 ... L10 2012 01 09 15 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 328869 UTA 2011 12 27 20 20 00 2604-99 P co2 CCGG 397.590 0.070 ... L10 2012 01 09 16 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 328870 UTA 2011 12 27 20 20 00 926-99 P co2 CCGG 397.520 0.070 ... L10 2012 01 09 15 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 328871 UTA 2012 01 03 21 20 00 3000-99 P co2 CCGG 396.650 0.070 ... L8 2012 01 20 12 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 329635 UTA 2012 01 03 21 20 00 6129-66 P co2 CCGG 396.760 0.070 ... L8 2012 01 20 12 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 329634 UTA 2012 01 09 18 05 00 3893-99 P co2 CCGG 397.390 0.070 ... L8 2012 01 20 13 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 329636 UTA 2012 01 09 18 05 00 956-99 P co2 CCGG 396.990 0.070 ... L8 2012 01 20 13 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 329637 UTA 2012 01 16 01 10 00 1477-99 P co2 CCGG 395.510 0.070 ... L10 2012 02 01 08 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 330414 UTA 2012 01 16 01 10 00 1478-99 P co2 CCGG 395.510 0.070 ... L10 2012 02 01 09 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 330415 UTA 2012 01 23 18 40 00 1577-99 P co2 CCGG 396.810 0.070 ... L10 2012 01 31 15 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 330416 UTA 2012 01 23 18 40 00 1578-99 P co2 CCGG 396.900 0.070 ... L10 2012 01 31 16 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 330417 UTA 2012 01 30 17 00 00 4074-99 P co2 CCGG 397.570 0.070 ... L10 2012 02 14 12 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 331186 UTA 2012 01 30 17 00 00 5191-99 P co2 CCGG 397.350 0.070 ... L10 2012 02 14 13 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 331187 UTA 2012 02 07 01 00 00 1744-99 P co2 CCGG 399.830 0.070 ... L10 2012 02 14 13 19 00 39.9018 -113.7181 1332.00 1327.00 5.00 331188 UTA 2012 02 07 01 00 00 2616-99 P co2 CCGG 399.870 0.070 ... L10 2012 02 14 13 36 00 39.9018 -113.7181 1332.00 1327.00 5.00 331189 UTA 2012 02 16 01 20 00 3971-99 P co2 CCGG 398.790 0.070 ... L8 2012 03 07 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 332107 UTA 2012 02 16 01 20 00 3972-99 P co2 CCGG 398.780 0.070 ... L8 2012 03 07 12 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 332108 UTA 2012 02 21 20 00 00 3143-99 P co2 CCGG 398.320 0.070 ... L8 2012 03 07 11 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 332105 UTA 2012 02 21 20 00 00 3144-99 P co2 CCGG 398.140 0.070 ... L8 2012 03 07 11 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 332106 UTA 2012 02 27 21 35 00 4053-99 P co2 CCGG 399.950 0.070 +.. L8 2012 03 19 11 41 00 39.9018 -113.7181 1332.00 1327.00 5.00 332696 UTA 2012 02 27 21 35 00 4334-99 P co2 CCGG 399.380 0.070 -.. L8 2012 03 19 11 57 00 39.9018 -113.7181 1332.00 1327.00 5.00 332697 UTA 2012 03 06 01 40 00 4293-99 P co2 CCGG 401.610 0.070 +.. L8 2012 03 19 11 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 332698 UTA 2012 03 06 01 40 00 4950-99 P co2 CCGG 400.760 0.070 -.. L8 2012 03 19 11 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 332699 UTA 2012 03 11 21 35 00 3139-99 P co2 CCGG 398.530 0.070 ... L8 2012 03 26 12 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 333143 UTA 2012 03 11 21 35 00 3554-99 P co2 CCGG 398.620 0.070 ... L8 2012 03 26 13 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 333144 UTA 2012 03 17 20 20 00 2938-99 P co2 CCGG 396.210 0.070 ... L8 2012 03 26 13 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 333146 UTA 2012 03 17 20 20 00 348-99 P co2 CCGG 396.170 0.070 ... L8 2012 03 26 13 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 333145 UTA 2012 03 26 00 05 00 3801-99 P co2 CCGG 395.720 0.070 ... L8 2012 04 09 11 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 333540 UTA 2012 03 26 00 05 00 3802-99 P co2 CCGG 395.690 0.070 ... L8 2012 04 09 11 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 333541 UTA 2012 03 31 20 00 00 2800-99 P co2 CCGG 396.090 0.070 ... L8 2012 04 18 16 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 334140 UTA 2012 03 31 20 00 00 3445-99 P co2 CCGG 395.910 0.070 ... L8 2012 04 18 15 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 334139 UTA 2012 04 06 23 35 00 2920-99 P co2 CCGG 398.460 0.070 ... L8 2012 04 18 16 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 334141 UTA 2012 04 06 23 35 00 4005-99 P co2 CCGG 398.750 0.070 ... L8 2012 04 18 16 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 334142 UTA 2012 04 13 22 50 00 6139-66 P co2 CCGG 398.020 0.070 ... L8 2012 05 04 14 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 334607 UTA 2012 04 13 22 50 00 6140-66 P co2 CCGG 397.790 0.070 ... L8 2012 05 04 14 49 00 39.9018 -113.7181 1332.00 1327.00 5.00 334608 UTA 2012 04 20 00 20 00 3721-99 P co2 CCGG 398.090 0.070 ... L8 2012 05 07 10 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 334605 UTA 2012 04 20 00 20 00 3722-99 P co2 CCGG 398.050 0.070 ... L8 2012 05 07 10 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 334606 UTA 2012 04 26 20 40 00 2683-99 P co2 CCGG 395.690 0.070 ... L10 2012 05 14 13 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 335252 UTA 2012 04 26 20 40 00 2684-99 P co2 CCGG 395.670 0.070 ... L10 2012 05 14 13 49 00 39.9018 -113.7181 1332.00 1327.00 5.00 335251 UTA 2012 05 02 22 25 00 1661-99 P co2 CCGG 395.810 0.070 ... L10 2012 05 14 14 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 335253 UTA 2012 05 02 22 25 00 1662-99 P co2 CCGG 395.840 0.070 ... L10 2012 05 14 14 21 00 39.9018 -113.7181 1332.00 1327.00 5.00 335254 UTA 2012 05 11 21 00 00 1369-99 P co2 CCGG 396.230 0.070 ... L8 2012 05 24 14 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 335855 UTA 2012 05 11 21 00 00 5356-99 P co2 CCGG 396.250 0.070 ... L8 2012 05 24 14 55 00 39.9018 -113.7181 1332.00 1327.00 5.00 335856 UTA 2012 05 18 02 15 00 4619-99 P co2 CCGG 397.260 0.070 ... L8 2012 05 24 15 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 335853 UTA 2012 05 18 02 15 00 4913-99 P co2 CCGG 397.150 0.070 ... L8 2012 05 24 15 25 00 39.9018 -113.7181 1332.00 1327.00 5.00 335854 UTA 2012 05 29 19 35 00 5403-99 P co2 CCGG 394.090 0.070 ... L8 2012 06 18 11 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 336939 UTA 2012 05 29 19 35 00 5404-99 P co2 CCGG 393.710 0.070 ... L8 2012 06 18 11 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 336940 UTA 2012 06 05 01 55 00 5217-99 P co2 CCGG 397.760 0.070 ... L8 2012 06 14 16 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 336941 UTA 2012 06 05 01 55 00 5218-99 P co2 CCGG 397.790 0.070 ... L8 2012 06 14 16 41 00 39.9018 -113.7181 1332.00 1327.00 5.00 336942 UTA 2012 06 13 03 35 00 4721-99 P co2 CCGG 396.640 0.070 ... L8 2012 07 03 11 17 00 39.9018 -113.7181 1332.00 1327.00 5.00 337741 UTA 2012 06 13 03 35 00 6179-66 P co2 CCGG 396.570 0.070 ... L8 2012 07 03 11 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 337742 UTA 2012 06 20 01 50 00 191-99 P co2 CCGG 394.300 0.070 ... L8 2012 07 03 11 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 337743 UTA 2012 06 20 01 50 00 974-99 P co2 CCGG 394.050 0.070 ... L8 2012 07 03 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 337744 UTA 2012 06 26 17 00 00 71-99 P co2 CCGG 392.980 0.070 ... L8 2012 07 12 09 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 338074 UTA 2012 06 26 17 00 00 72-99 P co2 CCGG 393.120 0.070 ... L8 2012 07 12 09 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 338075 UTA 2012 07 02 01 35 00 2477-99 P co2 CCGG 394.570 0.070 ... L8 2012 07 11 16 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 338077 UTA 2012 07 02 01 35 00 2478-99 P co2 CCGG 394.500 0.070 ... L8 2012 07 11 16 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 338076 UTA 2012 07 06 16 05 00 2-99 P co2 CCGG 395.750 0.070 -.. L8 2012 07 30 12 19 00 39.9018 -113.7181 1332.00 1327.00 5.00 338612 UTA 2012 07 06 16 05 00 2462-99 P co2 CCGG 396.570 0.070 +.. L8 2012 07 30 12 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 338613 UTA 2012 07 13 00 55 00 3037-99 P co2 CCGG 397.170 0.070 ... L8 2012 07 30 13 51 00 39.9018 -113.7181 1332.00 1327.00 5.00 338610 UTA 2012 07 13 00 55 00 3550-99 P co2 CCGG 396.870 0.070 ... L8 2012 07 30 14 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 338611 UTA 2012 07 19 01 55 00 3813-99 P co2 CCGG 395.380 0.070 ... L8 2012 08 10 11 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 339176 UTA 2012 07 19 01 55 00 3814-99 P co2 CCGG 395.200 0.070 ... L8 2012 08 10 11 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 339177 UTA 2012 07 23 19 50 00 2839-99 P co2 CCGG 392.260 0.070 -.. L8 2012 08 10 11 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 339174 UTA 2012 07 23 19 50 00 2840-99 P co2 CCGG 393.310 0.070 +.. L8 2012 08 10 12 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 339175 UTA 2012 07 30 02 45 00 1797-99 P co2 CCGG 403.940 0.070 .X. L8 2012 08 21 15 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 339575 UTA 2012 07 30 02 45 00 1798-99 P co2 CCGG 403.720 0.070 .X. L8 2012 08 21 16 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 339576 UTA 2012 08 04 18 15 00 1293-99 P co2 CCGG 386.130 0.070 +.. L8 2012 08 21 15 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 339577 UTA 2012 08 04 18 15 00 1294-99 P co2 CCGG 384.150 0.070 -.. L8 2012 08 21 15 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 339578 UTA 2012 08 10 23 35 00 264-99 P co2 CCGG 395.020 0.070 ... L8 2012 09 06 15 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 340434 UTA 2012 08 10 23 35 00 609-99 P co2 CCGG 394.960 0.070 ... L8 2012 09 06 15 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 340435 UTA 2012 08 17 14 40 00 451-99 P co2 CCGG 386.840 0.070 -.. L8 2012 09 06 15 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 340432 UTA 2012 08 17 14 40 00 4844-99 P co2 CCGG 389.330 0.070 +.. L8 2012 09 06 15 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 340433 UTA 2012 08 23 23 30 00 2370-99 P co2 CCGG 393.690 0.070 ... L8 2012 09 13 09 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 340798 UTA 2012 08 23 23 30 00 2456-99 P co2 CCGG 393.540 0.070 ... L8 2012 09 13 09 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 340799 UTA 2012 08 29 00 10 00 3193-99 P co2 CCGG 388.220 0.070 -.. L8 2012 09 13 09 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 340796 UTA 2012 08 29 00 10 00 4849-99 P co2 CCGG 389.650 0.070 +.. L8 2012 09 13 10 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 340797 UTA 2012 09 06 16 35 00 3269-99 P co2 CCGG 394.370 0.070 +.. L8 2012 09 25 13 23 00 39.9018 -113.7181 1332.00 1327.00 5.00 341308 UTA 2012 09 06 16 35 00 3270-99 P co2 CCGG 393.450 0.070 -.. L8 2012 09 25 13 38 00 39.9018 -113.7181 1332.00 1327.00 5.00 341309 UTA 2012 09 10 17 05 00 4533-99 P co2 CCGG 390.610 0.070 ... L8 2012 09 25 13 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 341306 UTA 2012 09 10 17 05 00 4534-99 P co2 CCGG 390.840 0.070 ... L8 2012 09 25 14 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 341307 UTA 2012 09 16 23 20 00 1737-99 P co2 CCGG 389.290 0.070 ... L8 2012 10 10 16 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 342176 UTA 2012 09 16 23 20 00 1738-99 P co2 CCGG 389.430 0.070 ... L8 2012 10 10 16 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 342177 UTA 2012 09 24 15 00 00 3479-99 P co2 CCGG 393.990 0.070 ... L8 2012 10 10 15 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 342175 UTA 2012 09 24 15 00 00 3480-99 P co2 CCGG 394.120 0.070 ... L8 2012 10 10 15 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 342174 UTA 2012 09 27 16 55 00 1219-99 P co2 CCGG 389.340 0.070 ... L8 2012 10 23 16 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 342526 UTA 2012 09 27 16 55 00 2176-99 P co2 CCGG 389.160 0.070 ... L8 2012 10 23 17 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 342527 UTA 2012 10 05 16 55 00 1744-99 P co2 CCGG 388.970 0.070 ... L8 2012 10 24 09 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 342528 UTA 2012 10 05 16 55 00 4074-99 P co2 CCGG 388.800 0.070 ... L8 2012 10 24 09 17 00 39.9018 -113.7181 1332.00 1327.00 5.00 342529 UTA 2012 10 10 19 00 00 1218-99 P co2 CCGG 392.710 0.070 ... L8 2012 10 31 11 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 343046 UTA 2012 10 10 19 00 00 734-99 P co2 CCGG 392.920 0.070 ... L8 2012 10 31 10 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 343045 UTA 2012 10 15 20 10 00 4071-99 P co2 CCGG 389.880 0.070 +.. L8 2012 10 31 11 25 00 39.9018 -113.7181 1332.00 1327.00 5.00 343043 UTA 2012 10 15 20 10 00 4629-99 P co2 CCGG 389.300 0.070 -.. L8 2012 10 31 11 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 343044 UTA 2012 10 22 21 05 00 2295-99 P co2 CCGG 390.680 0.070 ... L8 2012 11 14 15 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 343538 UTA 2012 10 22 21 05 00 2296-99 P co2 CCGG 390.950 0.070 ... L8 2012 11 14 16 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 343539 UTA 2012 10 31 00 23 00 2315-99 P co2 CCGG 394.840 0.070 ... L8 2012 11 14 15 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 343540 UTA 2012 10 31 00 23 00 2316-99 P co2 CCGG 394.820 0.070 ... L8 2012 11 14 15 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 343541 UTA 2012 11 05 17 00 00 2975-99 P co2 CCGG 393.520 0.070 ... L8 2012 11 26 13 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 344107 UTA 2012 11 05 17 00 00 2976-99 P co2 CCGG 393.930 0.070 ... L8 2012 11 26 14 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 344108 UTA 2012 11 13 16 00 00 2321-99 P co2 CCGG 399.970 0.070 ... L8 2012 11 26 13 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 344105 UTA 2012 11 13 16 00 00 2322-99 P co2 CCGG 400.020 0.070 ... L8 2012 11 26 13 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 344106 UTA 2012 11 20 16 20 00 199-99 P co2 CCGG 396.320 0.070 ... L8 2012 12 19 10 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 344961 UTA 2012 11 20 16 20 00 200-99 P co2 CCGG 396.250 0.070 ... L8 2012 12 19 10 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 344962 UTA 2012 11 26 19 00 00 3339-99 P co2 CCGG 397.130 0.070 ... L10 2012 12 20 14 25 00 39.9018 -113.7181 1332.00 1327.00 5.00 344971 UTA 2012 11 26 19 00 00 3340-99 P co2 CCGG 397.170 0.070 ... L10 2012 12 20 14 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 344972 UTA 2012 12 02 00 05 00 2437-99 P co2 CCGG 395.710 0.070 ... L8 2012 12 19 12 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 345080 UTA 2012 12 02 00 05 00 2438-99 P co2 CCGG 395.720 0.070 ... L8 2012 12 19 12 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 345081 UTA 2012 12 08 23 55 00 2755-99 P co2 CCGG 398.010 0.070 +.. L8 2012 12 19 12 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 345078 UTA 2012 12 08 23 55 00 2756-99 P co2 CCGG 397.450 0.070 -.. L8 2012 12 19 12 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 345079 UTA 2012 12 13 22 05 00 3147-99 P co2 CCGG 397.210 0.070 ... L8 2013 01 09 13 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 345570 UTA 2012 12 13 22 05 00 3148-99 P co2 CCGG 397.190 0.070 ... L8 2013 01 09 13 27 00 39.9018 -113.7181 1332.00 1327.00 5.00 345571 UTA 2012 12 19 19 38 00 3111-99 P co2 CCGG 398.450 0.070 ... L10 2013 01 15 12 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 345742 UTA 2012 12 19 19 38 00 3112-99 P co2 CCGG 398.520 0.070 ... L10 2013 01 15 12 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 345743 UTA 2012 12 27 22 20 00 1561-99 P co2 CCGG 400.540 0.070 ... L8 2013 01 15 15 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 346089 UTA 2012 12 27 22 20 00 2272-99 P co2 CCGG 400.900 0.070 ... L8 2013 01 15 16 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 346090 UTA 2012 12 31 20 35 00 3210-99 P co2 CCGG 402.180 0.070 ... L8 2013 01 17 11 41 00 39.9018 -113.7181 1332.00 1327.00 5.00 346091 UTA 2012 12 31 20 35 00 6017-66 P co2 CCGG 402.420 0.070 ... L8 2013 01 17 11 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 346092 UTA 2013 01 07 00 35 00 3985-99 P co2 CCGG 405.690 0.070 .X. L10 2013 01 25 10 23 00 39.9018 -113.7181 1332.00 1327.00 5.00 346477 UTA 2013 01 07 00 35 00 3986-99 P co2 CCGG 405.750 0.070 .X. L10 2013 01 25 10 39 00 39.9018 -113.7181 1332.00 1327.00 5.00 346478 UTA 2013 01 10 16 36 00 2197-99 P co2 CCGG 399.330 0.070 ... L10 2013 01 25 10 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 346469 UTA 2013 01 10 16 36 00 2198-99 P co2 CCGG 399.310 0.070 ... L10 2013 01 25 11 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 346470 UTA 2013 01 21 22 25 00 3852-99 P co2 CCGG 404.900 0.070 -.. L8 2013 02 01 10 49 00 39.9018 -113.7181 1332.00 1327.00 5.00 347089 UTA 2013 01 21 22 25 00 4613-99 P co2 CCGG 405.700 0.070 +.. L8 2013 02 01 11 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 347090 UTA 2013 01 25 18 18 00 2534-99 P co2 CCGG 408.770 0.070 .X. L8 2013 02 01 11 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 347088 UTA 2013 01 25 18 18 00 3609-99 P co2 CCGG 408.760 0.070 .X. L8 2013 02 01 11 33 00 39.9018 -113.7181 1332.00 1327.00 5.00 347087 UTA 2013 01 31 18 25 00 3075-99 P co2 CCGG 402.930 0.070 ... L10 2013 02 12 14 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 347520 UTA 2013 01 31 18 25 00 3632-99 P co2 CCGG 402.520 0.070 ... L10 2013 02 12 14 25 00 39.9018 -113.7181 1332.00 1327.00 5.00 347521 UTA 2013 02 04 00 40 00 2300-99 P co2 CCGG 401.570 0.070 ... L10 2013 02 12 13 36 00 39.9018 -113.7181 1332.00 1327.00 5.00 347522 UTA 2013 02 04 00 40 00 3346-99 P co2 CCGG 401.590 0.070 ... L10 2013 02 12 13 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 347523 UTA 2013 02 11 01 40 00 3179-99 P co2 CCGG 401.480 0.070 ... L10 2013 03 01 11 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 348098 UTA 2013 02 11 01 40 00 3180-99 P co2 CCGG 401.450 0.070 ... L10 2013 03 01 12 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 348097 UTA 2013 02 16 22 45 00 2321-99 P co2 CCGG 401.290 0.070 ... L10 2013 03 01 11 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 348099 UTA 2013 02 16 22 45 00 2322-99 P co2 CCGG 401.400 0.070 ... L10 2013 03 01 11 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 348100 UTA 2013 02 23 00 25 00 5337-99 P co2 CCGG 401.410 0.070 ... L10 2013 03 12 10 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 348451 UTA 2013 02 23 00 25 00 5338-99 P co2 CCGG 401.550 0.070 ... L10 2013 03 12 10 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 348452 UTA 2013 02 28 19 00 00 3177-99 P co2 CCGG 402.050 0.070 ... L10 2013 03 12 09 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 348449 UTA 2013 02 28 19 00 00 3178-99 P co2 CCGG 402.180 0.070 ... L10 2013 03 12 10 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 348450 UTA 2013 03 04 01 10 00 2197-99 P co2 CCGG 399.430 0.070 ... L10 2013 03 18 14 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 348737 UTA 2013 03 04 01 10 00 2198-99 P co2 CCGG 399.260 0.070 ... L10 2013 03 18 15 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 348738 UTA 2013 03 09 19 55 00 4645-99 P co2 CCGG 401.930 0.070 ... L10 2013 03 19 11 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 348743 UTA 2013 03 09 19 55 00 4646-99 P co2 CCGG 401.960 0.070 ... L10 2013 03 19 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 348744 UTA 2013 03 16 17 35 00 5245-99 P co2 CCGG 398.910 0.070 ... L10 2013 03 27 11 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 349326 UTA 2013 03 16 17 35 00 5246-99 P co2 CCGG 399.000 0.070 ... L10 2013 03 27 11 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 349327 UTA 2013 03 22 01 36 00 4703-99 P co2 CCGG 400.900 0.070 ... L10 2013 03 27 10 57 00 39.9018 -113.7181 1332.00 1327.00 5.00 349324 UTA 2013 03 22 01 36 00 4704-99 P co2 CCGG 400.860 0.070 ... L10 2013 03 27 11 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 349325 UTA 2013 03 30 00 32 00 303-99 P co2 CCGG 399.100 0.070 ... L8 2013 04 11 11 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 349959 UTA 2013 03 30 00 32 00 974-99 P co2 CCGG 399.320 0.070 ... L8 2013 04 11 11 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 349960 UTA 2013 04 02 23 30 00 2555-99 P co2 CCGG 400.150 0.070 ... L8 2013 04 11 11 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 349957 UTA 2013 04 02 23 30 00 4947-99 P co2 CCGG 400.030 0.070 ... L8 2013 04 11 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 349958 UTA 2013 04 08 19 20 00 1049-99 P co2 CCGG 400.410 0.070 ... L8 2013 04 26 10 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 350583 UTA 2013 04 08 19 20 00 967-99 P co2 CCGG 400.420 0.070 ... L8 2013 04 26 10 24 00 39.9018 -113.7181 1332.00 1327.00 5.00 350582 UTA 2013 04 16 02 32 00 2389-99 P co2 CCGG 401.340 0.070 ... L8 2013 04 26 10 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 350580 UTA 2013 04 16 02 32 00 3665-99 P co2 CCGG 401.140 0.070 ... L8 2013 04 26 11 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 350581 UTA 2013 04 23 02 48 00 1855-99 P co2 CCGG 400.260 0.070 ... L10 2013 05 16 15 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 351392 UTA 2013 04 23 02 48 00 2742-99 P co2 CCGG 400.660 0.070 ... L10 2013 05 16 16 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 351393 UTA 2013 05 01 14 10 00 3734-99 P co2 CCGG 400.830 0.070 -.. L8 2013 05 16 15 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 351390 UTA 2013 05 01 14 10 00 4357-99 P co2 CCGG 401.360 0.070 +.. L8 2013 05 16 16 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 351391 UTA 2013 05 06 18 55 00 3057-99 P co2 CCGG 398.220 0.070 ... L10 2013 05 28 16 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 352080 UTA 2013 05 06 18 55 00 3628-99 P co2 CCGG 397.780 0.070 ... L10 2013 05 28 16 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 352081 UTA 2013 05 13 17 25 00 4555-99 P co2 CCGG 397.180 0.070 ... L8 2013 05 29 09 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 352082 UTA 2013 05 13 17 25 00 5069-99 P co2 CCGG 396.980 0.070 ... L8 2013 05 29 09 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 352083 UTA 2013 05 20 17 30 00 1325-99 P co2 CCGG 395.630 0.070 ... L10 2013 06 07 10 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 352606 UTA 2013 05 20 17 30 00 264-99 P co2 CCGG 395.810 0.070 ... L10 2013 06 07 10 38 00 39.9018 -113.7181 1332.00 1327.00 5.00 352605 UTA 2013 05 25 19 56 00 3297-99 P co2 CCGG 395.650 0.070 -.. L10 2013 06 07 11 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 352603 UTA 2013 05 25 19 56 00 3961-99 P co2 CCGG 397.080 0.070 +.. L10 2013 06 07 11 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 352604 UTA 2013 05 31 16 28 00 3453-99 P co2 CCGG 398.440 0.070 ... L10 2013 06 13 11 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 353271 UTA 2013 05 31 16 28 00 3454-99 P co2 CCGG 398.220 0.070 ... L10 2013 06 13 11 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 353272 UTA 2013 06 07 00 10 00 1951-99 P co2 CCGG 395.890 0.070 ... L8 2013 06 13 11 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 353269 UTA 2013 06 07 00 10 00 1952-99 P co2 CCGG 396.030 0.070 ... L8 2013 06 13 11 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 353270 UTA 2013 06 13 00 38 00 2316-99 P co2 CCGG 401.140 0.070 ... L10 2013 07 02 12 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 353779 UTA 2013 06 13 00 38 00 2794-99 P co2 CCGG 401.100 0.070 ... L10 2013 07 02 12 57 00 39.9018 -113.7181 1332.00 1327.00 5.00 353780 UTA 2013 06 18 20 42 00 3533-99 P co2 CCGG 398.530 0.070 -.. L10 2013 07 02 12 24 00 39.9018 -113.7181 1332.00 1327.00 5.00 353778 UTA 2013 06 18 20 42 00 4595-99 P co2 CCGG 399.080 0.070 +.. L10 2013 07 02 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 353777 UTA 2013 06 27 17 21 00 4191-99 P co2 CCGG 395.650 0.070 +.. L8 2013 07 19 10 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 354431 UTA 2013 06 27 17 21 00 4192-99 P co2 CCGG 394.950 0.070 -.. L8 2013 07 19 11 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 354432 UTA 2013 07 04 02 55 00 611-99 P co2 CCGG 402.400 0.070 ... L8 2013 07 19 13 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 354429 UTA 2013 07 04 02 55 00 612-99 P co2 CCGG 402.570 0.070 ... L8 2013 07 19 13 23 00 39.9018 -113.7181 1332.00 1327.00 5.00 354430 UTA 2013 07 10 01 55 00 4985-99 P co2 CCGG 400.060 0.070 ... L8 2013 08 02 15 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 355182 UTA 2013 07 10 01 55 00 4986-99 P co2 CCGG 399.930 0.070 ... L8 2013 08 02 16 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 355183 UTA 2013 07 17 02 45 00 991-99 P co2 CCGG 411.900 0.070 -.. L8 2013 08 02 15 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 355180 UTA 2013 07 17 02 45 00 992-99 P co2 CCGG 414.290 0.070 +.. L8 2013 08 02 15 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 355181 UTA 2013 07 23 22 35 00 2425-99 P co2 CCGG 394.760 0.070 .X. L8 2013 08 14 12 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 355816 UTA 2013 07 23 22 35 00 937-99 P co2 CCGG 394.530 0.070 .X. L8 2013 08 14 11 57 00 39.9018 -113.7181 1332.00 1327.00 5.00 355815 UTA 2013 07 30 03 40 00 3609-99 P co2 CCGG 400.990 0.070 ... L8 2013 08 14 11 41 00 39.9018 -113.7181 1332.00 1327.00 5.00 355814 UTA 2013 07 30 03 40 00 4610-99 P co2 CCGG 400.950 0.070 ... L8 2013 08 14 11 25 00 39.9018 -113.7181 1332.00 1327.00 5.00 355813 UTA 2013 08 04 21 40 00 1675-99 P co2 CCGG 391.290 0.070 +.. L8 2013 08 22 09 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 356284 UTA 2013 08 04 21 40 00 1676-99 P co2 CCGG 390.630 0.070 -.. L8 2013 08 22 09 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 356285 UTA 2013 08 12 15 18 00 4851-99 P co2 CCGG 386.610 0.070 -.. L8 2013 08 21 16 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 356282 UTA 2013 08 12 15 18 00 4852-99 P co2 CCGG 387.160 0.070 +.. L8 2013 08 21 16 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 356283 UTA 2013 08 20 02 44 00 1289-99 P co2 CCGG 398.220 0.070 -.. L10 2013 09 25 15 39 00 39.9018 -113.7181 1332.00 1327.00 5.00 357091 UTA 2013 08 20 02 44 00 1290-99 P co2 CCGG 398.750 0.070 +.. L10 2013 09 25 15 55 00 39.9018 -113.7181 1332.00 1327.00 5.00 357092 UTA 2013 08 26 01 55 00 4239-99 P co2 CCGG 397.910 0.070 ... L10 2013 09 25 15 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 357108 UTA 2013 08 26 01 55 00 4240-99 P co2 CCGG 397.910 0.070 ... L10 2013 09 25 15 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 357109 UTA 2013 09 03 00 56 00 4557-99 P co2 CCGG 397.740 0.070 ... L10 2013 10 17 14 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 357686 UTA 2013 09 03 00 56 00 4558-99 P co2 CCGG 397.390 0.070 ... L10 2013 10 17 14 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 357687 UTA 2013 09 07 00 49 00 3393-99 P co2 CCGG 399.150 0.070 ... L10 2013 10 21 09 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 357684 UTA 2013 09 07 00 49 00 3394-99 P co2 CCGG 399.120 0.070 ... L10 2013 10 21 09 51 00 39.9018 -113.7181 1332.00 1327.00 5.00 357685 UTA 2013 09 13 02 30 00 4136-99 P co2 CCGG 422.580 0.070 +.. L8 2013 10 25 13 49 00 39.9018 -113.7181 1332.00 1327.00 5.00 358203 UTA 2013 09 13 02 30 00 4992-99 P co2 CCGG 420.940 0.070 -.. L8 2013 10 25 14 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 358204 UTA 2013 09 17 22 01 00 4751-99 P co2 CCGG 393.360 0.070 -.. L10 2013 10 25 14 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 358201 UTA 2013 09 17 22 01 00 6098-66 P co2 CCGG 393.920 0.070 +.. L10 2013 10 25 14 27 00 39.9018 -113.7181 1332.00 1327.00 5.00 358202 UTA 2013 09 24 22 25 00 1059-99 P co2 CCGG 391.420 0.070 ... L8 2013 10 30 11 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 358612 UTA 2013 09 24 22 25 00 1060-99 P co2 CCGG 391.250 0.070 ... L8 2013 10 30 11 36 00 39.9018 -113.7181 1332.00 1327.00 5.00 358613 UTA 2013 09 30 01 42 00 1255-99 P co2 CCGG 396.620 0.070 ... L8 2013 10 30 11 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 358610 UTA 2013 09 30 01 42 00 1256-99 P co2 CCGG 396.450 0.070 ... L8 2013 10 30 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 358611 UTA 2013 10 06 00 10 00 4494-99 P co2 CCGG 394.220 0.070 ... L10 2013 11 08 11 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 358913 UTA 2013 10 06 00 10 00 4763-99 P co2 CCGG 393.960 0.070 ... L10 2013 11 08 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 358914 UTA 2013 10 11 21 45 00 3545-99 P co2 CCGG 395.540 0.070 ... L10 2013 11 08 11 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 358911 UTA 2013 10 11 21 45 00 4775-99 P co2 CCGG 395.230 0.070 ... L10 2013 11 08 11 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 358912 UTA 2013 10 17 20 50 00 4985-99 P co2 CCGG 395.720 0.070 ... L8 2013 11 07 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 359358 UTA 2013 10 17 20 50 00 4986-99 P co2 CCGG 395.420 0.070 ... L8 2013 11 07 12 24 00 39.9018 -113.7181 1332.00 1327.00 5.00 359359 UTA 2013 10 23 17 00 00 5043-99 P co2 CCGG 396.210 0.070 ... L10 2013 11 07 12 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 359356 UTA 2013 10 23 17 00 00 5044-99 P co2 CCGG 395.860 0.070 ... L10 2013 11 07 12 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 359357 UTA 2013 11 04 21 35 00 5267-99 P co2 CCGG 396.980 0.070 ... L8 2013 11 21 14 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 360273 UTA 2013 11 04 21 35 00 6264-66 P co2 CCGG 396.550 0.070 ... L8 2013 11 21 14 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 360274 UTA 2013 11 11 17 55 00 545-99 P co2 CCGG 396.540 0.070 ... L8 2013 11 21 13 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 360271 UTA 2013 11 11 17 55 00 6002-66 P co2 CCGG 396.660 0.070 ... L8 2013 11 21 13 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 360272 UTA 2013 11 17 00 05 00 2991-99 P co2 CCGG 401.180 0.070 ... L10 2013 12 03 13 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 360832 UTA 2013 11 17 00 05 00 3312-99 P co2 CCGG 400.740 0.070 ... L10 2013 12 03 14 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 360833 UTA 2013 11 23 19 40 00 1739-99 P co2 CCGG 399.580 0.070 ... L8 2013 12 03 13 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 360830 UTA 2013 11 23 19 40 00 1747-99 P co2 CCGG 399.550 0.070 ... L8 2013 12 03 13 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 360831 UTA 2013 11 30 00 25 00 2785-99 P co2 CCGG 403.710 0.070 -.. L8 2013 12 16 13 55 00 39.9018 -113.7181 1332.00 1327.00 5.00 361437 UTA 2013 11 30 00 25 00 2786-99 P co2 CCGG 404.490 0.070 +.. L8 2013 12 16 14 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 361438 UTA 2013 12 02 23 05 00 3159-99 P co2 CCGG 398.820 0.070 +.. L8 2013 12 16 13 23 00 39.9018 -113.7181 1332.00 1327.00 5.00 361435 UTA 2013 12 02 23 05 00 3160-99 P co2 CCGG 396.950 0.070 -.. L8 2013 12 16 13 39 00 39.9018 -113.7181 1332.00 1327.00 5.00 361436 UTA 2013 12 09 18 10 00 677-99 P co2 CCGG 402.140 0.070 ... L8 2013 12 30 10 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 361973 UTA 2013 12 09 18 10 00 678-99 P co2 CCGG 402.340 0.070 ... L8 2013 12 30 10 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 361974 UTA 2013 12 14 23 32 00 4981-99 P co2 CCGG 402.890 0.070 -.. L10 2013 12 20 15 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 361971 UTA 2013 12 14 23 32 00 4982-99 P co2 CCGG 403.490 0.070 +.. L10 2013 12 20 16 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 361972 UTA 2013 12 21 22 45 00 1947-99 P co2 CCGG 402.570 0.070 ... L8 2014 01 09 16 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 362502 UTA 2013 12 21 22 45 00 1948-99 P co2 CCGG 402.740 0.070 ... L8 2014 01 09 17 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 362503 UTA 2013 12 31 17 15 00 1379-99 P co2 CCGG 402.580 0.070 ... L8 2014 01 10 08 33 00 39.9018 -113.7181 1332.00 1327.00 5.00 362500 UTA 2013 12 31 17 15 00 1380-99 P co2 CCGG 402.610 0.070 ... L8 2014 01 10 08 49 00 39.9018 -113.7181 1332.00 1327.00 5.00 362501 UTA 2014 01 04 20 04 00 3251-99 P co2 CCGG 401.800 0.070 ... L8 2014 01 30 16 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 362950 UTA 2014 01 04 20 04 00 3252-99 P co2 CCGG 406.830 0.070 N.. L8 2014 01 30 16 36 00 39.9018 -113.7181 1332.00 1327.00 5.00 362951 UTA 2014 01 11 00 55 00 2541-99 P co2 CCGG 403.360 0.070 ... L8 2014 02 03 11 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 362948 UTA 2014 01 11 00 55 00 2542-99 P co2 CCGG 403.150 0.070 ... L8 2014 02 03 12 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 362949 UTA 2014 01 17 21 55 00 3065-99 P co2 CCGG 402.550 0.070 ... L10 2014 02 06 14 21 00 39.9018 -113.7181 1332.00 1327.00 5.00 363519 UTA 2014 01 17 21 55 00 3066-99 P co2 CCGG 402.650 0.070 ... L10 2014 02 06 14 37 00 39.9018 -113.7181 1332.00 1327.00 5.00 363520 UTA 2014 01 23 21 45 00 291-99 P co2 CCGG 405.350 0.070 ... L10 2014 02 06 13 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 363515 UTA 2014 01 23 21 45 00 292-99 P co2 CCGG 405.220 0.070 ... L10 2014 02 06 14 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 363516 UTA 2014 02 01 22 03 00 4012-99 P co2 CCGG 403.100 0.070 ... L10 2014 02 24 16 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 364454 UTA 2014 02 01 22 03 00 4535-99 P co2 CCGG 402.790 0.070 ... L10 2014 02 24 16 19 00 39.9018 -113.7181 1332.00 1327.00 5.00 364455 UTA 2014 02 12 18 42 00 3345-99 P co2 CCGG 401.350 0.070 ... L10 2014 02 25 14 19 00 39.9018 -113.7181 1332.00 1327.00 5.00 364456 UTA 2014 02 12 18 42 00 3839-99 P co2 CCGG 401.270 0.070 ... L10 2014 02 25 14 36 00 39.9018 -113.7181 1332.00 1327.00 5.00 364457 UTA 2014 02 14 18 05 00 4075-99 P co2 CCGG 403.210 0.070 ... L8 2014 02 27 13 17 00 39.9018 -113.7181 1332.00 1327.00 5.00 364596 UTA 2014 02 14 18 05 00 4996-99 P co2 CCGG 402.720 0.070 ... L8 2014 02 27 13 33 00 39.9018 -113.7181 1332.00 1327.00 5.00 364597 UTA 2014 02 18 18 10 00 1222-99 P co2 CCGG 401.200 0.070 ... L8 2014 02 27 12 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 364594 UTA 2014 02 18 18 10 00 3791-99 P co2 CCGG 401.170 0.070 ... L8 2014 02 27 13 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 364595 UTA 2014 03 02 23 55 00 4723-99 P co2 CCGG 402.750 0.070 ... L10 2014 03 21 15 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 365629 UTA 2014 03 02 23 55 00 4724-99 P co2 CCGG 402.680 0.070 ... L10 2014 03 21 15 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 365628 UTA 2014 03 07 19 05 00 643-99 P co2 CCGG 402.140 0.070 ... L10 2014 03 21 15 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 365626 UTA 2014 03 07 19 05 00 644-99 P co2 CCGG 402.130 0.070 ... L10 2014 03 21 14 57 00 39.9018 -113.7181 1332.00 1327.00 5.00 365627 UTA 2014 03 15 20 25 00 2689-99 P co2 CCGG 403.370 0.070 ... L8 2014 03 31 13 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 365940 UTA 2014 03 15 20 25 00 2690-99 P co2 CCGG 403.210 0.070 ... L8 2014 03 31 13 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 365941 UTA 2014 03 21 00 55 00 3535-99 P co2 CCGG 403.940 0.070 -.. L8 2014 03 31 12 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 365939 UTA 2014 03 21 00 55 00 3536-99 P co2 CCGG 404.500 0.070 +.. L8 2014 03 31 13 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 365938 UTA 2014 03 26 02 30 00 6054-66 P co2 CCGG 402.660 0.070 ... L8 2014 04 11 16 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 366484 UTA 2014 03 26 02 30 00 817-99 P co2 CCGG 402.620 0.070 ... L8 2014 04 11 15 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 366485 UTA 2014 04 01 19 56 00 1989-99 P co2 CCGG 402.500 0.070 ... L8 2014 04 11 15 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 366482 UTA 2014 04 01 19 56 00 3637-99 P co2 CCGG 402.370 0.070 ... L8 2014 04 11 15 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 366483 UTA 2014 04 07 00 50 00 3465-99 P co2 CCGG 402.200 0.070 ... L8 2014 04 22 14 36 00 39.9018 -113.7181 1332.00 1327.00 5.00 366812 UTA 2014 04 07 00 50 00 6446-66 P co2 CCGG 402.180 0.070 ... L8 2014 04 22 14 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 366813 UTA 2014 04 13 02 15 00 1009-99 P co2 CCGG 404.700 0.070 ... L8 2014 04 21 12 57 00 39.9018 -113.7181 1332.00 1327.00 5.00 366782 UTA 2014 04 13 02 15 00 1577-99 P co2 CCGG 404.280 0.070 ... L8 2014 04 21 13 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 366783 UTA 2014 04 20 23 53 00 1284-99 P co2 CCGG 401.970 0.070 ... L8 2014 05 06 11 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 367335 UTA 2014 04 20 23 53 00 1868-99 P co2 CCGG 401.680 0.070 ... L8 2014 05 06 11 51 00 39.9018 -113.7181 1332.00 1327.00 5.00 367336 UTA 2014 04 26 21 55 00 4424-99 P co2 CCGG 401.640 0.070 ... L8 2014 05 06 11 19 00 39.9018 -113.7181 1332.00 1327.00 5.00 367333 UTA 2014 04 26 21 55 00 4984-99 P co2 CCGG 401.410 0.070 ... L8 2014 05 06 11 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 367334 UTA 2014 04 29 19 33 00 4216-99 P co2 CCGG 402.830 0.070 ... L8 2014 05 19 13 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 367689 UTA 2014 04 29 19 33 00 4674-99 P co2 CCGG 402.930 0.070 ... L8 2014 05 19 13 24 00 39.9018 -113.7181 1332.00 1327.00 5.00 367690 UTA 2014 05 05 02 10 00 1470-99 P co2 CCGG 404.750 0.070 -.. L8 2014 05 19 14 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 367687 UTA 2014 05 05 02 10 00 948-99 P co2 CCGG 405.510 0.070 +.. L8 2014 05 19 14 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 367688 UTA 2014 05 12 01 35 00 1198-99 P co2 CCGG 401.690 0.070 ... L8 2014 06 09 13 23 00 39.9018 -113.7181 1332.00 1327.00 5.00 368522 UTA 2014 05 12 01 35 00 2078-99 P co2 CCGG 401.610 0.070 ... L8 2014 06 09 13 39 00 39.9018 -113.7181 1332.00 1327.00 5.00 368523 UTA 2014 05 16 19 39 00 100-99 P co2 CCGG 398.400 0.070 ... L8 2014 06 09 13 55 00 39.9018 -113.7181 1332.00 1327.00 5.00 368520 UTA 2014 05 16 19 39 00 4972-99 P co2 CCGG 398.180 0.070 ... L8 2014 06 09 14 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 368521 UTA 2014 05 23 22 16 00 1507-99 P co2 CCGG 398.890 0.070 ... L8 2014 06 19 13 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 369000 UTA 2014 05 23 22 16 00 1508-99 P co2 CCGG 398.780 0.070 ... L8 2014 06 19 14 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 368999 UTA 2014 05 28 20 45 00 2245-99 P co2 CCGG 397.310 0.070 ... L8 2014 06 19 14 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 368997 UTA 2014 05 28 20 45 00 2246-99 P co2 CCGG 396.980 0.070 ... L8 2014 06 19 14 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 368998 UTA 2014 06 06 01 45 00 911-99 P co2 CCGG 398.310 0.070 ... L8 2014 06 26 16 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 369487 UTA 2014 06 06 01 45 00 912-99 P co2 CCGG 398.420 0.070 ... L8 2014 06 26 16 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 369488 UTA 2014 06 11 00 48 00 3503-99 P co2 CCGG 402.550 0.070 ... L8 2014 06 26 15 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 369485 UTA 2014 06 11 00 48 00 3504-99 P co2 CCGG 402.380 0.070 ... L8 2014 06 26 15 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 369486 UTA 2014 06 17 02 45 00 123-99 P co2 CCGG 400.970 0.070 ... L8 2014 07 09 13 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 370107 UTA 2014 06 17 02 45 00 124-99 P co2 CCGG 401.070 0.070 ... L8 2014 07 09 13 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 370108 UTA 2014 06 23 03 40 00 1729-99 P co2 CCGG 412.110 0.070 .X. L8 2014 07 09 12 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 370103 UTA 2014 06 23 03 40 00 1730-99 P co2 CCGG 412.140 0.070 .X. L8 2014 07 09 13 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 370104 UTA 2014 07 01 03 35 00 2359-99 P co2 CCGG 411.990 0.070 +.. L8 2014 07 23 14 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 370754 UTA 2014 07 01 03 35 00 4690-99 P co2 CCGG 411.480 0.070 -.. L8 2014 07 23 14 17 00 39.9018 -113.7181 1332.00 1327.00 5.00 370755 UTA 2014 07 07 01 12 00 6917-66 P co2 CCGG 398.590 0.070 ... L8 2014 07 21 16 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 370690 UTA 2014 07 07 01 12 00 787-99 P co2 CCGG 398.930 0.070 ... L8 2014 07 21 15 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 370689 UTA 2014 07 11 17 09 00 1933-99 P co2 CCGG 401.100 0.070 -.. L8 2014 07 31 14 24 00 39.9018 -113.7181 1332.00 1327.00 5.00 371261 UTA 2014 07 11 17 09 00 2632-99 P co2 CCGG 401.660 0.070 +.. L8 2014 07 31 14 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 371262 UTA 2014 07 18 13 45 00 4105-99 P co2 CCGG 412.190 0.070 +.. L8 2014 07 31 14 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 371259 UTA 2014 07 18 13 45 00 4996-99 P co2 CCGG 411.430 0.070 -.. L8 2014 07 31 15 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 371260 UTA 2014 07 23 16 50 00 4921-99 P co2 CCGG 396.910 0.070 ... L8 2014 08 11 14 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 371641 UTA 2014 07 23 16 50 00 4922-99 P co2 CCGG 397.220 0.070 ... L8 2014 08 11 14 27 00 39.9018 -113.7181 1332.00 1327.00 5.00 371642 UTA 2014 07 28 14 33 00 2949-99 P co2 CCGG 400.840 0.070 ... L8 2014 08 13 13 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 372057 UTA 2014 07 28 14 33 00 2950-99 P co2 CCGG 400.900 0.070 ... L8 2014 08 13 13 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 372058 UTA 2014 08 03 22 22 00 27-99 P co2 CCGG 399.920 0.070 ... L8 2014 08 21 13 55 00 39.9018 -113.7181 1332.00 1327.00 5.00 372443 UTA 2014 08 03 22 22 00 28-99 P co2 CCGG 400.010 0.070 ... L8 2014 08 21 14 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 372444 UTA 2014 08 09 01 56 00 1387-99 P co2 CCGG 400.150 0.070 ... L8 2014 08 21 14 27 00 39.9018 -113.7181 1332.00 1327.00 5.00 372441 UTA 2014 08 09 01 56 00 1388-99 P co2 CCGG 479.030 0.070 V.. L8 2014 08 21 14 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 372442 UTA 2014 08 09 01 56 00 1388-99 P co2 CCGG 399.920 0.070 ... L8 2014 08 21 16 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 372442 UTA 2014 08 15 17 20 00 61-99 P co2 CCGG 392.500 0.070 ... L8 2014 08 29 15 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 373156 UTA 2014 08 15 17 20 00 62-99 P co2 CCGG 392.880 0.070 ... L8 2014 08 29 15 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 373157 UTA 2014 08 22 01 23 00 3711-99 P co2 CCGG 396.420 0.070 ... L8 2014 08 29 14 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 373154 UTA 2014 08 22 01 23 00 3712-99 P co2 CCGG 396.540 0.070 ... L8 2014 08 29 14 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 373155 UTA 2014 08 28 21 35 00 4920-99 P co2 CCGG 394.850 0.070 ... L8 2014 09 12 13 37 00 39.9018 -113.7181 1332.00 1327.00 5.00 373733 UTA 2014 08 28 21 35 00 5128-99 P co2 CCGG 394.480 0.070 ... L8 2014 09 12 13 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 373734 UTA 2014 09 04 02 32 00 1191-99 P co2 CCGG 395.470 0.070 ... L8 2014 09 12 13 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 373731 UTA 2014 09 04 02 32 00 3484-99 P co2 CCGG 395.780 0.070 ... L8 2014 09 12 13 21 00 39.9018 -113.7181 1332.00 1327.00 5.00 373732 UTA 2014 09 11 15 10 00 6197-66 P co2 CCGG 390.070 0.070 .X. L8 2014 09 23 16 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 374409 UTA 2014 09 11 15 10 00 6198-66 P co2 CCGG 390.340 0.070 ... L8 2014 09 23 17 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 374410 UTA 2014 09 17 14 43 00 2669-99 P co2 CCGG 397.860 0.070 ... L8 2014 09 23 16 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 374407 UTA 2014 09 17 14 43 00 2670-99 P co2 CCGG 397.490 0.070 ... L8 2014 09 23 16 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 374408 UTA 2014 09 23 17 46 00 3401-99 P co2 CCGG 396.090 0.070 ... L8 2014 10 09 14 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 375174 UTA 2014 09 23 17 46 00 3402-99 P co2 CCGG 396.030 0.070 ... L8 2014 10 09 15 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 375175 UTA 2014 09 28 21 34 00 3471-99 P co2 CCGG 394.000 0.070 +.. L8 2014 10 09 15 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 375172 UTA 2014 09 28 21 34 00 3472-99 P co2 CCGG 393.020 0.070 -.. L8 2014 10 09 15 36 00 39.9018 -113.7181 1332.00 1327.00 5.00 375173 UTA 2014 10 06 15 56 00 3017-99 P co2 CCGG 391.710 0.070 +.. L8 2014 10 20 12 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 375813 UTA 2014 10 06 15 56 00 3018-99 P co2 CCGG 390.520 0.070 -.. L8 2014 10 20 13 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 375814 UTA 2014 10 10 22 36 00 2193-99 P co2 CCGG 398.040 0.070 ... L8 2014 10 21 13 38 00 39.9018 -113.7181 1332.00 1327.00 5.00 375900 UTA 2014 10 10 22 36 00 2194-99 P co2 CCGG 397.980 0.070 ... L8 2014 10 21 13 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 375901 UTA 2014 10 15 21 50 00 3833-99 P co2 CCGG 393.480 0.070 ... L8 2014 10 29 13 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 376310 UTA 2014 10 15 21 50 00 4199-99 P co2 CCGG 393.260 0.070 ... L8 2014 10 29 13 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 376309 UTA 2014 10 22 00 05 00 1013-99 P co2 CCGG 397.210 0.070 ... L8 2014 10 29 14 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 376316 UTA 2014 10 22 00 05 00 1141-99 P co2 CCGG 397.120 0.070 ... L8 2014 10 29 14 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 376315 UTA 2014 10 29 20 58 00 1070-99 P co2 CCGG 396.470 0.070 ... L8 2014 11 24 16 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 377271 UTA 2014 10 29 20 58 00 1699-99 P co2 CCGG 396.680 0.070 ... L8 2014 11 24 16 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 377272 UTA 2014 11 03 23 35 00 3290-99 P co2 CCGG 399.840 0.070 ... L8 2014 12 02 12 23 00 39.9018 -113.7181 1332.00 1327.00 5.00 377530 UTA 2014 11 03 23 35 00 4490-99 P co2 CCGG 399.720 0.070 ... L8 2014 12 02 12 39 00 39.9018 -113.7181 1332.00 1327.00 5.00 377531 UTA 2014 11 08 23 10 00 3611-99 P co2 CCGG 400.280 0.070 ... L8 2014 12 05 12 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 377889 UTA 2014 11 08 23 10 00 6184-66 P co2 CCGG 400.260 0.070 ... L8 2014 12 05 12 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 377890 UTA 2014 11 14 20 12 00 1166-99 P co2 CCGG 402.210 0.070 ... L8 2014 12 05 13 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 377887 UTA 2014 11 14 20 12 00 1772-99 P co2 CCGG 402.360 0.070 ... L8 2014 12 05 13 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 377888 UTA 2014 11 20 23 10 00 129-99 P co2 CCGG 404.020 0.070 ... L8 2014 12 16 16 38 00 39.9018 -113.7181 1332.00 1327.00 5.00 378484 UTA 2014 11 20 23 10 00 130-99 P co2 CCGG 403.980 0.070 ... L8 2014 12 16 16 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 378485 UTA 2014 11 27 00 44 00 143-99 P co2 CCGG 399.380 0.070 ... L8 2014 12 16 16 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 378482 UTA 2014 11 27 00 44 00 144-99 P co2 CCGG 399.270 0.070 ... L8 2014 12 16 16 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 378483 UTA 2014 12 01 23 30 00 4443-99 P co2 CCGG 401.630 0.070 ... L8 2014 12 23 11 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 379001 UTA 2014 12 01 23 30 00 4444-99 P co2 CCGG 401.630 0.070 ... L8 2014 12 23 12 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 379002 UTA 2014 12 07 23 20 00 4969-99 P co2 CCGG 401.970 0.070 ... L8 2014 12 23 12 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 378999 UTA 2014 12 07 23 20 00 4970-99 P co2 CCGG 401.790 0.070 ... L8 2014 12 23 12 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 379000 UTA 2014 12 12 23 48 00 2047-99 P co2 CCGG 399.760 0.070 ... L8 2015 01 07 08 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 379488 UTA 2014 12 12 23 48 00 2048-99 P co2 CCGG 399.980 0.070 ... L8 2015 01 07 08 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 379489 UTA 2014 12 18 22 18 00 5031-99 P co2 CCGG 402.530 0.070 ... L8 2015 01 06 16 33 00 39.9018 -113.7181 1332.00 1327.00 5.00 379486 UTA 2014 12 18 22 18 00 5032-99 P co2 CCGG 402.590 0.070 ... L8 2015 01 06 16 49 00 39.9018 -113.7181 1332.00 1327.00 5.00 379487 UTA 2014 12 27 00 41 00 2923-99 P co2 CCGG 404.220 0.070 ... L8 2015 01 27 12 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 380243 UTA 2014 12 27 00 41 00 2924-99 P co2 CCGG 404.260 0.070 ... L8 2015 01 27 12 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 380244 UTA 2014 12 31 17 12 00 2167-99 P co2 CCGG 406.300 0.070 ... L8 2015 01 27 14 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 380245 UTA 2014 12 31 17 12 00 2168-99 P co2 CCGG 406.240 0.070 ... L8 2015 01 27 15 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 380246 UTA 2015 01 07 00 48 00 1354-99 P co2 CCGG 409.450 0.070 ... L8 2015 02 06 10 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 380703 UTA 2015 01 07 00 48 00 6494-66 P co2 CCGG 409.280 0.070 ... L8 2015 02 06 10 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 380704 UTA 2015 01 13 01 55 00 1966-99 P co2 CCGG 413.040 0.070 .X. L8 2015 02 06 09 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 380705 UTA 2015 01 13 01 55 00 2796-99 P co2 CCGG 413.020 0.070 .X. L8 2015 02 06 10 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 380706 UTA 2015 01 20 16 55 00 4097-99 P co2 CCGG 403.500 0.070 ... L8 2015 02 18 16 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 381482 UTA 2015 01 20 16 55 00 4098-99 P co2 CCGG 403.590 0.070 ... L8 2015 02 18 16 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 381483 UTA 2015 01 27 19 06 00 3069-99 P co2 CCGG 403.040 0.070 ... L8 2015 02 18 16 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 381480 UTA 2015 01 27 19 06 00 3070-99 P co2 CCGG 403.300 0.070 ... L8 2015 02 18 17 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 381481 UTA 2015 02 09 00 33 00 1070-99 P co2 CCGG 406.910 0.070 ... L8 2015 03 18 09 37 00 39.9018 -113.7181 1332.00 1327.00 5.00 382408 UTA 2015 02 09 00 33 00 1699-99 P co2 CCGG 406.590 0.070 ... L8 2015 03 18 09 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 382409 UTA 2015 02 16 01 20 00 3025-99 P co2 CCGG 410.540 0.070 .X. L8 2015 03 18 09 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 382406 UTA 2015 02 16 01 20 00 3208-99 P co2 CCGG 410.660 0.070 .X. L8 2015 03 18 09 21 00 39.9018 -113.7181 1332.00 1327.00 5.00 382407 UTA 2015 02 23 01 20 00 133-99 P co2 CCGG 406.100 0.070 ... L8 2015 03 25 16 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 383009 UTA 2015 02 23 01 20 00 134-99 P co2 CCGG 406.130 0.070 ... L8 2015 03 25 16 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 383010 UTA 2015 02 26 20 30 00 1885-99 P co2 CCGG 402.950 0.070 ... L8 2015 03 25 17 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 383011 UTA 2015 02 26 20 30 00 1886-99 P co2 CCGG 402.990 0.070 ... L8 2015 03 25 17 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 383012 UTA 2015 03 05 17 35 00 6717-66 P co2 CCGG 405.700 0.070 ... L8 2015 03 31 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 383812 UTA 2015 03 05 17 35 00 6718-66 P co2 CCGG 405.650 0.070 ... L8 2015 03 31 12 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 383813 UTA 2015 03 09 16 39 00 307-99 P co2 CCGG 402.060 0.070 ... L8 2015 03 31 11 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 383815 UTA 2015 03 09 16 39 00 308-99 P co2 CCGG 402.270 0.070 ... L8 2015 03 31 11 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 383814 UTA 2015 03 14 19 03 00 2013-99 P co2 CCGG 402.990 0.070 ... L8 2015 04 13 14 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 384322 UTA 2015 03 14 19 03 00 6383-66 P co2 CCGG 402.950 0.070 ... L8 2015 04 13 14 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 384323 UTA 2015 03 19 22 24 00 4141-99 P co2 CCGG 403.040 0.070 ... L8 2015 04 13 14 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 384324 UTA 2015 03 19 22 24 00 5045-99 P co2 CCGG 403.040 0.070 ... L8 2015 04 13 14 49 00 39.9018 -113.7181 1332.00 1327.00 5.00 384325 UTA 2015 03 29 23 03 00 3463-99 P co2 CCGG 402.790 0.070 ... L8 2015 04 28 12 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 385336 UTA 2015 03 29 23 03 00 3464-99 P co2 CCGG 403.000 0.070 ... L8 2015 04 28 12 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 385337 UTA 2015 04 04 00 22 00 4593-99 P co2 CCGG 404.530 0.070 ... L8 2015 04 28 12 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 385334 UTA 2015 04 04 00 22 00 4594-99 P co2 CCGG 404.580 0.070 ... L8 2015 04 28 13 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 385335 UTA 2015 04 09 22 15 00 2019-99 P co2 CCGG 404.890 0.070 ... L8 2015 05 06 12 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 385806 UTA 2015 04 09 22 15 00 2020-99 P co2 CCGG 404.650 0.070 ... L8 2015 05 06 12 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 385807 UTA 2015 04 14 16 45 00 3329-99 P co2 CCGG 404.860 0.070 ... L8 2015 05 08 14 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 385834 UTA 2015 04 14 16 45 00 3330-99 P co2 CCGG 404.720 0.070 ... L8 2015 05 08 15 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 385835 UTA 2015 04 21 17 02 00 1870-99 P co2 CCGG 401.310 0.070 +.. L8 2015 05 27 11 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 386575 UTA 2015 04 21 17 02 00 949-99 P co2 CCGG 398.820 0.070 -.. L8 2015 05 27 10 51 00 39.9018 -113.7181 1332.00 1327.00 5.00 386576 UTA 2015 04 29 01 08 00 1432-99 P co2 CCGG 403.320 0.070 ... L8 2015 05 27 09 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 386573 UTA 2015 04 29 01 08 00 5255-99 P co2 CCGG 403.080 0.070 ... L8 2015 05 27 09 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 386574 UTA 2015 05 11 17 43 00 1477-99 P co2 CCGG 399.670 0.070 +.. L8 2015 06 24 15 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 387390 UTA 2015 05 11 17 43 00 486-99 P co2 CCGG 398.630 0.070 -.. L8 2015 06 24 15 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 387391 UTA 2015 05 14 20 36 00 4700-99 P co2 CCGG 400.330 0.070 ... L8 2015 06 24 15 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 387388 UTA 2015 05 14 20 36 00 4851-99 P co2 CCGG 400.120 0.070 ... L8 2015 06 24 16 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 387389 UTA 2015 05 20 23 19 00 6666-66 P co2 CCGG 403.060 0.070 ... L8 2015 06 17 15 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 387973 UTA 2015 05 20 23 19 00 999-99 P co2 CCGG 402.970 0.070 ... L8 2015 06 17 15 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 387974 UTA 2015 05 27 22 44 00 3978-99 P co2 CCGG 399.830 0.070 ... L8 2015 06 17 16 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 387971 UTA 2015 05 27 22 44 00 4166-99 P co2 CCGG 399.880 0.070 ... L8 2015 06 17 16 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 387972 UTA 2015 06 01 15 06 00 2921-99 P co2 CCGG 403.310 0.070 +.. L8 2015 07 10 09 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 388624 UTA 2015 06 01 15 06 00 4967-99 P co2 CCGG 402.570 0.070 -.. L8 2015 07 10 09 33 00 39.9018 -113.7181 1332.00 1327.00 5.00 388625 UTA 2015 06 06 00 30 00 3257-99 P co2 CCGG 402.470 0.070 ... L8 2015 07 09 17 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 388626 UTA 2015 06 06 00 30 00 4091-99 P co2 CCGG 402.170 0.070 ... L8 2015 07 09 17 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 388627 UTA 2015 06 15 01 11 00 3273-99 P co2 CCGG 401.190 0.070 +.. L8 2015 07 29 08 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 390132 UTA 2015 06 15 01 11 00 3274-99 P co2 CCGG 400.680 0.070 -.. L8 2015 07 29 09 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 390133 UTA 2015 07 03 03 54 00 4985-99 P co2 CCGG 413.600 0.070 .X. L8 2015 07 29 09 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 390130 UTA 2015 07 03 03 54 00 4986-99 P co2 CCGG 413.230 0.070 .X. L8 2015 07 29 09 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 390131 UTA 2015 07 06 02 42 00 2711-99 P co2 CCGG 404.870 0.070 ... L8 2015 08 05 15 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 390689 UTA 2015 07 06 02 42 00 2712-99 P co2 CCGG 404.830 0.070 ... L8 2015 08 05 15 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 390690 UTA 2015 07 12 02 30 00 295-99 P co2 CCGG 404.010 0.070 ... L8 2015 08 05 15 38 00 39.9018 -113.7181 1332.00 1327.00 5.00 390687 UTA 2015 07 12 02 30 00 296-99 P co2 CCGG 403.630 0.070 ... L8 2015 08 05 15 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 390688 UTA 2015 07 14 01 10 00 2805-99 P co2 CCGG 399.970 0.070 ... L8 2015 08 13 16 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 391379 UTA 2015 07 14 01 10 00 2806-99 P co2 CCGG 399.900 0.070 ... L8 2015 08 13 16 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 391380 UTA 2015 07 20 02 34 00 3222-99 P co2 CCGG 404.250 0.070 ... L8 2015 08 13 14 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 391377 UTA 2015 07 20 02 34 00 689-99 P co2 CCGG 404.240 0.070 ... L8 2015 08 13 14 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 391378 UTA 2015 07 22 23 26 00 3683-99 P co2 CCGG 396.560 0.070 ... L8 2015 08 20 16 51 00 39.9018 -113.7181 1332.00 1327.00 5.00 391953 UTA 2015 07 22 23 26 00 3684-99 P co2 CCGG 396.950 0.070 ... L8 2015 08 20 17 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 391954 UTA 2015 07 28 16 56 00 1339-99 P co2 CCGG 390.300 0.070 .X. L8 2015 08 21 09 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 391951 UTA 2015 07 28 16 56 00 1340-99 P co2 CCGG 390.360 0.070 .X. L8 2015 08 21 09 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 391952 UTA 2015 08 05 15 32 00 1136-99 P co2 CCGG 399.520 0.070 ... L8 2015 09 03 12 57 00 39.9018 -113.7181 1332.00 1327.00 5.00 392713 UTA 2015 08 05 15 32 00 255-99 P co2 CCGG 399.500 0.070 ... L8 2015 09 03 12 41 00 39.9018 -113.7181 1332.00 1327.00 5.00 392712 UTA 2015 08 12 15 55 00 411-99 P co2 CCGG 398.490 0.070 -.. L8 2015 09 03 13 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 392710 UTA 2015 08 12 15 55 00 440-99 P co2 CCGG 399.420 0.070 +.. L8 2015 09 03 13 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 392711 UTA 2015 08 25 00 42 00 1774-99 P co2 CCGG 397.670 0.070 -.. L8 2015 09 16 15 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 394011 UTA 2015 08 25 00 42 00 507-99 P co2 CCGG 398.240 0.070 +.. L8 2015 09 16 15 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 394012 UTA 2015 09 01 18 20 00 2915-99 P co2 CCGG 398.430 0.070 ... L8 2015 09 16 14 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 394010 UTA 2015 09 01 18 20 00 4511-99 P co2 CCGG 398.340 0.070 ... L8 2015 09 16 15 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 394009 UTA 2015 09 11 17 28 00 1478-99 P co2 CCGG 395.190 0.070 ... L8 2015 10 01 10 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 394694 UTA 2015 09 11 17 28 00 5285-99 P co2 CCGG 395.200 0.070 ... L8 2015 10 01 10 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 394695 UTA 2015 09 18 03 13 00 4055-99 P co2 CCGG 402.500 0.070 ... L8 2015 10 01 10 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 394696 UTA 2015 09 18 03 13 00 4092-99 P co2 CCGG 402.590 0.070 ... L8 2015 10 01 11 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 394697 UTA 2015 09 21 18 26 00 3585-99 P co2 CCGG 398.450 0.070 +.. L8 2015 10 21 10 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 395625 UTA 2015 09 21 18 26 00 3586-99 P co2 CCGG 397.380 0.070 -.. L8 2015 10 21 10 17 00 39.9018 -113.7181 1332.00 1327.00 5.00 395626 UTA 2015 09 28 21 41 00 1507-99 P co2 CCGG 396.950 0.070 -.. L8 2015 10 21 10 33 00 39.9018 -113.7181 1332.00 1327.00 5.00 395623 UTA 2015 09 28 21 41 00 1508-99 P co2 CCGG 397.670 0.070 +.. L8 2015 10 21 10 49 00 39.9018 -113.7181 1332.00 1327.00 5.00 395624 UTA 2015 10 06 18 23 00 3339-99 P co2 CCGG 398.000 0.070 ... L8 2015 10 29 11 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 396555 UTA 2015 10 06 18 23 00 3340-99 P co2 CCGG 397.730 0.070 ... L8 2015 10 29 12 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 396556 UTA 2015 10 13 22 32 00 3251-99 P co2 CCGG 399.760 0.070 +.. L8 2015 10 28 14 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 396429 UTA 2015 10 13 22 32 00 3252-99 P co2 CCGG 399.090 0.070 -.. L8 2015 10 28 15 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 396430 UTA 2015 10 20 00 55 00 2119-99 P co2 CCGG 402.940 0.070 ... L8 2015 11 04 15 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 396975 UTA 2015 10 20 00 55 00 2120-99 P co2 CCGG 403.280 0.070 ... L8 2015 11 04 15 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 396976 UTA 2015 10 26 01 15 00 3741-99 P co2 CCGG 404.320 0.070 ... L8 2015 11 04 15 51 00 39.9018 -113.7181 1332.00 1327.00 5.00 396973 UTA 2015 10 26 01 15 00 3742-99 P co2 CCGG 404.620 0.070 ... L8 2015 11 04 16 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 396974 UTA 2015 11 01 22 51 00 603-99 P co2 CCGG 399.520 0.070 ... L8 2015 11 20 13 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 397820 UTA 2015 11 01 22 51 00 604-99 P co2 CCGG 399.560 0.070 ... L8 2015 11 20 13 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 397821 UTA 2015 11 10 23 13 00 3841-99 P co2 CCGG 405.260 0.070 ... L8 2015 11 20 12 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 397818 UTA 2015 11 10 23 13 00 3842-99 P co2 CCGG 405.140 0.070 ... L8 2015 11 20 12 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 397819 UTA 2015 11 16 00 45 00 4525-99 P co2 CCGG 402.890 0.070 ... L8 2015 12 08 14 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 398668 UTA 2015 11 16 00 45 00 967-99 P co2 CCGG 403.020 0.070 ... L8 2015 12 08 14 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 398667 UTA 2015 11 23 22 05 00 1869-99 P co2 CCGG 404.360 0.070 ... L8 2015 12 08 11 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 398468 UTA 2015 11 23 22 05 00 571-99 P co2 CCGG 404.320 0.070 ... L8 2015 12 08 10 51 00 39.9018 -113.7181 1332.00 1327.00 5.00 398469 UTA 2015 11 27 23 04 00 2891-99 P co2 CCGG 408.890 0.070 ... L8 2015 12 29 12 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 399047 UTA 2015 11 27 23 04 00 3762-99 P co2 CCGG 408.890 0.070 ... L8 2015 12 29 13 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 399048 UTA 2015 12 02 01 02 00 4389-99 P co2 CCGG 411.270 0.070 +.. L8 2015 12 29 13 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 399046 UTA 2015 12 02 01 02 00 949-99 P co2 CCGG 410.540 0.070 -.. L8 2015 12 29 13 19 00 39.9018 -113.7181 1332.00 1327.00 5.00 399045 UTA 2015 12 07 17 24 00 1475-99 P co2 CCGG 404.400 0.070 ... L8 2016 01 04 11 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 399416 UTA 2015 12 07 17 24 00 268-99 P co2 CCGG 404.350 0.070 ... L8 2016 01 04 10 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 399415 UTA 2015 12 13 00 19 00 4913-99 P co2 CCGG 406.160 0.070 ... L8 2016 01 04 11 19 00 39.9018 -113.7181 1332.00 1327.00 5.00 399413 UTA 2015 12 13 00 19 00 4939-99 P co2 CCGG 406.240 0.070 ... L8 2016 01 04 11 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 399414 UTA 2015 12 16 18 26 00 1828-99 P co2 CCGG 407.660 0.070 ... L8 2016 01 14 10 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 399961 UTA 2015 12 16 18 26 00 353-99 P co2 CCGG 407.460 0.070 ... L8 2016 01 14 10 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 399960 UTA 2015 12 22 22 42 00 2036-99 P co2 CCGG 406.500 0.070 ... L8 2016 01 14 10 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 399958 UTA 2015 12 22 22 42 00 4844-99 P co2 CCGG 406.620 0.070 ... L8 2016 01 14 10 25 00 39.9018 -113.7181 1332.00 1327.00 5.00 399959 UTA 2016 01 01 23 55 00 229-99 P co2 CCGG 411.130 0.070 ... L8 2016 01 27 16 27 00 39.9018 -113.7181 1332.00 1327.00 5.00 400914 UTA 2016 01 01 23 55 00 230-99 P co2 CCGG 411.280 0.070 ... L8 2016 01 27 16 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 400915 UTA 2016 01 08 16 53 00 4583-99 P co2 CCGG 407.870 0.070 ... L8 2016 01 27 15 55 00 39.9018 -113.7181 1332.00 1327.00 5.00 400912 UTA 2016 01 08 16 53 00 4584-99 P co2 CCGG 407.970 0.070 ... L8 2016 01 27 16 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 400913 UTA 2016 01 13 22 06 00 3339-99 P co2 CCGG 408.500 0.070 ... L8 2016 02 10 11 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 401468 UTA 2016 01 13 22 06 00 3340-99 P co2 CCGG 408.540 0.070 ... L8 2016 02 10 11 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 401469 UTA 2016 01 20 18 55 00 5301-99 P co2 CCGG 406.130 0.070 ... L8 2016 02 10 11 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 401466 UTA 2016 01 20 18 55 00 5302-99 P co2 CCGG 406.120 0.070 ... L8 2016 02 10 11 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 401467 UTA 2016 02 02 00 21 00 3421-99 P co2 CCGG 408.200 0.070 ... L8 2016 02 22 13 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 402311 UTA 2016 02 02 00 21 00 3422-99 P co2 CCGG 408.080 0.070 ... L8 2016 02 22 13 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 402312 UTA 2016 02 09 17 18 00 165-99 P co2 CCGG 411.720 0.070 ... L8 2016 02 22 13 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 402309 UTA 2016 02 09 17 18 00 166-99 P co2 CCGG 411.670 0.070 ... L8 2016 02 22 13 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 402310 UTA 2016 02 15 18 32 00 570-99 P co2 CCGG 402.810 0.070 A.. L8 2016 03 07 16 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 402934 UTA 2016 02 15 18 32 00 570-99 P co2 CCGG 406.230 0.070 ... L8 2016 03 09 10 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 402934 UTA 2016 02 15 18 32 00 915-99 P co2 CCGG 402.860 0.070 A.. L8 2016 03 07 16 25 00 39.9018 -113.7181 1332.00 1327.00 5.00 402935 UTA 2016 02 15 18 32 00 915-99 P co2 CCGG 406.210 0.070 ... L8 2016 03 09 10 25 00 39.9018 -113.7181 1332.00 1327.00 5.00 402935 UTA 2016 02 20 21 49 00 1466-99 P co2 CCGG 407.980 0.070 ... L8 2016 03 08 09 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 402936 UTA 2016 02 20 21 49 00 2293-99 P co2 CCGG 407.980 0.070 ... L8 2016 03 08 09 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 402937 UTA 2016 02 24 17 22 00 3801-99 P co2 CCGG 413.170 0.070 ... L8 2016 03 10 14 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 403363 UTA 2016 02 24 17 22 00 3802-99 P co2 CCGG 412.970 0.070 ... L8 2016 03 10 14 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 403364 UTA 2016 03 01 04 18 00 1121-99 P co2 CCGG 419.430 0.070 -.. L8 2016 03 10 13 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 403361 UTA 2016 03 01 04 18 00 1122-99 P co2 CCGG 421.090 0.070 +.. L8 2016 03 10 13 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 403362 UTA 2016 03 04 00 39 00 1641-99 P co2 CCGG 408.690 0.070 ... L8 2016 03 21 09 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 403707 UTA 2016 03 04 00 39 00 27-99 P co2 CCGG 408.790 0.070 ... L8 2016 03 21 09 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 403708 UTA 2016 03 08 17 43 00 1702-99 P co2 CCGG 407.550 0.070 ... L8 2016 03 21 10 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 403705 UTA 2016 03 08 17 43 00 1957-99 P co2 CCGG 407.480 0.070 ... L8 2016 03 21 10 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 403706 UTA 2016 03 16 02 30 00 1065-99 P co2 CCGG 407.790 0.070 ... L8 2016 04 08 12 23 00 39.9018 -113.7181 1332.00 1327.00 5.00 404719 UTA 2016 03 16 02 30 00 114-99 P co2 CCGG 407.730 0.070 ... L8 2016 04 08 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 404720 UTA 2016 03 21 19 29 00 1008-99 P co2 CCGG 408.100 0.070 N.. L8 2016 04 08 09 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 404691 UTA 2016 03 21 19 29 00 3970-99 P co2 CCGG 406.500 0.070 ... L8 2016 04 08 09 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 404692 UTA 2016 03 24 16 49 00 2420-99 P co2 CCGG 407.950 0.070 ... L8 2016 04 12 14 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 405096 UTA 2016 03 24 16 49 00 361-99 P co2 CCGG 407.990 0.070 ... L8 2016 04 12 13 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 405095 UTA 2016 03 30 22 02 00 3094-99 P co2 CCGG 407.890 0.070 ... L8 2016 04 12 14 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 405097 UTA 2016 03 30 22 02 00 5065-99 P co2 CCGG 407.970 0.070 ... L8 2016 04 12 14 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 405098 UTA 2016 04 05 22 37 00 1740-99 P co2 CCGG 406.890 0.070 ... L8 2016 04 27 11 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 405803 UTA 2016 04 05 22 37 00 469-99 P co2 CCGG 406.840 0.070 ... L8 2016 04 27 10 55 00 39.9018 -113.7181 1332.00 1327.00 5.00 405804 UTA 2016 04 11 18 47 00 4190-99 P co2 CCGG 406.290 0.070 ... L8 2016 04 27 13 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 405805 UTA 2016 04 11 18 47 00 5349-99 P co2 CCGG 405.930 0.070 ... L8 2016 04 27 13 17 00 39.9018 -113.7181 1332.00 1327.00 5.00 405806 UTA 2016 04 15 18 06 00 3963-99 P co2 CCGG 407.550 0.070 ... L8 2016 05 04 15 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 406268 UTA 2016 04 15 18 06 00 3964-99 P co2 CCGG 407.600 0.070 ... L8 2016 05 04 15 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 406269 UTA 2016 04 21 19 27 00 809-99 P co2 CCGG 404.130 0.070 ... L8 2016 05 04 15 38 00 39.9018 -113.7181 1332.00 1327.00 5.00 406266 UTA 2016 04 21 19 27 00 810-99 P co2 CCGG 404.490 0.070 ... L8 2016 05 04 15 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 406267 UTA 2016 04 28 16 20 00 1419-99 P co2 CCGG 407.460 0.070 ... L8 2016 05 24 14 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 407014 UTA 2016 04 28 16 20 00 3194-99 P co2 CCGG 407.340 0.070 ... L8 2016 05 24 14 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 407015 UTA 2016 05 05 20 02 00 1925-99 P co2 CCGG 402.170 0.070 ... L8 2016 05 24 14 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 407012 UTA 2016 05 05 20 02 00 3978-99 P co2 CCGG 402.270 0.070 ... L8 2016 05 24 14 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 407013 UTA 2016 05 09 19 12 00 4589-99 P co2 CCGG 404.780 0.070 +.. L8 2016 05 31 15 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 407713 UTA 2016 05 09 19 12 00 5188-99 P co2 CCGG 403.960 0.070 -.. L8 2016 05 31 15 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 407714 UTA 2016 05 15 01 22 00 2563-99 P co2 CCGG 406.730 0.070 ... L8 2016 05 31 14 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 407711 UTA 2016 05 15 01 22 00 993-99 P co2 CCGG 406.730 0.070 ... L8 2016 05 31 14 38 00 39.9018 -113.7181 1332.00 1327.00 5.00 407712 UTA 2016 05 20 02 43 00 350-99 P co2 CCGG 407.290 0.070 ... L8 2016 06 07 12 23 00 39.9018 -113.7181 1332.00 1327.00 5.00 407951 UTA 2016 05 20 02 43 00 986-99 P co2 CCGG 406.940 0.070 ... L8 2016 06 07 12 39 00 39.9018 -113.7181 1332.00 1327.00 5.00 407952 UTA 2016 05 27 14 08 00 1325-99 P co2 CCGG 397.450 0.070 .X. L8 2016 06 07 11 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 407949 UTA 2016 05 27 14 08 00 3533-99 P co2 CCGG 397.090 0.070 .X. L8 2016 06 07 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 407950 UTA 2016 06 02 02 35 00 3024-99 P co2 CCGG 412.490 0.070 .X. L8 2016 06 23 13 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 408897 UTA 2016 06 02 02 35 00 3053-99 P co2 CCGG 412.100 0.070 .X. L8 2016 06 23 14 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 408898 UTA 2016 06 07 02 05 00 2660-99 P co2 CCGG 410.070 0.070 ... L8 2016 06 23 14 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 408895 UTA 2016 06 07 02 05 00 3851-99 P co2 CCGG 409.710 0.070 ... L8 2016 06 23 14 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 408896 UTA 2016 06 10 15 46 00 2241-99 P co2 CCGG 409.300 0.070 ... L8 2016 07 05 11 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 409485 UTA 2016 06 10 15 46 00 2242-99 P co2 CCGG 409.230 0.070 ... L8 2016 07 05 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 409486 UTA 2016 06 18 00 36 00 2965-99 P co2 CCGG 403.720 0.070 ... L8 2016 07 28 12 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 411179 UTA 2016 06 18 00 36 00 3914-99 P co2 CCGG 403.820 0.070 ... L8 2016 07 28 12 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 411180 UTA 2016 06 18 03 48 00 5209-99 P co2 CCGG 415.400 0.070 +.. L8 2016 07 01 12 39 00 39.9018 -113.7181 1332.00 1327.00 5.00 409488 UTA 2016 06 18 03 48 00 5210-99 P co2 CCGG 414.800 0.070 -.. L8 2016 07 01 12 55 00 39.9018 -113.7181 1332.00 1327.00 5.00 409487 UTA 2016 06 22 17 49 00 3800-99 P co2 CCGG 399.810 0.070 +.. L8 2016 07 28 12 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 411178 UTA 2016 06 22 17 49 00 88-99 P co2 CCGG 397.560 0.070 -.. L8 2016 07 28 11 57 00 39.9018 -113.7181 1332.00 1327.00 5.00 411177 UTA 2016 06 24 14 44 00 3084-99 P co2 CCGG 399.540 0.070 ... L8 2016 07 14 10 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 409985 UTA 2016 06 24 14 44 00 4866-99 P co2 CCGG 399.900 0.070 ... L8 2016 07 14 10 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 409986 UTA 2016 07 01 03 12 00 4119-99 P co2 CCGG 409.780 0.070 -.. L8 2016 07 14 10 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 409983 UTA 2016 07 01 03 12 00 5039-99 P co2 CCGG 410.410 0.070 +.. L8 2016 07 14 10 24 00 39.9018 -113.7181 1332.00 1327.00 5.00 409984 UTA 2016 07 07 21 54 00 3359-99 P co2 CCGG 398.310 0.070 ... L8 2016 07 19 09 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 410566 UTA 2016 07 07 21 54 00 3612-99 P co2 CCGG 398.180 0.070 ... L8 2016 07 19 09 23 00 39.9018 -113.7181 1332.00 1327.00 5.00 410567 UTA 2016 07 11 03 05 00 2288-99 P co2 CCGG 400.100 0.070 ... L8 2016 07 19 09 55 00 39.9018 -113.7181 1332.00 1327.00 5.00 410564 UTA 2016 07 11 03 05 00 690-99 P co2 CCGG 400.100 0.070 ... L8 2016 07 19 09 39 00 39.9018 -113.7181 1332.00 1327.00 5.00 410565 UTA 2016 07 19 15 28 00 1441-99 P co2 CCGG 404.050 0.070 ... L8 2016 08 05 10 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 411640 UTA 2016 07 19 15 28 00 2425-99 P co2 CCGG 404.410 0.070 ... L8 2016 08 05 09 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 411641 UTA 2016 07 25 21 01 00 716-99 P co2 CCGG 398.200 0.070 +.. L8 2016 08 04 16 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 411553 UTA 2016 07 25 21 01 00 937-99 P co2 CCGG 393.450 0.070 -.. L8 2016 08 04 16 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 411554 UTA 2016 07 31 15 12 00 3741-99 P co2 CCGG 402.500 0.070 +.. L8 2016 08 23 11 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 412674 UTA 2016 07 31 15 12 00 3742-99 P co2 CCGG 401.810 0.070 -.. L8 2016 08 23 11 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 412675 UTA 2016 08 06 01 18 00 3215-99 P co2 CCGG 406.330 0.070 N.. L8 2016 08 22 13 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 412596 UTA 2016 08 06 01 18 00 3216-99 P co2 CCGG 405.310 0.070 ... L8 2016 08 22 13 19 00 39.9018 -113.7181 1332.00 1327.00 5.00 412597 UTA 2016 08 13 14 35 00 4658-99 P co2 CCGG 390.220 0.070 .X. L8 2016 08 24 15 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 412776 UTA 2016 08 13 14 35 00 5571-99 P co2 CCGG 390.390 0.070 .X. L8 2016 08 24 15 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 412777 UTA 2016 08 17 21 05 00 3400-99 P co2 CCGG 401.030 0.070 ... L8 2016 08 24 16 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 412774 UTA 2016 08 17 21 05 00 5567-99 P co2 CCGG 400.750 0.070 ... L8 2016 08 24 16 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 412775 UTA 2016 08 26 14 57 00 3831-99 P co2 CCGG 397.790 0.070 .X. L10 2016 09 27 10 37 00 39.9018 -113.7181 1332.00 1327.00 5.00 413790 UTA 2016 08 26 14 57 00 3832-99 P co2 CCGG 398.010 0.070 ... L10 2016 09 27 10 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 413791 UTA 2016 08 31 01 25 00 5715-99 P co2 CCGG 405.650 0.070 ... L10 2016 09 27 10 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 413792 UTA 2016 08 31 01 25 00 5716-99 P co2 CCGG 405.600 0.070 ... L10 2016 09 27 10 21 00 39.9018 -113.7181 1332.00 1327.00 5.00 413793 UTA 2016 09 08 00 20 00 1473-99 P co2 CCGG 396.950 0.070 +.. L10 2016 09 30 10 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 414196 UTA 2016 09 08 00 20 00 4232-99 P co2 CCGG 396.420 0.070 -.. L10 2016 09 30 11 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 414197 UTA 2016 09 12 15 17 00 876-99 P co2 CCGG 400.240 0.070 ... L10 2016 09 30 11 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 414198 UTA 2016 09 12 15 17 00 952-99 P co2 CCGG 400.270 0.070 ... L10 2016 09 30 11 38 00 39.9018 -113.7181 1332.00 1327.00 5.00 414199 UTA 2016 09 22 01 48 00 702-99 P co2 CCGG 402.800 0.070 ... L10 2016 10 12 09 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 414954 UTA 2016 09 22 01 48 00 830-99 P co2 CCGG 402.780 0.070 ... L10 2016 10 12 10 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 414955 UTA 2016 09 28 18 19 00 3523-99 P co2 CCGG 403.880 0.070 +.. L10 2016 10 12 10 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 414952 UTA 2016 09 28 18 19 00 4087-99 P co2 CCGG 403.310 0.070 -.. L10 2016 10 12 10 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 414953 UTA 2016 09 30 16 51 00 2265-99 P co2 CCGG 399.750 0.070 +.. L10 2016 10 20 13 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 415218 UTA 2016 09 30 16 51 00 5415-99 P co2 CCGG 399.180 0.070 -.. L10 2016 10 20 13 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 415219 UTA 2016 10 04 23 42 00 109-99 P co2 CCGG 402.960 0.070 ... L10 2016 10 20 12 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 415220 UTA 2016 10 04 23 42 00 482-99 P co2 CCGG 402.980 0.070 ... L10 2016 10 20 12 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 415221 UTA 2016 10 12 17 58 00 4683-99 P co2 CCGG 401.780 0.070 -.. L10 2016 11 01 12 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 415645 UTA 2016 10 12 17 58 00 5145-99 P co2 CCGG 402.540 0.070 +.. L10 2016 11 01 12 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 415644 UTA 2016 10 14 16 07 00 2535-99 P co2 CCGG 402.970 0.070 ... L10 2016 11 01 11 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 415646 UTA 2016 10 14 16 07 00 3011-99 P co2 CCGG 402.970 0.070 ... L10 2016 11 01 12 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 415647 UTA 2016 10 24 22 58 00 1888-99 P co2 CCGG 402.850 0.070 ... L10 2016 11 15 14 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 416575 UTA 2016 10 24 22 58 00 4080-99 P co2 CCGG 402.850 0.070 ... L10 2016 11 15 14 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 416576 UTA 2016 10 30 00 25 00 4023-99 P co2 CCGG 411.190 0.070 -.. L10 2016 11 15 13 55 00 39.9018 -113.7181 1332.00 1327.00 5.00 416578 UTA 2016 10 30 00 25 00 4285-99 P co2 CCGG 412.080 0.070 +.. L10 2016 11 15 14 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 416577 UTA 2016 11 05 23 43 00 412-99 P co2 CCGG 406.620 0.070 ... L10 2016 11 22 13 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 417069 UTA 2016 11 05 23 43 00 4473-99 P co2 CCGG 406.680 0.070 ... L10 2016 11 22 13 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 417070 UTA 2016 11 09 17 08 00 2250-99 P co2 CCGG 404.530 0.070 ... L10 2016 11 22 14 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 417071 UTA 2016 11 09 17 08 00 4036-99 P co2 CCGG 404.660 0.070 ... L10 2016 11 22 15 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 417072 UTA 2016 11 20 21 46 00 4065-99 P co2 CCGG 405.520 0.070 ... L10 2016 12 08 17 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 417685 UTA 2016 11 20 21 46 00 4237-99 P co2 CCGG 405.470 0.070 ... L10 2016 12 08 17 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 417687 UTA 2016 11 28 00 57 00 4066-99 P co2 CCGG 409.440 0.070 ... L10 2016 12 08 16 51 00 39.9018 -113.7181 1332.00 1327.00 5.00 417686 UTA 2016 11 28 00 57 00 838-99 P co2 CCGG 409.310 0.070 ... L10 2016 12 08 16 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 417688 UTA 2016 11 29 21 55 00 2830-99 P co2 CCGG 408.530 0.070 ... L10 2016 12 16 17 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 418232 UTA 2016 11 29 21 55 00 2895-99 P co2 CCGG 408.380 0.070 ... L10 2016 12 16 17 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 418233 UTA 2016 12 06 23 07 00 4592-99 P co2 CCGG 408.290 0.070 ... L10 2016 12 19 10 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 418230 UTA 2016 12 06 23 07 00 5268-99 P co2 CCGG 408.400 0.070 ... L10 2016 12 19 10 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 418231 UTA 2016 12 10 23 20 00 1081-99 P co2 CCGG 406.450 0.070 ... L10 2016 12 28 17 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 418616 UTA 2016 12 10 23 20 00 5306-99 P co2 CCGG 406.430 0.070 ... L10 2016 12 28 17 23 00 39.9018 -113.7181 1332.00 1327.00 5.00 418617 UTA 2016 12 16 16 18 00 1003-99 P co2 CCGG 408.300 0.070 ... L10 2016 12 28 16 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 418619 UTA 2016 12 16 16 18 00 424-99 P co2 CCGG 408.420 0.070 ... L10 2016 12 28 16 36 00 39.9018 -113.7181 1332.00 1327.00 5.00 418618 UTA 2016 12 22 18 45 00 1797-99 P co2 CCGG 415.250 0.070 .X. L10 2017 01 18 10 37 00 39.9018 -113.7181 1332.00 1327.00 5.00 419171 UTA 2016 12 22 18 45 00 1798-99 P co2 CCGG 415.310 0.070 .X. L10 2017 01 18 10 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 419172 UTA 2016 12 29 20 48 00 2761-99 P co2 CCGG 411.450 0.070 ... L10 2017 01 18 10 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 419173 UTA 2016 12 29 20 48 00 2762-99 P co2 CCGG 411.370 0.070 ... L10 2017 01 18 10 21 00 39.9018 -113.7181 1332.00 1327.00 5.00 419174 UTA 2017 01 03 18 22 00 5653-99 P co2 CCGG 410.060 0.070 ... L10 2017 01 27 09 38 00 39.9018 -113.7181 1332.00 1327.00 5.00 419607 UTA 2017 01 03 18 22 00 5654-99 P co2 CCGG 410.080 0.070 ... L10 2017 01 27 09 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 419608 UTA 2017 01 09 16 51 00 4981-99 P co2 CCGG 408.520 0.070 ... L10 2017 01 27 10 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 419605 UTA 2017 01 09 16 51 00 4982-99 P co2 CCGG 408.570 0.070 ... L10 2017 01 27 10 25 00 39.9018 -113.7181 1332.00 1327.00 5.00 419606 UTA 2017 01 16 23 08 00 2141-99 P co2 CCGG 413.530 0.070 ... L10 2017 02 06 13 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 420028 UTA 2017 01 16 23 08 00 2142-99 P co2 CCGG 413.510 0.070 ... L10 2017 02 06 13 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 420029 UTA 2017 01 20 21 25 00 5527-99 P co2 CCGG 411.000 0.070 ... L10 2017 02 06 13 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 420026 UTA 2017 01 20 21 25 00 5528-99 P co2 CCGG 410.960 0.070 ... L10 2017 02 06 13 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 420027 UTA 2017 01 23 16 30 00 5237-99 P co2 CCGG 410.480 0.070 -.. L10 2017 02 21 13 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 421123 UTA 2017 01 23 16 30 00 5238-99 P co2 CCGG 411.640 0.070 +.. L10 2017 02 21 13 51 00 39.9018 -113.7181 1332.00 1327.00 5.00 421124 UTA 2017 02 06 00 58 00 1703-99 P co2 CCGG 411.000 0.070 ... L10 2017 02 21 14 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 421121 UTA 2017 02 06 00 58 00 1704-99 P co2 CCGG 411.030 0.070 ... L10 2017 02 21 14 23 00 39.9018 -113.7181 1332.00 1327.00 5.00 421122 UTA 2017 02 07 20 26 00 2747-99 P co2 CCGG 408.580 0.070 ... L10 2017 03 02 15 27 00 39.9018 -113.7181 1332.00 1327.00 5.00 421640 UTA 2017 02 07 20 26 00 2748-99 P co2 CCGG 408.490 0.070 ... L10 2017 03 02 15 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 421641 UTA 2017 02 16 22 40 00 5635-99 P co2 CCGG 412.060 0.070 ... L10 2017 03 02 14 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 421638 UTA 2017 02 16 22 40 00 5636-99 P co2 CCGG 411.950 0.070 ... L10 2017 03 02 15 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 421639 UTA 2017 02 20 17 00 00 2547-99 P co2 CCGG 410.790 0.070 ... L10 2017 03 14 15 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 422252 UTA 2017 02 20 17 00 00 3170-99 P co2 CCGG 410.710 0.070 ... L10 2017 03 14 15 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 422253 UTA 2017 02 27 00 20 00 102-99 P co2 CCGG 411.900 0.070 ... L10 2017 03 14 14 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 422250 UTA 2017 02 27 00 20 00 4490-99 P co2 CCGG 411.730 0.070 ... L10 2017 03 14 15 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 422251 UTA 2017 03 04 20 52 00 3471-99 P co2 CCGG 409.440 0.070 ... L8 2017 04 03 14 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 422947 UTA 2017 03 04 20 52 00 3472-99 P co2 CCGG 409.380 0.070 ... L8 2017 04 03 15 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 422948 UTA 2017 03 11 22 45 00 3911-99 P co2 CCGG 409.760 0.070 ... L8 2017 04 03 14 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 422949 UTA 2017 03 11 22 45 00 3912-99 P co2 CCGG 409.710 0.070 ... L8 2017 04 03 14 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 422950 UTA 2017 03 15 20 20 00 5715-99 P co2 CCGG 408.400 0.070 ... L8 2017 04 11 10 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 423389 UTA 2017 03 15 20 20 00 5716-99 P co2 CCGG 408.430 0.070 ... L8 2017 04 11 10 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 423390 UTA 2017 03 21 23 08 00 23-99 P co2 CCGG 407.840 0.070 ... L8 2017 04 11 10 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 423391 UTA 2017 03 21 23 08 00 24-99 P co2 CCGG 407.580 0.070 ... L8 2017 04 11 10 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 423392 UTA 2017 03 26 23 26 00 5531-99 P co2 CCGG 410.350 0.070 ... L8 2017 04 19 12 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 423847 UTA 2017 03 26 23 26 00 5532-99 P co2 CCGG 410.230 0.070 ... L8 2017 04 19 12 27 00 39.9018 -113.7181 1332.00 1327.00 5.00 423848 UTA 2017 03 31 20 40 00 3191-99 P co2 CCGG 410.970 0.070 ... L8 2017 04 19 12 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 423845 UTA 2017 03 31 20 40 00 3192-99 P co2 CCGG 410.990 0.070 ... L8 2017 04 19 12 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 423846 UTA 2017 04 06 21 00 00 4759-99 P co2 CCGG 408.480 0.070 ... L8 2017 04 28 11 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 424315 UTA 2017 04 06 21 00 00 4760-99 P co2 CCGG 408.190 0.070 ... L8 2017 04 28 11 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 424316 UTA 2017 04 13 00 43 00 1713-99 P co2 CCGG 410.540 0.070 ... L8 2017 04 28 09 19 00 39.9018 -113.7181 1332.00 1327.00 5.00 424313 UTA 2017 04 13 00 43 00 1714-99 P co2 CCGG 410.310 0.070 ... L8 2017 04 28 09 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 424314 UTA 2017 04 19 00 54 00 851-99 P co2 CCGG 412.270 0.070 ... L8 2017 05 08 10 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 424762 UTA 2017 04 19 00 54 00 852-99 P co2 CCGG 412.290 0.070 ... L8 2017 05 08 11 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 424763 UTA 2017 04 26 20 43 00 5391-99 P co2 CCGG 407.220 0.070 +.. L8 2017 05 08 10 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 424760 UTA 2017 04 26 20 43 00 5392-99 P co2 CCGG 406.630 0.070 -.. L8 2017 05 08 10 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 424761 UTA 2017 05 01 17 13 00 3233-99 P co2 CCGG 410.020 0.070 ... L8 2017 05 19 15 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 425590 UTA 2017 05 01 17 13 00 3234-99 P co2 CCGG 410.250 0.070 ... L8 2017 05 19 16 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 425591 UTA 2017 05 06 22 41 00 4305-99 P co2 CCGG 408.080 0.070 ... L8 2017 05 23 14 51 00 39.9018 -113.7181 1332.00 1327.00 5.00 425552 UTA 2017 05 06 22 41 00 4306-99 P co2 CCGG 407.870 0.070 ... L8 2017 05 23 15 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 425553 UTA 2017 05 12 19 30 00 3831-99 P co2 CCGG 407.040 0.070 ... L8 2017 06 02 14 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 426117 UTA 2017 05 12 19 30 00 3832-99 P co2 CCGG 406.970 0.070 ... L8 2017 06 02 14 17 00 39.9018 -113.7181 1332.00 1327.00 5.00 426118 UTA 2017 05 18 18 13 00 2363-99 P co2 CCGG 409.730 0.070 -.. L8 2017 06 02 13 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 426119 UTA 2017 05 18 18 13 00 2364-99 P co2 CCGG 410.410 0.070 +.. L8 2017 06 02 13 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 426120 UTA 2017 05 24 19 44 00 4879-99 P co2 CCGG 400.850 0.070 .X. L8 2017 06 14 13 21 00 39.9018 -113.7181 1332.00 1327.00 5.00 426589 UTA 2017 05 24 19 44 00 4880-99 P co2 CCGG 400.730 0.070 .X. L8 2017 06 14 13 37 00 39.9018 -113.7181 1332.00 1327.00 5.00 426590 UTA 2017 05 31 16 08 00 749-99 P co2 CCGG 407.560 0.070 ... L8 2017 06 14 12 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 426591 UTA 2017 05 31 16 08 00 750-99 P co2 CCGG 407.250 0.070 ... L8 2017 06 14 13 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 426592 UTA 2017 06 05 01 27 00 229-99 P co2 CCGG 411.830 0.070 ... L8 2017 06 22 11 49 00 39.9018 -113.7181 1332.00 1327.00 5.00 427127 UTA 2017 06 05 01 27 00 230-99 P co2 CCGG 411.930 0.070 ... L8 2017 06 22 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 427128 UTA 2017 06 11 02 50 00 5575-99 P co2 CCGG 410.730 0.070 ... L8 2017 06 22 11 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 427125 UTA 2017 06 11 02 50 00 5576-99 P co2 CCGG 410.460 0.070 ... L8 2017 06 22 11 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 427126 UTA 2017 06 17 16 43 00 5709-99 P co2 CCGG 403.940 0.070 ... L8 2017 07 14 13 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 427583 UTA 2017 06 17 16 43 00 5710-99 P co2 CCGG 404.340 0.070 ... L8 2017 07 14 13 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 427584 UTA 2017 06 26 03 30 00 4813-99 P co2 CCGG 432.730 0.070 .Z. L8 2017 07 14 13 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 427581 UTA 2017 06 26 03 30 00 4814-99 P co2 CCGG 432.770 0.070 .Z. L8 2017 07 14 13 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 427582 UTA 2017 06 29 03 29 00 195-99 P co2 CCGG 409.430 0.070 ... L8 2017 07 24 14 36 00 39.9018 -113.7181 1332.00 1327.00 5.00 427999 UTA 2017 06 29 03 29 00 196-99 P co2 CCGG 409.360 0.070 ... L8 2017 07 24 14 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 428000 UTA 2017 07 05 15 57 00 5117-99 P co2 CCGG 404.800 0.070 +.. L8 2017 07 21 14 57 00 39.9018 -113.7181 1332.00 1327.00 5.00 428008 UTA 2017 07 05 15 57 00 5118-99 P co2 CCGG 403.770 0.070 -.. L8 2017 07 21 15 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 428009 UTA 2017 07 10 01 55 00 779-99 P co2 CCGG 409.620 0.070 ... L8 2017 08 03 13 21 00 39.9018 -113.7181 1332.00 1327.00 5.00 428481 UTA 2017 07 10 01 55 00 780-99 P co2 CCGG 409.650 0.070 ... L8 2017 08 03 13 37 00 39.9018 -113.7181 1332.00 1327.00 5.00 428482 UTA 2017 07 16 01 07 00 181-99 P co2 CCGG 409.310 0.070 ... L8 2017 08 03 12 49 00 39.9018 -113.7181 1332.00 1327.00 5.00 428483 UTA 2017 07 16 01 07 00 182-99 P co2 CCGG 409.500 0.070 ... L8 2017 08 03 13 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 428484 UTA 2017 07 25 00 40 00 3065-99 P co2 CCGG 409.670 0.070 ... L8 2017 08 15 15 23 00 39.9018 -113.7181 1332.00 1327.00 5.00 429119 UTA 2017 07 25 00 40 00 3066-99 P co2 CCGG 409.570 0.070 ... L8 2017 08 15 15 39 00 39.9018 -113.7181 1332.00 1327.00 5.00 429120 UTA 2017 07 29 23 28 00 5225-99 P co2 CCGG 407.460 0.070 ... L8 2017 08 15 15 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 429117 UTA 2017 07 29 23 28 00 5226-99 P co2 CCGG 407.740 0.070 ... L8 2017 08 15 16 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 429118 UTA 2017 08 04 16 22 00 1375-99 P co2 CCGG 401.340 0.070 +.. L8 2017 08 29 13 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 429467 UTA 2017 08 04 16 22 00 1376-99 P co2 CCGG 400.830 0.070 -.. L8 2017 08 29 13 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 429468 UTA 2017 08 11 03 12 00 5659-99 P co2 CCGG 426.610 0.070 +.. L8 2017 08 29 13 38 00 39.9018 -113.7181 1332.00 1327.00 5.00 429465 UTA 2017 08 11 03 12 00 5660-99 P co2 CCGG 426.090 0.070 -.. L8 2017 08 29 13 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 429466 UTA 2017 08 17 16 00 00 1331-99 P co2 CCGG 398.460 0.070 .X. L8 2017 09 11 13 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 430196 UTA 2017 08 17 16 00 00 1332-99 P co2 CCGG 398.610 0.070 .X. L8 2017 09 11 13 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 430197 UTA 2017 08 22 17 22 00 5227-99 P co2 CCGG 397.440 0.070 +.. L8 2017 09 11 14 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 430194 UTA 2017 08 22 17 22 00 5228-99 P co2 CCGG 395.540 0.070 -.. L8 2017 09 11 14 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 430195 UTA 2017 08 29 23 06 00 3413-99 P co2 CCGG 405.600 0.070 ... L8 2017 09 20 13 38 00 39.9018 -113.7181 1332.00 1327.00 5.00 430828 UTA 2017 08 29 23 06 00 3414-99 P co2 CCGG 405.490 0.070 ... L8 2017 09 20 13 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 430829 UTA 2017 09 04 02 26 00 4305-99 P co2 CCGG 408.020 0.070 +.. L8 2017 09 20 13 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 430826 UTA 2017 09 04 02 26 00 4306-99 P co2 CCGG 407.020 0.070 -.. L8 2017 09 20 13 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 430827 UTA 2017 09 13 18 10 00 5313-99 P co2 CCGG 398.210 0.070 N.. L8 2017 10 12 13 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 431982 UTA 2017 09 13 18 10 00 5314-99 P co2 CCGG 399.330 0.070 N.. L8 2017 10 12 13 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 431983 UTA 2017 09 27 21 35 00 5777-99 P co2 CCGG 405.180 0.070 ... L8 2017 10 12 15 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 431980 UTA 2017 09 27 21 35 00 5778-99 P co2 CCGG 405.120 0.070 ... L8 2017 10 12 15 25 00 39.9018 -113.7181 1332.00 1327.00 5.00 431981 UTA 2017 10 01 23 47 00 5715-99 P co2 CCGG 401.240 0.070 ... L8 2017 10 19 12 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 432595 UTA 2017 10 01 23 47 00 5716-99 P co2 CCGG 401.300 0.070 ... L8 2017 10 19 12 37 00 39.9018 -113.7181 1332.00 1327.00 5.00 432596 UTA 2017 10 08 22 05 00 2633-99 P co2 CCGG 403.700 0.070 ... L8 2017 10 19 11 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 432597 UTA 2017 10 08 22 05 00 2634-99 P co2 CCGG 404.060 0.070 ... L8 2017 10 19 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 432598 UTA 2017 10 14 17 58 00 5531-99 P co2 CCGG 404.930 0.070 ... L8 2017 11 07 11 36 00 39.9018 -113.7181 1332.00 1327.00 5.00 433542 UTA 2017 10 14 17 58 00 5532-99 P co2 CCGG 404.940 0.070 ... L8 2017 11 07 11 51 00 39.9018 -113.7181 1332.00 1327.00 5.00 433543 UTA 2017 10 20 19 02 00 4999-99 P co2 CCGG 405.410 0.070 ... L8 2017 11 02 14 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 433323 UTA 2017 10 20 19 02 00 5000-99 P co2 CCGG 405.270 0.070 ... L8 2017 11 02 15 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 433324 UTA 2017 10 29 23 08 00 3763-99 P co2 CCGG 407.800 0.070 ... L8 2017 11 17 11 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 434017 UTA 2017 10 29 23 08 00 3764-99 P co2 CCGG 408.040 0.070 ... L8 2017 11 17 11 21 00 39.9018 -113.7181 1332.00 1327.00 5.00 434018 UTA 2017 11 02 23 57 00 2041-99 P co2 CCGG 407.320 0.070 ... L8 2017 11 16 14 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 434019 UTA 2017 11 02 23 57 00 2042-99 P co2 CCGG 407.350 0.070 ... L8 2017 11 16 14 23 00 39.9018 -113.7181 1332.00 1327.00 5.00 434020 UTA 2017 11 07 00 40 00 3957-99 P co2 CCGG 407.890 0.070 ... L8 2017 11 30 16 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 434765 UTA 2017 11 07 00 40 00 3958-99 P co2 CCGG 407.740 0.070 ... L8 2017 11 30 16 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 434766 UTA 2017 11 15 00 53 00 3797-99 P co2 CCGG 409.180 0.070 ... L8 2017 11 30 16 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 434767 UTA 2017 11 15 00 53 00 3798-99 P co2 CCGG 409.120 0.070 ... L8 2017 11 30 17 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 434768 UTA 2017 11 19 00 40 00 3927-99 P co2 CCGG 412.230 0.070 ... L8 2017 12 06 13 17 00 39.9018 -113.7181 1332.00 1327.00 5.00 435064 UTA 2017 11 19 00 40 00 3928-99 P co2 CCGG 411.890 0.070 ... L8 2017 12 06 13 33 00 39.9018 -113.7181 1332.00 1327.00 5.00 435065 UTA 2017 11 24 23 58 00 1947-99 P co2 CCGG 412.170 0.070 ... L8 2017 12 11 11 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 435261 UTA 2017 11 24 23 58 00 1948-99 P co2 CCGG 412.180 0.070 ... L8 2017 12 11 11 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 435262 UTA 2017 11 28 17 08 00 793-99 P co2 CCGG 412.290 0.070 ... L8 2017 12 18 12 23 00 39.9018 -113.7181 1332.00 1327.00 5.00 435408 UTA 2017 11 28 17 08 00 794-99 P co2 CCGG 412.130 0.070 ... L8 2017 12 18 12 39 00 39.9018 -113.7181 1332.00 1327.00 5.00 435409 UTA 2017 12 03 23 53 00 5379-99 P co2 CCGG 410.510 0.070 ... L8 2017 12 18 13 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 435410 UTA 2017 12 03 23 53 00 5380-99 P co2 CCGG 410.530 0.070 ... L8 2017 12 18 14 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 435411 UTA 2017 12 11 18 40 00 4100-99 P co2 CCGG 412.280 0.070 ... L8 2018 01 16 13 41 00 39.9018 -113.7181 1332.00 1327.00 5.00 436791 UTA 2017 12 11 18 40 00 610-99 P co2 CCGG 411.890 0.070 ... L8 2018 01 16 13 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 436790 UTA 2017 12 15 23 35 00 2161-99 P co2 CCGG 412.900 0.070 ... L8 2018 01 16 13 57 00 39.9018 -113.7181 1332.00 1327.00 5.00 436792 UTA 2017 12 15 23 35 00 2679-99 P co2 CCGG 412.720 0.070 ... L8 2018 01 16 14 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 436793 UTA 2017 12 20 17 03 00 879-99 P co2 CCGG 410.820 0.070 ... L8 2018 01 18 10 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 436745 UTA 2017 12 20 17 03 00 880-99 P co2 CCGG 410.440 0.070 ... L8 2018 01 18 10 19 00 39.9018 -113.7181 1332.00 1327.00 5.00 436746 UTA 2017 12 29 00 30 00 2805-99 P co2 CCGG 411.400 0.070 ... L8 2018 01 18 09 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 436743 UTA 2017 12 29 00 30 00 2806-99 P co2 CCGG 411.740 0.070 ... L8 2018 01 18 09 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 436744 UTA 2018 01 08 00 16 00 5451-99 P co2 CCGG 414.880 0.070 N.. L8 2018 02 06 09 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 437623 UTA 2018 01 08 00 16 00 5452-99 P co2 CCGG 413.080 0.070 N.. L8 2018 02 06 09 19 00 39.9018 -113.7181 1332.00 1327.00 5.00 437624 UTA 2018 01 11 17 33 00 1797-99 P co2 CCGG 411.990 0.070 ... L8 2018 02 06 09 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 437621 UTA 2018 01 11 17 33 00 1798-99 P co2 CCGG 411.910 0.070 ... L8 2018 02 06 09 51 00 39.9018 -113.7181 1332.00 1327.00 5.00 437622 UTA 2018 01 18 17 26 00 5665-99 P co2 CCGG 411.950 0.070 ... L8 2018 02 14 10 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 438072 UTA 2018 01 18 17 26 00 5666-99 P co2 CCGG 412.080 0.070 ... L8 2018 02 14 10 17 00 39.9018 -113.7181 1332.00 1327.00 5.00 438073 UTA 2018 01 24 00 56 00 2041-99 P co2 CCGG 415.150 0.070 ... L8 2018 02 13 15 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 438070 UTA 2018 01 24 00 56 00 2042-99 P co2 CCGG 415.350 0.070 ... L8 2018 02 13 15 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 438071 UTA 2018 01 25 18 55 00 3719-99 P co2 CCGG 411.940 0.070 ... L8 2018 02 22 16 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 438611 UTA 2018 01 25 18 55 00 3720-99 P co2 CCGG 411.960 0.070 ... L8 2018 02 22 16 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 438612 UTA 2018 02 05 00 59 00 1429-99 P co2 CCGG 411.990 0.070 ... L8 2018 02 22 15 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 438613 UTA 2018 02 05 00 59 00 1430-99 P co2 CCGG 411.880 0.070 ... L8 2018 02 22 15 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 438614 UTA 2018 02 08 17 36 00 5435-99 P co2 CCGG 411.120 0.070 ... L8 2018 03 07 13 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 439466 UTA 2018 02 08 17 36 00 5436-99 P co2 CCGG 411.090 0.070 ... L8 2018 03 07 13 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 439467 UTA 2018 02 15 00 30 00 385-99 P co2 CCGG 410.770 0.070 ... L8 2018 03 07 12 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 439464 UTA 2018 02 15 00 30 00 386-99 P co2 CCGG 410.760 0.070 ... L8 2018 03 07 13 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 439465 UTA 2018 02 22 17 28 00 2551-99 P co2 CCGG 414.210 0.070 ... L8 2018 03 09 15 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 439824 UTA 2018 02 22 17 28 00 2552-99 P co2 CCGG 414.080 0.070 ... L8 2018 03 09 15 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 439825 UTA 2018 02 28 21 52 00 5563-99 P co2 CCGG 414.300 0.070 ... L8 2018 03 09 13 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 439826 UTA 2018 02 28 21 52 00 5564-99 P co2 CCGG 414.460 0.070 ... L8 2018 03 09 14 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 439827 UTA 2018 03 04 00 22 00 4089-99 P co2 CCGG 413.710 0.070 ... L8 2018 03 19 16 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 440250 UTA 2018 03 04 00 22 00 4090-99 P co2 CCGG 413.710 0.070 ... L8 2018 03 19 16 28 00 39.9018 -113.7181 1332.00 1327.00 5.00 440251 UTA 2018 03 10 21 15 00 275-99 P co2 CCGG 412.110 0.070 ... L8 2018 03 19 16 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 440248 UTA 2018 03 10 21 15 00 276-99 P co2 CCGG 412.100 0.070 ... L8 2018 03 19 17 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 440249 UTA 2018 03 16 19 30 00 4107-99 P co2 CCGG 413.670 0.070 ... L8 2018 04 03 09 37 00 39.9018 -113.7181 1332.00 1327.00 5.00 440874 UTA 2018 03 16 19 30 00 4108-99 P co2 CCGG 413.620 0.070 ... L8 2018 04 03 09 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 440875 UTA 2018 03 23 22 30 00 4047-99 P co2 CCGG 413.380 0.070 ... L8 2018 04 03 09 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 440876 UTA 2018 03 23 22 30 00 4048-99 P co2 CCGG 413.210 0.070 ... L8 2018 04 03 09 21 00 39.9018 -113.7181 1332.00 1327.00 5.00 440877 UTA 2018 03 27 22 35 00 4803-99 P co2 CCGG 413.170 0.070 ... L8 2018 04 13 10 33 00 39.9018 -113.7181 1332.00 1327.00 5.00 441249 UTA 2018 03 27 22 35 00 4804-99 P co2 CCGG 413.230 0.070 ... L8 2018 04 13 10 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 441250 UTA 2018 04 04 22 15 00 4031-99 P co2 CCGG 413.770 0.070 ... L8 2018 04 13 11 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 441251 UTA 2018 04 04 22 15 00 4032-99 P co2 CCGG 413.660 0.070 ... L8 2018 04 13 11 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 441252 UTA 2018 04 10 15 14 00 2041-99 P co2 CCGG 412.430 0.070 ... L8 2018 04 19 09 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 441733 UTA 2018 04 10 15 14 00 2042-99 P co2 CCGG 412.440 0.070 ... L8 2018 04 19 10 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 441734 UTA 2018 04 16 15 04 00 2247-99 P co2 CCGG 412.960 0.070 ... L8 2018 04 19 09 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 441731 UTA 2018 04 16 15 04 00 2248-99 P co2 CCGG 412.700 0.070 ... L8 2018 04 19 09 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 441732 UTA 2018 04 25 15 42 00 4379-99 P co2 CCGG 412.640 0.070 ... L8 2018 05 10 11 44 00 39.9018 -113.7181 1332.00 1327.00 5.00 442868 UTA 2018 04 25 15 42 00 4380-99 P co2 CCGG 412.490 0.070 ... L8 2018 05 10 11 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 442869 UTA 2018 04 28 17 07 00 3647-99 P co2 CCGG 410.910 0.070 ... L8 2018 05 10 09 37 00 39.9018 -113.7181 1332.00 1327.00 5.00 442867 UTA 2018 04 28 17 07 00 3648-99 P co2 CCGG 410.980 0.070 ... L8 2018 05 10 09 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 442866 UTA 2018 05 05 20 32 00 371-99 P co2 CCGG 407.780 0.070 ... L8 2018 05 24 15 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 443838 UTA 2018 05 05 20 32 00 372-99 P co2 CCGG 408.250 0.070 ... L8 2018 05 24 15 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 443839 UTA 2018 05 11 14 55 00 987-99 P co2 CCGG 412.300 0.070 ... L8 2018 05 24 15 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 443836 UTA 2018 05 11 14 55 00 988-99 P co2 CCGG 412.370 0.070 ... L8 2018 05 24 15 24 00 39.9018 -113.7181 1332.00 1327.00 5.00 443837 UTA 2018 05 16 19 50 00 275-99 P co2 CCGG 411.140 0.070 ... L8 2018 06 04 12 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 444488 UTA 2018 05 16 19 50 00 276-99 P co2 CCGG 411.330 0.070 ... L8 2018 06 04 12 36 00 39.9018 -113.7181 1332.00 1327.00 5.00 444489 UTA 2018 05 22 22 00 00 5475-99 P co2 CCGG 413.130 0.070 ... L8 2018 06 04 11 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 444486 UTA 2018 05 22 22 00 00 5476-99 P co2 CCGG 413.190 0.070 ... L8 2018 06 04 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 444487 UTA 2018 05 29 20 35 00 4061-99 P co2 CCGG 404.610 0.070 N.. L8 2018 06 12 16 41 00 39.9018 -113.7181 1332.00 1327.00 5.00 444952 UTA 2018 05 29 20 35 00 4062-99 P co2 CCGG 406.350 0.070 N.. L8 2018 06 12 16 57 00 39.9018 -113.7181 1332.00 1327.00 5.00 444953 UTA 2018 06 05 02 30 00 3617-99 P co2 CCGG 420.230 0.070 .Z. L8 2018 06 12 16 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 444954 UTA 2018 06 05 02 30 00 3618-99 P co2 CCGG 420.030 0.070 .Z. L8 2018 06 12 16 25 00 39.9018 -113.7181 1332.00 1327.00 5.00 444955 UTA 2018 06 11 03 55 00 1149-99 P co2 CCGG 413.430 0.070 ... L8 2018 06 25 13 36 00 39.9018 -113.7181 1332.00 1327.00 5.00 445500 UTA 2018 06 11 03 55 00 1150-99 P co2 CCGG 413.210 0.070 ... L8 2018 06 25 13 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 445501 UTA 2018 06 17 22 47 00 5367-99 P co2 CCGG 411.170 0.070 ... L8 2018 06 25 13 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 445498 UTA 2018 06 17 22 47 00 5368-99 P co2 CCGG 411.190 0.070 ... L8 2018 06 25 13 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 445499 UTA 2018 06 25 21 05 00 3515-99 P co2 CCGG 407.060 0.070 ... L8 2018 07 05 15 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 445957 UTA 2018 06 25 21 05 00 3516-99 P co2 CCGG 406.610 0.070 ... L8 2018 07 05 15 25 00 39.9018 -113.7181 1332.00 1327.00 5.00 445958 UTA 2018 06 28 03 03 00 5659-99 P co2 CCGG 415.760 0.070 N.. L8 2018 07 05 14 37 00 39.9018 -113.7181 1332.00 1327.00 5.00 445959 UTA 2018 06 28 03 03 00 5660-99 P co2 CCGG 415.090 0.070 N.. L8 2018 07 05 14 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 445960 UTA 2018 07 05 21 20 00 1943-99 P co2 CCGG 402.610 0.070 N.. L8 2018 07 18 11 21 00 39.9018 -113.7181 1332.00 1327.00 5.00 446497 UTA 2018 07 05 21 20 00 1944-99 P co2 CCGG 403.320 0.070 N.. L8 2018 07 18 11 37 00 39.9018 -113.7181 1332.00 1327.00 5.00 446498 UTA 2018 07 12 21 38 00 3923-99 P co2 CCGG 403.350 0.070 N.. L8 2018 07 18 10 49 00 39.9018 -113.7181 1332.00 1327.00 5.00 446499 UTA 2018 07 12 21 38 00 3924-99 P co2 CCGG 400.910 0.070 N.. L8 2018 07 18 11 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 446500 UTA 2018 07 20 01 48 00 723-99 P co2 CCGG 412.520 0.070 ... L8 2018 08 01 15 27 00 39.9018 -113.7181 1332.00 1327.00 5.00 447022 UTA 2018 07 20 01 48 00 724-99 P co2 CCGG 412.490 0.070 ... L8 2018 08 01 15 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 447023 UTA 2018 07 24 23 29 00 4637-99 P co2 CCGG 405.620 0.070 ... L8 2018 08 06 10 24 00 39.9018 -113.7181 1332.00 1327.00 5.00 447024 UTA 2018 07 24 23 29 00 4638-99 P co2 CCGG 405.190 0.070 ... L8 2018 08 06 10 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 447025 UTA 2018 07 30 03 17 00 537-99 P co2 CCGG 425.270 0.070 N.. L8 2018 08 17 13 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 447593 UTA 2018 07 30 03 17 00 538-99 P co2 CCGG 427.210 0.070 N.. L8 2018 08 17 14 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 447594 UTA 2018 08 06 17 12 00 4531-99 P co2 CCGG 402.890 0.070 N.. L8 2018 08 17 13 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 447595 UTA 2018 08 06 17 12 00 4532-99 P co2 CCGG 401.750 0.070 N.. L8 2018 08 17 13 42 00 39.9018 -113.7181 1332.00 1327.00 5.00 447596 UTA 2018 08 12 23 46 00 4125-99 P co2 CCGG 406.370 0.070 ... L8 2018 08 29 09 36 00 39.9018 -113.7181 1332.00 1327.00 5.00 448155 UTA 2018 08 12 23 46 00 4126-99 P co2 CCGG 405.950 0.070 ... L8 2018 08 29 09 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 448156 UTA 2018 08 18 03 10 00 4061-99 P co2 CCGG 411.610 0.070 .X. L8 2018 08 29 09 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 448153 UTA 2018 08 18 03 10 00 4062-99 P co2 CCGG 411.230 0.070 .X. L8 2018 08 29 09 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 448154 UTA 2018 08 25 20 49 00 72-99 P co2 CCGG 401.370 0.070 ... L8 2018 09 17 16 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 448965 UTA 2018 08 25 20 49 00 8-99 P co2 CCGG 401.370 0.070 ... L8 2018 09 17 16 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 448966 UTA 2018 09 05 21 08 00 1740-99 P co2 CCGG 404.710 0.070 ... L8 2018 09 17 14 25 00 39.9018 -113.7181 1332.00 1327.00 5.00 448963 UTA 2018 09 05 21 08 00 1742-99 P co2 CCGG 404.600 0.070 ... L8 2018 09 17 14 41 00 39.9018 -113.7181 1332.00 1327.00 5.00 448964 UTA 2018 09 11 16 24 00 175-99 P co2 CCGG 399.980 0.070 ... L8 2018 09 26 09 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 449399 UTA 2018 09 11 16 24 00 176-99 P co2 CCGG 399.580 0.070 ... L8 2018 09 26 09 17 00 39.9018 -113.7181 1332.00 1327.00 5.00 449400 UTA 2018 09 15 18 34 00 4735-99 P co2 CCGG 402.670 0.070 ... L8 2018 09 25 17 00 00 39.9018 -113.7181 1332.00 1327.00 5.00 449397 UTA 2018 09 15 18 34 00 4736-99 P co2 CCGG 402.440 0.070 ... L8 2018 09 25 17 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 449398 UTA 2018 09 22 21 30 00 2341-99 P co2 CCGG 402.650 0.070 ... L8 2018 10 09 16 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 449872 UTA 2018 09 22 21 30 00 2342-99 P co2 CCGG 402.760 0.070 ... L8 2018 10 09 17 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 449873 UTA 2018 09 29 17 15 00 1703-99 P co2 CCGG 403.550 0.070 N.. L8 2018 10 05 14 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 449827 UTA 2018 09 29 17 15 00 1704-99 P co2 CCGG 403.000 0.070 N.. L8 2018 10 05 14 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 449828 UTA 2018 10 03 19 22 00 5669-99 P co2 CCGG 404.650 0.070 ... L8 2018 10 16 15 25 00 39.9018 -113.7181 1332.00 1327.00 5.00 450204 UTA 2018 10 03 19 22 00 5670-99 P co2 CCGG 404.350 0.070 ... L8 2018 10 16 15 41 00 39.9018 -113.7181 1332.00 1327.00 5.00 450205 UTA 2018 10 11 00 16 00 1829-99 P co2 CCGG 415.030 0.070 .X. L8 2018 10 16 14 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 450206 UTA 2018 10 11 00 16 00 1830-99 P co2 CCGG 415.480 0.070 .X. L8 2018 10 16 15 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 450207 UTA 2018 10 16 21 20 00 3551-99 P co2 CCGG 410.260 0.070 ... L8 2018 11 01 14 16 00 39.9018 -113.7181 1332.00 1327.00 5.00 450821 UTA 2018 10 16 21 20 00 3552-99 P co2 CCGG 410.300 0.070 ... L8 2018 11 01 14 32 00 39.9018 -113.7181 1332.00 1327.00 5.00 450822 UTA 2018 10 22 18 12 00 3017-99 P co2 CCGG 407.990 0.070 ... L8 2018 11 01 14 48 00 39.9018 -113.7181 1332.00 1327.00 5.00 450823 UTA 2018 10 22 18 12 00 3018-99 P co2 CCGG 407.940 0.070 ... L8 2018 11 01 15 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 450824 UTA 2018 10 27 02 05 00 5527-99 P co2 CCGG 420.290 0.070 .X. L8 2018 11 13 11 21 00 39.9018 -113.7181 1332.00 1327.00 5.00 451272 UTA 2018 10 27 02 05 00 5528-99 P co2 CCGG 420.370 0.070 .X. L8 2018 11 13 11 37 00 39.9018 -113.7181 1332.00 1327.00 5.00 451273 UTA 2018 11 02 21 56 00 4999-99 P co2 CCGG 408.010 0.070 ... L8 2018 11 13 10 49 00 39.9018 -113.7181 1332.00 1327.00 5.00 451270 UTA 2018 11 02 21 56 00 5000-99 P co2 CCGG 407.890 0.070 ... L8 2018 11 13 11 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 451271 UTA 2018 11 10 00 22 00 3719-99 P co2 CCGG 411.170 0.070 ... L8 2018 11 28 13 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 451736 UTA 2018 11 10 00 22 00 3720-99 P co2 CCGG 411.120 0.070 ... L8 2018 11 28 13 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 451737 UTA 2018 11 15 22 42 00 2861-99 P co2 CCGG 412.350 0.070 ... L8 2018 11 28 12 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 451738 UTA 2018 11 15 22 42 00 2862-99 P co2 CCGG 412.260 0.070 ... L8 2018 11 28 12 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 451739 UTA 2018 11 21 00 40 00 2363-99 P co2 CCGG 418.050 0.070 ... L8 2018 12 18 16 25 00 39.9018 -113.7181 1332.00 1327.00 5.00 452599 UTA 2018 11 21 00 40 00 2364-99 P co2 CCGG 417.910 0.070 ... L8 2018 12 18 16 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 452600 UTA 2018 11 27 22 30 00 2041-99 P co2 CCGG 413.360 0.070 ... L8 2018 12 19 08 25 00 39.9018 -113.7181 1332.00 1327.00 5.00 452856 UTA 2018 11 27 22 30 00 2042-99 P co2 CCGG 413.270 0.070 ... L8 2018 12 19 08 41 00 39.9018 -113.7181 1332.00 1327.00 5.00 452857 UTA 2018 12 03 01 38 00 2159-99 P co2 CCGG 413.350 0.070 ... L8 2018 12 21 14 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 452788 UTA 2018 12 03 01 38 00 2160-99 P co2 CCGG 413.590 0.070 ... L8 2018 12 21 14 51 00 39.9018 -113.7181 1332.00 1327.00 5.00 452789 UTA 2018 12 10 00 35 00 4879-99 P co2 CCGG 418.470 0.070 ... L8 2018 12 21 14 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 452790 UTA 2018 12 10 00 35 00 4880-99 P co2 CCGG 418.130 0.070 ... L8 2018 12 21 14 19 00 39.9018 -113.7181 1332.00 1327.00 5.00 452791 UTA 2018 12 15 18 59 00 5023-99 P co2 CCGG 415.610 0.070 ... L8 2019 01 25 10 29 00 39.9018 -113.7181 1332.00 1327.00 5.00 453452 UTA 2018 12 15 18 59 00 5024-99 P co2 CCGG 415.590 0.070 ... L8 2019 01 25 10 45 00 39.9018 -113.7181 1332.00 1327.00 5.00 453453 UTA 2018 12 20 22 00 00 5225-99 P co2 CCGG 421.350 0.070 N.. L8 2019 01 25 09 58 00 39.9018 -113.7181 1332.00 1327.00 5.00 453450 UTA 2018 12 20 22 00 00 5226-99 P co2 CCGG 414.860 0.070 N.. L8 2019 01 25 10 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 453451 UTA 2018 12 27 21 22 00 1405-99 P co2 CCGG 414.020 0.070 ... L8 2019 01 23 15 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 453301 UTA 2018 12 27 21 22 00 1406-99 P co2 CCGG 414.090 0.070 ... L8 2019 01 23 16 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 453302 UTA 2019 01 01 00 50 00 59-99 P co2 CCGG 417.940 0.070 ... L8 2019 01 23 16 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 453300 UTA 2019 01 01 00 50 00 60-99 P co2 CCGG 417.830 0.070 ... L8 2019 01 23 16 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 453299 UTA 2019 01 07 19 00 00 4531-99 P co2 CCGG 413.920 0.070 ... L8 2019 01 30 14 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 453737 UTA 2019 01 07 19 00 00 4532-99 P co2 CCGG 413.800 0.070 ... L8 2019 01 30 14 46 00 39.9018 -113.7181 1332.00 1327.00 5.00 453738 UTA 2019 01 14 00 20 00 5605-99 P co2 CCGG 419.210 0.070 N.. L8 2019 01 30 13 27 00 39.9018 -113.7181 1332.00 1327.00 5.00 453735 UTA 2019 01 14 00 20 00 5606-99 P co2 CCGG 419.850 0.070 N.. L8 2019 01 30 13 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 453736 UTA 2019 01 17 17 26 00 1947-99 P co2 CCGG 413.470 0.070 ... L8 2019 02 12 16 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 453984 UTA 2019 01 17 17 26 00 1948-99 P co2 CCGG 413.410 0.070 ... L8 2019 02 12 16 27 00 39.9018 -113.7181 1332.00 1327.00 5.00 453985 UTA 2019 01 25 16 17 00 1393-99 P co2 CCGG 421.190 0.070 .X. L8 2019 02 13 10 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 453982 UTA 2019 01 25 16 17 00 1394-99 P co2 CCGG 421.290 0.070 .X. L8 2019 02 13 11 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 453983 UTA 2019 01 31 00 53 00 3855-99 P co2 CCGG 424.590 0.070 .X. L8 2019 02 27 15 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 454471 UTA 2019 01 31 00 53 00 3856-99 P co2 CCGG 424.230 0.070 .X. L8 2019 02 27 15 25 00 39.9018 -113.7181 1332.00 1327.00 5.00 454472 UTA 2019 02 04 16 08 00 3551-99 P co2 CCGG 413.510 0.070 ... L8 2019 02 27 14 38 00 39.9018 -113.7181 1332.00 1327.00 5.00 454469 UTA 2019 02 04 16 08 00 3552-99 P co2 CCGG 413.470 0.070 ... L8 2019 02 27 14 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 454470 UTA 2019 02 11 22 00 00 5475-99 P co2 CCGG 416.320 0.070 ... L8 2019 03 05 15 39 00 39.9018 -113.7181 1332.00 1327.00 5.00 455193 UTA 2019 02 11 22 00 00 5476-99 P co2 CCGG 416.290 0.070 ... L8 2019 03 05 15 55 00 39.9018 -113.7181 1332.00 1327.00 5.00 455194 UTA 2019 02 18 19 15 00 5473-99 P co2 CCGG 416.900 0.070 ... L8 2019 03 05 16 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 455191 UTA 2019 02 18 19 15 00 5474-99 P co2 CCGG 416.910 0.070 ... L8 2019 03 05 16 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 455192 UTA 2019 02 23 23 45 00 1181-99 P co2 CCGG 416.020 0.070 ... L8 2019 03 11 13 36 00 39.9018 -113.7181 1332.00 1327.00 5.00 455541 UTA 2019 02 23 23 45 00 522-99 P co2 CCGG 415.880 0.070 ... L8 2019 03 11 13 20 00 39.9018 -113.7181 1332.00 1327.00 5.00 455542 UTA 2019 02 28 16 35 00 1488-99 P co2 CCGG 416.630 0.070 ... L8 2019 03 11 13 52 00 39.9018 -113.7181 1332.00 1327.00 5.00 455540 UTA 2019 02 28 16 35 00 5490-99 P co2 CCGG 416.150 0.070 ... L8 2019 03 11 14 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 455539 UTA 2019 03 06 22 58 00 4997-99 P co2 CCGG 413.820 0.070 ... L8 2019 03 20 15 59 00 39.9018 -113.7181 1332.00 1327.00 5.00 455896 UTA 2019 03 06 22 58 00 4998-99 P co2 CCGG 413.880 0.070 ... L8 2019 03 20 16 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 455897 UTA 2019 03 13 15 09 00 2169-99 P co2 CCGG 416.290 0.070 ... L8 2019 03 21 12 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 455910 UTA 2019 03 13 15 09 00 2170-99 P co2 CCGG 416.300 0.070 ... L8 2019 03 21 12 30 00 39.9018 -113.7181 1332.00 1327.00 5.00 455911 UTA 2019 03 19 00 05 00 2469-99 P co2 CCGG 417.490 0.070 ... L8 2019 04 08 13 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 456622 UTA 2019 03 19 00 05 00 2470-99 P co2 CCGG 417.440 0.070 ... L8 2019 04 08 13 24 00 39.9018 -113.7181 1332.00 1327.00 5.00 456623 UTA 2019 03 26 20 05 00 479-99 P co2 CCGG 415.770 0.070 ... L8 2019 04 08 13 56 00 39.9018 -113.7181 1332.00 1327.00 5.00 456620 UTA 2019 03 26 20 05 00 480-99 P co2 CCGG 415.740 0.070 ... L8 2019 04 08 14 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 456621 UTA 2019 03 30 21 33 00 2775-99 P co2 CCGG 415.760 0.070 ... L8 2019 04 18 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 457116 UTA 2019 03 30 21 33 00 2776-99 P co2 CCGG 415.850 0.070 ... L8 2019 04 18 12 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 457117 UTA 2019 04 05 22 38 00 3529-99 P co2 CCGG 413.210 0.070 ... L8 2019 04 18 12 34 00 39.9018 -113.7181 1332.00 1327.00 5.00 457118 UTA 2019 04 05 22 38 00 3530-99 P co2 CCGG 413.230 0.070 ... L8 2019 04 18 12 49 00 39.9018 -113.7181 1332.00 1327.00 5.00 457119 UTA 2019 04 12 17 06 00 1885-99 P co2 CCGG 416.560 0.070 ... L8 2019 05 06 15 27 00 39.9018 -113.7181 1332.00 1327.00 5.00 457843 UTA 2019 04 12 17 06 00 1886-99 P co2 CCGG 416.460 0.070 ... L8 2019 05 06 15 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 457844 UTA 2019 04 18 23 55 00 47-99 P co2 CCGG 414.390 0.070 ... L8 2019 05 06 14 24 00 39.9018 -113.7181 1332.00 1327.00 5.00 457841 UTA 2019 04 18 23 55 00 48-99 P co2 CCGG 414.230 0.070 ... L8 2019 05 06 14 40 00 39.9018 -113.7181 1332.00 1327.00 5.00 457842 UTA 2019 04 22 21 54 00 2861-99 P co2 CCGG 416.770 0.070 ... L8 2019 05 22 16 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 458657 UTA 2019 04 22 21 54 00 2862-99 P co2 CCGG 416.560 0.070 ... L8 2019 05 22 16 25 00 39.9018 -113.7181 1332.00 1327.00 5.00 458658 UTA 2019 04 29 16 55 00 3855-99 P co2 CCGG 414.290 0.070 ... L8 2019 05 28 12 27 00 39.9018 -113.7181 1332.00 1327.00 5.00 458659 UTA 2019 04 29 16 55 00 3856-99 P co2 CCGG 414.180 0.070 ... L8 2019 05 28 12 43 00 39.9018 -113.7181 1332.00 1327.00 5.00 458660 UTA 2019 05 05 21 50 00 1361-99 P co2 CCGG 410.390 0.070 ... L8 2019 05 28 14 35 00 39.9018 -113.7181 1332.00 1327.00 5.00 458914 UTA 2019 05 05 21 50 00 1362-99 P co2 CCGG 410.660 0.070 ... L8 2019 05 28 14 50 00 39.9018 -113.7181 1332.00 1327.00 5.00 458915 UTA 2019 05 13 00 23 00 2635-99 P co2 CCGG 412.210 0.070 ... L8 2019 05 28 15 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 458916 UTA 2019 05 13 00 23 00 2636-99 P co2 CCGG 412.670 0.070 ... L8 2019 05 28 15 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 458917 UTA 2019 05 21 22 50 00 759-99 P co2 CCGG 408.590 0.070 N.. L8 2019 06 19 15 22 00 39.9018 -113.7181 1332.00 1327.00 5.00 459945 UTA 2019 05 21 22 50 00 760-99 P co2 CCGG 411.140 0.070 N.. L8 2019 06 19 15 38 00 39.9018 -113.7181 1332.00 1327.00 5.00 459946 UTA 2019 05 24 20 16 00 607-99 P co2 CCGG 405.450 0.070 .X. L8 2019 06 19 15 53 00 39.9018 -113.7181 1332.00 1327.00 5.00 459943 UTA 2019 05 24 20 16 00 608-99 P co2 CCGG 405.200 0.070 .X. L8 2019 06 19 16 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 459944 UTA 2019 05 29 22 39 00 1651-99 P co2 CCGG 413.840 0.070 ... L8 2019 06 24 16 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 460108 UTA 2019 05 29 22 39 00 1652-99 P co2 CCGG 414.130 0.070 ... L8 2019 06 24 16 18 00 39.9018 -113.7181 1332.00 1327.00 5.00 460109 UTA 2019 06 05 20 26 00 3111-99 P co2 CCGG 409.950 0.070 ... L8 2019 06 24 15 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 460106 UTA 2019 06 05 20 26 00 3112-99 P co2 CCGG 409.790 0.070 ... L8 2019 06 24 15 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 460107 UTA 2019 06 11 22 20 00 3719-99 P co2 CCGG 410.380 0.070 N.. L8 2019 07 02 11 31 00 39.9018 -113.7181 1332.00 1327.00 5.00 460546 UTA 2019 06 11 22 20 00 3720-99 P co2 CCGG 409.450 0.070 N.. L8 2019 07 02 11 47 00 39.9018 -113.7181 1332.00 1327.00 5.00 460547 UTA 2019 06 18 00 15 00 4505-99 P co2 CCGG 411.990 0.070 ... L8 2019 07 02 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 460544 UTA 2019 06 18 00 15 00 4506-99 P co2 CCGG 412.090 0.070 ... L8 2019 07 02 12 19 00 39.9018 -113.7181 1332.00 1327.00 5.00 460545 UTA 2019 06 24 23 10 00 397-99 P co2 CCGG 407.880 0.070 ... L8 2019 07 19 15 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 461278 UTA 2019 06 24 23 10 00 398-99 P co2 CCGG 408.180 0.070 ... L8 2019 07 19 15 27 00 39.9018 -113.7181 1332.00 1327.00 5.00 461279 UTA 2019 06 28 23 50 00 1361-99 P co2 CCGG 410.350 0.070 ... L8 2019 07 19 14 38 00 39.9018 -113.7181 1332.00 1327.00 5.00 461280 UTA 2019 06 28 23 50 00 1362-99 P co2 CCGG 410.080 0.070 ... L8 2019 07 19 14 54 00 39.9018 -113.7181 1332.00 1327.00 5.00 461281 UTA 2019 07 04 21 55 00 1965-99 P co2 CCGG 402.780 0.070 N.. L8 2019 07 23 15 39 00 39.9018 -113.7181 1332.00 1327.00 5.00 461700 UTA 2019 07 04 21 55 00 1966-99 P co2 CCGG 403.900 0.070 N.. L8 2019 07 23 15 55 00 39.9018 -113.7181 1332.00 1327.00 5.00 461701 UTA 2019 07 10 02 35 00 5613-99 P co2 CCGG 412.400 0.070 ... L8 2019 07 23 16 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 461702 UTA 2019 07 10 02 35 00 5614-99 P co2 CCGG 412.240 0.070 ... L8 2019 07 23 16 26 00 39.9018 -113.7181 1332.00 1327.00 5.00 461703 UTA 2019 07 17 03 05 00 1351-99 P co2 CCGG 412.880 0.041 ... PC2 2019 08 08 12 38 07 39.9018 -113.7181 1332.00 1327.00 5.00 462653 UTA 2019 07 17 03 05 00 1352-99 P co2 CCGG 413.030 0.041 ... PC2 2019 08 08 12 52 24 39.9018 -113.7181 1332.00 1327.00 5.00 462652 UTA 2019 07 22 22 40 00 5531-99 P co2 CCGG 410.680 0.041 N.. PC2 2019 08 08 13 06 40 39.9018 -113.7181 1332.00 1327.00 5.00 462654 UTA 2019 07 22 22 40 00 5532-99 P co2 CCGG 409.790 0.041 N.. PC2 2019 08 08 13 20 56 39.9018 -113.7181 1332.00 1327.00 5.00 462655 UTA 2019 07 29 03 03 00 1651-99 P co2 CCGG 435.270 0.041 N.. PC2 2019 08 21 15 45 48 39.9018 -113.7181 1332.00 1327.00 5.00 463517 UTA 2019 07 29 03 03 00 1652-99 P co2 CCGG 429.630 0.041 N.. PC2 2019 08 21 16 00 03 39.9018 -113.7181 1332.00 1327.00 5.00 463518 UTA 2019 08 07 20 30 00 4531-99 P co2 CCGG 410.350 0.041 ... PC2 2019 08 26 16 03 14 39.9018 -113.7181 1332.00 1327.00 5.00 463661 UTA 2019 08 07 20 30 00 4532-99 P co2 CCGG 411.080 0.041 ... PC2 2019 08 26 16 17 32 39.9018 -113.7181 1332.00 1327.00 5.00 463662 UTA 2019 08 10 19 58 00 879-99 P co2 CCGG 406.930 0.041 ... PC2 2019 09 03 10 56 31 39.9018 -113.7181 1332.00 1327.00 5.00 463943 UTA 2019 08 10 19 58 00 880-99 P co2 CCGG 406.890 0.041 ... PC2 2019 09 03 10 42 16 39.9018 -113.7181 1332.00 1327.00 5.00 463944 UTA 2019 08 19 02 34 00 4973-99 P co2 CCGG 415.610 0.041 .X. PC2 2019 08 29 12 02 41 39.9018 -113.7181 1332.00 1327.00 5.00 463861 UTA 2019 08 19 02 34 00 4974-99 P co2 CCGG 415.610 0.041 .X. PC2 2019 08 29 12 17 00 39.9018 -113.7181 1332.00 1327.00 5.00 463862 UTA 2019 08 25 01 45 00 1999-99 P co2 CCGG 407.360 0.041 N.. PC2 2019 09 17 14 24 05 39.9018 -113.7181 1332.00 1327.00 5.00 464572 UTA 2019 08 25 01 45 00 2000-99 P co2 CCGG 407.870 0.041 N.. PC2 2019 09 17 14 38 21 39.9018 -113.7181 1332.00 1327.00 5.00 464573 UTA 2019 08 28 22 35 00 1849-99 P co2 CCGG 404.830 0.041 ... PC2 2019 09 17 13 55 34 39.9018 -113.7181 1332.00 1327.00 5.00 464570 UTA 2019 08 28 22 35 00 1850-99 P co2 CCGG 405.210 0.041 ... PC2 2019 09 17 14 09 50 39.9018 -113.7181 1332.00 1327.00 5.00 464571 UTA 2019 09 03 21 34 00 793-99 P co2 CCGG 410.840 0.041 ... PC2 2019 10 08 10 51 40 39.9018 -113.7181 1332.00 1327.00 5.00 465026 UTA 2019 09 03 21 34 00 794-99 P co2 CCGG 410.830 0.041 ... PC2 2019 10 08 11 05 59 39.9018 -113.7181 1332.00 1327.00 5.00 465027 UTA 2019 09 10 00 10 00 2635-99 P co2 CCGG 406.340 0.041 N.. PC2 2019 10 08 10 22 54 39.9018 -113.7181 1332.00 1327.00 5.00 465024 UTA 2019 09 10 00 10 00 2636-99 P co2 CCGG 405.770 0.041 N.. PC2 2019 10 08 10 37 14 39.9018 -113.7181 1332.00 1327.00 5.00 465025 UTA 2019 09 18 20 35 00 247-99 P co2 CCGG 404.410 0.041 N.. PC2 2019 10 22 10 27 46 39.9018 -113.7181 1332.00 1327.00 5.00 465803 UTA 2019 09 18 20 35 00 248-99 P co2 CCGG 405.650 0.041 N.. PC2 2019 10 22 10 42 05 39.9018 -113.7181 1332.00 1327.00 5.00 465804 UTA 2019 09 24 21 15 00 2273-99 P co2 CCGG 407.640 0.041 ... PC2 2019 10 22 10 56 26 39.9018 -113.7181 1332.00 1327.00 5.00 465801 UTA 2019 09 24 21 15 00 2274-99 P co2 CCGG 407.570 0.041 ... PC2 2019 10 22 11 10 45 39.9018 -113.7181 1332.00 1327.00 5.00 465802 UTA 2019 10 04 19 05 00 3801-99 P co2 CCGG 408.310 0.041 ... PC2 2019 11 01 14 40 19 39.9018 -113.7181 1332.00 1327.00 5.00 466559 UTA 2019 10 04 19 05 00 3802-99 P co2 CCGG 408.310 0.041 ... PC2 2019 11 01 14 54 38 39.9018 -113.7181 1332.00 1327.00 5.00 466560 UTA 2019 10 10 01 58 00 479-99 P co2 CCGG 410.050 0.041 ... PC2 2019 11 01 13 43 06 39.9018 -113.7181 1332.00 1327.00 5.00 466558 UTA 2019 10 10 01 58 00 480-99 P co2 CCGG 409.940 0.041 ... PC2 2019 11 01 13 57 24 39.9018 -113.7181 1332.00 1327.00 5.00 466557 UTA 2019 10 15 23 43 00 2133-99 P co2 CCGG 411.720 0.041 ... PC2 2019 11 15 13 32 55 39.9018 -113.7181 1332.00 1327.00 5.00 467031 UTA 2019 10 15 23 43 00 2134-99 P co2 CCGG 411.770 0.041 ... PC2 2019 11 15 13 47 10 39.9018 -113.7181 1332.00 1327.00 5.00 467032 UTA 2019 10 21 22 46 00 341-99 P co2 CCGG 410.230 0.041 ... PC2 2019 11 15 13 04 22 39.9018 -113.7181 1332.00 1327.00 5.00 467033 UTA 2019 10 21 22 46 00 342-99 P co2 CCGG 410.330 0.041 ... PC2 2019 11 15 13 18 40 39.9018 -113.7181 1332.00 1327.00 5.00 467034 UTA 2019 10 26 22 31 00 3797-99 P co2 CCGG 411.730 0.041 ... PC2 2019 12 04 11 58 18 39.9018 -113.7181 1332.00 1327.00 5.00 467664 UTA 2019 10 26 22 31 00 3798-99 P co2 CCGG 411.800 0.041 ... PC2 2019 12 04 12 12 37 39.9018 -113.7181 1332.00 1327.00 5.00 467665 UTA 2019 11 02 19 23 00 3017-99 P co2 CCGG 413.520 0.041 ... PC2 2019 12 04 11 00 55 39.9018 -113.7181 1332.00 1327.00 5.00 467662 UTA 2019 11 02 19 23 00 3018-99 P co2 CCGG 413.380 0.041 ... PC2 2019 12 04 11 15 18 39.9018 -113.7181 1332.00 1327.00 5.00 467663 UTA 2019 11 07 22 50 00 1903-99 P co2 CCGG 412.400 0.041 ... PC2 2019 12 09 10 29 18 39.9018 -113.7181 1332.00 1327.00 5.00 467844 UTA 2019 11 07 22 50 00 1904-99 P co2 CCGG 412.400 0.041 ... PC2 2019 12 09 10 43 35 39.9018 -113.7181 1332.00 1327.00 5.00 467845 UTA 2019 11 15 16 02 00 2689-99 P co2 CCGG 413.910 0.041 ... PC2 2019 12 06 17 18 16 39.9018 -113.7181 1332.00 1327.00 5.00 467842 UTA 2019 11 15 16 02 00 2690-99 P co2 CCGG 414.330 0.041 ... PC2 2019 12 06 17 32 42 39.9018 -113.7181 1332.00 1327.00 5.00 467843 UTA 2019 11 19 00 43 00 4531-99 P co2 CCGG 420.490 0.041 N.. PC2 2019 12 26 12 33 32 39.9018 -113.7181 1332.00 1327.00 5.00 468321 UTA 2019 11 19 00 43 00 4532-99 P co2 CCGG 421.380 0.041 N.. PC2 2019 12 26 12 47 50 39.9018 -113.7181 1332.00 1327.00 5.00 468322 UTA 2019 11 25 16 18 00 4505-99 P co2 CCGG 417.080 0.041 ... PC2 2019 12 26 12 04 57 39.9018 -113.7181 1332.00 1327.00 5.00 468319 UTA 2019 11 25 16 18 00 4506-99 P co2 CCGG 417.120 0.041 ... PC2 2019 12 26 12 19 14 39.9018 -113.7181 1332.00 1327.00 5.00 468320 UTA 2019 11 30 23 30 00 1523-99 P co2 CCGG 417.570 0.041 ... PC2 2020 01 21 15 49 26 39.9018 -113.7181 1332.00 1327.00 5.00 468766 UTA 2019 11 30 23 30 00 1524-99 P co2 CCGG 417.520 0.041 ... PC2 2020 01 21 16 03 48 39.9018 -113.7181 1332.00 1327.00 5.00 468767 UTA 2019 12 07 18 59 00 2443-99 P co2 CCGG 420.790 0.041 ... PC2 2020 01 21 16 18 09 39.9018 -113.7181 1332.00 1327.00 5.00 468768 UTA 2019 12 07 18 59 00 2444-99 P co2 CCGG 420.830 0.041 ... PC2 2020 01 21 16 32 30 39.9018 -113.7181 1332.00 1327.00 5.00 468769 UTA 2019 12 12 21 15 00 533-99 P co2 CCGG 413.820 0.041 ... PC2 2020 01 27 11 50 17 39.9018 -113.7181 1332.00 1327.00 5.00 469262 UTA 2019 12 12 21 15 00 534-99 P co2 CCGG 413.900 0.041 ... PC2 2020 01 27 12 04 37 39.9018 -113.7181 1332.00 1327.00 5.00 469263 UTA 2019 12 18 01 09 00 5239-99 P co2 CCGG 421.740 0.041 N.. PC2 2020 01 27 12 18 57 39.9018 -113.7181 1332.00 1327.00 5.00 469260 UTA 2019 12 18 01 09 00 5240-99 P co2 CCGG 422.460 0.041 N.. PC2 2020 01 27 12 33 16 39.9018 -113.7181 1332.00 1327.00 5.00 469261 UTA 2019 12 24 17 18 00 5371-99 P co2 CCGG 414.280 0.041 ... PC2 2020 02 03 11 28 33 39.9018 -113.7181 1332.00 1327.00 5.00 469629 UTA 2019 12 24 17 18 00 5372-99 P co2 CCGG 414.280 0.041 ... PC2 2020 02 03 11 42 53 39.9018 -113.7181 1332.00 1327.00 5.00 469630 UTA 2019 12 30 21 08 00 3837-99 P co2 CCGG 417.380 0.041 ... PC2 2020 02 03 12 54 33 39.9018 -113.7181 1332.00 1327.00 5.00 469659 UTA 2019 12 30 21 08 00 3838-99 P co2 CCGG 417.260 0.041 ... PC2 2020 02 03 13 08 54 39.9018 -113.7181 1332.00 1327.00 5.00 469660 UTA 2020 01 06 22 08 00 1979-99 P co2 CCGG 416.400 0.041 ... PC2 2020 02 06 16 29 48 39.9018 -113.7181 1332.00 1327.00 5.00 469795 UTA 2020 01 06 22 08 00 1980-99 P co2 CCGG 416.380 0.041 ... PC2 2020 02 06 16 44 07 39.9018 -113.7181 1332.00 1327.00 5.00 469796 UTA 2020 01 11 19 18 00 119-99 P co2 CCGG 416.320 0.041 ... PC2 2020 02 06 16 58 29 39.9018 -113.7181 1332.00 1327.00 5.00 469793 UTA 2020 01 11 19 18 00 120-99 P co2 CCGG 416.360 0.041 ... PC2 2020 02 06 17 12 48 39.9018 -113.7181 1332.00 1327.00 5.00 469794 UTA 2020 01 17 17 23 00 5157-99 P co2 CCGG 416.350 0.041 ... PC2 2020 02 24 16 29 11 39.9018 -113.7181 1332.00 1327.00 5.00 470524 UTA 2020 01 17 17 23 00 5158-99 P co2 CCGG 416.430 0.041 ... PC2 2020 02 24 16 43 35 39.9018 -113.7181 1332.00 1327.00 5.00 470525 UTA 2020 01 25 01 26 00 2133-99 P co2 CCGG 432.970 0.041 N.. PC2 2020 02 24 16 00 29 39.9018 -113.7181 1332.00 1327.00 5.00 470526 UTA 2020 01 25 01 26 00 2134-99 P co2 CCGG 431.230 0.041 N.. PC2 2020 02 24 16 14 51 39.9018 -113.7181 1332.00 1327.00 5.00 470527 UTA 2020 01 29 21 20 00 5833-99 P co2 CCGG 417.670 0.041 ... PC2 2020 03 09 12 52 35 39.9018 -113.7181 1332.00 1327.00 5.00 471368 UTA 2020 01 29 21 20 00 5834-99 P co2 CCGG 417.720 0.041 ... PC2 2020 03 09 13 06 56 39.9018 -113.7181 1332.00 1327.00 5.00 471369 UTA 2020 02 05 21 05 00 4531-99 P co2 CCGG 418.150 0.041 ... PC2 2020 03 09 13 21 24 39.9018 -113.7181 1332.00 1327.00 5.00 471370 UTA 2020 02 05 21 05 00 4532-99 P co2 CCGG 418.130 0.041 ... PC2 2020 03 09 13 35 46 39.9018 -113.7181 1332.00 1327.00 5.00 471371 UTA 2020 02 12 00 38 00 2723-99 P co2 CCGG 422.560 0.041 N.. PC2 2020 03 17 15 26 27 39.9018 -113.7181 1332.00 1327.00 5.00 471252 UTA 2020 02 12 00 38 00 2724-99 P co2 CCGG 423.120 0.041 N.. PC2 2020 03 17 15 40 48 39.9018 -113.7181 1332.00 1327.00 5.00 471253 UTA 2020 02 17 19 32 00 3787-99 P co2 CCGG 418.400 0.041 N.. PC2 2020 03 17 15 55 09 39.9018 -113.7181 1332.00 1327.00 5.00 471254 UTA 2020 02 17 19 32 00 3788-99 P co2 CCGG 417.780 0.041 N.. PC2 2020 03 17 16 09 29 39.9018 -113.7181 1332.00 1327.00 5.00 471255 UTA 2020 02 22 21 03 00 5481-99 P co2 CCGG 420.710 0.041 ... PC2 2020 03 27 13 12 44 39.9018 -113.7181 1332.00 1327.00 5.00 472094 UTA 2020 02 22 21 03 00 5482-99 P co2 CCGG 420.700 0.041 ... PC2 2020 03 27 13 27 05 39.9018 -113.7181 1332.00 1327.00 5.00 472095 UTA 2020 02 28 23 21 00 3797-99 P co2 CCGG 417.670 0.041 ... PC2 2020 03 27 13 41 25 39.9018 -113.7181 1332.00 1327.00 5.00 472092 UTA 2020 02 28 23 21 00 3798-99 P co2 CCGG 417.710 0.041 ... PC2 2020 03 27 13 55 49 39.9018 -113.7181 1332.00 1327.00 5.00 472093 UTA 2020 03 07 01 26 00 125-99 P co2 CCGG 416.930 0.041 ... PC2 2020 04 02 13 51 49 39.9018 -113.7181 1332.00 1327.00 5.00 472298 UTA 2020 03 07 01 26 00 126-99 P co2 CCGG 416.910 0.041 ... PC2 2020 04 02 14 06 09 39.9018 -113.7181 1332.00 1327.00 5.00 472299 UTA 2020 03 12 02 06 00 749-99 P co2 CCGG 419.440 0.041 ... PC2 2020 04 02 13 23 03 39.9018 -113.7181 1332.00 1327.00 5.00 472296 UTA 2020 03 12 02 06 00 750-99 P co2 CCGG 419.500 0.041 ... PC2 2020 04 02 13 37 23 39.9018 -113.7181 1332.00 1327.00 5.00 472297 UTA 2020 03 17 17 38 00 4599-99 P co2 CCGG 415.940 0.041 ... PC2 2020 04 08 15 55 59 39.9018 -113.7181 1332.00 1327.00 5.00 472612 UTA 2020 03 17 17 38 00 4600-99 P co2 CCGG 415.860 0.041 ... PC2 2020 04 08 16 10 19 39.9018 -113.7181 1332.00 1327.00 5.00 472613 UTA 2020 03 24 00 56 00 195-99 P co2 CCGG 417.870 0.041 ... PC2 2020 04 08 14 58 46 39.9018 -113.7181 1332.00 1327.00 5.00 472614 UTA 2020 03 24 00 56 00 196-99 P co2 CCGG 417.640 0.041 ... PC2 2020 04 08 15 13 04 39.9018 -113.7181 1332.00 1327.00 5.00 472615 UTA 2020 03 29 23 26 00 3813-99 P co2 CCGG 417.560 0.041 ... PC2 2020 04 16 10 30 49 39.9018 -113.7181 1332.00 1327.00 5.00 473123 UTA 2020 03 29 23 26 00 3814-99 P co2 CCGG 417.460 0.041 ... PC2 2020 04 16 10 45 09 39.9018 -113.7181 1332.00 1327.00 5.00 473124 UTA 2020 04 05 01 09 00 5715-99 P co2 CCGG 417.430 0.041 ... PC2 2020 04 15 16 42 37 39.9018 -113.7181 1332.00 1327.00 5.00 473125 UTA 2020 04 05 01 09 00 5716-99 P co2 CCGG 417.250 0.041 ... PC2 2020 04 15 16 56 57 39.9018 -113.7181 1332.00 1327.00 5.00 473126 UTA 2020 04 11 15 04 00 2683-99 P co2 CCGG 415.700 0.041 ... PC2 2020 04 29 15 05 25 39.9018 -113.7181 1332.00 1327.00 5.00 473703 UTA 2020 04 11 15 04 00 2684-99 P co2 CCGG 415.690 0.041 ... PC2 2020 04 29 15 19 44 39.9018 -113.7181 1332.00 1327.00 5.00 473704 UTA 2020 04 18 17 02 00 4785-99 P co2 CCGG 419.900 0.041 ... PC2 2020 05 05 13 24 08 39.9018 -113.7181 1332.00 1327.00 5.00 473936 UTA 2020 04 18 17 02 00 4786-99 P co2 CCGG 419.950 0.041 ... PC2 2020 05 05 13 38 25 39.9018 -113.7181 1332.00 1327.00 5.00 473937 UTA 2020 04 22 22 00 00 935-99 P co2 CCGG 415.220 0.041 ... PC2 2020 05 18 14 24 06 39.9018 -113.7181 1332.00 1327.00 5.00 474488 UTA 2020 04 22 22 00 00 936-99 P co2 CCGG 415.090 0.041 ... PC2 2020 05 18 14 38 24 39.9018 -113.7181 1332.00 1327.00 5.00 474489 UTA 2020 04 29 02 16 00 49-99 P co2 CCGG 419.950 0.041 ... PC2 2020 05 18 13 55 31 39.9018 -113.7181 1332.00 1327.00 5.00 474486 UTA 2020 04 29 02 16 00 50-99 P co2 CCGG 419.840 0.041 ... PC2 2020 05 18 14 09 49 39.9018 -113.7181 1332.00 1327.00 5.00 474487 UTA 2020 05 05 21 57 00 2217-99 P co2 CCGG 416.830 0.041 ... PC2 2020 06 04 15 33 59 39.9018 -113.7181 1332.00 1327.00 5.00 475019 UTA 2020 05 05 21 57 00 2218-99 P co2 CCGG 416.940 0.041 ... PC2 2020 06 04 15 48 18 39.9018 -113.7181 1332.00 1327.00 5.00 475020 UTA 2020 05 11 14 19 00 67-99 P co2 CCGG 418.340 0.041 ... PC2 2020 06 04 13 10 22 39.9018 -113.7181 1332.00 1327.00 5.00 475017 UTA 2020 05 11 14 19 00 68-99 P co2 CCGG 418.060 0.041 ... PC2 2020 06 04 13 24 41 39.9018 -113.7181 1332.00 1327.00 5.00 475018 UTA 2020 05 17 18 14 00 2125-99 P co2 CCGG 416.500 0.041 ... PC2 2020 06 17 16 07 48 39.9018 -113.7181 1332.00 1327.00 5.00 475940 UTA 2020 05 17 18 14 00 2216-99 P co2 CCGG 416.490 0.041 ... PC2 2020 06 17 16 22 12 39.9018 -113.7181 1332.00 1327.00 5.00 475941 UTA 2020 05 22 22 06 00 851-99 P co2 CCGG 417.060 0.041 ... PC2 2020 06 17 15 39 08 39.9018 -113.7181 1332.00 1327.00 5.00 475942 UTA 2020 05 22 22 06 00 852-99 P co2 CCGG 417.050 0.041 ... PC2 2020 06 17 15 53 28 39.9018 -113.7181 1332.00 1327.00 5.00 475943 UTA 2020 05 29 15 18 00 1157-99 P co2 CCGG 411.650 0.041 ... PC2 2020 07 07 11 57 14 39.9018 -113.7181 1332.00 1327.00 5.00 476258 UTA 2020 05 29 15 18 00 1158-99 P co2 CCGG 412.130 0.041 ... PC2 2020 07 07 12 11 34 39.9018 -113.7181 1332.00 1327.00 5.00 476259 UTA 2020 06 04 22 25 00 119-99 P co2 CCGG 415.590 0.041 ... PC2 2020 06 25 12 24 30 39.9018 -113.7181 1332.00 1327.00 5.00 476248 UTA 2020 06 04 22 25 00 120-99 P co2 CCGG 415.600 0.041 ... PC2 2020 06 25 12 38 49 39.9018 -113.7181 1332.00 1327.00 5.00 476249 UTA 2020 06 08 21 33 00 2947-99 P co2 CCGG 414.610 0.041 N.. PC2 2020 07 15 12 40 11 39.9018 -113.7181 1332.00 1327.00 5.00 476648 UTA 2020 06 08 21 33 00 2948-99 P co2 CCGG 414.050 0.041 N.. PC2 2020 07 15 12 54 33 39.9018 -113.7181 1332.00 1327.00 5.00 476649 UTA 2020 06 15 16 35 00 2963-99 P co2 CCGG 412.110 0.041 ... PC2 2020 07 14 12 50 03 39.9018 -113.7181 1332.00 1327.00 5.00 476672 UTA 2020 06 15 16 35 00 2964-99 P co2 CCGG 411.990 0.041 ... PC2 2020 07 14 13 04 21 39.9018 -113.7181 1332.00 1327.00 5.00 476673 UTA 2020 06 20 22 51 00 2817-99 P co2 CCGG 413.060 0.041 ... PC2 2020 07 20 12 11 28 39.9018 -113.7181 1332.00 1327.00 5.00 477047 UTA 2020 06 20 22 51 00 2818-99 P co2 CCGG 413.160 0.041 ... PC2 2020 07 20 12 25 50 39.9018 -113.7181 1332.00 1327.00 5.00 477048 UTA 2020 06 27 00 52 00 2785-99 P co2 CCGG 413.310 0.041 ... PC2 2020 07 20 11 42 42 39.9018 -113.7181 1332.00 1327.00 5.00 477045 UTA 2020 06 27 00 52 00 2786-99 P co2 CCGG 412.870 0.041 ... PC2 2020 07 20 11 57 04 39.9018 -113.7181 1332.00 1327.00 5.00 477046 UTA 2020 07 03 00 54 00 1609-99 P co2 CCGG 413.660 0.041 ... PC2 2020 07 24 15 45 24 39.9018 -113.7181 1332.00 1327.00 5.00 477533 UTA 2020 07 03 00 54 00 1610-99 P co2 CCGG 413.540 0.041 ... PC2 2020 07 24 15 59 47 39.9018 -113.7181 1332.00 1327.00 5.00 477534 UTA 2020 07 09 21 45 00 2167-99 P co2 CCGG 408.090 0.041 ... PC2 2020 07 24 15 16 42 39.9018 -113.7181 1332.00 1327.00 5.00 477531 UTA 2020 07 09 21 45 00 2168-99 P co2 CCGG 407.880 0.041 ... PC2 2020 07 24 15 31 03 39.9018 -113.7181 1332.00 1327.00 5.00 477532 UTA 2020 07 15 17 28 00 1871-99 P co2 CCGG 405.090 0.041 .X. PC2 2020 08 06 11 42 48 39.9018 -113.7181 1332.00 1327.00 5.00 478088 UTA 2020 07 15 17 28 00 1872-99 P co2 CCGG 404.930 0.041 .X. PC2 2020 08 06 11 57 11 39.9018 -113.7181 1332.00 1327.00 5.00 478089 UTA 2020 07 21 02 19 00 4605-99 P co2 CCGG 451.340 0.041 N.. PC2 2020 08 06 11 14 09 39.9018 -113.7181 1332.00 1327.00 5.00 478090 UTA 2020 07 21 02 19 00 4606-99 P co2 CCGG 444.750 0.041 N.. PC2 2020 08 06 11 28 28 39.9018 -113.7181 1332.00 1327.00 5.00 478091 UTA 2020 07 26 23 40 00 3223-99 P co2 CCGG 413.510 0.041 ... PC2 2020 08 14 13 52 21 39.9018 -113.7181 1332.00 1327.00 5.00 478529 UTA 2020 07 26 23 40 00 3224-99 P co2 CCGG 413.240 0.041 ... PC2 2020 08 14 14 06 40 39.9018 -113.7181 1332.00 1327.00 5.00 478530 UTA 2020 08 02 21 36 00 5159-99 P co2 CCGG 412.620 0.041 ... PC2 2020 08 14 13 23 41 39.9018 -113.7181 1332.00 1327.00 5.00 478531 UTA 2020 08 02 21 36 00 5160-99 P co2 CCGG 412.660 0.041 ... PC2 2020 08 14 13 38 03 39.9018 -113.7181 1332.00 1327.00 5.00 478532 UTA 2020 08 10 17 53 00 5831-99 P co2 CCGG 406.210 0.041 ... PC2 2020 08 24 11 34 55 39.9018 -113.7181 1332.00 1327.00 5.00 478876 UTA 2020 08 10 17 53 00 5832-99 P co2 CCGG 406.150 0.041 ... PC2 2020 08 24 11 49 15 39.9018 -113.7181 1332.00 1327.00 5.00 478877 UTA 2020 08 14 15 38 00 5035-99 P co2 CCGG 403.960 0.041 N.. PC2 2020 08 24 12 03 31 39.9018 -113.7181 1332.00 1327.00 5.00 478878 UTA 2020 08 14 15 38 00 5036-99 P co2 CCGG 404.600 0.041 N.. PC2 2020 08 24 12 17 50 39.9018 -113.7181 1332.00 1327.00 5.00 478879 UTA 2020 08 21 00 12 00 229-99 P co2 CCGG 412.330 0.041 ... PC2 2020 09 17 14 08 47 39.9018 -113.7181 1332.00 1327.00 5.00 479579 UTA 2020 08 21 00 12 00 230-99 P co2 CCGG 412.160 0.041 ... PC2 2020 09 17 14 23 05 39.9018 -113.7181 1332.00 1327.00 5.00 479580 UTA 2020 08 26 22 29 00 1429-99 P co2 CCGG 412.240 0.041 ... PC2 2020 09 15 09 53 54 39.9018 -113.7181 1332.00 1327.00 5.00 479574 UTA 2020 08 26 22 29 00 1430-99 P co2 CCGG 412.310 0.041 ... PC2 2020 09 15 10 08 12 39.9018 -113.7181 1332.00 1327.00 5.00 479575 UTA 2020 09 01 21 31 00 3363-99 P co2 CCGG 403.730 0.041 N.. PC2 2020 09 24 12 16 21 39.9018 -113.7181 1332.00 1327.00 5.00 480017 UTA 2020 09 01 21 31 00 3364-99 P co2 CCGG 403.210 0.041 N.. PC2 2020 09 24 12 30 36 39.9018 -113.7181 1332.00 1327.00 5.00 480018 UTA 2020 09 07 23 34 00 5709-99 P co2 CCGG 412.020 0.041 ... PC2 2020 09 25 15 14 53 39.9018 -113.7181 1332.00 1327.00 5.00 480031 UTA 2020 09 07 23 34 00 5710-99 P co2 CCGG 412.020 0.041 ... PC2 2020 09 25 15 29 11 39.9018 -113.7181 1332.00 1327.00 5.00 480032 UTA 2020 09 14 01 00 00 2637-99 P co2 CCGG 410.430 0.041 ... PC2 2020 10 02 11 44 16 39.9018 -113.7181 1332.00 1327.00 5.00 480461 UTA 2020 09 14 01 00 00 2638-99 P co2 CCGG 410.270 0.041 ... PC2 2020 10 02 11 58 34 39.9018 -113.7181 1332.00 1327.00 5.00 480462 UTA 2020 09 18 22 40 00 385-99 P co2 CCGG 412.910 0.041 ... PC2 2020 10 02 12 12 52 39.9018 -113.7181 1332.00 1327.00 5.00 480459 UTA 2020 09 18 22 40 00 386-99 P co2 CCGG 413.010 0.041 ... PC2 2020 10 02 12 27 09 39.9018 -113.7181 1332.00 1327.00 5.00 480460 UTA 2020 09 26 22 10 00 2963-99 P co2 CCGG 409.290 0.041 ... PC2 2020 10 14 11 38 15 39.9018 -113.7181 1332.00 1327.00 5.00 480738 UTA 2020 09 26 22 10 00 2964-99 P co2 CCGG 409.170 0.041 ... PC2 2020 10 14 11 52 31 39.9018 -113.7181 1332.00 1327.00 5.00 480739 UTA 2020 09 30 15 29 00 5531-99 P co2 CCGG 403.910 0.041 N.. PC2 2020 10 14 12 06 47 39.9018 -113.7181 1332.00 1327.00 5.00 480736 UTA 2020 09 30 15 29 00 5532-99 P co2 CCGG 405.530 0.041 N.. PC2 2020 10 14 12 21 04 39.9018 -113.7181 1332.00 1327.00 5.00 480737 UTA 2020 10 06 00 05 00 5729-99 P co2 CCGG 418.060 0.041 .X. PC2 2020 11 06 11 30 22 39.9018 -113.7181 1332.00 1327.00 5.00 481898 UTA 2020 10 06 00 05 00 5730-99 P co2 CCGG 418.090 0.041 .X. PC2 2020 11 06 11 44 38 39.9018 -113.7181 1332.00 1327.00 5.00 481899 UTA 2020 10 07 00 05 00 5743-99 P co2 CCGG 413.010 0.041 ... PC2 2020 10 29 14 30 55 39.9018 -113.7181 1332.00 1327.00 5.00 481262 UTA 2020 10 07 00 05 00 5744-99 P co2 CCGG 413.000 0.041 ... PC2 2020 10 29 14 45 11 39.9018 -113.7181 1332.00 1327.00 5.00 481263 UTA 2020 10 16 00 26 00 5809-99 P co2 CCGG 412.150 0.041 ... PC2 2020 10 29 13 33 44 39.9018 -113.7181 1332.00 1327.00 5.00 481260 UTA 2020 10 16 00 26 00 5810-99 P co2 CCGG 412.240 0.041 ... PC2 2020 10 29 13 48 01 39.9018 -113.7181 1332.00 1327.00 5.00 481261 UTA 2020 10 20 17 29 00 2367-99 P co2 CCGG 410.630 0.041 ... PC2 2020 11 06 11 58 54 39.9018 -113.7181 1332.00 1327.00 5.00 481860 UTA 2020 10 20 17 29 00 2368-99 P co2 CCGG 410.850 0.041 ... PC2 2020 11 06 12 13 09 39.9018 -113.7181 1332.00 1327.00 5.00 481861 UTA 2020 11 02 00 49 00 4043-99 P co2 CCGG 417.990 0.041 N.. PC2 2020 11 19 13 50 21 39.9018 -113.7181 1332.00 1327.00 5.00 482323 UTA 2020 11 02 00 49 00 4044-99 P co2 CCGG 417.470 0.041 N.. PC2 2020 11 19 14 04 38 39.9018 -113.7181 1332.00 1327.00 5.00 482324 UTA 2020 11 07 00 06 00 5371-99 P co2 CCGG 413.620 0.041 ... PC2 2020 11 19 13 21 48 39.9018 -113.7181 1332.00 1327.00 5.00 482325 UTA 2020 11 07 00 06 00 5372-99 P co2 CCGG 413.620 0.041 ... PC2 2020 11 19 13 36 05 39.9018 -113.7181 1332.00 1327.00 5.00 482326 UTA 2020 11 13 16 43 00 3573-99 P co2 CCGG 417.520 0.041 ... PC2 2020 12 07 16 19 55 39.9018 -113.7181 1332.00 1327.00 5.00 482977 UTA 2020 11 13 16 43 00 3574-99 P co2 CCGG 417.440 0.041 ... PC2 2020 12 07 16 34 14 39.9018 -113.7181 1332.00 1327.00 5.00 482978 UTA 2020 11 18 15 39 00 5079-99 P co2 CCGG 414.900 0.041 ... PC2 2020 12 07 15 51 19 39.9018 -113.7181 1332.00 1327.00 5.00 482980 UTA 2020 11 18 15 39 00 5080-99 P co2 CCGG 414.680 0.041 ... PC2 2020 12 07 16 05 38 39.9018 -113.7181 1332.00 1327.00 5.00 482979 UTA 2020 11 24 23 13 00 1541-99 P co2 CCGG 417.640 0.041 ... PC2 2020 12 09 15 46 03 39.9018 -113.7181 1332.00 1327.00 5.00 483152 UTA 2020 11 24 23 13 00 1542-99 P co2 CCGG 417.660 0.041 ... PC2 2020 12 09 16 00 18 39.9018 -113.7181 1332.00 1327.00 5.00 483153 UTA 2020 12 01 20 18 00 5435-99 P co2 CCGG 418.150 0.041 ... PC2 2020 12 11 15 06 32 39.9018 -113.7181 1332.00 1327.00 5.00 483233 UTA 2020 12 01 20 18 00 5436-99 P co2 CCGG 418.160 0.041 ... PC2 2020 12 11 15 20 45 39.9018 -113.7181 1332.00 1327.00 5.00 483234 UTA 2020 12 07 00 22 00 3577-99 P co2 CCGG 422.720 0.041 N.. PC2 2020 12 22 12 41 39 39.9018 -113.7181 1332.00 1327.00 5.00 483687 UTA 2020 12 07 00 22 00 3578-99 P co2 CCGG 421.930 0.041 N.. PC2 2020 12 22 12 55 59 39.9018 -113.7181 1332.00 1327.00 5.00 483688 UTA 2020 12 13 22 03 00 4933-99 P co2 CCGG 417.850 0.041 ... PC2 2020 12 22 13 10 15 39.9018 -113.7181 1332.00 1327.00 5.00 483685 UTA 2020 12 13 22 03 00 4934-99 P co2 CCGG 417.830 0.041 ... PC2 2020 12 22 13 24 32 39.9018 -113.7181 1332.00 1327.00 5.00 483686 UTA 2020 12 19 17 33 00 4639-99 P co2 CCGG 418.430 0.041 ... PC2 2021 01 06 13 39 21 39.9018 -113.7181 1332.00 1327.00 5.00 484021 UTA 2020 12 19 17 33 00 4640-99 P co2 CCGG 418.560 0.041 ... PC2 2021 01 06 13 53 38 39.9018 -113.7181 1332.00 1327.00 5.00 484022 UTA 2020 12 28 00 29 00 679-99 P co2 CCGG 425.630 0.041 N.. PC2 2021 01 05 15 48 50 39.9018 -113.7181 1332.00 1327.00 5.00 484023 UTA 2020 12 28 00 29 00 680-99 P co2 CCGG 424.910 0.041 N.. PC2 2021 01 05 16 03 06 39.9018 -113.7181 1332.00 1327.00 5.00 484024 UTA 2020 12 31 21 55 00 1999-99 P co2 CCGG 420.790 0.041 ... PC2 2021 01 14 14 39 55 39.9018 -113.7181 1332.00 1327.00 5.00 484497 UTA 2020 12 31 21 55 00 2000-99 P co2 CCGG 420.780 0.041 ... PC2 2021 01 14 14 54 11 39.9018 -113.7181 1332.00 1327.00 5.00 484498