# number_of_header_lines: 68 # comment: # comment: ************ USE OF ESRL GMD DATA **************** # comment: # comment: These data are made freely available to the public and the # comment: scientific community in the belief that their wide dissemination # comment: will lead to greater understanding and new scientific insights. # comment: The availability of these data does not constitute publication # comment: of the data. NOAA relies on the ethics and integrity of the user to # comment: insure that ESRL receives fair credit for their work. If the data # comment: are obtained for potential use in a publication or presentation, # comment: ESRL should be informed at the outset of the nature of this work. # comment: If the ESRL data are essential to the work, or if an important # comment: result or conclusion depends on the ESRL data, co-authorship # comment: may be appropriate. This should be discussed at an early stage in # comment: the work. Manuscripts using the ESRL data should be sent to ESRL # comment: for review before they are submitted for publication so we can # comment: insure that the quality and limitations of the data are accurately # comment: represented. # comment: # comment: Every effort is made to produce the most accurate and precise # comment: measurements possible. However, we reserve the right to make # comment: corrections to the data based on recalibration of standard gases # comment: or for other reasons deemed scientifically justified. # comment: # comment: We are not responsible for results and conclusions based on use # comment: of these data without regard to this warning. # comment: # contact_parameter: CO2O18 SIL (Individual Flasks) # contact_name: Bruce H Vaughn # contact_telephone: (303) 492-7985 # contact_email: Bruce.Vaughn@colorado.edu # comment: # comment: ************ COLLABORATORS *************** # comment: # comment: NOAA thanks the following collaborators without # comment: whom these measurements would not be possible. # comment: # collaborator_name: Chugach McKinley # comment: # comment: ************ RECIPROCITY AGREEMENT *************** # comment: # comment: Use of these data implies an agreement to reciprocate. # comment: Laboratories making similar measurements agree to make their # comment: own data available to the general public and to the scientific # comment: community in an equally complete and easily accessible form. # comment: Modelers are encouraged to make available to the community, # comment: upon request, their own tools used in the interpretation # comment: of the ESRL data, namely well documented model code, transport # comment: fields, and additional information necessary for other # comment: scientists to repeat the work and to run modified versions. # comment: Model availability includes collaborative support for new # comment: users of the models. # comment: # comment: ************ DATA DESCRIPTION *************** # comment: # description_site-code: shm # description_project-abbr: ccg_surface # description_strategy-abbr: flask # description_sample-constraints: date:1900-01-01,2014-12-31 # description_creation-time: 2015-10-26 12:45:36 # comment: # comment: ************ DATA DOCUMENTATION *************** # comment: # comment: Please refer to the species-specific README file in the # comment: appropriate directory folder at ftp://aftp.cmdl.noaa.gov/data/trace_gases/. # comment: # data_fields: sample_site_code sample_year sample_month sample_day sample_hour sample_minute sample_seconds sample_id sample_method parameter_formula analysis_group_abbr analysis_value analysis_uncertainty analysis_flag analysis_instrument analysis_year analysis_month analysis_day analysis_hour analysis_minute analysis_seconds sample_latitude sample_longitude sample_altitude event_number SHM 1992 03 22 01 00 00 6617-66 P co2o18 SIL 0.156 -999.990 A.. r1 1992 05 05 12 04 00 52.7200 174.1000 28.00 116806 SHM 1992 03 22 01 00 00 6618-66 P co2o18 SIL 0.330 -999.990 A.. r1 1992 05 05 11 42 00 52.7200 174.1000 28.00 116807 SHM 1992 03 29 23 45 00 6311-66 P co2o18 SIL 0.205 -999.990 A.. r1 1992 05 05 12 26 00 52.7200 174.1000 28.00 116808 SHM 1992 03 29 23 45 00 6312-66 P co2o18 SIL 0.182 -999.990 A.. r1 1992 05 05 12 46 00 52.7200 174.1000 28.00 116809 SHM 1992 04 05 01 35 00 6134-66 P co2o18 SIL 0.330 -999.990 ... r1 1992 05 31 03 04 00 52.7200 174.1000 28.00 116810 SHM 1992 04 05 01 35 00 6211-66 P co2o18 SIL 0.323 -999.990 ... r1 1992 05 31 02 42 00 52.7200 174.1000 28.00 116811 SHM 1992 04 12 02 30 00 6133-66 P co2o18 SIL 0.244 -999.990 A.. r1 1992 06 01 07 48 00 52.7200 174.1000 28.00 116812 SHM 1992 04 12 02 30 00 6212-66 P co2o18 SIL 0.287 -999.990 A.. r1 1992 06 01 07 26 00 52.7200 174.1000 28.00 116813 SHM 1992 04 26 23 35 00 6249-66 P co2o18 SIL 0.206 -999.990 ... r1 1992 06 02 07 46 00 52.7200 174.1000 28.00 116814 SHM 1992 04 26 23 35 00 6250-66 P co2o18 SIL 0.208 -999.990 ... r1 1992 06 02 08 08 00 52.7200 174.1000 28.00 116815 SHM 1992 05 03 00 40 00 6289-66 P co2o18 SIL 0.311 -999.990 ... r1 1992 06 02 07 02 00 52.7200 174.1000 28.00 116816 SHM 1992 05 03 00 40 00 6290-66 P co2o18 SIL 0.336 -999.990 ... r1 1992 06 02 07 24 00 52.7200 174.1000 28.00 116817 SHM 1992 05 11 02 40 00 6771-66 P co2o18 SIL -6.040 -999.990 -.. r1 1992 06 22 23 25 00 52.7200 174.1000 28.00 116818 SHM 1992 05 11 02 40 00 6772-66 P co2o18 SIL -0.165 -999.990 +.. r1 1992 06 22 23 47 00 52.7200 174.1000 28.00 116819 SHM 1992 05 18 08 50 00 6773-66 P co2o18 SIL -0.085 -999.990 -.. r1 1992 06 22 00 20 00 52.7200 174.1000 28.00 116820 SHM 1992 05 18 08 50 00 6774-66 P co2o18 SIL 0.283 -999.990 +.. r1 1992 06 22 00 43 00 52.7200 174.1000 28.00 116821 SHM 1992 05 24 22 15 00 6111-66 P co2o18 SIL -38.502 -999.990 !.. r1 1992 07 28 04 47 00 52.7200 174.1000 28.00 116822 SHM 1992 05 24 22 15 00 6112-66 P co2o18 SIL -38.809 -999.990 !.. r1 1992 07 28 05 09 00 52.7200 174.1000 28.00 116823 SHM 1992 05 31 00 40 00 6263-66 P co2o18 SIL 0.607 -999.990 ... r1 1992 08 01 08 51 00 52.7200 174.1000 28.00 116824 SHM 1992 05 31 00 40 00 6264-66 P co2o18 SIL 0.620 -999.990 ... r1 1992 08 01 09 13 00 52.7200 174.1000 28.00 116825 SHM 1992 06 21 00 45 00 6321-66 P co2o18 SIL 0.642 -999.990 ... r1 1992 08 18 11 43 00 52.7200 174.1000 28.00 116830 SHM 1992 06 21 00 45 00 6322-66 P co2o18 SIL 0.583 -999.990 ... r1 1992 08 18 12 05 00 52.7200 174.1000 28.00 116831 SHM 1992 07 05 00 10 00 6509-66 P co2o18 SIL 0.498 -999.990 ... r1 1992 08 17 08 51 00 52.7200 174.1000 28.00 116832 SHM 1992 07 05 00 10 00 6510-66 P co2o18 SIL 0.509 -999.990 ... r1 1992 08 17 09 13 00 52.7200 174.1000 28.00 116833 SHM 1992 07 12 20 25 00 6009-66 P co2o18 SIL 0.673 -999.990 ... r1 1992 08 18 13 10 00 52.7200 174.1000 28.00 116834 SHM 1992 07 12 20 25 00 6010-66 P co2o18 SIL 0.623 -999.990 ... r1 1992 08 18 13 32 00 52.7200 174.1000 28.00 116835 SHM 1992 07 19 20 10 00 6515-66 P co2o18 SIL 0.739 -999.990 ... r1 1992 09 03 10 36 00 52.7200 174.1000 28.00 116836 SHM 1992 07 19 20 10 00 6516-66 P co2o18 SIL 0.706 -999.990 ... r1 1992 09 03 10 58 00 52.7200 174.1000 28.00 116837 SHM 1992 07 26 00 55 00 6537-66 P co2o18 SIL 0.607 -999.990 ... r1 1992 08 28 07 21 00 52.7200 174.1000 28.00 116838 SHM 1992 07 26 00 55 00 6538-66 P co2o18 SIL 0.601 -999.990 ... r1 1992 08 28 07 42 00 52.7200 174.1000 28.00 116839 SHM 1992 08 10 07 11 00 6768-66 P co2o18 SIL -0.495 -999.990 .XS r1 1992 09 26 01 44 00 52.7200 174.1000 28.00 116842 SHM 1992 08 10 07 15 00 6617-66 P co2o18 SIL -0.633 -999.990 .X. r1 1992 09 15 07 32 00 52.7200 174.1000 28.00 116843 SHM 1992 08 10 07 15 00 6618-66 P co2o18 SIL -0.764 -999.990 .X. r1 1992 09 15 07 55 00 52.7200 174.1000 28.00 116844 SHM 1992 08 16 23 30 00 6727-66 P co2o18 SIL -1.373 -999.990 -.. r1 1992 09 22 09 01 00 52.7200 174.1000 28.00 116845 SHM 1992 08 16 23 30 00 6728-66 P co2o18 SIL -0.056 -999.990 +.. r1 1992 09 22 09 23 00 52.7200 174.1000 28.00 116846 SHM 1992 08 23 03 10 00 6231-66 P co2o18 SIL -0.212 -999.990 ... r1 1992 10 20 12 38 00 52.7200 174.1000 28.00 116847 SHM 1992 08 23 03 10 00 6232-66 P co2o18 SIL -0.269 -999.990 ... r1 1992 10 20 13 00 00 52.7200 174.1000 28.00 116848 SHM 1992 08 30 19 45 00 6007-66 P co2o18 SIL -1.092 -999.990 +.. r1 1992 10 22 12 58 00 52.7200 174.1000 28.00 116849 SHM 1992 08 30 19 45 00 6008-66 P co2o18 SIL -38.053 -999.990 !.. r1 1992 10 22 13 19 00 52.7200 174.1000 28.00 116850 SHM 1992 09 06 14 30 00 6083-66 P co2o18 SIL -36.427 -999.990 !.. r1 1992 10 21 04 18 00 52.7200 174.1000 28.00 116851 SHM 1992 09 06 14 30 00 6084-66 P co2o18 SIL -36.454 -999.990 !.. r1 1992 10 21 03 56 00 52.7200 174.1000 28.00 116852 SHM 1992 09 20 04 00 00 6327-66 P co2o18 SIL -0.034 -999.990 ... r1 1992 11 07 08 26 00 52.7200 174.1000 28.00 116855 SHM 1992 09 20 04 00 00 6328-66 P co2o18 SIL -0.034 -999.990 ... r1 1992 11 07 08 48 00 52.7200 174.1000 28.00 116856 SHM 1992 09 27 22 05 00 6393-66 P co2o18 SIL -0.151 -999.990 .x. r1 1992 10 30 10 08 00 52.7200 174.1000 28.00 116857 SHM 1992 09 27 22 05 00 6394-66 P co2o18 SIL -0.202 -999.990 .x. r1 1992 10 30 10 29 00 52.7200 174.1000 28.00 116858 SHM 1992 10 03 12 00 00 6269-66 P co2o18 SIL -0.538 -999.990 .x. r1 1992 12 07 14 16 00 52.7200 174.1000 28.00 116859 SHM 1992 10 03 12 00 00 6270-66 P co2o18 SIL -0.428 -999.990 .x. r1 1992 12 07 14 38 00 52.7200 174.1000 28.00 116860 SHM 1992 10 10 23 00 00 6399-66 P co2o18 SIL -0.024 -999.990 ... r1 1992 12 07 07 02 00 52.7200 174.1000 28.00 116861 SHM 1992 10 10 23 00 00 6400-66 P co2o18 SIL -0.086 -999.990 ... r1 1992 12 07 07 24 00 52.7200 174.1000 28.00 116862 SHM 1992 10 19 09 30 00 6781-66 P co2o18 SIL -0.374 -999.990 ... r1 1992 12 07 06 17 00 52.7200 174.1000 28.00 116863 SHM 1992 10 19 09 30 00 6782-66 P co2o18 SIL -0.376 -999.990 ... r1 1992 12 07 06 40 00 52.7200 174.1000 28.00 116864 SHM 1992 11 01 00 15 00 6721-66 P co2o18 SIL -0.164 -999.990 ... r1 1993 01 10 16 55 00 52.7200 174.1000 28.00 116865 SHM 1992 11 01 00 15 00 6722-66 P co2o18 SIL -0.058 -999.990 ... r1 1993 01 10 17 17 00 52.7200 174.1000 28.00 116866 SHM 1992 11 08 00 40 00 6371-66 P co2o18 SIL -1.004 -999.990 .X. r1 1993 01 08 17 12 00 52.7200 174.1000 28.00 116867 SHM 1992 11 08 00 40 00 6372-66 P co2o18 SIL -0.974 -999.990 .X. r1 1993 01 08 17 34 00 52.7200 174.1000 28.00 116868 SHM 1992 11 17 23 50 00 6545-66 P co2o18 SIL -0.650 -999.990 ... r1 1992 12 28 14 41 00 52.7200 174.1000 28.00 116869 SHM 1992 11 17 23 50 00 6546-66 P co2o18 SIL -0.739 -999.990 .X. r1 1992 12 28 15 03 00 52.7200 174.1000 28.00 116870 SHM 1992 11 23 01 00 00 6725-66 P co2o18 SIL -0.256 -999.990 ..S r1 1993 01 21 13 20 00 52.7200 174.1000 28.00 116871 SHM 1992 11 23 01 00 00 6725-66 P co2o18 SIL -0.308 -999.990 ... r1 1993 01 22 05 07 00 52.7200 174.1000 28.00 116871 SHM 1992 11 23 01 00 00 6726-66 P co2o18 SIL -0.373 -999.990 ... r1 1993 01 22 05 29 00 52.7200 174.1000 28.00 116872 SHM 1992 11 29 23 22 00 6099-66 P co2o18 SIL -0.450 -999.990 ... r1 1993 01 22 05 51 00 52.7200 174.1000 28.00 116873 SHM 1992 11 29 23 22 00 6100-66 P co2o18 SIL -0.417 -999.990 ..S r1 1993 01 21 14 31 00 52.7200 174.1000 28.00 116874 SHM 1992 11 29 23 22 00 6100-66 P co2o18 SIL -0.547 -999.990 ... r1 1993 01 22 06 13 00 52.7200 174.1000 28.00 116874 SHM 1992 12 06 23 21 00 6835-66 P co2o18 SIL -0.276 -999.990 ... r1 1993 01 25 14 37 00 52.7200 174.1000 28.00 116875 SHM 1992 12 06 23 21 00 6836-66 P co2o18 SIL -0.403 -999.990 ... r1 1993 01 25 14 59 00 52.7200 174.1000 28.00 116876 SHM 1992 12 13 00 15 00 6849-66 P co2o18 SIL -4.982 -999.990 +.. r1 1993 01 24 18 05 00 52.7200 174.1000 28.00 116877 SHM 1992 12 13 00 15 00 6850-66 P co2o18 SIL -13.625 -999.990 -.. r1 1993 01 24 18 27 00 52.7200 174.1000 28.00 116878 SHM 1992 12 20 23 00 00 6671-66 P co2o18 SIL -0.067 -999.990 ... r1 1993 02 19 11 56 00 52.7200 174.1000 28.00 116879 SHM 1992 12 20 23 00 00 6672-66 P co2o18 SIL -0.102 -999.990 ... r1 1993 02 19 12 18 00 52.7200 174.1000 28.00 116880 SHM 1992 12 27 01 00 00 6614-66 P co2o18 SIL 0.039 -999.990 ..S r1 1993 02 15 15 54 00 52.7200 174.1000 28.00 116881 SHM 1993 01 03 23 10 00 6391-66 P co2o18 SIL 0.229 -999.990 ... r1 1993 02 20 16 02 00 52.7200 174.1000 28.00 116882 SHM 1993 01 03 23 10 00 6392-66 P co2o18 SIL 0.240 -999.990 ... r1 1993 02 20 16 24 00 52.7200 174.1000 28.00 116883 SHM 1993 01 10 23 25 00 6329-66 P co2o18 SIL -0.199 -999.990 ... r1 1993 02 20 16 46 00 52.7200 174.1000 28.00 116884 SHM 1993 01 10 23 25 00 6330-66 P co2o18 SIL -0.112 -999.990 ... r1 1993 02 20 17 09 00 52.7200 174.1000 28.00 116885 SHM 1993 01 17 23 30 00 6057-66 P co2o18 SIL 0.076 -999.990 A.. r1 1993 02 18 12 22 00 52.7200 174.1000 28.00 116886 SHM 1993 01 17 23 30 00 6058-66 P co2o18 SIL 0.138 -999.990 A.. r1 1993 02 18 12 45 00 52.7200 174.1000 28.00 116887 SHM 1993 01 24 23 20 00 6499-66 P co2o18 SIL 0.171 -999.990 ... r1 1993 04 01 14 46 00 52.7200 174.1000 28.00 116888 SHM 1993 01 24 23 20 00 6500-66 P co2o18 SIL 0.134 -999.990 ... r1 1993 04 01 15 07 00 52.7200 174.1000 28.00 116889 SHM 1993 01 31 23 45 00 6643-66 P co2o18 SIL 0.158 -999.990 +.. r1 1993 04 08 08 48 00 52.7200 174.1000 28.00 116890 SHM 1993 01 31 23 45 00 6644-66 P co2o18 SIL -30.115 -999.990 !.. r1 1993 04 08 09 09 00 52.7200 174.1000 28.00 116891 SHM 1993 02 07 23 15 00 6675-66 P co2o18 SIL -36.144 -999.990 !.. r1 1993 04 13 14 47 00 52.7200 174.1000 28.00 116892 SHM 1993 02 07 23 15 00 6676-66 P co2o18 SIL -36.591 -999.990 !.. r1 1993 04 13 15 08 00 52.7200 174.1000 28.00 116893 SHM 1993 02 14 23 00 00 6155-66 P co2o18 SIL 0.322 -999.990 ... r1 1993 04 07 06 24 00 52.7200 174.1000 28.00 116894 SHM 1993 02 14 23 00 00 6156-66 P co2o18 SIL 0.245 -999.990 ... r1 1993 04 07 06 45 00 52.7200 174.1000 28.00 116895 SHM 1993 02 21 11 30 00 6479-66 P co2o18 SIL 0.308 -999.990 ... r1 1993 04 06 15 47 00 52.7200 174.1000 28.00 116896 SHM 1993 02 21 11 30 00 6480-66 P co2o18 SIL 0.363 -999.990 ... r1 1993 04 06 16 08 00 52.7200 174.1000 28.00 116897 SHM 1993 02 28 22 55 00 6277-66 P co2o18 SIL 0.106 -999.990 ... r1 1993 04 07 05 42 00 52.7200 174.1000 28.00 116898 SHM 1993 02 28 22 55 00 6278-66 P co2o18 SIL 0.211 -999.990 ... r1 1993 04 07 06 03 00 52.7200 174.1000 28.00 116899 SHM 1993 03 07 00 10 00 6311-66 P co2o18 SIL 0.154 -999.990 A.. r1 1993 05 04 03 03 00 52.7200 174.1000 28.00 116900 SHM 1993 03 07 00 10 00 6312-66 P co2o18 SIL 0.171 -999.990 A.. r1 1993 05 04 03 25 00 52.7200 174.1000 28.00 116901 SHM 1993 03 14 11 05 00 6725-66 P co2o18 SIL 0.548 -999.990 ... r1 1993 05 07 14 20 00 52.7200 174.1000 28.00 116902 SHM 1993 03 14 11 05 00 6726-66 P co2o18 SIL 0.617 -999.990 ... r1 1993 05 07 14 42 00 52.7200 174.1000 28.00 116903 SHM 1993 03 28 00 00 00 6391-66 P co2o18 SIL 0.470 -999.990 ... r1 1993 05 08 00 15 00 52.7200 174.1000 28.00 116904 SHM 1993 03 28 00 00 00 6392-66 P co2o18 SIL 0.362 -999.990 ... r1 1993 05 08 00 37 00 52.7200 174.1000 28.00 116905 SHM 1993 04 04 23 00 00 6329-66 P co2o18 SIL 0.299 -999.990 ... r1 1993 05 07 23 32 00 52.7200 174.1000 28.00 116906 SHM 1993 04 04 23 00 00 6330-66 P co2o18 SIL 0.357 -999.990 ... r1 1993 05 07 23 54 00 52.7200 174.1000 28.00 116907 SHM 1993 04 11 23 30 00 6253-66 P co2o18 SIL 0.431 -999.990 ... r1 1993 05 11 19 25 00 52.7200 174.1000 28.00 116908 SHM 1993 04 11 23 30 00 6254-66 P co2o18 SIL 0.401 -999.990 ... r1 1993 05 11 19 47 00 52.7200 174.1000 28.00 116909 SHM 1993 04 18 23 00 00 6233-66 P co2o18 SIL -14.803 -999.990 +.. r1 1993 05 11 20 30 00 52.7200 174.1000 28.00 116910 SHM 1993 04 18 23 00 00 6234-66 P co2o18 SIL -31.605 -999.990 !.. r1 1993 05 11 20 09 00 52.7200 174.1000 28.00 116911 SHM 1993 04 25 23 00 00 6165-66 P co2o18 SIL 0.338 -999.990 ... r1 1993 05 22 18 47 00 52.7200 174.1000 28.00 116912 SHM 1993 04 25 23 00 00 6166-66 P co2o18 SIL 0.346 -999.990 ... r1 1993 05 22 19 09 00 52.7200 174.1000 28.00 116913 SHM 1993 05 02 01 15 00 6273-66 P co2o18 SIL 0.490 -999.990 ... r1 1993 05 26 01 16 00 52.7200 174.1000 28.00 116914 SHM 1993 05 02 01 15 00 6274-66 P co2o18 SIL 0.471 -999.990 ... r1 1993 05 26 01 37 00 52.7200 174.1000 28.00 116915 SHM 1993 05 09 23 30 00 6923-66 P co2o18 SIL 0.419 -999.990 ... r1 1993 06 07 10 57 00 52.7200 174.1000 28.00 116916 SHM 1993 05 09 23 30 00 6924-66 P co2o18 SIL 0.431 -999.990 ... r1 1993 06 07 11 19 00 52.7200 174.1000 28.00 116917 SHM 1993 05 17 00 18 00 6917-66 P co2o18 SIL 0.329 -999.990 ... r1 1993 06 08 04 59 00 52.7200 174.1000 28.00 116918 SHM 1993 05 17 00 18 00 6918-66 P co2o18 SIL 0.344 -999.990 ... r1 1993 06 08 05 20 00 52.7200 174.1000 28.00 116919 SHM 1993 05 23 12 00 00 6621-66 P co2o18 SIL 0.360 -999.990 ... r1 1993 06 24 07 52 00 52.7200 174.1000 28.00 116920 SHM 1993 05 23 12 00 00 6622-66 P co2o18 SIL 0.316 -999.990 ... r1 1993 06 24 08 14 00 52.7200 174.1000 28.00 116921 SHM 1993 05 30 00 15 00 6187-66 P co2o18 SIL 0.486 -999.990 ... r1 1993 06 24 08 36 00 52.7200 174.1000 28.00 116922 SHM 1993 05 30 00 15 00 6188-66 P co2o18 SIL 0.415 -999.990 ... r1 1993 06 24 08 57 00 52.7200 174.1000 28.00 116923 SHM 1993 06 06 23 24 00 6907-66 P co2o18 SIL 0.314 -999.990 ... r1 1993 06 23 15 15 00 52.7200 174.1000 28.00 116924 SHM 1993 06 06 23 24 00 6908-66 P co2o18 SIL 0.301 -999.990 ... r1 1993 06 23 15 37 00 52.7200 174.1000 28.00 116925 SHM 1993 06 13 12 34 56 6268-66 P co2o18 SIL -36.966 -999.990 !.S r1 1993 07 27 05 54 00 52.7200 174.1000 28.00 116928 SHM 1993 06 13 22 30 00 6861-66 P co2o18 SIL 0.482 -999.990 ... r1 1993 07 30 02 46 00 52.7200 174.1000 28.00 116926 SHM 1993 06 13 22 30 00 6862-66 P co2o18 SIL 0.464 -999.990 ... r1 1993 07 30 03 08 00 52.7200 174.1000 28.00 116927 SHM 1993 06 21 01 25 00 6063-66 P co2o18 SIL 0.557 -999.990 ... r1 1993 07 20 21 56 00 52.7200 174.1000 28.00 116929 SHM 1993 06 21 01 25 00 6064-66 P co2o18 SIL 0.479 -999.990 ... r1 1993 07 20 22 18 00 52.7200 174.1000 28.00 116930 SHM 1993 06 28 20 45 00 6727-66 P co2o18 SIL 0.415 -999.990 ... r1 1993 07 27 20 15 00 52.7200 174.1000 28.00 116931 SHM 1993 06 28 20 45 00 6728-66 P co2o18 SIL 0.465 -999.990 ... r1 1993 07 27 20 36 00 52.7200 174.1000 28.00 116932 SHM 1993 07 01 22 45 00 6166-66 P co2o18 SIL 0.566 -999.990 n.S r1 1993 08 19 00 25 00 52.7200 174.1000 28.00 116933 SHM 1993 07 06 23 45 00 6695-66 P co2o18 SIL 0.504 -999.990 ... r1 1993 08 20 06 19 00 52.7200 174.1000 28.00 116934 SHM 1993 07 06 23 45 00 6696-66 P co2o18 SIL 0.463 -999.990 ... r1 1993 08 20 06 40 00 52.7200 174.1000 28.00 116935 SHM 1993 07 13 23 30 00 6857-66 P co2o18 SIL 0.413 -999.990 ... r1 1993 08 20 07 02 00 52.7200 174.1000 28.00 116936 SHM 1993 07 13 23 30 00 6858-66 P co2o18 SIL 0.396 -999.990 ... r1 1993 08 20 07 23 00 52.7200 174.1000 28.00 116937 SHM 1993 07 18 23 55 00 6899-66 P co2o18 SIL 0.614 -999.990 ... r1 1993 08 18 09 07 00 52.7200 174.1000 28.00 116938 SHM 1993 07 18 23 55 00 6900-66 P co2o18 SIL 0.568 -999.990 ... r1 1993 08 18 09 29 00 52.7200 174.1000 28.00 116939 SHM 1993 07 25 23 55 00 6277-66 P co2o18 SIL 0.492 -999.990 .x. r1 1993 08 18 08 23 00 52.7200 174.1000 28.00 116940 SHM 1993 07 25 23 55 00 6278-66 P co2o18 SIL 0.449 -999.990 .x. r1 1993 08 18 08 45 00 52.7200 174.1000 28.00 116941 SHM 1993 08 01 23 05 00 6105-66 P co2o18 SIL 0.407 -999.990 ... r1 1993 08 23 03 36 00 52.7200 174.1000 28.00 116942 SHM 1993 08 01 23 05 00 6106-66 P co2o18 SIL 0.370 -999.990 ... r1 1993 08 23 03 57 00 52.7200 174.1000 28.00 116943 SHM 1993 08 08 23 00 00 6827-66 P co2o18 SIL -0.778 -999.990 .X. r1 1993 09 16 05 10 00 52.7200 174.1000 28.00 116944 SHM 1993 08 08 23 00 00 6828-66 P co2o18 SIL -0.825 -999.990 .X. r1 1993 09 16 05 31 00 52.7200 174.1000 28.00 116945 SHM 1993 08 15 23 25 00 6275-66 P co2o18 SIL -0.744 -999.990 ... r1 1993 09 16 03 00 00 52.7200 174.1000 28.00 116946 SHM 1993 08 15 23 25 00 6276-66 P co2o18 SIL -0.794 -999.990 ... r1 1993 09 16 03 21 00 52.7200 174.1000 28.00 116947 SHM 1993 08 23 00 30 00 6226-66 P co2o18 SIL -0.377 -999.990 n.S r1 1993 09 13 10 45 00 52.7200 174.1000 28.00 116949 SHM 1993 08 30 13 50 00 6121-66 P co2o18 SIL -1.110 -999.990 ... r1 1993 09 09 10 05 00 52.7200 174.1000 28.00 116950 SHM 1993 08 30 13 50 00 6122-66 P co2o18 SIL -1.171 -999.990 ... r1 1993 09 09 10 26 00 52.7200 174.1000 28.00 116951 SHM 1993 09 05 23 40 00 6903-66 P co2o18 SIL -0.637 -999.990 ... r1 1993 11 04 03 20 00 52.7200 174.1000 28.00 116952 SHM 1993 09 05 23 40 00 6904-66 P co2o18 SIL -0.638 -999.990 ... r1 1993 11 04 03 41 00 52.7200 174.1000 28.00 116953 SHM 1993 09 12 22 50 00 6783-66 P co2o18 SIL -1.936 -999.990 -.. r1 1993 11 04 02 37 00 52.7200 174.1000 28.00 116954 SHM 1993 09 12 22 50 00 6784-66 P co2o18 SIL -1.139 -999.990 +.. r1 1993 11 04 02 58 00 52.7200 174.1000 28.00 116955 SHM 1993 09 19 22 45 00 6007-66 P co2o18 SIL -1.412 -999.990 ... r1 1993 10 23 00 10 00 52.7200 174.1000 28.00 116956 SHM 1993 09 19 22 45 00 6008-66 P co2o18 SIL -1.429 -999.990 ... r1 1993 10 23 00 32 00 52.7200 174.1000 28.00 116957 SHM 1993 09 26 23 30 00 6035-66 P co2o18 SIL -3.198 -999.990 +.. r1 1993 10 18 08 19 00 52.7200 174.1000 28.00 116958 SHM 1993 09 26 23 30 00 6036-66 P co2o18 SIL -25.966 -999.990 !.. r1 1993 10 18 08 40 00 52.7200 174.1000 28.00 116959 SHM 1993 10 03 23 00 00 6813-66 P co2o18 SIL -1.301 -999.990 -.. r1 1993 11 20 12 14 00 52.7200 174.1000 28.00 116960 SHM 1993 10 03 23 00 00 6814-66 P co2o18 SIL -0.999 -999.990 +.. r1 1993 11 20 12 36 00 52.7200 174.1000 28.00 116961 SHM 1993 10 10 22 50 00 6403-66 P co2o18 SIL -0.894 -999.990 -.. r1 1993 11 20 11 31 00 52.7200 174.1000 28.00 116962 SHM 1993 10 10 22 50 00 6404-66 P co2o18 SIL -0.626 -999.990 +.. r1 1993 11 20 11 53 00 52.7200 174.1000 28.00 116963 SHM 1993 10 18 22 00 00 6267-66 P co2o18 SIL -1.078 -999.990 ... r1 1993 11 21 05 21 00 52.7200 174.1000 28.00 116964 SHM 1993 10 18 22 00 00 6268-66 P co2o18 SIL -1.052 -999.990 ... r1 1993 11 21 05 42 00 52.7200 174.1000 28.00 116965 SHM 1993 10 24 11 00 00 6349-66 P co2o18 SIL -0.896 -999.990 .x. r1 1993 11 20 10 48 00 52.7200 174.1000 28.00 116966 SHM 1993 10 24 11 00 00 6350-66 P co2o18 SIL -0.918 -999.990 .x. r1 1993 11 20 11 10 00 52.7200 174.1000 28.00 116967 SHM 1993 10 31 23 25 00 6305-66 P co2o18 SIL -0.985 -999.990 ... r1 1993 12 01 09 26 00 52.7200 174.1000 28.00 116968 SHM 1993 10 31 23 25 00 6306-66 P co2o18 SIL -0.992 -999.990 ... r1 1993 12 01 09 47 00 52.7200 174.1000 28.00 116969 SHM 1993 11 07 22 00 00 6739-66 P co2o18 SIL -0.847 -999.990 ... r1 1993 12 01 08 43 00 52.7200 174.1000 28.00 116970 SHM 1993 11 07 22 00 00 6740-66 P co2o18 SIL -0.812 -999.990 ... r1 1993 12 01 09 04 00 52.7200 174.1000 28.00 116971 SHM 1993 11 14 22 55 00 6905-66 P co2o18 SIL -0.702 -999.990 ... r1 1993 12 19 12 41 00 52.7200 174.1000 28.00 116972 SHM 1993 11 14 22 55 00 6906-66 P co2o18 SIL -0.703 -999.990 ... r1 1993 12 19 13 03 00 52.7200 174.1000 28.00 116973 SHM 1993 11 22 12 00 00 6385-66 P co2o18 SIL -0.714 -999.990 ... r1 1993 12 19 11 58 00 52.7200 174.1000 28.00 116974 SHM 1993 11 22 12 00 00 6386-66 P co2o18 SIL -0.806 -999.990 ... r1 1993 12 19 12 20 00 52.7200 174.1000 28.00 116975 SHM 1993 12 07 13 50 00 6154-66 P co2o18 SIL -0.795 -999.990 ..S r1 1994 03 03 22 25 00 52.7200 174.1000 28.00 116976 SHM 1993 12 14 11 50 00 6779-66 P co2o18 SIL -0.580 -999.990 ... r1 1994 01 26 21 19 00 52.7200 174.1000 28.00 116977 SHM 1993 12 14 11 50 00 6780-66 P co2o18 SIL -0.567 -999.990 ... r1 1994 01 26 21 41 00 52.7200 174.1000 28.00 116978 SHM 1993 12 20 01 50 00 6865-66 P co2o18 SIL -0.568 -999.990 -.. r1 1994 01 14 18 20 00 52.7200 174.1000 28.00 116979 SHM 1993 12 20 01 50 00 6866-66 P co2o18 SIL -0.350 -999.990 +.. r1 1994 01 14 18 41 00 52.7200 174.1000 28.00 116980 SHM 1993 12 27 15 45 00 6351-66 P co2o18 SIL -0.396 -999.990 ... r1 1994 01 14 16 54 00 52.7200 174.1000 28.00 116981 SHM 1993 12 27 15 45 00 6352-66 P co2o18 SIL -0.432 -999.990 ... r1 1994 01 14 17 15 00 52.7200 174.1000 28.00 116982 SHM 1994 01 03 13 55 00 6693-66 P co2o18 SIL -0.239 -999.990 ... r1 1994 02 07 11 39 00 52.7200 174.1000 28.00 116983 SHM 1994 01 03 13 55 00 6694-66 P co2o18 SIL -0.331 -999.990 ... r1 1994 02 07 12 00 00 52.7200 174.1000 28.00 116984 SHM 1994 01 10 01 00 00 6931-66 P co2o18 SIL -0.131 -999.990 ... r1 1994 02 06 14 15 00 52.7200 174.1000 28.00 116985 SHM 1994 01 10 01 00 00 6932-66 P co2o18 SIL -0.215 -999.990 ... r1 1994 02 06 14 36 00 52.7200 174.1000 28.00 116986 SHM 1994 01 17 14 50 00 6557-66 P co2o18 SIL -0.121 -999.990 ... r1 1994 03 03 00 22 00 52.7200 174.1000 28.00 116987 SHM 1994 01 17 14 50 00 6558-66 P co2o18 SIL -0.126 -999.990 ... r1 1994 03 03 00 44 00 52.7200 174.1000 28.00 116988 SHM 1994 01 26 12 40 00 6851-66 P co2o18 SIL -0.272 -999.990 ... r1 1994 03 02 23 37 00 52.7200 174.1000 28.00 116989 SHM 1994 01 26 12 40 00 6852-66 P co2o18 SIL -0.131 -999.990 ... r1 1994 03 03 00 00 00 52.7200 174.1000 28.00 116990 SHM 1994 01 30 14 25 00 6333-66 P co2o18 SIL -0.110 -999.990 A.. r1 1994 03 04 23 59 00 52.7200 174.1000 28.00 116991 SHM 1994 01 30 14 25 00 6334-66 P co2o18 SIL -0.130 -999.990 A.. r1 1994 03 05 00 22 00 52.7200 174.1000 28.00 116992 SHM 1994 02 07 02 00 00 6283-66 P co2o18 SIL -0.005 -999.990 ... r1 1994 03 09 15 21 00 52.7200 174.1000 28.00 116993 SHM 1994 02 07 02 00 00 6284-66 P co2o18 SIL -0.013 -999.990 ... r1 1994 03 09 15 43 00 52.7200 174.1000 28.00 116994 SHM 1994 02 13 01 25 00 6281-66 P co2o18 SIL 0.020 -999.990 ... r1 1994 03 12 06 03 00 52.7200 174.1000 28.00 116995 SHM 1994 02 13 01 25 00 6282-66 P co2o18 SIL 0.039 -999.990 ... r1 1994 03 12 06 25 00 52.7200 174.1000 28.00 116996 SHM 1994 02 21 00 15 00 6349-66 P co2o18 SIL 0.008 -999.990 ... r1 1994 03 19 21 03 00 52.7200 174.1000 28.00 116997 SHM 1994 02 21 00 15 00 6350-66 P co2o18 SIL 0.053 -999.990 ... r1 1994 03 19 21 25 00 52.7200 174.1000 28.00 116998 SHM 1994 02 28 14 15 00 6519-66 P co2o18 SIL -21.014 -999.990 !.. r1 1994 03 17 08 30 00 52.7200 174.1000 28.00 116999 SHM 1994 02 28 14 15 00 6520-66 P co2o18 SIL -22.203 -999.990 !.. r1 1994 03 17 08 52 00 52.7200 174.1000 28.00 117000 SHM 1994 03 08 13 40 00 6189-66 P co2o18 SIL -0.020 -999.990 A.. r1 1994 04 08 13 44 00 52.7200 174.1000 28.00 117001 SHM 1994 03 08 13 40 00 6190-66 P co2o18 SIL -0.012 -999.990 A.. r1 1994 04 08 14 07 00 52.7200 174.1000 28.00 117002 SHM 1994 03 17 00 30 00 6301-66 P co2o18 SIL 0.025 -999.990 A.. r1 1994 04 08 13 00 00 52.7200 174.1000 28.00 117003 SHM 1994 03 17 00 30 00 6302-66 P co2o18 SIL -0.001 -999.990 A.. r1 1994 04 08 13 22 00 52.7200 174.1000 28.00 117004 SHM 1994 03 20 01 15 00 6379-66 P co2o18 SIL -1.015 -999.990 +.. r1 1994 06 10 05 55 00 52.7200 174.1000 28.00 117005 SHM 1994 03 20 01 15 00 6380-66 P co2o18 SIL -1.960 -999.990 -.. r1 1994 06 10 06 17 00 52.7200 174.1000 28.00 117006 SHM 1994 03 27 00 30 00 6595-66 P co2o18 SIL -1.146 -999.990 .X. r1 1994 06 10 06 39 00 52.7200 174.1000 28.00 117007 SHM 1994 03 27 00 30 00 6596-66 P co2o18 SIL -1.281 -999.990 .X. r1 1994 06 10 07 02 00 52.7200 174.1000 28.00 117008 SHM 1994 04 03 23 15 00 6171-66 P co2o18 SIL -0.984 -999.990 -.. r1 1994 10 23 06 46 00 52.7200 174.1000 28.00 117009 SHM 1994 04 03 23 15 00 6172-66 P co2o18 SIL 0.127 -999.990 +.. r1 1994 10 23 07 10 00 52.7200 174.1000 28.00 117010 SHM 1994 04 17 23 50 00 6893-66 P co2o18 SIL -0.376 -999.990 ... r1 1994 10 24 16 37 00 52.7200 174.1000 28.00 117011 SHM 1994 04 17 23 50 00 6894-66 P co2o18 SIL -0.274 -999.990 ... r1 1994 10 24 17 01 00 52.7200 174.1000 28.00 117012 SHM 1994 05 02 09 50 00 6075-66 P co2o18 SIL -0.107 -999.990 ... r1 1994 06 11 05 06 00 52.7200 174.1000 28.00 117013 SHM 1994 05 02 09 50 00 6076-66 P co2o18 SIL -0.148 -999.990 ... r1 1994 06 11 05 28 00 52.7200 174.1000 28.00 117014 SHM 1994 05 18 01 10 00 6841-66 P co2o18 SIL -0.202 -999.990 ..S r1 1994 06 12 05 43 00 52.7200 174.1000 28.00 117015 SHM 1994 05 18 02 00 00 6763-66 P co2o18 SIL -0.146 -999.990 ... r1 1994 06 13 09 40 00 52.7200 174.1000 28.00 117016 SHM 1994 05 18 02 00 00 6764-66 P co2o18 SIL -0.077 -999.990 ... r1 1994 06 13 10 02 00 52.7200 174.1000 28.00 117017 SHM 1994 05 23 00 58 00 6297-66 P co2o18 SIL -0.117 -999.990 ..S r1 1994 06 12 05 21 00 52.7200 174.1000 28.00 117018 SHM 1994 05 29 11 55 00 6299-66 P co2o18 SIL 0.098 -999.990 ... r1 1994 07 02 14 05 00 52.7200 174.1000 28.00 117019 SHM 1994 05 29 11 55 00 6300-66 P co2o18 SIL 0.018 -999.990 ... r1 1994 07 02 14 27 00 52.7200 174.1000 28.00 117020 SHM 1994 06 19 23 05 00 6313-66 P co2o18 SIL 0.378 -999.990 ..S r1 1994 07 02 13 42 00 52.7200 174.1000 28.00 117021 SHM 1994 06 20 23 04 00 6903-66 P co2o18 SIL 0.392 -999.990 ... r1 1994 07 28 00 19 00 52.7200 174.1000 28.00 117022 SHM 1994 06 20 23 04 00 6904-66 P co2o18 SIL 0.404 -999.990 ... r1 1994 07 28 00 44 00 52.7200 174.1000 28.00 117023 SHM 1994 07 03 22 05 00 6709-66 P co2o18 SIL 0.107 -999.990 ... r1 1994 07 28 10 32 00 52.7200 174.1000 28.00 117024 SHM 1994 07 03 22 05 00 6710-66 P co2o18 SIL 0.114 -999.990 ... r1 1994 07 28 10 56 00 52.7200 174.1000 28.00 117025 SHM 1994 07 10 23 15 00 6371-66 P co2o18 SIL 0.603 -999.990 -.. r1 1994 07 28 11 21 00 52.7200 174.1000 28.00 117026 SHM 1994 07 10 23 15 00 6372-66 P co2o18 SIL 0.770 -999.990 +.. r1 1994 07 28 11 46 00 52.7200 174.1000 28.00 117027 SHM 1994 07 17 23 15 00 6449-66 P co2o18 SIL 0.176 -999.990 ... r1 1994 09 06 00 22 00 52.7200 174.1000 28.00 117028 SHM 1994 07 17 23 15 00 6450-66 P co2o18 SIL 0.154 -999.990 ... r1 1994 09 06 00 48 00 52.7200 174.1000 28.00 117029 SHM 1994 07 24 00 37 00 6719-66 P co2o18 SIL 0.361 -999.990 ... r1 1994 08 27 23 45 00 52.7200 174.1000 28.00 117030 SHM 1994 07 24 00 37 00 6720-66 P co2o18 SIL 0.487 -999.990 ... r1 1994 08 28 00 15 00 52.7200 174.1000 28.00 117031 SHM 1994 07 31 23 20 00 6443-66 P co2o18 SIL -1.049 -999.990 +.. r1 1994 08 31 08 11 00 52.7200 174.1000 28.00 117032 SHM 1994 07 31 23 20 00 6444-66 P co2o18 SIL -32.726 -999.990 !.. r1 1994 08 31 07 41 00 52.7200 174.1000 28.00 117033 SHM 1994 08 07 14 27 00 6607-66 P co2o18 SIL -1.717 -999.990 -x. r1 1994 08 31 06 41 00 52.7200 174.1000 28.00 117034 SHM 1994 08 07 14 27 00 6608-66 P co2o18 SIL -0.825 -999.990 +x. r1 1994 08 31 07 11 00 52.7200 174.1000 28.00 117035 SHM 1994 08 15 00 30 00 6259-66 P co2o18 SIL 0.035 -999.990 +.. r1 1994 10 15 01 25 00 52.7200 174.1000 28.00 117036 SHM 1994 08 15 00 30 00 6260-66 P co2o18 SIL -0.737 -999.990 -.. r1 1994 10 15 01 50 00 52.7200 174.1000 28.00 117037 SHM 1994 08 21 23 50 00 6497-66 P co2o18 SIL -1.279 -999.990 .x. r1 1994 10 15 02 15 00 52.7200 174.1000 28.00 117038 SHM 1994 08 21 23 50 00 6498-66 P co2o18 SIL -1.254 -999.990 .x. r1 1994 10 15 02 40 00 52.7200 174.1000 28.00 117039 SHM 1994 08 31 00 29 00 6707-66 P co2o18 SIL -1.528 -999.990 -.. r1 1994 12 23 23 45 00 52.7200 174.1000 28.00 117040 SHM 1994 08 31 00 29 00 6708-66 P co2o18 SIL -1.355 -999.990 +.. r1 1994 12 24 00 08 00 52.7200 174.1000 28.00 117041 SHM 1994 10 02 22 30 00 6051-66 P co2o18 SIL -0.366 -999.990 A.. r1 1994 12 27 01 37 00 52.7200 174.1000 28.00 117042 SHM 1994 10 02 22 30 00 6052-66 P co2o18 SIL -0.570 -999.990 A.. r1 1994 12 27 02 00 00 52.7200 174.1000 28.00 117043 SHM 1994 11 06 16 00 00 6828-66 P co2o18 SIL -0.953 -999.990 A.S r1 1994 12 25 04 42 00 52.7200 174.1000 28.00 117044 SHM 1994 11 12 19 30 00 6650-66 P co2o18 SIL -0.487 -999.990 +.. r1 1994 12 05 19 32 00 52.7200 174.1000 28.00 117045 SHM 1994 11 12 19 30 00 6727-66 P co2o18 SIL -0.954 -999.990 -.. r1 1994 12 05 19 57 00 52.7200 174.1000 28.00 117046 SHM 1994 11 20 11 46 00 6261-66 P co2o18 SIL -0.779 -999.990 A.S r1 1994 12 25 04 19 00 52.7200 174.1000 28.00 117047 SHM 1994 11 20 21 46 00 6903-66 P co2o18 SIL -0.698 -999.990 ... r1 1995 02 13 08 25 00 52.7200 174.1000 28.00 117048 SHM 1994 11 20 21 46 00 6904-66 P co2o18 SIL -0.714 -999.990 ... r1 1995 02 13 08 49 00 52.7200 174.1000 28.00 117049 SHM 1994 12 05 12 34 56 6053-66 P co2o18 SIL -0.459 -999.990 n.S r1 1995 02 13 09 13 00 52.7200 174.1000 28.00 117052 SHM 1994 12 05 22 51 00 6487-66 P co2o18 SIL -0.646 -999.990 ... r1 1995 01 09 08 24 00 52.7200 174.1000 28.00 117050 SHM 1994 12 05 22 51 00 6488-66 P co2o18 SIL -0.640 -999.990 ... r1 1995 01 09 08 48 00 52.7200 174.1000 28.00 117051 SHM 1995 01 08 22 30 00 6710-66 P co2o18 SIL -0.823 -999.990 n.S r1 1995 01 31 10 17 00 52.7200 174.1000 28.00 117054 SHM 1995 01 08 22 45 00 6649-66 P co2o18 SIL -2.251 -999.990 -.. r1 1995 01 29 14 45 00 52.7200 174.1000 28.00 117055 SHM 1995 01 08 22 45 00 6650-66 P co2o18 SIL -0.760 -999.990 +.. r1 1995 01 29 15 10 00 52.7200 174.1000 28.00 117056 SHM 1995 01 17 05 50 00 6363-66 P co2o18 SIL -0.471 -999.990 ..S r1 1995 03 03 12 55 00 52.7200 174.1000 28.00 117057 SHM 1995 02 03 02 00 00 6809-66 P co2o18 SIL -0.539 -999.990 -.. r1 1995 03 07 11 16 00 52.7200 174.1000 28.00 117058 SHM 1995 02 03 02 00 00 6810-66 P co2o18 SIL -0.296 -999.990 +.. r1 1995 03 07 11 39 00 52.7200 174.1000 28.00 117059 SHM 1995 02 07 01 15 00 6647-66 P co2o18 SIL -21.108 -999.990 !.. r1 1995 04 03 10 57 00 52.7200 174.1000 28.00 117060 SHM 1995 02 07 01 15 00 6648-66 P co2o18 SIL -24.782 -999.990 !.. r1 1995 04 03 11 21 00 52.7200 174.1000 28.00 117061 SHM 1995 02 20 03 53 00 6779-66 P co2o18 SIL -0.040 -999.990 ... r1 1995 03 26 02 58 00 52.7200 174.1000 28.00 117062 SHM 1995 02 20 03 53 00 6780-66 P co2o18 SIL 0.052 -999.990 ... r1 1995 03 26 03 22 00 52.7200 174.1000 28.00 117063 SHM 1995 02 27 01 30 00 6845-66 P co2o18 SIL -0.132 -999.990 ... r1 1995 04 10 01 05 00 52.7200 174.1000 28.00 117064 SHM 1995 02 27 01 30 00 6846-66 P co2o18 SIL -0.054 -999.990 ... r1 1995 04 10 01 30 00 52.7200 174.1000 28.00 117065 SHM 1995 03 11 22 55 00 6727-66 P co2o18 SIL 0.053 -999.990 ... r1 1995 04 10 00 15 00 52.7200 174.1000 28.00 117066 SHM 1995 03 11 22 55 00 6728-66 P co2o18 SIL 0.110 -999.990 ... r1 1995 04 10 00 40 00 52.7200 174.1000 28.00 117067 SHM 1995 03 19 23 11 00 6519-66 P co2o18 SIL -0.279 -999.990 ... r1 1995 04 15 13 00 00 52.7200 174.1000 28.00 117068 SHM 1995 03 19 23 11 00 6520-66 P co2o18 SIL -0.326 -999.990 ... r1 1995 04 15 13 25 00 52.7200 174.1000 28.00 117069 SHM 1995 03 26 23 08 00 6788-66 P co2o18 SIL -0.084 -999.990 ..S r1 1995 04 25 08 52 00 52.7200 174.1000 28.00 117070 SHM 1995 04 02 23 40 00 6340-66 P co2o18 SIL 0.100 -999.990 ... r1 1995 05 02 09 08 00 52.7200 174.1000 28.00 117071 SHM 1995 04 02 23 40 00 6719-66 P co2o18 SIL 0.110 -999.990 ... r1 1995 05 02 09 32 00 52.7200 174.1000 28.00 117072 SHM 1995 04 10 00 30 00 6339-66 P co2o18 SIL -0.155 -999.990 ... r1 1995 05 01 13 01 00 52.7200 174.1000 28.00 117073 SHM 1995 04 10 00 30 00 6720-66 P co2o18 SIL -0.130 -999.990 ... r1 1995 05 01 13 25 00 52.7200 174.1000 28.00 117074 SHM 1995 04 16 12 34 56 6707-66 P co2o18 SIL -0.057 -999.990 ... r1 1995 05 10 00 45 00 52.7200 174.1000 28.00 117075 SHM 1995 04 16 12 34 56 6708-66 P co2o18 SIL 0.000 -999.990 ... r1 1995 05 10 01 09 00 52.7200 174.1000 28.00 117076 SHM 1995 04 17 03 30 00 6494-66 P co2o18 SIL 0.138 -999.990 +.. r1 1995 05 09 23 55 00 52.7200 174.1000 28.00 117078 SHM 1995 04 17 03 30 00 6494-66 P co2o18 SIL -0.062 -999.990 -.. r1 1995 05 10 00 20 00 52.7200 174.1000 28.00 117078 SHM 1995 05 01 01 38 00 6151-66 P co2o18 SIL -0.511 -999.990 +.. r1 1995 05 31 05 54 00 52.7200 174.1000 28.00 117079 SHM 1995 05 01 01 38 00 6152-66 P co2o18 SIL -1.251 -999.990 -.. r1 1995 05 31 06 19 00 52.7200 174.1000 28.00 117080 SHM 1995 05 08 00 14 00 6825-66 P co2o18 SIL -0.367 -999.990 +.. r1 1995 05 23 22 02 00 52.7200 174.1000 28.00 117081 SHM 1995 05 08 00 14 00 6826-66 P co2o18 SIL -0.767 -999.990 -.. r1 1995 05 23 22 27 00 52.7200 174.1000 28.00 117082 SHM 1995 05 14 23 15 00 6725-66 P co2o18 SIL -0.831 -999.990 -.. r1 1995 06 17 02 20 00 52.7200 174.1000 28.00 117083 SHM 1995 05 14 23 15 00 6726-66 P co2o18 SIL 0.449 -999.990 +.. r1 1995 06 17 02 45 00 52.7200 174.1000 28.00 117084 SHM 1995 05 21 23 15 00 6263-66 P co2o18 SIL -0.169 -999.990 ... r1 1995 06 17 12 12 00 52.7200 174.1000 28.00 117085 SHM 1995 05 21 23 15 00 6264-66 P co2o18 SIL -0.062 -999.990 ... r1 1995 06 17 12 36 00 52.7200 174.1000 28.00 117086 SHM 1995 05 28 23 15 00 6273-66 P co2o18 SIL -0.033 -999.990 ... r1 1995 06 16 17 05 00 52.7200 174.1000 28.00 117087 SHM 1995 05 28 23 15 00 6274-66 P co2o18 SIL -0.020 -999.990 ... r1 1995 06 16 17 30 00 52.7200 174.1000 28.00 117088 SHM 1995 06 04 23 10 00 6157-66 P co2o18 SIL -0.039 -999.990 ... r1 1995 06 20 03 55 00 52.7200 174.1000 28.00 117089 SHM 1995 06 04 23 10 00 6158-66 P co2o18 SIL -0.066 -999.990 ... r1 1995 06 20 04 20 00 52.7200 174.1000 28.00 117090 SHM 1995 06 18 11 00 00 6611-66 P co2o18 SIL -0.084 -999.990 ... r1 1995 08 27 08 55 00 52.7200 174.1000 28.00 117091 SHM 1995 06 18 11 00 00 6800-66 P co2o18 SIL -0.014 -999.990 ... r1 1995 08 27 08 32 00 52.7200 174.1000 28.00 117092 SHM 1995 06 25 11 00 00 6612-66 P co2o18 SIL -1.374 -999.990 -.. r1 1995 08 21 09 16 00 52.7200 174.1000 28.00 117093 SHM 1995 06 25 11 00 00 6799-66 P co2o18 SIL -0.385 -999.990 +.. r1 1995 08 21 08 52 00 52.7200 174.1000 28.00 117094 SHM 1995 07 02 23 10 00 6059-66 P co2o18 SIL 0.233 -999.990 ... r1 1995 07 31 19 52 00 52.7200 174.1000 28.00 117095 SHM 1995 07 02 23 10 00 6060-66 P co2o18 SIL 0.241 -999.990 ... r1 1995 07 31 20 18 00 52.7200 174.1000 28.00 117096 SHM 1995 07 09 23 25 00 6129-66 P co2o18 SIL 0.343 -999.990 ... r1 1995 08 06 20 26 00 52.7200 174.1000 28.00 117097 SHM 1995 07 09 23 25 00 6130-66 P co2o18 SIL 0.355 -999.990 ... r1 1995 08 06 20 52 00 52.7200 174.1000 28.00 117098 SHM 1995 07 16 23 15 00 6255-66 P co2o18 SIL 0.184 -999.990 n.S r1 1995 08 15 22 49 00 52.7200 174.1000 28.00 117099 SHM 1995 07 23 23 15 00 6579-66 P co2o18 SIL 0.260 -999.990 ... r1 1995 08 15 08 50 00 52.7200 174.1000 28.00 117100 SHM 1995 07 23 23 15 00 6580-66 P co2o18 SIL 0.143 -999.990 ... r1 1995 08 15 09 13 00 52.7200 174.1000 28.00 117101 SHM 1995 07 30 23 15 00 6325-66 P co2o18 SIL 0.151 -999.990 ... r1 1995 08 24 10 41 00 52.7200 174.1000 28.00 117102 SHM 1995 07 30 23 15 00 6326-66 P co2o18 SIL 0.122 -999.990 ... r1 1995 08 24 11 05 00 52.7200 174.1000 28.00 117103 SHM 1995 08 06 23 15 00 6577-66 P co2o18 SIL 0.022 -999.990 ... r1 1995 08 23 08 08 00 52.7200 174.1000 28.00 117104 SHM 1995 08 06 23 15 00 6578-66 P co2o18 SIL -0.029 -999.990 ... r1 1995 08 23 08 31 00 52.7200 174.1000 28.00 117105 SHM 1995 08 13 23 15 00 6571-66 P co2o18 SIL -0.251 -999.990 +.. r1 1995 09 11 10 56 00 52.7200 174.1000 28.00 117106 SHM 1995 08 13 23 15 00 6572-66 P co2o18 SIL -0.411 -999.990 -.. r1 1995 09 11 11 20 00 52.7200 174.1000 28.00 117107 SHM 1995 08 20 23 10 00 6742-66 P co2o18 SIL 0.520 -999.990 n.S r1 1995 09 08 01 21 00 52.7200 174.1000 28.00 117108 SHM 1995 08 27 23 10 00 537-91 P co2o18 SIL -1.350 -999.990 .X. r1 1995 10 09 22 19 00 52.7200 174.1000 28.00 117109 SHM 1995 08 27 23 10 00 538-91 P co2o18 SIL -1.258 -999.990 ... r1 1995 10 09 22 40 00 52.7200 174.1000 28.00 117110 SHM 1995 09 03 23 10 00 217-91 P co2o18 SIL -1.037 -999.990 ..S r1 1995 09 24 00 05 00 52.7200 174.1000 28.00 117111 SHM 1995 09 10 23 10 00 821-91 P co2o18 SIL -0.695 -999.990 ... r1 1995 10 10 22 37 00 52.7200 174.1000 28.00 117113 SHM 1995 09 10 23 10 00 822-91 P co2o18 SIL -0.755 -999.990 ... r1 1995 10 10 22 58 00 52.7200 174.1000 28.00 117114 SHM 1995 09 17 23 10 00 207-91 P co2o18 SIL -0.933 -999.990 ... r1 1995 10 12 00 00 00 52.7200 174.1000 28.00 117115 SHM 1995 09 17 23 10 00 208-91 P co2o18 SIL -0.934 -999.990 ... r1 1995 10 12 00 21 00 52.7200 174.1000 28.00 117116 SHM 1995 09 24 23 15 00 6091-66 P co2o18 SIL -1.289 -999.990 ... r1 1995 10 14 12 00 00 52.7200 174.1000 28.00 117117 SHM 1995 09 24 23 15 00 6092-66 P co2o18 SIL -1.324 -999.990 ... r1 1995 10 14 12 22 00 52.7200 174.1000 28.00 117118 SHM 1995 10 01 23 10 00 643-91 P co2o18 SIL -1.521 -999.990 ... r1 1995 10 21 13 12 00 52.7200 174.1000 28.00 117119 SHM 1995 10 01 23 10 00 644-91 P co2o18 SIL -1.538 -999.990 ... r1 1995 10 21 13 33 00 52.7200 174.1000 28.00 117120 SHM 1995 10 08 23 10 00 465-91 P co2o18 SIL -1.128 -999.990 ... r1 1995 10 21 13 54 00 52.7200 174.1000 28.00 117121 SHM 1995 10 08 23 10 00 466-91 P co2o18 SIL -1.161 -999.990 ... r1 1995 10 21 14 16 00 52.7200 174.1000 28.00 117122 SHM 1995 10 15 23 15 00 443-91 P co2o18 SIL -1.349 -999.990 ... r1 1995 11 06 08 56 00 52.7200 174.1000 28.00 117123 SHM 1995 10 15 23 15 00 444-91 P co2o18 SIL -1.321 -999.990 ... r1 1995 11 06 09 19 00 52.7200 174.1000 28.00 117124 SHM 1995 10 22 23 10 00 235-91 P co2o18 SIL -0.507 -999.990 ... r1 1995 11 06 08 10 00 52.7200 174.1000 28.00 117125 SHM 1995 10 22 23 10 00 236-91 P co2o18 SIL -0.475 -999.990 ... r1 1995 11 06 08 33 00 52.7200 174.1000 28.00 117126 SHM 1995 10 29 23 15 00 491-91 P co2o18 SIL -0.935 -999.990 +.. r1 1995 12 10 12 40 00 52.7200 174.1000 28.00 117127 SHM 1995 10 29 23 15 00 492-91 P co2o18 SIL -1.207 -999.990 -.. r1 1995 12 10 13 02 00 52.7200 174.1000 28.00 117128 SHM 1995 11 05 23 25 00 6527-66 P co2o18 SIL -0.724 -999.990 ... r1 1995 12 05 00 49 00 52.7200 174.1000 28.00 117129 SHM 1995 11 05 23 25 00 6528-66 P co2o18 SIL -0.647 -999.990 ... r1 1995 12 05 01 12 00 52.7200 174.1000 28.00 117130 SHM 1995 11 12 22 58 00 6445-66 P co2o18 SIL -1.413 -999.990 +x. r1 1995 12 20 01 36 00 52.7200 174.1000 28.00 117131 SHM 1995 11 12 22 58 00 6446-66 P co2o18 SIL -1.583 -999.990 -x. r1 1995 12 20 01 57 00 52.7200 174.1000 28.00 117132 SHM 1995 12 04 00 20 00 6637-66 P co2o18 SIL -0.431 -999.990 ... r1 1996 01 13 04 16 00 52.7200 174.1000 28.00 117133 SHM 1995 12 04 00 20 00 6638-66 P co2o18 SIL -0.493 -999.990 ... r1 1996 01 13 04 38 00 52.7200 174.1000 28.00 117134 SHM 1995 12 11 00 04 00 6537-66 P co2o18 SIL -0.487 -999.990 ... r1 1996 01 09 22 53 00 52.7200 174.1000 28.00 117135 SHM 1995 12 11 00 04 00 6538-66 P co2o18 SIL -0.419 -999.990 ... r1 1996 01 09 23 15 00 52.7200 174.1000 28.00 117136 SHM 1995 12 18 00 42 00 441-91 P co2o18 SIL -0.647 -999.990 ... r1 1996 01 25 23 42 00 52.7200 174.1000 28.00 117137 SHM 1995 12 18 00 42 00 442-91 P co2o18 SIL -0.680 -999.990 ... r1 1996 01 26 00 03 00 52.7200 174.1000 28.00 117138 SHM 1995 12 25 00 40 00 105-91 P co2o18 SIL -0.595 -999.990 ... r1 1996 01 29 08 06 00 52.7200 174.1000 28.00 117139 SHM 1995 12 25 00 40 00 106-91 P co2o18 SIL -0.538 -999.990 ... r1 1996 01 29 08 27 00 52.7200 174.1000 28.00 117140 SHM 1996 01 01 00 47 00 6397-66 P co2o18 SIL -1.193 -999.990 +.. r1 1996 02 03 10 16 00 52.7200 174.1000 28.00 117141 SHM 1996 01 01 00 47 00 6398-66 P co2o18 SIL -2.742 -999.990 -.. r1 1996 02 03 10 38 00 52.7200 174.1000 28.00 117142 SHM 1996 01 07 23 36 00 6461-66 P co2o18 SIL -17.476 -999.990 A.. r1 1996 02 01 11 39 00 52.7200 174.1000 28.00 117143 SHM 1996 01 07 23 36 00 6462-66 P co2o18 SIL -16.510 -999.990 A.. r1 1996 02 01 12 01 00 52.7200 174.1000 28.00 117144 SHM 1996 01 15 00 40 00 715-91 P co2o18 SIL -0.178 -999.990 ... r1 1996 02 19 14 54 00 52.7200 174.1000 28.00 117145 SHM 1996 01 15 00 40 00 716-91 P co2o18 SIL -0.262 -999.990 ... r1 1996 02 19 15 15 00 52.7200 174.1000 28.00 117146 SHM 1996 01 22 00 48 00 103-91 P co2o18 SIL -0.516 -999.990 ... r1 1996 02 19 03 53 00 52.7200 174.1000 28.00 117147 SHM 1996 01 22 00 48 00 104-91 P co2o18 SIL -0.531 -999.990 ... r1 1996 02 19 04 15 00 52.7200 174.1000 28.00 117148 SHM 1996 01 29 00 10 00 141-91 P co2o18 SIL -0.537 -999.990 ... r1 1996 03 05 02 17 00 52.7200 174.1000 28.00 117149 SHM 1996 01 29 00 10 00 142-91 P co2o18 SIL -0.455 -999.990 ... r1 1996 03 05 02 40 00 52.7200 174.1000 28.00 117150 SHM 1996 02 06 14 34 00 1251-91 P co2o18 SIL -0.247 -999.990 ... r1 1996 03 05 01 31 00 52.7200 174.1000 28.00 117151 SHM 1996 02 06 14 34 00 1252-91 P co2o18 SIL -0.336 -999.990 ... r1 1996 03 05 01 54 00 52.7200 174.1000 28.00 117152 SHM 1996 02 11 21 42 00 1513-91 P co2o18 SIL -0.234 -999.990 ... r1 1996 03 16 07 54 00 52.7200 174.1000 28.00 117153 SHM 1996 02 11 21 42 00 1514-91 P co2o18 SIL -0.225 -999.990 ... r1 1996 03 16 08 16 00 52.7200 174.1000 28.00 117154 SHM 1996 02 25 23 20 00 6841-66 P co2o18 SIL -0.302 -999.990 ... r1 1996 04 05 22 42 00 52.7200 174.1000 28.00 117157 SHM 1996 02 25 23 20 00 6842-66 P co2o18 SIL -0.329 -999.990 ... r1 1996 04 05 23 05 00 52.7200 174.1000 28.00 117158 SHM 1996 03 05 13 30 00 6721-66 P co2o18 SIL -0.216 -999.990 ..S r1 1996 04 07 01 34 00 52.7200 174.1000 28.00 117159 SHM 1996 03 10 23 35 00 6369-66 P co2o18 SIL -0.117 -999.990 ... r1 1996 04 09 23 37 00 52.7200 174.1000 28.00 117160 SHM 1996 03 10 23 35 00 6370-66 P co2o18 SIL -0.084 -999.990 ... r1 1996 04 10 00 00 00 52.7200 174.1000 28.00 117161 SHM 1996 03 19 13 35 00 6081-66 P co2o18 SIL -0.256 -999.990 ... r1 1996 04 10 00 23 00 52.7200 174.1000 28.00 117162 SHM 1996 03 19 13 35 00 6082-66 P co2o18 SIL -0.301 -999.990 ... r1 1996 04 10 00 47 00 52.7200 174.1000 28.00 117163 SHM 1996 03 25 01 50 00 6807-66 P co2o18 SIL -0.149 -999.990 ... r1 1996 04 27 01 08 00 52.7200 174.1000 28.00 117164 SHM 1996 03 25 01 50 00 6808-66 P co2o18 SIL -0.159 -999.990 ... r1 1996 04 27 01 31 00 52.7200 174.1000 28.00 117165 SHM 1996 04 01 00 30 00 6719-66 P co2o18 SIL 0.006 -999.990 ... r1 1996 04 27 10 54 00 52.7200 174.1000 28.00 117166 SHM 1996 04 01 00 30 00 6720-66 P co2o18 SIL 0.015 -999.990 ... r1 1996 04 27 11 18 00 52.7200 174.1000 28.00 117167 SHM 1996 04 08 00 26 00 555-91 P co2o18 SIL -0.102 -999.990 ... r1 1996 05 02 01 29 00 52.7200 174.1000 28.00 117168 SHM 1996 04 08 00 26 00 556-91 P co2o18 SIL -0.111 -999.990 ... r1 1996 05 02 01 52 00 52.7200 174.1000 28.00 117169 SHM 1996 04 14 23 50 00 1431-91 P co2o18 SIL -0.004 -999.990 ... r1 1996 05 02 00 41 00 52.7200 174.1000 28.00 117170 SHM 1996 04 14 23 50 00 1432-91 P co2o18 SIL -0.095 -999.990 ... r1 1996 05 02 01 05 00 52.7200 174.1000 28.00 117171 SHM 1996 04 21 20 35 00 6093-66 P co2o18 SIL -0.204 -999.990 ... r1 1996 05 12 13 50 00 52.7200 174.1000 28.00 117172 SHM 1996 04 21 20 35 00 6094-66 P co2o18 SIL -0.252 -999.990 ... r1 1996 05 12 14 14 00 52.7200 174.1000 28.00 117173 SHM 1996 04 28 00 10 00 629-91 P co2o18 SIL -0.045 -999.990 ... r1 1996 05 25 11 50 00 52.7200 174.1000 28.00 117174 SHM 1996 04 28 00 10 00 630-91 P co2o18 SIL 0.022 -999.990 ... r1 1996 05 25 12 13 00 52.7200 174.1000 28.00 117175 SHM 1996 04 28 22 14 00 6729-66 P co2o18 SIL -0.134 -999.990 ... r1 1996 05 12 13 02 00 52.7200 174.1000 28.00 117176 SHM 1996 04 28 22 14 00 6730-66 P co2o18 SIL -0.139 -999.990 ... r1 1996 05 12 13 26 00 52.7200 174.1000 28.00 117177 SHM 1996 05 05 23 41 00 571-91 P co2o18 SIL -33.583 -999.990 !.. r1 1996 05 25 12 37 00 52.7200 174.1000 28.00 117178 SHM 1996 05 05 23 41 00 572-91 P co2o18 SIL -34.307 -999.990 !.. r1 1996 05 25 13 00 00 52.7200 174.1000 28.00 117179 SHM 1996 05 12 23 53 00 1119-91 P co2o18 SIL -0.093 -999.990 ... r1 1996 06 03 13 25 00 52.7200 174.1000 28.00 117180 SHM 1996 05 12 23 53 00 1120-91 P co2o18 SIL -0.063 -999.990 ... r1 1996 06 03 13 49 00 52.7200 174.1000 28.00 117181 SHM 1996 05 19 23 58 00 1799-91 P co2o18 SIL -0.056 -999.990 ..S r1 1996 06 07 00 28 00 52.7200 174.1000 28.00 117182 SHM 1996 05 27 00 34 00 1557-91 P co2o18 SIL -0.074 -999.990 ... r1 1996 06 24 00 25 00 52.7200 174.1000 28.00 117183 SHM 1996 05 27 00 34 00 1558-91 P co2o18 SIL -0.044 -999.990 ... r1 1996 06 24 00 52 00 52.7200 174.1000 28.00 117184 SHM 1996 06 04 12 39 00 1559-91 P co2o18 SIL 0.185 -999.990 ... r1 1996 06 25 20 25 00 52.7200 174.1000 28.00 117185 SHM 1996 06 04 12 39 00 1560-91 P co2o18 SIL 0.218 -999.990 ... r1 1996 06 25 20 51 00 52.7200 174.1000 28.00 117186 SHM 1996 06 10 00 55 00 1341-91 P co2o18 SIL -0.142 -999.990 ... r1 1996 06 29 01 22 00 52.7200 174.1000 28.00 117187 SHM 1996 06 10 00 55 00 1342-91 P co2o18 SIL -0.180 -999.990 ... r1 1996 06 29 01 48 00 52.7200 174.1000 28.00 117188 SHM 1996 06 17 01 18 00 1343-91 P co2o18 SIL 0.109 -999.990 ... r1 1996 07 01 23 50 00 52.7200 174.1000 28.00 117189 SHM 1996 06 17 01 18 00 1344-91 P co2o18 SIL 0.046 -999.990 ... r1 1996 07 02 00 16 00 52.7200 174.1000 28.00 117190 SHM 1996 06 24 00 50 00 167-91 P co2o18 SIL -0.006 -999.990 ... r1 1996 07 22 11 55 00 52.7200 174.1000 28.00 117191 SHM 1996 06 24 00 50 00 168-91 P co2o18 SIL -0.008 -999.990 ... r1 1996 07 22 12 21 00 52.7200 174.1000 28.00 117192 SHM 1996 07 01 01 36 00 859-91 P co2o18 SIL -0.137 -999.990 ... r1 1996 07 22 11 02 00 52.7200 174.1000 28.00 117193 SHM 1996 07 01 01 36 00 860-91 P co2o18 SIL -0.053 -999.990 ... r1 1996 07 22 11 28 00 52.7200 174.1000 28.00 117194 SHM 1996 07 08 00 25 00 315-91 P co2o18 SIL 0.167 -999.990 ... r1 1996 08 02 02 05 00 52.7200 174.1000 28.00 117195 SHM 1996 07 08 00 25 00 316-91 P co2o18 SIL 0.246 -999.990 ... r1 1996 08 02 02 27 00 52.7200 174.1000 28.00 117196 SHM 1996 07 15 00 05 00 257-91 P co2o18 SIL 0.167 -999.990 ... r1 1996 08 02 01 19 00 52.7200 174.1000 28.00 117197 SHM 1996 07 15 00 05 00 258-91 P co2o18 SIL 0.154 -999.990 ... r1 1996 08 02 01 42 00 52.7200 174.1000 28.00 117198 SHM 1996 07 21 23 00 00 1357-91 P co2o18 SIL 0.293 -999.990 .x. r1 1996 08 15 16 13 00 52.7200 174.1000 28.00 117199 SHM 1996 07 21 23 00 00 1358-91 P co2o18 SIL 0.222 -999.990 .x. r1 1996 08 15 16 36 00 52.7200 174.1000 28.00 117200 SHM 1996 07 28 23 05 00 1359-91 P co2o18 SIL -0.201 -999.990 ..S r1 1996 08 21 10 41 00 52.7200 174.1000 28.00 117201 SHM 1996 08 04 23 05 00 67-91 P co2o18 SIL -0.769 -999.990 .X. r1 1996 08 25 17 07 00 52.7200 174.1000 28.00 117202 SHM 1996 08 04 23 05 00 68-91 P co2o18 SIL -0.761 -999.990 .X. r1 1996 08 25 17 30 00 52.7200 174.1000 28.00 117203 SHM 1996 08 08 23 05 00 341-91 P co2o18 SIL -1.403 -999.990 .X. r1 1996 09 30 12 31 00 52.7200 174.1000 28.00 117204 SHM 1996 08 08 23 05 00 342-91 P co2o18 SIL -1.439 -999.990 .X. r1 1996 09 30 12 55 00 52.7200 174.1000 28.00 117205 SHM 1996 08 12 00 00 00 1191-91 P co2o18 SIL 0.326 -999.990 .x. r1 1996 08 25 16 21 00 52.7200 174.1000 28.00 117206 SHM 1996 08 12 00 00 00 1192-91 P co2o18 SIL 0.414 -999.990 .x. r1 1996 08 25 16 44 00 52.7200 174.1000 28.00 117207 SHM 1996 08 18 12 34 56 1047-91 P co2o18 SIL -0.161 -999.990 ... r1 1996 09 09 14 47 00 52.7200 174.1000 28.00 117208 SHM 1996 08 18 12 34 56 1048-91 P co2o18 SIL -0.145 -999.990 ... r1 1996 09 09 15 10 00 52.7200 174.1000 28.00 117209 SHM 1996 08 26 00 00 00 375-91 P co2o18 SIL -0.323 -999.990 ... r1 1996 09 07 18 06 00 52.7200 174.1000 28.00 117210 SHM 1996 08 26 00 00 00 376-91 P co2o18 SIL -0.284 -999.990 ... r1 1996 09 07 18 29 00 52.7200 174.1000 28.00 117211 SHM 1996 09 02 00 30 00 123-91 P co2o18 SIL -2.133 -999.990 .X. r1 1996 09 30 13 18 00 52.7200 174.1000 28.00 117212 SHM 1996 09 02 00 30 00 124-91 P co2o18 SIL -2.103 -999.990 .X. r1 1996 09 30 13 41 00 52.7200 174.1000 28.00 117213 SHM 1996 09 16 00 05 00 1331-91 P co2o18 SIL -0.722 -999.990 ... r1 1996 10 04 13 29 00 52.7200 174.1000 28.00 117214 SHM 1996 09 16 00 05 00 1332-91 P co2o18 SIL -0.821 -999.990 ... r1 1996 10 04 13 52 00 52.7200 174.1000 28.00 117215 SHM 1996 09 22 22 45 00 87-91 P co2o18 SIL -1.857 -999.990 .X. o1 1996 10 25 01 49 00 52.7200 174.1000 28.00 117216 SHM 1996 09 22 22 45 00 88-91 P co2o18 SIL -1.837 -999.990 .X. o1 1996 10 25 02 08 00 52.7200 174.1000 28.00 117217 SHM 1996 09 27 00 10 00 275-91 P co2o18 SIL -0.875 -999.990 ... o1 1996 10 29 16 56 00 52.7200 174.1000 28.00 117218 SHM 1996 09 27 00 10 00 276-91 P co2o18 SIL -0.844 -999.990 ... o1 1996 10 29 17 17 00 52.7200 174.1000 28.00 117219 SHM 1996 10 06 23 30 00 1777-91 P co2o18 SIL -1.013 -999.990 ... o1 1996 10 29 17 37 00 52.7200 174.1000 28.00 117220 SHM 1996 10 06 23 30 00 1778-91 P co2o18 SIL -1.012 -999.990 ... o1 1996 10 29 17 58 00 52.7200 174.1000 28.00 117221 SHM 1996 10 12 23 00 00 91-91 P co2o18 SIL -0.848 -999.990 ... o1 1996 10 31 22 26 00 52.7200 174.1000 28.00 117222 SHM 1996 10 12 23 00 00 92-91 P co2o18 SIL -0.790 -999.990 ... o1 1996 10 31 22 46 00 52.7200 174.1000 28.00 117223 SHM 1996 10 20 23 56 00 73-91 P co2o18 SIL -1.063 -999.990 ... o1 1996 10 31 21 46 00 52.7200 174.1000 28.00 117224 SHM 1996 10 20 23 56 00 74-91 P co2o18 SIL -1.008 -999.990 ... o1 1996 10 31 22 05 00 52.7200 174.1000 28.00 117225 SHM 1996 10 31 02 17 00 1727-91 P co2o18 SIL -0.585 -999.990 ... o1 1996 11 20 22 33 00 52.7200 174.1000 28.00 117226 SHM 1996 10 31 02 17 00 1728-91 P co2o18 SIL -0.622 -999.990 ... o1 1996 11 20 22 51 00 52.7200 174.1000 28.00 117227 SHM 1996 11 03 23 22 00 1489-91 P co2o18 SIL -1.071 -999.990 ... o1 1996 11 20 21 57 00 52.7200 174.1000 28.00 117228 SHM 1996 11 03 23 22 00 1490-91 P co2o18 SIL -1.124 -999.990 ... o1 1996 11 20 22 15 00 52.7200 174.1000 28.00 117229 SHM 1996 11 12 00 13 00 675-91 P co2o18 SIL -0.979 -999.990 ... o1 1996 12 28 09 35 00 52.7200 174.1000 28.00 117230 SHM 1996 11 12 00 13 00 676-91 P co2o18 SIL -0.980 -999.990 ... o1 1996 12 28 09 53 00 52.7200 174.1000 28.00 117231 SHM 1996 11 18 01 15 00 237-91 P co2o18 SIL -0.930 -999.990 ... o1 1996 12 28 10 12 00 52.7200 174.1000 28.00 117232 SHM 1996 11 18 01 15 00 238-91 P co2o18 SIL -0.928 -999.990 ... o1 1996 12 28 10 30 00 52.7200 174.1000 28.00 117233 SHM 1996 11 24 23 05 00 151-91 P co2o18 SIL -1.135 -999.990 ... o1 1996 12 26 22 39 00 52.7200 174.1000 28.00 117234 SHM 1996 11 24 23 05 00 152-91 P co2o18 SIL -1.076 -999.990 ... o1 1996 12 26 22 58 00 52.7200 174.1000 28.00 117235 SHM 1996 12 01 23 10 00 4207-91 P co2o18 SIL -0.650 -999.990 ... o1 1996 12 26 22 03 00 52.7200 174.1000 28.00 117236 SHM 1996 12 01 23 10 00 4208-91 P co2o18 SIL -0.680 -999.990 ... o1 1996 12 26 22 21 00 52.7200 174.1000 28.00 117237 SHM 1996 12 08 23 10 00 261-91 P co2o18 SIL -0.913 -999.990 ... o1 1997 01 10 00 36 00 52.7200 174.1000 28.00 117238 SHM 1996 12 08 23 10 00 262-91 P co2o18 SIL -0.875 -999.990 ... o1 1997 01 10 00 55 00 52.7200 174.1000 28.00 117239 SHM 1996 12 22 23 10 00 183-91 P co2o18 SIL -0.924 -999.990 ... o1 1997 01 20 21 29 00 52.7200 174.1000 28.00 117242 SHM 1996 12 22 23 10 00 184-91 P co2o18 SIL -0.905 -999.990 ... o1 1997 01 20 21 48 00 52.7200 174.1000 28.00 117243 SHM 1996 12 29 23 07 00 1123-91 P co2o18 SIL -0.416 -999.990 ... o1 1997 01 17 21 36 00 52.7200 174.1000 28.00 117244 SHM 1996 12 29 23 07 00 1124-91 P co2o18 SIL -0.365 -999.990 ... o1 1997 01 17 21 54 00 52.7200 174.1000 28.00 117245 SHM 1997 01 05 23 15 00 855-91 P co2o18 SIL -0.445 -999.990 ... o1 1997 02 13 23 05 00 52.7200 174.1000 28.00 117246 SHM 1997 01 05 23 15 00 856-91 P co2o18 SIL -0.369 -999.990 ... o1 1997 02 13 23 24 00 52.7200 174.1000 28.00 117247 SHM 1997 01 19 23 33 00 1857-91 P co2o18 SIL -0.420 -999.990 ... o1 1997 02 13 21 13 00 52.7200 174.1000 28.00 117248 SHM 1997 01 19 23 33 00 1858-91 P co2o18 SIL -0.388 -999.990 ... o1 1997 02 13 21 32 00 52.7200 174.1000 28.00 117249 SHM 1997 01 28 23 54 00 1981-91 P co2o18 SIL -339.816 -999.990 !.. o1 1997 03 06 23 40 00 52.7200 174.1000 28.00 117250 SHM 1997 01 28 23 54 00 1982-91 P co2o18 SIL -0.480 -999.990 ..S o1 1997 03 06 23 58 00 52.7200 174.1000 28.00 117251 SHM 1997 02 04 14 44 00 1985-91 P co2o18 SIL -0.293 -999.990 ... o1 1997 03 07 05 09 00 52.7200 174.1000 28.00 117252 SHM 1997 02 04 14 44 00 1986-91 P co2o18 SIL -0.236 -999.990 ... o1 1997 03 07 05 27 00 52.7200 174.1000 28.00 117253 SHM 1997 02 11 15 14 00 71-91 P co2o18 SIL -0.406 -999.990 ... o1 1997 03 22 04 28 00 52.7200 174.1000 28.00 117254 SHM 1997 02 11 15 14 00 72-91 P co2o18 SIL -0.381 -999.990 ... o1 1997 03 22 04 47 00 52.7200 174.1000 28.00 117255 SHM 1997 02 17 01 36 00 657-91 P co2o18 SIL -0.420 -999.990 ... o1 1997 03 06 21 12 00 52.7200 174.1000 28.00 117256 SHM 1997 02 17 01 36 00 658-91 P co2o18 SIL -0.424 -999.990 ... o1 1997 03 06 21 30 00 52.7200 174.1000 28.00 117257 SHM 1997 03 05 14 40 00 4149-91 P co2o18 SIL -0.198 -999.990 ..S o1 1997 03 24 22 20 00 52.7200 174.1000 28.00 117260 SHM 1997 03 30 23 22 00 539-91 P co2o18 SIL -1.264 -999.990 -.. o1 1997 05 13 20 06 00 52.7200 174.1000 28.00 117265 SHM 1997 03 30 23 22 00 540-91 P co2o18 SIL -0.569 -999.990 +.. o1 1997 05 13 20 25 00 52.7200 174.1000 28.00 117266 SHM 1997 04 06 23 07 00 927-91 P co2o18 SIL -0.343 -999.990 ... o1 1997 05 12 22 54 00 52.7200 174.1000 28.00 117267 SHM 1997 04 06 23 07 00 928-91 P co2o18 SIL -0.303 -999.990 ... o1 1997 05 12 23 13 00 52.7200 174.1000 28.00 117268 SHM 1997 04 14 00 05 00 2053-91 P co2o18 SIL -0.058 -999.990 ... o1 1997 05 08 12 08 00 52.7200 174.1000 28.00 117269 SHM 1997 04 14 00 05 00 2054-91 P co2o18 SIL -0.067 -999.990 ... o1 1997 05 08 12 27 00 52.7200 174.1000 28.00 117270 SHM 1997 04 20 23 25 00 1655-91 P co2o18 SIL -0.172 -999.990 ... o1 1997 05 09 21 52 00 52.7200 174.1000 28.00 117271 SHM 1997 04 20 23 25 00 1656-91 P co2o18 SIL -0.152 -999.990 ... o1 1997 05 09 22 11 00 52.7200 174.1000 28.00 117272 SHM 1997 04 27 23 05 00 153-91 P co2o18 SIL -0.476 -999.990 ... o1 1997 06 05 21 23 00 52.7200 174.1000 28.00 117273 SHM 1997 04 27 23 05 00 154-91 P co2o18 SIL -0.512 -999.990 ... o1 1997 06 05 21 42 00 52.7200 174.1000 28.00 117274 SHM 1997 05 04 23 22 00 77-91 P co2o18 SIL -0.401 -999.990 ... o1 1997 06 05 20 46 00 52.7200 174.1000 28.00 117275 SHM 1997 05 04 23 22 00 78-91 P co2o18 SIL -0.290 -999.990 ... o1 1997 06 05 21 05 00 52.7200 174.1000 28.00 117276 SHM 1997 05 11 23 26 00 4289-91 P co2o18 SIL -0.278 -999.990 ... o1 1997 06 12 13 23 00 52.7200 174.1000 28.00 117277 SHM 1997 05 11 23 26 00 4290-91 P co2o18 SIL -0.308 -999.990 ... o1 1997 06 12 13 42 00 52.7200 174.1000 28.00 117278 SHM 1997 05 18 23 00 00 4287-91 P co2o18 SIL -0.519 -999.990 ... o1 1997 06 12 14 00 00 52.7200 174.1000 28.00 117279 SHM 1997 05 18 23 00 00 4288-91 P co2o18 SIL -0.493 -999.990 ... o1 1997 06 12 14 19 00 52.7200 174.1000 28.00 117280 SHM 1997 05 27 23 12 00 4022-91 P co2o18 SIL 0.043 -999.990 ... o1 1997 06 23 21 13 00 52.7200 174.1000 28.00 117281 SHM 1997 05 27 23 12 00 4303-91 P co2o18 SIL -0.017 -999.990 ... o1 1997 06 23 20 55 00 52.7200 174.1000 28.00 117282 SHM 1997 06 01 23 20 00 4021-91 P co2o18 SIL 0.144 -999.990 ... o1 1997 06 18 20 27 00 52.7200 174.1000 28.00 117283 SHM 1997 06 01 23 20 00 4304-91 P co2o18 SIL 0.186 -999.990 ... o1 1997 06 18 20 45 00 52.7200 174.1000 28.00 117284 SHM 1997 06 08 23 21 00 1357-91 P co2o18 SIL -3.049 -999.990 .X. o1 1997 07 14 17 53 00 52.7200 174.1000 28.00 117285 SHM 1997 06 08 23 21 00 1358-91 P co2o18 SIL -3.080 -999.990 .X. o1 1997 07 14 18 12 00 52.7200 174.1000 28.00 117286 SHM 1997 06 15 23 24 00 523-91 P co2o18 SIL -2.526 -999.990 .X. o1 1997 07 14 17 16 00 52.7200 174.1000 28.00 117287 SHM 1997 06 15 23 24 00 524-91 P co2o18 SIL -2.604 -999.990 .X. o1 1997 07 14 17 35 00 52.7200 174.1000 28.00 117288 SHM 1997 06 29 23 08 00 357-91 P co2o18 SIL 0.556 -999.990 A.. o1 1997 07 28 14 31 00 52.7200 174.1000 28.00 117289 SHM 1997 06 29 23 08 00 4004-91 P co2o18 SIL 0.280 -999.990 A.. o1 1997 07 28 14 49 00 52.7200 174.1000 28.00 117290 SHM 1997 07 06 23 07 00 358-91 P co2o18 SIL 0.339 -999.990 A.. o1 1997 07 28 14 13 00 52.7200 174.1000 28.00 117291 SHM 1997 07 06 23 07 00 4003-91 P co2o18 SIL 0.456 -999.990 A.. o1 1997 07 28 13 55 00 52.7200 174.1000 28.00 117292 SHM 1997 07 13 22 49 00 1717-91 P co2o18 SIL -0.596 -999.990 A.. o1 1997 08 11 03 52 00 52.7200 174.1000 28.00 117293 SHM 1997 07 13 22 49 00 1718-91 P co2o18 SIL -0.609 -999.990 A.. o1 1997 08 11 04 10 00 52.7200 174.1000 28.00 117294 SHM 1997 07 20 23 15 00 721-91 P co2o18 SIL 0.637 -999.990 A.. o1 1997 08 11 04 29 00 52.7200 174.1000 28.00 117295 SHM 1997 07 20 23 15 00 722-91 P co2o18 SIL 0.678 -999.990 A.. o1 1997 08 11 04 47 00 52.7200 174.1000 28.00 117296 SHM 1997 07 27 22 58 00 4177-91 P co2o18 SIL -0.093 -999.990 ... o1 1997 08 16 14 49 00 52.7200 174.1000 28.00 117297 SHM 1997 07 27 22 58 00 4178-91 P co2o18 SIL 0.017 -999.990 ... o1 1997 08 16 15 08 00 52.7200 174.1000 28.00 117298 SHM 1997 08 03 22 30 00 137-91 P co2o18 SIL -0.541 -999.990 ... o1 1997 08 16 14 11 00 52.7200 174.1000 28.00 117299 SHM 1997 08 03 22 30 00 138-91 P co2o18 SIL -0.452 -999.990 ... o1 1997 08 16 14 30 00 52.7200 174.1000 28.00 117300 SHM 1997 08 10 23 38 00 265-91 P co2o18 SIL -0.412 -999.990 A.. o1 1997 09 24 16 19 00 52.7200 174.1000 28.00 117301 SHM 1997 08 10 23 38 00 266-91 P co2o18 SIL -0.353 -999.990 A.. o1 1997 09 24 16 38 00 52.7200 174.1000 28.00 117302 SHM 1997 08 19 04 05 00 835-91 P co2o18 SIL -0.211 -999.990 -.. o1 1997 09 23 03 40 00 52.7200 174.1000 28.00 117303 SHM 1997 08 19 04 05 00 836-91 P co2o18 SIL -0.077 -999.990 +.. o1 1997 09 23 03 59 00 52.7200 174.1000 28.00 117304 SHM 1997 08 25 23 45 00 1921-91 P co2o18 SIL 0.108 -999.990 +.. o1 1997 09 12 15 44 00 52.7200 174.1000 28.00 117305 SHM 1997 08 25 23 45 00 1922-91 P co2o18 SIL -0.024 -999.990 -.. o1 1997 09 12 16 02 00 52.7200 174.1000 28.00 117306 SHM 1997 08 31 00 22 00 123-91 P co2o18 SIL -0.171 -999.990 .X. o1 1997 09 12 16 21 00 52.7200 174.1000 28.00 117307 SHM 1997 08 31 00 22 00 124-91 P co2o18 SIL -0.164 -999.990 .X. o1 1997 09 12 16 40 00 52.7200 174.1000 28.00 117308 SHM 1997 09 07 23 33 00 465-91 P co2o18 SIL -1.614 -999.990 ... o1 1997 10 14 18 06 00 52.7200 174.1000 28.00 117309 SHM 1997 09 07 23 33 00 466-91 P co2o18 SIL -1.646 -999.990 ... o1 1997 10 14 18 25 00 52.7200 174.1000 28.00 117310 SHM 1997 09 15 00 00 00 4007-91 P co2o18 SIL -1.450 -999.990 ... o1 1997 10 14 17 27 00 52.7200 174.1000 28.00 117311 SHM 1997 09 15 00 00 00 4008-91 P co2o18 SIL -1.437 -999.990 ... o1 1997 10 14 17 47 00 52.7200 174.1000 28.00 117312 SHM 1997 09 28 23 10 00 1715-91 P co2o18 SIL -0.768 -999.990 +.. o1 1997 11 12 16 22 00 52.7200 174.1000 28.00 117313 SHM 1997 09 28 23 10 00 1716-91 P co2o18 SIL -1.018 -999.990 -.. o1 1997 11 12 16 42 00 52.7200 174.1000 28.00 117314 SHM 1997 10 05 23 08 00 1193-91 P co2o18 SIL -0.657 -999.990 +.. o1 1997 11 13 16 54 00 52.7200 174.1000 28.00 117315 SHM 1997 10 05 23 08 00 1194-91 P co2o18 SIL -0.847 -999.990 -.. o1 1997 11 13 17 13 00 52.7200 174.1000 28.00 117316 SHM 1997 10 20 00 47 00 1367-91 P co2o18 SIL -0.875 -999.990 ... o1 1997 11 24 22 27 00 52.7200 174.1000 28.00 117317 SHM 1997 10 20 00 47 00 1368-91 P co2o18 SIL -0.943 -999.990 ... o1 1997 11 24 22 46 00 52.7200 174.1000 28.00 117318 SHM 1997 11 10 00 17 00 643-91 P co2o18 SIL -1.064 -999.990 ... o1 1997 11 25 18 31 00 52.7200 174.1000 28.00 117319 SHM 1997 11 10 00 17 00 644-91 P co2o18 SIL -1.103 -999.990 ... o1 1997 11 25 18 50 00 52.7200 174.1000 28.00 117320 SHM 1997 11 24 01 06 00 721-91 P co2o18 SIL -0.717 -999.990 -.. o1 1998 01 15 03 42 00 52.7200 174.1000 28.00 117321 SHM 1997 11 24 01 06 00 722-91 P co2o18 SIL -0.359 -999.990 +.. o1 1998 01 15 04 01 00 52.7200 174.1000 28.00 117322 SHM 1997 12 08 00 00 00 1717-91 P co2o18 SIL -0.780 -999.990 ... o1 1998 01 15 04 20 00 52.7200 174.1000 28.00 117323 SHM 1997 12 08 00 00 00 1718-91 P co2o18 SIL -0.757 -999.990 ... o1 1998 01 15 04 40 00 52.7200 174.1000 28.00 117324 SHM 1997 12 19 12 00 00 627-91 P co2o18 SIL -0.644 -999.990 ... o1 1998 01 29 04 29 00 52.7200 174.1000 28.00 117325 SHM 1997 12 19 12 00 00 628-91 P co2o18 SIL -0.627 -999.990 ... o1 1998 01 29 04 48 00 52.7200 174.1000 28.00 117326 SHM 1997 12 21 23 53 00 133-91 P co2o18 SIL -0.677 -999.990 ... o1 1998 01 29 03 12 00 52.7200 174.1000 28.00 117327 SHM 1997 12 21 23 53 00 134-91 P co2o18 SIL -0.604 -999.990 ... o1 1998 01 29 03 32 00 52.7200 174.1000 28.00 117328 SHM 1997 12 31 07 15 00 483-91 P co2o18 SIL -0.399 -999.990 ... o1 1998 02 03 23 59 00 52.7200 174.1000 28.00 117329 SHM 1997 12 31 07 15 00 484-91 P co2o18 SIL -0.417 -999.990 ... o1 1998 02 04 00 18 00 52.7200 174.1000 28.00 117330 SHM 1998 01 19 01 52 00 1389-91 P co2o18 SIL -0.430 -999.990 ... o1 1998 02 04 03 13 00 52.7200 174.1000 28.00 117331 SHM 1998 01 19 01 52 00 1390-91 P co2o18 SIL -0.450 -999.990 ... o1 1998 02 04 03 32 00 52.7200 174.1000 28.00 117332 SHM 1998 01 26 00 06 00 4605-91 P co2o18 SIL -0.356 -999.990 ... o1 1998 03 02 22 28 00 52.7200 174.1000 28.00 117333 SHM 1998 01 26 00 06 00 4606-91 P co2o18 SIL -0.463 -999.990 ... o1 1998 03 02 22 48 00 52.7200 174.1000 28.00 117334 SHM 1998 02 08 23 58 00 1249-91 P co2o18 SIL -0.530 -999.990 A.. o1 1998 02 28 04 48 00 52.7200 174.1000 28.00 117335 SHM 1998 02 08 23 58 00 1250-91 P co2o18 SIL -0.303 -999.990 A.. o1 1998 02 28 05 09 00 52.7200 174.1000 28.00 117336 SHM 1998 02 23 00 05 00 1437-91 P co2o18 SIL -0.327 -999.990 ... o1 1998 03 12 13 43 00 52.7200 174.1000 28.00 117337 SHM 1998 02 23 00 05 00 1438-91 P co2o18 SIL -0.324 -999.990 ... o1 1998 03 12 14 02 00 52.7200 174.1000 28.00 117338 SHM 1998 03 01 23 48 00 859-91 P co2o18 SIL -0.248 -999.990 ... o1 1998 03 11 08 16 00 52.7200 174.1000 28.00 117339 SHM 1998 03 01 23 48 00 860-91 P co2o18 SIL -0.291 -999.990 ... o1 1998 03 11 08 36 00 52.7200 174.1000 28.00 117340 SHM 1998 03 08 23 32 00 445-91 P co2o18 SIL -0.514 -999.990 .x. o1 1998 03 31 02 06 00 52.7200 174.1000 28.00 117341 SHM 1998 03 08 23 32 00 446-91 P co2o18 SIL -0.502 -999.990 .x. o1 1998 03 31 02 26 00 52.7200 174.1000 28.00 117342 SHM 1998 03 15 23 40 00 1143-91 P co2o18 SIL -0.257 -999.990 ... o1 1998 03 31 01 26 00 52.7200 174.1000 28.00 117343 SHM 1998 03 15 23 40 00 1144-91 P co2o18 SIL -0.228 -999.990 ... o1 1998 03 31 01 46 00 52.7200 174.1000 28.00 117344 SHM 1998 03 23 00 07 00 4391-91 P co2o18 SIL -0.288 -999.990 ... o1 1998 04 09 03 01 00 52.7200 174.1000 28.00 117345 SHM 1998 03 23 00 07 00 4392-91 P co2o18 SIL -0.308 -999.990 ... o1 1998 04 09 03 20 00 52.7200 174.1000 28.00 117346 SHM 1998 03 30 00 38 00 4675-91 P co2o18 SIL -0.135 -999.990 ... o1 1998 04 09 02 22 00 52.7200 174.1000 28.00 117347 SHM 1998 03 30 00 38 00 4676-91 P co2o18 SIL -0.166 -999.990 ... o1 1998 04 09 02 41 00 52.7200 174.1000 28.00 117348 SHM 1998 04 05 23 51 00 143-91 P co2o18 SIL -0.138 -999.990 ... o1 1998 04 27 22 40 00 52.7200 174.1000 28.00 117349 SHM 1998 04 05 23 51 00 144-91 P co2o18 SIL -0.101 -999.990 ... o1 1998 04 27 23 00 00 52.7200 174.1000 28.00 117350 SHM 1998 04 12 23 33 00 1555-91 P co2o18 SIL -0.141 -999.990 ... o1 1998 04 28 03 48 00 52.7200 174.1000 28.00 117351 SHM 1998 04 12 23 33 00 1556-91 P co2o18 SIL -0.150 -999.990 ... o1 1998 04 28 04 07 00 52.7200 174.1000 28.00 117352 SHM 1998 04 19 23 32 00 1009-91 P co2o18 SIL -0.091 -999.990 ... o1 1998 05 11 17 20 00 52.7200 174.1000 28.00 117353 SHM 1998 04 19 23 32 00 1010-91 P co2o18 SIL -0.072 -999.990 ... o1 1998 05 11 17 39 00 52.7200 174.1000 28.00 117354 SHM 1998 04 26 23 48 00 1241-91 P co2o18 SIL -0.030 -999.990 ... o1 1998 05 11 14 48 00 52.7200 174.1000 28.00 117355 SHM 1998 04 26 23 48 00 1242-91 P co2o18 SIL -0.031 -999.990 ... o1 1998 05 11 15 07 00 52.7200 174.1000 28.00 117356 SHM 1998 05 17 23 15 00 1361-91 P co2o18 SIL -0.390 -999.990 ... o1 1998 06 30 19 52 00 52.7200 174.1000 28.00 117357 SHM 1998 05 17 23 15 00 1362-91 P co2o18 SIL -0.428 -999.990 ... o1 1998 06 30 20 11 00 52.7200 174.1000 28.00 117358 SHM 1998 06 01 00 04 00 1763-91 P co2o18 SIL -0.114 -999.990 ... o1 1998 06 30 00 08 00 52.7200 174.1000 28.00 117359 SHM 1998 06 01 00 04 00 1764-91 P co2o18 SIL -0.106 -999.990 ... o1 1998 06 30 00 27 00 52.7200 174.1000 28.00 117360 SHM 1998 06 08 00 14 00 757-91 P co2o18 SIL -0.143 -999.990 +.. o1 1998 06 26 19 16 00 52.7200 174.1000 28.00 117361 SHM 1998 06 08 00 14 00 758-91 P co2o18 SIL -0.281 -999.990 -.. o1 1998 06 26 19 36 00 52.7200 174.1000 28.00 117362 SHM 1998 06 14 23 42 00 77-91 P co2o18 SIL 0.149 -999.990 ... o1 1998 06 26 18 37 00 52.7200 174.1000 28.00 117363 SHM 1998 06 14 23 42 00 77-91 P co2o18 SIL -0.226 -999.990 ... o1 2000 04 03 17 58 00 52.7200 174.1000 28.00 117363 SHM 1998 06 14 23 42 00 78-91 P co2o18 SIL 0.149 -999.990 ... o1 1998 06 26 18 57 00 52.7200 174.1000 28.00 117364 SHM 1998 06 14 23 42 00 78-91 P co2o18 SIL -0.257 -999.990 ... o1 2000 04 03 18 17 00 52.7200 174.1000 28.00 117364 SHM 1998 06 22 00 02 00 453-91 P co2o18 SIL 0.078 -999.990 A.S o1 1998 07 15 14 31 00 52.7200 174.1000 28.00 117365 SHM 1998 06 28 23 38 00 1175-91 P co2o18 SIL 0.189 -999.990 ... o1 1998 07 14 17 18 00 52.7200 174.1000 28.00 117366 SHM 1998 06 28 23 38 00 1176-91 P co2o18 SIL 0.236 -999.990 ... o1 1998 07 14 17 37 00 52.7200 174.1000 28.00 117367 SHM 1998 07 19 23 42 00 239-91 P co2o18 SIL -0.130 -999.990 ... o1 1998 09 08 19 04 00 52.7200 174.1000 28.00 117372 SHM 1998 07 19 23 42 00 240-91 P co2o18 SIL -0.209 -999.990 ... o1 1998 09 08 19 23 00 52.7200 174.1000 28.00 117373 SHM 1998 07 26 23 35 00 4713-91 P co2o18 SIL -1.060 -999.990 .x. o1 1998 09 08 19 42 00 52.7200 174.1000 28.00 117374 SHM 1998 07 26 23 35 00 4714-91 P co2o18 SIL -1.106 -999.990 .x. o1 1998 09 08 20 01 00 52.7200 174.1000 28.00 117375 SHM 1998 08 16 23 38 00 495-91 P co2o18 SIL -0.977 -999.990 ... o1 1998 09 05 01 29 00 52.7200 174.1000 28.00 117380 SHM 1998 08 16 23 38 00 496-91 P co2o18 SIL -0.975 -999.990 ... o1 1998 09 05 01 47 00 52.7200 174.1000 28.00 117381 SHM 1998 08 24 00 11 00 1865-91 P co2o18 SIL -1.071 -999.990 ... o1 1998 09 04 22 20 00 52.7200 174.1000 28.00 117382 SHM 1998 08 24 00 11 00 1866-91 P co2o18 SIL -1.087 -999.990 ... o1 1998 09 04 22 39 00 52.7200 174.1000 28.00 117383 SHM 1998 08 31 00 03 00 4281-91 P co2o18 SIL -2.335 -999.990 .X. o1 1998 09 12 03 59 00 52.7200 174.1000 28.00 117384 SHM 1998 08 31 00 03 00 4282-91 P co2o18 SIL -2.321 -999.990 .X. o1 1998 09 12 04 18 00 52.7200 174.1000 28.00 117385 SHM 1998 09 07 00 10 00 43-98 P co2o18 SIL -0.897 -999.990 ..S o1 1998 10 09 21 42 00 52.7200 174.1000 28.00 117386 SHM 1998 09 13 23 50 00 1931-91 P co2o18 SIL -0.948 -999.990 .X. o1 1998 09 29 18 02 00 52.7200 174.1000 28.00 117387 SHM 1998 09 13 23 50 00 2035-91 P co2o18 SIL -1.014 -999.990 ... o1 1998 09 29 18 22 00 52.7200 174.1000 28.00 117388 SHM 1998 09 20 23 52 00 669-91 P co2o18 SIL -1.717 -999.990 ... o1 1998 10 10 04 15 00 52.7200 174.1000 28.00 117389 SHM 1998 09 20 23 52 00 670-91 P co2o18 SIL -1.788 -999.990 ... o1 1998 10 10 04 35 00 52.7200 174.1000 28.00 117390 SHM 1998 09 27 23 46 00 1475-91 P co2o18 SIL -1.865 -999.990 ... o1 1998 10 10 03 36 00 52.7200 174.1000 28.00 117391 SHM 1998 09 27 23 46 00 1476-91 P co2o18 SIL -1.820 -999.990 ... o1 1998 10 10 03 56 00 52.7200 174.1000 28.00 117392 SHM 1998 10 04 21 10 00 379-91 P co2o18 SIL -1.892 -999.990 A.. o1 1998 11 03 19 39 00 52.7200 174.1000 28.00 117393 SHM 1998 10 04 21 10 00 380-91 P co2o18 SIL -1.888 -999.990 A.. o1 1998 11 03 19 58 00 52.7200 174.1000 28.00 117394 SHM 1998 10 12 00 07 00 1819-91 P co2o18 SIL -1.286 -999.990 A.. o1 1998 11 03 20 18 00 52.7200 174.1000 28.00 117395 SHM 1998 10 12 00 07 00 1820-91 P co2o18 SIL -1.342 -999.990 A.. o1 1998 11 03 20 38 00 52.7200 174.1000 28.00 117396 SHM 1998 10 18 23 05 00 373-91 P co2o18 SIL -1.709 -999.990 ... o1 1998 11 12 01 05 00 52.7200 174.1000 28.00 117397 SHM 1998 10 18 23 05 00 374-91 P co2o18 SIL -1.708 -999.990 ... o1 1998 11 12 01 25 00 52.7200 174.1000 28.00 117398 SHM 1998 10 26 00 07 00 1789-91 P co2o18 SIL -1.394 -999.990 ... o1 1998 11 12 01 45 00 52.7200 174.1000 28.00 117399 SHM 1998 10 26 00 07 00 1790-91 P co2o18 SIL -1.316 -999.990 ... o1 1998 11 12 02 05 00 52.7200 174.1000 28.00 117400 SHM 1998 11 02 00 05 00 433-91 P co2o18 SIL -1.643 -999.990 A.. o1 1998 12 02 04 07 00 52.7200 174.1000 28.00 117401 SHM 1998 11 02 00 05 00 434-91 P co2o18 SIL -1.584 -999.990 A.. o1 1998 12 02 04 28 00 52.7200 174.1000 28.00 117402 SHM 1998 11 08 23 36 00 1629-91 P co2o18 SIL -0.845 -999.990 ... o1 1998 12 02 00 51 00 52.7200 174.1000 28.00 117403 SHM 1998 11 08 23 36 00 1630-91 P co2o18 SIL -0.832 -999.990 ... o1 1998 12 02 01 11 00 52.7200 174.1000 28.00 117404 SHM 1998 11 22 23 51 00 403-91 P co2o18 SIL -0.914 -999.990 ... o1 1998 12 22 19 35 00 52.7200 174.1000 28.00 117407 SHM 1998 11 22 23 51 00 404-91 P co2o18 SIL -0.875 -999.990 ... o1 1998 12 22 19 55 00 52.7200 174.1000 28.00 117408 SHM 1998 11 30 00 21 00 1971-91 P co2o18 SIL -0.905 -999.990 ... o1 1998 12 22 21 34 00 52.7200 174.1000 28.00 117409 SHM 1998 11 30 00 21 00 1972-91 P co2o18 SIL -0.825 -999.990 ... o1 1998 12 22 21 54 00 52.7200 174.1000 28.00 117410 SHM 1998 12 06 23 40 00 4169-91 P co2o18 SIL -0.640 -999.990 ... o1 1998 12 22 20 54 00 52.7200 174.1000 28.00 117411 SHM 1998 12 06 23 40 00 4170-91 P co2o18 SIL -0.705 -999.990 ... o1 1998 12 22 21 14 00 52.7200 174.1000 28.00 117412 SHM 1998 12 13 23 40 00 215-91 P co2o18 SIL -0.881 -999.990 ... o1 1999 01 19 18 41 00 52.7200 174.1000 28.00 117413 SHM 1998 12 13 23 40 00 216-91 P co2o18 SIL -0.800 -999.990 ... o1 1999 01 19 19 00 00 52.7200 174.1000 28.00 117414 SHM 1998 12 27 23 55 00 1563-91 P co2o18 SIL -0.574 -999.990 ... o1 1999 01 19 19 19 00 52.7200 174.1000 28.00 117415 SHM 1998 12 27 23 55 00 1564-91 P co2o18 SIL -0.601 -999.990 ... o1 1999 01 19 19 38 00 52.7200 174.1000 28.00 117416 SHM 1999 01 03 00 17 00 4001-91 P co2o18 SIL -0.603 -999.990 ... o1 1999 01 27 03 35 00 52.7200 174.1000 28.00 117417 SHM 1999 01 03 00 17 00 4002-91 P co2o18 SIL -0.648 -999.990 ... o1 1999 01 27 03 54 00 52.7200 174.1000 28.00 117418 SHM 1999 01 11 01 15 00 103-91 P co2o18 SIL -0.595 -999.990 ... o1 1999 01 27 02 57 00 52.7200 174.1000 28.00 117419 SHM 1999 01 11 01 15 00 104-91 P co2o18 SIL -0.682 -999.990 ... o1 1999 01 27 03 16 00 52.7200 174.1000 28.00 117420 SHM 1999 01 18 01 09 00 527-91 P co2o18 SIL -0.407 -999.990 ... o1 1999 02 08 20 16 00 52.7200 174.1000 28.00 117421 SHM 1999 01 18 01 09 00 528-91 P co2o18 SIL -0.425 -999.990 ... o1 1999 02 08 20 35 00 52.7200 174.1000 28.00 117422 SHM 1999 01 25 01 05 00 131-98 P co2o18 SIL -0.415 -999.990 ... o1 1999 02 08 18 20 00 52.7200 174.1000 28.00 117423 SHM 1999 01 25 01 05 00 132-98 P co2o18 SIL -0.468 -999.990 ... o1 1999 02 08 18 39 00 52.7200 174.1000 28.00 117424 SHM 1999 02 01 01 16 00 4667-91 P co2o18 SIL -0.782 -999.990 ... o1 1999 02 20 20 05 00 52.7200 174.1000 28.00 117425 SHM 1999 02 01 01 16 00 4668-91 P co2o18 SIL -0.792 -999.990 ... o1 1999 02 20 20 24 00 52.7200 174.1000 28.00 117426 SHM 1999 02 08 01 02 00 273-91 P co2o18 SIL -0.365 -999.990 ... o1 1999 02 20 19 26 00 52.7200 174.1000 28.00 117427 SHM 1999 02 08 01 02 00 274-91 P co2o18 SIL -0.346 -999.990 ... o1 1999 02 20 19 46 00 52.7200 174.1000 28.00 117428 SHM 1999 02 15 01 25 00 1935-91 P co2o18 SIL -0.406 -999.990 ... o1 1999 03 03 19 20 00 52.7200 174.1000 28.00 117429 SHM 1999 02 15 01 25 00 1936-91 P co2o18 SIL -0.386 -999.990 ... o1 1999 03 03 19 39 00 52.7200 174.1000 28.00 117430 SHM 1999 02 22 00 00 00 1951-91 P co2o18 SIL -0.500 -999.990 ... o1 1999 03 03 18 40 00 52.7200 174.1000 28.00 117431 SHM 1999 02 22 00 00 00 1952-91 P co2o18 SIL -0.414 -999.990 ... o1 1999 03 03 19 00 00 52.7200 174.1000 28.00 117432 SHM 1999 03 02 02 05 00 1927-91 P co2o18 SIL -0.455 -999.990 ... o1 1999 03 23 14 57 00 52.7200 174.1000 28.00 117433 SHM 1999 03 02 02 05 00 1928-91 P co2o18 SIL -0.355 -999.990 ... o1 1999 03 23 15 17 00 52.7200 174.1000 28.00 117434 SHM 1999 03 08 01 08 00 197-98 P co2o18 SIL -0.169 -999.990 ... o1 1999 03 23 15 36 00 52.7200 174.1000 28.00 117435 SHM 1999 03 08 01 08 00 198-98 P co2o18 SIL -0.200 -999.990 n.. o1 1999 03 23 15 55 00 52.7200 174.1000 28.00 117436 SHM 1999 03 15 01 06 00 87-91 P co2o18 SIL -0.341 -999.990 ... o1 1999 04 06 19 55 00 52.7200 174.1000 28.00 117437 SHM 1999 03 15 01 06 00 88-91 P co2o18 SIL -0.342 -999.990 ... o1 1999 04 06 20 14 00 52.7200 174.1000 28.00 117438 SHM 1999 03 25 23 30 00 487-91 P co2o18 SIL -0.471 -999.990 ... o1 1999 04 06 20 33 00 52.7200 174.1000 28.00 117439 SHM 1999 03 25 23 30 00 488-91 P co2o18 SIL -0.454 -999.990 ... o1 1999 04 06 20 52 00 52.7200 174.1000 28.00 117440 SHM 1999 03 29 01 14 00 4415-91 P co2o18 SIL -0.039 -999.990 ... o1 1999 04 15 20 10 00 52.7200 174.1000 28.00 117441 SHM 1999 03 29 01 14 00 4416-91 P co2o18 SIL -0.066 -999.990 ... o1 1999 04 15 20 29 00 52.7200 174.1000 28.00 117442 SHM 1999 04 06 02 03 00 4559-91 P co2o18 SIL -0.129 -999.990 ... o1 1999 04 15 20 48 00 52.7200 174.1000 28.00 117443 SHM 1999 04 06 02 03 00 4560-91 P co2o18 SIL -0.181 -999.990 ... o1 1999 04 15 21 07 00 52.7200 174.1000 28.00 117444 SHM 1999 04 15 01 00 00 1217-91 P co2o18 SIL 0.278 -999.990 ... o1 1999 05 04 21 13 00 52.7200 174.1000 28.00 117445 SHM 1999 04 15 01 00 00 1218-91 P co2o18 SIL 0.285 -999.990 ... o1 1999 05 04 21 32 00 52.7200 174.1000 28.00 117446 SHM 1999 04 18 23 40 00 1809-91 P co2o18 SIL -0.426 -999.990 ... o1 1999 05 04 03 26 00 52.7200 174.1000 28.00 117447 SHM 1999 04 18 23 40 00 1810-91 P co2o18 SIL -0.509 -999.990 ... o1 1999 05 04 03 46 00 52.7200 174.1000 28.00 117448 SHM 1999 04 25 23 25 00 1571-91 P co2o18 SIL 0.050 -999.990 A.. o1 1999 05 20 02 00 00 52.7200 174.1000 28.00 117449 SHM 1999 04 25 23 25 00 1572-91 P co2o18 SIL 0.027 -999.990 A.. o1 1999 05 20 02 19 00 52.7200 174.1000 28.00 117450 SHM 1999 05 02 23 31 00 4283-91 P co2o18 SIL -0.255 -999.990 A.. o1 1999 05 20 02 38 00 52.7200 174.1000 28.00 117451 SHM 1999 05 02 23 31 00 4284-91 P co2o18 SIL -0.263 -999.990 A.. o1 1999 05 20 02 57 00 52.7200 174.1000 28.00 117452 SHM 1999 05 09 23 45 00 100-91 P co2o18 SIL 0.019 -999.990 ... o1 1999 06 05 03 12 00 52.7200 174.1000 28.00 117453 SHM 1999 05 09 23 45 00 99-91 P co2o18 SIL 0.026 -999.990 ... o1 1999 06 05 02 53 00 52.7200 174.1000 28.00 117454 SHM 1999 05 16 23 55 00 5-98 P co2o18 SIL -0.061 -999.990 ... o1 1999 06 05 03 31 00 52.7200 174.1000 28.00 117455 SHM 1999 05 16 23 55 00 6-98 P co2o18 SIL -0.037 -999.990 ... o1 1999 06 05 03 49 00 52.7200 174.1000 28.00 117456 SHM 1999 05 22 23 45 00 135-98 P co2o18 SIL -0.206 -999.990 ... o1 1999 06 27 13 38 00 52.7200 174.1000 28.00 117457 SHM 1999 05 22 23 45 00 136-98 P co2o18 SIL -0.176 -999.990 ... o1 1999 06 27 13 57 00 52.7200 174.1000 28.00 117458 SHM 1999 05 30 23 45 00 1429-91 P co2o18 SIL 0.186 -999.990 ... o1 1999 06 23 17 04 00 52.7200 174.1000 28.00 117459 SHM 1999 05 30 23 45 00 1430-91 P co2o18 SIL 0.199 -999.990 ... o1 1999 06 23 17 24 00 52.7200 174.1000 28.00 117460 SHM 1999 06 13 23 50 00 283-91 P co2o18 SIL -0.165 -999.990 ... o1 1999 07 08 04 14 00 52.7200 174.1000 28.00 117461 SHM 1999 06 13 23 50 00 284-91 P co2o18 SIL -0.119 -999.990 ... o1 1999 07 08 04 33 00 52.7200 174.1000 28.00 117462 SHM 1999 06 20 23 48 00 581-91 P co2o18 SIL -2.405 -999.990 -.. o1 1999 07 08 04 52 00 52.7200 174.1000 28.00 117463 SHM 1999 06 20 23 48 00 582-91 P co2o18 SIL -0.020 -999.990 +.. o1 1999 07 08 05 12 00 52.7200 174.1000 28.00 117464 SHM 1999 06 27 23 55 00 503-91 P co2o18 SIL 0.223 -999.990 ... o1 1999 07 30 18 39 00 52.7200 174.1000 28.00 117465 SHM 1999 06 27 23 55 00 504-91 P co2o18 SIL 0.214 -999.990 ... o1 1999 07 30 18 59 00 52.7200 174.1000 28.00 117466 SHM 1999 07 04 23 55 00 1435-91 P co2o18 SIL 0.109 -999.990 ... o1 1999 07 30 18 01 00 52.7200 174.1000 28.00 117467 SHM 1999 07 04 23 55 00 1436-91 P co2o18 SIL 0.197 -999.990 ... o1 1999 07 30 18 20 00 52.7200 174.1000 28.00 117468 SHM 1999 07 11 23 45 00 259-91 P co2o18 SIL 0.343 -999.990 ... o1 1999 08 07 03 53 00 52.7200 174.1000 28.00 117469 SHM 1999 07 11 23 45 00 260-91 P co2o18 SIL 0.336 -999.990 ... o1 1999 08 07 04 12 00 52.7200 174.1000 28.00 117470 SHM 1999 07 18 23 44 00 1741-91 P co2o18 SIL 0.564 -999.990 .x. o1 1999 08 07 03 15 00 52.7200 174.1000 28.00 117471 SHM 1999 07 18 23 44 00 1742-91 P co2o18 SIL 0.451 -999.990 .x. o1 1999 08 07 03 34 00 52.7200 174.1000 28.00 117472 SHM 1999 07 25 23 57 00 655-91 P co2o18 SIL -0.956 -999.990 A.. o1 1999 08 26 01 36 00 52.7200 174.1000 28.00 117473 SHM 1999 07 25 23 57 00 656-91 P co2o18 SIL -0.916 -999.990 A.. o1 1999 08 26 01 55 00 52.7200 174.1000 28.00 117474 SHM 1999 08 02 00 00 00 4745-91 P co2o18 SIL -1.144 -999.990 A.. o1 1999 08 26 00 59 00 52.7200 174.1000 28.00 117475 SHM 1999 08 02 00 00 00 4746-91 P co2o18 SIL -1.211 -999.990 A.. o1 1999 08 26 01 17 00 52.7200 174.1000 28.00 117476 SHM 1999 08 09 00 10 00 5-91 P co2o18 SIL -1.095 -999.990 A.. o1 1999 08 31 16 27 00 52.7200 174.1000 28.00 117477 SHM 1999 08 09 00 10 00 6-91 P co2o18 SIL -0.935 -999.990 A.. o1 1999 08 31 16 46 00 52.7200 174.1000 28.00 117478 SHM 1999 08 16 00 22 00 529-91 P co2o18 SIL -0.301 -999.990 A.. o1 1999 08 31 20 50 00 52.7200 174.1000 28.00 117479 SHM 1999 08 16 00 22 00 530-91 P co2o18 SIL -0.398 -999.990 A.. o1 1999 08 31 21 09 00 52.7200 174.1000 28.00 117480 SHM 1999 08 23 00 06 00 1353-91 P co2o18 SIL -2.031 -999.990 A.. o1 1999 08 31 20 13 00 52.7200 174.1000 28.00 117481 SHM 1999 08 23 00 06 00 1354-91 P co2o18 SIL -2.145 -999.990 A.. o1 1999 08 31 20 31 00 52.7200 174.1000 28.00 117482 SHM 1999 08 29 23 56 00 2049-91 P co2o18 SIL -1.076 -999.990 ... o1 1999 09 24 12 29 00 52.7200 174.1000 28.00 117483 SHM 1999 08 29 23 56 00 2050-91 P co2o18 SIL -1.067 -999.990 ... o1 1999 09 24 12 47 00 52.7200 174.1000 28.00 117484 SHM 1999 09 05 23 41 00 4669-91 P co2o18 SIL -0.774 -999.990 ... o1 1999 09 24 11 51 00 52.7200 174.1000 28.00 117485 SHM 1999 09 05 23 41 00 4670-91 P co2o18 SIL -0.783 -999.990 ... o1 1999 09 24 12 10 00 52.7200 174.1000 28.00 117486 SHM 1999 09 12 23 52 00 373-91 P co2o18 SIL -2.446 -999.990 Ax. o1 1999 10 01 16 38 00 52.7200 174.1000 28.00 117487 SHM 1999 09 12 23 52 00 374-91 P co2o18 SIL -2.473 -999.990 Ax. o1 1999 10 01 16 57 00 52.7200 174.1000 28.00 117488 SHM 1999 09 19 23 52 00 555-91 P co2o18 SIL -1.871 -999.990 A.. o1 1999 10 01 17 15 00 52.7200 174.1000 28.00 117489 SHM 1999 09 19 23 52 00 556-91 P co2o18 SIL -1.772 -999.990 A.. o1 1999 10 01 17 34 00 52.7200 174.1000 28.00 117490 SHM 1999 09 27 21 20 00 1269-91 P co2o18 SIL -0.398 -999.990 .X. o1 1999 10 13 19 04 00 52.7200 174.1000 28.00 117491 SHM 1999 09 27 21 20 00 1270-91 P co2o18 SIL -0.407 -999.990 .X. o1 1999 10 13 19 23 00 52.7200 174.1000 28.00 117492 SHM 1999 10 04 00 22 00 4009-91 P co2o18 SIL -0.847 -999.990 ... o1 1999 10 13 18 26 00 52.7200 174.1000 28.00 117493 SHM 1999 10 04 00 22 00 4010-91 P co2o18 SIL -0.842 -999.990 ... o1 1999 10 13 18 45 00 52.7200 174.1000 28.00 117494 SHM 1999 10 10 23 54 00 1593-91 P co2o18 SIL -0.797 -999.990 ... o1 1999 11 04 00 48 00 52.7200 174.1000 28.00 117495 SHM 1999 10 10 23 54 00 1594-91 P co2o18 SIL -0.912 -999.990 ... o1 1999 11 04 01 07 00 52.7200 174.1000 28.00 117496 SHM 1999 10 17 23 45 00 1639-91 P co2o18 SIL -1.213 -999.990 ... o1 1999 11 04 00 10 00 52.7200 174.1000 28.00 117497 SHM 1999 10 17 23 45 00 1640-91 P co2o18 SIL -1.303 -999.990 ... o1 1999 11 04 00 29 00 52.7200 174.1000 28.00 117498 SHM 1999 10 24 23 40 00 1407-91 P co2o18 SIL -1.006 -999.990 ... o1 1999 11 23 01 06 00 52.7200 174.1000 28.00 117499 SHM 1999 10 24 23 40 00 1408-91 P co2o18 SIL -1.037 -999.990 ... o1 1999 11 23 01 25 00 52.7200 174.1000 28.00 117500 SHM 1999 10 31 23 30 00 4735-91 P co2o18 SIL -0.932 -999.990 ... o1 1999 11 16 20 34 00 52.7200 174.1000 28.00 117501 SHM 1999 10 31 23 30 00 4736-91 P co2o18 SIL -0.935 -999.990 ... o1 1999 11 16 20 52 00 52.7200 174.1000 28.00 117502 SHM 1999 11 07 23 35 00 265-91 P co2o18 SIL -0.944 -999.990 ... o1 1999 12 03 18 48 00 52.7200 174.1000 28.00 117503 SHM 1999 11 07 23 35 00 266-91 P co2o18 SIL -0.890 -999.990 ... o1 1999 12 03 19 07 00 52.7200 174.1000 28.00 117504 SHM 1999 11 15 22 20 00 1129-91 P co2o18 SIL -0.982 -999.990 +.. o1 1999 12 03 17 32 00 52.7200 174.1000 28.00 117505 SHM 1999 11 15 22 20 00 1130-91 P co2o18 SIL -1.491 -999.990 -.. o1 1999 12 03 17 51 00 52.7200 174.1000 28.00 117506 SHM 1999 11 22 01 48 00 655-91 P co2o18 SIL -0.866 -999.990 ... o1 1999 12 12 04 22 00 52.7200 174.1000 28.00 117507 SHM 1999 11 22 01 48 00 656-91 P co2o18 SIL -0.881 -999.990 ... o1 1999 12 12 04 41 00 52.7200 174.1000 28.00 117508 SHM 1999 11 29 00 38 00 4745-91 P co2o18 SIL -0.732 -999.990 ... o1 1999 12 12 03 45 00 52.7200 174.1000 28.00 117509 SHM 1999 11 29 00 38 00 4746-91 P co2o18 SIL -0.747 -999.990 ... o1 1999 12 12 04 03 00 52.7200 174.1000 28.00 117510 SHM 1999 12 20 01 04 00 4685-91 P co2o18 SIL 0.006 -999.990 A.. o1 2000 01 18 14 57 00 52.7200 174.1000 28.00 117515 SHM 1999 12 20 01 04 00 4686-91 P co2o18 SIL -0.055 -999.990 A.. o1 2000 01 18 15 17 00 52.7200 174.1000 28.00 117516 SHM 1999 12 27 00 46 00 12-98 P co2o18 SIL -0.340 -999.990 ..S o1 2000 02 04 03 34 00 52.7200 174.1000 28.00 117517 SHM 2000 01 03 01 07 00 1065-91 P co2o18 SIL -0.527 -999.990 ... o1 2000 01 27 17 36 00 52.7200 174.1000 28.00 117518 SHM 2000 01 03 01 07 00 1066-91 P co2o18 SIL -0.539 -999.990 ... o1 2000 01 27 17 55 00 52.7200 174.1000 28.00 117519 SHM 2000 01 10 00 59 00 1865-91 P co2o18 SIL -0.372 -999.990 ... o1 2000 01 27 18 14 00 52.7200 174.1000 28.00 117520 SHM 2000 01 10 00 59 00 1866-91 P co2o18 SIL -0.431 -999.990 ... o1 2000 01 27 18 33 00 52.7200 174.1000 28.00 117521 SHM 2000 01 17 00 49 00 1125-91 P co2o18 SIL -0.075 -999.990 ... o1 2000 02 02 23 19 00 52.7200 174.1000 28.00 117522 SHM 2000 01 17 00 49 00 1126-91 P co2o18 SIL 0.013 -999.990 ... o1 2000 02 02 23 38 00 52.7200 174.1000 28.00 117523 SHM 2000 01 24 00 40 00 543-91 P co2o18 SIL -0.672 -999.990 ... o1 2000 02 03 01 14 00 52.7200 174.1000 28.00 117524 SHM 2000 01 24 00 40 00 544-91 P co2o18 SIL -0.599 -999.990 ... o1 2000 02 03 01 33 00 52.7200 174.1000 28.00 117525 SHM 2000 01 31 00 33 00 1939-91 P co2o18 SIL -0.425 -999.990 ... o1 2000 02 19 23 56 00 52.7200 174.1000 28.00 117526 SHM 2000 01 31 00 33 00 1940-91 P co2o18 SIL -0.449 -999.990 ... o1 2000 02 20 00 15 00 52.7200 174.1000 28.00 117527 SHM 2000 02 07 00 28 00 4069-91 P co2o18 SIL -0.405 -999.990 ... o1 2000 02 19 20 10 00 52.7200 174.1000 28.00 117528 SHM 2000 02 07 00 28 00 4070-91 P co2o18 SIL -0.420 -999.990 ... o1 2000 02 19 20 29 00 52.7200 174.1000 28.00 117529 SHM 2000 02 13 23 40 00 1027-91 P co2o18 SIL -0.332 -999.990 ... o1 2000 03 12 17 07 00 52.7200 174.1000 28.00 117530 SHM 2000 02 13 23 40 00 1028-91 P co2o18 SIL -0.328 -999.990 ... o1 2000 03 12 17 27 00 52.7200 174.1000 28.00 117531 SHM 2000 02 20 23 35 00 617-91 P co2o18 SIL -0.172 -999.990 ... o1 2000 03 10 21 15 00 52.7200 174.1000 28.00 117532 SHM 2000 02 20 23 35 00 618-91 P co2o18 SIL -0.143 -999.990 ... o1 2000 03 10 21 35 00 52.7200 174.1000 28.00 117533 SHM 2000 02 27 23 50 00 1697-91 P co2o18 SIL -0.336 -999.990 ... o1 2000 03 30 07 07 00 52.7200 174.1000 28.00 117534 SHM 2000 02 27 23 50 00 1698-91 P co2o18 SIL -0.342 -999.990 ... o1 2000 03 30 07 26 00 52.7200 174.1000 28.00 117535 SHM 2000 03 06 01 10 00 4773-91 P co2o18 SIL -0.252 -999.990 ... o1 2000 03 29 22 36 00 52.7200 174.1000 28.00 117536 SHM 2000 03 06 01 10 00 4774-91 P co2o18 SIL -0.244 -999.990 ... o1 2000 03 29 22 56 00 52.7200 174.1000 28.00 117537 SHM 2000 03 13 01 00 00 27-91 P co2o18 SIL -0.272 -999.990 ... o1 2000 04 04 14 46 00 52.7200 174.1000 28.00 117538 SHM 2000 03 13 01 00 00 28-91 P co2o18 SIL -0.249 -999.990 ... o1 2000 04 04 15 06 00 52.7200 174.1000 28.00 117539 SHM 2000 03 20 01 10 00 1815-91 P co2o18 SIL -0.222 -999.990 ... o1 2000 03 31 13 10 00 52.7200 174.1000 28.00 117540 SHM 2000 03 20 01 10 00 1816-91 P co2o18 SIL -0.247 -999.990 ... o1 2000 03 31 13 30 00 52.7200 174.1000 28.00 117541 SHM 2000 03 27 01 00 00 1219-91 P co2o18 SIL -0.087 -999.990 ... o1 2000 04 12 16 53 00 52.7200 174.1000 28.00 117542 SHM 2000 03 27 01 00 00 1220-91 P co2o18 SIL -0.096 -999.990 ... o1 2000 04 12 17 12 00 52.7200 174.1000 28.00 117543 SHM 2000 04 02 23 46 00 1573-91 P co2o18 SIL -0.079 -999.990 ... o1 2000 04 12 17 32 00 52.7200 174.1000 28.00 117544 SHM 2000 04 02 23 46 00 1574-91 P co2o18 SIL -0.065 -999.990 ... o1 2000 04 12 17 51 00 52.7200 174.1000 28.00 117545 SHM 2000 04 09 23 53 00 163-98 P co2o18 SIL -0.183 -999.990 ... o1 2000 05 04 19 16 00 52.7200 174.1000 28.00 117546 SHM 2000 04 09 23 53 00 164-98 P co2o18 SIL -0.203 -999.990 ... o1 2000 05 04 19 36 00 52.7200 174.1000 28.00 117547 SHM 2000 04 16 23 49 00 1935-91 P co2o18 SIL -0.169 -999.990 ... o1 2000 05 04 23 17 00 52.7200 174.1000 28.00 117548 SHM 2000 04 16 23 49 00 1936-91 P co2o18 SIL -0.183 -999.990 ... o1 2000 05 04 23 37 00 52.7200 174.1000 28.00 117549 SHM 2000 04 23 23 54 00 393-91 P co2o18 SIL -0.143 -999.990 ... o1 2000 05 23 00 52 00 52.7200 174.1000 28.00 117550 SHM 2000 04 23 23 54 00 394-91 P co2o18 SIL -0.169 -999.990 ... o1 2000 05 23 01 12 00 52.7200 174.1000 28.00 117551 SHM 2000 04 30 23 50 00 1239-91 P co2o18 SIL -0.437 -999.990 ... o1 2000 05 22 23 32 00 52.7200 174.1000 28.00 117552 SHM 2000 04 30 23 50 00 1240-91 P co2o18 SIL -0.412 -999.990 ... o1 2000 05 22 23 52 00 52.7200 174.1000 28.00 117553 SHM 2000 05 07 23 53 00 1179-91 P co2o18 SIL -0.027 -999.990 ... o1 2000 06 03 04 27 00 52.7200 174.1000 28.00 117554 SHM 2000 05 07 23 53 00 1180-91 P co2o18 SIL -0.026 -999.990 ... o1 2000 06 03 04 47 00 52.7200 174.1000 28.00 117555 SHM 2000 05 15 23 28 00 4559-91 P co2o18 SIL -0.013 -999.990 ... o1 2000 06 03 05 07 00 52.7200 174.1000 28.00 117556 SHM 2000 05 15 23 28 00 4560-91 P co2o18 SIL -0.000 -999.990 ... o1 2000 06 03 05 27 00 52.7200 174.1000 28.00 117557 SHM 2000 05 22 21 51 00 679-91 P co2o18 SIL -0.127 -999.990 ... o1 2000 06 27 00 28 00 52.7200 174.1000 28.00 117558 SHM 2000 05 22 21 51 00 680-91 P co2o18 SIL -0.140 -999.990 ... o1 2000 06 27 00 48 00 52.7200 174.1000 28.00 117559 SHM 2000 05 29 23 05 00 49-98 P co2o18 SIL 0.121 -999.990 ... o1 2000 06 25 05 47 00 52.7200 174.1000 28.00 117560 SHM 2000 05 29 23 05 00 50-98 P co2o18 SIL 0.066 -999.990 ... o1 2000 06 25 06 07 00 52.7200 174.1000 28.00 117561 SHM 2000 06 04 23 38 00 1057-91 P co2o18 SIL 0.085 -999.990 ... o1 2000 07 07 17 28 00 52.7200 174.1000 28.00 117562 SHM 2000 06 04 23 38 00 1058-91 P co2o18 SIL 0.102 -999.990 ... o1 2000 07 07 17 49 00 52.7200 174.1000 28.00 117563 SHM 2000 06 11 23 35 00 23-98 P co2o18 SIL 0.156 -999.990 -.. o1 2000 07 07 18 09 00 52.7200 174.1000 28.00 117564 SHM 2000 06 11 23 35 00 24-98 P co2o18 SIL 174.270 -999.990 !.. o1 2000 07 07 18 30 00 52.7200 174.1000 28.00 117565 SHM 2000 06 18 23 25 00 369-91 P co2o18 SIL 0.247 -999.990 ... o1 2000 07 04 10 36 00 52.7200 174.1000 28.00 117566 SHM 2000 06 18 23 25 00 369-91 P co2o18 SIL 0.224 -999.990 ... o1 2000 07 05 12 21 00 52.7200 174.1000 28.00 117566 SHM 2000 06 18 23 25 00 370-91 P co2o18 SIL 0.210 -999.990 ... o1 2000 07 04 10 57 00 52.7200 174.1000 28.00 117567 SHM 2000 06 18 23 25 00 370-91 P co2o18 SIL 0.173 -999.990 ... o1 2000 07 05 12 41 00 52.7200 174.1000 28.00 117567 SHM 2000 06 25 23 40 00 993-91 P co2o18 SIL 0.133 -999.990 ... o1 2000 07 04 11 18 00 52.7200 174.1000 28.00 117568 SHM 2000 06 25 23 40 00 993-91 P co2o18 SIL 0.070 -999.990 ... o1 2000 07 05 13 02 00 52.7200 174.1000 28.00 117568 SHM 2000 06 25 23 40 00 994-91 P co2o18 SIL 0.105 -999.990 ... o1 2000 07 04 11 38 00 52.7200 174.1000 28.00 117569 SHM 2000 06 25 23 40 00 994-91 P co2o18 SIL 0.126 -999.990 ... o1 2000 07 05 13 22 00 52.7200 174.1000 28.00 117569 SHM 2000 07 03 23 30 00 4573-91 P co2o18 SIL 0.264 -999.990 ... o1 2000 08 01 13 54 00 52.7200 174.1000 28.00 117570 SHM 2000 07 03 23 30 00 4574-91 P co2o18 SIL 0.337 -999.990 ... o1 2000 08 01 14 15 00 52.7200 174.1000 28.00 117571 SHM 2000 07 09 23 43 00 4163-91 P co2o18 SIL 0.538 -999.990 ... o1 2000 08 01 14 37 00 52.7200 174.1000 28.00 117572 SHM 2000 07 09 23 43 00 4164-91 P co2o18 SIL 0.564 -999.990 ... o1 2000 08 01 14 58 00 52.7200 174.1000 28.00 117573 SHM 2000 07 16 23 48 00 63-91 P co2o18 SIL -0.471 -999.990 .X. o1 2000 08 12 14 50 00 52.7200 174.1000 28.00 117574 SHM 2000 07 16 23 48 00 64-91 P co2o18 SIL -0.447 -999.990 .X. o1 2000 08 12 15 11 00 52.7200 174.1000 28.00 117575 SHM 2000 07 23 23 40 00 4449-91 P co2o18 SIL -0.172 -999.990 ... o1 2000 08 11 17 17 00 52.7200 174.1000 28.00 117576 SHM 2000 07 23 23 40 00 4450-91 P co2o18 SIL -0.100 -999.990 ... o1 2000 08 11 17 38 00 52.7200 174.1000 28.00 117577 SHM 2000 07 30 23 48 00 349-91 P co2o18 SIL 0.191 -999.990 ... o1 2000 08 23 06 22 00 52.7200 174.1000 28.00 117578 SHM 2000 07 30 23 48 00 350-91 P co2o18 SIL 0.236 -999.990 ... o1 2000 08 23 06 43 00 52.7200 174.1000 28.00 117579 SHM 2000 08 06 23 29 00 11-98 P co2o18 SIL -0.402 -999.990 ... o1 2000 08 25 16 56 00 52.7200 174.1000 28.00 117580 SHM 2000 08 06 23 29 00 12-98 P co2o18 SIL -0.363 -999.990 ... o1 2000 08 25 17 17 00 52.7200 174.1000 28.00 117581 SHM 2000 08 13 23 50 00 59-91 P co2o18 SIL -1.892 -999.990 -.. o1 2000 09 07 06 51 00 52.7200 174.1000 28.00 117582 SHM 2000 08 13 23 50 00 60-91 P co2o18 SIL -0.037 -999.990 +.. o1 2000 09 07 07 12 00 52.7200 174.1000 28.00 117583 SHM 2000 08 20 23 50 00 4531-91 P co2o18 SIL 0.263 -999.990 .x. o1 2000 09 07 07 32 00 52.7200 174.1000 28.00 117584 SHM 2000 08 20 23 50 00 4532-91 P co2o18 SIL 0.282 -999.990 .x. o1 2000 09 07 07 53 00 52.7200 174.1000 28.00 117585 SHM 2000 08 27 23 44 00 1087-91 P co2o18 SIL -0.694 -999.990 ... o1 2000 09 21 08 45 00 52.7200 174.1000 28.00 117586 SHM 2000 08 27 23 44 00 1088-91 P co2o18 SIL -0.747 -999.990 ... o1 2000 09 21 09 05 00 52.7200 174.1000 28.00 117587 SHM 2000 09 03 22 04 00 4967-91 P co2o18 SIL -0.877 -999.990 ... o1 2000 09 22 06 28 00 52.7200 174.1000 28.00 117588 SHM 2000 09 03 22 04 00 4968-91 P co2o18 SIL -0.817 -999.990 ... o1 2000 09 22 06 49 00 52.7200 174.1000 28.00 117589 SHM 2000 09 11 00 00 00 763-91 P co2o18 SIL -0.863 -999.990 ... o1 2000 10 09 11 25 00 52.7200 174.1000 28.00 117590 SHM 2000 09 11 00 00 00 764-91 P co2o18 SIL -0.878 -999.990 ... o1 2000 10 09 11 45 00 52.7200 174.1000 28.00 117591 SHM 2000 09 17 23 35 00 1865-91 P co2o18 SIL -1.147 -999.990 ... o1 2000 10 03 05 19 00 52.7200 174.1000 28.00 117592 SHM 2000 09 17 23 35 00 1866-91 P co2o18 SIL -1.211 -999.990 ... o1 2000 10 03 05 39 00 52.7200 174.1000 28.00 117593 SHM 2000 09 23 23 32 00 4215-91 P co2o18 SIL -0.622 -999.990 ... o1 2000 10 13 14 51 00 52.7200 174.1000 28.00 117594 SHM 2000 09 23 23 32 00 4216-91 P co2o18 SIL -0.607 -999.990 ... o1 2000 10 13 15 11 00 52.7200 174.1000 28.00 117595 SHM 2000 10 02 23 40 00 4681-91 P co2o18 SIL -0.832 -999.990 -.. o1 2000 10 13 13 23 00 52.7200 174.1000 28.00 117596 SHM 2000 10 02 23 40 00 4682-91 P co2o18 SIL -0.670 -999.990 +.. o1 2000 10 13 14 31 00 52.7200 174.1000 28.00 117597 SHM 2000 10 08 23 35 00 673-91 P co2o18 SIL -0.978 -999.990 ... o1 2000 10 25 16 49 00 52.7200 174.1000 28.00 117598 SHM 2000 10 08 23 35 00 674-91 P co2o18 SIL -1.087 -999.990 ... o1 2000 10 25 17 09 00 52.7200 174.1000 28.00 117599 SHM 2000 10 15 23 40 00 4061-91 P co2o18 SIL -1.060 -999.990 ... o1 2000 10 26 00 07 00 52.7200 174.1000 28.00 117600 SHM 2000 10 15 23 40 00 4062-91 P co2o18 SIL -1.087 -999.990 ... o1 2000 10 26 00 27 00 52.7200 174.1000 28.00 117601 SHM 2000 10 22 23 25 00 4623-91 P co2o18 SIL -0.657 -999.990 ... o1 2000 11 09 17 54 00 52.7200 174.1000 28.00 117602 SHM 2000 10 22 23 25 00 4624-91 P co2o18 SIL -0.641 -999.990 ... o1 2000 11 09 18 14 00 52.7200 174.1000 28.00 117603 SHM 2000 10 29 23 22 00 4589-91 P co2o18 SIL -1.271 -999.990 .x. o1 2000 11 10 11 50 00 52.7200 174.1000 28.00 117604 SHM 2000 10 29 23 22 00 4590-91 P co2o18 SIL -1.286 -999.990 .x. o1 2000 11 10 12 10 00 52.7200 174.1000 28.00 117605 SHM 2000 11 05 23 09 00 1139-91 P co2o18 SIL -1.030 -999.990 ... o1 2000 11 29 08 40 00 52.7200 174.1000 28.00 117606 SHM 2000 11 05 23 09 00 1140-91 P co2o18 SIL -1.003 -999.990 ... o1 2000 11 29 09 00 00 52.7200 174.1000 28.00 117607 SHM 2000 11 11 23 25 00 185-98 P co2o18 SIL -0.901 -999.990 ... o1 2000 11 29 08 00 00 52.7200 174.1000 28.00 117608 SHM 2000 11 11 23 25 00 186-98 P co2o18 SIL -0.910 -999.990 ... o1 2000 11 29 08 20 00 52.7200 174.1000 28.00 117609 SHM 2000 11 19 23 25 00 1007-91 P co2o18 SIL -0.787 -999.990 ... o1 2000 12 08 00 40 00 52.7200 174.1000 28.00 117610 SHM 2000 11 19 23 25 00 1008-91 P co2o18 SIL -0.757 -999.990 ... o1 2000 12 08 01 00 00 52.7200 174.1000 28.00 117611 SHM 2000 11 26 23 20 00 1699-91 P co2o18 SIL -0.703 -999.990 ... o1 2000 12 07 21 17 00 52.7200 174.1000 28.00 117612 SHM 2000 11 26 23 20 00 1700-91 P co2o18 SIL -0.741 -999.990 ... o1 2000 12 07 21 37 00 52.7200 174.1000 28.00 117613 SHM 2000 12 03 23 25 00 93-91 P co2o18 SIL -0.713 -999.990 ... o1 2001 01 03 23 25 00 52.7200 174.1000 28.00 117614 SHM 2000 12 03 23 25 00 94-91 P co2o18 SIL -0.664 -999.990 ... o1 2001 01 03 23 45 00 52.7200 174.1000 28.00 117615 SHM 2000 12 11 00 00 00 4123-91 P co2o18 SIL -0.520 -999.990 ... o1 2001 01 03 22 45 00 52.7200 174.1000 28.00 117616 SHM 2000 12 11 00 00 00 4124-91 P co2o18 SIL -0.495 -999.990 ... o1 2001 01 03 23 05 00 52.7200 174.1000 28.00 117617 SHM 2000 12 17 23 30 00 1863-91 P co2o18 SIL -1.295 -999.990 -.. o1 2001 07 23 13 42 00 52.7200 174.1000 28.00 117618 SHM 2000 12 17 23 30 00 1864-91 P co2o18 SIL -0.740 -999.990 +.. o1 2001 07 23 14 02 00 52.7200 174.1000 28.00 117619 SHM 2000 12 23 23 45 00 4733-91 P co2o18 SIL -0.540 -999.990 ... o1 2001 01 17 05 16 00 52.7200 174.1000 28.00 117621 SHM 2000 12 23 23 45 00 4734-91 P co2o18 SIL -0.585 -999.990 ... o1 2001 01 17 05 35 00 52.7200 174.1000 28.00 117622 SHM 2000 12 31 23 30 00 1403-91 P co2o18 SIL -0.524 -999.990 ... o1 2001 01 17 03 18 00 52.7200 174.1000 28.00 117623 SHM 2000 12 31 23 30 00 1404-91 P co2o18 SIL -0.532 -999.990 ... o1 2001 01 17 03 37 00 52.7200 174.1000 28.00 117624 SHM 2001 01 07 23 30 00 4401-91 P co2o18 SIL -0.365 -999.990 ... o1 2001 02 01 06 08 00 52.7200 174.1000 28.00 117625 SHM 2001 01 07 23 30 00 4402-91 P co2o18 SIL -0.333 -999.990 ... o1 2001 02 01 06 28 00 52.7200 174.1000 28.00 117626 SHM 2001 01 14 22 15 00 529-91 P co2o18 SIL -0.343 -999.990 ... o1 2001 02 01 05 28 00 52.7200 174.1000 28.00 117627 SHM 2001 01 14 22 15 00 530-91 P co2o18 SIL -0.366 -999.990 ... o1 2001 02 01 05 48 00 52.7200 174.1000 28.00 117628 SHM 2001 01 22 00 10 00 4778-91 P co2o18 SIL -0.516 -999.990 ..S o1 2001 02 16 16 28 00 52.7200 174.1000 28.00 117629 SHM 2001 01 28 23 50 00 4589-91 P co2o18 SIL -0.510 -999.990 ... o1 2001 02 16 14 29 00 52.7200 174.1000 28.00 117630 SHM 2001 01 28 23 50 00 4590-91 P co2o18 SIL -0.515 -999.990 ... o1 2001 02 16 14 49 00 52.7200 174.1000 28.00 117631 SHM 2001 02 05 00 20 00 4163-91 P co2o18 SIL -0.373 -999.990 ... o1 2001 02 23 23 07 00 52.7200 174.1000 28.00 117632 SHM 2001 02 05 00 20 00 4164-91 P co2o18 SIL -0.382 -999.990 ... o1 2001 02 23 23 27 00 52.7200 174.1000 28.00 117633 SHM 2001 02 18 23 35 00 927-91 P co2o18 SIL -0.071 -999.990 ... o1 2001 03 12 19 50 00 52.7200 174.1000 28.00 117634 SHM 2001 02 18 23 35 00 928-91 P co2o18 SIL -0.086 -999.990 ... o1 2001 03 12 20 10 00 52.7200 174.1000 28.00 117635 SHM 2001 02 26 00 00 00 4045-91 P co2o18 SIL -0.138 -999.990 ... o1 2001 03 08 18 38 00 52.7200 174.1000 28.00 117636 SHM 2001 02 26 00 00 00 4046-91 P co2o18 SIL -0.176 -999.990 ... o1 2001 03 08 18 58 00 52.7200 174.1000 28.00 117637 SHM 2001 03 04 23 30 00 4437-91 P co2o18 SIL -0.213 -999.990 ... o1 2001 03 24 04 02 00 52.7200 174.1000 28.00 117638 SHM 2001 03 04 23 30 00 4438-91 P co2o18 SIL -0.220 -999.990 ... o1 2001 03 24 04 22 00 52.7200 174.1000 28.00 117639 SHM 2001 03 11 23 37 00 1789-91 P co2o18 SIL -0.189 -999.990 ... o1 2001 03 27 02 04 00 52.7200 174.1000 28.00 117640 SHM 2001 03 11 23 37 00 1790-91 P co2o18 SIL -0.158 -999.990 ... o1 2001 03 27 02 23 00 52.7200 174.1000 28.00 117641 SHM 2001 03 18 23 35 00 2019-91 P co2o18 SIL -0.522 -999.990 .x. o1 2001 04 19 22 47 00 52.7200 174.1000 28.00 117642 SHM 2001 03 18 23 35 00 2020-91 P co2o18 SIL -0.540 -999.990 .x. o1 2001 04 19 23 07 00 52.7200 174.1000 28.00 117643 SHM 2001 03 25 23 35 00 1627-91 P co2o18 SIL -0.232 -999.990 ... o1 2001 04 19 22 08 00 52.7200 174.1000 28.00 117644 SHM 2001 03 25 23 35 00 1628-91 P co2o18 SIL -0.252 -999.990 ... o1 2001 04 19 22 27 00 52.7200 174.1000 28.00 117645 SHM 2001 04 01 23 32 00 4353-91 P co2o18 SIL -0.039 -999.990 ... o1 2001 05 01 20 11 00 52.7200 174.1000 28.00 117646 SHM 2001 04 01 23 32 00 4354-91 P co2o18 SIL -0.063 -999.990 ... o1 2001 05 01 20 31 00 52.7200 174.1000 28.00 117647 SHM 2001 04 08 23 36 00 4145-91 P co2o18 SIL -0.101 -999.990 ... o1 2001 05 01 18 52 00 52.7200 174.1000 28.00 117648 SHM 2001 04 08 23 36 00 4146-91 P co2o18 SIL -0.112 -999.990 ... o1 2001 05 01 19 12 00 52.7200 174.1000 28.00 117649 SHM 2001 04 15 23 40 00 4757-91 P co2o18 SIL -0.209 -999.990 ... o1 2001 05 30 17 43 00 52.7200 174.1000 28.00 117650 SHM 2001 04 15 23 40 00 4758-91 P co2o18 SIL -0.172 -999.990 ... o1 2001 05 30 18 03 00 52.7200 174.1000 28.00 117651 SHM 2001 04 22 23 45 00 1057-91 P co2o18 SIL -0.199 -999.990 ... o1 2001 07 23 14 21 00 52.7200 174.1000 28.00 117652 SHM 2001 04 22 23 45 00 1058-91 P co2o18 SIL -0.175 -999.990 ... o1 2001 07 23 14 41 00 52.7200 174.1000 28.00 117653 SHM 2001 04 29 23 20 00 1753-91 P co2o18 SIL -0.062 -999.990 ... o1 2001 05 23 21 04 00 52.7200 174.1000 28.00 117654 SHM 2001 04 29 23 20 00 1754-91 P co2o18 SIL -0.023 -999.990 ... o1 2001 05 23 21 24 00 52.7200 174.1000 28.00 117655 SHM 2001 05 06 23 30 00 193-91 P co2o18 SIL 0.061 -999.990 ... o1 2001 05 23 19 05 00 52.7200 174.1000 28.00 117656 SHM 2001 05 06 23 30 00 194-91 P co2o18 SIL 0.079 -999.990 ... o1 2001 05 23 19 25 00 52.7200 174.1000 28.00 117657 SHM 2001 05 13 23 30 00 1391-91 P co2o18 SIL 0.216 -999.990 ... o1 2001 06 07 16 47 00 52.7200 174.1000 28.00 117658 SHM 2001 05 13 23 30 00 1392-91 P co2o18 SIL 0.173 -999.990 ... o1 2001 06 07 17 07 00 52.7200 174.1000 28.00 117659 SHM 2001 05 20 23 34 00 4427-91 P co2o18 SIL 0.124 -999.990 ... o1 2001 07 05 03 09 00 52.7200 174.1000 28.00 117660 SHM 2001 05 20 23 34 00 4428-91 P co2o18 SIL 0.133 -999.990 ... o1 2001 07 05 03 29 00 52.7200 174.1000 28.00 117661 SHM 2001 05 27 23 45 00 1655-91 P co2o18 SIL 0.028 -999.990 ... o1 2001 09 10 21 55 00 52.7200 174.1000 28.00 117662 SHM 2001 05 27 23 45 00 1656-91 P co2o18 SIL 0.092 -999.990 ... o1 2001 09 10 22 14 00 52.7200 174.1000 28.00 117663 SHM 2001 06 03 23 35 00 673-91 P co2o18 SIL 0.242 -999.990 ... o1 2001 08 04 01 01 00 52.7200 174.1000 28.00 117664 SHM 2001 06 03 23 35 00 674-91 P co2o18 SIL 0.235 -999.990 ... o1 2001 08 04 01 20 00 52.7200 174.1000 28.00 117665 SHM 2001 06 17 23 30 00 1807-91 P co2o18 SIL 0.598 -999.990 ... o1 2001 07 26 02 46 00 52.7200 174.1000 28.00 117666 SHM 2001 06 17 23 30 00 1808-91 P co2o18 SIL 0.570 -999.990 ... o1 2001 07 26 03 06 00 52.7200 174.1000 28.00 117667 SHM 2001 06 27 23 32 00 4489-91 P co2o18 SIL 0.190 -999.990 ... o1 2001 09 24 21 12 00 52.7200 174.1000 28.00 117668 SHM 2001 06 27 23 32 00 4490-91 P co2o18 SIL 0.187 -999.990 ... o1 2001 09 24 21 32 00 52.7200 174.1000 28.00 117669 SHM 2001 07 04 23 39 00 1681-91 P co2o18 SIL 0.134 -999.990 ... o1 2001 09 04 11 57 00 52.7200 174.1000 28.00 117670 SHM 2001 07 04 23 39 00 1682-91 P co2o18 SIL 0.191 -999.990 ... o1 2001 09 04 12 17 00 52.7200 174.1000 28.00 117671 SHM 2001 07 09 00 00 00 427-91 P co2o18 SIL 0.466 -999.990 ... o1 2001 08 29 07 41 00 52.7200 174.1000 28.00 117672 SHM 2001 07 09 00 00 00 428-91 P co2o18 SIL 0.541 -999.990 ... o1 2001 08 29 08 00 00 52.7200 174.1000 28.00 117673 SHM 2001 07 14 23 27 00 75-91 P co2o18 SIL -0.207 -999.990 ... o1 2001 08 15 17 24 00 52.7200 174.1000 28.00 117674 SHM 2001 07 14 23 27 00 76-91 P co2o18 SIL -0.220 -999.990 ... o1 2001 08 15 17 43 00 52.7200 174.1000 28.00 117675 SHM 2001 07 22 23 30 00 4321-91 P co2o18 SIL 0.046 -999.990 ... o1 2001 08 30 16 16 00 52.7200 174.1000 28.00 117676 SHM 2001 07 22 23 30 00 4322-91 P co2o18 SIL 0.048 -999.990 ... o1 2001 08 30 16 35 00 52.7200 174.1000 28.00 117677 SHM 2001 07 29 23 30 00 501-91 P co2o18 SIL 0.117 -999.990 ... o1 2001 09 03 03 27 00 52.7200 174.1000 28.00 117678 SHM 2001 07 29 23 30 00 502-91 P co2o18 SIL 0.052 -999.990 ... o1 2001 09 03 03 46 00 52.7200 174.1000 28.00 117679 SHM 2001 08 05 23 40 00 4439-91 P co2o18 SIL -0.203 -999.990 ... o1 2001 08 29 08 20 00 52.7200 174.1000 28.00 117680 SHM 2001 08 05 23 40 00 4440-91 P co2o18 SIL -0.190 -999.990 ... o1 2001 08 29 08 40 00 52.7200 174.1000 28.00 117681 SHM 2001 08 12 22 58 00 1245-91 P co2o18 SIL -0.032 -999.990 +.. o1 2001 09 01 22 13 00 52.7200 174.1000 28.00 117682 SHM 2001 08 12 22 58 00 1246-91 P co2o18 SIL -0.232 -999.990 -.. o1 2001 09 01 22 33 00 52.7200 174.1000 28.00 117683 SHM 2001 08 19 23 30 00 1313-91 P co2o18 SIL -0.598 -999.990 ... o1 2001 09 01 21 34 00 52.7200 174.1000 28.00 117684 SHM 2001 08 19 23 30 00 1314-91 P co2o18 SIL -0.617 -999.990 ... o1 2001 09 01 21 53 00 52.7200 174.1000 28.00 117685 SHM 2001 08 26 23 30 00 4429-91 P co2o18 SIL 0.120 -999.990 .X. o1 2001 10 02 04 16 00 52.7200 174.1000 28.00 117686 SHM 2001 08 26 23 30 00 4430-91 P co2o18 SIL 0.068 -999.990 .X. o1 2001 10 02 04 37 00 52.7200 174.1000 28.00 117687 SHM 2001 09 02 23 20 00 1426-91 P co2o18 SIL -0.726 -999.990 ..S o1 2001 10 02 04 58 00 52.7200 174.1000 28.00 117688 SHM 2001 09 09 23 30 00 4751-91 P co2o18 SIL -0.600 -999.990 ... o1 2001 09 28 23 40 00 52.7200 174.1000 28.00 117689 SHM 2001 09 09 23 30 00 4752-91 P co2o18 SIL -0.558 -999.990 ... o1 2001 09 29 00 00 00 52.7200 174.1000 28.00 117690 SHM 2001 09 16 23 21 00 4645-91 P co2o18 SIL -0.760 -999.990 ... o1 2001 09 28 23 01 00 52.7200 174.1000 28.00 117691 SHM 2001 09 16 23 21 00 4646-91 P co2o18 SIL -0.751 -999.990 ... o1 2001 09 28 23 21 00 52.7200 174.1000 28.00 117692 SHM 2001 09 24 00 00 00 349-99 P co2o18 SIL -1.048 -999.990 ... o1 2001 10 26 06 41 00 52.7200 174.1000 28.00 117693 SHM 2001 09 24 00 00 00 350-99 P co2o18 SIL -1.079 -999.990 ... o1 2001 10 26 07 02 00 52.7200 174.1000 28.00 117694 SHM 2001 09 30 23 38 00 225-99 P co2o18 SIL -0.968 -999.990 ... o1 2001 10 26 05 58 00 52.7200 174.1000 28.00 117695 SHM 2001 09 30 23 38 00 226-99 P co2o18 SIL -0.986 -999.990 ... o1 2001 10 26 06 19 00 52.7200 174.1000 28.00 117696 SHM 2001 10 07 23 31 00 1093-91 P co2o18 SIL -0.680 -999.990 ... o1 2001 11 08 02 45 00 52.7200 174.1000 28.00 117697 SHM 2001 10 07 23 31 00 1094-91 P co2o18 SIL -0.630 -999.990 ... o1 2001 11 08 03 06 00 52.7200 174.1000 28.00 117698 SHM 2001 10 15 03 02 00 449-99 P co2o18 SIL -0.588 -999.990 ... o1 2001 11 08 03 27 00 52.7200 174.1000 28.00 117699 SHM 2001 10 15 03 02 00 450-99 P co2o18 SIL -0.578 -999.990 ... o1 2001 11 08 03 48 00 52.7200 174.1000 28.00 117700 SHM 2001 10 21 23 25 00 965-91 P co2o18 SIL -1.126 -999.990 ... o1 2001 11 26 19 31 00 52.7200 174.1000 28.00 117701 SHM 2001 10 21 23 25 00 966-91 P co2o18 SIL -1.127 -999.990 ... o1 2001 11 26 19 51 00 52.7200 174.1000 28.00 117702 SHM 2001 10 28 23 35 00 499-91 P co2o18 SIL -1.190 -999.990 ... o1 2001 11 26 22 47 00 52.7200 174.1000 28.00 117703 SHM 2001 10 28 23 35 00 500-91 P co2o18 SIL -1.223 -999.990 ... o1 2001 11 26 23 06 00 52.7200 174.1000 28.00 117704 SHM 2001 11 06 22 45 00 479-99 P co2o18 SIL -1.056 -999.990 ... o1 2002 01 03 00 11 00 52.7200 174.1000 28.00 117705 SHM 2001 11 06 22 45 00 480-99 P co2o18 SIL -0.982 -999.990 ... o1 2002 01 03 00 32 00 52.7200 174.1000 28.00 117706 SHM 2001 11 12 23 45 00 481-99 P co2o18 SIL -0.568 -999.990 ... o1 2002 01 03 00 53 00 52.7200 174.1000 28.00 117707 SHM 2001 11 12 23 45 00 482-99 P co2o18 SIL -0.526 -999.990 ... o1 2002 01 03 01 14 00 52.7200 174.1000 28.00 117708 SHM 2001 11 18 23 46 00 853-91 P co2o18 SIL -0.922 -999.990 ... o1 2002 01 09 07 19 00 52.7200 174.1000 28.00 117709 SHM 2001 11 18 23 46 00 854-91 P co2o18 SIL -0.920 -999.990 ... o1 2002 01 09 07 38 00 52.7200 174.1000 28.00 117710 SHM 2001 11 25 23 27 00 1919-91 P co2o18 SIL -0.760 -999.990 ... o1 2002 01 08 06 16 00 52.7200 174.1000 28.00 117711 SHM 2001 11 25 23 27 00 1920-91 P co2o18 SIL -0.718 -999.990 ... o1 2002 01 08 06 35 00 52.7200 174.1000 28.00 117712 SHM 2001 12 06 00 20 00 1083-91 P co2o18 SIL -0.641 -999.990 ... o1 2002 01 14 15 23 00 52.7200 174.1000 28.00 117713 SHM 2001 12 06 00 20 00 1084-91 P co2o18 SIL -0.588 -999.990 ... o1 2002 01 14 15 43 00 52.7200 174.1000 28.00 117714 SHM 2001 12 09 23 30 00 4339-91 P co2o18 SIL -0.585 -999.990 ... o1 2002 01 14 16 03 00 52.7200 174.1000 28.00 117715 SHM 2001 12 09 23 30 00 4340-91 P co2o18 SIL -0.558 -999.990 ... o1 2002 01 14 16 22 00 52.7200 174.1000 28.00 117716 SHM 2001 12 17 23 55 00 1629-91 P co2o18 SIL -0.548 -999.990 ... o1 2002 01 26 00 26 00 52.7200 174.1000 28.00 117717 SHM 2001 12 17 23 55 00 1630-91 P co2o18 SIL -0.559 -999.990 ... o1 2002 01 26 00 46 00 52.7200 174.1000 28.00 117718 SHM 2001 12 24 23 30 00 215-91 P co2o18 SIL -0.438 -999.990 ... o1 2002 01 25 23 47 00 52.7200 174.1000 28.00 117719 SHM 2001 12 24 23 30 00 216-91 P co2o18 SIL -0.476 -999.990 ... o1 2002 01 26 00 06 00 52.7200 174.1000 28.00 117720 SHM 2001 12 30 23 00 00 4141-91 P co2o18 SIL -0.427 -999.990 ... o1 2002 02 02 06 55 00 52.7200 174.1000 28.00 117721 SHM 2001 12 30 23 00 00 4142-91 P co2o18 SIL -0.311 -999.990 ... o1 2002 02 02 07 15 00 52.7200 174.1000 28.00 117722 SHM 2002 01 06 23 20 00 111-91 P co2o18 SIL -0.284 -999.990 ... o1 2002 02 02 07 35 00 52.7200 174.1000 28.00 117723 SHM 2002 01 06 23 20 00 112-91 P co2o18 SIL -0.315 -999.990 ... o1 2002 02 02 07 54 00 52.7200 174.1000 28.00 117724 SHM 2002 01 13 23 18 00 577-91 P co2o18 SIL 611.688 -999.990 !.. o1 2002 01 28 06 28 00 52.7200 174.1000 28.00 117725 SHM 2002 01 13 23 18 00 577-91 P co2o18 SIL -0.388 -999.990 ... o1 2002 02 01 09 51 00 52.7200 174.1000 28.00 117725 SHM 2002 01 13 23 18 00 578-91 P co2o18 SIL 613.291 -999.990 !.. o1 2002 01 28 06 51 00 52.7200 174.1000 28.00 117726 SHM 2002 01 13 23 18 00 578-91 P co2o18 SIL -0.415 -999.990 ... o1 2002 02 01 10 13 00 52.7200 174.1000 28.00 117726 SHM 2002 01 20 23 21 00 2023-91 P co2o18 SIL -0.185 -999.990 ... o1 2002 02 24 04 42 00 52.7200 174.1000 28.00 117727 SHM 2002 01 20 23 21 00 2024-91 P co2o18 SIL -0.257 -999.990 ... o1 2002 02 24 05 03 00 52.7200 174.1000 28.00 117728 SHM 2002 01 26 23 23 00 4399-91 P co2o18 SIL -0.274 -999.990 ... o1 2002 02 21 22 31 00 52.7200 174.1000 28.00 117729 SHM 2002 01 26 23 23 00 4400-91 P co2o18 SIL -0.295 -999.990 ... o1 2002 02 21 22 51 00 52.7200 174.1000 28.00 117730 SHM 2002 02 03 23 40 00 1245-91 P co2o18 SIL -0.278 -999.990 ... o1 2002 03 22 19 24 00 52.7200 174.1000 28.00 117731 SHM 2002 02 03 23 40 00 1246-91 P co2o18 SIL -0.296 -999.990 ... o1 2002 03 22 19 43 00 52.7200 174.1000 28.00 117732 SHM 2002 02 17 23 35 00 485-91 P co2o18 SIL 0.046 -999.990 ... o1 2002 03 27 04 18 00 52.7200 174.1000 28.00 117733 SHM 2002 02 17 23 35 00 486-91 P co2o18 SIL 0.006 -999.990 ... o1 2002 03 27 04 38 00 52.7200 174.1000 28.00 117734 SHM 2002 02 25 00 01 00 2047-91 P co2o18 SIL 0.032 -999.990 ..S o1 2002 03 26 23 06 00 52.7200 174.1000 28.00 117735 SHM 2002 03 10 12 34 56 4169-91 P co2o18 SIL -0.061 -999.990 ... o1 2002 04 03 13 03 00 52.7200 174.1000 28.00 117736 SHM 2002 03 10 12 34 56 4170-91 P co2o18 SIL -0.129 -999.990 ... o1 2002 04 03 13 23 00 52.7200 174.1000 28.00 117737 SHM 2002 03 18 22 20 00 625-91 P co2o18 SIL -0.197 -999.990 ... o1 2002 03 28 15 33 00 52.7200 174.1000 28.00 117738 SHM 2002 03 18 22 20 00 626-91 P co2o18 SIL -0.237 -999.990 ... o1 2002 03 28 15 53 00 52.7200 174.1000 28.00 117739 SHM 2002 04 01 00 01 00 4031-91 P co2o18 SIL -0.028 -999.990 ... o1 2002 04 23 21 01 00 52.7200 174.1000 28.00 117740 SHM 2002 04 01 00 01 00 4032-91 P co2o18 SIL -0.014 -999.990 ... o1 2002 04 23 21 21 00 52.7200 174.1000 28.00 117741 SHM 2002 04 08 01 20 00 1467-91 P co2o18 SIL -0.038 -999.990 ... o1 2002 04 24 06 49 00 52.7200 174.1000 28.00 117742 SHM 2002 04 08 01 20 00 1468-91 P co2o18 SIL -0.027 -999.990 ... o1 2002 04 24 07 09 00 52.7200 174.1000 28.00 117743 SHM 2002 04 15 00 40 00 1577-91 P co2o18 SIL -0.250 -999.990 ... o1 2002 05 16 02 31 00 52.7200 174.1000 28.00 117744 SHM 2002 04 15 00 40 00 1578-91 P co2o18 SIL -0.183 -999.990 ... o1 2002 05 16 02 52 00 52.7200 174.1000 28.00 117745 SHM 2002 04 23 00 30 00 4159-91 P co2o18 SIL -0.059 -999.990 +.. o1 2002 05 15 22 19 00 52.7200 174.1000 28.00 117746 SHM 2002 04 23 00 30 00 4160-91 P co2o18 SIL -0.217 -999.990 -.. o1 2002 05 15 22 40 00 52.7200 174.1000 28.00 117747 SHM 2002 04 28 23 30 00 1217-91 P co2o18 SIL -0.065 -999.990 ... o1 2002 05 30 23 42 00 52.7200 174.1000 28.00 117748 SHM 2002 04 28 23 30 00 1218-91 P co2o18 SIL -0.151 -999.990 ... o1 2002 05 31 00 03 00 52.7200 174.1000 28.00 117749 SHM 2002 05 05 23 30 00 4281-91 P co2o18 SIL -1000.240 -999.990 !.. o1 2002 05 29 06 25 00 52.7200 174.1000 28.00 117750 SHM 2002 05 05 23 30 00 4281-91 P co2o18 SIL 0.065 -999.990 ... o1 2002 05 31 07 21 00 52.7200 174.1000 28.00 117750 SHM 2002 05 05 23 30 00 4282-91 P co2o18 SIL -1000.230 -999.990 !.. o1 2002 05 29 06 49 00 52.7200 174.1000 28.00 117751 SHM 2002 05 05 23 30 00 4282-91 P co2o18 SIL 0.088 -999.990 ... o1 2002 05 31 07 42 00 52.7200 174.1000 28.00 117751 SHM 2002 05 13 00 01 00 1711-91 P co2o18 SIL -0.172 -999.990 .x. o1 2002 06 07 00 16 00 52.7200 174.1000 28.00 117752 SHM 2002 05 13 00 01 00 1712-91 P co2o18 SIL -0.129 -999.990 .x. o1 2002 06 07 00 37 00 52.7200 174.1000 28.00 117753 SHM 2002 05 20 00 28 00 285-99 P co2o18 SIL -0.109 -999.990 ... o1 2002 06 06 23 34 00 52.7200 174.1000 28.00 117754 SHM 2002 05 20 00 28 00 286-99 P co2o18 SIL -0.139 -999.990 ... o1 2002 06 06 23 55 00 52.7200 174.1000 28.00 117755 SHM 2002 06 02 23 30 00 1483-91 P co2o18 SIL 0.025 -999.990 ... o1 2002 07 06 00 48 00 52.7200 174.1000 28.00 117756 SHM 2002 06 02 23 30 00 1484-91 P co2o18 SIL 0.070 -999.990 ... o1 2002 07 06 01 10 00 52.7200 174.1000 28.00 117757 SHM 2002 06 09 23 15 00 571-99 P co2o18 SIL 0.160 -999.990 ... o1 2002 07 06 00 06 00 52.7200 174.1000 28.00 117758 SHM 2002 06 09 23 15 00 572-99 P co2o18 SIL 0.146 -999.990 ... o1 2002 07 06 00 27 00 52.7200 174.1000 28.00 117759 SHM 2002 06 16 23 21 00 4059-91 P co2o18 SIL 0.379 -999.990 ..S o1 2002 07 12 22 48 00 52.7200 174.1000 28.00 117760 SHM 2002 06 23 23 20 00 4337-91 P co2o18 SIL 0.332 -999.990 ... o1 2002 07 13 04 03 00 52.7200 174.1000 28.00 117761 SHM 2002 06 23 23 20 00 4338-91 P co2o18 SIL 0.446 -999.990 ... o1 2002 07 13 04 25 00 52.7200 174.1000 28.00 117762 SHM 2002 06 30 23 30 00 1569-91 P co2o18 SIL 0.652 -999.990 ... o1 2002 07 15 06 26 00 52.7200 174.1000 28.00 117763 SHM 2002 06 30 23 30 00 1570-91 P co2o18 SIL 0.588 -999.990 ... o1 2002 07 15 06 46 00 52.7200 174.1000 28.00 117764 SHM 2002 07 07 22 31 00 63-91 P co2o18 SIL 0.493 -999.990 ... o1 2002 07 29 15 28 00 52.7200 174.1000 28.00 117765 SHM 2002 07 07 22 31 00 64-91 P co2o18 SIL 0.565 -999.990 ... o1 2002 07 29 15 48 00 52.7200 174.1000 28.00 117766 SHM 2002 07 14 23 20 00 4389-91 P co2o18 SIL 0.569 -999.990 ... o1 2002 07 29 14 48 00 52.7200 174.1000 28.00 117767 SHM 2002 07 14 23 20 00 4390-91 P co2o18 SIL 0.536 -999.990 ... o1 2002 07 29 15 08 00 52.7200 174.1000 28.00 117768 SHM 2002 07 21 23 25 00 1860-91 P co2o18 SIL 0.272 -999.990 ... o1 2002 08 12 20 48 00 52.7200 174.1000 28.00 117769 SHM 2002 07 21 23 25 00 581-99 P co2o18 SIL 0.163 -999.990 ... o1 2002 08 12 19 48 00 52.7200 174.1000 28.00 117770 SHM 2002 07 28 23 25 00 1859-91 P co2o18 SIL 0.292 -999.990 ... o1 2002 08 12 20 28 00 52.7200 174.1000 28.00 117771 SHM 2002 07 28 23 25 00 582-99 P co2o18 SIL 0.310 -999.990 ... o1 2002 08 12 20 08 00 52.7200 174.1000 28.00 117772 SHM 2002 08 04 23 30 00 61-99 P co2o18 SIL -0.002 -999.990 ... o1 2002 08 23 14 00 00 52.7200 174.1000 28.00 117773 SHM 2002 08 04 23 30 00 62-99 P co2o18 SIL 0.027 -999.990 ... o1 2002 08 23 14 22 00 52.7200 174.1000 28.00 117774 SHM 2002 08 11 23 30 00 263-99 P co2o18 SIL -0.063 -999.990 ... o1 2002 08 23 13 17 00 52.7200 174.1000 28.00 117775 SHM 2002 08 11 23 30 00 264-99 P co2o18 SIL -0.020 -999.990 ... o1 2002 08 23 13 39 00 52.7200 174.1000 28.00 117776 SHM 2002 08 18 23 35 00 587-99 P co2o18 SIL 0.444 -999.990 .x. o1 2002 09 13 21 28 00 52.7200 174.1000 28.00 117777 SHM 2002 08 18 23 35 00 588-99 P co2o18 SIL 0.433 -999.990 .x. o1 2002 09 13 21 49 00 52.7200 174.1000 28.00 117778 SHM 2002 08 20 23 30 00 171-98 P co2o18 SIL -0.074 -999.990 ... o1 2002 09 15 19 06 00 52.7200 174.1000 28.00 117779 SHM 2002 08 20 23 30 00 172-98 P co2o18 SIL -0.077 -999.990 ... o1 2002 09 15 19 26 00 52.7200 174.1000 28.00 117780 SHM 2002 09 01 23 35 00 767-91 P co2o18 SIL -0.120 -999.990 ... o1 2002 09 27 02 16 00 52.7200 174.1000 28.00 117781 SHM 2002 09 01 23 35 00 768-91 P co2o18 SIL -0.133 -999.990 ... o1 2002 09 27 02 37 00 52.7200 174.1000 28.00 117782 SHM 2002 09 08 23 45 00 2039-91 P co2o18 SIL -0.777 -999.990 .x. o1 2002 09 27 01 33 00 52.7200 174.1000 28.00 117783 SHM 2002 09 08 23 45 00 2040-91 P co2o18 SIL -0.706 -999.990 .x. o1 2002 09 27 01 54 00 52.7200 174.1000 28.00 117784 SHM 2002 09 18 00 00 00 269-91 P co2o18 SIL -0.425 -999.990 ... o1 2002 10 04 20 20 00 52.7200 174.1000 28.00 117785 SHM 2002 09 18 00 00 00 270-91 P co2o18 SIL -0.469 -999.990 ... o1 2002 10 04 20 40 00 52.7200 174.1000 28.00 117786 SHM 2002 09 22 23 25 00 549-91 P co2o18 SIL -0.453 -999.990 -.. o1 2002 10 04 19 40 00 52.7200 174.1000 28.00 117787 SHM 2002 09 22 23 25 00 550-91 P co2o18 SIL -0.327 -999.990 +.. o1 2002 10 04 20 00 00 52.7200 174.1000 28.00 117788 SHM 2002 09 29 23 20 00 409-91 P co2o18 SIL -1.463 -999.990 .x. o1 2002 10 25 20 48 00 52.7200 174.1000 28.00 117789 SHM 2002 09 29 23 20 00 410-91 P co2o18 SIL -1.491 -999.990 .x. o1 2002 10 25 21 07 00 52.7200 174.1000 28.00 117790 SHM 2002 10 06 23 25 00 233-99 P co2o18 SIL -1.104 -999.990 ... o1 2002 10 25 15 32 00 52.7200 174.1000 28.00 117791 SHM 2002 10 06 23 25 00 234-99 P co2o18 SIL -1.128 -999.990 ... o1 2002 10 25 15 52 00 52.7200 174.1000 28.00 117792 SHM 2002 10 13 23 30 00 369-99 P co2o18 SIL -1.478 -999.990 .X. o1 2002 10 30 21 05 00 52.7200 174.1000 28.00 117793 SHM 2002 10 13 23 30 00 370-99 P co2o18 SIL -1.520 -999.990 .X. o1 2002 10 30 21 25 00 52.7200 174.1000 28.00 117794 SHM 2002 10 20 23 30 00 25-91 P co2o18 SIL -0.703 -999.990 ... o1 2002 10 30 17 09 00 52.7200 174.1000 28.00 117795 SHM 2002 10 20 23 30 00 26-91 P co2o18 SIL -0.766 -999.990 ... o1 2002 10 30 17 28 00 52.7200 174.1000 28.00 117796 SHM 2002 10 27 23 41 00 421-91 P co2o18 SIL -1.057 -999.990 ... o1 2002 11 20 16 04 00 52.7200 174.1000 28.00 117797 SHM 2002 10 27 23 41 00 422-91 P co2o18 SIL -1.076 -999.990 ... o1 2002 11 20 16 24 00 52.7200 174.1000 28.00 117798 SHM 2002 11 03 23 33 00 1407-91 P co2o18 SIL -0.606 -999.990 ... o1 2002 11 22 01 35 00 52.7200 174.1000 28.00 117799 SHM 2002 11 03 23 33 00 1408-91 P co2o18 SIL -0.594 -999.990 ... o1 2002 11 22 01 55 00 52.7200 174.1000 28.00 117800 SHM 2002 11 10 23 30 00 4277-91 P co2o18 SIL -0.627 -999.990 -.. o1 2002 12 03 21 38 00 52.7200 174.1000 28.00 117802 SHM 2002 11 10 23 30 00 4278-91 P co2o18 SIL -0.477 -999.990 +.. o1 2002 12 03 21 58 00 52.7200 174.1000 28.00 117803 SHM 2002 11 18 00 25 00 515-99 P co2o18 SIL -0.674 -999.990 ... o1 2002 12 10 13 41 00 52.7200 174.1000 28.00 117804 SHM 2002 11 18 00 25 00 516-99 P co2o18 SIL -0.686 -999.990 ... o1 2002 12 10 14 01 00 52.7200 174.1000 28.00 117805 SHM 2002 11 24 23 30 00 311-91 P co2o18 SIL -0.258 -999.990 ... o1 2002 12 10 13 01 00 52.7200 174.1000 28.00 117806 SHM 2002 11 24 23 30 00 312-91 P co2o18 SIL -0.267 -999.990 ... o1 2002 12 10 13 21 00 52.7200 174.1000 28.00 117807 SHM 2002 12 02 23 30 00 219-99 P co2o18 SIL -0.456 -999.990 ... o1 2003 02 02 20 18 00 52.7200 174.1000 28.00 117808 SHM 2002 12 02 23 30 00 220-99 P co2o18 SIL -0.492 -999.990 ... o1 2003 02 02 20 38 00 52.7200 174.1000 28.00 117809 SHM 2002 12 08 23 25 00 4795-91 P co2o18 SIL -0.575 -999.990 ... o1 2003 02 02 22 58 00 52.7200 174.1000 28.00 117810 SHM 2002 12 08 23 25 00 4796-91 P co2o18 SIL -0.546 -999.990 ... o1 2003 02 02 23 18 00 52.7200 174.1000 28.00 117811 SHM 2002 12 15 23 30 00 191-91 P co2o18 SIL -0.397 -999.990 ... o1 2003 02 05 00 34 00 52.7200 174.1000 28.00 117812 SHM 2002 12 15 23 30 00 192-91 P co2o18 SIL -0.285 -999.990 ... o1 2003 02 05 00 54 00 52.7200 174.1000 28.00 117813 SHM 2002 12 22 23 30 00 1681-91 P co2o18 SIL -0.345 -999.990 ... o1 2003 02 05 01 13 00 52.7200 174.1000 28.00 117814 SHM 2002 12 22 23 30 00 1682-91 P co2o18 SIL -0.315 -999.990 ... o1 2003 02 05 01 33 00 52.7200 174.1000 28.00 117815 SHM 2002 12 29 23 30 00 1711-91 P co2o18 SIL -0.339 -999.990 ... o1 2003 02 18 20 03 00 52.7200 174.1000 28.00 117816 SHM 2002 12 29 23 30 00 1712-91 P co2o18 SIL -0.382 -999.990 ... o1 2003 02 18 20 23 00 52.7200 174.1000 28.00 117817 SHM 2003 01 06 23 30 00 247-99 P co2o18 SIL -0.223 -999.990 ... o1 2003 02 18 17 23 00 52.7200 174.1000 28.00 117818 SHM 2003 01 06 23 30 00 248-99 P co2o18 SIL -0.206 -999.990 ... o1 2003 02 18 17 43 00 52.7200 174.1000 28.00 117819 SHM 2003 01 12 23 50 00 605-99 P co2o18 SIL -0.440 -999.990 ... o1 2003 02 17 15 37 00 52.7200 174.1000 28.00 117820 SHM 2003 01 12 23 50 00 606-99 P co2o18 SIL -0.405 -999.990 ... o1 2003 02 17 15 57 00 52.7200 174.1000 28.00 117821 SHM 2003 01 19 23 58 00 29-91 P co2o18 SIL -0.079 -999.990 ... o1 2003 02 19 00 42 00 52.7200 174.1000 28.00 117822 SHM 2003 01 19 23 58 00 30-91 P co2o18 SIL -0.151 -999.990 ... o1 2003 02 19 01 02 00 52.7200 174.1000 28.00 117823 SHM 2003 01 26 23 40 00 579-99 P co2o18 SIL -0.107 -999.990 ... o1 2003 03 10 19 18 00 52.7200 174.1000 28.00 117824 SHM 2003 01 26 23 40 00 580-99 P co2o18 SIL -0.106 -999.990 ... o1 2003 03 10 19 38 00 52.7200 174.1000 28.00 117825 SHM 2003 02 03 23 30 00 87-99 P co2o18 SIL -0.096 -999.990 ... o1 2003 03 10 19 57 00 52.7200 174.1000 28.00 117826 SHM 2003 02 03 23 30 00 88-99 P co2o18 SIL -0.130 -999.990 ... o1 2003 03 10 20 17 00 52.7200 174.1000 28.00 117827 SHM 2003 02 09 23 59 00 653-99 P co2o18 SIL -0.156 -999.990 ... o1 2003 03 24 14 45 00 52.7200 174.1000 28.00 117828 SHM 2003 02 09 23 59 00 654-99 P co2o18 SIL -0.157 -999.990 ... o1 2003 03 24 15 05 00 52.7200 174.1000 28.00 117829 SHM 2003 02 17 23 45 00 1949-91 P co2o18 SIL -0.043 -999.990 ... o1 2003 03 24 18 41 00 52.7200 174.1000 28.00 117830 SHM 2003 02 17 23 45 00 1950-91 P co2o18 SIL -0.041 -999.990 ... o1 2003 03 24 19 00 00 52.7200 174.1000 28.00 117831 SHM 2003 02 24 23 00 00 850-99 P co2o18 SIL -0.158 -999.990 ... o1 2003 03 28 02 29 00 52.7200 174.1000 28.00 117832 SHM 2003 02 24 23 00 00 851-99 P co2o18 SIL -0.122 -999.990 ... o1 2003 03 28 02 48 00 52.7200 174.1000 28.00 117833 SHM 2003 03 02 23 00 00 849-99 P co2o18 SIL 0.006 -999.990 ... o1 2003 03 28 02 09 00 52.7200 174.1000 28.00 117834 SHM 2003 03 02 23 00 00 852-99 P co2o18 SIL 0.033 -999.990 ... o1 2003 03 28 03 08 00 52.7200 174.1000 28.00 117835 SHM 2003 03 10 00 00 00 1113-99 P co2o18 SIL 0.104 -999.990 ... o1 2003 04 11 08 12 00 52.7200 174.1000 28.00 117836 SHM 2003 03 10 00 00 00 1114-99 P co2o18 SIL 0.106 -999.990 ... o1 2003 04 11 08 31 00 52.7200 174.1000 28.00 117837 SHM 2003 03 16 23 30 00 479-99 P co2o18 SIL 0.246 -999.990 ... o1 2003 04 11 06 54 00 52.7200 174.1000 28.00 117838 SHM 2003 03 16 23 30 00 480-99 P co2o18 SIL 0.184 -999.990 ... o1 2003 04 11 07 14 00 52.7200 174.1000 28.00 117839 SHM 2003 03 23 23 30 00 4881-91 P co2o18 SIL 0.270 -999.990 ..S o1 2003 04 23 22 59 00 52.7200 174.1000 28.00 117840 SHM 2003 03 31 00 00 00 91-91 P co2o18 SIL 0.096 -999.990 ... o1 2003 04 18 16 00 00 52.7200 174.1000 28.00 117841 SHM 2003 03 31 00 00 00 92-91 P co2o18 SIL 0.164 -999.990 ... o1 2003 04 18 16 20 00 52.7200 174.1000 28.00 117842 SHM 2003 04 08 23 30 00 1797-91 P co2o18 SIL 0.006 -999.990 ... o1 2003 05 17 19 08 00 52.7200 174.1000 28.00 117843 SHM 2003 04 08 23 30 00 1798-91 P co2o18 SIL 0.024 -999.990 ... o1 2003 05 17 19 27 00 52.7200 174.1000 28.00 117844 SHM 2003 04 13 23 30 00 1753-91 P co2o18 SIL 0.214 -999.990 ... o1 2003 05 19 21 01 00 52.7200 174.1000 28.00 117845 SHM 2003 04 13 23 30 00 1754-91 P co2o18 SIL 0.196 -999.990 ... o1 2003 05 19 21 21 00 52.7200 174.1000 28.00 117846 SHM 2003 04 20 23 05 00 1343-91 P co2o18 SIL -0.173 -999.990 -.. o1 2003 05 21 14 08 00 52.7200 174.1000 28.00 117847 SHM 2003 04 20 23 05 00 1344-91 P co2o18 SIL -0.045 -999.990 +.. o1 2003 05 21 14 28 00 52.7200 174.1000 28.00 117848 SHM 2003 04 27 23 34 00 49-98 P co2o18 SIL 0.069 -999.990 ... o1 2003 05 21 12 50 00 52.7200 174.1000 28.00 117849 SHM 2003 04 27 23 34 00 50-98 P co2o18 SIL -0.024 -999.990 ... o1 2003 05 21 13 09 00 52.7200 174.1000 28.00 117850 SHM 2003 05 06 00 20 00 1029-99 P co2o18 SIL -0.124 -999.990 ... o1 2003 06 19 04 21 00 52.7200 174.1000 28.00 117851 SHM 2003 05 06 00 20 00 1030-99 P co2o18 SIL -0.191 -999.990 ... o1 2003 06 19 04 41 00 52.7200 174.1000 28.00 117852 SHM 2003 05 12 00 00 00 93-99 P co2o18 SIL 0.061 -999.990 +.. o1 2003 06 19 03 42 00 52.7200 174.1000 28.00 117853 SHM 2003 05 12 00 00 00 94-99 P co2o18 SIL -0.194 -999.990 -.. o1 2003 06 19 04 01 00 52.7200 174.1000 28.00 117854 SHM 2003 05 19 00 25 00 1383-99 P co2o18 SIL 0.131 0.076 ... o1 2003 08 04 21 54 00 52.7200 174.1000 28.00 117855 SHM 2003 05 19 00 25 00 1384-99 P co2o18 SIL 0.015 0.076 ... o1 2003 08 04 22 14 00 52.7200 174.1000 28.00 117856 SHM 2003 05 25 23 40 00 1385-99 P co2o18 SIL 0.469 -999.990 ... o1 2003 07 16 21 37 00 52.7200 174.1000 28.00 117857 SHM 2003 05 25 23 40 00 1386-99 P co2o18 SIL 0.389 -999.990 ... o1 2003 07 16 21 56 00 52.7200 174.1000 28.00 117858 SHM 2003 06 02 23 59 00 1175-99 P co2o18 SIL 0.621 -999.990 ... o1 2003 07 14 00 12 00 52.7200 174.1000 28.00 117859 SHM 2003 06 02 23 59 00 1176-99 P co2o18 SIL 0.596 -999.990 ... o1 2003 07 14 00 32 00 52.7200 174.1000 28.00 117860 SHM 2003 06 08 23 00 00 1177-99 P co2o18 SIL 0.395 -999.990 ... o1 2003 07 14 00 52 00 52.7200 174.1000 28.00 117861 SHM 2003 06 08 23 00 00 1178-99 P co2o18 SIL 0.474 -999.990 ... o1 2003 07 14 01 12 00 52.7200 174.1000 28.00 117862 SHM 2003 06 15 23 25 00 4203-91 P co2o18 SIL 0.602 0.074 A.H o1 2003 08 03 17 50 00 52.7200 174.1000 28.00 117863 SHM 2003 06 15 23 25 00 4204-91 P co2o18 SIL 0.600 0.074 A.H o1 2003 08 03 18 10 00 52.7200 174.1000 28.00 117864 SHM 2003 06 23 01 00 00 4605-91 P co2o18 SIL 0.030 0.079 -.. o1 2003 08 14 00 52 00 52.7200 174.1000 28.00 117865 SHM 2003 06 23 01 00 00 4606-91 P co2o18 SIL 0.211 0.079 +.. o1 2003 08 14 01 12 00 52.7200 174.1000 28.00 117866 SHM 2003 06 29 23 59 00 1503-99 P co2o18 SIL 0.422 0.078 A.. o1 2003 08 20 14 55 00 52.7200 174.1000 28.00 117867 SHM 2003 06 29 23 59 00 1504-99 P co2o18 SIL 0.595 0.078 A.. o1 2003 08 20 15 14 00 52.7200 174.1000 28.00 117868 SHM 2003 07 06 23 45 00 1505-99 P co2o18 SIL 0.148 0.071 A.. o1 2003 08 22 00 25 00 52.7200 174.1000 28.00 117869 SHM 2003 07 06 23 45 00 1506-99 P co2o18 SIL 0.115 0.071 A.. o1 2003 08 22 00 46 00 52.7200 174.1000 28.00 117870 SHM 2003 07 13 23 59 00 1509-99 P co2o18 SIL 0.273 0.062 ..S o1 2003 08 30 21 25 00 52.7200 174.1000 28.00 117871 SHM 2003 07 20 23 45 00 1507-99 P co2o18 SIL -0.023 0.066 A.L o1 2003 09 03 14 37 00 52.7200 174.1000 28.00 117872 SHM 2003 07 20 23 45 00 1508-99 P co2o18 SIL -0.048 0.066 A.L o1 2003 09 03 14 57 00 52.7200 174.1000 28.00 117873 SHM 2003 07 28 00 39 00 6797-66 P co2o18 SIL 0.434 0.063 A.S o1 2003 09 10 10 33 00 52.7200 174.1000 28.00 117874 SHM 2003 07 29 12 16 00 6249-66 P co2o18 SIL -0.075 0.069 A.. o1 2003 09 06 06 38 00 52.7200 174.1000 28.00 117875 SHM 2003 07 29 12 16 00 6250-66 P co2o18 SIL 0.202 0.069 A.. o1 2003 09 06 06 57 00 52.7200 174.1000 28.00 117876 SHM 2003 08 03 23 59 00 269-99 P co2o18 SIL 0.188 0.074 A.. o1 2003 10 02 01 04 00 52.7200 174.1000 28.00 117877 SHM 2003 08 03 23 59 00 270-99 P co2o18 SIL 0.686 0.074 A.. o1 2003 10 02 01 24 00 52.7200 174.1000 28.00 117878 SHM 2003 08 12 12 15 00 525-91 P co2o18 SIL -1.035 0.086 ..L o1 2003 10 13 16 33 00 52.7200 174.1000 28.00 117879 SHM 2003 08 12 12 15 00 526-91 P co2o18 SIL -0.939 0.086 ..L o1 2003 10 13 16 53 00 52.7200 174.1000 28.00 117880 SHM 2003 08 17 23 59 00 237-91 P co2o18 SIL -0.476 0.076 A.. o1 2003 10 16 23 41 00 52.7200 174.1000 28.00 117881 SHM 2003 08 17 23 59 00 238-91 P co2o18 SIL -0.501 0.076 A.. o1 2003 10 17 00 01 00 52.7200 174.1000 28.00 117882 SHM 2003 08 25 00 05 00 119-91 P co2o18 SIL -1.381 0.076 A.. o1 2003 10 17 00 21 00 52.7200 174.1000 28.00 117883 SHM 2003 08 25 00 05 00 120-91 P co2o18 SIL -1.329 0.076 A.. o1 2003 10 17 00 41 00 52.7200 174.1000 28.00 117884 SHM 2003 09 01 01 50 00 4775-91 P co2o18 SIL -0.662 0.066 -.. o1 2003 10 08 18 31 00 52.7200 174.1000 28.00 117885 SHM 2003 09 01 01 50 00 4776-91 P co2o18 SIL -0.472 0.066 +.. o1 2003 10 08 18 51 00 52.7200 174.1000 28.00 117886 SHM 2003 09 10 05 00 00 4815-91 P co2o18 SIL -1.145 0.067 ... o1 2003 10 10 05 44 00 52.7200 174.1000 28.00 117887 SHM 2003 09 10 05 00 00 4816-91 P co2o18 SIL -1.211 0.067 ... o1 2003 10 10 06 05 00 52.7200 174.1000 28.00 117888 SHM 2003 09 18 05 00 00 229-91 P co2o18 SIL -0.825 0.074 ..L o1 2003 10 30 17 21 00 52.7200 174.1000 28.00 117889 SHM 2003 09 18 05 00 00 230-91 P co2o18 SIL -0.891 0.074 ..L o1 2003 10 30 17 41 00 52.7200 174.1000 28.00 117890 SHM 2003 09 23 03 00 00 1809-91 P co2o18 SIL -1.212 0.074 ..L o1 2003 10 30 18 01 00 52.7200 174.1000 28.00 117891 SHM 2003 09 23 03 00 00 1810-91 P co2o18 SIL -1.286 0.074 ..L o1 2003 10 30 18 22 00 52.7200 174.1000 28.00 117892 SHM 2003 10 06 01 15 00 1529-99 P co2o18 SIL -1.410 0.075 ... o1 2003 12 17 16 02 00 52.7200 174.1000 28.00 117893 SHM 2003 10 06 01 15 00 1530-99 P co2o18 SIL -1.463 0.075 ... o1 2003 12 17 16 23 00 52.7200 174.1000 28.00 117894 SHM 2003 10 13 23 30 00 1527-99 P co2o18 SIL -0.970 0.075 ... o1 2003 12 17 16 43 00 52.7200 174.1000 28.00 117895 SHM 2003 10 13 23 30 00 1528-99 P co2o18 SIL -1.077 0.075 ... o1 2003 12 17 17 04 00 52.7200 174.1000 28.00 117896 SHM 2003 10 20 03 30 00 1399-99 P co2o18 SIL -0.692 0.075 A.. o1 2004 01 03 16 51 00 52.7200 174.1000 28.00 117897 SHM 2003 10 20 03 30 00 1400-99 P co2o18 SIL -0.971 0.075 A.. o1 2004 01 03 17 12 00 52.7200 174.1000 28.00 117898 SHM 2003 10 26 23 30 00 315-99 P co2o18 SIL -0.848 0.075 A.. o1 2004 01 03 17 31 00 52.7200 174.1000 28.00 117899 SHM 2003 10 26 23 30 00 316-99 P co2o18 SIL -0.562 0.075 A.. o1 2004 01 03 17 51 00 52.7200 174.1000 28.00 117900 SHM 2003 11 03 01 09 00 483-99 P co2o18 SIL -0.455 0.067 A.. o1 2003 12 20 02 18 00 52.7200 174.1000 28.00 117901 SHM 2003 11 03 01 09 00 484-99 P co2o18 SIL -0.418 0.067 A.. o1 2003 12 20 02 38 00 52.7200 174.1000 28.00 117902 SHM 2003 11 10 06 15 00 545-99 P co2o18 SIL -1.321 0.067 A.. o1 2003 12 20 02 59 00 52.7200 174.1000 28.00 117903 SHM 2003 11 10 06 15 00 546-99 P co2o18 SIL -1.152 0.067 A.. o1 2003 12 20 03 19 00 52.7200 174.1000 28.00 117904 SHM 2003 11 19 06 15 00 61-91 P co2o18 SIL -0.878 0.075 -.. o1 2004 01 04 01 33 00 52.7200 174.1000 28.00 117905 SHM 2003 11 19 06 15 00 62-91 P co2o18 SIL -0.724 0.075 +.. o1 2004 01 04 01 52 00 52.7200 174.1000 28.00 117906 SHM 2003 11 25 04 35 00 165-91 P co2o18 SIL -0.709 0.075 ... o1 2004 01 04 00 52 00 52.7200 174.1000 28.00 117907 SHM 2003 11 25 04 35 00 166-91 P co2o18 SIL -0.808 0.075 ... o1 2004 01 04 01 12 00 52.7200 174.1000 28.00 117908 SHM 2003 12 01 02 15 00 1809-91 P co2o18 SIL -0.700 0.088 ..H o1 2004 02 13 17 24 00 52.7200 174.1000 28.00 117909 SHM 2003 12 01 02 15 00 1810-91 P co2o18 SIL -0.704 0.088 ..H o1 2004 02 13 17 45 00 52.7200 174.1000 28.00 117910 SHM 2003 12 10 03 10 00 1155-91 P co2o18 SIL -0.740 0.088 ..H o1 2004 02 13 16 43 00 52.7200 174.1000 28.00 117911 SHM 2003 12 10 03 10 00 1156-91 P co2o18 SIL -0.749 0.088 ..H o1 2004 02 13 17 03 00 52.7200 174.1000 28.00 117912 SHM 2003 12 18 21 30 00 2017-91 P co2o18 SIL -0.411 0.057 ... o1 2004 04 18 16 52 00 52.7200 174.1000 28.00 117913 SHM 2003 12 18 21 30 00 2018-91 P co2o18 SIL -0.441 0.057 ... o1 2004 04 18 17 12 00 52.7200 174.1000 28.00 117914 SHM 2003 12 23 03 00 00 1463-99 P co2o18 SIL -0.374 0.057 -.. o1 2004 04 19 05 25 00 52.7200 174.1000 28.00 117915 SHM 2003 12 23 03 00 00 1464-99 P co2o18 SIL -0.219 0.057 +.. o1 2004 04 19 05 45 00 52.7200 174.1000 28.00 117916 SHM 2003 12 28 23 30 00 2352-99 P co2o18 SIL -0.401 0.064 ... o1 2004 04 11 01 36 00 52.7200 174.1000 28.00 117917 SHM 2003 12 28 23 30 00 2353-99 P co2o18 SIL -0.427 0.064 ... o1 2004 04 11 01 57 00 52.7200 174.1000 28.00 117918 SHM 2004 01 07 23 30 00 2351-99 P co2o18 SIL -0.441 0.052 -.. o1 2004 04 04 23 52 00 52.7200 174.1000 28.00 117919 SHM 2004 01 07 23 30 00 2354-99 P co2o18 SIL -0.263 0.052 +.. o1 2004 04 05 00 12 00 52.7200 174.1000 28.00 117920 SHM 2004 01 14 23 30 00 2460-99 P co2o18 SIL -0.516 0.050 ... o1 2004 03 25 03 14 00 52.7200 174.1000 28.00 117921 SHM 2004 01 14 23 30 00 2471-99 P co2o18 SIL -0.440 0.050 ... o1 2004 03 25 02 14 00 52.7200 174.1000 28.00 117922 SHM 2004 01 21 23 45 00 2459-99 P co2o18 SIL -0.309 0.050 ... o1 2004 03 25 02 54 00 52.7200 174.1000 28.00 117923 SHM 2004 01 21 23 45 00 2472-99 P co2o18 SIL -0.240 0.050 ... o1 2004 03 25 02 34 00 52.7200 174.1000 28.00 117924 SHM 2004 01 25 11 30 00 6187-66 P co2o18 SIL -0.208 0.057 -.. o1 2004 05 01 20 43 00 52.7200 174.1000 28.00 117925 SHM 2004 01 25 11 30 00 6188-66 P co2o18 SIL 756.877 0.057 !.P o1 2004 05 01 21 02 00 52.7200 174.1000 28.00 117926 SHM 2004 02 01 11 39 00 2609-99 P co2o18 SIL -0.340 0.057 -.. o1 2004 04 30 17 09 00 52.7200 174.1000 28.00 117927 SHM 2004 02 01 11 39 00 2609-99 P co2o18 SIL -0.189 0.069 ..T o1 2004 05 02 21 02 00 52.7200 174.1000 28.00 117927 SHM 2004 02 01 11 39 00 2610-99 P co2o18 SIL 0.039 0.057 +.. o1 2004 04 30 17 28 00 52.7200 174.1000 28.00 117928 SHM 2004 02 01 11 39 00 2610-99 P co2o18 SIL -0.172 0.069 ..T o1 2004 05 02 21 21 00 52.7200 174.1000 28.00 117928 SHM 2004 02 08 13 30 00 1253-99 P co2o18 SIL -0.435 0.064 ... o1 2004 05 10 20 04 00 52.7200 174.1000 28.00 117929 SHM 2004 02 08 13 30 00 1254-99 P co2o18 SIL -0.345 0.064 ... o1 2004 05 10 20 24 00 52.7200 174.1000 28.00 117930 SHM 2004 02 17 03 30 00 1179-99 P co2o18 SIL -0.599 0.064 ... o1 2004 05 10 19 22 00 52.7200 174.1000 28.00 117931 SHM 2004 02 17 03 30 00 1180-99 P co2o18 SIL -0.572 0.064 ... o1 2004 05 10 19 43 00 52.7200 174.1000 28.00 117932 SHM 2004 02 23 06 45 00 6734-66 P co2o18 SIL -0.586 0.071 A.S o1 2004 05 25 21 28 00 52.7200 174.1000 28.00 117933 SHM 2004 02 23 07 00 00 2465-99 P co2o18 SIL -0.020 0.068 ... o1 2004 05 06 00 33 00 52.7200 174.1000 28.00 117934 SHM 2004 02 23 07 00 00 2466-99 P co2o18 SIL -0.129 0.068 ... o1 2004 05 06 00 53 00 52.7200 174.1000 28.00 117935 SHM 2004 03 01 07 30 00 2867-99 P co2o18 SIL -0.180 0.065 A.. o1 2004 04 14 20 35 00 52.7200 174.1000 28.00 117936 SHM 2004 03 01 07 30 00 2868-99 P co2o18 SIL 0.072 0.065 A.. o1 2004 04 14 20 55 00 52.7200 174.1000 28.00 117937 SHM 2004 03 09 06 00 00 2869-99 P co2o18 SIL -0.316 0.080 A.T o1 2004 05 15 05 57 00 52.7200 174.1000 28.00 117938 SHM 2004 03 09 06 00 00 2870-99 P co2o18 SIL -0.026 0.080 A.T o1 2004 05 15 06 17 00 52.7200 174.1000 28.00 117939 SHM 2004 03 15 09 20 00 1017-99 P co2o18 SIL -0.129 0.069 +.T o1 2004 05 03 10 23 00 52.7200 174.1000 28.00 117940 SHM 2004 03 15 09 20 00 1018-99 P co2o18 SIL -0.458 0.069 -.T o1 2004 05 03 10 43 00 52.7200 174.1000 28.00 117941 SHM 2004 04 04 12 15 00 6621-66 P co2o18 SIL -0.294 0.069 ..T o1 2004 05 03 05 48 00 52.7200 174.1000 28.00 117946 SHM 2004 04 04 12 15 00 6622-66 P co2o18 SIL -0.285 0.069 ..T o1 2004 05 03 06 08 00 52.7200 174.1000 28.00 117947 SHM 2004 04 14 00 00 00 3299-99 P co2o18 SIL -0.166 0.073 A.. o1 2004 05 30 07 29 00 52.7200 174.1000 28.00 117948 SHM 2004 04 14 00 00 00 3302-99 P co2o18 SIL 0.007 0.073 A.. o1 2004 05 30 07 49 00 52.7200 174.1000 28.00 117949 SHM 2004 04 28 23 00 00 1173-99 P co2o18 SIL -0.044 0.060 A.L o1 2004 06 23 01 14 00 52.7200 174.1000 28.00 117952 SHM 2004 04 28 23 00 00 1174-99 P co2o18 SIL -0.090 0.060 A.L o1 2004 06 23 01 34 00 52.7200 174.1000 28.00 117953 SHM 2004 05 04 23 00 00 1109-99 P co2o18 SIL -0.012 0.060 A.L o1 2004 06 23 01 54 00 52.7200 174.1000 28.00 117954 SHM 2004 05 04 23 00 00 1110-99 P co2o18 SIL 0.004 0.060 A.L o1 2004 06 23 02 14 00 52.7200 174.1000 28.00 117955 SHM 2004 05 10 12 00 00 3523-99 P co2o18 SIL -0.491 0.052 -.. o1 2004 06 27 19 25 00 52.7200 174.1000 28.00 117956 SHM 2004 05 10 12 00 00 3524-99 P co2o18 SIL -0.238 0.052 +.. o1 2004 06 27 19 45 00 52.7200 174.1000 28.00 117957 SHM 2004 05 17 12 15 00 3521-99 P co2o18 SIL -0.280 0.052 ... o1 2004 06 27 18 44 00 52.7200 174.1000 28.00 117958 SHM 2004 05 17 12 15 00 3522-99 P co2o18 SIL -0.332 0.052 ... o1 2004 06 27 19 04 00 52.7200 174.1000 28.00 117959 SHM 2004 05 23 23 30 00 1389-99 P co2o18 SIL -0.234 0.052 ... o1 2004 07 01 03 43 00 52.7200 174.1000 28.00 117960 SHM 2004 05 23 23 30 00 1390-99 P co2o18 SIL -0.203 0.052 ... o1 2004 07 01 04 04 00 52.7200 174.1000 28.00 117961 SHM 2004 05 30 23 55 00 1451-99 P co2o18 SIL -0.216 0.057 A.H o1 2004 06 29 17 54 00 52.7200 174.1000 28.00 117962 SHM 2004 05 30 23 55 00 1452-99 P co2o18 SIL -0.162 0.057 A.H o1 2004 06 29 18 15 00 52.7200 174.1000 28.00 117963 SHM 2004 06 06 23 30 00 3519-99 P co2o18 SIL -0.100 0.097 ... o1 2004 08 11 02 15 00 52.7200 174.1000 28.00 117964 SHM 2004 06 06 23 30 00 3520-99 P co2o18 SIL -0.191 0.097 ... o1 2004 08 11 02 33 00 52.7200 174.1000 28.00 117965 SHM 2004 06 14 12 00 00 3533-99 P co2o18 SIL -0.136 0.097 ... o1 2004 08 11 02 51 00 52.7200 174.1000 28.00 117966 SHM 2004 06 14 12 00 00 3534-99 P co2o18 SIL -0.135 0.097 ... o1 2004 08 11 03 09 00 52.7200 174.1000 28.00 117967 SHM 2004 06 22 12 15 00 1095-99 P co2o18 SIL -0.195 0.129 ..L o1 2004 08 18 16 45 00 52.7200 174.1000 28.00 117968 SHM 2004 06 22 12 15 00 1096-99 P co2o18 SIL -0.162 0.129 ..L o1 2004 08 18 17 04 00 52.7200 174.1000 28.00 117969 SHM 2004 06 27 23 35 00 6231-66 P co2o18 SIL 0.106 0.129 -.L o1 2004 08 18 20 57 00 52.7200 174.1000 28.00 117970 SHM 2004 06 27 23 35 00 6232-66 P co2o18 SIL 0.263 0.129 +.L o1 2004 08 18 21 15 00 52.7200 174.1000 28.00 117971 SHM 2004 07 04 23 55 00 1781-99 P co2o18 SIL 0.720 0.035 .X. o1 2004 09 17 21 15 00 52.7200 174.1000 28.00 117972 SHM 2004 07 04 23 55 00 1782-99 P co2o18 SIL 0.677 0.035 .X. o1 2004 09 17 21 33 00 52.7200 174.1000 28.00 117973 SHM 2004 07 12 12 30 00 2855-99 P co2o18 SIL 0.473 0.035 ... o1 2004 09 17 20 40 00 52.7100 174.1000 28.00 117974 SHM 2004 07 12 12 30 00 2856-99 P co2o18 SIL 0.455 0.035 ... o1 2004 09 17 20 57 00 52.7100 174.1000 28.00 117975 SHM 2004 07 18 23 55 00 2973-99 P co2o18 SIL 0.333 0.105 ... o1 2004 09 07 03 57 00 52.7200 174.1000 28.00 117976 SHM 2004 07 18 23 55 00 2974-99 P co2o18 SIL 0.418 0.105 ... o1 2004 09 07 04 15 00 52.7200 174.1000 28.00 117977 SHM 2004 07 26 12 00 00 6217-66 P co2o18 SIL -0.422 0.035 ... o1 2004 09 19 13 47 00 52.7200 174.1000 28.00 117978 SHM 2004 07 26 12 00 00 6218-66 P co2o18 SIL -0.395 0.035 ... o1 2004 09 19 14 05 00 52.7200 174.1000 28.00 117979 SHM 2004 08 01 23 55 00 1535-99 P co2o18 SIL -0.413 0.045 +.. o1 2004 10 17 18 35 00 52.7100 174.0800 28.00 188951 SHM 2004 08 01 23 55 00 1536-99 P co2o18 SIL -0.944 0.045 -.. o1 2004 10 17 18 53 00 52.7100 174.0800 28.00 188952 SHM 2004 08 10 01 00 00 3067-99 P co2o18 SIL -0.663 0.045 ... o1 2004 10 18 02 51 00 52.7100 174.0800 28.00 188953 SHM 2004 08 10 01 00 00 3068-99 P co2o18 SIL -0.554 0.045 ... o1 2004 10 18 03 09 00 52.7100 174.0800 28.00 188954 SHM 2004 08 20 01 00 00 2261-99 P co2o18 SIL -1.323 0.043 +.. o1 2004 10 15 13 21 00 52.7100 174.0800 28.00 189113 SHM 2004 08 20 01 00 00 2262-99 P co2o18 SIL -1.504 0.043 -.. o1 2004 10 15 13 39 00 52.7100 174.0800 28.00 189114 SHM 2004 08 22 23 30 00 2595-99 P co2o18 SIL -0.749 0.043 -.. o1 2004 10 15 21 36 00 52.7100 174.0800 28.00 189115 SHM 2004 08 22 23 30 00 2596-99 P co2o18 SIL -0.225 0.043 +.. o1 2004 10 15 21 54 00 52.7100 174.0800 28.00 189116 SHM 2004 09 05 23 30 00 3614-99 P co2o18 SIL -1.105 0.044 ..S o1 2004 10 17 01 25 00 52.7100 174.0800 28.00 189237 SHM 2004 09 05 23 52 00 41-99 P co2o18 SIL -1.468 0.047 ... o1 2004 10 26 17 09 00 52.7100 174.0800 28.00 189238 SHM 2004 09 05 23 52 00 42-99 P co2o18 SIL -1.522 0.047 ... o1 2004 10 26 17 27 00 52.7100 174.0800 28.00 189239 SHM 2004 09 13 23 35 00 2379-99 P co2o18 SIL -2.824 0.042 -.. o1 2004 11 04 17 15 00 52.7100 174.0800 28.00 190707 SHM 2004 09 13 23 35 00 2380-99 P co2o18 SIL -1.668 0.042 +.. o1 2004 11 04 17 33 00 52.7100 174.0800 28.00 190708 SHM 2004 09 19 23 30 00 3867-99 P co2o18 SIL -0.717 0.043 .X. o1 2004 11 05 13 53 00 52.7100 174.0800 28.00 190709 SHM 2004 09 19 23 30 00 3868-99 P co2o18 SIL -0.686 0.043 .X. o1 2004 11 05 14 11 00 52.7100 174.0800 28.00 190710 SHM 2004 09 26 23 45 00 1607-99 P co2o18 SIL -1.776 0.040 ... o1 2004 12 05 00 34 00 52.7100 174.0800 28.00 191261 SHM 2004 09 26 23 45 00 1608-99 P co2o18 SIL -1.672 0.040 ... o1 2004 12 05 00 52 00 52.7100 174.0800 28.00 191262 SHM 2004 10 04 11 20 00 1181-99 P co2o18 SIL -1.645 0.040 ... o1 2004 12 04 23 58 00 52.7100 174.0800 28.00 191259 SHM 2004 10 04 11 20 00 1182-99 P co2o18 SIL -1.656 0.040 ... o1 2004 12 05 00 16 00 52.7100 174.0800 28.00 191260 SHM 2004 10 10 23 50 00 443-99 P co2o18 SIL -1.030 0.022 -.. o1 2004 12 08 15 58 00 52.7100 174.0800 28.00 191754 SHM 2004 10 10 23 50 00 444-99 P co2o18 SIL -0.902 0.022 +.. o1 2004 12 08 16 15 00 52.7100 174.0800 28.00 191755 SHM 2004 10 17 23 35 00 1259-99 P co2o18 SIL -0.337 0.024 .X. o1 2004 12 10 20 55 00 52.7100 174.0800 28.00 191752 SHM 2004 10 17 23 35 00 1260-99 P co2o18 SIL -0.352 0.024 .X. o1 2004 12 10 21 12 00 52.7100 174.0800 28.00 191753 SHM 2004 11 01 00 01 00 1912-99 P co2o18 SIL -1.049 0.059 ..S o1 2005 01 04 04 23 00 52.7100 174.0800 28.00 192880 SHM 2004 11 07 23 45 00 895-99 P co2o18 SIL -1.164 0.062 +.. o1 2005 01 07 23 52 00 52.7100 174.0800 28.00 192881 SHM 2004 11 07 23 45 00 896-99 P co2o18 SIL -1.319 0.062 -.. o1 2005 01 08 00 09 00 52.7100 174.0800 28.00 192882 SHM 2004 11 21 23 59 00 3477-99 P co2o18 SIL -1.194 0.048 -.. o1 2005 02 10 13 51 00 52.7100 174.0800 28.00 194701 SHM 2004 11 21 23 59 00 3478-99 P co2o18 SIL -0.872 0.048 +.. o1 2005 02 10 14 09 00 52.7100 174.0800 28.00 194702 SHM 2004 12 05 13 00 00 3529-99 P co2o18 SIL 20.565 0.048 !.P o1 2005 02 10 13 14 00 52.7100 174.0800 28.00 194705 SHM 2004 12 05 13 00 00 3529-99 P co2o18 SIL -0.454 0.045 ... o1 2005 02 11 12 35 00 52.7100 174.0800 28.00 194705 SHM 2004 12 05 13 00 00 3530-99 P co2o18 SIL 299.244 0.048 !.P o1 2005 02 10 13 37 00 52.7100 174.0800 28.00 194706 SHM 2004 12 05 13 00 00 3530-99 P co2o18 SIL -0.571 0.045 ... o1 2005 02 11 12 53 00 52.7100 174.0800 28.00 194706 SHM 2004 12 12 23 59 00 1629-99 P co2o18 SIL -0.547 0.045 ... o1 2005 02 11 15 32 00 52.7100 174.0800 28.00 194703 SHM 2004 12 12 23 59 00 1630-99 P co2o18 SIL -0.640 0.045 ... o1 2005 02 11 15 50 00 52.7100 174.0800 28.00 194704 SHM 2004 12 26 23 45 00 3403-99 P co2o18 SIL -0.421 0.045 ... o1 2005 02 11 16 08 00 52.7100 174.0800 28.00 194699 SHM 2004 12 26 23 45 00 3404-99 P co2o18 SIL -0.414 0.045 ... o1 2005 02 11 16 26 00 52.7100 174.0800 28.00 194700 SHM 2005 01 09 23 59 00 4075-99 P co2o18 SIL -0.046 0.048 ... o1 2005 02 10 14 27 00 52.7100 174.0800 28.00 194717 SHM 2005 01 09 23 59 00 4076-99 P co2o18 SIL 0.019 0.048 ... o1 2005 02 10 14 44 00 52.7100 174.0800 28.00 194718 SHM 2005 01 16 23 50 00 287-99 P co2o18 SIL -0.033 0.045 ... o1 2005 02 12 00 59 00 52.7100 174.0800 28.00 194715 SHM 2005 01 16 23 50 00 288-99 P co2o18 SIL -0.083 0.045 ... o1 2005 02 12 01 17 00 52.7100 174.0800 28.00 194716 SHM 2005 01 23 23 30 00 3953-99 P co2o18 SIL -0.006 0.048 -.. o1 2005 03 06 23 50 00 52.7100 174.0800 28.00 195851 SHM 2005 01 23 23 30 00 3954-99 P co2o18 SIL 0.148 0.048 +.. o1 2005 03 07 00 08 00 52.7100 174.0800 28.00 195852 SHM 2005 02 01 12 30 00 4045-99 P co2o18 SIL -0.006 0.048 ... o1 2005 03 06 23 15 00 52.7100 174.0800 28.00 195853 SHM 2005 02 01 12 30 00 4046-99 P co2o18 SIL 0.058 0.048 ... o1 2005 03 06 23 32 00 52.7100 174.0800 28.00 195854 SHM 2005 02 09 22 30 00 4119-99 P co2o18 SIL -0.146 0.025 ... o1 2005 03 21 19 31 00 52.7100 174.0800 28.00 196619 SHM 2005 02 09 22 30 00 4120-99 P co2o18 SIL -0.122 0.025 ... o1 2005 03 21 19 49 00 52.7100 174.0800 28.00 196620 SHM 2005 02 13 23 45 00 4117-99 P co2o18 SIL -0.291 0.025 ... o1 2005 03 21 18 55 00 52.7100 174.0800 28.00 196617 SHM 2005 02 13 23 45 00 4118-99 P co2o18 SIL -0.325 0.025 ... o1 2005 03 21 19 13 00 52.7100 174.0800 28.00 196618 SHM 2005 02 21 23 50 00 1355-99 P co2o18 SIL -0.019 0.024 ... o1 2005 04 08 01 39 00 52.7100 174.0800 28.00 197277 SHM 2005 02 21 23 50 00 1356-99 P co2o18 SIL -0.126 0.024 ... o1 2005 04 08 01 57 00 52.7100 174.0800 28.00 197278 SHM 2005 02 28 23 30 00 1797-99 P co2o18 SIL -0.092 0.024 ... o1 2005 04 08 17 49 00 52.7100 174.0800 28.00 197275 SHM 2005 02 28 23 30 00 1798-99 P co2o18 SIL -0.100 0.024 ... o1 2005 04 08 18 07 00 52.7100 174.0800 28.00 197276 SHM 2005 03 06 23 50 00 565-99 P co2o18 SIL -0.159 0.035 -.. o1 2005 05 03 10 09 00 52.7100 174.0800 28.00 197823 SHM 2005 03 06 23 50 00 566-99 P co2o18 SIL 0.039 0.035 +.. o1 2005 05 03 10 27 00 52.7100 174.0800 28.00 197824 SHM 2005 03 17 03 15 00 2013-99 P co2o18 SIL -0.009 0.041 ... o1 2005 04 29 21 23 00 52.7100 174.0800 28.00 197819 SHM 2005 03 17 03 15 00 2014-99 P co2o18 SIL -0.039 0.041 ... o1 2005 04 29 21 40 00 52.7100 174.0800 28.00 197820 SHM 2005 03 20 23 45 00 2903-99 P co2o18 SIL -0.079 0.041 ... o1 2005 04 29 18 27 00 52.7100 174.0800 28.00 197821 SHM 2005 03 20 23 45 00 2904-99 P co2o18 SIL -0.122 0.041 ... o1 2005 04 29 18 44 00 52.7100 174.0800 28.00 197822 SHM 2005 03 28 12 45 00 3111-99 P co2o18 SIL -0.061 0.041 ... o1 2005 04 29 21 58 00 52.7100 174.0800 28.00 197825 SHM 2005 03 28 12 45 00 3112-99 P co2o18 SIL -0.090 0.041 ... o1 2005 04 29 22 16 00 52.7100 174.0800 28.00 197826 SHM 2005 03 28 12 45 00 3112-99 P co2o18 SIL 0.274 0.041 ... o1 2005 04 29 22 33 00 52.7100 174.0800 28.00 197826 SHM 2005 04 03 23 45 00 6137-66 P co2o18 SIL 0.019 0.042 ... o1 2005 05 21 18 59 00 52.7100 174.0800 28.00 198725 SHM 2005 04 03 23 45 00 6138-66 P co2o18 SIL 0.128 0.042 ... o1 2005 05 21 19 17 00 52.7100 174.0800 28.00 198726 SHM 2005 04 13 12 45 00 2109-99 P co2o18 SIL 0.106 0.041 ... o1 2005 05 23 07 41 00 52.7100 174.0800 28.00 198723 SHM 2005 04 13 12 45 00 2110-99 P co2o18 SIL 0.084 0.041 ... o1 2005 05 23 07 59 00 52.7100 174.0800 28.00 198724 SHM 2005 04 17 23 30 00 2787-99 P co2o18 SIL -0.040 0.025 ... o1 2005 06 19 04 13 00 52.7100 174.0800 28.00 199991 SHM 2005 04 17 23 30 00 2788-99 P co2o18 SIL 0.004 0.025 ... o1 2005 06 19 04 31 00 52.7100 174.0800 28.00 199992 SHM 2005 04 24 23 15 00 3877-99 P co2o18 SIL 0.173 0.024 ... o1 2005 06 18 04 20 00 52.7100 174.0800 28.00 199993 SHM 2005 04 24 23 15 00 3878-99 P co2o18 SIL 0.135 0.024 ... o1 2005 06 18 04 37 00 52.7100 174.0800 28.00 199994 SHM 2005 05 02 23 30 00 2721-99 P co2o18 SIL 0.413 0.026 ... o1 2005 06 24 05 25 00 52.7100 174.0800 28.00 200251 SHM 2005 05 02 23 30 00 2722-99 P co2o18 SIL 0.371 0.026 ... o1 2005 06 24 05 43 00 52.7100 174.0800 28.00 200252 SHM 2005 05 08 23 30 00 3835-99 P co2o18 SIL -0.081 0.026 ... o1 2005 06 23 18 33 00 52.7100 174.0800 28.00 200265 SHM 2005 05 08 23 30 00 3836-99 P co2o18 SIL -0.048 0.026 ... o1 2005 06 23 18 51 00 52.7100 174.0800 28.00 200266 SHM 2005 05 15 23 30 00 2349-99 P co2o18 SIL -0.515 0.030 ... o1 2005 07 20 20 14 00 52.7100 174.0800 28.00 201771 SHM 2005 05 15 23 30 00 2350-99 P co2o18 SIL -0.462 0.030 ... o1 2005 07 20 20 32 00 52.7100 174.0800 28.00 201772 SHM 2005 05 22 13 45 00 3739-99 P co2o18 SIL 0.114 0.030 +.. o1 2005 07 20 19 36 00 52.7100 174.0800 28.00 201769 SHM 2005 05 22 13 45 00 3740-99 P co2o18 SIL -0.300 0.030 -.. o1 2005 07 20 19 55 00 52.7100 174.0800 28.00 201770 SHM 2005 05 29 23 30 00 2769-99 P co2o18 SIL -0.226 0.047 ... o1 2005 08 09 03 12 00 52.7100 174.0800 28.00 201841 SHM 2005 05 29 23 30 00 2770-99 P co2o18 SIL -0.244 0.047 ... o1 2005 08 09 03 31 00 52.7100 174.0800 28.00 201842 SHM 2005 06 05 23 30 00 2821-99 P co2o18 SIL 0.128 0.035 ... o1 2005 08 16 20 25 00 52.7100 174.0800 28.00 201843 SHM 2005 06 05 23 30 00 2822-99 P co2o18 SIL 0.066 0.035 ... o1 2005 08 16 20 43 00 52.7100 174.0800 28.00 201844 SHM 2005 06 12 12 30 00 2385-99 P co2o18 SIL 0.017 0.038 ... o1 2005 09 12 06 31 00 52.7100 174.0800 28.00 203577 SHM 2005 06 12 12 30 00 2386-99 P co2o18 SIL -0.009 0.038 ... o1 2005 09 12 06 49 00 52.7100 174.0800 28.00 203578 SHM 2005 06 19 12 30 00 1803-99 P co2o18 SIL 0.102 0.041 ... o1 2005 09 16 03 27 00 52.7100 174.0800 28.00 203579 SHM 2005 06 19 12 30 00 1804-99 P co2o18 SIL 0.059 0.041 ... o1 2005 09 16 03 45 00 52.7100 174.0800 28.00 203580 SHM 2005 06 26 23 45 00 6537-66 P co2o18 SIL 0.178 0.038 ... o1 2005 09 12 14 32 00 52.7100 174.0800 28.00 203619 SHM 2005 06 26 23 45 00 6538-66 P co2o18 SIL 0.191 0.038 ... o1 2005 09 12 14 50 00 52.7100 174.0800 28.00 203620 SHM 2005 07 03 23 30 00 6871-66 P co2o18 SIL 0.136 0.038 ... o1 2005 09 12 13 55 00 52.7100 174.0800 28.00 203581 SHM 2005 07 03 23 30 00 6872-66 P co2o18 SIL 0.158 0.038 ... o1 2005 09 12 14 13 00 52.7100 174.0800 28.00 203582 SHM 2005 07 10 23 35 00 3307-99 P co2o18 SIL -1.637 0.033 .X. o1 2006 01 27 16 40 00 52.7100 174.0800 28.00 211173 SHM 2005 07 10 23 35 00 3307-99 P co2o18 SIL -1.593 0.031 -.. o1 2006 01 28 21 34 00 52.7100 174.0800 28.00 211173 SHM 2005 07 10 23 35 00 3308-99 P co2o18 SIL -1.520 0.033 .X. o1 2006 01 27 16 59 00 52.7100 174.0800 28.00 211174 SHM 2005 07 10 23 35 00 3308-99 P co2o18 SIL -1.409 0.031 +.. o1 2006 01 28 21 52 00 52.7100 174.0800 28.00 211174 SHM 2005 07 17 23 45 00 1693-99 P co2o18 SIL -0.122 0.033 +.. o1 2006 01 27 17 17 00 52.7100 174.0800 28.00 211175 SHM 2005 07 17 23 45 00 1693-99 P co2o18 SIL -0.141 0.031 +.. o1 2006 01 28 22 10 00 52.7100 174.0800 28.00 211175 SHM 2005 07 17 23 45 00 1694-99 P co2o18 SIL -0.269 0.033 -.. o1 2006 01 27 17 36 00 52.7100 174.0800 28.00 211176 SHM 2005 07 17 23 45 00 1694-99 P co2o18 SIL -0.296 0.031 -.. o1 2006 01 28 22 28 00 52.7100 174.0800 28.00 211176 SHM 2005 11 20 22 30 00 3747-99 P co2o18 SIL -0.447 0.028 +.. o1 2006 01 24 02 00 00 52.7100 174.0800 28.00 211283 SHM 2005 11 20 22 30 00 3748-99 P co2o18 SIL -0.617 0.028 -.. o1 2006 01 24 02 18 00 52.7100 174.0800 28.00 211284 SHM 2005 11 29 12 45 00 1888-99 P co2o18 SIL -0.379 0.028 ..S o1 2006 01 24 01 41 00 52.7100 174.0800 28.00 211282 SHM 2005 12 18 23 30 00 2787-99 P co2o18 SIL 0.293 0.040 +.. o1 2006 02 20 09 36 00 52.7100 174.0800 28.00 212640 SHM 2005 12 18 23 30 00 2788-99 P co2o18 SIL 0.042 0.040 -.. o1 2006 02 20 09 55 00 52.7100 174.0800 28.00 212641 SHM 2005 12 26 00 30 00 1877-99 P co2o18 SIL -0.666 0.040 -.. o1 2006 02 20 04 40 00 52.7100 174.0800 28.00 212638 SHM 2005 12 26 00 30 00 1878-99 P co2o18 SIL -0.334 0.040 +.. o1 2006 02 20 09 18 00 52.7100 174.0800 28.00 212639 SHM 2006 01 15 23 55 00 925-99 P co2o18 SIL -0.458 0.030 ... o1 2006 03 20 22 55 00 52.7100 174.0800 28.00 213551 SHM 2006 01 15 23 55 00 926-99 P co2o18 SIL -0.369 0.030 ... o1 2006 03 20 23 14 00 52.7100 174.0800 28.00 213552 SHM 2006 01 31 23 59 00 2421-99 P co2o18 SIL -0.175 0.030 ... o1 2006 03 20 21 41 00 52.7100 174.0800 28.00 213553 SHM 2006 01 31 23 59 00 2422-99 P co2o18 SIL -0.221 0.030 ... o1 2006 03 20 22 00 00 52.7100 174.0800 28.00 213554 SHM 2006 02 05 23 45 00 3289-99 P co2o18 SIL -0.330 0.030 ... o1 2006 03 20 22 18 00 52.7100 174.0800 28.00 213557 SHM 2006 02 05 23 45 00 3290-99 P co2o18 SIL -0.299 0.030 ... o1 2006 03 20 22 37 00 52.7100 174.0800 28.00 213558 SHM 2006 02 15 12 30 00 3545-99 P co2o18 SIL -0.355 0.030 ... o1 2006 03 20 21 04 00 52.7100 174.0800 28.00 213555 SHM 2006 02 15 12 30 00 3546-99 P co2o18 SIL -0.359 0.030 ... o1 2006 03 20 21 23 00 52.7100 174.0800 28.00 213556 SHM 2006 04 02 23 45 00 1551-99 P co2o18 SIL 0.079 0.025 ... o1 2006 05 27 03 44 00 52.7100 174.0800 28.00 215914 SHM 2006 04 02 23 45 00 1551-99 P co2o18 SIL 0.119 0.027 ... o1 2006 05 29 07 00 00 52.7100 174.0800 28.00 215914 SHM 2006 04 02 23 45 00 1552-99 P co2o18 SIL 0.144 0.025 ... o1 2006 05 27 04 03 00 52.7100 174.0800 28.00 215915 SHM 2006 04 02 23 45 00 1552-99 P co2o18 SIL 0.121 0.027 ... o1 2006 05 29 07 19 00 52.7100 174.0800 28.00 215915 SHM 2006 04 08 23 40 00 965-99 P co2o18 SIL 0.003 0.027 ... o1 2006 05 28 16 46 00 52.7100 174.0800 28.00 215916 SHM 2006 04 08 23 40 00 966-99 P co2o18 SIL -0.047 0.027 ... o1 2006 05 28 17 05 00 52.7100 174.0800 28.00 215917 SHM 2006 05 08 00 20 00 2073-99 P co2o18 SIL -0.021 0.027 ... o1 2006 06 14 23 56 00 52.7100 174.0800 28.00 217323 SHM 2006 05 08 00 20 00 2074-99 P co2o18 SIL -0.067 0.027 ... o1 2006 06 15 00 14 00 52.7100 174.0800 28.00 217324 SHM 2006 05 22 00 30 00 67-99 P co2o18 SIL -0.170 0.020 ... o1 2006 07 07 13 11 00 52.7100 174.0800 28.00 218208 SHM 2006 05 22 00 30 00 68-99 P co2o18 SIL -0.175 0.020 ... o1 2006 07 07 13 29 00 52.7100 174.0800 28.00 218209 SHM 2006 05 28 00 30 00 2091-99 P co2o18 SIL -0.147 0.020 ... o1 2006 07 07 13 48 00 52.7100 174.0800 28.00 218206 SHM 2006 05 28 00 30 00 2092-99 P co2o18 SIL -0.031 0.020 ... o1 2006 07 07 14 06 00 52.7100 174.0800 28.00 218207 SHM 2006 06 18 11 35 00 377-99 P co2o18 SIL 0.039 0.041 ... o1 2006 08 09 15 10 00 52.7100 174.0800 28.00 219492 SHM 2006 06 18 11 35 00 378-99 P co2o18 SIL -0.012 0.041 ... o1 2006 08 09 15 29 00 52.7100 174.0800 28.00 219493 SHM 2006 06 25 00 10 00 55-99 P co2o18 SIL 0.352 0.041 ... o1 2006 08 09 14 33 00 52.7100 174.0800 28.00 219494 SHM 2006 06 25 00 10 00 56-99 P co2o18 SIL 0.383 0.041 ... o1 2006 08 09 14 52 00 52.7100 174.0800 28.00 219495 SHM 2006 07 09 11 20 00 3747-99 P co2o18 SIL -0.097 0.023 ... o1 2006 08 16 17 39 00 52.7100 174.0800 28.00 220318 SHM 2006 07 09 11 20 00 3748-99 P co2o18 SIL -0.067 0.023 ... o1 2006 08 16 17 57 00 52.7100 174.0800 28.00 220319 SHM 2006 07 16 00 15 00 4257-99 P co2o18 SIL 0.089 0.023 ... o1 2006 08 16 19 31 00 52.7100 174.0800 28.00 220316 SHM 2006 07 16 00 15 00 4258-99 P co2o18 SIL 0.119 0.023 ... o1 2006 08 16 19 49 00 52.7100 174.0800 28.00 220317 SHM 2006 07 23 11 30 00 3307-99 P co2o18 SIL -0.486 0.031 ... o1 2006 09 15 00 31 00 52.7100 174.0800 28.00 221901 SHM 2006 07 23 11 30 00 3308-99 P co2o18 SIL -0.426 0.031 ... o1 2006 09 15 00 49 00 52.7100 174.0800 28.00 221902 SHM 2006 08 06 23 50 00 577-99 P co2o18 SIL 0.161 0.031 .X. o1 2006 09 14 23 53 00 52.7100 174.0800 28.00 221903 SHM 2006 08 06 23 50 00 578-99 P co2o18 SIL 0.266 0.031 .X. o1 2006 09 15 00 12 00 52.7100 174.0800 28.00 221904 SHM 2006 08 13 23 45 00 2337-99 P co2o18 SIL -0.161 0.031 -.. o1 2006 09 15 01 08 00 52.7100 174.0800 28.00 221897 SHM 2006 08 13 23 45 00 2338-99 P co2o18 SIL 0.177 0.031 +.. o1 2006 09 15 01 27 00 52.7100 174.0800 28.00 221898 SHM 2006 08 20 23 37 00 1301-99 P co2o18 SIL 0.119 0.031 .X. o1 2006 09 15 01 45 00 52.7100 174.0800 28.00 221899 SHM 2006 08 20 23 37 00 1302-99 P co2o18 SIL 0.152 0.031 .X. o1 2006 09 15 02 04 00 52.7100 174.0800 28.00 221900 SHM 2006 08 27 23 30 00 941-99 P co2o18 SIL -6.363 0.024 -.. o1 2006 10 18 04 44 00 52.7100 174.0800 28.00 223335 SHM 2006 08 27 23 30 00 942-99 P co2o18 SIL -4.136 0.024 +.. o1 2006 10 18 05 02 00 52.7100 174.0800 28.00 223336 SHM 2006 09 06 02 00 00 705-99 P co2o18 SIL -1.433 0.024 ... o1 2006 10 18 04 06 00 52.7100 174.0800 28.00 223333 SHM 2006 09 06 02 00 00 706-99 P co2o18 SIL -1.369 0.024 ... o1 2006 10 18 04 25 00 52.7100 174.0800 28.00 223334 SHM 2006 09 17 23 30 00 2013-99 P co2o18 SIL -1.520 0.041 ... o1 2006 11 29 02 11 00 52.7100 174.0800 28.00 224535 SHM 2006 09 17 23 30 00 2014-99 P co2o18 SIL -1.409 0.041 ... o1 2006 11 29 02 29 00 52.7100 174.0800 28.00 224536 SHM 2006 09 24 23 45 00 2845-99 P co2o18 SIL -1.123 0.041 ... o1 2006 11 29 06 33 00 52.7100 174.0800 28.00 224533 SHM 2006 09 24 23 45 00 2846-99 P co2o18 SIL -1.107 0.041 ... o1 2006 11 29 06 51 00 52.7100 174.0800 28.00 224534 SHM 2006 10 08 23 45 00 55-99 P co2o18 SIL -1.014 0.040 ... o1 2006 11 09 17 25 00 52.7100 174.0800 28.00 224376 SHM 2006 10 08 23 45 00 56-99 P co2o18 SIL -1.032 0.040 ... o1 2006 11 09 17 44 00 52.7100 174.0800 28.00 224377 SHM 2006 10 16 12 45 00 4157-99 P co2o18 SIL -1.064 0.044 ... o1 2006 12 08 03 04 00 52.7100 174.0800 28.00 224704 SHM 2006 10 16 12 45 00 4158-99 P co2o18 SIL -1.031 0.044 ... o1 2006 12 08 03 22 00 52.7100 174.0800 28.00 224705 SHM 2006 10 23 12 30 00 3611-99 P co2o18 SIL -0.953 0.044 ... o1 2006 12 08 02 26 00 52.7100 174.0800 28.00 224706 SHM 2006 10 23 12 30 00 3612-99 P co2o18 SIL -0.997 0.044 ... o1 2006 12 08 02 44 00 52.7100 174.0800 28.00 224707 SHM 2006 10 30 00 05 00 3133-99 P co2o18 SIL -1.145 0.041 ... o1 2006 11 28 18 43 00 52.7100 174.0800 28.00 225353 SHM 2006 10 30 00 05 00 3134-99 P co2o18 SIL -1.178 0.041 ... o1 2006 11 28 19 02 00 52.7100 174.0800 28.00 225354 SHM 2006 11 05 11 30 00 2967-99 P co2o18 SIL -0.806 0.041 -.. o1 2006 11 28 19 20 00 52.7100 174.0800 28.00 225355 SHM 2006 11 05 11 30 00 2968-99 P co2o18 SIL -0.664 0.041 +.. o1 2006 11 28 19 39 00 52.7100 174.0800 28.00 225356 SHM 2006 11 12 11 30 00 3889-99 P co2o18 SIL -0.770 0.033 ... o1 2007 01 18 03 12 00 52.7100 174.0800 28.00 226936 SHM 2006 11 12 11 30 00 3890-99 P co2o18 SIL -0.713 0.033 ... o1 2007 01 18 03 31 00 52.7100 174.0800 28.00 226937 SHM 2006 11 19 23 45 00 753-99 P co2o18 SIL -0.955 0.033 ... o1 2007 01 18 02 34 00 52.7100 174.0800 28.00 226934 SHM 2006 11 19 23 45 00 754-99 P co2o18 SIL -1.054 0.033 ... o1 2007 01 18 02 53 00 52.7100 174.0800 28.00 226935 SHM 2006 11 26 23 30 00 2681-99 P co2o18 SIL -0.814 0.039 ... o1 2007 02 23 22 00 00 52.7100 174.0800 28.00 227707 SHM 2006 11 26 23 30 00 2682-99 P co2o18 SIL -0.814 0.039 ... o1 2007 02 23 22 19 00 52.7100 174.0800 28.00 227708 SHM 2006 12 24 23 50 00 1115-99 P co2o18 SIL -0.734 0.037 ... o1 2007 02 21 23 54 00 52.7100 174.0800 28.00 227711 SHM 2006 12 24 23 50 00 1116-99 P co2o18 SIL -0.672 0.037 ... o1 2007 02 22 00 13 00 52.7100 174.0800 28.00 227712 SHM 2007 01 07 23 30 00 1963-99 P co2o18 SIL -0.487 0.038 ... o1 2007 04 02 02 14 00 52.7100 174.0800 28.00 229172 SHM 2007 01 07 23 30 00 1964-99 P co2o18 SIL -0.522 0.038 ... o1 2007 04 02 02 32 00 52.7100 174.0800 28.00 229173 SHM 2007 01 21 23 39 00 101-99 P co2o18 SIL -0.443 0.032 ... o1 2007 03 24 05 09 00 52.7100 174.0800 28.00 229208 SHM 2007 01 21 23 39 00 102-99 P co2o18 SIL -0.445 0.032 ... o1 2007 03 24 05 28 00 52.7100 174.0800 28.00 229209 SHM 2007 01 29 23 45 00 1339-99 P co2o18 SIL -0.159 0.038 ... o1 2007 04 04 00 23 00 52.7100 174.0800 28.00 230698 SHM 2007 01 29 23 45 00 1340-99 P co2o18 SIL -0.110 0.038 ... o1 2007 04 04 00 42 00 52.7100 174.0800 28.00 230699 SHM 2007 02 05 12 45 00 4271-99 P co2o18 SIL -0.121 0.039 ... o1 2007 04 01 03 26 00 52.7100 174.0800 28.00 230696 SHM 2007 02 05 12 45 00 4272-99 P co2o18 SIL -0.147 0.039 ... o1 2007 04 01 03 45 00 52.7100 174.0800 28.00 230697 SHM 2007 02 11 23 50 00 2407-99 P co2o18 SIL -0.268 0.030 -.. o1 2007 03 22 01 34 00 52.7100 174.0800 28.00 230702 SHM 2007 02 11 23 50 00 2408-99 P co2o18 SIL -0.102 0.030 +.. o1 2007 03 22 01 52 00 52.7100 174.0800 28.00 230703 SHM 2007 02 19 23 30 00 533-99 P co2o18 SIL -0.106 0.030 ... o1 2007 03 21 22 30 00 52.7100 174.0800 28.00 230700 SHM 2007 02 19 23 30 00 534-99 P co2o18 SIL -0.058 0.030 ... o1 2007 03 21 22 48 00 52.7100 174.0800 28.00 230701 SHM 2007 02 25 23 35 00 1145-99 P co2o18 SIL -0.172 0.059 ... o1 2007 04 25 18 30 00 52.7100 174.0800 28.00 232230 SHM 2007 02 25 23 35 00 1146-99 P co2o18 SIL -0.191 0.059 ... o1 2007 04 25 18 48 00 52.7100 174.0800 28.00 232231 SHM 2007 03 04 23 45 00 3143-99 P co2o18 SIL -0.260 0.059 +.. o1 2007 04 25 17 52 00 52.7100 174.0800 28.00 232232 SHM 2007 03 04 23 45 00 3144-99 P co2o18 SIL -0.387 0.059 -.. o1 2007 04 25 18 11 00 52.7100 174.0800 28.00 232233 SHM 2007 03 11 12 45 00 2549-99 P co2o18 SIL -0.268 0.033 ... o1 2007 05 08 15 49 00 52.7100 174.0800 28.00 232802 SHM 2007 03 11 12 45 00 2550-99 P co2o18 SIL -0.294 0.033 ... o1 2007 05 08 16 07 00 52.7100 174.0800 28.00 232803 SHM 2007 03 20 12 25 00 2101-99 P co2o18 SIL -0.123 0.032 ... o1 2007 05 07 20 02 00 52.7100 174.0800 28.00 232804 SHM 2007 03 20 12 25 00 2102-99 P co2o18 SIL -0.124 0.032 ... o1 2007 05 07 20 20 00 52.7100 174.0800 28.00 232805 SHM 2007 03 25 22 30 00 2033-99 P co2o18 SIL -0.194 0.032 ... o1 2007 05 07 19 25 00 52.7100 174.0800 28.00 232808 SHM 2007 03 25 22 30 00 2034-99 P co2o18 SIL -0.115 0.032 ... o1 2007 05 07 19 44 00 52.7100 174.0800 28.00 232809 SHM 2007 04 01 23 30 00 327-99 P co2o18 SIL -0.220 0.032 ... o1 2007 05 07 18 49 00 52.7100 174.0800 28.00 232806 SHM 2007 04 01 23 30 00 328-99 P co2o18 SIL -0.145 0.032 ... o1 2007 05 07 19 07 00 52.7100 174.0800 28.00 232807 SHM 2007 04 07 23 25 00 3459-99 P co2o18 SIL -0.157 0.034 ... o1 2007 05 14 19 50 00 52.7100 174.0800 28.00 233635 SHM 2007 04 07 23 25 00 3460-99 P co2o18 SIL -0.203 0.034 ... o1 2007 05 14 20 08 00 52.7100 174.0800 28.00 233636 SHM 2007 04 14 14 00 00 1631-99 P co2o18 SIL -0.161 0.034 ... o1 2007 05 15 01 18 00 52.7100 174.0800 28.00 233633 SHM 2007 04 14 14 00 00 1632-99 P co2o18 SIL -0.108 0.034 ... o1 2007 05 15 01 36 00 52.7100 174.0800 28.00 233634 SHM 2007 04 22 22 30 00 1161-99 P co2o18 SIL -0.090 0.042 ... o1 2007 06 09 17 17 00 52.7100 174.0800 28.00 234267 SHM 2007 04 22 22 30 00 1162-99 P co2o18 SIL -0.158 0.042 ... o1 2007 06 09 17 35 00 52.7100 174.0800 28.00 234268 SHM 2007 04 29 22 30 00 1857-99 P co2o18 SIL -0.249 0.043 ... o1 2007 06 11 17 35 00 52.7100 174.0800 28.00 234269 SHM 2007 04 29 22 30 00 1858-99 P co2o18 SIL -0.212 0.043 ... o1 2007 06 11 17 53 00 52.7100 174.0800 28.00 234270 SHM 2007 05 06 22 30 00 2499-99 P co2o18 SIL 0.145 0.036 ... o1 2007 07 04 16 28 00 52.7100 174.0800 28.00 235809 SHM 2007 05 06 22 30 00 2500-99 P co2o18 SIL 0.222 0.036 ... o1 2007 07 04 16 46 00 52.7100 174.0800 28.00 235810 SHM 2007 05 14 02 00 00 1783-99 P co2o18 SIL 0.186 0.036 ... o1 2007 07 04 15 16 00 52.7100 174.0800 28.00 235807 SHM 2007 05 14 02 00 00 1784-99 P co2o18 SIL 0.157 0.036 ... o1 2007 07 04 15 34 00 52.7100 174.0800 28.00 235808 SHM 2007 05 28 12 00 00 1053-99 P co2o18 SIL 0.149 0.040 -.. o1 2007 07 18 02 41 00 52.7100 174.0800 28.00 236942 SHM 2007 05 28 12 00 00 1054-99 P co2o18 SIL 0.277 0.040 +.. o1 2007 07 18 02 59 00 52.7100 174.0800 28.00 236943 SHM 2007 06 04 12 00 00 4521-99 P co2o18 SIL -0.074 0.040 ... o1 2007 07 18 02 05 00 52.7100 174.0800 28.00 236944 SHM 2007 06 04 12 00 00 4522-99 P co2o18 SIL -0.104 0.040 ... o1 2007 07 18 02 23 00 52.7100 174.0800 28.00 236945 SHM 2007 06 18 02 00 00 3161-99 P co2o18 SIL 0.347 0.048 ... o1 2007 08 02 06 16 00 52.7100 174.0800 28.00 238451 SHM 2007 06 18 02 00 00 3162-99 P co2o18 SIL 0.367 0.048 ... o1 2007 08 02 06 34 00 52.7100 174.0800 28.00 238452 SHM 2007 06 24 10 30 00 1333-99 P co2o18 SIL 0.311 0.045 ... o1 2007 08 21 00 12 00 52.7100 174.0800 28.00 239104 SHM 2007 06 24 10 30 00 1334-99 P co2o18 SIL 0.371 0.045 ... o1 2007 08 21 00 30 00 52.7100 174.0800 28.00 239105 SHM 2007 07 01 10 30 00 4445-99 P co2o18 SIL 0.446 0.045 +.. o1 2007 08 20 23 36 00 52.7100 174.0800 28.00 239106 SHM 2007 07 01 10 30 00 4446-99 P co2o18 SIL 0.305 0.045 -.. o1 2007 08 20 23 54 00 52.7100 174.0800 28.00 239107 SHM 2007 07 08 10 30 00 3867-99 P co2o18 SIL 0.283 0.045 ... o1 2007 08 20 21 47 00 52.7100 174.0800 28.00 239102 SHM 2007 07 08 10 30 00 3868-99 P co2o18 SIL 0.232 0.045 ... o1 2007 08 20 22 05 00 52.7100 174.0800 28.00 239103 SHM 2007 07 16 01 30 00 2769-99 P co2o18 SIL 0.274 0.045 ... o1 2007 08 20 21 11 00 52.7100 174.0800 28.00 239100 SHM 2007 07 16 01 30 00 2770-99 P co2o18 SIL 0.169 0.045 ... o1 2007 08 20 21 29 00 52.7100 174.0800 28.00 239101 SHM 2007 07 22 23 45 00 2866-99 P co2o18 SIL -0.133 0.036 ... o1 2007 08 29 02 24 00 52.7100 174.0800 28.00 240284 SHM 2007 07 22 23 45 00 3673-99 P co2o18 SIL -0.111 0.036 ... o1 2007 08 29 02 05 00 52.7100 174.0800 28.00 240283 SHM 2007 07 29 18 15 00 3517-99 P co2o18 SIL 0.767 0.036 .XS o1 2007 08 29 04 10 00 52.7100 174.0800 28.00 240285 SHM 2007 08 05 01 30 00 2885-99 P co2o18 SIL -0.524 0.033 -.. o1 2007 09 11 14 56 00 52.7100 174.0800 28.00 240645 SHM 2007 08 05 01 30 00 2886-99 P co2o18 SIL -0.170 0.033 +.. o1 2007 09 11 15 14 00 52.7100 174.0800 28.00 240646 SHM 2007 08 12 00 30 00 3001-99 P co2o18 SIL -0.534 0.033 ... o1 2007 09 11 19 07 00 52.7100 174.0800 28.00 240643 SHM 2007 08 12 00 30 00 3002-99 P co2o18 SIL -0.482 0.033 ... o1 2007 09 11 19 25 00 52.7100 174.0800 28.00 240644 SHM 2007 08 19 11 10 00 1857-99 P co2o18 SIL -1.176 0.032 +.. o1 2007 09 19 00 25 00 52.7100 174.0800 28.00 241373 SHM 2007 08 19 11 10 00 1858-99 P co2o18 SIL -1.316 0.032 -.. o1 2007 09 19 00 43 00 52.7100 174.0800 28.00 241374 SHM 2007 08 26 23 30 00 135-99 P co2o18 SIL -0.885 0.032 ... o1 2007 09 19 02 14 00 52.7100 174.0800 28.00 241371 SHM 2007 08 26 23 30 00 136-99 P co2o18 SIL -0.866 0.032 ... o1 2007 09 19 02 33 00 52.7100 174.0800 28.00 241372 SHM 2007 09 02 22 50 00 2597-99 P co2o18 SIL -1.199 0.034 -.. o1 2007 10 05 22 17 00 52.7100 174.0800 28.00 242453 SHM 2007 09 02 22 50 00 2598-99 P co2o18 SIL -1.055 0.034 +.. o1 2007 10 05 22 35 00 52.7100 174.0800 28.00 242454 SHM 2007 09 09 11 15 00 4897-99 P co2o18 SIL -0.748 0.031 ... o1 2007 10 10 01 27 00 52.7100 174.0800 28.00 242556 SHM 2007 09 09 11 15 00 4898-99 P co2o18 SIL -0.699 0.031 ... o1 2007 10 10 01 45 00 52.7100 174.0800 28.00 242557 SHM 2007 09 30 23 00 00 4889-99 P co2o18 SIL -1.324 0.034 ... o1 2007 10 29 16 50 00 52.7100 174.0800 28.00 243329 SHM 2007 09 30 23 00 00 4890-99 P co2o18 SIL -1.379 0.034 ... o1 2007 10 29 17 08 00 52.7100 174.0800 28.00 243330 SHM 2007 10 07 22 45 00 3993-99 P co2o18 SIL -1.189 0.028 ... o1 2007 11 17 01 58 00 52.7100 174.0800 28.00 244299 SHM 2007 10 07 22 45 00 3994-99 P co2o18 SIL -1.224 0.028 ... o1 2007 11 17 02 16 00 52.7100 174.0800 28.00 244300 SHM 2007 10 14 22 45 00 3341-99 P co2o18 SIL -0.971 0.028 ... o1 2007 11 16 20 36 00 52.7100 174.0800 28.00 244301 SHM 2007 10 14 22 45 00 3342-99 P co2o18 SIL -0.934 0.028 ... o1 2007 11 16 20 54 00 52.7100 174.0800 28.00 244302 SHM 2007 10 21 10 45 00 2683-99 P co2o18 SIL -0.640 0.031 ... o1 2007 11 30 04 44 00 52.7100 174.0800 28.00 245318 SHM 2007 10 21 10 45 00 2684-99 P co2o18 SIL -0.577 0.031 ... o1 2007 11 30 05 02 00 52.7100 174.0800 28.00 245319 SHM 2007 10 28 22 45 00 1681-99 P co2o18 SIL -0.726 0.031 ..S o1 2007 11 30 05 38 00 52.7100 174.0800 28.00 245317 SHM 2007 11 04 22 45 00 1148-99 P co2o18 SIL -1.167 0.048 ..H o1 2007 12 18 21 05 00 52.7100 174.0800 28.00 246098 SHM 2007 11 04 22 45 00 1427-99 P co2o18 SIL -1.121 0.048 ..H o1 2007 12 18 20 47 00 52.7100 174.0800 28.00 246097 SHM 2007 11 11 22 45 00 2825-99 P co2o18 SIL -0.549 0.048 ..H o1 2007 12 18 21 42 00 52.7100 174.0800 28.00 246096 SHM 2007 11 11 22 45 00 287-99 P co2o18 SIL -0.580 0.048 ..H o1 2007 12 18 21 24 00 52.7100 174.0800 28.00 246095 SHM 2007 11 18 22 45 00 4893-99 P co2o18 SIL -0.837 0.047 ... o1 2007 12 19 17 25 00 52.7100 174.0800 28.00 246113 SHM 2007 11 18 22 45 00 4894-99 P co2o18 SIL -0.846 0.047 ... o1 2007 12 19 17 43 00 52.7100 174.0800 28.00 246114 SHM 2007 11 25 23 40 00 137-99 P co2o18 SIL -0.655 0.047 ... o1 2007 12 20 05 29 00 52.7100 174.0800 28.00 246111 SHM 2007 11 25 23 40 00 138-99 P co2o18 SIL -0.606 0.047 ... o1 2007 12 20 05 47 00 52.7100 174.0800 28.00 246112 SHM 2007 12 02 00 21 00 1237-99 P co2o18 SIL -0.548 0.033 ... o1 2008 01 25 18 27 00 52.7100 174.0800 28.00 247539 SHM 2007 12 02 00 21 00 4627-99 P co2o18 SIL -0.574 0.033 ... o1 2008 01 25 18 45 00 52.7100 174.0800 28.00 247540 SHM 2007 12 09 23 30 00 4210-99 P co2o18 SIL -0.645 0.033 ... o1 2008 01 25 17 51 00 52.7100 174.0800 28.00 247537 SHM 2007 12 09 23 30 00 4392-99 P co2o18 SIL -0.618 0.033 ... o1 2008 01 25 18 09 00 52.7100 174.0800 28.00 247538 SHM 2007 12 16 23 45 00 1156-99 P co2o18 SIL -0.331 0.040 ... o1 2008 02 09 00 35 00 52.7200 174.0800 28.00 248566 SHM 2007 12 16 23 45 00 818-99 P co2o18 SIL -0.273 0.040 ... o1 2008 02 09 00 17 00 52.7200 174.0800 28.00 248565 SHM 2007 12 23 23 45 00 4571-99 P co2o18 SIL -0.487 0.040 ..S o1 2008 02 08 23 59 00 52.7200 174.0800 28.00 248564 SHM 2007 12 30 22 45 00 4531-99 P co2o18 SIL -0.568 0.040 ... o1 2008 02 08 20 40 00 52.7200 174.0800 28.00 248569 SHM 2007 12 30 22 45 00 4532-99 P co2o18 SIL -0.580 0.040 ... o1 2008 02 08 20 58 00 52.7200 174.0800 28.00 248570 SHM 2008 01 06 22 45 00 3813-99 P co2o18 SIL -0.655 0.040 ... o1 2008 02 08 15 16 00 52.7200 174.0800 28.00 248567 SHM 2008 01 06 22 45 00 3814-99 P co2o18 SIL -0.648 0.040 ... o1 2008 02 08 15 34 00 52.7200 174.0800 28.00 248568 SHM 2008 01 15 22 30 00 1647-99 P co2o18 SIL -0.284 0.023 ... o1 2008 02 28 05 51 00 52.7200 174.0800 28.00 249826 SHM 2008 01 15 22 30 00 4510-99 P co2o18 SIL -0.290 0.023 ... o1 2008 02 28 06 09 00 52.7200 174.0800 28.00 249827 SHM 2008 01 29 03 15 00 3993-99 P co2o18 SIL -0.148 0.022 ... o1 2008 03 24 01 01 00 52.7200 174.0800 28.00 250260 SHM 2008 01 29 03 15 00 3994-99 P co2o18 SIL -0.175 0.022 ... o1 2008 03 24 01 19 00 52.7200 174.0800 28.00 250261 SHM 2008 02 04 06 30 00 2273-99 P co2o18 SIL -0.239 0.018 ... o1 2008 03 19 04 29 00 52.7200 174.0800 28.00 250262 SHM 2008 02 04 06 30 00 2274-99 P co2o18 SIL -0.195 0.018 ... o1 2008 03 19 04 47 00 52.7200 174.0800 28.00 250263 SHM 2008 02 10 22 45 00 2317-99 P co2o18 SIL -0.131 0.032 ... o1 2008 04 12 00 21 00 52.7200 174.0800 28.00 251237 SHM 2008 02 10 22 45 00 2318-99 P co2o18 SIL -0.164 0.032 ... o1 2008 04 12 00 39 00 52.7200 174.0800 28.00 251238 SHM 2008 02 17 22 45 00 201-99 P co2o18 SIL -0.209 0.032 ... o1 2008 04 11 23 43 00 52.7200 174.0800 28.00 251239 SHM 2008 02 17 22 45 00 202-99 P co2o18 SIL -0.193 0.032 ... o1 2008 04 12 00 02 00 52.7200 174.0800 28.00 251240 SHM 2008 03 02 22 45 00 2169-99 P co2o18 SIL -0.020 0.029 ... o1 2008 04 04 07 07 00 52.7200 174.0800 28.00 251570 SHM 2008 03 02 22 45 00 2170-99 P co2o18 SIL 0.002 0.029 ... o1 2008 04 04 07 25 00 52.7200 174.0800 28.00 251571 SHM 2008 03 09 22 40 00 3407-99 P co2o18 SIL 0.097 0.029 ... o1 2008 04 04 07 44 00 52.7200 174.0800 28.00 251572 SHM 2008 03 09 22 40 00 3408-99 P co2o18 SIL 0.092 0.029 ... o1 2008 04 04 08 02 00 52.7200 174.0800 28.00 251573 SHM 2008 03 15 23 10 00 3511-99 P co2o18 SIL -0.145 0.039 ... o1 2008 04 16 22 44 00 52.7200 174.0800 28.00 252305 SHM 2008 03 15 23 10 00 3512-99 P co2o18 SIL -0.123 0.039 ... o1 2008 04 16 23 02 00 52.7200 174.0800 28.00 252306 SHM 2008 03 23 22 42 00 2775-99 P co2o18 SIL -0.041 0.039 ... o1 2008 04 16 22 06 00 52.7200 174.0800 28.00 252307 SHM 2008 03 23 22 42 00 2776-99 P co2o18 SIL -0.051 0.039 ... o1 2008 04 16 22 25 00 52.7200 174.0800 28.00 252308 SHM 2008 03 30 22 40 00 3503-99 P co2o18 SIL 0.240 0.030 ... o1 2008 07 17 18 03 00 52.7200 174.1000 28.00 253918 SHM 2008 03 30 22 40 00 3504-99 P co2o18 SIL 0.270 0.030 ... o1 2008 07 17 18 21 00 52.7200 174.1000 28.00 253919 SHM 2008 04 06 22 45 00 2967-99 P co2o18 SIL -0.637 0.043 .X. o1 2008 05 16 02 09 00 52.7200 174.1000 28.00 253920 SHM 2008 04 06 22 45 00 2968-99 P co2o18 SIL -0.626 0.043 .X. o1 2008 05 16 02 27 00 52.7200 174.1000 28.00 253921 SHM 2008 04 13 23 45 00 1855-99 P co2o18 SIL -0.466 0.027 A.S o1 2008 06 14 03 01 00 52.7200 174.1000 28.00 254928 SHM 2008 04 20 11 45 00 1229-99 P co2o18 SIL -0.982 0.027 A.. o1 2008 06 14 03 45 00 52.7200 174.1000 28.00 254930 SHM 2008 04 20 11 45 00 1230-99 P co2o18 SIL -0.651 0.027 A.. o1 2008 06 14 04 07 00 52.7200 174.1000 28.00 254931 SHM 2008 04 28 23 45 00 1130-99 P co2o18 SIL 0.002 0.023 ... o1 2008 06 10 21 40 00 52.7200 174.1000 28.00 255146 SHM 2008 04 28 23 45 00 955-99 P co2o18 SIL 0.068 0.023 ... o1 2008 06 10 21 22 00 52.7200 174.1000 28.00 255145 SHM 2008 05 04 23 45 00 3312-99 P co2o18 SIL -0.516 0.023 +.. o1 2008 06 10 22 16 00 52.7200 174.1000 28.00 255148 SHM 2008 05 04 23 45 00 740-99 P co2o18 SIL -8.714 0.023 -.. o1 2008 06 10 21 58 00 52.7200 174.1000 28.00 255147 SHM 2008 05 12 10 45 00 2161-99 P co2o18 SIL -0.325 0.031 ... o1 2008 06 30 21 11 00 52.7200 174.1000 28.00 256435 SHM 2008 05 12 10 45 00 2162-99 P co2o18 SIL -0.268 0.031 ... o1 2008 06 30 21 29 00 52.7200 174.1000 28.00 256436 SHM 2008 05 18 22 45 00 1231-99 P co2o18 SIL -0.125 0.031 ... o1 2008 06 30 21 47 00 52.7200 174.1000 28.00 256437 SHM 2008 05 18 22 45 00 1232-99 P co2o18 SIL -0.095 0.031 ... o1 2008 06 30 22 06 00 52.7200 174.1000 28.00 256438 SHM 2008 05 25 22 45 00 1259-99 P co2o18 SIL 0.289 -9.000 ..o o1 2008 07 08 18 25 00 52.7200 174.1000 28.00 256718 SHM 2008 05 25 22 45 00 1260-99 P co2o18 SIL 0.189 -9.000 ..o o1 2008 07 08 18 45 00 52.7200 174.1000 28.00 256719 SHM 2008 06 01 22 45 00 1383-99 P co2o18 SIL 0.042 -9.000 ..o o1 2008 07 08 17 49 00 52.7200 174.1000 28.00 256716 SHM 2008 06 01 22 45 00 1384-99 P co2o18 SIL -0.034 -9.000 ..o o1 2008 07 08 18 07 00 52.7200 174.1000 28.00 256717 SHM 2008 06 08 23 45 00 1920-99 P co2o18 SIL -6.792 0.478 H.. o1 2008 09 10 07 13 00 52.7200 174.1000 28.00 258008 SHM 2008 06 08 23 45 00 638-99 P co2o18 SIL -6.800 0.478 H.. o1 2008 09 10 06 54 00 52.7200 174.1000 28.00 258007 SHM 2008 06 15 23 45 00 2504-99 P co2o18 SIL -7.181 0.478 H.. o1 2008 09 10 07 32 00 52.7200 174.1000 28.00 258009 SHM 2008 06 15 23 45 00 2891-99 P co2o18 SIL -7.095 0.478 H.. o1 2008 09 10 07 50 00 52.7200 174.1000 28.00 258010 SHM 2008 06 22 10 45 00 4423-99 P co2o18 SIL 0.029 0.049 ... o1 2008 10 21 05 54 00 52.7200 174.1000 28.00 260288 SHM 2008 06 22 10 45 00 4424-99 P co2o18 SIL 0.100 0.049 ... o1 2008 10 21 06 13 00 52.7200 174.1000 28.00 260289 SHM 2008 06 29 22 45 00 3511-99 P co2o18 SIL -0.407 0.057 -.L o1 2008 10 22 18 43 00 52.7200 174.1000 28.00 260290 SHM 2008 06 29 22 45 00 3512-99 P co2o18 SIL -0.269 0.057 +.L o1 2008 10 22 19 03 00 52.7200 174.1000 28.00 260291 SHM 2008 07 06 22 45 00 2279-99 P co2o18 SIL -0.266 0.057 ..L o1 2008 10 23 03 53 00 52.7200 174.1000 28.00 259157 SHM 2008 07 06 22 45 00 2825-99 P co2o18 SIL -0.156 0.057 ..L o1 2008 10 23 04 14 00 52.7200 174.1000 28.00 259158 SHM 2008 07 13 10 45 00 113-99 P co2o18 SIL -0.967 0.057 .XL o1 2008 10 22 23 54 00 52.7200 174.1000 28.00 259155 SHM 2008 07 13 10 45 00 950-99 P co2o18 SIL -0.864 0.057 .XL o1 2008 10 23 00 15 00 52.7200 174.1000 28.00 259156 SHM 2008 07 22 02 45 00 2687-99 P co2o18 SIL -0.008 0.057 ..L o1 2008 10 23 00 35 00 52.7200 174.1000 28.00 259153 SHM 2008 07 22 02 45 00 2688-99 P co2o18 SIL 0.030 0.057 ..L o1 2008 10 23 00 55 00 52.7200 174.1000 28.00 259154 SHM 2008 07 27 22 45 00 2291-99 P co2o18 SIL -0.062 0.057 ..L o1 2008 10 23 04 33 00 52.7200 174.1000 28.00 259151 SHM 2008 07 27 22 45 00 2292-99 P co2o18 SIL -0.006 0.057 ..L o1 2008 10 23 04 53 00 52.7200 174.1000 28.00 259152 SHM 2008 08 03 23 01 00 433-99 P co2o18 SIL -0.063 0.049 -.. o1 2008 10 21 04 02 00 52.7200 174.1000 28.00 259948 SHM 2008 08 03 23 01 00 434-99 P co2o18 SIL 0.138 0.049 +.. o1 2008 10 21 04 21 00 52.7200 174.1000 28.00 259949 SHM 2008 08 10 22 50 00 1617-99 P co2o18 SIL -0.185 0.049 ... o1 2008 10 21 04 40 00 52.7200 174.1000 28.00 259946 SHM 2008 08 10 22 50 00 1618-99 P co2o18 SIL -0.138 0.049 ... o1 2008 10 21 04 59 00 52.7200 174.1000 28.00 259947 SHM 2008 08 17 22 45 00 3453-99 P co2o18 SIL -0.114 0.038 -.. o1 2008 09 30 09 20 00 52.7200 174.1000 28.00 261172 SHM 2008 08 17 22 45 00 3454-99 P co2o18 SIL 0.118 0.038 +.. o1 2008 09 30 09 39 00 52.7200 174.1000 28.00 261173 SHM 2008 08 24 22 45 00 327-99 P co2o18 SIL -1.740 0.035 .X. o1 2008 09 27 04 39 00 52.7200 174.1000 28.00 261170 SHM 2008 08 24 22 45 00 328-99 P co2o18 SIL -1.679 0.035 .X. o1 2008 09 27 04 58 00 52.7200 174.1000 28.00 261171 SHM 2008 08 31 10 45 00 1361-99 P co2o18 SIL -1.027 0.024 ... o1 2008 11 10 14 28 00 52.7200 174.1000 28.00 262821 SHM 2008 08 31 10 45 00 1362-99 P co2o18 SIL -1.057 0.024 ... o1 2008 11 10 14 46 00 52.7200 174.1000 28.00 262822 SHM 2008 09 07 10 45 00 5039-99 P co2o18 SIL -0.777 0.024 +.. o1 2008 11 10 13 52 00 52.7200 174.1000 28.00 262819 SHM 2008 09 07 10 45 00 5040-99 P co2o18 SIL -1.135 0.024 -.. o1 2008 11 10 14 10 00 52.7200 174.1000 28.00 262820 SHM 2008 09 15 11 15 00 3775-99 P co2o18 SIL -1.078 0.053 -.. o1 2008 10 30 21 15 00 52.7200 174.1000 28.00 262823 SHM 2008 09 15 11 15 00 3776-99 P co2o18 SIL -0.572 0.053 +.. o1 2008 10 30 21 34 00 52.7200 174.1000 28.00 262824 SHM 2008 09 21 22 45 00 3327-99 P co2o18 SIL -0.707 0.053 ... o1 2008 10 30 20 37 00 52.7200 174.1000 28.00 262825 SHM 2008 09 21 22 45 00 3328-99 P co2o18 SIL -0.726 0.053 ... o1 2008 10 30 20 56 00 52.7200 174.1000 28.00 262826 SHM 2008 09 28 22 45 00 4307-99 P co2o18 SIL -1.512 0.031 +.. o1 2008 12 02 02 13 00 52.7200 174.1000 28.00 264291 SHM 2008 09 28 22 45 00 4683-99 P co2o18 SIL -5.066 0.031 -.. o1 2008 12 02 02 31 00 52.7200 174.1000 28.00 264292 SHM 2008 10 07 10 45 00 3221-99 P co2o18 SIL -1.347 0.031 A.. o1 2008 12 04 19 22 00 52.7200 174.1000 28.00 264293 SHM 2008 10 07 10 45 00 3894-99 P co2o18 SIL -1.282 0.031 A.. o1 2008 12 04 19 41 00 52.7200 174.1000 28.00 264294 SHM 2008 10 19 22 45 00 563-99 P co2o18 SIL -1.566 0.029 ... o1 2009 01 06 15 39 00 52.7200 174.1000 28.00 264297 SHM 2008 10 19 22 45 00 564-99 P co2o18 SIL -1.590 0.029 ... o1 2009 01 06 15 58 00 52.7200 174.1000 28.00 264298 SHM 2008 10 27 01 20 00 2611-99 P co2o18 SIL -0.953 0.031 -.. o1 2008 12 02 01 36 00 52.7200 174.1000 28.00 264295 SHM 2008 10 27 01 20 00 2612-99 P co2o18 SIL -0.749 0.031 +.. o1 2008 12 02 01 54 00 52.7200 174.1000 28.00 264296 SHM 2008 11 16 22 30 00 1596-99 P co2o18 SIL -1.283 0.032 ... o1 2009 01 09 00 58 00 52.7200 174.1000 28.00 265928 SHM 2008 11 16 22 30 00 4958-99 P co2o18 SIL -1.255 0.032 ... o1 2009 01 09 01 16 00 52.7200 174.1000 28.00 265929 SHM 2008 11 25 04 00 00 2256-99 P co2o18 SIL -0.778 0.029 +.. o1 2009 01 06 14 44 00 52.7200 174.1000 28.00 265925 SHM 2008 11 25 04 00 00 649-99 P co2o18 SIL -1.130 0.029 -.. o1 2009 01 06 14 26 00 52.7200 174.1000 28.00 265924 SHM 2008 11 30 22 45 00 1598-99 P co2o18 SIL -0.800 0.032 ... o1 2009 01 09 01 51 00 52.7200 174.1000 28.00 265927 SHM 2008 11 30 22 45 00 4741-99 P co2o18 SIL -0.801 0.032 ... o1 2009 01 09 01 34 00 52.7200 174.1000 28.00 265926 SHM 2008 12 08 22 45 00 459-99 P co2o18 SIL -0.931 0.028 ... o1 2009 02 07 17 54 00 52.7200 174.1000 28.00 266786 SHM 2008 12 08 22 45 00 605-99 P co2o18 SIL -0.884 0.028 ... o1 2009 02 07 18 12 00 52.7200 174.1000 28.00 266787 SHM 2008 12 14 23 45 00 2450-99 P co2o18 SIL -0.816 0.028 ... o1 2009 02 07 18 47 00 52.7200 174.1000 28.00 266785 SHM 2008 12 14 23 45 00 3312-99 P co2o18 SIL -0.881 0.028 ... o1 2009 02 07 18 30 00 52.7200 174.1000 28.00 266784 SHM 2008 12 23 11 30 00 2353-99 P co2o18 SIL -0.815 0.029 ... o1 2009 01 24 00 50 00 52.7200 174.1000 28.00 267517 SHM 2008 12 23 11 30 00 2354-99 P co2o18 SIL -0.823 0.029 ... o1 2009 01 24 01 08 00 52.7200 174.1000 28.00 267518 SHM 2008 12 28 22 45 00 4117-99 P co2o18 SIL -0.442 0.029 ... o1 2009 01 24 00 32 00 52.7200 174.1000 28.00 267515 SHM 2008 12 28 22 45 00 4118-99 P co2o18 SIL -0.466 0.029 ... o1 2009 01 24 00 15 00 52.7200 174.1000 28.00 267516 SHM 2009 01 04 10 45 00 1361-99 P co2o18 SIL -0.496 0.019 ... o1 2009 03 03 03 27 00 52.7200 174.1000 28.00 269473 SHM 2009 01 04 10 45 00 1362-99 P co2o18 SIL -0.485 0.019 ... o1 2009 03 03 03 44 00 52.7200 174.1000 28.00 269474 SHM 2009 01 12 10 45 00 2995-99 P co2o18 SIL -0.443 0.018 ... o1 2009 03 03 12 06 00 52.7200 174.1000 28.00 269471 SHM 2009 01 12 10 45 00 2996-99 P co2o18 SIL -0.455 0.018 ... o1 2009 03 03 12 24 00 52.7200 174.1000 28.00 269472 SHM 2009 01 18 22 45 00 2087-99 P co2o18 SIL -0.433 0.016 ... o1 2009 03 04 21 00 00 52.7200 174.1000 28.00 270608 SHM 2009 01 18 22 45 00 2088-99 P co2o18 SIL -0.404 0.016 ... o1 2009 03 04 21 18 00 52.7200 174.1000 28.00 270609 SHM 2009 01 25 22 45 00 3775-99 P co2o18 SIL -0.537 0.016 ... o1 2009 03 04 21 35 00 52.7200 174.1000 28.00 270606 SHM 2009 01 25 22 45 00 3776-99 P co2o18 SIL -0.546 0.016 ... o1 2009 03 04 21 53 00 52.7200 174.1000 28.00 270607 SHM 2009 02 01 10 45 00 502-99 P co2o18 SIL -0.390 0.016 ... o1 2009 03 05 01 41 00 52.7200 174.1000 28.00 270590 SHM 2009 02 01 10 45 00 954-99 P co2o18 SIL -0.407 0.016 ... o1 2009 03 05 01 59 00 52.7200 174.1000 28.00 270591 SHM 2009 02 09 10 45 00 2108-99 P co2o18 SIL -0.239 0.016 ... o1 2009 03 05 02 17 00 52.7200 174.1000 28.00 270592 SHM 2009 02 09 10 45 00 4439-99 P co2o18 SIL -0.198 0.016 ... o1 2009 03 05 02 34 00 52.7200 174.1000 28.00 270593 SHM 2009 02 17 10 45 00 1217-99 P co2o18 SIL -0.042 0.026 ... o1 2009 04 10 03 17 00 52.7200 174.1000 28.00 272949 SHM 2009 02 17 10 45 00 1428-99 P co2o18 SIL -0.005 0.026 ... o1 2009 04 10 03 35 00 52.7200 174.1000 28.00 272950 SHM 2009 02 23 10 45 00 1113-99 P co2o18 SIL -0.475 0.024 ... o1 2009 04 13 23 16 00 52.7200 174.1000 28.00 272915 SHM 2009 02 23 10 45 00 1212-99 P co2o18 SIL -0.464 0.024 ... o1 2009 04 13 23 33 00 52.7200 174.1000 28.00 272916 SHM 2009 03 01 22 45 00 4739-99 P co2o18 SIL -0.348 0.017 ... o1 2009 04 24 17 51 00 52.7200 174.1000 28.00 274107 SHM 2009 03 01 22 45 00 6417-66 P co2o18 SIL -0.391 0.017 ... o1 2009 04 24 18 08 00 52.7200 174.1000 28.00 274108 SHM 2009 03 09 01 45 00 2173-99 P co2o18 SIL -0.583 0.017 ... o1 2009 04 25 00 53 00 52.7200 174.1000 28.00 274109 SHM 2009 03 09 01 45 00 2401-99 P co2o18 SIL -0.659 0.017 ... o1 2009 04 25 01 10 00 52.7200 174.1000 28.00 274110 SHM 2009 05 19 21 45 00 3117-99 P co2o18 SIL 0.166 0.035 ... o1 2009 08 06 00 09 00 52.7200 174.1000 28.00 280405 SHM 2009 05 19 21 45 00 3118-99 P co2o18 SIL 0.141 0.035 ... o1 2009 08 06 00 26 00 52.7200 174.1000 28.00 280406 SHM 2009 05 24 10 45 00 2753-99 P co2o18 SIL -0.321 0.037 ... o1 2009 08 06 21 21 00 52.7200 174.1000 28.00 280403 SHM 2009 05 24 10 45 00 2754-99 P co2o18 SIL -0.242 0.037 ... o1 2009 08 06 21 38 00 52.7200 174.1000 28.00 280404 SHM 2009 05 31 22 45 00 2723-99 P co2o18 SIL 0.244 0.035 ... o1 2009 07 30 17 58 00 52.7200 174.1000 28.00 279769 SHM 2009 05 31 22 45 00 2724-99 P co2o18 SIL 0.197 0.035 ... o1 2009 07 30 18 15 00 52.7200 174.1000 28.00 279770 SHM 2009 06 08 10 45 00 3223-99 P co2o18 SIL -0.161 0.035 -.. o1 2009 07 30 18 33 00 52.7200 174.1000 28.00 279767 SHM 2009 06 08 10 45 00 3224-99 P co2o18 SIL 0.236 0.035 +.. o1 2009 07 30 18 51 00 52.7200 174.1000 28.00 279768 SHM 2009 06 15 10 45 00 1253-99 P co2o18 SIL -0.813 0.034 .X. o1 2009 08 14 19 02 00 52.7200 174.1000 28.00 281084 SHM 2009 06 15 10 45 00 1254-99 P co2o18 SIL -0.772 0.034 .X. o1 2009 08 14 19 20 00 52.7200 174.1000 28.00 281085 SHM 2009 06 21 22 45 00 4427-99 P co2o18 SIL -0.009 0.034 ... o1 2009 08 14 17 52 00 52.7200 174.1000 28.00 281082 SHM 2009 06 21 22 45 00 4428-99 P co2o18 SIL 0.000 0.034 .x. o1 2009 08 14 18 10 00 52.7200 174.1000 28.00 281083 SHM 2009 06 28 22 45 00 3329-99 P co2o18 SIL 0.117 0.034 +.. o1 2009 08 14 18 27 00 52.7200 174.1000 28.00 281088 SHM 2009 06 28 22 45 00 3330-99 P co2o18 SIL -0.092 0.034 -.. o1 2009 08 14 18 45 00 52.7200 174.1000 28.00 281089 SHM 2009 07 05 22 45 00 399-99 P co2o18 SIL 0.008 0.035 ... o1 2009 08 18 16 22 00 52.7200 174.1000 28.00 281086 SHM 2009 07 05 22 45 00 400-99 P co2o18 SIL 0.033 0.035 ... o1 2009 08 18 16 39 00 52.7200 174.1000 28.00 281087 SHM 2009 07 19 10 45 00 3631-99 P co2o18 SIL -0.735 0.028 ... o1 2009 09 10 17 11 00 52.7200 174.1000 28.00 282858 SHM 2009 07 19 10 45 00 3632-99 P co2o18 SIL -0.799 0.028 .X. o1 2009 09 10 17 30 00 52.7200 174.1000 28.00 282859 SHM 2009 07 26 10 45 00 4063-99 P co2o18 SIL -0.933 0.028 .X. o1 2009 09 10 17 48 00 52.7200 174.1000 28.00 282856 SHM 2009 07 26 10 45 00 4064-99 P co2o18 SIL -0.850 0.028 ... o1 2009 09 10 18 06 00 52.7200 174.1000 28.00 282857 SHM 2009 08 02 22 45 00 502-99 P co2o18 SIL -0.867 0.026 ... o1 2009 09 18 02 05 00 52.7200 174.1000 28.00 283189 SHM 2009 08 02 22 45 00 954-99 P co2o18 SIL -0.917 0.026 ... o1 2009 09 18 02 23 00 52.7200 174.1000 28.00 283190 SHM 2009 08 17 00 44 00 1176-99 P co2o18 SIL -0.568 0.026 ... o1 2009 09 18 01 29 00 52.7200 174.1000 28.00 283191 SHM 2009 08 17 00 44 00 1595-99 P co2o18 SIL -0.501 0.026 ... o1 2009 09 18 01 47 00 52.7200 174.1000 28.00 283192 SHM 2009 08 23 23 30 00 1860-99 P co2o18 SIL -0.382 0.023 A.. o1 2009 09 18 18 46 00 52.7200 174.1000 28.00 283346 SHM 2009 08 23 23 30 00 693-99 P co2o18 SIL -0.338 0.023 A.. o1 2009 09 18 18 28 00 52.7200 174.1000 28.00 283345 SHM 2009 08 30 02 06 00 1251-99 P co2o18 SIL -0.570 0.023 A.. o1 2009 09 18 19 04 00 52.7200 174.1000 28.00 283347 SHM 2009 08 30 02 06 00 2557-99 P co2o18 SIL -0.587 0.023 A.. o1 2009 09 18 19 22 00 52.7200 174.1000 28.00 283348 SHM 2009 09 06 22 45 00 222-99 P co2o18 SIL -1.078 0.021 +.. o1 2009 10 16 02 55 00 52.7200 174.1000 28.00 284661 SHM 2009 09 06 22 45 00 2796-99 P co2o18 SIL -1.239 0.021 -.. o1 2009 10 16 03 14 00 52.7200 174.1000 28.00 284662 SHM 2009 09 13 10 45 00 2556-99 P co2o18 SIL -1.411 0.020 ... o1 2009 10 19 15 18 00 52.7200 174.1000 28.00 284664 SHM 2009 09 13 10 45 00 446-99 P co2o18 SIL -1.492 0.020 ... o1 2009 10 19 15 00 00 52.7200 174.1000 28.00 284663 SHM 2009 09 20 22 45 00 3563-99 P co2o18 SIL -1.369 0.039 ... o1 2009 11 18 18 07 00 52.7200 174.1000 28.00 286036 SHM 2009 09 20 22 45 00 3847-99 P co2o18 SIL -1.287 0.039 ... o1 2009 11 18 18 25 00 52.7200 174.1000 28.00 286037 SHM 2009 09 27 22 45 00 3674-99 P co2o18 SIL -1.048 0.039 ... o1 2009 11 18 18 42 00 52.7200 174.1000 28.00 286038 SHM 2009 09 27 22 45 00 4525-99 P co2o18 SIL -1.079 0.039 ... o1 2009 11 18 19 00 00 52.7200 174.1000 28.00 286039 SHM 2009 10 11 22 45 00 2084-99 P co2o18 SIL -0.922 0.042 ... o1 2009 12 20 00 28 00 52.7200 174.1000 28.00 287660 SHM 2009 10 11 22 45 00 973-99 P co2o18 SIL -0.916 0.042 ... o1 2009 12 20 00 10 00 52.7200 174.1000 28.00 287659 SHM 2009 11 22 23 15 00 2393-99 P co2o18 SIL -0.980 0.042 ... o1 2009 12 19 23 34 00 52.7200 174.1000 28.00 287657 SHM 2009 11 22 23 15 00 3710-99 P co2o18 SIL -0.893 0.042 ... o1 2009 12 19 23 52 00 52.7200 174.1000 28.00 287658 SHM 2009 12 10 13 21 00 1591-99 P co2o18 SIL -0.593 0.052 ... o1 2010 01 30 02 51 00 52.7200 174.1000 28.00 289106 SHM 2009 12 10 13 21 00 463-99 P co2o18 SIL -0.593 0.052 ... o1 2010 01 30 02 34 00 52.7200 174.1000 28.00 289105 SHM 2009 12 16 13 09 00 45-99 P co2o18 SIL -0.362 0.052 ... o1 2010 01 30 01 58 00 52.7200 174.1000 28.00 289103 SHM 2009 12 16 13 09 00 6780-66 P co2o18 SIL -0.398 0.052 ... o1 2010 01 30 02 16 00 52.7200 174.1000 28.00 289104 SHM 2009 12 20 22 45 00 1309-99 P co2o18 SIL -0.763 0.053 ... o1 2010 02 06 07 51 00 52.7200 174.1000 28.00 289379 SHM 2009 12 20 22 45 00 1310-99 P co2o18 SIL -0.717 0.053 ... o1 2010 02 06 08 09 00 52.7200 174.1000 28.00 289380 SHM 2009 12 27 23 45 00 3535-99 P co2o18 SIL -0.602 0.053 ... o1 2010 02 06 07 16 00 52.7200 174.1000 28.00 289381 SHM 2009 12 27 23 45 00 3536-99 P co2o18 SIL -0.600 0.053 ... o1 2010 02 06 07 33 00 52.7200 174.1000 28.00 289382 SHM 2010 01 03 23 45 00 4217-99 P co2o18 SIL -0.456 0.052 ... o1 2010 03 10 21 49 00 52.7200 174.1000 28.00 291452 SHM 2010 01 03 23 45 00 4219-99 P co2o18 SIL -0.455 0.052 ... o1 2010 03 10 22 08 00 52.7200 174.1000 28.00 291453 SHM 2010 01 10 22 45 00 4164-99 P co2o18 SIL -0.539 0.052 ... o1 2010 03 10 21 13 00 52.7200 174.1000 28.00 291454 SHM 2010 01 10 22 45 00 4536-99 P co2o18 SIL -0.523 0.052 ... o1 2010 03 10 21 31 00 52.7200 174.1000 28.00 291455 SHM 2010 01 17 23 15 00 1455-99 P co2o18 SIL -0.346 0.052 ... o1 2010 04 01 01 56 00 52.7200 174.1000 28.00 292293 SHM 2010 01 17 23 15 00 1456-99 P co2o18 SIL -0.352 0.052 ... o1 2010 04 01 02 13 00 52.7200 174.1000 28.00 292294 SHM 2010 02 01 23 30 00 3025-99 P co2o18 SIL -0.496 0.052 ... o1 2010 04 01 01 20 00 52.7200 174.1000 28.00 292291 SHM 2010 02 01 23 30 00 3026-99 P co2o18 SIL -0.514 0.052 ... o1 2010 04 01 01 38 00 52.7200 174.1000 28.00 292292 SHM 2010 02 14 20 45 00 2317-99 P co2o18 SIL -0.481 0.053 ... o1 2010 04 12 06 25 00 52.7200 174.1000 28.00 293083 SHM 2010 02 14 20 45 00 2318-99 P co2o18 SIL -0.381 0.053 ... o1 2010 04 12 06 42 00 52.7200 174.1000 28.00 293084 SHM 2010 02 22 20 45 00 1603-99 P co2o18 SIL -0.288 0.053 ... o1 2010 04 12 05 49 00 52.7200 174.1000 28.00 293085 SHM 2010 02 22 20 45 00 1604-99 P co2o18 SIL -0.331 0.053 ... o1 2010 04 12 06 07 00 52.7200 174.1000 28.00 293086 SHM 2010 03 14 22 45 00 3434-99 P co2o18 SIL -0.299 0.053 ... o1 2010 04 17 06 16 00 52.7200 174.1000 28.00 293703 SHM 2010 03 14 22 45 00 3974-99 P co2o18 SIL -0.332 0.053 ... o1 2010 04 17 06 33 00 52.7200 174.1000 28.00 293704 SHM 2010 03 21 23 30 00 2413-99 P co2o18 SIL -0.286 0.053 ... o1 2010 04 17 05 41 00 52.7200 174.1000 28.00 293701 SHM 2010 03 21 23 30 00 2876-99 P co2o18 SIL -0.304 0.053 ... o1 2010 04 17 05 59 00 52.7200 174.1000 28.00 293702 SHM 2010 03 29 00 15 00 5149-99 P co2o18 SIL -0.387 0.051 ... o1 2010 04 21 21 01 00 52.7200 174.1000 28.00 294892 SHM 2010 03 29 00 15 00 5150-99 P co2o18 SIL -0.316 0.051 ... o1 2010 04 21 21 19 00 52.7200 174.1000 28.00 294893 SHM 2010 04 04 23 45 00 1959-99 P co2o18 SIL -0.303 0.051 ... o1 2010 04 21 21 37 00 52.7200 174.1000 28.00 294894 SHM 2010 04 04 23 45 00 1960-99 P co2o18 SIL -0.312 0.051 ... o1 2010 04 21 21 54 00 52.7200 174.1000 28.00 294895 SHM 2010 04 18 22 30 00 3084-99 P co2o18 SIL 0.090 0.052 ..S o1 2010 06 14 13 00 00 52.7200 174.1000 28.00 296831 SHM 2010 04 26 10 45 00 859-99 P co2o18 SIL -0.085 -9.000 ..o i2 2010 06 10 19 38 00 52.7200 174.1000 28.00 296832 SHM 2010 04 26 10 45 00 860-99 P co2o18 SIL -0.048 -9.000 ..o i2 2010 06 10 19 59 00 52.7200 174.1000 28.00 296833 SHM 2010 05 03 01 30 00 1469-99 P co2o18 SIL -0.034 -9.000 ..o o1 2010 07 06 14 36 00 52.7200 174.1000 28.00 298398 SHM 2010 05 03 01 30 00 1509-99 P co2o18 SIL -0.073 -9.000 ..o o1 2010 07 06 14 54 00 52.7200 174.1000 28.00 298399 SHM 2010 05 09 22 45 00 1485-99 P co2o18 SIL -0.077 0.054 ... o1 2010 06 28 19 05 00 52.7200 174.1000 28.00 298400 SHM 2010 05 09 22 45 00 4509-99 P co2o18 SIL -0.089 0.054 ... o1 2010 06 28 19 22 00 52.7200 174.1000 28.00 298401 SHM 2010 05 23 22 45 00 6301-66 P co2o18 SIL -0.216 0.065 A.L o1 2010 07 18 06 19 00 52.7200 174.1000 28.00 299330 SHM 2010 05 23 22 45 00 6334-66 P co2o18 SIL -0.064 0.065 A.L o1 2010 07 18 06 37 00 52.7200 174.1000 28.00 299331 SHM 2010 05 30 22 45 00 3644-99 P co2o18 SIL 0.054 0.065 A.L o1 2010 07 18 06 54 00 52.7200 174.1000 28.00 299332 SHM 2010 05 30 22 45 00 4082-99 P co2o18 SIL 0.007 0.065 A.L o1 2010 07 18 07 12 00 52.7200 174.1000 28.00 299333 SHM 2010 06 06 22 45 00 2336-99 P co2o18 SIL -0.079 0.054 ... o1 2010 07 27 16 13 00 52.7200 174.1000 28.00 299328 SHM 2010 06 06 22 45 00 5045-99 P co2o18 SIL -0.021 0.054 ... o1 2010 07 27 16 30 00 52.7200 174.1000 28.00 299329 SHM 2010 06 14 11 50 00 1295-99 P co2o18 SIL -0.729 -9.000 .Xo o1 2010 07 21 20 17 00 52.7200 174.1000 28.00 299326 SHM 2010 06 14 11 50 00 1371-99 P co2o18 SIL -0.769 -9.000 .Xo o1 2010 07 21 20 34 00 52.7200 174.1000 28.00 299327 SHM 2010 06 20 22 48 00 3917-99 P co2o18 SIL -0.370 0.053 ..S o1 2010 08 20 15 42 00 52.7200 174.1000 28.00 300739 SHM 2010 06 27 23 46 00 4145-99 P co2o18 SIL 0.113 0.058 ... o1 2010 08 06 00 57 00 52.7200 174.1000 28.00 300737 SHM 2010 06 27 23 46 00 4146-99 P co2o18 SIL 0.062 0.058 ... o1 2010 08 06 01 15 00 52.7200 174.1000 28.00 300738 SHM 2010 07 05 01 00 00 3399-99 P co2o18 SIL -0.264 0.054 ... o1 2010 07 27 20 52 00 52.7200 174.1000 28.00 300270 SHM 2010 07 05 01 00 00 3400-99 P co2o18 SIL -0.245 0.054 ... o1 2010 07 27 21 09 00 52.7200 174.1000 28.00 300271 SHM 2010 07 14 22 00 00 1297-99 P co2o18 SIL -0.219 0.054 ... o1 2010 08 18 19 11 00 52.7200 174.1000 28.00 301950 SHM 2010 07 14 22 00 00 338-99 P co2o18 SIL -0.188 0.054 ... o1 2010 08 18 18 54 00 52.7200 174.1000 28.00 301949 SHM 2010 07 18 22 45 00 2534-99 P co2o18 SIL -0.005 0.054 ... o1 2010 08 18 14 14 00 52.7200 174.1000 28.00 301951 SHM 2010 07 18 22 45 00 4496-99 P co2o18 SIL -0.045 0.054 ... o1 2010 08 18 14 31 00 52.7200 174.1000 28.00 301952 SHM 2010 07 25 22 15 00 2276-99 P co2o18 SIL 0.045 0.054 ... o1 2010 08 18 13 21 00 52.7200 174.1000 28.00 301954 SHM 2010 07 25 22 15 00 312-99 P co2o18 SIL 0.023 0.054 ... o1 2010 08 18 13 03 00 52.7200 174.1000 28.00 301953 SHM 2010 08 01 22 15 00 1102-99 P co2o18 SIL 0.398 0.054 .X. o1 2010 08 18 13 38 00 52.7200 174.1000 28.00 301955 SHM 2010 08 01 22 15 00 1756-99 P co2o18 SIL 0.429 0.054 .X. o1 2010 08 18 13 56 00 52.7200 174.1000 28.00 301956 SHM 2010 08 15 10 45 00 5211-99 P co2o18 SIL -2.128 0.056 .X. o1 2010 10 07 06 44 00 52.7200 174.1000 28.00 304446 SHM 2010 08 15 10 45 00 5212-99 P co2o18 SIL -2.216 0.056 .X. o1 2010 10 07 07 02 00 52.7200 174.1000 28.00 304447 SHM 2010 08 22 10 45 00 5209-99 P co2o18 SIL -2.098 0.054 .X. i2 2010 10 07 19 13 00 52.7200 174.1000 28.00 304444 SHM 2010 08 22 10 45 00 5210-99 P co2o18 SIL -2.081 0.054 .X. i2 2010 10 07 19 32 00 52.7200 174.1000 28.00 304445 SHM 2010 08 29 22 45 00 458-99 P co2o18 SIL -1.780 0.054 ... o1 2010 10 15 18 39 00 52.7200 174.1000 28.00 304880 SHM 2010 08 29 22 45 00 4792-99 P co2o18 SIL -1.791 0.054 ... o1 2010 10 15 18 56 00 52.7200 174.1000 28.00 304881 SHM 2010 09 05 22 45 00 249-99 P co2o18 SIL -1.726 0.054 -.. o1 2010 10 15 18 22 00 52.7200 174.1000 28.00 304883 SHM 2010 09 05 22 45 00 73-99 P co2o18 SIL -1.578 0.054 +.. o1 2010 10 15 18 05 00 52.7200 174.1000 28.00 304882 SHM 2010 09 19 23 45 00 4523-99 P co2o18 SIL -1.313 0.060 ... o1 2010 10 19 17 25 00 52.7200 174.1000 28.00 305414 SHM 2010 09 19 23 45 00 4524-99 P co2o18 SIL -1.197 0.060 ... o1 2010 10 19 17 43 00 52.7200 174.1000 28.00 305415 SHM 2010 09 28 12 00 00 2419-99 P co2o18 SIL -0.925 0.060 +.. o1 2010 10 19 16 52 00 52.7200 174.1000 28.00 305416 SHM 2010 09 28 12 00 00 2420-99 P co2o18 SIL -1.063 0.060 -.. o1 2010 10 19 17 08 00 52.7200 174.1000 28.00 305417 SHM 2010 10 04 12 16 00 3315-99 P co2o18 SIL -1.174 0.026 ... i2 2010 11 03 20 24 00 52.7200 174.1000 28.00 306161 SHM 2010 10 04 12 16 00 3316-99 P co2o18 SIL -1.164 0.026 ... i2 2010 11 03 20 45 00 52.7200 174.1000 28.00 306162 SHM 2010 10 10 22 55 00 3781-99 P co2o18 SIL -1.235 0.026 ... i2 2010 11 03 21 06 00 52.7200 174.1000 28.00 306159 SHM 2010 10 10 22 55 00 3782-99 P co2o18 SIL -1.258 0.026 ... i2 2010 11 03 21 26 00 52.7200 174.1000 28.00 306160 SHM 2010 10 18 01 11 00 2694-99 P co2o18 SIL -1.219 0.054 ... o1 2010 12 10 20 31 00 52.7200 174.1000 28.00 308947 SHM 2010 10 18 01 11 00 3295-99 P co2o18 SIL -1.188 0.054 ... o1 2010 12 10 20 49 00 52.7200 174.1000 28.00 308948 SHM 2010 10 24 22 45 00 2272-99 P co2o18 SIL -1.495 0.054 ... o1 2010 12 10 21 07 00 52.7200 174.1000 28.00 308945 SHM 2010 10 24 22 45 00 2933-99 P co2o18 SIL -1.522 0.054 ... o1 2010 12 10 21 24 00 52.7200 174.1000 28.00 308946 SHM 2010 11 08 00 45 00 4395-99 P co2o18 SIL -1.475 0.053 ... o1 2010 12 23 02 17 00 52.7200 174.1000 28.00 309544 SHM 2010 11 08 00 45 00 807-99 P co2o18 SIL -1.465 0.053 ... o1 2010 12 23 02 00 00 52.7200 174.1000 28.00 309543 SHM 2010 11 14 22 45 00 3091-99 P co2o18 SIL -0.911 0.053 ... o1 2010 12 23 03 09 00 52.7200 174.1000 28.00 309545 SHM 2010 11 14 22 45 00 4715-99 P co2o18 SIL -0.916 0.053 ... o1 2010 12 23 03 27 00 52.7200 174.1000 28.00 309546 SHM 2010 12 05 23 15 00 2474-99 P co2o18 SIL -0.383 0.098 ... o1 2011 01 12 01 16 00 52.7200 174.1000 28.00 310600 SHM 2010 12 05 23 15 00 4020-99 P co2o18 SIL -0.408 0.098 ... o1 2011 01 12 01 34 00 52.7200 174.1000 28.00 310601 SHM 2010 12 12 23 00 00 2744-99 P co2o18 SIL -0.465 0.045 ... o1 2011 01 10 20 02 00 52.7200 174.1000 28.00 310602 SHM 2010 12 12 23 00 00 3808-99 P co2o18 SIL -0.399 0.045 ... o1 2011 01 10 20 19 00 52.7200 174.1000 28.00 310603 SHM 2010 12 23 12 00 00 2126-99 P co2o18 SIL -0.677 0.045 ... o1 2011 01 10 21 47 00 52.7200 174.1000 28.00 310576 SHM 2010 12 23 12 00 00 2907-99 P co2o18 SIL -0.636 0.045 ... o1 2011 01 10 22 04 00 52.7200 174.1000 28.00 310577 SHM 2010 12 27 00 42 00 4034-99 P co2o18 SIL -0.716 0.045 ... o1 2011 01 11 01 49 00 52.7200 174.1000 28.00 310578 SHM 2010 12 27 00 42 00 4566-99 P co2o18 SIL -0.791 0.045 ... o1 2011 01 11 02 07 00 52.7200 174.1000 28.00 310579 SHM 2011 01 03 01 10 00 2832-99 P co2o18 SIL -1.048 0.039 .X. o1 2011 02 09 04 38 00 52.7200 174.1000 28.00 311780 SHM 2011 01 03 01 10 00 3007-99 P co2o18 SIL -0.992 0.039 .X. o1 2011 02 09 04 55 00 52.7200 174.1000 28.00 311781 SHM 2011 01 10 12 08 00 2831-99 P co2o18 SIL -0.490 0.040 ... o1 2011 02 07 14 35 00 52.7200 174.1000 28.00 311778 SHM 2011 01 10 12 08 00 3008-99 P co2o18 SIL -0.533 0.040 ... o1 2011 02 07 14 52 00 52.7200 174.1000 28.00 311779 SHM 2011 01 16 01 30 00 1086-99 P co2o18 SIL -0.412 0.046 ... o1 2011 03 10 04 10 00 52.7200 174.1000 28.00 313652 SHM 2011 01 16 01 30 00 74-99 P co2o18 SIL -0.373 0.046 ..P o1 2011 03 10 03 53 00 52.7200 174.1000 28.00 313651 SHM 2011 01 23 11 00 00 2460-99 P co2o18 SIL -0.040 0.046 ... o1 2011 03 10 04 27 00 52.7200 174.1000 28.00 313653 SHM 2011 01 23 11 00 00 3266-99 P co2o18 SIL -0.015 0.046 ... o1 2011 03 10 04 44 00 52.7200 174.1000 28.00 313654 SHM 2011 02 07 11 00 00 865-99 P co2o18 SIL -0.256 0.041 ... o1 2011 03 25 03 49 00 52.7200 174.1000 28.00 314558 SHM 2011 02 07 11 00 00 866-99 P co2o18 SIL -0.209 0.041 ... o1 2011 03 25 04 07 00 52.7200 174.1000 28.00 314559 SHM 2011 02 13 22 45 00 2975-99 P co2o18 SIL -0.031 0.041 ... o1 2011 03 25 03 15 00 52.7200 174.1000 28.00 314556 SHM 2011 02 13 22 45 00 2976-99 P co2o18 SIL -0.041 0.041 ... o1 2011 03 25 03 33 00 52.7200 174.1000 28.00 314557 SHM 2011 02 20 22 45 00 5391-99 P co2o18 SIL -0.243 0.041 ... o1 2011 03 25 04 24 00 52.7200 174.1000 28.00 314554 SHM 2011 02 20 22 45 00 5392-99 P co2o18 SIL -0.245 0.041 ... o1 2011 03 25 04 41 00 52.7200 174.1000 28.00 314555 SHM 2011 02 27 22 45 00 5393-99 P co2o18 SIL -0.225 0.046 ... o1 2011 03 24 01 55 00 52.7200 174.1000 28.00 314563 SHM 2011 02 27 22 45 00 5394-99 P co2o18 SIL -0.243 0.046 ... o1 2011 03 24 02 12 00 52.7200 174.1000 28.00 314564 SHM 2011 03 03 12 47 00 1510-99 P co2o18 SIL -0.223 0.041 ... o1 2011 05 14 00 55 00 52.7200 174.1000 28.00 316343 SHM 2011 03 03 12 47 00 2099-99 P co2o18 SIL -0.199 0.041 ... o1 2011 05 14 01 13 00 52.7200 174.1000 28.00 316344 SHM 2011 03 15 11 15 00 3785-99 P co2o18 SIL -0.384 0.040 ... o1 2011 04 12 23 46 00 52.7200 174.1000 28.00 315551 SHM 2011 03 15 11 15 00 3977-99 P co2o18 SIL -0.424 0.040 ... o1 2011 04 13 00 03 00 52.7200 174.1000 28.00 315550 SHM 2011 03 22 11 15 00 1870-99 P co2o18 SIL -0.403 0.040 ... o1 2011 04 13 00 20 00 52.7200 174.1000 28.00 315552 SHM 2011 03 22 11 15 00 3609-99 P co2o18 SIL -0.401 0.040 ... o1 2011 04 13 00 37 00 52.7200 174.1000 28.00 315553 SHM 2011 03 27 23 15 00 1461-99 P co2o18 SIL -0.715 0.046 -.. o1 2011 05 26 04 11 00 52.7200 174.1000 28.00 316016 SHM 2011 03 27 23 15 00 1462-99 P co2o18 SIL -0.352 0.046 +.. o1 2011 05 26 04 28 00 52.7200 174.1000 28.00 316017 SHM 2011 04 11 00 50 00 1145-99 P co2o18 SIL -0.295 0.041 ... o1 2011 05 14 01 46 00 52.7200 174.1000 28.00 316342 SHM 2011 04 11 00 50 00 137-99 P co2o18 SIL -0.254 0.041 ... o1 2011 05 14 01 29 00 52.7200 174.1000 28.00 316341 SHM 2011 04 18 01 00 00 3113-99 P co2o18 SIL -0.450 0.044 ... o1 2011 06 01 22 07 00 52.7200 174.1000 28.00 317440 SHM 2011 04 18 01 00 00 3114-99 P co2o18 SIL -0.474 0.044 ... o1 2011 06 01 22 25 00 52.7200 174.1000 28.00 317441 SHM 2011 04 25 11 51 00 2013-99 P co2o18 SIL -1.226 0.056 .X. o1 2011 06 10 00 35 00 52.7200 174.1000 28.00 317442 SHM 2011 04 25 11 51 00 2014-99 P co2o18 SIL -1.126 0.056 .X. o1 2011 06 10 00 52 00 52.7200 174.1000 28.00 317443 SHM 2011 05 08 23 00 00 1090-99 P co2o18 SIL -0.130 0.053 ... o1 2011 07 02 15 14 00 52.7200 174.1000 28.00 318847 SHM 2011 05 08 23 00 00 327-99 P co2o18 SIL -0.108 0.053 ... o1 2011 07 02 14 57 00 52.7200 174.1000 28.00 318846 SHM 2011 05 15 23 15 00 2005-99 P co2o18 SIL -0.135 0.053 ... o1 2011 07 02 15 31 00 52.7200 174.1000 28.00 318844 SHM 2011 05 15 23 15 00 5149-99 P co2o18 SIL -0.140 0.053 ... o1 2011 07 02 15 48 00 52.7200 174.1000 28.00 318845 SHM 2011 05 22 23 25 00 465-99 P co2o18 SIL -0.201 0.053 ... o1 2011 07 07 00 28 00 52.7200 174.1000 28.00 318975 SHM 2011 05 22 23 25 00 466-99 P co2o18 SIL -0.196 0.053 ... o1 2011 07 07 00 45 00 52.7200 174.1000 28.00 318976 SHM 2011 05 29 22 45 00 1379-99 P co2o18 SIL -0.284 0.053 ... o1 2011 07 06 23 54 00 52.7200 174.1000 28.00 318977 SHM 2011 05 29 22 45 00 1380-99 P co2o18 SIL -0.302 0.053 ... o1 2011 07 07 00 11 00 52.7200 174.1000 28.00 318978 SHM 2011 06 06 01 15 00 1182-99 P co2o18 SIL -0.405 0.041 ... o1 2011 07 16 18 53 00 52.7200 174.1000 28.00 320376 SHM 2011 06 06 01 15 00 986-99 P co2o18 SIL -0.460 0.041 ... o1 2011 07 16 18 35 00 52.7200 174.1000 28.00 320375 SHM 2011 06 12 22 45 00 2653-99 P co2o18 SIL 0.028 0.041 ... o1 2011 07 16 19 10 00 52.7200 174.1000 28.00 320378 SHM 2011 06 12 22 45 00 2680-99 P co2o18 SIL -0.026 0.041 ... o1 2011 07 16 19 28 00 52.7200 174.1000 28.00 320377 SHM 2011 06 29 05 00 00 5019-99 P co2o18 SIL 0.008 0.050 ... o1 2011 07 22 17 37 00 52.7200 174.1000 28.00 320954 SHM 2011 06 29 05 00 00 5020-99 P co2o18 SIL 0.019 0.050 ... o1 2011 07 22 17 55 00 52.7200 174.1000 28.00 320955 SHM 2011 07 04 00 01 00 1169-99 P co2o18 SIL 0.009 0.077 A.. o1 2011 07 26 17 46 00 52.7200 174.1000 28.00 320956 SHM 2011 07 04 00 01 00 1170-99 P co2o18 SIL 0.040 0.077 A.. o1 2011 07 26 18 04 00 52.7200 174.1000 28.00 320957 SHM 2011 07 11 00 57 00 4987-99 P co2o18 SIL -0.274 0.056 ... o1 2011 08 09 15 59 00 52.7200 174.1000 28.00 321578 SHM 2011 07 11 00 57 00 4988-99 P co2o18 SIL -0.251 0.056 ... o1 2011 08 09 16 16 00 52.7200 174.1000 28.00 321579 SHM 2011 07 18 01 20 00 865-99 P co2o18 SIL -0.343 0.056 ... o1 2011 08 09 18 48 00 52.7200 174.1000 28.00 321576 SHM 2011 07 18 01 20 00 866-99 P co2o18 SIL -0.337 0.056 ... o1 2011 08 09 19 05 00 52.7200 174.1000 28.00 321577 SHM 2011 07 25 00 39 00 2677-99 P co2o18 SIL -1.958 0.041 .X. o1 2011 09 19 19 58 00 52.7200 174.1000 28.00 323735 SHM 2011 07 25 00 39 00 2678-99 P co2o18 SIL -1.914 0.041 .X. o1 2011 09 19 20 16 00 52.7200 174.1000 28.00 323736 SHM 2011 08 08 22 45 00 5133-99 P co2o18 SIL -1.997 0.041 .X. o1 2011 09 19 20 33 00 52.7200 174.1000 28.00 323737 SHM 2011 08 08 22 45 00 5134-99 P co2o18 SIL -1.920 0.041 .X. o1 2011 09 19 20 50 00 52.7200 174.1000 28.00 323738 SHM 2011 08 15 22 45 00 3753-99 P co2o18 SIL -2.122 0.038 .X. o1 2011 10 19 01 52 00 52.7200 174.1000 28.00 324706 SHM 2011 08 15 22 45 00 4779-99 P co2o18 SIL -2.040 0.038 .X. o1 2011 10 19 02 09 00 52.7200 174.1000 28.00 324707 SHM 2011 08 22 22 45 00 3347-99 P co2o18 SIL -2.153 0.044 .X. o1 2011 10 18 02 11 00 52.7200 174.1000 28.00 324704 SHM 2011 08 22 22 45 00 3894-99 P co2o18 SIL -2.155 0.044 .X. o1 2011 10 18 01 53 00 52.7200 174.1000 28.00 324705 SHM 2011 08 28 22 45 00 329-99 P co2o18 SIL -1.512 0.045 -.. o1 2011 10 21 05 02 00 52.7200 174.1000 28.00 325143 SHM 2011 08 28 22 45 00 330-99 P co2o18 SIL -1.365 0.045 +.. o1 2011 10 21 05 19 00 52.7200 174.1000 28.00 325144 SHM 2011 09 05 22 45 00 4157-99 P co2o18 SIL -2.221 0.045 .X. o1 2011 10 21 04 28 00 52.7200 174.1000 28.00 325145 SHM 2011 09 05 22 45 00 4158-99 P co2o18 SIL -2.220 0.045 .X. o1 2011 10 21 04 45 00 52.7200 174.1000 28.00 325146 SHM 2011 09 12 22 45 00 2104-99 P co2o18 SIL -1.295 0.038 A.. o1 2011 10 18 17 48 00 52.7200 174.1000 28.00 325005 SHM 2011 09 12 22 45 00 2104-99 P co2o18 SIL -1.472 0.042 ... o1 2011 10 26 03 12 00 52.7200 174.1000 28.00 325005 SHM 2011 09 12 22 45 00 2604-99 P co2o18 SIL 553.521 0.038 !.P o1 2011 10 18 18 06 00 52.7200 174.1000 28.00 325006 SHM 2011 09 12 22 45 00 2604-99 P co2o18 SIL -1.455 0.042 ... o1 2011 10 26 03 29 00 52.7200 174.1000 28.00 325006 SHM 2011 09 19 22 45 00 3705-99 P co2o18 SIL -1.564 0.038 ... o1 2011 10 18 18 21 00 52.7200 174.1000 28.00 325007 SHM 2011 09 19 22 45 00 3765-99 P co2o18 SIL -1.616 0.038 ... o1 2011 10 18 18 39 00 52.7200 174.1000 28.00 325008 SHM 2011 09 25 22 45 00 229-99 P co2o18 SIL -1.242 0.046 ... o1 2011 11 05 01 16 00 52.7200 174.1000 28.00 325854 SHM 2011 09 25 22 45 00 230-99 P co2o18 SIL -1.240 0.046 ... o1 2011 11 05 01 34 00 52.7200 174.1000 28.00 325855 SHM 2011 10 10 01 13 00 2713-99 P co2o18 SIL -1.455 0.046 ... o1 2011 11 05 01 51 00 52.7200 174.1000 28.00 325852 SHM 2011 10 10 01 13 00 2714-99 P co2o18 SIL -1.512 0.046 ... o1 2011 11 05 02 09 00 52.7200 174.1000 28.00 325853 SHM 2011 10 17 01 30 00 4006-99 P co2o18 SIL -1.415 0.040 ... o1 2011 12 20 18 46 00 52.7200 174.1000 28.00 327745 SHM 2011 10 17 01 30 00 4403-99 P co2o18 SIL -1.365 0.040 ... o1 2011 12 20 18 28 00 52.7200 174.1000 28.00 327744 SHM 2011 10 23 22 45 00 3778-99 P co2o18 SIL -1.213 0.040 ... o1 2011 12 20 20 48 00 52.7200 174.1000 28.00 327746 SHM 2011 10 23 22 45 00 4781-99 P co2o18 SIL -1.269 0.040 ... o1 2011 12 20 21 05 00 52.7200 174.1000 28.00 327747 SHM 2011 10 31 21 15 00 3441-99 P co2o18 SIL -1.307 0.040 ... o1 2011 12 20 17 53 00 52.7200 174.1000 28.00 327735 SHM 2011 10 31 21 15 00 3442-99 P co2o18 SIL -1.252 0.040 ... o1 2011 12 20 18 11 00 52.7200 174.1000 28.00 327734 SHM 2011 11 13 23 15 00 2879-99 P co2o18 SIL -0.889 0.052 ... o1 2012 01 05 02 50 00 52.7200 174.1000 28.00 328224 SHM 2011 11 13 23 15 00 625-99 P co2o18 SIL -0.855 0.052 ... o1 2012 01 05 02 32 00 52.7200 174.1000 28.00 328223 SHM 2011 11 20 23 15 00 3199-99 P co2o18 SIL -1.105 0.052 ... o1 2012 01 05 03 07 00 52.7200 174.1000 28.00 328225 SHM 2011 11 20 23 15 00 4104-99 P co2o18 SIL -1.075 0.052 ... o1 2012 01 05 03 25 00 52.7200 174.1000 28.00 328226 SHM 2011 12 04 22 45 00 2735-99 P co2o18 SIL -0.859 0.052 ... o1 2012 01 24 18 35 00 52.7200 174.1000 28.00 329242 SHM 2011 12 04 22 45 00 2736-99 P co2o18 SIL -0.867 0.052 ... o1 2012 01 24 18 53 00 52.7200 174.1000 28.00 329243 SHM 2011 12 18 22 45 00 3741-99 P co2o18 SIL -0.853 0.052 ... o1 2012 01 24 19 11 00 52.7200 174.1000 28.00 329240 SHM 2011 12 18 22 45 00 3742-99 P co2o18 SIL -0.849 0.052 ... o1 2012 01 24 19 28 00 52.7200 174.1000 28.00 329241 SHM 2011 12 25 22 45 00 1269-99 P co2o18 SIL -0.722 0.052 ... o1 2012 01 26 19 39 00 52.7200 174.1000 28.00 329554 SHM 2011 12 25 22 45 00 1270-99 P co2o18 SIL -0.740 0.052 ... o1 2012 01 26 19 57 00 52.7200 174.1000 28.00 329555 SHM 2012 01 01 22 45 00 5189-99 P co2o18 SIL -0.547 0.052 ... o1 2012 01 27 01 29 00 52.7200 174.1000 28.00 329556 SHM 2012 01 01 22 45 00 5190-99 P co2o18 SIL -0.576 0.052 ... o1 2012 01 27 01 47 00 52.7200 174.1000 28.00 329557 SHM 2012 01 08 22 30 00 847-99 P co2o18 SIL -0.724 0.051 ... o1 2012 02 16 17 07 00 52.7200 174.1000 28.00 331168 SHM 2012 01 08 22 30 00 848-99 P co2o18 SIL -0.700 0.051 ... o1 2012 02 16 17 24 00 52.7200 174.1000 28.00 331169 SHM 2012 01 21 23 30 00 6193-66 P co2o18 SIL -0.367 0.055 ... o1 2012 02 17 20 49 00 52.7200 174.1000 28.00 331170 SHM 2012 01 21 23 30 00 6194-66 P co2o18 SIL -0.380 0.055 ... o1 2012 02 17 21 06 00 52.7200 174.1000 28.00 331171 SHM 2012 01 26 00 45 00 2602-99 P co2o18 SIL -0.660 0.052 ... o1 2012 03 26 18 41 00 52.7200 174.1000 28.00 332851 SHM 2012 01 26 00 45 00 474-99 P co2o18 SIL -0.667 0.052 ... o1 2012 03 26 18 23 00 52.7200 174.1000 28.00 332850 SHM 2012 01 29 22 45 00 2643-99 P co2o18 SIL -0.386 0.052 ... o1 2012 03 26 17 46 00 52.7200 174.1000 28.00 332852 SHM 2012 01 29 22 45 00 3682-99 P co2o18 SIL -0.392 0.052 ... o1 2012 03 26 18 05 00 52.7200 174.1000 28.00 332853 SHM 2012 02 12 22 45 00 4923-99 P co2o18 SIL -0.333 0.052 ... o1 2012 03 26 17 10 00 52.7200 174.1000 28.00 332856 SHM 2012 02 12 22 45 00 4924-99 P co2o18 SIL -0.338 0.052 ... o1 2012 03 26 17 28 00 52.7200 174.1000 28.00 332857 SHM 2012 02 26 22 45 00 643-99 P co2o18 SIL -0.385 0.052 ... o1 2012 03 26 21 25 00 52.7200 174.1000 28.00 332854 SHM 2012 02 26 22 45 00 644-99 P co2o18 SIL -0.371 0.052 ... o1 2012 03 26 21 43 00 52.7200 174.1000 28.00 332855 SHM 2012 03 06 11 15 00 3458-99 P co2o18 SIL -0.439 0.052 ... o1 2012 05 08 01 04 00 52.7200 174.1000 28.00 334406 SHM 2012 03 06 11 15 00 4350-99 P co2o18 SIL -0.481 0.052 ... o1 2012 05 08 01 22 00 52.7200 174.1000 28.00 334407 SHM 2012 03 11 10 45 00 1770-99 P co2o18 SIL -0.381 0.052 +.. o1 2012 05 08 01 39 00 52.7200 174.1000 28.00 334408 SHM 2012 03 11 10 45 00 3093-99 P co2o18 SIL -0.508 0.052 -.. o1 2012 05 08 01 56 00 52.7200 174.1000 28.00 334409 SHM 2012 03 19 10 45 00 5075-99 P co2o18 SIL -0.404 0.051 ... o1 2012 05 09 02 59 00 52.7200 174.1000 28.00 334416 SHM 2012 03 19 10 45 00 5076-99 P co2o18 SIL -0.404 0.051 ... o1 2012 05 09 03 16 00 52.7200 174.1000 28.00 334417 SHM 2012 03 25 10 45 00 2817-99 P co2o18 SIL -0.410 0.051 ... o1 2012 05 09 02 24 00 52.7200 174.1000 28.00 334414 SHM 2012 03 25 10 45 00 2818-99 P co2o18 SIL -0.392 0.051 ... o1 2012 05 09 02 41 00 52.7200 174.1000 28.00 334415 SHM 2012 04 09 07 30 00 341-99 P co2o18 SIL -0.325 0.039 ... o1 2012 05 17 05 09 00 52.7200 174.1000 28.00 334757 SHM 2012 04 09 07 30 00 342-99 P co2o18 SIL -0.316 0.039 ... o1 2012 05 17 05 26 00 52.7200 174.1000 28.00 334758 SHM 2012 04 15 23 30 00 3565-99 P co2o18 SIL -0.112 0.048 ... o1 2012 05 23 16 13 00 52.7200 174.1000 28.00 334759 SHM 2012 04 15 23 30 00 3566-99 P co2o18 SIL -0.119 0.048 ... o1 2012 05 23 16 30 00 52.7200 174.1000 28.00 334760 SHM 2012 04 29 23 00 00 288-99 P co2o18 SIL 0.037 0.044 ... o1 2012 05 26 22 00 00 52.7200 174.1000 28.00 335724 SHM 2012 04 29 23 00 00 412-99 P co2o18 SIL -0.011 0.044 ... o1 2012 05 26 22 17 00 52.7200 174.1000 28.00 335725 SHM 2012 05 07 01 38 00 1346-99 P co2o18 SIL -0.289 0.044 ... o1 2012 05 26 22 34 00 52.7200 174.1000 28.00 335726 SHM 2012 05 07 01 38 00 2927-99 P co2o18 SIL -0.312 0.044 ... o1 2012 05 26 22 52 00 52.7200 174.1000 28.00 335727 SHM 2012 05 14 10 45 00 3203-99 P co2o18 SIL -0.240 0.054 -.. o1 2012 07 23 17 37 00 52.7200 174.1000 28.00 338192 SHM 2012 05 14 10 45 00 3204-99 P co2o18 SIL -0.111 0.054 +.. o1 2012 07 23 17 55 00 52.7200 174.1000 28.00 338193 SHM 2012 05 20 10 45 00 5365-99 P co2o18 SIL -1.023 0.054 +.. o1 2012 07 23 18 12 00 52.7200 174.1000 28.00 338188 SHM 2012 05 20 10 45 00 5366-99 P co2o18 SIL -1.199 0.054 -.. o1 2012 07 23 18 31 00 52.7200 174.1000 28.00 338189 SHM 2012 06 02 11 15 00 3116-99 P co2o18 SIL -1.117 0.053 .X. o1 2012 07 21 16 05 00 52.7200 174.1000 28.00 338161 SHM 2012 06 02 11 15 00 3859-99 P co2o18 SIL -1.030 0.053 .X. o1 2012 07 21 16 23 00 52.7200 174.1000 28.00 338162 SHM 2012 06 17 11 15 00 1272-99 P co2o18 SIL 0.018 0.053 ... o1 2012 07 21 17 00 00 52.7200 174.1000 28.00 338164 SHM 2012 06 17 11 15 00 460-99 P co2o18 SIL 0.110 0.053 ... o1 2012 07 21 16 41 00 52.7200 174.1000 28.00 338163 SHM 2012 06 24 11 15 00 3187-99 P co2o18 SIL -0.976 0.063 +.. o1 2012 09 12 17 33 00 52.7200 174.1000 28.00 340013 SHM 2012 06 24 11 15 00 3188-99 P co2o18 SIL -1.136 0.063 -.. o1 2012 09 12 17 50 00 52.7200 174.1000 28.00 340014 SHM 2012 07 01 11 15 00 1063-99 P co2o18 SIL -0.292 0.066 A.. o1 2012 09 14 08 04 00 52.7200 174.1000 28.00 340007 SHM 2012 07 01 11 15 00 1064-99 P co2o18 SIL -0.374 0.066 A.. o1 2012 09 14 08 21 00 52.7200 174.1000 28.00 340008 SHM 2012 07 06 03 00 00 88-99 P co2o18 SIL -0.550 0.071 A.S o1 2012 10 10 07 05 00 52.7200 174.1000 28.00 341438 SHM 2012 07 15 13 15 00 3339-99 P co2o18 SIL -0.127 0.066 A.. o1 2012 09 14 08 39 00 52.7200 174.1000 28.00 340003 SHM 2012 07 15 13 15 00 3339-99 P co2o18 SIL -0.103 0.062 ... o1 2012 09 18 07 05 00 52.7200 174.1000 28.00 340003 SHM 2012 07 15 13 15 00 3340-99 P co2o18 SIL -0.038 0.066 A.. o1 2012 09 14 08 57 00 52.7200 174.1000 28.00 340004 SHM 2012 07 15 13 15 00 3340-99 P co2o18 SIL -0.050 0.062 ... o1 2012 09 18 07 23 00 52.7200 174.1000 28.00 340004 SHM 2012 07 26 12 00 00 2677-99 P co2o18 SIL -0.080 0.066 A.. o1 2012 09 14 09 14 00 52.7200 174.1000 28.00 340005 SHM 2012 07 26 12 00 00 2677-99 P co2o18 SIL -0.186 0.062 ... o1 2012 09 18 06 31 00 52.7200 174.1000 28.00 340005 SHM 2012 07 26 12 00 00 2678-99 P co2o18 SIL -0.096 0.066 A.. o1 2012 09 14 09 32 00 52.7200 174.1000 28.00 340006 SHM 2012 07 26 12 00 00 2678-99 P co2o18 SIL -0.079 0.062 ... o1 2012 09 18 06 48 00 52.7200 174.1000 28.00 340006 SHM 2012 08 14 04 48 00 800-99 P co2o18 SIL -0.886 0.071 A.S o1 2012 10 10 07 23 00 52.7200 174.1000 28.00 341437 SHM 2012 08 29 11 15 00 5367-99 P co2o18 SIL -1.636 0.020 .X. i2 2012 10 20 09 13 00 52.7112 174.1260 28.00 342504 SHM 2012 08 29 11 15 00 5368-99 P co2o18 SIL -1.725 0.020 .X. i2 2012 10 20 09 33 00 52.7112 174.1260 28.00 342505 SHM 2012 09 09 11 15 00 4645-99 P co2o18 SIL -0.676 0.083 A.. o1 2012 10 30 00 37 00 52.7112 174.1260 28.00 342746 SHM 2012 09 09 11 15 00 4646-99 P co2o18 SIL -0.698 0.083 A.. o1 2012 10 30 00 55 00 52.7112 174.1260 28.00 342747 SHM 2012 09 18 11 15 00 2507-99 P co2o18 SIL -1.193 0.083 A.. o1 2012 10 30 01 13 00 52.7112 174.1260 28.00 342744 SHM 2012 09 18 11 15 00 2508-99 P co2o18 SIL -1.298 0.083 A.. o1 2012 10 30 01 32 00 52.7112 174.1260 28.00 342745 SHM 2012 09 23 23 45 00 337-99 P co2o18 SIL -0.828 0.058 +.. o1 2012 11 29 18 04 00 52.7112 174.1260 28.00 343590 SHM 2012 09 23 23 45 00 953-99 P co2o18 SIL -1.091 0.058 -.. o1 2012 11 29 18 22 00 52.7112 174.1260 28.00 343591 SHM 2012 09 30 11 00 00 1457-99 P co2o18 SIL -0.625 0.069 ..H o1 2012 11 21 21 34 00 52.7112 174.1260 28.00 343588 SHM 2012 09 30 11 00 00 4613-99 P co2o18 SIL -0.739 0.069 ..H o1 2012 11 21 21 53 00 52.7112 174.1260 28.00 343589 SHM 2012 10 09 10 45 00 1044-99 P co2o18 SIL -0.710 0.051 ... o1 2012 11 27 06 50 00 52.7112 174.1260 28.00 343903 SHM 2012 10 09 10 45 00 584-99 P co2o18 SIL -0.636 0.051 ... o1 2012 11 27 06 31 00 52.7112 174.1260 28.00 343904 SHM 2012 10 17 01 15 00 1335-99 P co2o18 SIL -0.912 0.051 -.. o1 2012 11 27 06 13 00 52.7112 174.1260 28.00 343902 SHM 2012 10 17 01 15 00 673-99 P co2o18 SIL -0.729 0.051 +.. o1 2012 11 27 05 55 00 52.7112 174.1260 28.00 343901 SHM 2012 10 22 01 50 00 2033-99 P co2o18 SIL -1.200 0.054 ... o1 2012 12 07 06 34 00 52.7112 174.1260 28.00 344394 SHM 2012 10 22 01 50 00 2034-99 P co2o18 SIL -1.257 0.054 ... o1 2012 12 07 06 53 00 52.7112 174.1260 28.00 344395 SHM 2012 10 30 13 10 00 313-99 P co2o18 SIL -0.458 0.054 ... o1 2012 12 07 07 11 00 52.7112 174.1260 28.00 344392 SHM 2012 10 30 13 10 00 314-99 P co2o18 SIL -0.454 0.054 ... o1 2012 12 07 07 29 00 52.7112 174.1260 28.00 344393 SHM 2012 11 04 13 15 00 1935-99 P co2o18 SIL -0.696 0.043 ... o1 2012 12 20 19 54 00 52.7112 174.1260 28.00 344740 SHM 2012 11 04 13 15 00 70-99 P co2o18 SIL -0.585 0.043 ... o1 2012 12 20 19 34 00 52.7112 174.1260 28.00 344741 SHM 2012 11 15 03 50 00 4661-99 P co2o18 SIL -0.458 0.043 ... o1 2012 12 20 18 56 00 52.7112 174.1260 28.00 344743 SHM 2012 11 15 03 50 00 6510-66 P co2o18 SIL -0.506 0.043 ... o1 2012 12 20 19 15 00 52.7112 174.1260 28.00 344742 SHM 2012 11 18 22 45 00 357-99 P co2o18 SIL -0.781 0.038 ... o1 2013 01 07 15 43 00 52.7112 174.1260 28.00 345211 SHM 2012 11 18 22 45 00 358-99 P co2o18 SIL -0.819 0.038 ... o1 2013 01 07 16 01 00 52.7112 174.1260 28.00 345212 SHM 2012 11 26 11 15 00 1167-99 P co2o18 SIL -1.288 0.038 .X. o1 2013 01 07 16 19 00 52.7112 174.1260 28.00 345209 SHM 2012 11 26 11 15 00 1168-99 P co2o18 SIL -1.187 0.038 ... o1 2013 01 07 16 38 00 52.7112 174.1260 28.00 345210 SHM 2012 12 09 22 45 00 801-99 P co2o18 SIL -0.668 0.023 ... o1 2013 02 01 16 11 00 52.7112 174.1260 28.00 346634 SHM 2012 12 09 22 45 00 824-99 P co2o18 SIL -0.605 0.023 ... o1 2013 02 01 16 29 00 52.7112 174.1260 28.00 346635 SHM 2012 12 16 22 30 00 2526-99 P co2o18 SIL -0.565 0.025 ... o1 2013 02 01 00 44 00 52.7112 174.1260 28.00 346636 SHM 2012 12 16 22 30 00 2604-99 P co2o18 SIL -0.539 0.025 ... o1 2013 02 01 01 03 00 52.7112 174.1260 28.00 346637 SHM 2012 12 31 10 45 00 4031-99 P co2o18 SIL -0.530 -9.000 ..o o1 2013 02 18 18 17 00 52.7112 174.1260 28.00 347583 SHM 2012 12 31 10 45 00 4032-99 P co2o18 SIL -0.503 -9.000 ..o o1 2013 02 18 18 36 00 52.7112 174.1260 28.00 347584 SHM 2013 01 07 11 15 00 2025-99 P co2o18 SIL -0.436 0.043 ..L o1 2013 02 15 18 09 00 52.7112 174.1260 28.00 347581 SHM 2013 01 07 11 15 00 2026-99 P co2o18 SIL -0.475 0.043 ..L o1 2013 02 15 18 28 00 52.7112 174.1260 28.00 347582 SHM 2013 01 20 11 15 00 180-99 P co2o18 SIL -0.614 0.048 ... o1 2013 03 02 05 32 00 52.7112 174.1260 28.00 348041 SHM 2013 01 20 11 15 00 243-99 P co2o18 SIL -0.529 0.048 ... o1 2013 03 02 05 51 00 52.7112 174.1260 28.00 348042 SHM 2013 01 28 01 30 00 3740-99 P co2o18 SIL -0.204 0.050 ... o1 2013 03 04 19 17 00 52.7112 174.1260 28.00 348039 SHM 2013 01 28 01 30 00 5147-99 P co2o18 SIL -0.239 0.050 ... o1 2013 03 04 19 36 00 52.7112 174.1260 28.00 348040 SHM 2013 02 13 00 14 00 355-99 P co2o18 SIL -0.471 0.040 ... o1 2013 03 21 17 52 00 52.7112 174.1260 28.00 348647 SHM 2013 02 13 00 14 00 356-99 P co2o18 SIL -0.450 0.040 ... o1 2013 03 21 18 11 00 52.7112 174.1260 28.00 348648 SHM 2013 02 18 01 12 00 1349-99 P co2o18 SIL -0.221 0.040 ... o1 2013 03 21 18 29 00 52.7112 174.1260 28.00 348649 SHM 2013 02 18 01 12 00 1350-99 P co2o18 SIL -0.179 0.040 ... o1 2013 03 21 18 48 00 52.7112 174.1260 28.00 348650 SHM 2013 02 24 22 45 00 2498-99 P co2o18 SIL -0.831 0.078 +.. o1 2013 04 30 23 15 00 52.7112 174.1260 28.00 350387 SHM 2013 02 24 22 45 00 3312-99 P co2o18 SIL -1.243 0.078 -.. o1 2013 04 30 23 33 00 52.7112 174.1260 28.00 350388 SHM 2013 03 17 22 45 00 3991-99 P co2o18 SIL -0.263 0.078 ..S o1 2013 04 30 18 03 00 52.7112 174.1260 28.00 350390 SHM 2013 04 15 11 15 00 179-99 P co2o18 SIL 0.113 0.048 ..H i2 2013 09 28 03 15 00 52.7112 174.1260 28.00 352346 SHM 2013 04 15 11 15 00 3925-99 P co2o18 SIL 0.143 0.048 ..H i2 2013 09 28 03 32 00 52.7112 174.1260 28.00 352347 SHM 2013 04 21 23 00 00 1440-99 P co2o18 SIL -0.089 0.054 A.. o1 2013 09 28 18 40 00 52.7112 174.1260 28.00 352344 SHM 2013 04 21 23 00 00 2938-99 P co2o18 SIL -0.175 0.054 A.. o1 2013 09 28 19 00 00 52.7112 174.1260 28.00 352345 SHM 2013 04 28 22 45 00 3995-99 P co2o18 SIL 0.092 0.089 ... o1 2013 07 02 06 48 00 52.7112 174.1260 28.00 353404 SHM 2013 04 28 22 45 00 3996-99 P co2o18 SIL 0.033 0.089 ... o1 2013 07 02 07 06 00 52.7112 174.1260 28.00 353405 SHM 2013 05 06 01 15 00 2841-99 P co2o18 SIL 0.059 0.028 ... i2 2013 06 19 22 18 00 52.7112 174.1260 28.00 353402 SHM 2013 05 06 01 15 00 2842-99 P co2o18 SIL 0.050 0.028 ... i2 2013 06 19 22 38 00 52.7112 174.1260 28.00 353403 SHM 2013 05 13 01 28 00 4567-99 P co2o18 SIL 0.322 0.087 ..H o1 2013 07 09 23 40 00 52.7112 174.1260 28.00 353207 SHM 2013 05 13 01 28 00 4568-99 P co2o18 SIL 0.326 0.087 ..H o1 2013 07 09 23 58 00 52.7112 174.1260 28.00 353208 SHM 2013 05 20 12 40 00 343-99 P co2o18 SIL 0.057 0.090 ... o1 2013 07 09 08 35 00 52.7112 174.1260 28.00 353205 SHM 2013 05 20 12 40 00 344-99 P co2o18 SIL 0.076 0.090 ... o1 2013 07 09 08 53 00 52.7112 174.1260 28.00 353206 SHM 2013 05 27 00 14 00 1836-99 P co2o18 SIL -0.496 0.055 ... i2 2013 10 18 18 55 00 52.7112 174.1260 28.00 354427 SHM 2013 05 27 00 14 00 2491-99 P co2o18 SIL -0.385 0.055 ... i2 2013 10 18 19 16 00 52.7112 174.1260 28.00 354428 SHM 2013 06 02 22 45 00 2984-99 P co2o18 SIL -0.257 0.081 ... o1 2013 07 22 19 33 00 52.7112 174.1260 28.00 354425 SHM 2013 06 02 22 45 00 6765-66 P co2o18 SIL -0.233 0.081 ... o1 2013 07 22 19 51 00 52.7112 174.1260 28.00 354426 SHM 2013 06 09 23 15 00 2557-99 P co2o18 SIL -0.025 0.047 ... o1 2013 07 25 00 45 00 52.7112 174.1260 28.00 354440 SHM 2013 06 09 23 15 00 2682-99 P co2o18 SIL 0.020 0.047 ... o1 2013 07 25 01 03 00 52.7112 174.1260 28.00 354441 SHM 2013 06 16 23 00 00 4103-99 P co2o18 SIL 0.337 0.053 +.. o1 2013 07 27 00 21 00 52.7112 174.1260 28.00 354442 SHM 2013 06 16 23 00 00 4159-99 P co2o18 SIL -0.031 0.053 -.. o1 2013 07 27 00 39 00 52.7112 174.1260 28.00 354443 SHM 2013 06 23 14 00 00 1739-99 P co2o18 SIL -0.211 0.036 ... o1 2013 10 12 08 41 00 52.7112 174.1260 28.00 356783 SHM 2013 06 23 14 00 00 2991-99 P co2o18 SIL -0.198 0.036 ... o1 2013 10 12 09 01 00 52.7112 174.1260 28.00 356784 SHM 2013 07 08 11 00 00 3851-99 P co2o18 SIL -1.071 0.054 -.. o1 2013 09 29 07 40 00 52.7112 174.1260 28.00 356779 SHM 2013 07 08 11 00 00 5267-99 P co2o18 SIL 0.416 0.054 +.. o1 2013 09 29 08 00 00 52.7112 174.1260 28.00 356780 SHM 2013 07 14 23 15 00 4867-99 P co2o18 SIL -0.092 0.036 ... o1 2013 10 12 10 01 00 52.7112 174.1260 28.00 356781 SHM 2013 07 14 23 15 00 4868-99 P co2o18 SIL -0.125 0.036 ... o1 2013 10 12 10 20 00 52.7112 174.1260 28.00 356782 SHM 2013 07 21 22 45 00 1909-99 P co2o18 SIL 0.218 0.054 +.. o1 2013 10 02 19 24 00 52.7112 174.1260 28.00 356785 SHM 2013 07 21 22 45 00 1910-99 P co2o18 SIL -0.206 0.054 -.. o1 2013 10 02 19 44 00 52.7112 174.1260 28.00 356786 SHM 2013 08 09 00 30 00 2883-99 P co2o18 SIL -1.119 0.035 +.. i2 2013 11 11 23 48 00 52.7112 174.1260 28.00 358671 SHM 2013 08 09 00 30 00 2884-99 P co2o18 SIL -1.679 0.035 -.. i2 2013 11 12 00 09 00 52.7112 174.1260 28.00 358672 SHM 2013 08 18 23 55 00 1947-99 P co2o18 SIL -0.736 0.030 ... o1 2013 10 24 01 12 00 52.7112 174.1260 28.00 357525 SHM 2013 08 18 23 55 00 1948-99 P co2o18 SIL -0.754 0.030 ... o1 2013 10 24 01 32 00 52.7112 174.1260 28.00 357526 SHM 2013 08 26 01 20 00 1549-99 P co2o18 SIL -1.064 0.062 ... i2 2013 10 24 14 08 00 52.7112 174.1260 28.00 357527 SHM 2013 08 26 01 20 00 1550-99 P co2o18 SIL -1.034 0.062 ... i2 2013 10 24 14 34 00 52.7112 174.1260 28.00 357528 SHM 2013 09 02 01 30 00 365-99 P co2o18 SIL -1.164 0.056 +.. o1 2013 11 26 20 37 00 52.7112 174.1260 28.00 358669 SHM 2013 09 02 01 30 00 366-99 P co2o18 SIL -1.502 0.056 -.. o1 2013 11 26 20 57 00 52.7112 174.1260 28.00 358670 SHM 2013 09 22 22 45 00 4043-99 P co2o18 SIL -2.647 0.027 -.. o1 2014 04 22 10 34 00 52.7112 174.1260 28.00 366465 SHM 2013 09 22 22 45 00 4044-99 P co2o18 SIL -2.225 0.027 +.. o1 2014 04 22 10 57 00 52.7112 174.1260 28.00 366464 SHM 2013 09 29 22 45 00 3501-99 P co2o18 SIL -1.595 0.027 +.. o1 2014 04 21 23 31 00 52.7112 174.1260 28.00 366462 SHM 2013 09 29 22 45 00 3502-99 P co2o18 SIL -2.046 0.027 -.. o1 2014 04 21 23 54 00 52.7112 174.1260 28.00 366463 SHM 2014 02 17 22 45 00 4382-99 P co2o18 SIL -0.423 0.073 ... i2 2014 04 07 20 03 00 52.7112 174.1260 28.00 365880 SHM 2014 02 17 22 45 00 669-99 P co2o18 SIL -0.412 0.073 ... i2 2014 04 07 19 42 00 52.7112 174.1260 28.00 365881 SHM 2014 02 23 22 45 00 1933-99 P co2o18 SIL -0.348 0.073 ... i2 2014 04 07 23 55 00 52.7112 174.1260 28.00 365878 SHM 2014 02 23 22 45 00 4752-99 P co2o18 SIL -0.381 0.073 ... i2 2014 04 08 00 16 00 52.7112 174.1260 28.00 365879 SHM 2014 03 10 11 00 00 1773-99 P co2o18 SIL -0.232 0.043 ... o1 2014 05 10 12 20 00 52.7112 174.1260 28.00 367252 SHM 2014 03 10 11 00 00 735-99 P co2o18 SIL -0.211 0.043 ... o1 2014 05 10 11 56 00 52.7112 174.1260 28.00 367253 SHM 2014 03 30 01 30 00 3071-99 P co2o18 SIL -0.134 0.043 ... o1 2014 05 10 10 25 00 52.7112 174.1260 28.00 367250 SHM 2014 03 30 01 30 00 3744-99 P co2o18 SIL -0.051 0.043 ... o1 2014 05 10 10 48 00 52.7112 174.1260 28.00 367251 SHM 2014 04 29 02 30 00 1269-99 P co2o18 SIL 0.007 0.029 ... o1 2014 07 01 19 54 00 52.7112 174.1260 28.00 369249 SHM 2014 04 29 02 30 00 1270-99 P co2o18 SIL -0.004 0.029 ... o1 2014 07 01 20 13 00 52.7112 174.1260 28.00 369250 SHM 2014 05 04 22 45 00 245-99 P co2o18 SIL -0.102 0.025 ... o1 2014 06 30 23 04 00 52.7112 174.1260 28.00 369247 SHM 2014 05 04 22 45 00 246-99 P co2o18 SIL -0.165 0.025 ... o1 2014 06 30 23 23 00 52.7112 174.1260 28.00 369248 SHM 2014 05 11 22 45 00 5117-99 P co2o18 SIL -0.067 0.029 ... o1 2014 07 01 18 36 00 52.7112 174.1260 28.00 369243 SHM 2014 05 11 22 45 00 5118-99 P co2o18 SIL -0.111 0.029 ... o1 2014 07 01 18 56 00 52.7112 174.1260 28.00 369244 SHM 2014 05 18 22 45 00 4125-99 P co2o18 SIL 0.220 0.029 ... o1 2014 07 01 19 15 00 52.7112 174.1260 28.00 369245 SHM 2014 05 18 22 45 00 4126-99 P co2o18 SIL 0.206 0.029 ... o1 2014 07 01 19 34 00 52.7112 174.1260 28.00 369246 SHM 2014 06 01 22 15 00 3199-99 P co2o18 SIL 0.222 0.065 ... o1 2014 07 26 11 09 00 52.7112 174.1260 28.00 370508 SHM 2014 06 01 22 15 00 4234-99 P co2o18 SIL 0.193 0.065 ... o1 2014 07 26 11 29 00 52.7112 174.1260 28.00 370509 SHM 2014 06 10 01 45 00 2698-99 P co2o18 SIL -0.137 0.065 ... o1 2014 07 26 11 50 00 52.7112 174.1260 28.00 370510 SHM 2014 06 10 01 45 00 3639-99 P co2o18 SIL -0.071 0.065 ... o1 2014 07 26 12 10 00 52.7112 174.1260 28.00 370511 SHM 2014 06 15 22 45 00 5331-99 P co2o18 SIL -0.058 0.031 ... o1 2014 08 19 21 08 00 52.7112 174.1260 28.00 372071 SHM 2014 06 15 22 45 00 5332-99 P co2o18 SIL -0.036 0.031 ... o1 2014 08 19 21 29 00 52.7112 174.1260 28.00 372072 SHM 2014 06 22 22 45 00 5207-99 P co2o18 SIL 0.194 0.031 ... o1 2014 08 19 05 54 00 52.7112 174.1260 28.00 372073 SHM 2014 06 22 22 45 00 5208-99 P co2o18 SIL 0.221 0.031 ... o1 2014 08 19 06 14 00 52.7112 174.1260 28.00 372074 SHM 2014 06 29 22 45 00 264-99 P co2o18 SIL 0.369 0.031 ... o1 2014 09 10 04 09 00 52.7112 174.1260 28.00 372606 SHM 2014 06 29 22 45 00 489-99 P co2o18 SIL 0.345 0.031 ... o1 2014 09 10 04 26 00 52.7112 174.1260 28.00 372607 SHM 2014 07 08 01 30 00 1568-99 P co2o18 SIL -0.400 0.030 ... o1 2014 08 28 09 51 00 52.7112 174.1260 28.00 372604 SHM 2014 07 08 01 30 00 5093-99 P co2o18 SIL -0.336 0.030 ..P o1 2014 08 28 10 11 00 52.7112 174.1260 28.00 372605 SHM 2014 07 20 22 45 00 2181-99 P co2o18 SIL -0.181 0.031 ... o1 2014 09 09 23 15 00 52.7112 174.1260 28.00 372610 SHM 2014 07 20 22 45 00 3176-99 P co2o18 SIL -0.231 0.031 ... o1 2014 09 09 23 32 00 52.7112 174.1260 28.00 372611 SHM 2014 07 27 22 45 00 6605-66 P co2o18 SIL 0.119 0.031 +.. o1 2014 09 09 22 58 00 52.7112 174.1260 28.00 372609 SHM 2014 07 27 22 45 00 734-99 P co2o18 SIL -0.724 0.031 -.. o1 2014 09 09 22 41 00 52.7112 174.1260 28.00 372608 SHM 2014 08 03 22 45 00 243-99 P co2o18 SIL -1.169 0.026 -.. o1 2014 10 16 19 39 00 52.7112 174.1260 28.00 374874 SHM 2014 08 03 22 45 00 797-99 P co2o18 SIL -0.828 0.026 +.. o1 2014 10 16 19 56 00 52.7112 174.1260 28.00 374875 SHM 2014 08 10 22 45 00 4967-99 P co2o18 SIL -0.768 0.026 +.. o1 2014 10 16 20 13 00 52.7112 174.1260 28.00 374878 SHM 2014 08 10 22 45 00 5197-99 P co2o18 SIL -0.915 0.026 -.. o1 2014 10 16 20 30 00 52.7112 174.1260 28.00 374879 SHM 2014 08 17 22 45 00 311-99 P co2o18 SIL -1.821 0.029 -.. o1 2014 10 11 06 02 00 52.7112 174.1260 28.00 374880 SHM 2014 08 17 22 45 00 4009-99 P co2o18 SIL -1.309 0.029 +.. o1 2014 10 11 06 19 00 52.7112 174.1260 28.00 374881 SHM 2014 08 26 11 15 00 1973-99 P co2o18 SIL -0.980 0.029 ... o1 2014 10 11 08 19 00 52.7112 174.1260 28.00 374876 SHM 2014 08 26 11 15 00 4133-99 P co2o18 SIL -0.994 0.029 ... o1 2014 10 11 08 36 00 52.7112 174.1260 28.00 374877 SHM 2014 09 01 22 45 00 1623-99 P co2o18 SIL -1.242 0.027 ... o1 2014 10 22 18 37 00 52.7112 174.1260 28.00 375563 SHM 2014 09 01 22 45 00 1624-99 P co2o18 SIL -1.219 0.027 ... o1 2014 10 22 18 55 00 52.7112 174.1260 28.00 375564 SHM 2014 09 14 22 45 00 3685-99 P co2o18 SIL -1.019 0.025 ... o1 2014 10 21 21 58 00 52.7112 174.1260 28.00 375565 SHM 2014 09 14 22 45 00 3686-99 P co2o18 SIL -1.006 0.025 ... o1 2014 10 21 22 16 00 52.7112 174.1260 28.00 375566 SHM 2014 09 21 22 45 00 4203-99 P co2o18 SIL -1.048 0.039 +.. o1 2014 11 12 21 18 00 52.7112 174.1260 28.00 376576 SHM 2014 09 21 22 45 00 4204-99 P co2o18 SIL -1.281 0.039 -.. o1 2014 11 12 21 35 00 52.7112 174.1260 28.00 376577 SHM 2014 09 29 12 00 00 3841-99 P co2o18 SIL -0.837 0.039 ... o1 2014 11 12 20 09 00 52.7112 174.1260 28.00 376578 SHM 2014 09 29 12 00 00 3842-99 P co2o18 SIL -0.904 0.039 ... o1 2014 11 12 20 27 00 52.7112 174.1260 28.00 376579 SHM 2014 10 05 22 45 00 3187-99 P co2o18 SIL -1.419 0.025 ... o1 2014 12 13 09 59 00 52.7112 174.1260 28.00 378336 SHM 2014 10 05 22 45 00 3188-99 P co2o18 SIL -1.391 0.025 ... o1 2014 12 13 10 17 00 52.7112 174.1260 28.00 378337 SHM 2014 10 12 22 45 00 429-99 P co2o18 SIL -0.793 0.025 ... o1 2014 12 13 04 51 00 52.7112 174.1260 28.00 378338 SHM 2014 10 12 22 45 00 430-99 P co2o18 SIL -0.801 0.025 ... o1 2014 12 13 05 08 00 52.7112 174.1260 28.00 378339 SHM 2014 10 19 22 45 00 2058-99 P co2o18 SIL -1.171 0.025 -.. o1 2014 12 13 00 12 00 52.7112 174.1260 28.00 378340 SHM 2014 10 19 22 45 00 3893-99 P co2o18 SIL -0.675 0.025 +.. o1 2014 12 13 00 29 00 52.7112 174.1260 28.00 378341 SHM 2014 11 02 22 45 00 2135-99 P co2o18 SIL -1.040 0.025 ... o1 2014 12 13 00 46 00 52.7112 174.1260 28.00 378343 SHM 2014 11 02 22 45 00 2985-99 P co2o18 SIL -1.036 0.025 ... o1 2014 12 13 01 04 00 52.7112 174.1260 28.00 378342 SHM 2014 11 16 22 45 00 1259-99 P co2o18 SIL -0.716 0.072 +.. o1 2015 02 09 23 53 00 52.7112 174.1260 28.00 380473 SHM 2014 11 16 22 45 00 1260-99 P co2o18 SIL -0.897 0.072 -.. o1 2015 02 10 00 11 00 52.7112 174.1260 28.00 380474 SHM 2014 11 30 22 45 00 561-99 P co2o18 SIL -0.899 0.072 ... o1 2015 02 11 05 28 00 52.7112 174.1260 28.00 380472 SHM 2014 11 30 22 45 00 562-99 P co2o18 SIL -0.784 0.072 ... o1 2015 02 11 05 45 00 52.7112 174.1260 28.00 380471 SHM 2014 12 07 10 45 00 1740-99 P co2o18 SIL -0.786 0.069 ... o1 2015 02 18 20 22 00 52.7112 174.1260 28.00 380478 SHM 2014 12 07 10 45 00 584-99 P co2o18 SIL -0.891 0.069 ... o1 2015 02 18 20 04 00 52.7112 174.1260 28.00 380477 SHM 2014 12 15 10 45 00 1145-99 P co2o18 SIL -0.441 0.069 ... o1 2015 02 18 20 39 00 52.7112 174.1260 28.00 380476 SHM 2014 12 15 10 45 00 1153-99 P co2o18 SIL -0.453 0.069 ... o1 2015 02 18 20 56 00 52.7112 174.1260 28.00 380475 SHM 2014 12 22 01 00 00 2422-99 P co2o18 SIL -0.492 0.033 ... i2 2015 02 11 18 29 00 52.7112 174.1260 28.00 380826 SHM 2014 12 22 01 00 00 3643-99 P co2o18 SIL -0.457 0.033 ... i2 2015 02 11 18 51 00 52.7112 174.1260 28.00 380827 SHM 2014 12 28 12 30 00 384-99 P co2o18 SIL -0.464 0.033 ... i2 2015 02 11 14 59 00 52.7112 174.1260 28.00 380824 SHM 2014 12 28 12 30 00 4690-99 P co2o18 SIL -0.428 0.033 ... i2 2015 02 11 15 19 00 52.7112 174.1260 28.00 380825