# number_of_header_lines: 69 # comment: # comment: ************ USE OF ESRL GMD DATA **************** # comment: # comment: These data are made freely available to the public and the # comment: scientific community in the belief that their wide dissemination # comment: will lead to greater understanding and new scientific insights. # comment: The availability of these data does not constitute publication # comment: of the data. NOAA relies on the ethics and integrity of the user to # comment: ensure that GML receives fair credit for their work. If the data # comment: are obtained for potential use in a publication or presentation, # comment: GML should be informed at the outset of the nature of this work. # comment: If the GML data are essential to the work, or if an important # comment: result or conclusion depends on the GML data, co-authorship # comment: may be appropriate. This should be discussed at an early stage in # comment: the work. Manuscripts using the GML data should be sent to GML # comment: for review before they are submitted for publication so we can # comment: ensure that the quality and limitations of the data are accurately # comment: represented. # comment: Please see accompanying README file, if available, for citation text. # comment: # comment: Every effort is made to produce the most accurate and precise # comment: measurements possible. However, we reserve the right to make # comment: corrections to the data based on recalibration of standard gases # comment: or for other reasons deemed scientifically justified. # comment: # comment: We are not responsible for results and conclusions based on use # comment: of these data without regard to this warning. # comment: # contact_parameter: SF6 CCGG (Individual Flasks) # contact_name: Ed Dlugokencky # contact_telephone: (303) 497-6228 # contact_email: Ed.Dlugokencky@noaa.gov # comment: # comment: ************ COLLABORATORS *************** # comment: # comment: NOAA thanks the following collaborators without # comment: whom these measurements would not be possible. # comment: # collaborator_name: Private Party # comment: # comment: ************ RECIPROCITY AGREEMENT *************** # comment: # comment: Use of these data implies an agreement to reciprocate. # comment: Laboratories making similar measurements agree to make their # comment: own data available to the general public and to the scientific # comment: community in an equally complete and easily accessible form. # comment: Modelers are encouraged to make available to the community, # comment: upon request, their own tools used in the interpretation # comment: of the GML data, namely well documented model code, transport # comment: fields, and additional information necessary for other # comment: scientists to repeat the work and to run modified versions. # comment: Model availability includes collaborative support for new # comment: users of the models. # comment: # comment: ************ DATA DESCRIPTION *************** # comment: # description_site-code: rpb # description_project-abbr: ccg_surface # description_strategy-abbr: flask # description_sample-constraints: me:-H~date:1900-01-01,2020-12-31 # description_creation-time: 2021-07-30 13:19:43 # comment: # comment: ************ DATA DOCUMENTATION *************** # comment: # comment: Please refer to the species-specific README file in the # comment: appropriate directory folder at ftp://aftp.cmdl.noaa.gov/data/trace_gases/. # comment: # data_fields: sample_site_code sample_year sample_month sample_day sample_hour sample_minute sample_seconds sample_id sample_method parameter_formula analysis_group_abbr analysis_value analysis_uncertainty analysis_flag analysis_instrument analysis_year analysis_month analysis_day analysis_hour analysis_minute analysis_seconds sample_latitude sample_longitude sample_altitude sample_elevation sample_intake_height event_number RPB 1995 11 19 10 15 00 6194-66 P sf6 CCGG 3.620 -999.990 A.. D1 1996 01 14 00 09 00 13.1650 -59.4320 20.00 15.00 5.00 108168 RPB 1995 11 28 10 15 00 6754-66 P sf6 CCGG 3.630 -999.990 A.. D1 1996 01 13 23 00 00 13.1650 -59.4320 20.00 15.00 5.00 108170 RPB 1996 01 08 10 15 00 6386-66 P sf6 CCGG 5.720 -999.990 A.. D1 1996 02 25 19 39 00 13.1650 -59.4320 20.00 15.00 5.00 108179 RPB 1996 01 14 10 15 00 6570-66 P sf6 CCGG 3.390 -999.990 A.. D1 1996 02 25 22 25 00 13.1650 -59.4320 20.00 15.00 5.00 108181 RPB 1996 01 28 10 15 00 1330-91 P sf6 CCGG 3.460 -999.990 A.. D1 1996 02 25 19 16 00 13.1650 -59.4320 20.00 15.00 5.00 108184 RPB 1996 02 11 10 15 00 1215-91 P sf6 CCGG 3.370 -999.990 A.. D1 1996 03 08 14 20 00 13.1650 -59.4320 20.00 15.00 5.00 108187 RPB 1996 02 11 10 15 00 1216-91 P sf6 CCGG 3.460 -999.990 A.. D1 1996 03 08 14 43 00 13.1650 -59.4320 20.00 15.00 5.00 108188 RPB 1996 02 20 10 15 00 144-91 P sf6 CCGG 3.560 -999.990 A.. D1 1996 03 18 16 24 00 13.1650 -59.4320 20.00 15.00 5.00 108190 RPB 1996 02 25 10 15 00 278-91 P sf6 CCGG 3.470 -999.990 A.. D1 1996 03 18 16 02 00 13.1650 -59.4320 20.00 15.00 5.00 108192 RPB 1996 03 05 10 15 00 124-91 P sf6 CCGG 3.510 -999.990 A.. D1 1996 03 25 14 04 00 13.1650 -59.4320 20.00 15.00 5.00 108194 RPB 1996 03 10 10 15 00 464-91 P sf6 CCGG 3.470 -999.990 A.. D1 1996 03 25 13 42 00 13.1650 -59.4320 20.00 15.00 5.00 108196 RPB 1996 03 18 10 15 00 526-91 P sf6 CCGG 3.510 -999.990 A.. D1 1996 04 10 20 55 00 13.1650 -59.4320 20.00 15.00 5.00 108198 RPB 1996 03 24 10 15 00 986-91 P sf6 CCGG 3.440 -999.990 A.. D1 1996 04 10 20 32 00 13.1650 -59.4320 20.00 15.00 5.00 108200 RPB 1996 04 02 10 15 00 576-91 P sf6 CCGG 3.430 -999.990 A.. D1 1996 04 24 14 38 00 13.1650 -59.4320 20.00 15.00 5.00 108202 RPB 1996 04 02 10 15 00 576-91 P sf6 CCGG 3.450 -999.990 A.. D1 1996 04 24 16 12 00 13.1650 -59.4320 20.00 15.00 5.00 108202 RPB 1996 04 08 10 15 00 1254-91 P sf6 CCGG 3.420 -999.990 A.. D1 1996 04 24 15 01 00 13.1650 -59.4320 20.00 15.00 5.00 108204 RPB 1996 04 16 10 15 00 1234-91 P sf6 CCGG 3.540 -999.990 A.. D1 1996 05 09 15 41 00 13.1650 -59.4320 20.00 15.00 5.00 108206 RPB 1996 04 25 10 15 00 1570-91 P sf6 CCGG 3.520 -999.990 A.. D1 1996 05 09 15 18 00 13.1650 -59.4320 20.00 15.00 5.00 108208 RPB 1996 04 30 10 15 00 162-91 P sf6 CCGG 3.580 -999.990 A.. D1 1996 06 11 13 12 00 13.1650 -59.4320 20.00 15.00 5.00 108210 RPB 1996 05 06 10 15 00 1208-91 P sf6 CCGG 3.580 -999.990 A.. D1 1996 06 11 13 35 00 13.1650 -59.4320 20.00 15.00 5.00 108212 RPB 1996 05 14 10 15 00 562-91 P sf6 CCGG 3.680 -999.990 A.. D1 1996 06 16 13 35 00 13.1650 -59.4320 20.00 15.00 5.00 108214 RPB 1996 05 23 10 15 00 1340-91 P sf6 CCGG 3.630 -999.990 A.. D1 1996 06 16 13 58 00 13.1650 -59.4320 20.00 15.00 5.00 108216 RPB 1996 05 30 10 15 00 358-91 P sf6 CCGG 3.530 -999.990 A.. D1 1996 06 20 15 08 00 13.1650 -59.4320 20.00 15.00 5.00 108218 RPB 1996 05 30 10 15 00 358-91 P sf6 CCGG 3.690 -999.990 A.. D1 1996 06 20 16 16 00 13.1650 -59.4320 20.00 15.00 5.00 108218 RPB 1996 06 03 10 15 00 986-91 P sf6 CCGG 3.590 -999.990 A.. D1 1996 06 23 18 32 00 13.1650 -59.4320 20.00 15.00 5.00 108220 RPB 1996 06 12 10 15 00 844-91 P sf6 CCGG 3.640 -999.990 A.. D1 1996 07 11 16 41 00 13.1650 -59.4320 20.00 15.00 5.00 108222 RPB 1996 06 17 10 15 00 1374-91 P sf6 CCGG 3.590 -999.990 A.. D1 1996 07 11 16 18 00 13.1650 -59.4320 20.00 15.00 5.00 108224 RPB 1996 06 27 16 55 00 710-91 P sf6 CCGG 3.590 -999.990 A.. D1 1996 07 19 15 06 00 13.1650 -59.4320 20.00 15.00 5.00 108226 RPB 1996 07 02 10 15 00 1918-91 P sf6 CCGG 3.540 -999.990 A.. D1 1996 07 24 19 09 00 13.1650 -59.4320 20.00 15.00 5.00 108228 RPB 1996 07 10 10 15 00 1236-91 P sf6 CCGG 3.590 -999.990 A.. D1 1996 07 25 15 31 00 13.1650 -59.4320 20.00 15.00 5.00 108230 RPB 1996 07 14 10 15 00 1750-91 P sf6 CCGG 3.620 -999.990 A.. D1 1996 07 25 14 46 00 13.1650 -59.4320 20.00 15.00 5.00 108232 RPB 1996 07 23 10 15 00 78-91 P sf6 CCGG 3.690 -999.990 A.. D1 1996 08 20 11 55 00 13.1650 -59.4320 20.00 15.00 5.00 108234 RPB 1996 07 28 10 15 00 256-91 P sf6 CCGG 3.690 -999.990 A.. D1 1996 08 20 11 09 00 13.1650 -59.4320 20.00 15.00 5.00 108236 RPB 1996 08 06 10 15 00 1262-91 P sf6 CCGG 3.830 -999.990 A.. D1 1996 09 10 20 05 00 13.1650 -59.4320 20.00 15.00 5.00 108238 RPB 1996 08 11 10 15 00 1478-91 P sf6 CCGG 3.670 -999.990 A.. D1 1996 09 10 22 02 00 13.1650 -59.4320 20.00 15.00 5.00 108240 RPB 1996 08 21 10 15 00 74-91 P sf6 CCGG 3.730 -999.990 A.. D1 1996 09 10 17 59 00 13.1650 -59.4320 20.00 15.00 5.00 108242 RPB 1996 08 30 10 15 00 92-91 P sf6 CCGG 3.510 -999.990 A.. D1 1996 09 10 17 36 00 13.1650 -59.4320 20.00 15.00 5.00 108244 RPB 1997 07 10 10 15 00 1019-91 P sf6 CCGG 4.110 0.070 ... H4 1997 08 26 15 34 00 13.1650 -59.4320 20.00 15.00 5.00 108320 RPB 1997 07 10 10 15 00 1020-91 P sf6 CCGG 4.080 0.070 ... H4 1997 08 26 15 48 00 13.1650 -59.4320 20.00 15.00 5.00 108321 RPB 1997 07 17 10 15 00 1929-91 P sf6 CCGG 4.150 0.070 ... H4 1997 08 26 15 07 00 13.1650 -59.4320 20.00 15.00 5.00 108322 RPB 1997 07 17 10 15 00 1930-91 P sf6 CCGG 4.140 0.070 ... H4 1997 08 26 15 21 00 13.1650 -59.4320 20.00 15.00 5.00 108323 RPB 1997 07 24 10 15 00 1005-91 P sf6 CCGG 4.160 0.070 ... H4 1997 08 28 09 30 00 13.1650 -59.4320 20.00 15.00 5.00 108324 RPB 1997 07 24 10 15 00 1006-91 P sf6 CCGG 4.160 0.070 ... H4 1997 08 28 09 44 00 13.1650 -59.4320 20.00 15.00 5.00 108325 RPB 1997 07 31 10 15 00 4205-91 P sf6 CCGG 4.080 0.070 ... H4 1997 08 28 11 51 00 13.1650 -59.4320 20.00 15.00 5.00 108326 RPB 1997 07 31 10 15 00 4206-91 P sf6 CCGG 4.120 0.070 ... H4 1997 08 28 12 04 00 13.1650 -59.4320 20.00 15.00 5.00 108327 RPB 1997 08 09 10 20 00 449-91 P sf6 CCGG 4.070 0.070 ... H4 1997 09 22 11 15 00 13.1650 -59.4320 20.00 15.00 5.00 108328 RPB 1997 08 14 10 15 00 1381-91 P sf6 CCGG 10.590 0.070 N.. H4 1997 09 22 09 26 00 13.1650 -59.4320 20.00 15.00 5.00 108329 RPB 1997 08 14 10 15 00 1382-91 P sf6 CCGG 6.700 0.070 N.. H4 1997 09 22 09 39 00 13.1650 -59.4320 20.00 15.00 5.00 108330 RPB 1997 08 22 10 15 00 1611-91 P sf6 CCGG 4.070 0.070 ... H4 1997 09 24 11 46 00 13.1650 -59.4320 20.00 15.00 5.00 108331 RPB 1997 08 22 10 15 00 1612-91 P sf6 CCGG 4.140 0.070 ... H4 1997 09 24 12 00 00 13.1650 -59.4320 20.00 15.00 5.00 108332 RPB 1997 08 28 10 15 00 4197-91 P sf6 CCGG 4.190 0.070 ... H4 1997 09 24 11 20 00 13.1650 -59.4320 20.00 15.00 5.00 108333 RPB 1997 08 28 10 15 00 4198-91 P sf6 CCGG 4.100 0.070 ... H4 1997 09 24 11 33 00 13.1650 -59.4320 20.00 15.00 5.00 108334 RPB 1997 09 04 10 15 00 1407-91 P sf6 CCGG 5.870 0.070 N.. H4 1997 10 15 10 11 00 13.1650 -59.4320 20.00 15.00 5.00 108335 RPB 1997 09 04 10 15 00 1408-91 P sf6 CCGG 7.250 0.070 N.. H4 1997 10 15 10 24 00 13.1650 -59.4320 20.00 15.00 5.00 108336 RPB 1997 09 11 10 15 00 1909-91 P sf6 CCGG 4.140 0.070 ... H4 1997 10 15 09 44 00 13.1650 -59.4320 20.00 15.00 5.00 108337 RPB 1997 09 11 10 15 00 1910-91 P sf6 CCGG 4.070 0.070 ... H4 1997 10 15 09 57 00 13.1650 -59.4320 20.00 15.00 5.00 108338 RPB 1997 09 18 10 15 00 699-91 P sf6 CCGG 4.110 0.070 ... H4 1997 10 09 15 47 00 13.1650 -59.4320 20.00 15.00 5.00 108339 RPB 1997 09 18 10 15 00 700-91 P sf6 CCGG 4.100 0.070 ... H4 1997 10 09 16 01 00 13.1650 -59.4320 20.00 15.00 5.00 108340 RPB 1997 09 25 10 15 00 4437-91 P sf6 CCGG 3.990 0.070 ... H4 1997 10 10 12 47 00 13.1650 -59.4320 20.00 15.00 5.00 108341 RPB 1997 09 25 10 15 00 4438-91 P sf6 CCGG 4.010 0.070 ... H4 1997 10 10 13 01 00 13.1650 -59.4320 20.00 15.00 5.00 108342 RPB 1997 10 02 10 15 00 563-91 P sf6 CCGG 3.980 0.070 ... H4 1997 11 04 10 47 00 13.1650 -59.4320 20.00 15.00 5.00 108343 RPB 1997 10 02 10 15 00 564-91 P sf6 CCGG 3.950 0.070 ... H4 1997 11 04 11 00 00 13.1650 -59.4320 20.00 15.00 5.00 108344 RPB 1997 10 09 10 50 00 1391-91 P sf6 CCGG 8.060 0.070 N.. H4 1997 11 04 12 07 00 13.1650 -59.4320 20.00 15.00 5.00 108345 RPB 1997 10 09 10 50 00 1392-91 P sf6 CCGG 8.520 0.070 N.. H4 1997 11 04 12 21 00 13.1650 -59.4320 20.00 15.00 5.00 108346 RPB 1997 10 17 10 50 00 495-91 P sf6 CCGG 3.980 0.070 ... H4 1997 11 18 10 26 00 13.1650 -59.4320 20.00 15.00 5.00 108347 RPB 1997 10 17 10 50 00 496-91 P sf6 CCGG 4.020 0.070 ... H4 1997 11 18 10 39 00 13.1650 -59.4320 20.00 15.00 5.00 108348 RPB 1997 10 23 10 15 00 1321-91 P sf6 CCGG 4.070 0.070 ... H4 1997 11 18 09 59 00 13.1650 -59.4320 20.00 15.00 5.00 108349 RPB 1997 10 23 10 15 00 1322-91 P sf6 CCGG 4.070 0.070 ... H4 1997 11 18 10 12 00 13.1650 -59.4320 20.00 15.00 5.00 108350 RPB 1997 11 01 10 15 00 4643-91 P sf6 CCGG 4.220 0.070 ... H4 1997 12 03 13 33 00 13.1650 -59.4320 20.00 15.00 5.00 108351 RPB 1997 11 01 10 15 00 4644-91 P sf6 CCGG 4.140 0.070 ... H4 1997 12 03 13 46 00 13.1650 -59.4320 20.00 15.00 5.00 108352 RPB 1997 11 13 10 15 00 211-91 P sf6 CCGG 4.130 0.070 ... H4 1997 12 11 15 00 00 13.1650 -59.4320 20.00 15.00 5.00 108353 RPB 1997 11 13 10 15 00 212-91 P sf6 CCGG 4.140 0.070 ... H4 1997 12 11 15 13 00 13.1650 -59.4320 20.00 15.00 5.00 108354 RPB 1997 11 20 10 15 00 1563-91 P sf6 CCGG 12.340 -999.990 N.. H4 1997 12 11 16 20 00 13.1650 -59.4320 20.00 15.00 5.00 108355 RPB 1997 11 20 10 15 00 1564-91 P sf6 CCGG 4.320 0.070 .X. H4 1997 12 11 16 34 00 13.1650 -59.4320 20.00 15.00 5.00 108356 RPB 1997 11 27 10 15 00 199-91 P sf6 CCGG 4.180 0.070 ... H4 1998 01 15 15 02 00 13.1650 -59.4320 20.00 15.00 5.00 108357 RPB 1997 11 27 10 15 00 200-91 P sf6 CCGG 4.230 0.070 ... H4 1998 01 15 15 15 00 13.1650 -59.4320 20.00 15.00 5.00 108358 RPB 1997 12 05 10 05 00 707-91 P sf6 CCGG 4.100 0.070 ... H4 1998 01 15 15 31 00 13.1650 -59.4320 20.00 15.00 5.00 108359 RPB 1997 12 05 10 05 00 708-91 P sf6 CCGG 4.130 0.070 ... H4 1998 01 15 15 44 00 13.1650 -59.4320 20.00 15.00 5.00 108360 RPB 1997 12 13 10 40 00 247-91 P sf6 CCGG 4.160 0.070 ... H4 1998 01 09 10 46 00 13.1650 -59.4320 20.00 15.00 5.00 108361 RPB 1997 12 13 10 40 00 248-91 P sf6 CCGG 4.220 0.070 ... H4 1998 01 09 10 59 00 13.1650 -59.4320 20.00 15.00 5.00 108362 RPB 1997 12 18 10 15 00 4229-91 P sf6 CCGG 4.150 0.070 ... H4 1998 01 09 11 13 00 13.1650 -59.4320 20.00 15.00 5.00 108363 RPB 1997 12 18 10 15 00 4230-91 P sf6 CCGG 4.150 0.070 ... H4 1998 01 09 11 27 00 13.1650 -59.4320 20.00 15.00 5.00 108364 RPB 1997 12 25 10 40 00 1569-91 P sf6 CCGG 4.120 0.070 ... H4 1998 01 27 14 50 00 13.1650 -59.4320 20.00 15.00 5.00 108365 RPB 1997 12 25 10 40 00 1570-91 P sf6 CCGG 4.180 0.070 ... H4 1998 01 27 15 04 00 13.1650 -59.4320 20.00 15.00 5.00 108366 RPB 1998 01 01 10 21 00 4405-91 P sf6 CCGG 4.160 0.070 ... H4 1998 01 27 15 17 00 13.1650 -59.4320 20.00 15.00 5.00 108367 RPB 1998 01 01 10 21 00 4406-91 P sf6 CCGG 4.230 0.070 ... H4 1998 01 27 15 31 00 13.1650 -59.4320 20.00 15.00 5.00 108368 RPB 1998 01 08 10 40 00 1211-91 P sf6 CCGG 4.200 0.070 ... H4 1998 01 28 13 21 00 13.1650 -59.4320 20.00 15.00 5.00 108369 RPB 1998 01 08 10 40 00 1212-91 P sf6 CCGG 4.230 0.070 ... H4 1998 01 28 13 35 00 13.1650 -59.4320 20.00 15.00 5.00 108370 RPB 1998 01 15 10 25 00 1283-91 P sf6 CCGG 4.300 0.070 ... H4 1998 01 27 15 47 00 13.1650 -59.4320 20.00 15.00 5.00 108371 RPB 1998 01 15 10 25 00 1284-91 P sf6 CCGG 4.210 0.070 ... H4 1998 01 27 16 00 00 13.1650 -59.4320 20.00 15.00 5.00 108372 RPB 1998 01 22 11 00 00 643-91 P sf6 CCGG 4.170 0.070 ... H4 1998 02 25 09 16 00 13.1650 -59.4320 20.00 15.00 5.00 108373 RPB 1998 01 22 11 00 00 644-91 P sf6 CCGG 4.130 0.070 ... H4 1998 02 25 09 30 00 13.1650 -59.4320 20.00 15.00 5.00 108374 RPB 1998 01 29 10 40 00 1309-91 P sf6 CCGG 4.200 0.070 ... H4 1998 02 25 09 43 00 13.1650 -59.4320 20.00 15.00 5.00 108375 RPB 1998 01 29 10 40 00 1310-91 P sf6 CCGG 4.170 0.070 ... H4 1998 02 25 09 57 00 13.1650 -59.4320 20.00 15.00 5.00 108376 RPB 1998 02 07 10 35 00 1403-91 P sf6 CCGG 4.780 0.070 .X. H4 1998 02 25 10 10 00 13.1650 -59.4320 20.00 15.00 5.00 108377 RPB 1998 02 07 10 35 00 1404-91 P sf6 CCGG 4.700 0.070 .X. H4 1998 02 25 10 24 00 13.1650 -59.4320 20.00 15.00 5.00 108378 RPB 1998 02 13 10 35 00 4643-91 P sf6 CCGG 4.160 0.070 ... H4 1998 02 25 10 49 00 13.1650 -59.4320 20.00 15.00 5.00 108379 RPB 1998 02 13 10 35 00 4644-91 P sf6 CCGG 4.190 0.070 ... H4 1998 02 25 11 02 00 13.1650 -59.4320 20.00 15.00 5.00 108380 RPB 1998 02 22 10 25 00 229-91 P sf6 CCGG 4.190 0.070 ... H4 1998 03 25 11 03 00 13.1650 -59.4320 20.00 15.00 5.00 108381 RPB 1998 02 22 10 25 00 230-91 P sf6 CCGG 4.200 0.070 ... H4 1998 03 25 11 17 00 13.1650 -59.4320 20.00 15.00 5.00 108382 RPB 1998 02 28 10 15 00 1167-91 P sf6 CCGG 4.140 0.070 ... H4 1998 03 25 12 25 00 13.1650 -59.4320 20.00 15.00 5.00 108383 RPB 1998 02 28 10 15 00 1168-91 P sf6 CCGG 4.130 0.070 ... H4 1998 03 25 12 39 00 13.1650 -59.4320 20.00 15.00 5.00 108384 RPB 1998 03 07 10 35 00 585-91 P sf6 CCGG 4.220 0.070 ... H4 1998 03 25 14 16 00 13.1650 -59.4320 20.00 15.00 5.00 108385 RPB 1998 03 07 10 35 00 586-91 P sf6 CCGG 4.240 0.070 ... H4 1998 03 25 14 30 00 13.1650 -59.4320 20.00 15.00 5.00 108386 RPB 1998 03 12 10 15 00 4427-91 P sf6 CCGG 4.230 0.070 ... H4 1998 03 26 16 02 00 13.1650 -59.4320 20.00 15.00 5.00 108387 RPB 1998 03 12 10 15 00 4428-91 P sf6 CCGG 4.300 0.070 ... H4 1998 03 26 16 16 00 13.1650 -59.4320 20.00 15.00 5.00 108388 RPB 1998 03 21 10 30 00 4705-91 P sf6 CCGG 4.290 0.070 ... H4 1998 04 14 10 53 00 13.1650 -59.4320 20.00 15.00 5.00 108389 RPB 1998 03 21 10 30 00 4706-91 P sf6 CCGG 4.270 0.070 ... H4 1998 04 14 11 07 00 13.1650 -59.4320 20.00 15.00 5.00 108390 RPB 1998 03 26 10 25 00 161-91 P sf6 CCGG 4.310 0.070 ... H4 1998 04 14 12 17 00 13.1650 -59.4320 20.00 15.00 5.00 108391 RPB 1998 03 26 10 25 00 162-91 P sf6 CCGG 4.380 0.070 ... H4 1998 04 14 12 31 00 13.1650 -59.4320 20.00 15.00 5.00 108392 RPB 1998 04 02 10 20 00 4549-91 P sf6 CCGG 4.280 0.070 ... H4 1998 04 14 11 50 00 13.1650 -59.4320 20.00 15.00 5.00 108393 RPB 1998 04 02 10 20 00 4550-91 P sf6 CCGG 4.320 0.070 ... H4 1998 04 14 12 04 00 13.1650 -59.4320 20.00 15.00 5.00 108394 RPB 1998 04 10 10 15 00 4207-91 P sf6 CCGG 4.220 0.070 ... H4 1998 05 11 14 22 00 13.1650 -59.4320 20.00 15.00 5.00 108395 RPB 1998 04 10 10 15 00 4208-91 P sf6 CCGG 4.150 0.070 ... H4 1998 05 11 14 36 00 13.1650 -59.4320 20.00 15.00 5.00 108396 RPB 1998 04 18 10 15 00 4669-91 P sf6 CCGG 4.170 0.070 ... H4 1998 05 11 14 50 00 13.1650 -59.4320 20.00 15.00 5.00 108397 RPB 1998 04 18 10 15 00 4670-91 P sf6 CCGG 4.240 0.070 ... H4 1998 05 11 15 03 00 13.1650 -59.4320 20.00 15.00 5.00 108398 RPB 1998 04 23 10 15 00 621-91 P sf6 CCGG 4.220 0.070 ... H4 1998 05 13 15 40 00 13.1650 -59.4320 20.00 15.00 5.00 108399 RPB 1998 04 23 10 15 00 622-91 P sf6 CCGG 4.220 0.070 ... H4 1998 05 13 15 54 00 13.1650 -59.4320 20.00 15.00 5.00 108400 RPB 1998 05 02 10 20 00 4015-91 P sf6 CCGG 4.220 0.070 ... H4 1998 05 13 14 04 00 13.1650 -59.4320 20.00 15.00 5.00 108401 RPB 1998 05 02 10 20 00 4016-91 P sf6 CCGG 4.170 0.070 ... H4 1998 05 13 14 17 00 13.1650 -59.4320 20.00 15.00 5.00 108402 RPB 1998 05 08 10 15 00 483-91 P sf6 CCGG 4.230 0.070 ... H4 1998 06 16 13 02 00 13.1650 -59.4320 20.00 15.00 5.00 108403 RPB 1998 05 08 10 15 00 484-91 P sf6 CCGG 4.310 0.070 ... H4 1998 06 16 13 15 00 13.1650 -59.4320 20.00 15.00 5.00 108404 RPB 1998 05 15 10 15 00 4401-91 P sf6 CCGG 4.240 0.070 ... H4 1998 06 16 12 34 00 13.1650 -59.4320 20.00 15.00 5.00 108405 RPB 1998 05 15 10 15 00 4402-91 P sf6 CCGG 4.280 0.070 ... H4 1998 06 16 12 48 00 13.1650 -59.4320 20.00 15.00 5.00 108406 RPB 1998 06 06 10 15 00 87-91 P sf6 CCGG 4.260 0.070 ... H4 1998 07 08 09 46 00 13.1650 -59.4320 20.00 15.00 5.00 108407 RPB 1998 06 06 10 15 00 88-91 P sf6 CCGG 4.230 0.070 ... H4 1998 07 08 09 59 00 13.1650 -59.4320 20.00 15.00 5.00 108408 RPB 1998 06 11 10 20 00 4523-91 P sf6 CCGG 4.230 0.070 ... H4 1998 07 08 10 13 00 13.1650 -59.4320 20.00 15.00 5.00 108409 RPB 1998 06 11 10 20 00 4524-91 P sf6 CCGG 4.310 0.070 ... H4 1998 07 08 10 27 00 13.1650 -59.4320 20.00 15.00 5.00 108410 RPB 1998 06 20 10 20 00 575-91 P sf6 CCGG -999.990 -999.990 *.. H4 1998 07 07 11 10 00 13.1650 -59.4320 20.00 15.00 5.00 108411 RPB 1998 06 20 10 20 00 576-91 P sf6 CCGG 4.100 0.070 N.. H4 1998 07 07 11 23 00 13.1650 -59.4320 20.00 15.00 5.00 108412 RPB 1998 06 25 10 45 00 898-91 P sf6 CCGG 4.320 0.070 ... H4 1998 07 07 10 43 00 13.1650 -59.4320 20.00 15.00 5.00 108413 RPB 1998 06 25 10 45 00 899-91 P sf6 CCGG 4.310 0.070 ... H4 1998 07 07 10 56 00 13.1650 -59.4320 20.00 15.00 5.00 108414 RPB 1998 07 05 11 15 00 1937-91 P sf6 CCGG 4.280 0.070 ... H4 1998 08 17 09 26 00 13.1650 -59.4320 20.00 15.00 5.00 108415 RPB 1998 07 05 11 15 00 1938-91 P sf6 CCGG 4.300 0.070 ... H4 1998 08 17 09 40 00 13.1650 -59.4320 20.00 15.00 5.00 108416 RPB 1998 07 09 10 15 00 4699-91 P sf6 CCGG 4.440 0.070 ... H4 1998 07 30 16 11 00 13.1650 -59.4320 20.00 15.00 5.00 108417 RPB 1998 07 09 10 15 00 4700-91 P sf6 CCGG 4.390 0.070 ... H4 1998 07 30 16 24 00 13.1650 -59.4320 20.00 15.00 5.00 108418 RPB 1998 07 16 10 20 00 566-91 P sf6 CCGG 4.300 0.070 ... H4 1998 08 17 10 21 00 13.1650 -59.4320 20.00 15.00 5.00 108419 RPB 1998 07 23 10 50 00 1037-91 P sf6 CCGG 4.310 0.070 ... H4 1998 08 17 13 08 00 13.1650 -59.4320 20.00 15.00 5.00 108420 RPB 1998 07 23 10 50 00 1038-91 P sf6 CCGG 4.400 0.070 ... H4 1998 08 17 13 22 00 13.1650 -59.4320 20.00 15.00 5.00 108421 RPB 1998 07 30 10 15 00 1969-91 P sf6 CCGG 4.360 0.070 ... H4 1998 09 14 14 08 00 13.1650 -59.4320 20.00 15.00 5.00 108422 RPB 1998 07 30 10 15 00 1970-91 P sf6 CCGG 4.350 0.070 ... H4 1998 09 14 14 22 00 13.1650 -59.4320 20.00 15.00 5.00 108423 RPB 1998 08 06 11 00 00 2019-91 P sf6 CCGG 4.280 0.070 ... H4 1998 09 15 11 59 00 13.1650 -59.4320 20.00 15.00 5.00 108424 RPB 1998 08 06 11 00 00 2020-91 P sf6 CCGG 4.410 0.070 ... H4 1998 09 15 12 12 00 13.1650 -59.4320 20.00 15.00 5.00 108425 RPB 1998 08 13 10 10 00 1361-91 P sf6 CCGG 4.330 0.070 ... H4 1998 10 14 12 32 00 13.1650 -59.4320 20.00 15.00 5.00 108426 RPB 1998 08 13 10 10 00 1362-91 P sf6 CCGG 4.250 0.070 ... H4 1998 10 14 12 46 00 13.1650 -59.4320 20.00 15.00 5.00 108427 RPB 1998 08 20 10 15 00 4686-91 P sf6 CCGG 4.200 0.070 ... H4 1998 10 22 16 09 00 13.1650 -59.4320 20.00 15.00 5.00 108428 RPB 1998 08 27 10 20 00 1915-91 P sf6 CCGG 4.180 0.070 ... H4 1998 10 06 14 00 00 13.1650 -59.4320 20.00 15.00 5.00 108429 RPB 1998 08 27 10 20 00 1916-91 P sf6 CCGG 4.240 0.070 ... H4 1998 10 06 14 14 00 13.1650 -59.4320 20.00 15.00 5.00 108430 RPB 1998 09 04 19 05 00 1431-91 P sf6 CCGG 4.180 0.070 ... H4 1998 10 06 15 22 00 13.1650 -59.4320 20.00 15.00 5.00 108431 RPB 1998 09 04 19 05 00 1432-91 P sf6 CCGG 4.220 0.070 ... H4 1998 10 06 15 36 00 13.1650 -59.4320 20.00 15.00 5.00 108432 RPB 1998 09 10 10 15 00 1123-91 P sf6 CCGG 4.120 0.070 ... H4 1998 10 27 13 26 00 13.1650 -59.4320 20.00 15.00 5.00 108433 RPB 1998 09 10 10 15 00 1124-91 P sf6 CCGG 4.230 0.070 ... H4 1998 10 27 13 40 00 13.1650 -59.4320 20.00 15.00 5.00 108434 RPB 1998 09 17 10 50 00 4521-91 P sf6 CCGG 4.260 0.070 ... H4 1998 10 27 12 32 00 13.1650 -59.4320 20.00 15.00 5.00 108435 RPB 1998 09 17 10 50 00 4522-91 P sf6 CCGG 4.290 0.070 ... H4 1998 10 27 12 45 00 13.1650 -59.4320 20.00 15.00 5.00 108436 RPB 1998 09 24 18 25 00 1043-91 P sf6 CCGG 4.400 0.070 ... H4 1998 10 27 13 54 00 13.1650 -59.4320 20.00 15.00 5.00 108437 RPB 1998 09 24 18 25 00 1044-91 P sf6 CCGG 4.420 0.070 ... H4 1998 10 27 14 07 00 13.1650 -59.4320 20.00 15.00 5.00 108438 RPB 1998 10 03 10 15 00 4663-91 P sf6 CCGG 4.350 0.070 ... H4 1998 10 27 12 59 00 13.1650 -59.4320 20.00 15.00 5.00 108439 RPB 1998 10 03 10 15 00 4664-91 P sf6 CCGG 4.290 0.070 ... H4 1998 10 27 13 13 00 13.1650 -59.4320 20.00 15.00 5.00 108440 RPB 1998 10 10 10 15 00 609-91 P sf6 CCGG 4.360 0.070 ... H4 1998 11 13 10 38 00 13.1650 -59.4320 20.00 15.00 5.00 108441 RPB 1998 10 10 10 15 00 610-91 P sf6 CCGG 4.490 0.070 ... H4 1998 11 13 10 52 00 13.1650 -59.4320 20.00 15.00 5.00 108442 RPB 1998 10 20 18 05 00 4567-91 P sf6 CCGG 4.320 0.070 ... H4 1998 11 13 10 07 00 13.1650 -59.4320 20.00 15.00 5.00 108443 RPB 1998 10 20 18 05 00 4568-91 P sf6 CCGG 4.280 0.070 ... H4 1998 11 13 10 21 00 13.1650 -59.4320 20.00 15.00 5.00 108444 RPB 1998 10 24 10 15 00 45-91 P sf6 CCGG 4.280 0.070 ... H4 1998 11 13 09 12 00 13.1650 -59.4320 20.00 15.00 5.00 108445 RPB 1998 10 24 10 15 00 46-91 P sf6 CCGG 4.320 0.070 ... H4 1998 11 13 09 26 00 13.1650 -59.4320 20.00 15.00 5.00 108446 RPB 1998 10 31 10 15 00 1431-91 P sf6 CCGG 4.320 0.070 ... H4 1998 11 13 09 40 00 13.1650 -59.4320 20.00 15.00 5.00 108447 RPB 1998 10 31 10 15 00 1432-91 P sf6 CCGG 4.410 0.070 ... H4 1998 11 13 09 53 00 13.1650 -59.4320 20.00 15.00 5.00 108448 RPB 1998 11 07 10 15 00 627-91 P sf6 CCGG 4.360 0.070 ... H4 1998 12 10 14 51 00 13.1650 -59.4320 20.00 15.00 5.00 108449 RPB 1998 11 07 10 15 00 628-91 P sf6 CCGG 4.370 0.070 ... H4 1998 12 10 15 05 00 13.1650 -59.4320 20.00 15.00 5.00 108450 RPB 1998 11 17 10 15 00 2049-91 P sf6 CCGG 4.400 0.070 ... H4 1998 12 10 15 20 00 13.1650 -59.4320 20.00 15.00 5.00 108451 RPB 1998 11 17 10 15 00 2050-91 P sf6 CCGG 4.410 0.070 ... H4 1998 12 10 15 34 00 13.1650 -59.4320 20.00 15.00 5.00 108452 RPB 1998 11 22 10 20 00 235-91 P sf6 CCGG 4.310 0.070 ... H4 1998 12 10 13 29 00 13.1650 -59.4320 20.00 15.00 5.00 108453 RPB 1998 11 22 10 20 00 236-91 P sf6 CCGG 4.390 0.070 ... H4 1998 12 10 13 43 00 13.1650 -59.4320 20.00 15.00 5.00 108454 RPB 1998 12 02 13 00 00 573-91 P sf6 CCGG 4.340 0.070 ... H4 1998 12 10 13 56 00 13.1650 -59.4320 20.00 15.00 5.00 108455 RPB 1998 12 02 13 00 00 574-91 P sf6 CCGG 4.330 0.070 ... H4 1998 12 10 14 10 00 13.1650 -59.4320 20.00 15.00 5.00 108456 RPB 1998 12 10 10 25 00 703-91 P sf6 CCGG 4.470 0.070 ... H4 1999 01 20 10 38 00 13.1650 -59.4320 20.00 15.00 5.00 108457 RPB 1998 12 10 10 25 00 704-91 P sf6 CCGG 4.450 0.070 ... H4 1999 01 20 10 51 00 13.1650 -59.4320 20.00 15.00 5.00 108458 RPB 1998 12 20 10 24 00 1039-91 P sf6 CCGG 4.400 0.070 ... H4 1999 01 20 10 10 00 13.1650 -59.4320 20.00 15.00 5.00 108459 RPB 1998 12 20 10 24 00 1040-91 P sf6 CCGG 4.340 0.070 ... H4 1999 01 20 10 24 00 13.1650 -59.4320 20.00 15.00 5.00 108460 RPB 1998 12 26 10 35 00 4297-91 P sf6 CCGG 4.370 0.070 ... H4 1999 01 20 13 00 00 13.1650 -59.4320 20.00 15.00 5.00 108461 RPB 1998 12 26 10 35 00 4298-91 P sf6 CCGG 4.420 0.070 ... H4 1999 01 20 13 14 00 13.1650 -59.4320 20.00 15.00 5.00 108462 RPB 1999 01 02 10 15 00 4713-91 P sf6 CCGG 4.400 0.070 ... H4 1999 01 20 13 27 00 13.1650 -59.4320 20.00 15.00 5.00 108463 RPB 1999 01 02 10 15 00 4714-91 P sf6 CCGG 4.390 0.070 ... H4 1999 01 20 13 41 00 13.1650 -59.4320 20.00 15.00 5.00 108464 RPB 1999 01 09 10 45 00 193-91 P sf6 CCGG 4.440 0.070 ... H4 1999 02 10 13 03 00 13.1650 -59.4320 20.00 15.00 5.00 108465 RPB 1999 01 09 10 45 00 194-91 P sf6 CCGG 4.540 0.070 ... H4 1999 02 10 13 17 00 13.1650 -59.4320 20.00 15.00 5.00 108466 RPB 1999 01 16 10 45 00 373-91 P sf6 CCGG 4.430 0.070 ... H4 1999 02 10 13 30 00 13.1650 -59.4320 20.00 15.00 5.00 108467 RPB 1999 01 16 10 45 00 374-91 P sf6 CCGG 4.450 0.070 ... H4 1999 02 10 13 44 00 13.1650 -59.4320 20.00 15.00 5.00 108468 RPB 1999 01 23 10 30 00 577-91 P sf6 CCGG 4.430 0.070 ... H4 1999 02 10 13 58 00 13.1650 -59.4320 20.00 15.00 5.00 108469 RPB 1999 01 23 10 30 00 578-91 P sf6 CCGG 4.390 0.070 ... H4 1999 02 10 14 11 00 13.1650 -59.4320 20.00 15.00 5.00 108470 RPB 1999 01 28 10 15 00 1381-91 P sf6 CCGG 4.440 0.070 ... H4 1999 02 10 14 32 00 13.1650 -59.4320 20.00 15.00 5.00 108471 RPB 1999 01 28 10 15 00 1382-91 P sf6 CCGG 4.560 0.070 ... H4 1999 02 10 14 46 00 13.1650 -59.4320 20.00 15.00 5.00 108472 RPB 1999 02 06 10 25 00 675-91 P sf6 CCGG 4.450 0.070 ... H4 1999 02 23 12 05 00 13.1650 -59.4320 20.00 15.00 5.00 108473 RPB 1999 02 06 10 25 00 676-91 P sf6 CCGG 4.400 0.070 ... H4 1999 02 23 12 19 00 13.1650 -59.4320 20.00 15.00 5.00 108474 RPB 1999 02 13 10 30 00 1669-91 P sf6 CCGG 4.350 0.070 ... H4 1999 02 23 12 33 00 13.1650 -59.4320 20.00 15.00 5.00 108475 RPB 1999 02 13 10 30 00 1670-91 P sf6 CCGG 4.390 0.070 ... H4 1999 02 23 12 46 00 13.1650 -59.4320 20.00 15.00 5.00 108476 RPB 1999 02 20 11 15 00 567-91 P sf6 CCGG 4.450 0.070 ... H4 1999 03 30 12 16 00 13.1650 -59.4320 20.00 15.00 5.00 108477 RPB 1999 02 20 11 15 00 568-91 P sf6 CCGG 4.480 0.070 ... H4 1999 03 30 12 30 00 13.1650 -59.4320 20.00 15.00 5.00 108478 RPB 1999 02 27 10 30 00 1129-91 P sf6 CCGG 4.370 0.070 ... H4 1999 03 30 10 23 00 13.1650 -59.4320 20.00 15.00 5.00 108479 RPB 1999 02 27 10 30 00 1130-91 P sf6 CCGG 4.470 0.070 ... H4 1999 03 30 10 37 00 13.1650 -59.4320 20.00 15.00 5.00 108480 RPB 1999 03 07 11 05 00 1949-91 P sf6 CCGG 4.490 0.070 ... H4 1999 03 24 11 47 00 13.1650 -59.4320 20.00 15.00 5.00 108481 RPB 1999 03 07 11 05 00 1950-91 P sf6 CCGG 4.430 0.070 ... H4 1999 03 24 12 01 00 13.1650 -59.4320 20.00 15.00 5.00 108482 RPB 1999 03 13 10 15 00 4097-91 P sf6 CCGG 4.430 0.070 ... H4 1999 03 24 11 20 00 13.1650 -59.4320 20.00 15.00 5.00 108483 RPB 1999 03 13 10 15 00 4098-91 P sf6 CCGG 4.480 0.070 ... H4 1999 03 24 11 33 00 13.1650 -59.4320 20.00 15.00 5.00 108484 RPB 1999 03 20 10 15 00 4711-91 P sf6 CCGG 4.480 0.070 ... H4 1999 04 21 13 31 00 13.1650 -59.4320 20.00 15.00 5.00 108485 RPB 1999 03 20 10 15 00 4712-91 P sf6 CCGG 4.400 0.070 ... H4 1999 04 21 13 44 00 13.1650 -59.4320 20.00 15.00 5.00 108486 RPB 1999 03 27 10 15 00 4745-91 P sf6 CCGG 4.440 0.070 ... H4 1999 04 21 13 58 00 13.1650 -59.4320 20.00 15.00 5.00 108487 RPB 1999 03 27 10 15 00 4746-91 P sf6 CCGG 4.450 0.070 ... H4 1999 04 21 14 12 00 13.1650 -59.4320 20.00 15.00 5.00 108488 RPB 1999 04 02 10 15 00 119-98 P sf6 CCGG 4.490 0.070 ... H4 1999 04 29 14 31 00 13.1650 -59.4320 20.00 15.00 5.00 108489 RPB 1999 04 02 10 15 00 120-98 P sf6 CCGG 4.510 0.070 ... H4 1999 04 29 14 45 00 13.1650 -59.4320 20.00 15.00 5.00 108490 RPB 1999 04 10 10 15 00 229-91 P sf6 CCGG 4.360 0.070 ... H4 1999 04 29 14 59 00 13.1650 -59.4320 20.00 15.00 5.00 108491 RPB 1999 04 10 10 15 00 230-91 P sf6 CCGG 4.460 0.070 ... H4 1999 04 29 15 12 00 13.1650 -59.4320 20.00 15.00 5.00 108492 RPB 1999 04 17 10 15 00 51-91 P sf6 CCGG 4.400 0.070 ... H4 1999 05 17 16 18 00 13.1650 -59.4320 20.00 15.00 5.00 108493 RPB 1999 04 17 10 15 00 52-91 P sf6 CCGG 4.400 0.070 ... H4 1999 05 17 16 32 00 13.1650 -59.4320 20.00 15.00 5.00 108494 RPB 1999 04 24 10 15 00 4401-91 P sf6 CCGG 4.430 0.070 ... H4 1999 05 17 15 50 00 13.1650 -59.4320 20.00 15.00 5.00 108495 RPB 1999 04 24 10 15 00 4402-91 P sf6 CCGG 4.430 0.070 ... H4 1999 05 17 16 04 00 13.1650 -59.4320 20.00 15.00 5.00 108496 RPB 1999 05 01 10 15 00 1919-91 P sf6 CCGG 4.400 0.070 ... H4 1999 05 19 14 03 00 13.1650 -59.4320 20.00 15.00 5.00 108497 RPB 1999 05 01 10 15 00 1920-91 P sf6 CCGG 4.400 0.070 ... H4 1999 05 19 14 17 00 13.1650 -59.4320 20.00 15.00 5.00 108498 RPB 1999 05 09 10 15 00 4533-91 P sf6 CCGG 4.410 0.070 ... H4 1999 05 19 13 36 00 13.1650 -59.4320 20.00 15.00 5.00 108499 RPB 1999 05 09 10 15 00 4534-91 P sf6 CCGG 4.470 0.070 ... H4 1999 05 19 13 49 00 13.1650 -59.4320 20.00 15.00 5.00 108500 RPB 1999 05 14 11 05 00 63-98 P sf6 CCGG 4.280 0.070 ... H4 1999 06 24 12 28 00 13.1650 -59.4320 20.00 15.00 5.00 108501 RPB 1999 05 14 11 05 00 64-98 P sf6 CCGG 4.430 0.070 ... H4 1999 06 24 12 42 00 13.1650 -59.4320 20.00 15.00 5.00 108502 RPB 1999 05 23 10 15 00 549-91 P sf6 CCGG 4.490 0.070 ... H4 1999 06 23 10 43 00 13.1650 -59.4320 20.00 15.00 5.00 108503 RPB 1999 05 23 10 15 00 550-91 P sf6 CCGG 4.500 0.070 ... H4 1999 06 23 10 57 00 13.1650 -59.4320 20.00 15.00 5.00 108504 RPB 1999 05 29 10 30 00 4353-91 P sf6 CCGG 4.410 0.070 ... H4 1999 06 23 10 14 00 13.1650 -59.4320 20.00 15.00 5.00 108505 RPB 1999 05 29 10 30 00 4354-91 P sf6 CCGG 4.440 0.070 ... H4 1999 06 23 10 28 00 13.1650 -59.4320 20.00 15.00 5.00 108506 RPB 1999 06 05 10 40 00 1289-91 P sf6 CCGG 4.380 0.070 ... H4 1999 07 09 16 37 00 13.1650 -59.4320 20.00 15.00 5.00 108507 RPB 1999 06 05 10 40 00 1290-91 P sf6 CCGG 4.480 0.070 ... H4 1999 07 09 16 51 00 13.1650 -59.4320 20.00 15.00 5.00 108508 RPB 1999 06 11 10 20 00 4063-91 P sf6 CCGG 4.480 0.070 ... H4 1999 07 09 17 04 00 13.1650 -59.4320 20.00 15.00 5.00 108509 RPB 1999 06 11 10 20 00 4064-91 P sf6 CCGG 4.480 0.070 ... H4 1999 07 09 17 18 00 13.1650 -59.4320 20.00 15.00 5.00 108510 RPB 1999 06 19 10 15 00 723-91 P sf6 CCGG 4.420 0.070 ... H4 1999 07 09 14 46 00 13.1650 -59.4320 20.00 15.00 5.00 108511 RPB 1999 06 19 10 15 00 724-91 P sf6 CCGG 4.520 0.070 ... H4 1999 07 09 15 00 00 13.1650 -59.4320 20.00 15.00 5.00 108512 RPB 1999 06 29 10 15 00 1583-91 P sf6 CCGG 4.490 0.070 ... H4 1999 07 09 15 41 00 13.1650 -59.4320 20.00 15.00 5.00 108513 RPB 1999 06 29 10 15 00 1584-91 P sf6 CCGG 4.510 0.070 ... H4 1999 07 09 15 55 00 13.1650 -59.4320 20.00 15.00 5.00 108514 RPB 1999 07 03 10 15 00 485-91 P sf6 CCGG 4.430 0.070 ... H4 1999 08 20 10 51 00 13.1650 -59.4320 20.00 15.00 5.00 108515 RPB 1999 07 03 10 15 00 486-91 P sf6 CCGG 4.460 0.070 ... H4 1999 08 20 11 04 00 13.1650 -59.4320 20.00 15.00 5.00 108516 RPB 1999 07 10 10 15 00 4003-91 P sf6 CCGG 4.480 0.070 ... H4 1999 08 20 10 23 00 13.1650 -59.4320 20.00 15.00 5.00 108517 RPB 1999 07 10 10 15 00 4004-91 P sf6 CCGG 4.440 0.070 ... H4 1999 08 20 10 37 00 13.1650 -59.4320 20.00 15.00 5.00 108518 RPB 1999 07 17 10 30 00 97-98 P sf6 CCGG 4.510 0.070 ... H4 1999 08 17 16 15 00 13.1650 -59.4320 20.00 15.00 5.00 108519 RPB 1999 07 17 10 30 00 98-98 P sf6 CCGG 4.460 0.070 ... H4 1999 08 17 16 28 00 13.1650 -59.4320 20.00 15.00 5.00 108520 RPB 1999 07 24 10 15 00 4229-91 P sf6 CCGG 4.430 0.070 ... H4 1999 08 18 11 23 00 13.1650 -59.4320 20.00 15.00 5.00 108521 RPB 1999 07 24 10 15 00 4230-91 P sf6 CCGG 4.390 0.070 ... H4 1999 08 18 11 37 00 13.1650 -59.4320 20.00 15.00 5.00 108522 RPB 1999 07 31 10 50 00 295-91 P sf6 CCGG 4.550 0.070 ... H4 1999 09 08 10 33 00 13.1650 -59.4320 20.00 15.00 5.00 108523 RPB 1999 07 31 10 50 00 296-91 P sf6 CCGG 4.470 0.070 ... H4 1999 09 08 10 47 00 13.1650 -59.4320 20.00 15.00 5.00 108524 RPB 1999 08 07 10 20 00 4207-91 P sf6 CCGG 4.490 0.070 ... H4 1999 09 08 10 04 00 13.1650 -59.4320 20.00 15.00 5.00 108525 RPB 1999 08 07 10 20 00 4208-91 P sf6 CCGG 4.460 0.070 ... H4 1999 09 08 10 18 00 13.1650 -59.4320 20.00 15.00 5.00 108526 RPB 1999 08 14 10 30 00 513-91 P sf6 CCGG 4.540 0.070 ... H4 1999 09 08 11 00 00 13.1650 -59.4320 20.00 15.00 5.00 108527 RPB 1999 08 14 10 30 00 514-91 P sf6 CCGG 4.500 0.070 ... H4 1999 09 08 11 14 00 13.1650 -59.4320 20.00 15.00 5.00 108528 RPB 1999 08 21 10 15 00 4439-91 P sf6 CCGG 4.530 0.070 ... H4 1999 09 08 11 28 00 13.1650 -59.4320 20.00 15.00 5.00 108529 RPB 1999 08 21 10 15 00 4440-91 P sf6 CCGG 4.550 0.070 ... H4 1999 09 08 11 41 00 13.1650 -59.4320 20.00 15.00 5.00 108530 RPB 1999 09 01 10 20 00 527-91 P sf6 CCGG 4.330 0.070 ... H4 1999 09 30 15 00 00 13.1650 -59.4320 20.00 15.00 5.00 108531 RPB 1999 09 01 10 20 00 528-91 P sf6 CCGG 4.330 0.070 ... H4 1999 09 30 15 14 00 13.1650 -59.4320 20.00 15.00 5.00 108532 RPB 1999 09 08 10 15 00 4269-91 P sf6 CCGG 4.460 0.070 ... H4 1999 09 30 14 33 00 13.1650 -59.4320 20.00 15.00 5.00 108533 RPB 1999 09 08 10 15 00 4270-91 P sf6 CCGG 4.410 0.070 ... H4 1999 09 30 14 46 00 13.1650 -59.4320 20.00 15.00 5.00 108534 RPB 1999 09 14 10 40 00 563-91 P sf6 CCGG 4.540 0.070 ... H4 1999 10 01 15 12 00 13.1650 -59.4320 20.00 15.00 5.00 108535 RPB 1999 09 14 10 40 00 564-91 P sf6 CCGG 4.520 0.070 ... H4 1999 10 01 15 26 00 13.1650 -59.4320 20.00 15.00 5.00 108536 RPB 1999 09 19 10 20 00 1021-91 P sf6 CCGG 4.340 0.070 ... H4 1999 10 01 13 48 00 13.1650 -59.4320 20.00 15.00 5.00 108537 RPB 1999 09 19 10 20 00 1022-91 P sf6 CCGG 4.310 0.070 ... H4 1999 10 01 14 02 00 13.1650 -59.4320 20.00 15.00 5.00 108538 RPB 1999 09 26 10 15 00 57-91 P sf6 CCGG 4.590 0.070 ... H4 1999 10 27 15 02 00 13.1650 -59.4320 20.00 15.00 5.00 108539 RPB 1999 09 26 10 15 00 58-91 P sf6 CCGG 4.520 0.070 ... H4 1999 10 27 15 16 00 13.1650 -59.4320 20.00 15.00 5.00 108540 RPB 1999 10 03 10 15 00 1647-91 P sf6 CCGG 4.500 0.070 ... H4 1999 10 27 14 35 00 13.1650 -59.4320 20.00 15.00 5.00 108541 RPB 1999 10 03 10 15 00 1648-91 P sf6 CCGG 4.500 0.070 ... H4 1999 10 27 14 49 00 13.1650 -59.4320 20.00 15.00 5.00 108542 RPB 1999 10 08 11 00 00 1047-91 P sf6 CCGG 4.470 0.070 ... H4 1999 10 28 11 28 00 13.1650 -59.4320 20.00 15.00 5.00 108543 RPB 1999 10 08 11 00 00 1048-91 P sf6 CCGG 4.500 0.070 ... H4 1999 10 28 11 41 00 13.1650 -59.4320 20.00 15.00 5.00 108544 RPB 1999 10 17 10 15 00 4361-91 P sf6 CCGG 4.560 0.070 ... H4 1999 10 28 11 00 00 13.1650 -59.4320 20.00 15.00 5.00 108545 RPB 1999 10 17 10 15 00 4362-91 P sf6 CCGG 4.500 0.070 ... H4 1999 10 28 11 14 00 13.1650 -59.4320 20.00 15.00 5.00 108546 RPB 1999 10 31 10 30 00 361-91 P sf6 CCGG 4.590 0.070 A.. H4 1999 12 07 13 11 00 13.1650 -59.4320 20.00 15.00 5.00 108547 RPB 1999 10 31 10 30 00 362-91 P sf6 CCGG 4.560 0.070 A.. H4 1999 12 07 13 25 00 13.1650 -59.4320 20.00 15.00 5.00 108548 RPB 1999 11 10 10 30 00 399-91 P sf6 CCGG 4.490 0.070 A.. H4 1999 12 13 14 32 00 13.1650 -59.4320 20.00 15.00 5.00 108549 RPB 1999 11 10 10 30 00 400-91 P sf6 CCGG 4.450 0.070 A.. H4 1999 12 13 14 46 00 13.1650 -59.4320 20.00 15.00 5.00 108550 RPB 1999 11 14 10 15 00 835-91 P sf6 CCGG 4.480 0.070 A.. H4 1999 12 13 11 19 00 13.1650 -59.4320 20.00 15.00 5.00 108551 RPB 1999 11 14 10 15 00 836-91 P sf6 CCGG 4.460 0.070 A.. H4 1999 12 13 11 33 00 13.1650 -59.4320 20.00 15.00 5.00 108552 RPB 1999 11 27 10 15 00 373-91 P sf6 CCGG 4.490 0.070 A.. H4 1999 12 21 14 20 00 13.1650 -59.4320 20.00 15.00 5.00 108553 RPB 1999 11 27 10 15 00 374-91 P sf6 CCGG 4.420 0.070 A.. H4 1999 12 21 14 34 00 13.1650 -59.4320 20.00 15.00 5.00 108554 RPB 1999 11 30 10 15 00 4557-91 P sf6 CCGG 4.520 0.070 A.. H4 1999 12 21 14 48 00 13.1650 -59.4320 20.00 15.00 5.00 108555 RPB 1999 11 30 10 15 00 4558-91 P sf6 CCGG 4.540 0.070 A.. H4 1999 12 21 15 01 00 13.1650 -59.4320 20.00 15.00 5.00 108556 RPB 2000 01 23 11 00 00 1193-91 P sf6 CCGG 4.630 0.070 A.. H4 2000 02 08 15 51 00 13.1650 -59.4320 20.00 15.00 5.00 108557 RPB 2000 01 23 11 00 00 1194-91 P sf6 CCGG 4.620 0.070 A.. H4 2000 02 08 16 04 00 13.1650 -59.4320 20.00 15.00 5.00 108558 RPB 2000 01 30 10 30 00 4447-91 P sf6 CCGG 4.540 0.070 A.. H4 2000 02 08 15 23 00 13.1650 -59.4320 20.00 15.00 5.00 108559 RPB 2000 01 30 10 30 00 4448-91 P sf6 CCGG 4.650 0.070 A.. H4 2000 02 08 15 37 00 13.1650 -59.4320 20.00 15.00 5.00 108560 RPB 2000 02 06 10 15 00 1801-91 P sf6 CCGG 4.580 0.070 A.. H4 2000 02 24 15 26 00 13.1650 -59.4320 20.00 15.00 5.00 108561 RPB 2000 02 06 10 15 00 1802-91 P sf6 CCGG 4.650 0.070 A.. H4 2000 02 24 15 40 00 13.1650 -59.4320 20.00 15.00 5.00 108562 RPB 2000 02 13 10 15 00 4111-91 P sf6 CCGG 4.630 0.070 A.. H4 2000 02 29 09 50 00 13.1650 -59.4320 20.00 15.00 5.00 108563 RPB 2000 02 13 10 15 00 4112-91 P sf6 CCGG 4.610 0.070 A.. H4 2000 02 29 10 04 00 13.1650 -59.4320 20.00 15.00 5.00 108564 RPB 2000 03 04 10 30 00 189-91 P sf6 CCGG 4.570 0.070 ... H4 2000 04 05 15 28 00 13.1650 -59.4320 20.00 15.00 5.00 108565 RPB 2000 03 04 10 30 00 190-91 P sf6 CCGG 4.590 0.070 ... H4 2000 04 05 15 41 00 13.1650 -59.4320 20.00 15.00 5.00 108566 RPB 2000 03 11 10 15 00 767-91 P sf6 CCGG 4.590 0.070 ... H4 2000 04 05 15 02 00 13.1650 -59.4320 20.00 15.00 5.00 108567 RPB 2000 03 11 10 15 00 768-91 P sf6 CCGG 4.550 0.070 ... H4 2000 04 05 15 15 00 13.1650 -59.4320 20.00 15.00 5.00 108568 RPB 2000 03 18 20 15 00 4081-91 P sf6 CCGG 4.650 0.070 ... H4 2000 04 04 13 28 00 13.1650 -59.4320 20.00 15.00 5.00 108569 RPB 2000 03 18 20 15 00 4082-91 P sf6 CCGG 4.580 0.070 ... H4 2000 04 04 13 41 00 13.1650 -59.4320 20.00 15.00 5.00 108570 RPB 2000 03 28 10 15 00 4504-91 P sf6 CCGG 4.600 0.070 ... H4 2000 04 04 16 08 00 13.1650 -59.4320 20.00 15.00 5.00 108571 RPB 2000 04 30 10 30 00 55-91 P sf6 CCGG 4.670 0.070 ... H4 2000 05 19 12 03 00 13.1650 -59.4320 20.00 15.00 5.00 108572 RPB 2000 04 30 10 30 00 56-91 P sf6 CCGG 4.820 0.070 ... H4 2000 05 19 12 16 00 13.1650 -59.4320 20.00 15.00 5.00 108573 RPB 2000 05 06 10 15 00 4443-91 P sf6 CCGG 4.670 0.070 ... H4 2000 05 19 10 43 00 13.1650 -59.4320 20.00 15.00 5.00 108574 RPB 2000 05 06 10 15 00 4444-91 P sf6 CCGG 4.570 0.070 ... H4 2000 05 19 10 56 00 13.1650 -59.4320 20.00 15.00 5.00 108575 RPB 2000 05 13 10 45 00 543-91 P sf6 CCGG 4.620 0.070 ... H4 2000 05 31 12 30 00 13.1650 -59.4320 20.00 15.00 5.00 108576 RPB 2000 05 13 10 45 00 544-91 P sf6 CCGG 4.650 0.070 ... H4 2000 05 31 12 43 00 13.1650 -59.4320 20.00 15.00 5.00 108577 RPB 2000 05 22 10 15 00 4200-91 P sf6 CCGG 4.550 0.070 ... H4 2000 06 01 10 33 00 13.1650 -59.4320 20.00 15.00 5.00 108578 RPB 2000 05 27 10 15 00 159-91 P sf6 CCGG 4.610 0.070 ... H4 2000 07 20 13 15 00 13.1650 -59.4320 20.00 15.00 5.00 108579 RPB 2000 05 27 10 15 00 160-91 P sf6 CCGG 4.680 0.070 ... H4 2000 07 20 13 28 00 13.1650 -59.4320 20.00 15.00 5.00 108580 RPB 2000 06 03 10 15 00 4247-91 P sf6 CCGG 4.660 0.070 ... H4 2000 07 20 11 55 00 13.1650 -59.4320 20.00 15.00 5.00 108581 RPB 2000 06 03 10 15 00 4248-91 P sf6 CCGG 4.710 0.070 ... H4 2000 07 20 12 08 00 13.1650 -59.4320 20.00 15.00 5.00 108582 RPB 2000 06 10 10 15 00 723-91 P sf6 CCGG 4.710 0.070 ... H4 2000 08 18 09 08 00 13.1650 -59.4320 20.00 15.00 5.00 108583 RPB 2000 06 10 10 15 00 724-91 P sf6 CCGG 4.690 0.070 ... H4 2000 08 18 09 21 00 13.1650 -59.4320 20.00 15.00 5.00 108584 RPB 2000 06 15 10 20 00 4029-91 P sf6 CCGG 4.760 0.070 ... H4 2000 08 18 09 34 00 13.1650 -59.4320 20.00 15.00 5.00 108585 RPB 2000 06 15 10 20 00 4030-91 P sf6 CCGG 4.760 0.070 ... H4 2000 08 18 09 47 00 13.1650 -59.4320 20.00 15.00 5.00 108586 RPB 2000 06 24 11 00 00 7-91 P sf6 CCGG 4.750 0.070 ... H4 2000 08 18 08 42 00 13.1650 -59.4320 20.00 15.00 5.00 108587 RPB 2000 06 24 11 00 00 8-91 P sf6 CCGG 4.770 0.070 ... H4 2000 08 18 08 55 00 13.1650 -59.4320 20.00 15.00 5.00 108588 RPB 2000 06 30 10 40 00 4427-91 P sf6 CCGG 4.690 0.070 ... H4 2000 08 18 08 16 00 13.1650 -59.4320 20.00 15.00 5.00 108589 RPB 2000 06 30 10 40 00 4428-91 P sf6 CCGG 4.640 0.070 ... H4 2000 08 18 08 29 00 13.1650 -59.4320 20.00 15.00 5.00 108590 RPB 2000 07 08 10 30 00 447-91 P sf6 CCGG 4.710 0.070 ... H4 2000 08 17 10 02 00 13.1650 -59.4320 20.00 15.00 5.00 108591 RPB 2000 07 08 10 30 00 448-91 P sf6 CCGG 4.730 0.070 ... H4 2000 08 17 10 15 00 13.1650 -59.4320 20.00 15.00 5.00 108592 RPB 2000 07 15 10 15 00 4195-91 P sf6 CCGG 4.660 0.070 ... H4 2000 08 17 09 36 00 13.1650 -59.4320 20.00 15.00 5.00 108593 RPB 2000 07 15 10 15 00 4196-91 P sf6 CCGG 4.700 0.070 ... H4 2000 08 17 09 49 00 13.1650 -59.4320 20.00 15.00 5.00 108594 RPB 2000 07 22 10 14 00 1239-91 D sf6 CCGG 4.590 0.070 ... H4 2000 09 22 13 07 00 13.1650 -59.4320 20.00 15.00 5.00 108595 RPB 2000 07 22 10 14 00 1240-91 D sf6 CCGG 4.630 0.070 ... H4 2000 09 22 13 20 00 13.1650 -59.4320 20.00 15.00 5.00 108596 RPB 2000 07 29 10 15 00 4521-91 D sf6 CCGG 4.650 0.070 ... H4 2000 09 22 13 59 00 13.1650 -59.4320 20.00 15.00 5.00 108597 RPB 2000 07 29 10 15 00 4522-91 D sf6 CCGG 4.650 0.070 ... H4 2000 09 22 14 12 00 13.1650 -59.4320 20.00 15.00 5.00 108598 RPB 2000 08 05 11 15 00 1475-91 D sf6 CCGG 4.760 0.070 ... H4 2000 09 20 08 13 00 13.1650 -59.4320 20.00 15.00 5.00 108599 RPB 2000 08 05 11 15 00 1476-91 D sf6 CCGG 4.720 0.070 ... H4 2000 09 20 08 26 00 13.1650 -59.4320 20.00 15.00 5.00 108600 RPB 2000 08 12 10 30 00 4785-91 D sf6 CCGG 4.700 0.070 ... H4 2000 09 20 08 41 00 13.1650 -59.4320 20.00 15.00 5.00 108601 RPB 2000 08 12 10 30 00 4786-91 D sf6 CCGG 4.670 0.070 ... H4 2000 09 20 08 54 00 13.1650 -59.4320 20.00 15.00 5.00 108602 RPB 2000 08 26 10 15 00 224-91 D sf6 CCGG 4.780 0.070 ... H4 2000 10 17 15 37 00 13.1650 -59.4320 20.00 15.00 5.00 108603 RPB 2000 09 02 10 15 00 4517-91 D sf6 CCGG 4.710 0.070 ... H4 2000 10 17 14 19 00 13.1650 -59.4320 20.00 15.00 5.00 108604 RPB 2000 09 02 10 15 00 4518-91 D sf6 CCGG 4.760 0.070 ... H4 2000 10 17 14 32 00 13.1650 -59.4320 20.00 15.00 5.00 108605 RPB 2000 09 10 19 30 00 27-91 D sf6 CCGG 4.670 0.070 ... H4 2000 10 18 14 54 00 13.1650 -59.4320 20.00 15.00 5.00 108606 RPB 2000 09 10 19 30 00 28-91 D sf6 CCGG 4.620 0.070 ... H4 2000 10 18 15 07 00 13.1650 -59.4320 20.00 15.00 5.00 108607 RPB 2000 09 16 10 15 00 1969-91 D sf6 CCGG 4.680 0.070 ... H4 2000 10 18 15 20 00 13.1650 -59.4320 20.00 15.00 5.00 108608 RPB 2000 09 16 10 15 00 1970-91 D sf6 CCGG 4.640 0.070 ... H4 2000 10 18 15 33 00 13.1650 -59.4320 20.00 15.00 5.00 108609 RPB 2000 09 24 10 30 00 377-91 D sf6 CCGG 4.620 0.070 ... H4 2000 10 27 10 14 00 13.1650 -59.4320 20.00 15.00 5.00 108610 RPB 2000 09 24 10 30 00 378-91 D sf6 CCGG 4.660 0.070 ... H4 2000 10 27 10 27 00 13.1650 -59.4320 20.00 15.00 5.00 108611 RPB 2000 10 04 10 30 00 4671-91 D sf6 CCGG 4.770 0.070 ... H4 2000 10 27 09 20 00 13.1650 -59.4320 20.00 15.00 5.00 108612 RPB 2000 10 04 10 30 00 4672-91 D sf6 CCGG 4.780 0.070 ... H4 2000 10 27 09 33 00 13.1650 -59.4320 20.00 15.00 5.00 108613 RPB 2000 10 20 10 45 00 149-91 D sf6 CCGG 4.880 0.070 ... H4 2000 12 06 14 57 00 13.1650 -59.4320 20.00 15.00 5.00 108614 RPB 2000 10 20 10 45 00 150-91 D sf6 CCGG 4.780 0.070 ... H4 2000 12 06 15 10 00 13.1650 -59.4320 20.00 15.00 5.00 108615 RPB 2000 10 27 10 45 00 1795-91 D sf6 CCGG 4.760 0.070 ... H4 2000 12 06 15 23 00 13.1650 -59.4320 20.00 15.00 5.00 108616 RPB 2000 10 27 10 45 00 1796-91 D sf6 CCGG 4.750 0.070 ... H4 2000 12 06 15 36 00 13.1650 -59.4320 20.00 15.00 5.00 108617 RPB 2000 11 07 10 15 00 100-91 D sf6 CCGG 4.630 0.070 ... H4 2000 12 08 11 04 00 13.1650 -59.4320 20.00 15.00 5.00 108619 RPB 2000 11 07 10 15 00 99-91 D sf6 CCGG 4.760 0.070 ... H4 2000 12 08 10 51 00 13.1650 -59.4320 20.00 15.00 5.00 108618 RPB 2000 11 12 10 30 00 819-91 D sf6 CCGG 4.930 0.070 N.. H4 2000 12 08 11 19 00 13.1650 -59.4320 20.00 15.00 5.00 108620 RPB 2000 11 12 10 30 00 820-91 D sf6 CCGG 4.740 0.070 ... H4 2000 12 08 11 32 00 13.1650 -59.4320 20.00 15.00 5.00 108621 RPB 2000 11 18 10 15 00 637-91 D sf6 CCGG 4.790 0.070 ... H4 2001 01 03 13 55 00 13.1650 -59.4320 20.00 15.00 5.00 108622 RPB 2000 11 18 10 15 00 638-91 D sf6 CCGG 4.720 0.070 ... H4 2001 01 03 14 08 00 13.1650 -59.4320 20.00 15.00 5.00 108623 RPB 2000 11 24 10 15 00 1465-91 D sf6 CCGG 4.690 0.070 ... H4 2001 01 03 13 28 00 13.1650 -59.4320 20.00 15.00 5.00 108624 RPB 2000 11 24 10 15 00 1466-91 D sf6 CCGG 4.640 0.070 ... H4 2001 01 03 13 42 00 13.1650 -59.4320 20.00 15.00 5.00 108625 RPB 2000 12 03 10 15 00 257-91 D sf6 CCGG 4.730 0.070 ... H4 2001 01 02 16 29 00 13.1650 -59.4320 20.00 15.00 5.00 108626 RPB 2000 12 03 10 15 00 258-91 D sf6 CCGG 4.600 0.070 ... H4 2001 01 02 16 42 00 13.1650 -59.4320 20.00 15.00 5.00 108627 RPB 2000 12 10 10 30 00 1239-91 D sf6 CCGG 4.670 0.070 ... H4 2001 01 02 16 03 00 13.1650 -59.4320 20.00 15.00 5.00 108628 RPB 2000 12 10 10 30 00 1240-91 D sf6 CCGG 4.760 0.070 ... H4 2001 01 02 16 16 00 13.1650 -59.4320 20.00 15.00 5.00 108629 RPB 2000 12 16 10 30 00 689-91 D sf6 CCGG 4.780 0.070 ... H4 2001 02 02 11 57 00 13.1650 -59.4320 20.00 15.00 5.00 108630 RPB 2000 12 16 10 30 00 690-91 D sf6 CCGG 4.790 0.070 ... H4 2001 02 02 12 10 00 13.1650 -59.4320 20.00 15.00 5.00 108631 RPB 2000 12 23 10 15 00 1925-91 D sf6 CCGG 4.810 0.070 ... H4 2001 02 02 11 31 00 13.1650 -59.4320 20.00 15.00 5.00 108632 RPB 2000 12 23 10 15 00 1926-91 D sf6 CCGG 4.770 0.070 ... H4 2001 02 02 11 44 00 13.1650 -59.4320 20.00 15.00 5.00 108633 RPB 2000 12 31 10 15 00 4147-91 D sf6 CCGG 4.720 0.070 ... H4 2001 02 02 10 11 00 13.1650 -59.4320 20.00 15.00 5.00 108634 RPB 2000 12 31 10 15 00 4148-91 D sf6 CCGG 4.750 0.070 ... H4 2001 02 02 10 24 00 13.1650 -59.4320 20.00 15.00 5.00 108635 RPB 2001 01 07 10 15 00 4807-91 D sf6 CCGG 4.740 0.070 ... H4 2001 02 02 10 37 00 13.1650 -59.4320 20.00 15.00 5.00 108636 RPB 2001 01 07 10 15 00 4808-91 D sf6 CCGG 4.820 0.070 ... H4 2001 02 02 10 50 00 13.1650 -59.4320 20.00 15.00 5.00 108637 RPB 2001 01 12 10 30 00 1781-91 D sf6 CCGG 4.800 0.070 ... H4 2001 03 21 09 56 00 13.1650 -59.4320 20.00 15.00 5.00 108638 RPB 2001 01 12 10 30 00 1782-91 D sf6 CCGG 4.740 0.070 ... H4 2001 03 21 10 09 00 13.1650 -59.4320 20.00 15.00 5.00 108639 RPB 2001 01 20 10 20 00 4787-91 D sf6 CCGG 4.760 0.070 ... H4 2001 03 21 10 22 00 13.1650 -59.4320 20.00 15.00 5.00 108640 RPB 2001 01 20 10 20 00 4788-91 D sf6 CCGG 4.760 0.070 ... H4 2001 03 21 10 35 00 13.1650 -59.4320 20.00 15.00 5.00 108641 RPB 2001 01 27 10 30 00 4407-91 D sf6 CCGG 4.820 0.070 ... H4 2001 03 19 13 14 00 13.1650 -59.4320 20.00 15.00 5.00 108642 RPB 2001 01 27 10 30 00 4408-91 D sf6 CCGG 4.830 0.070 ... H4 2001 03 19 13 27 00 13.1650 -59.4320 20.00 15.00 5.00 108643 RPB 2001 02 04 10 30 00 4443-91 D sf6 CCGG 4.830 0.070 ... H4 2001 03 19 12 48 00 13.1650 -59.4320 20.00 15.00 5.00 108644 RPB 2001 02 04 10 30 00 4444-91 D sf6 CCGG 4.840 0.070 ... H4 2001 03 19 13 01 00 13.1650 -59.4320 20.00 15.00 5.00 108645 RPB 2001 02 11 10 15 00 211-91 D sf6 CCGG 4.740 0.070 ... H4 2001 03 29 13 34 00 13.1650 -59.4320 20.00 15.00 5.00 108646 RPB 2001 02 11 10 15 00 212-91 D sf6 CCGG 4.790 0.070 ... H4 2001 03 29 13 47 00 13.1650 -59.4320 20.00 15.00 5.00 108647 RPB 2001 02 18 10 15 00 511-91 D sf6 CCGG 4.770 0.070 ... H4 2001 03 29 14 00 00 13.1650 -59.4320 20.00 15.00 5.00 108648 RPB 2001 02 18 10 15 00 512-91 D sf6 CCGG 4.750 0.070 ... H4 2001 03 29 14 13 00 13.1650 -59.4320 20.00 15.00 5.00 108649 RPB 2001 02 25 10 15 00 271-99 D sf6 CCGG 4.750 0.070 ... H4 2001 04 03 14 31 00 13.1650 -59.4320 20.00 15.00 5.00 108650 RPB 2001 02 25 10 15 00 272-99 D sf6 CCGG 4.830 0.070 ... H4 2001 04 03 14 44 00 13.1650 -59.4320 20.00 15.00 5.00 108651 RPB 2001 03 04 10 15 00 273-99 D sf6 CCGG 4.860 0.070 ... H4 2001 04 03 14 05 00 13.1650 -59.4320 20.00 15.00 5.00 108652 RPB 2001 03 04 10 15 00 274-99 D sf6 CCGG 4.830 0.070 ... H4 2001 04 03 14 18 00 13.1650 -59.4320 20.00 15.00 5.00 108653 RPB 2001 03 11 10 15 00 4067-91 D sf6 CCGG 4.820 0.070 ... H4 2001 06 11 14 19 00 13.1650 -59.4320 20.00 15.00 5.00 108654 RPB 2001 03 11 10 15 00 4068-91 D sf6 CCGG 4.820 0.070 ... H4 2001 06 11 14 32 00 13.1650 -59.4320 20.00 15.00 5.00 108655 RPB 2001 03 18 10 15 00 4819-91 D sf6 CCGG 4.850 0.070 ... H4 2001 06 11 13 53 00 13.1650 -59.4320 20.00 15.00 5.00 108656 RPB 2001 03 18 10 15 00 4820-91 D sf6 CCGG 4.820 0.070 ... H4 2001 06 11 14 06 00 13.1650 -59.4320 20.00 15.00 5.00 108657 RPB 2001 03 25 10 15 00 1419-91 D sf6 CCGG 4.890 0.070 ... H4 2001 06 11 09 53 00 13.1650 -59.4320 20.00 15.00 5.00 108658 RPB 2001 03 25 10 15 00 1420-91 D sf6 CCGG 4.890 0.070 ... H4 2001 06 11 10 06 00 13.1650 -59.4320 20.00 15.00 5.00 108659 RPB 2001 04 01 10 15 00 4970-91 D sf6 CCGG 4.790 0.070 ... H4 2001 06 11 14 45 00 13.1650 -59.4320 20.00 15.00 5.00 108660 RPB 2001 04 08 10 15 00 721-91 D sf6 CCGG 4.830 0.070 ... H4 2001 06 05 15 30 00 13.1650 -59.4320 20.00 15.00 5.00 108661 RPB 2001 04 08 10 15 00 722-91 D sf6 CCGG 4.750 0.070 ... H4 2001 06 05 15 43 00 13.1650 -59.4320 20.00 15.00 5.00 108662 RPB 2001 04 15 10 15 00 2021-91 D sf6 CCGG 4.780 0.070 ... H4 2001 06 05 15 56 00 13.1650 -59.4320 20.00 15.00 5.00 108663 RPB 2001 04 15 10 15 00 2022-91 D sf6 CCGG 4.790 0.070 ... H4 2001 06 05 16 09 00 13.1650 -59.4320 20.00 15.00 5.00 108664 RPB 2001 04 22 10 15 00 1901-91 D sf6 CCGG 4.900 0.070 ... H4 2001 06 07 12 29 00 13.1650 -59.4320 20.00 15.00 5.00 108665 RPB 2001 04 22 10 15 00 1902-91 D sf6 CCGG 4.880 0.070 ... H4 2001 06 07 12 42 00 13.1650 -59.4320 20.00 15.00 5.00 108666 RPB 2001 04 29 10 15 00 4661-91 D sf6 CCGG 4.860 0.070 ... H4 2001 06 07 12 55 00 13.1650 -59.4320 20.00 15.00 5.00 108667 RPB 2001 04 29 10 15 00 4662-91 D sf6 CCGG 4.900 0.070 ... H4 2001 06 07 13 08 00 13.1650 -59.4320 20.00 15.00 5.00 108668 RPB 2001 05 06 10 15 00 1987-91 D sf6 CCGG 3.710 0.070 N.. H4 2001 06 07 13 49 00 13.1650 -59.4320 20.00 15.00 5.00 108669 RPB 2001 05 06 10 15 00 1988-91 D sf6 CCGG 3.340 0.070 N.. H4 2001 06 07 14 02 00 13.1650 -59.4320 20.00 15.00 5.00 108670 RPB 2001 05 13 10 15 00 4409-91 D sf6 CCGG 4.910 0.070 ... H4 2001 06 07 13 21 00 13.1650 -59.4320 20.00 15.00 5.00 108671 RPB 2001 05 13 10 15 00 4410-91 D sf6 CCGG 4.890 0.070 ... H4 2001 06 07 13 34 00 13.1650 -59.4320 20.00 15.00 5.00 108672 RPB 2001 06 22 10 15 00 409-99 D sf6 CCGG 4.890 0.070 ... H4 2001 07 09 10 16 00 13.1650 -59.4320 20.00 15.00 5.00 108673 RPB 2001 06 22 10 15 00 410-99 D sf6 CCGG 4.870 0.070 ... H4 2001 07 09 10 29 00 13.1650 -59.4320 20.00 15.00 5.00 108674 RPB 2001 06 30 10 15 00 413-99 D sf6 CCGG 4.900 0.070 ... H4 2001 07 09 09 50 00 13.1650 -59.4320 20.00 15.00 5.00 108675 RPB 2001 06 30 10 15 00 414-99 D sf6 CCGG 4.880 0.070 ... H4 2001 07 09 10 03 00 13.1650 -59.4320 20.00 15.00 5.00 108676 RPB 2001 07 08 10 45 00 1771-91 D sf6 CCGG 2.230 0.070 N.. H4 2001 07 20 12 52 00 13.1650 -59.4320 20.00 15.00 5.00 108677 RPB 2001 07 08 10 45 00 1772-91 D sf6 CCGG -999.990 -999.990 *.. H4 2001 07 20 13 05 00 13.1650 -59.4320 20.00 15.00 5.00 108678 RPB 2001 07 16 16 50 00 4941-91 D sf6 CCGG 4.800 0.070 ... H4 2001 07 20 11 19 00 13.1650 -59.4320 20.00 15.00 5.00 108679 RPB 2001 07 16 16 50 00 4942-91 D sf6 CCGG 4.900 0.070 ... H4 2001 07 20 11 32 00 13.1650 -59.4320 20.00 15.00 5.00 108680 RPB 2001 07 22 10 15 00 177-91 D sf6 CCGG 4.910 0.070 ... H4 2001 08 02 15 04 00 13.1650 -59.4320 20.00 15.00 5.00 108681 RPB 2001 07 22 10 15 00 178-91 D sf6 CCGG 4.870 0.070 ... H4 2001 08 02 15 17 00 13.1650 -59.4320 20.00 15.00 5.00 108682 RPB 2001 07 30 10 15 00 1501-91 D sf6 CCGG 4.880 0.070 ... H4 2001 08 02 14 38 00 13.1650 -59.4320 20.00 15.00 5.00 108683 RPB 2001 07 30 10 15 00 1502-91 D sf6 CCGG 4.890 0.070 ... H4 2001 08 02 14 51 00 13.1650 -59.4320 20.00 15.00 5.00 108684 RPB 2001 08 07 10 15 00 1935-91 D sf6 CCGG 4.940 0.070 ... H4 2001 08 23 11 04 00 13.1650 -59.4320 20.00 15.00 5.00 108685 RPB 2001 08 07 10 15 00 1936-91 D sf6 CCGG 4.910 0.070 ... H4 2001 08 23 11 17 00 13.1650 -59.4320 20.00 15.00 5.00 108686 RPB 2001 08 15 10 15 00 4019-91 D sf6 CCGG 4.710 0.070 ... H4 2001 08 23 11 32 00 13.1650 -59.4320 20.00 15.00 5.00 108687 RPB 2001 08 15 10 15 00 4020-91 D sf6 CCGG 4.700 0.070 ... H4 2001 08 23 11 45 00 13.1650 -59.4320 20.00 15.00 5.00 108688 RPB 2001 08 20 10 15 00 407-99 D sf6 CCGG 4.930 0.070 ... H4 2001 09 04 11 13 00 13.1650 -59.4320 20.00 15.00 5.00 108689 RPB 2001 08 20 10 15 00 408-99 D sf6 CCGG 4.880 0.070 ... H4 2001 09 04 11 26 00 13.1650 -59.4320 20.00 15.00 5.00 108690 RPB 2001 08 28 10 15 00 417-99 D sf6 CCGG 4.830 0.070 ... H4 2001 09 04 10 21 00 13.1650 -59.4320 20.00 15.00 5.00 108691 RPB 2001 08 28 10 15 00 418-99 D sf6 CCGG 4.920 0.070 ... H4 2001 09 04 10 34 00 13.1650 -59.4320 20.00 15.00 5.00 108692 RPB 2001 09 01 10 20 00 259-91 D sf6 CCGG 4.850 0.070 ... H4 2001 09 21 13 43 00 13.1650 -59.4320 20.00 15.00 5.00 108693 RPB 2001 09 01 10 20 00 260-91 D sf6 CCGG 4.850 0.070 ... H4 2001 09 21 13 56 00 13.1650 -59.4320 20.00 15.00 5.00 108694 RPB 2001 09 12 10 15 00 4375-91 D sf6 CCGG 4.880 0.070 ... H4 2001 09 21 13 17 00 13.1650 -59.4320 20.00 15.00 5.00 108695 RPB 2001 09 12 10 15 00 4376-91 D sf6 CCGG 4.820 0.070 ... H4 2001 09 21 13 30 00 13.1650 -59.4320 20.00 15.00 5.00 108696 RPB 2001 09 19 10 15 00 523-91 D sf6 CCGG 4.810 0.070 ... H4 2001 10 03 11 13 00 13.1650 -59.4320 20.00 15.00 5.00 108697 RPB 2001 09 19 10 15 00 524-91 D sf6 CCGG 4.850 0.070 ... H4 2001 10 03 11 26 00 13.1650 -59.4320 20.00 15.00 5.00 108698 RPB 2001 09 26 10 15 00 4427-91 D sf6 CCGG 4.930 0.070 ... H4 2001 10 03 12 36 00 13.1650 -59.4320 20.00 15.00 5.00 108699 RPB 2001 09 26 10 15 00 4428-91 D sf6 CCGG 4.920 0.070 ... H4 2001 10 03 12 49 00 13.1650 -59.4320 20.00 15.00 5.00 108700 RPB 2001 10 01 10 15 00 231-91 D sf6 CCGG 4.940 0.070 ... H4 2001 10 16 13 43 00 13.1650 -59.4320 20.00 15.00 5.00 108701 RPB 2001 10 01 10 15 00 232-91 D sf6 CCGG 4.890 0.070 ... H4 2001 10 16 13 56 00 13.1650 -59.4320 20.00 15.00 5.00 108702 RPB 2001 10 08 10 15 00 1735-91 D sf6 CCGG 4.870 0.070 ... H4 2001 10 16 13 17 00 13.1650 -59.4320 20.00 15.00 5.00 108703 RPB 2001 10 08 10 15 00 1736-91 D sf6 CCGG 4.900 0.070 ... H4 2001 10 16 13 30 00 13.1650 -59.4320 20.00 15.00 5.00 108704 RPB 2001 10 15 10 15 00 1037-91 D sf6 CCGG 4.940 0.070 ... H4 2001 11 05 15 06 00 13.1650 -59.4320 20.00 15.00 5.00 108705 RPB 2001 10 15 10 15 00 1038-91 D sf6 CCGG 4.900 0.070 ... H4 2001 11 05 15 19 00 13.1650 -59.4320 20.00 15.00 5.00 108706 RPB 2001 10 25 10 15 00 2013-91 D sf6 CCGG 4.890 0.070 ... H4 2001 11 05 14 40 00 13.1650 -59.4320 20.00 15.00 5.00 108707 RPB 2001 10 25 10 15 00 2014-91 D sf6 CCGG 4.880 0.070 ... H4 2001 11 05 14 53 00 13.1650 -59.4320 20.00 15.00 5.00 108708 RPB 2001 10 31 11 00 00 423-91 D sf6 CCGG 4.900 0.070 ... H4 2001 11 20 14 47 00 13.1650 -59.4320 20.00 15.00 5.00 108709 RPB 2001 10 31 11 00 00 424-91 D sf6 CCGG 4.870 0.070 ... H4 2001 11 20 15 00 00 13.1650 -59.4320 20.00 15.00 5.00 108710 RPB 2001 11 07 10 15 00 4573-91 D sf6 CCGG 4.800 0.070 ... H4 2001 11 20 14 21 00 13.1650 -59.4320 20.00 15.00 5.00 108711 RPB 2001 11 07 10 15 00 4574-91 D sf6 CCGG 4.880 0.070 ... H4 2001 11 20 14 34 00 13.1650 -59.4320 20.00 15.00 5.00 108712 RPB 2001 11 12 10 15 00 1015-91 D sf6 CCGG 4.890 0.070 ... H4 2001 12 05 16 25 00 13.1650 -59.4320 20.00 15.00 5.00 108713 RPB 2001 11 12 10 15 00 1016-91 D sf6 CCGG 4.850 0.070 ... H4 2001 12 05 16 38 00 13.1650 -59.4320 20.00 15.00 5.00 108714 RPB 2001 11 21 10 15 00 4629-91 D sf6 CCGG 5.030 0.070 ... H4 2001 12 05 15 58 00 13.1650 -59.4320 20.00 15.00 5.00 108715 RPB 2001 11 21 10 15 00 4630-91 D sf6 CCGG 5.030 0.070 ... H4 2001 12 05 16 11 00 13.1650 -59.4320 20.00 15.00 5.00 108716 RPB 2001 11 30 10 15 00 43-98 D sf6 CCGG 4.960 0.070 ... H4 2001 12 28 15 06 00 13.1650 -59.4320 20.00 15.00 5.00 108717 RPB 2001 11 30 10 15 00 44-98 D sf6 CCGG 4.970 0.070 ... H4 2001 12 28 15 19 00 13.1650 -59.4320 20.00 15.00 5.00 108718 RPB 2001 12 07 19 45 00 1941-91 D sf6 CCGG 4.870 0.070 ... H4 2001 12 28 15 32 00 13.1650 -59.4320 20.00 15.00 5.00 108719 RPB 2001 12 07 19 45 00 1942-91 D sf6 CCGG 4.870 0.070 ... H4 2001 12 28 15 45 00 13.1650 -59.4320 20.00 15.00 5.00 108720 RPB 2001 12 14 10 20 00 219-99 D sf6 CCGG 4.920 0.070 ... H4 2001 12 27 16 30 00 13.1650 -59.4320 20.00 15.00 5.00 108721 RPB 2001 12 14 10 20 00 220-99 D sf6 CCGG 4.910 0.070 ... H4 2001 12 27 16 43 00 13.1650 -59.4320 20.00 15.00 5.00 108722 RPB 2001 12 20 20 14 00 1123-91 D sf6 CCGG 4.960 0.070 ... H4 2001 12 28 12 50 00 13.1650 -59.4320 20.00 15.00 5.00 108723 RPB 2001 12 20 20 14 00 1124-91 D sf6 CCGG 4.950 0.070 ... H4 2001 12 28 13 03 00 13.1650 -59.4320 20.00 15.00 5.00 108724 RPB 2001 12 27 10 20 00 1319-91 D sf6 CCGG 5.040 0.070 ... H4 2002 01 11 14 37 00 13.1650 -59.4320 20.00 15.00 5.00 108725 RPB 2001 12 27 10 20 00 1320-91 D sf6 CCGG 5.030 0.070 ... H4 2002 01 11 14 50 00 13.1650 -59.4320 20.00 15.00 5.00 108726 RPB 2002 01 02 10 15 00 1991-91 D sf6 CCGG 5.020 0.070 ... H4 2002 01 11 15 05 00 13.1650 -59.4320 20.00 15.00 5.00 108727 RPB 2002 01 02 10 15 00 1992-91 D sf6 CCGG 4.970 0.070 ... H4 2002 01 11 15 18 00 13.1650 -59.4320 20.00 15.00 5.00 108728 RPB 2002 01 13 10 20 00 177-91 D sf6 CCGG 4.970 0.070 ... H4 2002 01 31 14 57 00 13.1650 -59.4320 20.00 15.00 5.00 108729 RPB 2002 01 13 10 20 00 178-91 D sf6 CCGG 4.990 0.070 ... H4 2002 01 31 15 10 00 13.1650 -59.4320 20.00 15.00 5.00 108730 RPB 2002 01 23 10 25 00 205-99 D sf6 CCGG 4.920 0.070 ... H4 2002 01 31 16 17 00 13.1650 -59.4320 20.00 15.00 5.00 108731 RPB 2002 01 23 10 25 00 206-99 D sf6 CCGG 4.970 0.070 ... H4 2002 01 31 16 30 00 13.1650 -59.4320 20.00 15.00 5.00 108732 RPB 2002 01 31 10 20 00 1403-91 D sf6 CCGG 4.870 0.070 ... H4 2002 02 12 15 12 00 13.1650 -59.4320 20.00 15.00 5.00 108733 RPB 2002 01 31 10 20 00 1404-91 D sf6 CCGG 4.940 0.070 ... H4 2002 02 12 15 25 00 13.1650 -59.4320 20.00 15.00 5.00 108734 RPB 2002 02 06 10 30 00 1951-91 D sf6 CCGG 4.920 0.070 ... H4 2002 02 14 11 02 00 13.1650 -59.4320 20.00 15.00 5.00 108735 RPB 2002 02 06 10 30 00 1952-91 D sf6 CCGG 4.960 0.070 ... H4 2002 02 14 11 15 00 13.1650 -59.4320 20.00 15.00 5.00 108736 RPB 2002 02 15 10 30 00 1015-91 D sf6 CCGG 4.910 0.070 ... H4 2002 03 11 16 10 00 13.1650 -59.4320 20.00 15.00 5.00 108737 RPB 2002 02 15 10 30 00 1016-91 D sf6 CCGG 4.940 0.070 ... H4 2002 03 11 16 23 00 13.1650 -59.4320 20.00 15.00 5.00 108738 RPB 2002 02 20 10 20 00 4891-91 D sf6 CCGG 5.020 0.070 ... H4 2002 03 11 15 18 00 13.1650 -59.4320 20.00 15.00 5.00 108739 RPB 2002 02 20 10 20 00 4892-91 D sf6 CCGG 5.030 0.070 ... H4 2002 03 11 15 31 00 13.1650 -59.4320 20.00 15.00 5.00 108740 RPB 2002 03 02 10 30 00 1283-91 D sf6 CCGG 4.980 0.070 ... H4 2002 03 18 13 23 00 13.1650 -59.4320 20.00 15.00 5.00 108741 RPB 2002 03 02 10 30 00 1284-91 D sf6 CCGG 5.020 0.070 ... H4 2002 03 18 13 36 00 13.1650 -59.4320 20.00 15.00 5.00 108742 RPB 2002 03 11 10 20 00 4319-91 D sf6 CCGG 5.020 0.070 ... H4 2002 03 18 13 49 00 13.1650 -59.4320 20.00 15.00 5.00 108743 RPB 2002 03 11 10 20 00 4320-91 D sf6 CCGG 4.970 0.070 ... H4 2002 03 18 14 02 00 13.1650 -59.4320 20.00 15.00 5.00 108744 RPB 2002 03 18 10 25 00 1747-91 D sf6 CCGG 5.080 0.070 ... H4 2002 03 28 14 27 00 13.1650 -59.4320 20.00 15.00 5.00 108745 RPB 2002 03 18 10 25 00 1748-91 D sf6 CCGG 5.070 0.070 ... H4 2002 03 28 14 40 00 13.1650 -59.4320 20.00 15.00 5.00 108746 RPB 2002 03 25 10 30 00 4655-91 D sf6 CCGG 4.990 0.070 ... H4 2002 03 28 13 07 00 13.1650 -59.4320 20.00 15.00 5.00 108747 RPB 2002 03 25 10 30 00 4656-91 D sf6 CCGG 5.090 0.070 ... H4 2002 03 28 13 20 00 13.1650 -59.4320 20.00 15.00 5.00 108748 RPB 2002 04 01 10 40 00 249-91 D sf6 CCGG 5.030 0.070 ... H4 2002 04 22 09 44 00 13.1650 -59.4320 20.00 15.00 5.00 108749 RPB 2002 04 01 10 40 00 250-91 D sf6 CCGG 5.050 0.070 ... H4 2002 04 22 09 57 00 13.1650 -59.4320 20.00 15.00 5.00 108750 RPB 2002 04 09 10 15 00 4621-91 D sf6 CCGG 5.090 0.070 ... H4 2002 04 22 11 57 00 13.1650 -59.4320 20.00 15.00 5.00 108751 RPB 2002 04 09 10 15 00 4622-91 D sf6 CCGG 4.950 0.070 ... H4 2002 04 22 12 10 00 13.1650 -59.4320 20.00 15.00 5.00 108752 RPB 2002 04 15 10 15 00 1193-91 D sf6 CCGG 5.020 0.070 ... H4 2002 05 13 11 38 00 13.1650 -59.4320 20.00 15.00 5.00 108753 RPB 2002 04 15 10 15 00 1194-91 D sf6 CCGG 5.030 0.070 ... H4 2002 05 13 11 51 00 13.1650 -59.4320 20.00 15.00 5.00 108754 RPB 2002 04 21 10 15 00 159-91 D sf6 CCGG 5.040 0.070 ... H4 2002 05 13 13 25 00 13.1650 -59.4320 20.00 15.00 5.00 108755 RPB 2002 04 21 10 15 00 160-91 D sf6 CCGG 5.060 0.070 ... H4 2002 05 13 13 38 00 13.1650 -59.4320 20.00 15.00 5.00 108756 RPB 2002 05 01 10 15 00 4797-91 D sf6 CCGG 5.120 0.070 ... H4 2002 05 13 12 59 00 13.1650 -59.4320 20.00 15.00 5.00 108757 RPB 2002 05 01 10 15 00 4798-91 D sf6 CCGG 5.080 0.070 ... H4 2002 05 13 13 12 00 13.1650 -59.4320 20.00 15.00 5.00 108758 RPB 2002 05 08 20 10 00 577-99 D sf6 CCGG 5.050 0.070 ... H4 2002 05 29 16 10 00 13.1650 -59.4320 20.00 15.00 5.00 108759 RPB 2002 05 08 20 10 00 578-99 D sf6 CCGG 5.000 0.070 ... H4 2002 05 29 16 23 00 13.1650 -59.4320 20.00 15.00 5.00 108760 RPB 2002 05 15 10 15 00 1391-91 D sf6 CCGG 5.040 0.070 ... H4 2002 05 29 16 36 00 13.1650 -59.4320 20.00 15.00 5.00 108761 RPB 2002 05 15 10 15 00 1392-91 D sf6 CCGG 5.040 0.070 ... H4 2002 05 29 16 49 00 13.1650 -59.4320 20.00 15.00 5.00 108762 RPB 2002 05 29 10 15 00 409-99 D sf6 CCGG 5.030 0.070 ... H4 2002 06 12 10 54 00 13.1650 -59.4320 20.00 15.00 5.00 108763 RPB 2002 05 29 10 15 00 410-99 D sf6 CCGG 5.070 0.070 ... H4 2002 06 12 11 07 00 13.1650 -59.4320 20.00 15.00 5.00 108764 RPB 2002 06 05 10 15 00 477-99 D sf6 CCGG 5.040 0.070 ... H4 2002 06 12 11 21 00 13.1650 -59.4320 20.00 15.00 5.00 108765 RPB 2002 06 05 10 15 00 478-99 D sf6 CCGG 5.050 0.070 ... H4 2002 06 12 11 34 00 13.1650 -59.4320 20.00 15.00 5.00 108766 RPB 2002 06 12 10 15 00 4135-91 D sf6 CCGG 5.040 0.070 ... H4 2002 07 16 15 24 00 13.1650 -59.4320 20.00 15.00 5.00 108767 RPB 2002 06 12 10 15 00 4136-91 D sf6 CCGG 5.070 0.070 ... H4 2002 07 16 15 37 00 13.1650 -59.4320 20.00 15.00 5.00 108768 RPB 2002 06 21 10 15 00 593-99 D sf6 CCGG 5.120 0.070 ... H4 2002 07 16 16 16 00 13.1650 -59.4320 20.00 15.00 5.00 108769 RPB 2002 06 21 10 15 00 594-99 D sf6 CCGG 5.050 0.070 ... H4 2002 07 16 16 29 00 13.1650 -59.4320 20.00 15.00 5.00 108770 RPB 2002 06 26 10 15 00 4795-91 D sf6 CCGG 5.130 0.070 ... H4 2002 07 16 14 57 00 13.1650 -59.4320 20.00 15.00 5.00 108771 RPB 2002 06 26 10 15 00 4796-91 D sf6 CCGG 5.100 0.070 ... H4 2002 07 16 15 11 00 13.1650 -59.4320 20.00 15.00 5.00 108772 RPB 2002 07 04 10 15 00 6025-66 D sf6 CCGG 5.050 0.070 ... H4 2002 07 16 12 43 00 13.1650 -59.4320 20.00 15.00 5.00 108773 RPB 2002 07 04 10 15 00 6026-66 D sf6 CCGG 5.070 0.070 ... H4 2002 07 16 12 56 00 13.1650 -59.4320 20.00 15.00 5.00 108774 RPB 2002 07 10 10 15 00 6345-66 D sf6 CCGG 5.160 0.070 ... H4 2002 07 16 12 17 00 13.1650 -59.4320 20.00 15.00 5.00 108775 RPB 2002 07 10 10 15 00 6346-66 D sf6 CCGG 5.130 0.070 ... H4 2002 07 16 12 30 00 13.1650 -59.4320 20.00 15.00 5.00 108776 RPB 2002 07 17 10 15 00 711-91 D sf6 CCGG 5.120 0.070 ... H4 2002 07 30 13 22 00 13.1650 -59.4320 20.00 15.00 5.00 108777 RPB 2002 07 17 10 15 00 712-91 D sf6 CCGG 5.110 0.070 ... H4 2002 07 30 13 35 00 13.1650 -59.4320 20.00 15.00 5.00 108778 RPB 2002 07 24 12 30 00 4613-91 D sf6 CCGG 5.100 0.070 ... H4 2002 07 30 15 15 00 13.1650 -59.4320 20.00 15.00 5.00 108779 RPB 2002 07 24 12 30 00 4614-91 D sf6 CCGG 5.170 0.070 ... H4 2002 07 30 15 28 00 13.1650 -59.4320 20.00 15.00 5.00 108780 RPB 2002 07 31 10 15 00 427-99 D sf6 CCGG 5.060 0.070 ... H4 2002 08 13 12 43 00 13.1650 -59.4320 20.00 15.00 5.00 108781 RPB 2002 07 31 10 15 00 428-99 D sf6 CCGG 5.050 0.070 ... H4 2002 08 13 12 56 00 13.1650 -59.4320 20.00 15.00 5.00 108782 RPB 2002 08 07 12 10 00 695-99 D sf6 CCGG 5.040 0.070 ... H4 2002 08 13 11 51 00 13.1650 -59.4320 20.00 15.00 5.00 108783 RPB 2002 08 07 12 10 00 696-99 D sf6 CCGG 5.090 0.070 ... H4 2002 08 13 12 04 00 13.1650 -59.4320 20.00 15.00 5.00 108784 RPB 2002 08 15 10 20 00 271-99 D sf6 CCGG 5.100 0.070 ... H4 2002 08 27 10 04 00 13.1650 -59.4320 20.00 15.00 5.00 108785 RPB 2002 08 15 10 20 00 272-99 D sf6 CCGG 5.100 0.070 ... H4 2002 08 27 10 17 00 13.1650 -59.4320 20.00 15.00 5.00 108786 RPB 2002 08 21 10 20 00 585-99 D sf6 CCGG 5.010 0.070 ... H4 2002 08 27 09 38 00 13.1650 -59.4320 20.00 15.00 5.00 108787 RPB 2002 08 21 10 20 00 586-99 D sf6 CCGG 5.090 0.070 ... H4 2002 08 27 09 51 00 13.1650 -59.4320 20.00 15.00 5.00 108788 RPB 2002 08 28 10 20 00 327-99 D sf6 CCGG 5.120 0.070 ... H4 2002 09 16 09 41 00 13.1650 -59.4320 20.00 15.00 5.00 108789 RPB 2002 08 28 10 20 00 328-99 D sf6 CCGG 5.150 0.070 ... H4 2002 09 16 09 54 00 13.1650 -59.4320 20.00 15.00 5.00 108790 RPB 2002 09 04 10 15 00 4209-91 D sf6 CCGG 5.100 0.070 ... H4 2002 09 16 10 07 00 13.1650 -59.4320 20.00 15.00 5.00 108791 RPB 2002 09 04 10 15 00 4210-91 D sf6 CCGG 5.050 0.070 ... H4 2002 09 16 10 20 00 13.1650 -59.4320 20.00 15.00 5.00 108792 RPB 2002 09 11 18 45 00 619-99 D sf6 CCGG 5.130 0.070 ... H4 2002 09 25 10 41 00 13.1650 -59.4320 20.00 15.00 5.00 108793 RPB 2002 09 11 18 45 00 620-99 D sf6 CCGG 5.060 0.070 ... H4 2002 09 25 10 54 00 13.1650 -59.4320 20.00 15.00 5.00 108794 RPB 2002 09 18 10 55 00 4723-91 D sf6 CCGG 4.960 0.070 ... H4 2002 09 25 11 33 00 13.1650 -59.4320 20.00 15.00 5.00 108795 RPB 2002 09 18 10 55 00 4724-91 D sf6 CCGG 4.930 0.070 ... H4 2002 09 25 11 46 00 13.1650 -59.4320 20.00 15.00 5.00 108796 RPB 2002 09 25 10 25 00 381-99 D sf6 CCGG 5.150 0.070 ... H4 2002 10 08 14 02 00 13.1650 -59.4320 20.00 15.00 5.00 108797 RPB 2002 09 25 10 25 00 382-99 D sf6 CCGG 5.190 0.070 ... H4 2002 10 08 14 15 00 13.1650 -59.4320 20.00 15.00 5.00 108798 RPB 2002 10 02 10 20 00 1169-91 D sf6 CCGG 4.960 0.070 ... H4 2002 10 08 13 36 00 13.1650 -59.4320 20.00 15.00 5.00 108799 RPB 2002 10 02 10 20 00 1170-91 D sf6 CCGG 5.040 0.070 ... H4 2002 10 08 13 49 00 13.1650 -59.4320 20.00 15.00 5.00 108800 RPB 2002 10 09 10 30 00 459-99 D sf6 CCGG 5.000 0.070 ... H4 2002 10 28 14 28 00 13.1650 -59.4320 20.00 15.00 5.00 108801 RPB 2002 10 09 10 30 00 460-99 D sf6 CCGG 5.030 0.070 ... H4 2002 10 28 14 41 00 13.1650 -59.4320 20.00 15.00 5.00 108802 RPB 2002 10 16 18 20 00 1137-91 D sf6 CCGG 5.120 0.070 ... H4 2002 10 28 14 02 00 13.1650 -59.4320 20.00 15.00 5.00 108803 RPB 2002 10 16 18 20 00 1138-91 D sf6 CCGG 5.090 0.070 ... H4 2002 10 28 14 15 00 13.1650 -59.4320 20.00 15.00 5.00 108804 RPB 2002 10 23 18 30 00 1369-91 D sf6 CCGG 4.970 0.070 ... H4 2002 11 05 10 49 00 13.1650 -59.4320 20.00 15.00 5.00 108805 RPB 2002 10 23 18 30 00 1370-91 D sf6 CCGG 5.060 0.070 ... H4 2002 11 05 11 02 00 13.1650 -59.4320 20.00 15.00 5.00 108806 RPB 2002 10 30 10 20 00 1759-91 D sf6 CCGG 5.150 0.070 ... H4 2002 11 05 12 15 00 13.1650 -59.4320 20.00 15.00 5.00 108807 RPB 2002 10 30 10 20 00 1760-91 D sf6 CCGG 5.160 0.070 ... H4 2002 11 05 12 28 00 13.1650 -59.4320 20.00 15.00 5.00 108808 RPB 2002 11 06 10 20 00 613-91 D sf6 CCGG 5.210 0.070 ... H4 2002 11 18 15 58 00 13.1650 -59.4320 20.00 15.00 5.00 108809 RPB 2002 11 06 10 20 00 614-91 D sf6 CCGG 5.130 0.070 ... H4 2002 11 18 16 11 00 13.1650 -59.4320 20.00 15.00 5.00 108810 RPB 2002 11 13 12 45 00 4881-91 D sf6 CCGG 5.150 0.070 ... H4 2002 11 18 15 32 00 13.1650 -59.4320 20.00 15.00 5.00 108811 RPB 2002 11 13 12 45 00 4882-91 D sf6 CCGG 5.160 0.070 ... H4 2002 11 18 15 45 00 13.1650 -59.4320 20.00 15.00 5.00 108812 RPB 2002 11 20 10 40 00 1969-91 D sf6 CCGG 5.140 0.070 ... H4 2002 12 04 14 08 00 13.1650 -59.4320 20.00 15.00 5.00 108813 RPB 2002 11 20 10 40 00 1970-91 D sf6 CCGG 5.160 0.070 ... H4 2002 12 04 14 21 00 13.1650 -59.4320 20.00 15.00 5.00 108814 RPB 2002 11 27 19 50 00 4859-91 D sf6 CCGG 5.190 0.070 ... H4 2002 12 04 13 42 00 13.1650 -59.4320 20.00 15.00 5.00 108815 RPB 2002 11 27 19 50 00 4860-91 D sf6 CCGG 5.130 0.070 ... H4 2002 12 04 13 55 00 13.1650 -59.4320 20.00 15.00 5.00 108816 RPB 2002 12 05 10 20 00 349-99 D sf6 CCGG 5.170 0.070 ... H4 2002 12 17 16 14 00 13.1650 -59.4320 20.00 15.00 5.00 108817 RPB 2002 12 05 10 20 00 350-99 D sf6 CCGG 5.200 0.070 ... H4 2002 12 17 16 27 00 13.1650 -59.4320 20.00 15.00 5.00 108818 RPB 2002 12 12 10 45 00 509-99 D sf6 CCGG 5.170 0.070 ... H4 2002 12 17 16 40 00 13.1650 -59.4320 20.00 15.00 5.00 108819 RPB 2002 12 12 10 45 00 510-99 D sf6 CCGG 5.220 0.070 ... H4 2002 12 17 16 53 00 13.1650 -59.4320 20.00 15.00 5.00 108820 RPB 2002 12 20 10 35 00 571-99 D sf6 CCGG 5.150 0.070 ... H4 2003 01 09 12 28 00 13.1650 -59.4320 20.00 15.00 5.00 108821 RPB 2002 12 20 10 35 00 572-99 D sf6 CCGG 5.100 0.070 ... H4 2003 01 09 12 41 00 13.1650 -59.4320 20.00 15.00 5.00 108822 RPB 2002 12 29 10 25 00 677-99 D sf6 CCGG 5.180 0.070 ... H4 2003 01 09 12 02 00 13.1650 -59.4320 20.00 15.00 5.00 108823 RPB 2002 12 29 10 25 00 678-99 D sf6 CCGG 5.140 0.070 ... H4 2003 01 09 12 15 00 13.1650 -59.4320 20.00 15.00 5.00 108824 RPB 2003 01 05 10 20 00 1085-91 D sf6 CCGG 5.130 0.070 ... H4 2003 01 27 14 32 00 13.1650 -59.4320 20.00 15.00 5.00 108825 RPB 2003 01 05 10 20 00 1086-91 D sf6 CCGG 5.070 0.070 ... H4 2003 01 27 14 45 00 13.1650 -59.4320 20.00 15.00 5.00 108826 RPB 2003 01 12 10 40 00 4095-91 D sf6 CCGG 5.210 0.070 ... H4 2003 01 27 14 06 00 13.1650 -59.4320 20.00 15.00 5.00 108827 RPB 2003 01 12 10 40 00 4096-91 D sf6 CCGG 5.150 0.070 ... H4 2003 01 27 14 19 00 13.1650 -59.4320 20.00 15.00 5.00 108828 RPB 2003 01 18 10 30 00 525-91 D sf6 CCGG 5.160 0.070 ... H4 2003 02 03 09 34 00 13.1650 -59.4320 20.00 15.00 5.00 108829 RPB 2003 01 18 10 30 00 526-91 D sf6 CCGG 5.180 0.070 ... H4 2003 02 03 09 47 00 13.1650 -59.4320 20.00 15.00 5.00 108830 RPB 2003 01 26 10 35 00 1205-91 D sf6 CCGG 5.210 0.070 ... H4 2003 02 03 10 27 00 13.1650 -59.4320 20.00 15.00 5.00 108831 RPB 2003 01 26 10 35 00 1206-91 D sf6 CCGG 5.210 0.070 ... H4 2003 02 03 10 40 00 13.1650 -59.4320 20.00 15.00 5.00 108832 RPB 2003 02 03 10 20 00 4193-91 D sf6 CCGG 5.210 0.070 ... H4 2003 02 12 14 30 00 13.1650 -59.4320 20.00 15.00 5.00 108833 RPB 2003 02 03 10 20 00 4194-91 D sf6 CCGG 5.180 0.070 ... H4 2003 02 12 14 43 00 13.1650 -59.4320 20.00 15.00 5.00 108834 RPB 2003 02 09 10 40 00 4585-91 D sf6 CCGG 5.260 0.070 ... H4 2003 02 12 15 48 00 13.1650 -59.4320 20.00 15.00 5.00 108835 RPB 2003 02 09 10 40 00 4586-91 D sf6 CCGG 5.230 0.070 ... H4 2003 02 12 16 01 00 13.1650 -59.4320 20.00 15.00 5.00 108836 RPB 2003 02 16 10 25 00 4111-91 D sf6 CCGG 5.180 0.070 ... H4 2003 03 05 17 21 00 13.1650 -59.4320 20.00 15.00 5.00 108837 RPB 2003 02 16 10 25 00 4112-91 D sf6 CCGG 5.250 0.070 ... H4 2003 03 05 17 34 00 13.1650 -59.4320 20.00 15.00 5.00 108838 RPB 2003 02 23 10 20 00 4939-91 D sf6 CCGG 5.170 0.070 ... H4 2003 03 05 16 49 00 13.1650 -59.4320 20.00 15.00 5.00 108839 RPB 2003 02 23 10 20 00 4940-91 D sf6 CCGG 5.200 0.070 ... H4 2003 03 05 17 02 00 13.1650 -59.4320 20.00 15.00 5.00 108840 RPB 2003 03 03 10 20 00 227-99 D sf6 CCGG 5.160 0.070 ... H4 2003 03 21 09 48 00 13.1650 -59.4320 20.00 15.00 5.00 108841 RPB 2003 03 03 10 20 00 228-99 D sf6 CCGG 5.240 0.070 ... H4 2003 03 21 10 01 00 13.1650 -59.4320 20.00 15.00 5.00 108842 RPB 2003 03 10 11 00 00 1909-91 D sf6 CCGG 5.150 0.070 ... H4 2003 03 21 09 22 00 13.1650 -59.4320 20.00 15.00 5.00 108843 RPB 2003 03 10 11 00 00 1910-91 D sf6 CCGG 5.140 0.070 ... H4 2003 03 21 09 35 00 13.1650 -59.4320 20.00 15.00 5.00 108844 RPB 2003 03 17 10 15 00 227-91 D sf6 CCGG 5.240 0.070 ... H4 2003 04 07 12 14 00 13.1650 -59.4320 20.00 15.00 5.00 108845 RPB 2003 03 17 10 15 00 228-91 D sf6 CCGG 5.190 0.070 ... H4 2003 04 07 12 27 00 13.1650 -59.4320 20.00 15.00 5.00 108846 RPB 2003 03 24 10 20 00 1035-99 D sf6 CCGG 5.240 0.070 ... H4 2003 04 07 13 32 00 13.1650 -59.4320 20.00 15.00 5.00 108847 RPB 2003 03 24 10 20 00 1036-99 D sf6 CCGG 5.200 0.070 ... H4 2003 04 07 13 45 00 13.1650 -59.4320 20.00 15.00 5.00 108848 RPB 2003 03 31 10 15 00 491-99 D sf6 CCGG 5.270 0.070 ... H4 2003 04 15 13 28 00 13.1650 -59.4320 20.00 15.00 5.00 108849 RPB 2003 03 31 10 15 00 492-99 D sf6 CCGG 5.320 0.070 ... H4 2003 04 15 13 41 00 13.1650 -59.4320 20.00 15.00 5.00 108850 RPB 2003 04 08 10 15 00 525-91 D sf6 CCGG 5.160 0.070 ... H4 2003 04 15 12 36 00 13.1650 -59.4320 20.00 15.00 5.00 108851 RPB 2003 04 08 10 15 00 526-91 D sf6 CCGG 5.260 0.070 ... H4 2003 04 15 12 49 00 13.1650 -59.4320 20.00 15.00 5.00 108852 RPB 2003 04 15 10 20 00 1149-99 D sf6 CCGG 5.320 0.070 ... H4 2003 05 06 12 32 00 13.1650 -59.4320 20.00 15.00 5.00 108853 RPB 2003 04 15 10 20 00 1150-99 D sf6 CCGG 5.270 0.070 ... H4 2003 05 06 12 45 00 13.1650 -59.4320 20.00 15.00 5.00 108854 RPB 2003 04 23 10 25 00 1235-99 D sf6 CCGG 5.220 0.070 ... H4 2003 05 06 12 58 00 13.1650 -59.4320 20.00 15.00 5.00 108855 RPB 2003 04 23 10 25 00 1236-99 D sf6 CCGG 5.250 0.070 ... H4 2003 05 06 13 11 00 13.1650 -59.4320 20.00 15.00 5.00 108856 RPB 2003 04 30 10 20 00 373-91 D sf6 CCGG 5.240 0.050 ... H4 2003 05 28 11 47 00 13.1650 -59.4320 20.00 15.00 5.00 108857 RPB 2003 04 30 10 20 00 374-91 D sf6 CCGG 5.310 0.050 ... H4 2003 05 28 12 00 00 13.1650 -59.4320 20.00 15.00 5.00 108858 RPB 2003 05 07 10 15 00 1579-91 D sf6 CCGG 5.230 0.050 ... H4 2003 05 28 12 14 00 13.1650 -59.4320 20.00 15.00 5.00 108859 RPB 2003 05 07 10 15 00 1580-91 D sf6 CCGG 5.240 0.050 ... H4 2003 05 28 12 27 00 13.1650 -59.4320 20.00 15.00 5.00 108860 RPB 2003 05 28 10 35 00 273-91 D sf6 CCGG 5.250 0.050 ... H4 2003 06 17 10 12 00 13.1650 -59.4320 20.00 15.00 5.00 108861 RPB 2003 05 28 10 35 00 274-91 D sf6 CCGG 5.270 0.050 ... H4 2003 06 17 10 25 00 13.1650 -59.4320 20.00 15.00 5.00 108862 RPB 2003 06 04 10 15 00 1291-91 D sf6 CCGG 4.940 0.050 A.. H4 2003 06 17 09 20 00 13.1650 -59.4320 20.00 15.00 5.00 108863 RPB 2003 06 04 10 15 00 1292-91 D sf6 CCGG 5.350 0.050 ... H4 2003 06 17 09 33 00 13.1650 -59.4320 20.00 15.00 5.00 108864 RPB 2003 06 11 10 25 00 983-99 D sf6 CCGG 5.380 0.050 ... H4 2003 06 25 16 17 00 13.1650 -59.4320 20.00 15.00 5.00 108865 RPB 2003 06 11 10 25 00 984-99 D sf6 CCGG 5.330 0.050 ... H4 2003 06 25 16 30 00 13.1650 -59.4320 20.00 15.00 5.00 108866 RPB 2003 06 16 02 15 00 1353-99 D sf6 CCGG 5.390 0.050 ... H4 2003 06 25 15 51 00 13.1650 -59.4320 20.00 15.00 5.00 108867 RPB 2003 06 16 02 15 00 1354-99 D sf6 CCGG 5.390 0.050 ... H4 2003 06 25 16 04 00 13.1650 -59.4320 20.00 15.00 5.00 108868 RPB 2003 06 25 10 15 00 5-99 D sf6 CCGG 5.280 0.050 ... H4 2003 07 14 11 50 00 13.1650 -59.4320 20.00 15.00 5.00 108869 RPB 2003 06 25 10 15 00 6-99 D sf6 CCGG 5.310 0.050 ... H4 2003 07 14 12 03 00 13.1650 -59.4320 20.00 15.00 5.00 108870 RPB 2003 07 02 10 15 00 641-99 D sf6 CCGG 5.340 0.050 ... H4 2003 07 14 11 24 00 13.1650 -59.4320 20.00 15.00 5.00 108871 RPB 2003 07 02 10 15 00 642-99 D sf6 CCGG 5.440 0.050 ... H4 2003 07 14 11 37 00 13.1650 -59.4320 20.00 15.00 5.00 108872 RPB 2003 07 09 10 15 00 1105-91 D sf6 CCGG 5.430 0.050 ... H4 2003 07 29 14 48 00 13.1650 -59.4320 20.00 15.00 5.00 108873 RPB 2003 07 09 10 15 00 1106-91 D sf6 CCGG 5.500 0.050 ... H4 2003 07 29 15 01 00 13.1650 -59.4320 20.00 15.00 5.00 108874 RPB 2003 07 16 10 20 00 4601-91 D sf6 CCGG 5.410 0.050 ... H4 2003 07 29 12 43 00 13.1650 -59.4320 20.00 15.00 5.00 108875 RPB 2003 07 16 10 20 00 4602-91 D sf6 CCGG 5.380 0.050 ... H4 2003 07 29 12 56 00 13.1650 -59.4320 20.00 15.00 5.00 108876 RPB 2003 07 23 10 20 00 127-99 D sf6 CCGG 5.430 0.050 ... H4 2003 08 15 12 30 00 13.1650 -59.4320 20.00 15.00 5.00 108877 RPB 2003 07 23 10 20 00 128-99 D sf6 CCGG 5.430 0.050 ... H4 2003 08 15 12 43 00 13.1650 -59.4320 20.00 15.00 5.00 108878 RPB 2003 07 30 10 20 00 1407-99 D sf6 CCGG 5.410 0.050 ... H4 2003 08 14 17 42 00 13.1650 -59.4320 20.00 15.00 5.00 108879 RPB 2003 07 30 10 20 00 1408-99 D sf6 CCGG 5.390 0.050 ... H4 2003 08 14 17 55 00 13.1650 -59.4320 20.00 15.00 5.00 108880 RPB 2003 08 13 10 20 00 53-99 D sf6 CCGG 5.370 0.050 ... H4 2003 08 27 14 25 00 13.1650 -59.4320 20.00 15.00 5.00 108881 RPB 2003 08 13 10 20 00 54-99 D sf6 CCGG 5.320 0.050 ... H4 2003 08 27 14 38 00 13.1650 -59.4320 20.00 15.00 5.00 108882 RPB 2003 08 21 10 20 00 579-91 D sf6 CCGG 5.410 0.050 ... H4 2003 09 02 13 04 00 13.1650 -59.4320 20.00 15.00 5.00 108883 RPB 2003 08 21 10 20 00 580-91 D sf6 CCGG 5.350 0.050 ... H4 2003 09 02 13 17 00 13.1650 -59.4320 20.00 15.00 5.00 108884 RPB 2003 08 27 10 15 00 4379-91 D sf6 CCGG 5.330 0.050 ... H4 2003 09 02 12 37 00 13.1650 -59.4320 20.00 15.00 5.00 108885 RPB 2003 08 27 10 15 00 4380-91 D sf6 CCGG 5.320 0.050 ... H4 2003 09 02 12 51 00 13.1650 -59.4320 20.00 15.00 5.00 108886 RPB 2003 09 03 20 50 00 389-99 D sf6 CCGG 5.280 0.050 ... H4 2003 09 15 18 42 00 13.1650 -59.4320 20.00 15.00 5.00 108887 RPB 2003 09 03 20 50 00 390-99 D sf6 CCGG 5.260 0.050 ... H4 2003 09 15 18 55 00 13.1650 -59.4320 20.00 15.00 5.00 108888 RPB 2003 09 10 11 15 00 411-99 D sf6 CCGG 5.390 0.050 ... H4 2003 09 15 19 08 00 13.1650 -59.4320 20.00 15.00 5.00 108889 RPB 2003 09 10 11 15 00 412-99 D sf6 CCGG 5.420 0.050 ... H4 2003 09 15 19 21 00 13.1650 -59.4320 20.00 15.00 5.00 108890 RPB 2003 09 17 10 15 00 951-99 D sf6 CCGG 5.350 0.050 ... H4 2003 10 01 10 41 00 13.1650 -59.4320 20.00 15.00 5.00 108891 RPB 2003 09 17 10 15 00 952-99 D sf6 CCGG 5.340 0.050 ... H4 2003 10 01 10 54 00 13.1650 -59.4320 20.00 15.00 5.00 108892 RPB 2003 09 24 10 30 00 1695-91 D sf6 CCGG 5.350 0.050 ... H4 2003 10 01 11 33 00 13.1650 -59.4320 20.00 15.00 5.00 108893 RPB 2003 09 24 10 30 00 1696-91 D sf6 CCGG 5.370 0.050 ... H4 2003 10 01 11 46 00 13.1650 -59.4320 20.00 15.00 5.00 108894 RPB 2003 10 04 10 15 00 1149-99 D sf6 CCGG 5.330 0.050 ... H4 2003 10 15 11 02 00 13.1650 -59.4320 20.00 15.00 5.00 108895 RPB 2003 10 04 10 15 00 1150-99 D sf6 CCGG 5.260 0.050 ... H4 2003 10 15 11 15 00 13.1650 -59.4320 20.00 15.00 5.00 108896 RPB 2003 10 09 10 55 00 1407-91 D sf6 CCGG 5.390 0.050 ... H4 2003 10 14 17 33 00 13.1650 -59.4320 20.00 15.00 5.00 108897 RPB 2003 10 09 10 55 00 1408-91 D sf6 CCGG 5.380 0.050 ... H4 2003 10 14 17 46 00 13.1650 -59.4320 20.00 15.00 5.00 108898 RPB 2003 10 15 10 45 00 985-99 D sf6 CCGG 5.410 0.050 ... H4 2003 10 29 16 33 00 13.1650 -59.4320 20.00 15.00 5.00 108899 RPB 2003 10 15 10 45 00 986-99 D sf6 CCGG 5.450 0.050 ... H4 2003 10 29 16 47 00 13.1650 -59.4320 20.00 15.00 5.00 108900 RPB 2003 10 22 10 15 00 1521-99 D sf6 CCGG 5.490 0.050 ... H4 2003 10 29 17 00 00 13.1650 -59.4320 20.00 15.00 5.00 108901 RPB 2003 10 22 10 15 00 1522-99 D sf6 CCGG 5.490 0.050 ... H4 2003 10 29 17 13 00 13.1650 -59.4320 20.00 15.00 5.00 108902 RPB 2003 11 01 10 15 00 1161-91 D sf6 CCGG 5.420 0.050 ... H4 2003 12 09 12 45 00 13.1650 -59.4320 20.00 15.00 5.00 108903 RPB 2003 11 01 10 15 00 1162-91 D sf6 CCGG 5.350 0.050 ... H4 2003 12 09 12 58 00 13.1650 -59.4320 20.00 15.00 5.00 108904 RPB 2003 11 08 10 25 00 4763-91 D sf6 CCGG 5.360 0.050 ... H4 2003 12 09 12 19 00 13.1650 -59.4320 20.00 15.00 5.00 108905 RPB 2003 11 08 10 25 00 4764-91 D sf6 CCGG 5.420 0.050 ... H4 2003 12 09 12 32 00 13.1650 -59.4320 20.00 15.00 5.00 108906 RPB 2003 11 15 10 20 00 2075-99 D sf6 CCGG 5.280 0.050 ... H4 2003 12 09 11 53 00 13.1650 -59.4320 20.00 15.00 5.00 108907 RPB 2003 11 15 10 20 00 2076-99 D sf6 CCGG 5.290 0.050 ... H4 2003 12 09 12 06 00 13.1650 -59.4320 20.00 15.00 5.00 108908 RPB 2003 11 22 10 35 00 2079-99 D sf6 CCGG 5.350 0.050 ... H4 2003 12 09 11 27 00 13.1650 -59.4320 20.00 15.00 5.00 108909 RPB 2003 11 22 10 35 00 2080-99 D sf6 CCGG 5.310 0.050 ... H4 2003 12 09 11 40 00 13.1650 -59.4320 20.00 15.00 5.00 108910 RPB 2003 11 26 10 25 00 245-99 D sf6 CCGG 5.480 0.050 ... H4 2003 12 11 12 50 00 13.1650 -59.4320 20.00 15.00 5.00 108911 RPB 2003 11 26 10 25 00 246-99 D sf6 CCGG 5.400 0.050 ... H4 2003 12 11 13 03 00 13.1650 -59.4320 20.00 15.00 5.00 108912 RPB 2003 12 03 10 25 00 1457-99 D sf6 CCGG 5.370 0.050 ... H4 2003 12 11 12 24 00 13.1650 -59.4320 20.00 15.00 5.00 108913 RPB 2003 12 03 10 25 00 1458-99 D sf6 CCGG 5.490 0.050 ... H4 2003 12 11 12 37 00 13.1650 -59.4320 20.00 15.00 5.00 108914 RPB 2003 12 10 14 15 00 1743-99 D sf6 CCGG 5.340 0.050 ... H4 2004 01 07 10 07 00 13.1650 -59.4320 20.00 15.00 5.00 108915 RPB 2003 12 10 14 15 00 1744-99 D sf6 CCGG 5.450 0.050 ... H4 2004 01 07 10 20 00 13.1650 -59.4320 20.00 15.00 5.00 108916 RPB 2003 12 17 10 40 00 2183-99 D sf6 CCGG 5.420 0.050 ... H4 2004 01 07 10 35 00 13.1650 -59.4320 20.00 15.00 5.00 108917 RPB 2003 12 17 10 40 00 2184-99 D sf6 CCGG 5.330 0.050 ... H4 2004 01 07 10 48 00 13.1650 -59.4320 20.00 15.00 5.00 108918 RPB 2003 12 27 10 25 00 1677-91 D sf6 CCGG 5.500 0.050 ... H4 2004 01 14 17 41 00 13.1650 -59.4320 20.00 15.00 5.00 108919 RPB 2003 12 27 10 25 00 1678-91 D sf6 CCGG 5.480 0.050 ... H4 2004 01 14 17 54 00 13.1650 -59.4320 20.00 15.00 5.00 108920 RPB 2004 01 04 17 00 00 4967-91 D sf6 CCGG 5.450 0.050 ... H4 2004 01 14 19 21 00 13.1650 -59.4320 20.00 15.00 5.00 108921 RPB 2004 01 04 17 00 00 4968-91 D sf6 CCGG 5.430 0.050 ... H4 2004 01 14 19 34 00 13.1650 -59.4320 20.00 15.00 5.00 108922 RPB 2004 01 11 10 30 00 819-99 D sf6 CCGG 5.430 0.050 ... H4 2004 02 03 15 23 00 13.1650 -59.4320 20.00 15.00 5.00 108923 RPB 2004 01 11 10 30 00 820-99 D sf6 CCGG 5.380 0.050 ... H4 2004 02 03 15 36 00 13.1650 -59.4320 20.00 15.00 5.00 108924 RPB 2004 01 19 20 10 00 2043-99 D sf6 CCGG 5.460 0.050 ... H4 2004 02 03 14 57 00 13.1650 -59.4320 20.00 15.00 5.00 108925 RPB 2004 01 19 20 10 00 2044-99 D sf6 CCGG 5.460 0.050 ... H4 2004 02 03 15 10 00 13.1650 -59.4320 20.00 15.00 5.00 108926 RPB 2004 01 26 16 00 00 25-98 D sf6 CCGG 5.440 0.050 ... H4 2004 02 17 12 19 00 13.1650 -59.4320 20.00 15.00 5.00 108927 RPB 2004 01 26 16 00 00 26-98 D sf6 CCGG 5.430 0.050 ... H4 2004 02 17 12 32 00 13.1650 -59.4320 20.00 15.00 5.00 108928 RPB 2004 02 04 15 15 00 1821-99 D sf6 CCGG 5.460 0.050 ... H4 2004 02 17 11 34 00 13.1650 -59.4320 20.00 15.00 5.00 108929 RPB 2004 02 04 15 15 00 1822-99 D sf6 CCGG 5.430 0.050 ... H4 2004 02 17 11 47 00 13.1650 -59.4320 20.00 15.00 5.00 108930 RPB 2004 02 14 15 15 00 2417-99 D sf6 CCGG 5.550 0.050 ... H4 2004 03 01 10 12 00 13.1650 -59.4320 20.00 15.00 5.00 108931 RPB 2004 02 14 15 15 00 2418-99 D sf6 CCGG 5.520 0.050 ... H4 2004 03 01 10 25 00 13.1650 -59.4320 20.00 15.00 5.00 108932 RPB 2004 02 20 17 48 00 2419-99 D sf6 CCGG 5.480 0.050 ... H4 2004 03 01 10 43 00 13.1650 -59.4320 20.00 15.00 5.00 108933 RPB 2004 02 20 17 48 00 2420-99 D sf6 CCGG 5.510 0.050 ... H4 2004 03 01 10 56 00 13.1650 -59.4320 20.00 15.00 5.00 108934 RPB 2004 02 29 17 05 00 2527-99 D sf6 CCGG 5.530 0.050 ... H4 2004 03 16 11 45 00 13.1650 -59.4320 20.00 15.00 5.00 108935 RPB 2004 02 29 17 05 00 2528-99 D sf6 CCGG 5.480 0.050 ... H4 2004 03 16 11 58 00 13.1650 -59.4320 20.00 15.00 5.00 108936 RPB 2004 03 06 15 30 00 2541-99 D sf6 CCGG 5.610 0.050 ... H4 2004 03 16 11 19 00 13.1650 -59.4320 20.00 15.00 5.00 108937 RPB 2004 03 06 15 30 00 2542-99 D sf6 CCGG 5.550 0.050 ... H4 2004 03 16 11 32 00 13.1650 -59.4320 20.00 15.00 5.00 108938 RPB 2004 03 21 19 30 00 1225-99 D sf6 CCGG 5.470 0.050 ... H4 2004 04 05 19 06 00 13.1650 -59.4320 20.00 15.00 5.00 108939 RPB 2004 03 21 19 30 00 1226-99 D sf6 CCGG 5.440 0.050 ... H4 2004 04 05 19 20 00 13.1650 -59.4320 20.00 15.00 5.00 108940 RPB 2004 03 27 18 12 00 2593-99 D sf6 CCGG 5.590 0.050 ... H4 2004 04 05 18 40 00 13.1650 -59.4320 20.00 15.00 5.00 108941 RPB 2004 03 27 18 12 00 2594-99 D sf6 CCGG 5.470 0.050 ... H4 2004 04 05 18 53 00 13.1650 -59.4320 20.00 15.00 5.00 108942 RPB 2004 04 02 10 20 00 291-99 D sf6 CCGG 5.490 0.050 ... H4 2004 04 15 10 34 00 13.1650 -59.4320 20.00 15.00 5.00 108943 RPB 2004 04 02 10 20 00 292-99 D sf6 CCGG 5.480 0.050 ... H4 2004 04 15 10 47 00 13.1650 -59.4320 20.00 15.00 5.00 108944 RPB 2004 04 11 10 25 00 657-99 D sf6 CCGG 5.390 0.050 ... H4 2004 04 15 11 00 00 13.1650 -59.4320 20.00 15.00 5.00 108945 RPB 2004 04 11 10 25 00 658-99 D sf6 CCGG 5.440 0.050 ... H4 2004 04 15 11 13 00 13.1650 -59.4320 20.00 15.00 5.00 108946 RPB 2004 04 19 10 55 00 1935-99 D sf6 CCGG 5.460 0.050 ... H4 2004 04 28 12 39 00 13.1650 -59.4320 20.00 15.00 5.00 108947 RPB 2004 04 19 10 55 00 1936-99 D sf6 CCGG 5.540 0.050 ... H4 2004 04 28 12 52 00 13.1650 -59.4320 20.00 15.00 5.00 108948 RPB 2004 04 25 10 15 00 6155-66 D sf6 CCGG 5.540 0.050 ... H4 2004 04 28 12 11 00 13.1650 -59.4320 20.00 15.00 5.00 108949 RPB 2004 04 25 10 15 00 6156-66 D sf6 CCGG 5.540 0.050 ... H4 2004 04 28 12 24 00 13.1650 -59.4320 20.00 15.00 5.00 108950 RPB 2004 05 02 10 20 00 1675-99 D sf6 CCGG 5.600 0.050 ... H4 2004 05 20 13 18 00 13.1650 -59.4320 20.00 15.00 5.00 108951 RPB 2004 05 02 10 20 00 1676-99 D sf6 CCGG 5.540 0.050 ... H4 2004 05 20 13 31 00 13.1650 -59.4320 20.00 15.00 5.00 108952 RPB 2004 05 09 12 05 00 3087-99 D sf6 CCGG 5.620 0.050 ... H4 2004 05 20 13 44 00 13.1650 -59.4320 20.00 15.00 5.00 108953 RPB 2004 05 09 12 05 00 3088-99 D sf6 CCGG 5.510 0.050 ... H4 2004 05 20 13 57 00 13.1650 -59.4320 20.00 15.00 5.00 108954 RPB 2004 05 18 10 15 00 1147-99 D sf6 CCGG 5.610 0.050 ... H4 2004 06 03 15 10 00 13.1650 -59.4320 20.00 15.00 5.00 108955 RPB 2004 05 18 10 15 00 1148-99 D sf6 CCGG 5.610 0.050 ... H4 2004 06 03 15 23 00 13.1650 -59.4320 20.00 15.00 5.00 108956 RPB 2004 05 23 20 45 00 2293-99 D sf6 CCGG 5.600 0.050 ... H4 2004 06 03 12 18 00 13.1650 -59.4320 20.00 15.00 5.00 108957 RPB 2004 05 23 20 45 00 2294-99 D sf6 CCGG 5.460 0.050 ... H4 2004 06 03 12 31 00 13.1650 -59.4320 20.00 15.00 5.00 108958 RPB 2004 06 02 10 15 00 3413-99 D sf6 CCGG 5.570 0.050 ... H4 2004 06 17 15 34 00 13.1650 -59.4320 20.00 15.00 5.00 108959 RPB 2004 06 02 10 15 00 3414-99 D sf6 CCGG 5.580 0.050 ... H4 2004 06 17 15 47 00 13.1650 -59.4320 20.00 15.00 5.00 108960 RPB 2004 06 09 10 15 00 3423-99 D sf6 CCGG 5.540 0.050 ... H4 2004 06 17 15 08 00 13.1650 -59.4320 20.00 15.00 5.00 108961 RPB 2004 06 09 10 15 00 3424-99 D sf6 CCGG 5.490 0.050 ... H4 2004 06 17 15 21 00 13.1650 -59.4320 20.00 15.00 5.00 108962 RPB 2004 06 13 15 15 00 867-99 D sf6 CCGG 5.510 0.050 ... H4 2004 06 29 09 50 00 13.1650 -59.4320 20.00 15.00 5.00 108963 RPB 2004 06 13 15 15 00 868-99 D sf6 CCGG 5.470 0.050 ... H4 2004 06 29 10 03 00 13.1650 -59.4320 20.00 15.00 5.00 108964 RPB 2004 06 20 10 20 00 2063-99 D sf6 CCGG 5.560 0.050 ... H4 2004 06 29 09 23 00 13.1650 -59.4320 20.00 15.00 5.00 108965 RPB 2004 06 20 10 20 00 2064-99 D sf6 CCGG 5.510 0.050 ... H4 2004 06 29 09 36 00 13.1650 -59.4320 20.00 15.00 5.00 108966 RPB 2004 07 02 10 15 00 525-99 D sf6 CCGG 5.470 0.050 ... H4 2004 07 28 10 37 00 13.1650 -59.4320 20.00 15.00 5.00 108967 RPB 2004 07 02 10 15 00 526-99 D sf6 CCGG 5.540 0.050 ... H4 2004 07 28 10 50 00 13.1650 -59.4320 20.00 15.00 5.00 108968 RPB 2004 07 07 10 15 00 1917-99 D sf6 CCGG 5.610 0.050 ... H4 2004 07 28 10 09 00 13.1650 -59.4320 20.00 15.00 5.00 108969 RPB 2004 07 07 10 15 00 1918-99 D sf6 CCGG 5.610 0.050 ... H4 2004 07 28 10 22 00 13.1650 -59.4320 20.00 15.00 5.00 108970 RPB 2004 07 14 10 25 00 335-99 D sf6 CCGG 5.560 0.050 ... H4 2004 08 09 12 07 00 13.1650 -59.4320 20.00 15.00 5.00 108971 RPB 2004 07 14 10 25 00 336-99 D sf6 CCGG 5.520 0.050 ... H4 2004 08 09 12 20 00 13.1650 -59.4320 20.00 15.00 5.00 108972 RPB 2004 07 21 10 15 00 2443-99 D sf6 CCGG 5.480 0.050 ... H4 2004 08 09 14 03 00 13.1650 -59.4320 20.00 15.00 5.00 108973 RPB 2004 07 21 10 15 00 2444-99 D sf6 CCGG 5.620 0.050 ... H4 2004 08 09 14 16 00 13.1650 -59.4320 20.00 15.00 5.00 108974 RPB 2004 07 28 10 20 00 1973-99 D sf6 CCGG 5.550 0.050 ... H4 2004 08 23 15 16 00 13.1650 -59.4320 20.00 15.00 5.00 108975 RPB 2004 07 28 10 20 00 1974-99 D sf6 CCGG 5.560 0.050 ... H4 2004 08 23 15 29 00 13.1650 -59.4320 20.00 15.00 5.00 108976 RPB 2004 08 04 21 20 00 2121-99 D sf6 CCGG 5.460 0.050 ... H4 2004 08 23 15 54 00 13.1650 -59.4320 20.00 15.00 5.00 108977 RPB 2004 08 04 21 20 00 2122-99 D sf6 CCGG 5.490 0.050 ... H4 2004 08 23 16 07 00 13.1650 -59.4320 20.00 15.00 5.00 108978 RPB 2004 08 11 10 20 00 1359-99 D sf6 CCGG 5.590 0.050 ... H4 2004 09 21 16 44 00 13.1650 -59.4320 20.00 15.00 5.00 108979 RPB 2004 08 11 10 20 00 1360-99 D sf6 CCGG 5.620 0.050 ... H4 2004 09 21 16 58 00 13.1650 -59.4320 20.00 15.00 5.00 108980 RPB 2004 08 18 10 15 00 2415-99 D sf6 CCGG 5.510 0.050 ... H4 2004 09 21 17 13 00 13.1650 -59.4320 20.00 15.00 5.00 108981 RPB 2004 08 18 10 15 00 2416-99 D sf6 CCGG 5.570 0.050 ... H4 2004 09 21 17 27 00 13.1650 -59.4320 20.00 15.00 5.00 108982 RPB 2004 08 25 10 30 00 2923-99 D sf6 CCGG 5.590 0.050 ... H4 2004 09 20 15 36 00 13.1650 -59.4320 20.00 15.00 5.00 188979 RPB 2004 08 25 10 30 00 2924-99 D sf6 CCGG 5.560 0.050 ... H4 2004 09 20 15 50 00 13.1650 -59.4320 20.00 15.00 5.00 188980 RPB 2004 09 01 10 20 00 2039-99 D sf6 CCGG 5.610 0.050 ... H4 2004 09 20 17 03 00 13.1650 -59.4320 20.00 15.00 5.00 188977 RPB 2004 09 01 10 20 00 2040-99 D sf6 CCGG 5.600 0.050 ... H4 2004 09 20 17 17 00 13.1650 -59.4320 20.00 15.00 5.00 188978 RPB 2004 09 10 10 20 00 2843-99 D sf6 CCGG 5.610 0.050 ... H4 2004 10 05 16 11 00 13.1650 -59.4320 20.00 15.00 5.00 189233 RPB 2004 09 10 10 20 00 2844-99 D sf6 CCGG 5.560 0.050 ... H4 2004 10 05 16 25 00 13.1650 -59.4320 20.00 15.00 5.00 189234 RPB 2004 09 15 10 15 00 3853-99 D sf6 CCGG 5.520 0.050 ... H4 2004 10 05 14 18 00 13.1650 -59.4320 20.00 15.00 5.00 189235 RPB 2004 09 15 10 15 00 3854-99 D sf6 CCGG 5.580 0.050 ... H4 2004 10 05 14 32 00 13.1650 -59.4320 20.00 15.00 5.00 189236 RPB 2004 09 22 10 15 00 1765-99 D sf6 CCGG 5.660 0.050 ... H4 2004 10 18 15 57 00 13.1650 -59.4320 20.00 15.00 5.00 189775 RPB 2004 09 22 10 15 00 1766-99 D sf6 CCGG 5.680 0.050 ... H4 2004 10 18 16 11 00 13.1650 -59.4320 20.00 15.00 5.00 189776 RPB 2004 09 29 10 15 00 2641-99 D sf6 CCGG 5.530 0.050 ... H4 2004 10 18 17 22 00 13.1650 -59.4320 20.00 15.00 5.00 189777 RPB 2004 09 29 10 15 00 2642-99 D sf6 CCGG 5.550 0.050 ... H4 2004 10 18 17 36 00 13.1650 -59.4320 20.00 15.00 5.00 189778 RPB 2004 10 06 12 45 00 819-99 D sf6 CCGG 5.530 0.050 ... H4 2004 10 26 16 32 00 13.1650 -59.4320 20.00 15.00 5.00 190492 RPB 2004 10 06 12 45 00 820-99 D sf6 CCGG 5.540 0.050 ... H4 2004 10 26 16 46 00 13.1650 -59.4320 20.00 15.00 5.00 190493 RPB 2004 10 13 10 50 00 3393-99 D sf6 CCGG 5.580 0.050 ... H4 2004 10 26 16 04 00 13.1650 -59.4320 20.00 15.00 5.00 190494 RPB 2004 10 13 10 50 00 3394-99 D sf6 CCGG 5.450 0.050 ... H4 2004 10 26 16 18 00 13.1650 -59.4320 20.00 15.00 5.00 190495 RPB 2004 10 20 13 45 00 2203-99 D sf6 CCGG 5.560 0.050 ... H4 2004 11 05 13 29 00 13.1650 -59.4320 20.00 15.00 5.00 191238 RPB 2004 10 20 13 45 00 2204-99 D sf6 CCGG 5.530 0.050 ... H4 2004 11 05 13 43 00 13.1650 -59.4320 20.00 15.00 5.00 191239 RPB 2004 10 27 10 20 00 3855-99 D sf6 CCGG 5.590 0.050 ... H4 2004 11 05 13 58 00 13.1650 -59.4320 20.00 15.00 5.00 191240 RPB 2004 10 27 10 20 00 3856-99 D sf6 CCGG 5.570 0.050 ... H4 2004 11 05 14 12 00 13.1650 -59.4320 20.00 15.00 5.00 191241 RPB 2004 11 03 10 20 00 915-99 D sf6 CCGG 5.570 0.050 ... H4 2004 11 17 11 12 00 13.1650 -59.4320 20.00 15.00 5.00 191877 RPB 2004 11 03 10 20 00 916-99 D sf6 CCGG 5.590 0.050 ... H4 2004 11 17 11 26 00 13.1650 -59.4320 20.00 15.00 5.00 191878 RPB 2004 11 10 10 15 00 3893-99 D sf6 CCGG 5.650 0.050 ... H4 2004 11 17 10 44 00 13.1650 -59.4320 20.00 15.00 5.00 191875 RPB 2004 11 10 10 15 00 3894-99 D sf6 CCGG 5.580 0.050 ... H4 2004 11 17 10 58 00 13.1650 -59.4320 20.00 15.00 5.00 191876 RPB 2004 11 17 10 30 00 4105-99 D sf6 CCGG 5.470 0.050 ... H4 2004 11 30 20 04 00 13.1650 -59.4320 20.00 15.00 5.00 192287 RPB 2004 11 17 10 30 00 4106-99 D sf6 CCGG 5.520 0.050 ... H4 2004 11 30 20 18 00 13.1650 -59.4320 20.00 15.00 5.00 192288 RPB 2004 11 24 10 20 00 4121-99 D sf6 CCGG 5.600 0.050 ... H4 2004 11 30 20 32 00 13.1650 -59.4320 20.00 15.00 5.00 192285 RPB 2004 11 24 10 20 00 4122-99 D sf6 CCGG 5.620 0.050 ... H4 2004 11 30 20 46 00 13.1650 -59.4320 20.00 15.00 5.00 192286 RPB 2004 12 02 11 00 00 4163-99 D sf6 CCGG 5.610 0.050 ... H4 2004 12 14 14 38 00 13.1650 -59.4320 20.00 15.00 5.00 192883 RPB 2004 12 02 11 00 00 4164-99 D sf6 CCGG 5.670 0.050 ... H4 2004 12 14 14 52 00 13.1650 -59.4320 20.00 15.00 5.00 192884 RPB 2004 12 08 20 15 00 6025-66 D sf6 CCGG 5.660 0.050 ... H4 2004 12 14 15 06 00 13.1650 -59.4320 20.00 15.00 5.00 192885 RPB 2004 12 08 20 15 00 6026-66 D sf6 CCGG 5.630 0.050 ... H4 2004 12 14 15 20 00 13.1650 -59.4320 20.00 15.00 5.00 192886 RPB 2004 12 15 16 15 00 2261-99 D sf6 CCGG 5.650 0.050 ... H4 2005 01 12 13 14 00 13.1650 -59.4320 20.00 15.00 5.00 193840 RPB 2004 12 15 16 15 00 2262-99 D sf6 CCGG 5.600 0.050 ... H4 2005 01 12 13 28 00 13.1650 -59.4320 20.00 15.00 5.00 193841 RPB 2004 12 22 10 30 00 2595-99 D sf6 CCGG 5.590 0.050 ... H4 2005 01 12 14 10 00 13.1650 -59.4320 20.00 15.00 5.00 193842 RPB 2004 12 22 10 30 00 2596-99 D sf6 CCGG 5.700 0.050 ... H4 2005 01 12 14 24 00 13.1650 -59.4320 20.00 15.00 5.00 193843 RPB 2004 12 29 17 00 00 2549-99 D sf6 CCGG 5.620 0.050 ... H4 2005 01 13 14 47 00 13.1650 -59.4320 20.00 15.00 5.00 193856 RPB 2004 12 29 17 00 00 2550-99 D sf6 CCGG 5.690 0.050 ... H4 2005 01 13 15 01 00 13.1650 -59.4320 20.00 15.00 5.00 193857 RPB 2005 01 04 14 20 00 2861-99 D sf6 CCGG 5.680 0.050 ... H4 2005 01 13 12 48 00 13.1650 -59.4320 20.00 15.00 5.00 193858 RPB 2005 01 04 14 20 00 2862-99 D sf6 CCGG 5.670 0.050 ... H4 2005 01 13 13 03 00 13.1650 -59.4320 20.00 15.00 5.00 193859 RPB 2005 01 12 13 20 00 2203-99 D sf6 CCGG 5.670 0.050 ... H4 2005 02 10 14 00 00 13.1650 -59.4320 20.00 15.00 5.00 194919 RPB 2005 01 12 13 20 00 2204-99 D sf6 CCGG 5.680 0.050 ... H4 2005 02 10 14 15 00 13.1650 -59.4320 20.00 15.00 5.00 194920 RPB 2005 01 19 11 15 00 3855-99 D sf6 CCGG 5.660 0.050 ... H4 2005 02 10 14 29 00 13.1650 -59.4320 20.00 15.00 5.00 194917 RPB 2005 01 19 11 15 00 3856-99 D sf6 CCGG 5.660 0.050 ... H4 2005 02 10 14 43 00 13.1650 -59.4320 20.00 15.00 5.00 194918 RPB 2005 01 26 11 25 00 819-99 D sf6 CCGG 5.690 0.050 ... H4 2005 02 11 11 41 00 13.1650 -59.4320 20.00 15.00 5.00 194931 RPB 2005 01 26 11 25 00 820-99 D sf6 CCGG 5.720 0.050 ... H4 2005 02 11 11 55 00 13.1650 -59.4320 20.00 15.00 5.00 194932 RPB 2005 02 02 21 00 00 2717-99 D sf6 CCGG 5.670 0.050 ... H4 2005 02 11 11 13 00 13.1650 -59.4320 20.00 15.00 5.00 194929 RPB 2005 02 02 21 00 00 2718-99 D sf6 CCGG 5.750 0.050 ... H4 2005 02 11 11 27 00 13.1650 -59.4320 20.00 15.00 5.00 194930 RPB 2005 02 09 13 15 00 915-99 D sf6 CCGG 5.660 0.050 ... H4 2005 03 01 12 40 00 13.1650 -59.4320 20.00 15.00 5.00 195855 RPB 2005 02 09 13 15 00 916-99 D sf6 CCGG 5.660 0.050 ... H4 2005 03 01 12 54 00 13.1650 -59.4320 20.00 15.00 5.00 195856 RPB 2005 02 21 15 00 00 2145-99 D sf6 CCGG 5.730 0.050 ... H4 2005 03 01 13 08 00 13.1650 -59.4320 20.00 15.00 5.00 195857 RPB 2005 02 21 15 00 00 2146-99 D sf6 CCGG 5.710 0.050 ... H4 2005 03 01 13 22 00 13.1650 -59.4320 20.00 15.00 5.00 195858 RPB 2005 02 28 13 50 00 427-99 D sf6 CCGG 5.690 0.050 ... H4 2005 03 21 14 38 00 13.1650 -59.4320 20.00 15.00 5.00 196749 RPB 2005 02 28 13 50 00 428-99 D sf6 CCGG 5.760 0.050 ... H4 2005 03 21 14 52 00 13.1650 -59.4320 20.00 15.00 5.00 196750 RPB 2005 03 07 13 50 00 1485-99 D sf6 CCGG 5.710 0.050 ... H4 2005 03 21 14 10 00 13.1650 -59.4320 20.00 15.00 5.00 196747 RPB 2005 03 07 13 50 00 1486-99 D sf6 CCGG 5.690 0.050 ... H4 2005 03 21 14 24 00 13.1650 -59.4320 20.00 15.00 5.00 196748 RPB 2005 03 14 12 00 00 2729-99 D sf6 CCGG 5.860 0.050 ... H4 2005 03 23 14 30 00 13.1650 -59.4320 20.00 15.00 5.00 196893 RPB 2005 03 14 12 00 00 2730-99 D sf6 CCGG 5.720 0.050 ... H4 2005 03 23 14 44 00 13.1650 -59.4320 20.00 15.00 5.00 196894 RPB 2005 03 20 10 15 00 3149-99 D sf6 CCGG 5.650 0.050 ... H4 2005 03 23 14 58 00 13.1650 -59.4320 20.00 15.00 5.00 196895 RPB 2005 03 20 10 15 00 3150-99 D sf6 CCGG 5.750 0.050 ... H4 2005 03 23 15 12 00 13.1650 -59.4320 20.00 15.00 5.00 196896 RPB 2005 03 23 14 00 00 2413-99 D sf6 CCGG 5.590 0.050 ... H4 2005 04 05 10 25 00 13.1650 -59.4320 20.00 15.00 5.00 197291 RPB 2005 03 23 14 00 00 2414-99 D sf6 CCGG 5.670 0.050 ... H4 2005 04 05 10 39 00 13.1650 -59.4320 20.00 15.00 5.00 197292 RPB 2005 03 30 10 30 00 3011-99 D sf6 CCGG 5.690 0.050 ... H4 2005 04 05 10 53 00 13.1650 -59.4320 20.00 15.00 5.00 197289 RPB 2005 03 30 10 30 00 3012-99 D sf6 CCGG 5.720 0.050 ... H4 2005 04 05 11 07 00 13.1650 -59.4320 20.00 15.00 5.00 197290 RPB 2005 04 08 10 15 00 2429-99 D sf6 CCGG 5.720 0.050 ... H4 2005 04 26 12 08 00 13.1650 -59.4320 20.00 15.00 5.00 197841 RPB 2005 04 08 10 15 00 2430-99 D sf6 CCGG 5.700 0.050 ... H4 2005 04 26 12 22 00 13.1650 -59.4320 20.00 15.00 5.00 197842 RPB 2005 04 13 11 45 00 2675-99 D sf6 CCGG 5.790 0.050 ... H4 2005 04 26 12 36 00 13.1650 -59.4320 20.00 15.00 5.00 197843 RPB 2005 04 13 11 45 00 2676-99 D sf6 CCGG 5.720 0.050 ... H4 2005 04 26 12 50 00 13.1650 -59.4320 20.00 15.00 5.00 197844 RPB 2005 04 20 19 20 00 13-99 D sf6 CCGG 5.680 0.050 ... H4 2005 05 09 12 46 00 13.1650 -59.4320 20.00 15.00 5.00 198457 RPB 2005 04 20 19 20 00 14-99 D sf6 CCGG 5.710 0.050 ... H4 2005 05 09 13 00 00 13.1650 -59.4320 20.00 15.00 5.00 198458 RPB 2005 04 27 10 55 00 2679-99 D sf6 CCGG 5.660 0.050 ... H4 2005 05 09 12 18 00 13.1650 -59.4320 20.00 15.00 5.00 198459 RPB 2005 04 27 10 55 00 2680-99 D sf6 CCGG 5.650 0.050 ... H4 2005 05 09 12 32 00 13.1650 -59.4320 20.00 15.00 5.00 198460 RPB 2005 05 03 02 15 00 75-99 D sf6 CCGG 5.720 0.050 ... H4 2005 05 31 11 00 00 13.1650 -59.4320 20.00 15.00 5.00 199321 RPB 2005 05 03 02 15 00 76-99 D sf6 CCGG 5.680 0.050 ... H4 2005 05 31 11 14 00 13.1650 -59.4320 20.00 15.00 5.00 199322 RPB 2005 05 14 13 15 00 3939-99 D sf6 CCGG 5.690 0.050 ... H4 2005 05 31 11 28 00 13.1650 -59.4320 20.00 15.00 5.00 199319 RPB 2005 05 14 13 15 00 3940-99 D sf6 CCGG 5.770 0.050 ... H4 2005 05 31 11 43 00 13.1650 -59.4320 20.00 15.00 5.00 199320 RPB 2005 05 21 10 15 00 159-99 D sf6 CCGG 5.670 0.050 ... H4 2005 06 16 14 45 00 13.1650 -59.4320 20.00 15.00 5.00 200131 RPB 2005 05 21 10 15 00 160-99 D sf6 CCGG 5.680 0.050 ... H4 2005 06 16 14 59 00 13.1650 -59.4320 20.00 15.00 5.00 200132 RPB 2005 05 27 10 15 00 1601-99 D sf6 CCGG 5.760 0.050 ... H4 2005 06 16 15 13 00 13.1650 -59.4320 20.00 15.00 5.00 200133 RPB 2005 05 27 10 15 00 1602-99 D sf6 CCGG 5.690 0.050 ... H4 2005 06 16 15 28 00 13.1650 -59.4320 20.00 15.00 5.00 200134 RPB 2005 06 08 10 15 00 1463-99 D sf6 CCGG 5.580 0.050 ... H4 2005 07 14 13 05 00 13.1650 -59.4320 20.00 15.00 5.00 201279 RPB 2005 06 08 10 15 00 1464-99 D sf6 CCGG 5.610 0.050 ... H4 2005 07 14 13 19 00 13.1650 -59.4320 20.00 15.00 5.00 201280 RPB 2005 06 15 10 15 00 3029-99 D sf6 CCGG 5.660 0.050 ... H4 2005 07 14 13 34 00 13.1650 -59.4320 20.00 15.00 5.00 201281 RPB 2005 06 15 10 15 00 3030-99 D sf6 CCGG 5.620 0.050 ... H4 2005 07 14 13 48 00 13.1650 -59.4320 20.00 15.00 5.00 201282 RPB 2005 06 24 11 30 00 2467-99 D sf6 CCGG 5.740 0.050 ... H4 2005 07 21 15 16 00 13.1650 -59.4320 20.00 15.00 5.00 201837 RPB 2005 06 24 11 30 00 2468-99 D sf6 CCGG 5.770 0.050 ... H4 2005 07 21 15 31 00 13.1650 -59.4320 20.00 15.00 5.00 201838 RPB 2005 06 29 10 15 00 6779-66 D sf6 CCGG 5.710 0.050 ... H4 2005 07 22 09 16 00 13.1650 -59.4320 20.00 15.00 5.00 201839 RPB 2005 06 29 10 15 00 6780-66 D sf6 CCGG 5.770 0.050 ... H4 2005 07 22 09 30 00 13.1650 -59.4320 20.00 15.00 5.00 201840 RPB 2005 07 05 11 20 00 93-99 D sf6 CCGG 5.720 0.050 ... H4 2005 08 10 12 01 00 13.1650 -59.4320 20.00 15.00 5.00 202835 RPB 2005 07 05 11 20 00 94-99 D sf6 CCGG 5.770 0.050 ... H4 2005 08 10 12 15 00 13.1650 -59.4320 20.00 15.00 5.00 202836 RPB 2005 07 17 10 10 00 2497-99 D sf6 CCGG 5.770 0.050 A.. H4 2005 08 10 11 04 00 13.1650 -59.4320 20.00 15.00 5.00 202837 RPB 2005 07 17 10 10 00 2498-99 D sf6 CCGG 5.720 0.050 ... H4 2005 08 10 11 18 00 13.1650 -59.4320 20.00 15.00 5.00 202838 RPB 2005 07 20 12 40 00 435-99 D sf6 CCGG 5.850 0.050 ... H4 2005 08 16 15 21 00 13.1650 -59.4320 20.00 15.00 5.00 203355 RPB 2005 07 20 12 40 00 436-99 D sf6 CCGG 5.810 0.050 ... H4 2005 08 16 15 35 00 13.1650 -59.4320 20.00 15.00 5.00 203356 RPB 2005 07 27 10 20 00 6839-66 D sf6 CCGG 5.690 0.050 ... H4 2005 08 16 15 49 00 13.1650 -59.4320 20.00 15.00 5.00 203357 RPB 2005 07 27 10 20 00 6840-66 D sf6 CCGG 5.640 0.050 ... H4 2005 08 16 16 03 00 13.1650 -59.4320 20.00 15.00 5.00 203358 RPB 2005 08 05 11 45 00 333-99 D sf6 CCGG 5.760 0.050 ... H4 2005 08 26 11 15 00 13.1650 -59.4320 20.00 15.00 5.00 204115 RPB 2005 08 05 11 45 00 334-99 D sf6 CCGG 5.730 0.050 ... H4 2005 08 26 11 29 00 13.1650 -59.4320 20.00 15.00 5.00 204116 RPB 2005 08 10 15 55 00 4113-99 D sf6 CCGG 5.580 0.050 ... H4 2005 08 26 11 43 00 13.1650 -59.4320 20.00 15.00 5.00 204117 RPB 2005 08 10 15 55 00 4114-99 D sf6 CCGG 5.680 0.050 ... H4 2005 08 26 11 57 00 13.1650 -59.4320 20.00 15.00 5.00 204118 RPB 2005 08 17 13 50 00 1643-99 D sf6 CCGG 5.710 0.050 ... H4 2005 09 09 15 38 00 13.1650 -59.4320 20.00 15.00 5.00 204767 RPB 2005 08 17 13 50 00 1644-99 D sf6 CCGG 5.710 0.050 ... H4 2005 09 09 15 52 00 13.1650 -59.4320 20.00 15.00 5.00 204768 RPB 2005 08 24 11 30 00 2193-99 D sf6 CCGG 5.770 0.050 ... H4 2005 09 09 15 10 00 13.1650 -59.4320 20.00 15.00 5.00 204765 RPB 2005 08 24 11 30 00 2194-99 D sf6 CCGG 5.850 0.050 ... H4 2005 09 09 15 24 00 13.1650 -59.4320 20.00 15.00 5.00 204766 RPB 2005 08 31 12 00 00 613-99 D sf6 CCGG 5.690 0.050 ... H4 2005 09 15 09 27 00 13.1650 -59.4320 20.00 15.00 5.00 205694 RPB 2005 08 31 12 00 00 614-99 D sf6 CCGG 5.730 0.050 ... H4 2005 09 15 09 41 00 13.1650 -59.4320 20.00 15.00 5.00 205695 RPB 2005 09 07 12 45 00 635-99 D sf6 CCGG 5.680 0.050 ... H4 2005 09 15 09 56 00 13.1650 -59.4320 20.00 15.00 5.00 205696 RPB 2005 09 07 12 45 00 636-99 D sf6 CCGG 5.650 0.050 ... H4 2005 09 15 10 10 00 13.1650 -59.4320 20.00 15.00 5.00 205697 RPB 2005 09 14 11 15 00 2573-99 D sf6 CCGG 5.840 0.050 ... H4 2005 10 11 14 30 00 13.1650 -59.4320 20.00 15.00 5.00 206430 RPB 2005 09 14 11 15 00 2574-99 D sf6 CCGG 5.800 0.050 ... H4 2005 10 11 14 44 00 13.1650 -59.4320 20.00 15.00 5.00 206431 RPB 2005 09 21 11 20 00 3939-99 D sf6 CCGG 5.740 0.050 ... H4 2005 10 11 14 58 00 13.1650 -59.4320 20.00 15.00 5.00 206428 RPB 2005 09 21 11 20 00 3940-99 D sf6 CCGG 5.760 0.050 ... H4 2005 10 11 15 13 00 13.1650 -59.4320 20.00 15.00 5.00 206429 RPB 2005 09 28 12 45 00 363-99 D sf6 CCGG 5.860 0.050 ... H4 2005 10 25 12 11 00 13.1650 -59.4320 20.00 15.00 5.00 207134 RPB 2005 09 28 12 45 00 364-99 D sf6 CCGG 5.890 0.050 ... H4 2005 10 25 12 25 00 13.1650 -59.4320 20.00 15.00 5.00 207135 RPB 2005 10 05 10 10 00 4163-99 D sf6 CCGG 5.700 0.050 ... H4 2005 10 25 12 40 00 13.1650 -59.4320 20.00 15.00 5.00 207136 RPB 2005 10 05 10 10 00 4164-99 D sf6 CCGG 5.730 0.050 ... H4 2005 10 25 12 54 00 13.1650 -59.4320 20.00 15.00 5.00 207137 RPB 2005 10 12 10 10 00 555-99 D sf6 CCGG 5.860 0.050 ... H4 2005 11 04 13 58 00 13.1650 -59.4320 20.00 15.00 5.00 207820 RPB 2005 10 12 10 10 00 556-99 D sf6 CCGG 5.820 0.050 ... H4 2005 11 04 14 12 00 13.1650 -59.4320 20.00 15.00 5.00 207821 RPB 2005 10 18 20 20 00 2775-99 D sf6 CCGG 5.790 0.050 ... H4 2005 11 04 13 30 00 13.1650 -59.4320 20.00 15.00 5.00 207822 RPB 2005 10 18 20 20 00 2776-99 D sf6 CCGG 5.780 0.050 ... H4 2005 11 04 13 44 00 13.1650 -59.4320 20.00 15.00 5.00 207823 RPB 2005 10 26 10 15 00 1583-99 D sf6 CCGG 5.830 0.050 ... H4 2005 11 17 15 00 00 13.1650 -59.4320 20.00 15.00 5.00 208623 RPB 2005 10 26 10 15 00 1584-99 D sf6 CCGG 5.830 0.050 ... H4 2005 11 17 15 15 00 13.1650 -59.4320 20.00 15.00 5.00 208624 RPB 2005 11 02 10 15 00 3495-99 D sf6 CCGG 5.770 0.050 ... H4 2005 11 17 14 32 00 13.1650 -59.4320 20.00 15.00 5.00 208621 RPB 2005 11 02 10 15 00 3496-99 D sf6 CCGG 5.750 0.050 ... H4 2005 11 17 14 46 00 13.1650 -59.4320 20.00 15.00 5.00 208622 RPB 2005 11 09 10 15 00 2489-99 D sf6 CCGG 5.760 0.050 ... H4 2005 11 30 16 11 00 13.1650 -59.4320 20.00 15.00 5.00 209314 RPB 2005 11 09 10 15 00 2490-99 D sf6 CCGG 5.830 0.050 ... H4 2005 11 30 16 26 00 13.1650 -59.4320 20.00 15.00 5.00 209315 RPB 2005 11 16 10 15 00 2679-99 D sf6 CCGG 5.880 0.050 ... H4 2005 11 30 15 43 00 13.1650 -59.4320 20.00 15.00 5.00 209316 RPB 2005 11 16 10 15 00 2680-99 D sf6 CCGG 5.820 0.050 ... H4 2005 11 30 15 57 00 13.1650 -59.4320 20.00 15.00 5.00 209317 RPB 2005 11 23 10 15 00 4029-99 D sf6 CCGG 5.780 0.050 ... H4 2005 12 08 11 17 00 13.1650 -59.4320 20.00 15.00 5.00 209793 RPB 2005 11 23 10 15 00 4030-99 D sf6 CCGG 5.840 0.050 ... H4 2005 12 08 11 32 00 13.1650 -59.4320 20.00 15.00 5.00 209794 RPB 2005 11 30 10 15 00 6097-66 D sf6 CCGG 5.900 0.050 ... H4 2005 12 08 10 49 00 13.1650 -59.4320 20.00 15.00 5.00 209791 RPB 2005 11 30 10 15 00 6098-66 D sf6 CCGG 5.930 0.050 ... H4 2005 12 08 11 03 00 13.1650 -59.4320 20.00 15.00 5.00 209792 RPB 2005 12 07 10 15 00 2581-99 D sf6 CCGG 5.920 0.050 ... H4 2005 12 20 14 40 00 13.1650 -59.4320 20.00 15.00 5.00 210427 RPB 2005 12 07 10 15 00 2582-99 D sf6 CCGG 5.810 0.050 ... H4 2005 12 20 14 54 00 13.1650 -59.4320 20.00 15.00 5.00 210428 RPB 2005 12 14 10 15 00 6545-66 D sf6 CCGG 5.890 0.050 ... H4 2005 12 20 13 43 00 13.1650 -59.4320 20.00 15.00 5.00 210425 RPB 2005 12 14 10 15 00 6546-66 D sf6 CCGG 5.880 0.050 ... H4 2005 12 20 13 57 00 13.1650 -59.4320 20.00 15.00 5.00 210426 RPB 2005 12 21 10 30 00 3675-99 D sf6 CCGG 5.850 0.050 ... H4 2006 01 09 14 09 00 13.1650 -59.4320 20.00 15.00 5.00 210874 RPB 2005 12 21 10 30 00 3676-99 D sf6 CCGG 5.960 0.050 ... H4 2006 01 09 14 23 00 13.1650 -59.4320 20.00 15.00 5.00 210875 RPB 2005 12 27 10 15 00 3983-99 D sf6 CCGG 5.820 0.050 ... H4 2006 01 09 14 37 00 13.1650 -59.4320 20.00 15.00 5.00 210876 RPB 2005 12 27 10 15 00 3984-99 D sf6 CCGG 5.820 0.050 ... H4 2006 01 09 14 51 00 13.1650 -59.4320 20.00 15.00 5.00 210877 RPB 2006 01 04 10 15 00 2909-99 D sf6 CCGG 5.890 0.050 ... H4 2006 01 24 17 27 00 13.1650 -59.4320 20.00 15.00 5.00 211592 RPB 2006 01 04 10 15 00 2910-99 D sf6 CCGG 5.850 0.050 ... H4 2006 01 24 17 41 00 13.1650 -59.4320 20.00 15.00 5.00 211593 RPB 2006 01 11 10 15 00 3975-99 D sf6 CCGG 5.870 0.050 ... H4 2006 01 24 16 58 00 13.1650 -59.4320 20.00 15.00 5.00 211590 RPB 2006 01 11 10 15 00 3976-99 D sf6 CCGG 5.850 0.050 ... H4 2006 01 24 17 12 00 13.1650 -59.4320 20.00 15.00 5.00 211591 RPB 2006 01 20 10 20 00 2931-99 D sf6 CCGG 5.920 0.050 ... H4 2006 02 07 16 01 00 13.1650 -59.4320 20.00 15.00 5.00 212109 RPB 2006 01 20 10 20 00 2932-99 D sf6 CCGG 5.900 0.050 ... H4 2006 02 07 16 15 00 13.1650 -59.4320 20.00 15.00 5.00 212110 RPB 2006 01 25 10 20 00 3305-99 D sf6 CCGG 6.030 0.050 ... H4 2006 02 07 15 32 00 13.1650 -59.4320 20.00 15.00 5.00 212111 RPB 2006 01 25 10 20 00 3306-99 D sf6 CCGG 6.020 0.050 ... H4 2006 02 07 15 47 00 13.1650 -59.4320 20.00 15.00 5.00 212112 RPB 2006 02 01 10 20 00 2891-99 D sf6 CCGG 5.920 0.050 ... H4 2006 02 14 10 57 00 13.1650 -59.4320 20.00 15.00 5.00 212715 RPB 2006 02 01 10 20 00 2892-99 D sf6 CCGG 5.930 0.050 ... H4 2006 02 14 11 11 00 13.1650 -59.4320 20.00 15.00 5.00 212716 RPB 2006 02 08 10 20 00 3749-99 D sf6 CCGG 6.020 0.050 ... H4 2006 02 14 11 26 00 13.1650 -59.4320 20.00 15.00 5.00 212713 RPB 2006 02 08 10 20 00 3750-99 D sf6 CCGG 5.980 0.050 ... H4 2006 02 14 11 40 00 13.1650 -59.4320 20.00 15.00 5.00 212714 RPB 2006 02 15 10 20 00 3343-99 D sf6 CCGG 5.940 0.050 ... H4 2006 03 02 16 29 00 13.1650 -59.4320 20.00 15.00 5.00 213381 RPB 2006 02 15 10 20 00 3344-99 D sf6 CCGG 5.960 0.050 ... H4 2006 03 02 16 43 00 13.1650 -59.4320 20.00 15.00 5.00 213382 RPB 2006 02 22 10 15 00 3753-99 D sf6 CCGG 5.870 0.050 ... H4 2006 03 02 16 00 00 13.1650 -59.4320 20.00 15.00 5.00 213379 RPB 2006 02 22 10 15 00 3754-99 D sf6 CCGG 5.940 0.050 ... H4 2006 03 02 16 14 00 13.1650 -59.4320 20.00 15.00 5.00 213380 RPB 2006 03 02 10 15 00 189-99 D sf6 CCGG 5.910 0.050 ... H4 2006 03 14 11 17 00 13.1650 -59.4320 20.00 15.00 5.00 213860 RPB 2006 03 02 10 15 00 190-99 D sf6 CCGG 5.860 0.050 ... H4 2006 03 14 11 31 00 13.1650 -59.4320 20.00 15.00 5.00 213861 RPB 2006 03 08 10 15 00 637-99 D sf6 CCGG 5.930 0.050 ... H4 2006 03 14 10 49 00 13.1650 -59.4320 20.00 15.00 5.00 213862 RPB 2006 03 08 10 15 00 638-99 D sf6 CCGG 5.910 0.050 ... H4 2006 03 14 11 03 00 13.1650 -59.4320 20.00 15.00 5.00 213863 RPB 2006 03 15 10 15 00 4481-99 D sf6 CCGG 5.930 0.050 ... H4 2006 03 27 13 06 00 13.1650 -59.4320 20.00 15.00 5.00 214327 RPB 2006 03 15 10 15 00 4482-99 D sf6 CCGG 5.990 0.050 ... H4 2006 03 27 13 21 00 13.1650 -59.4320 20.00 15.00 5.00 214328 RPB 2006 03 22 10 15 00 4483-99 D sf6 CCGG 5.950 0.050 ... H4 2006 03 27 13 35 00 13.1650 -59.4320 20.00 15.00 5.00 214329 RPB 2006 03 22 10 15 00 4484-99 D sf6 CCGG 5.910 0.050 ... H4 2006 03 27 13 49 00 13.1650 -59.4320 20.00 15.00 5.00 214330 RPB 2006 03 29 10 15 00 3209-99 D sf6 CCGG 5.870 0.050 ... H4 2006 04 12 12 34 00 13.1650 -59.4320 20.00 15.00 5.00 215187 RPB 2006 03 29 10 15 00 3210-99 D sf6 CCGG 5.920 0.050 ... H4 2006 04 12 12 48 00 13.1650 -59.4320 20.00 15.00 5.00 215188 RPB 2006 04 05 10 15 00 3331-99 D sf6 CCGG 5.970 0.050 ... H4 2006 04 12 12 05 00 13.1650 -59.4320 20.00 15.00 5.00 215189 RPB 2006 04 05 10 15 00 3332-99 D sf6 CCGG 5.910 0.050 ... H4 2006 04 12 12 20 00 13.1650 -59.4320 20.00 15.00 5.00 215190 RPB 2006 04 12 10 15 00 251-99 D sf6 CCGG 5.990 0.050 ... H4 2006 04 26 10 16 00 13.1650 -59.4320 20.00 15.00 5.00 215952 RPB 2006 04 12 10 15 00 252-99 D sf6 CCGG 5.910 0.050 ... H4 2006 04 26 10 31 00 13.1650 -59.4320 20.00 15.00 5.00 215953 RPB 2006 04 19 10 15 00 2903-99 D sf6 CCGG 5.950 0.050 ... H4 2006 04 26 10 45 00 13.1650 -59.4320 20.00 15.00 5.00 215950 RPB 2006 04 19 10 15 00 2904-99 D sf6 CCGG 5.950 0.050 ... H4 2006 04 26 10 59 00 13.1650 -59.4320 20.00 15.00 5.00 215951 RPB 2006 04 26 10 15 00 2891-99 D sf6 CCGG 6.050 0.050 ... H4 2006 05 16 11 36 00 13.1650 -59.4320 20.00 15.00 5.00 216606 RPB 2006 04 26 10 15 00 2892-99 D sf6 CCGG 6.000 0.050 ... H4 2006 05 16 11 51 00 13.1650 -59.4320 20.00 15.00 5.00 216607 RPB 2006 05 03 10 15 00 3419-99 D sf6 CCGG 5.980 0.050 ... H4 2006 05 16 12 05 00 13.1650 -59.4320 20.00 15.00 5.00 216604 RPB 2006 05 03 10 15 00 3420-99 D sf6 CCGG 5.960 0.050 ... H4 2006 05 16 12 19 00 13.1650 -59.4320 20.00 15.00 5.00 216605 RPB 2006 05 10 10 15 00 233-99 D sf6 CCGG 5.940 0.050 ... H4 2006 06 26 09 51 00 13.1650 -59.4320 20.00 15.00 5.00 218093 RPB 2006 05 10 10 15 00 234-99 D sf6 CCGG 5.960 0.050 ... H4 2006 06 26 10 06 00 13.1650 -59.4320 20.00 15.00 5.00 218094 RPB 2006 05 17 10 30 00 3195-99 D sf6 CCGG 5.960 0.050 ... H4 2006 06 26 10 20 00 13.1650 -59.4320 20.00 15.00 5.00 218095 RPB 2006 05 17 10 30 00 3196-99 D sf6 CCGG 5.910 0.050 ... H4 2006 06 26 10 34 00 13.1650 -59.4320 20.00 15.00 5.00 218096 RPB 2006 05 24 10 15 00 791-99 D sf6 CCGG 5.980 0.050 ... H4 2006 06 14 14 08 00 13.1650 -59.4320 20.00 15.00 5.00 217873 RPB 2006 05 24 10 15 00 792-99 D sf6 CCGG 6.000 0.050 ... H4 2006 06 14 14 22 00 13.1650 -59.4320 20.00 15.00 5.00 217874 RPB 2006 05 31 10 15 00 6537-66 D sf6 CCGG 6.020 0.050 ... H4 2006 06 14 14 36 00 13.1650 -59.4320 20.00 15.00 5.00 217871 RPB 2006 05 31 10 15 00 6538-66 D sf6 CCGG 6.020 0.050 ... H4 2006 06 14 14 50 00 13.1650 -59.4320 20.00 15.00 5.00 217872 RPB 2006 06 07 10 15 00 1259-99 D sf6 CCGG 5.950 0.050 ... H4 2006 06 30 13 40 00 13.1650 -59.4320 20.00 15.00 5.00 218452 RPB 2006 06 07 10 15 00 1260-99 D sf6 CCGG 6.000 0.050 ... H4 2006 06 30 13 54 00 13.1650 -59.4320 20.00 15.00 5.00 218453 RPB 2006 06 14 10 15 00 3331-99 D sf6 CCGG 6.010 0.050 ... H4 2006 06 30 14 08 00 13.1650 -59.4320 20.00 15.00 5.00 218450 RPB 2006 06 14 10 15 00 3332-99 D sf6 CCGG 6.030 0.050 ... H4 2006 06 30 14 22 00 13.1650 -59.4320 20.00 15.00 5.00 218451 RPB 2006 06 21 10 15 00 516-99 D sf6 CCGG 5.940 0.050 ... H4 2006 07 18 11 24 00 13.1650 -59.4320 20.00 15.00 5.00 218967 RPB 2006 06 28 10 15 00 2145-99 D sf6 CCGG 5.930 0.050 ... H4 2006 07 17 15 06 00 13.1650 -59.4320 20.00 15.00 5.00 218968 RPB 2006 06 28 10 15 00 2146-99 D sf6 CCGG 5.960 0.050 ... H4 2006 07 17 15 20 00 13.1650 -59.4320 20.00 15.00 5.00 218969 RPB 2006 07 07 10 15 00 1607-99 D sf6 CCGG 5.990 0.050 ... H4 2006 07 27 13 44 00 13.1650 -59.4320 20.00 15.00 5.00 219717 RPB 2006 07 07 10 15 00 1608-99 D sf6 CCGG 6.070 0.050 ... H4 2006 07 27 13 59 00 13.1650 -59.4320 20.00 15.00 5.00 219718 RPB 2006 07 12 13 15 00 2641-99 D sf6 CCGG 6.020 0.050 ... H4 2006 07 27 13 16 00 13.1650 -59.4320 20.00 15.00 5.00 219719 RPB 2006 07 12 13 15 00 2642-99 D sf6 CCGG 6.040 0.050 ... H4 2006 07 27 13 30 00 13.1650 -59.4320 20.00 15.00 5.00 219720 RPB 2006 07 19 10 30 00 2253-99 D sf6 CCGG 6.040 0.050 ... H4 2006 08 15 10 28 00 13.1650 -59.4320 20.00 15.00 5.00 220332 RPB 2006 07 19 10 30 00 2254-99 D sf6 CCGG 6.040 0.050 ... H4 2006 08 15 10 42 00 13.1650 -59.4320 20.00 15.00 5.00 220333 RPB 2006 07 26 10 30 00 3087-99 D sf6 CCGG 6.090 0.050 ... H4 2006 08 15 09 31 00 13.1650 -59.4320 20.00 15.00 5.00 220334 RPB 2006 07 26 10 30 00 3088-99 D sf6 CCGG 6.000 0.050 ... H4 2006 08 15 09 46 00 13.1650 -59.4320 20.00 15.00 5.00 220335 RPB 2006 08 02 17 30 00 1011-99 D sf6 CCGG 5.960 0.050 ... H4 2006 08 24 14 43 00 13.1650 -59.4320 20.00 15.00 5.00 220921 RPB 2006 08 02 17 30 00 1012-99 D sf6 CCGG 5.970 0.050 ... H4 2006 08 24 14 57 00 13.1650 -59.4320 20.00 15.00 5.00 220922 RPB 2006 08 09 13 50 00 2959-99 D sf6 CCGG 6.060 0.050 ... H4 2006 08 24 14 14 00 13.1650 -59.4320 20.00 15.00 5.00 220923 RPB 2006 08 09 13 50 00 2960-99 D sf6 CCGG 6.050 0.050 ... H4 2006 08 24 14 29 00 13.1650 -59.4320 20.00 15.00 5.00 220924 RPB 2006 08 16 14 50 00 483-99 D sf6 CCGG 6.050 0.050 ... H4 2006 09 05 13 15 00 13.1650 -59.4320 20.00 15.00 5.00 221559 RPB 2006 08 16 14 50 00 484-99 D sf6 CCGG 6.010 0.050 ... H4 2006 09 05 13 29 00 13.1650 -59.4320 20.00 15.00 5.00 221560 RPB 2006 08 23 13 50 00 3163-99 D sf6 CCGG 6.070 0.050 ... H4 2006 09 05 14 12 00 13.1650 -59.4320 20.00 15.00 5.00 221561 RPB 2006 08 23 13 50 00 3164-99 D sf6 CCGG 6.090 0.050 ... H4 2006 09 05 14 26 00 13.1650 -59.4320 20.00 15.00 5.00 221562 RPB 2006 08 30 10 05 00 997-99 D sf6 CCGG 6.010 0.050 ... H4 2006 09 18 11 13 00 13.1650 -59.4320 20.00 15.00 5.00 222195 RPB 2006 08 30 10 05 00 998-99 D sf6 CCGG 5.990 0.050 ... H4 2006 09 18 11 27 00 13.1650 -59.4320 20.00 15.00 5.00 222196 RPB 2006 09 06 10 20 00 1921-99 D sf6 CCGG 6.000 0.050 ... H4 2006 09 18 12 10 00 13.1650 -59.4320 20.00 15.00 5.00 222193 RPB 2006 09 06 10 20 00 1922-99 D sf6 CCGG 5.970 0.050 ... H4 2006 09 18 12 24 00 13.1650 -59.4320 20.00 15.00 5.00 222194 RPB 2006 09 13 10 50 00 2369-99 D sf6 CCGG 6.220 0.050 ... H4 2006 10 05 14 06 00 13.1650 -59.4320 20.00 15.00 5.00 222971 RPB 2006 09 13 10 50 00 2370-99 D sf6 CCGG 6.050 0.050 ... H4 2006 10 05 14 21 00 13.1650 -59.4320 20.00 15.00 5.00 222972 RPB 2006 09 20 10 15 00 3021-99 D sf6 CCGG 5.880 0.050 ... H4 2006 10 05 14 35 00 13.1650 -59.4320 20.00 15.00 5.00 222969 RPB 2006 09 20 10 15 00 3022-99 D sf6 CCGG 5.880 0.050 ... H4 2006 10 05 14 49 00 13.1650 -59.4320 20.00 15.00 5.00 222970 RPB 2006 09 27 10 40 00 2019-99 D sf6 CCGG 6.050 0.050 ... H4 2006 10 19 14 45 00 13.1650 -59.4320 20.00 15.00 5.00 223635 RPB 2006 09 27 10 40 00 2020-99 D sf6 CCGG 6.010 0.050 ... H4 2006 10 19 14 59 00 13.1650 -59.4320 20.00 15.00 5.00 223636 RPB 2006 10 04 10 15 00 3153-99 D sf6 CCGG 6.070 0.050 ... H4 2006 10 20 10 53 00 13.1650 -59.4320 20.00 15.00 5.00 223637 RPB 2006 10 04 10 15 00 3154-99 D sf6 CCGG 6.090 0.050 ... H4 2006 10 20 11 08 00 13.1650 -59.4320 20.00 15.00 5.00 223638 RPB 2006 10 11 10 05 00 671-99 D sf6 CCGG 5.960 0.050 ... H4 2006 11 01 10 17 00 13.1650 -59.4320 20.00 15.00 5.00 224093 RPB 2006 10 11 10 05 00 672-99 D sf6 CCGG 6.010 0.050 ... H4 2006 11 01 10 31 00 13.1650 -59.4320 20.00 15.00 5.00 224094 RPB 2006 10 18 10 10 00 1211-99 D sf6 CCGG 5.990 0.050 ... H4 2006 11 01 09 48 00 13.1650 -59.4320 20.00 15.00 5.00 224095 RPB 2006 10 18 10 10 00 1212-99 D sf6 CCGG 6.050 0.050 ... H4 2006 11 01 10 02 00 13.1650 -59.4320 20.00 15.00 5.00 224096 RPB 2006 10 25 10 05 00 635-99 D sf6 CCGG 5.970 0.050 ... H4 2006 11 13 15 03 00 13.1650 -59.4320 20.00 15.00 5.00 224806 RPB 2006 10 25 10 05 00 636-99 D sf6 CCGG 5.980 0.050 ... H4 2006 11 13 15 18 00 13.1650 -59.4320 20.00 15.00 5.00 224807 RPB 2006 11 01 10 05 00 3559-99 D sf6 CCGG 6.040 0.050 ... H4 2006 11 13 14 35 00 13.1650 -59.4320 20.00 15.00 5.00 224808 RPB 2006 11 01 10 05 00 3560-99 D sf6 CCGG 6.040 0.050 ... H4 2006 11 13 14 49 00 13.1650 -59.4320 20.00 15.00 5.00 224809 RPB 2006 11 08 10 05 00 1449-99 D sf6 CCGG 6.160 0.050 ... H4 2006 11 30 11 30 00 13.1650 -59.4320 20.00 15.00 5.00 225381 RPB 2006 11 08 10 05 00 1450-99 D sf6 CCGG 6.130 0.050 ... H4 2006 11 30 11 44 00 13.1650 -59.4320 20.00 15.00 5.00 225382 RPB 2006 11 15 12 45 00 3847-99 D sf6 CCGG 5.990 0.050 ... H4 2006 11 30 11 01 00 13.1650 -59.4320 20.00 15.00 5.00 225379 RPB 2006 11 15 12 45 00 3848-99 D sf6 CCGG 6.060 0.050 ... H4 2006 11 30 11 16 00 13.1650 -59.4320 20.00 15.00 5.00 225380 RPB 2006 11 22 12 40 00 965-99 D sf6 CCGG 6.180 0.050 ... H4 2006 12 08 13 45 00 13.1650 -59.4320 20.00 15.00 5.00 225959 RPB 2006 11 22 12 40 00 966-99 D sf6 CCGG 6.090 0.050 ... H4 2006 12 08 13 59 00 13.1650 -59.4320 20.00 15.00 5.00 225960 RPB 2006 11 29 13 05 00 3803-99 D sf6 CCGG 6.030 0.050 ... H4 2006 12 08 14 13 00 13.1650 -59.4320 20.00 15.00 5.00 225957 RPB 2006 11 29 13 05 00 3804-99 D sf6 CCGG 6.050 0.050 ... H4 2006 12 08 14 27 00 13.1650 -59.4320 20.00 15.00 5.00 225958 RPB 2006 12 06 13 50 00 705-99 D sf6 CCGG 6.050 0.050 ... H4 2007 01 09 13 55 00 13.1650 -59.4320 20.00 15.00 5.00 226560 RPB 2006 12 06 13 50 00 706-99 D sf6 CCGG 6.170 0.050 ... H4 2007 01 09 14 09 00 13.1650 -59.4320 20.00 15.00 5.00 226561 RPB 2006 12 13 14 00 00 2415-99 D sf6 CCGG 6.110 0.050 ... H4 2007 01 09 14 23 00 13.1650 -59.4320 20.00 15.00 5.00 226562 RPB 2006 12 13 14 00 00 2416-99 D sf6 CCGG 6.150 0.050 ... H4 2007 01 09 14 37 00 13.1650 -59.4320 20.00 15.00 5.00 226563 RPB 2006 12 20 13 05 00 129-99 D sf6 CCGG 6.130 0.050 ... H4 2007 01 22 10 46 00 13.1650 -59.4320 20.00 15.00 5.00 227545 RPB 2006 12 20 13 05 00 130-99 D sf6 CCGG 6.180 0.050 ... H4 2007 01 22 11 00 00 13.1650 -59.4320 20.00 15.00 5.00 227546 RPB 2006 12 27 13 10 00 3261-99 D sf6 CCGG 6.090 0.050 ... H4 2007 01 22 11 15 00 13.1650 -59.4320 20.00 15.00 5.00 227543 RPB 2006 12 27 13 10 00 3262-99 D sf6 CCGG 6.130 0.050 ... H4 2007 01 22 11 29 00 13.1650 -59.4320 20.00 15.00 5.00 227544 RPB 2007 01 03 13 05 00 1169-99 D sf6 CCGG 6.140 0.050 ... H4 2007 01 22 10 18 00 13.1650 -59.4320 20.00 15.00 5.00 227541 RPB 2007 01 03 13 05 00 1170-99 D sf6 CCGG 6.140 0.050 ... H4 2007 01 22 10 32 00 13.1650 -59.4320 20.00 15.00 5.00 227542 RPB 2007 01 10 12 20 00 49-99 D sf6 CCGG 6.120 0.050 ... H4 2007 02 06 13 06 00 13.1650 -59.4320 20.00 15.00 5.00 228199 RPB 2007 01 10 12 20 00 50-99 D sf6 CCGG 6.110 0.050 ... H4 2007 02 06 13 21 00 13.1650 -59.4320 20.00 15.00 5.00 228200 RPB 2007 01 17 13 05 00 1755-99 D sf6 CCGG 6.170 0.050 ... H4 2007 02 06 13 35 00 13.1650 -59.4320 20.00 15.00 5.00 228197 RPB 2007 01 17 13 05 00 1756-99 D sf6 CCGG 6.140 0.050 ... H4 2007 02 06 13 49 00 13.1650 -59.4320 20.00 15.00 5.00 228198 RPB 2007 01 24 17 45 00 881-99 D sf6 CCGG 6.140 0.050 ... H4 2007 02 21 14 04 00 13.1650 -59.4320 20.00 15.00 5.00 229190 RPB 2007 01 24 17 45 00 882-99 D sf6 CCGG 6.200 0.050 ... H4 2007 02 21 14 19 00 13.1650 -59.4320 20.00 15.00 5.00 229191 RPB 2007 01 31 12 50 00 3069-99 D sf6 CCGG 6.200 0.050 ... H4 2007 02 21 13 36 00 13.1650 -59.4320 20.00 15.00 5.00 229188 RPB 2007 01 31 12 50 00 3070-99 D sf6 CCGG 6.160 0.050 ... H4 2007 02 21 13 50 00 13.1650 -59.4320 20.00 15.00 5.00 229189 RPB 2007 02 07 13 05 00 3327-99 D sf6 CCGG 6.210 0.050 ... H4 2007 03 07 14 44 00 13.1650 -59.4320 20.00 15.00 5.00 230080 RPB 2007 02 07 13 05 00 3328-99 D sf6 CCGG 6.200 0.050 ... H4 2007 03 07 14 59 00 13.1650 -59.4320 20.00 15.00 5.00 230081 RPB 2007 02 14 13 05 00 3765-99 D sf6 CCGG 6.140 0.050 ... H4 2007 03 07 14 16 00 13.1650 -59.4320 20.00 15.00 5.00 230082 RPB 2007 02 14 13 05 00 3766-99 D sf6 CCGG 6.120 0.050 ... H4 2007 03 07 14 30 00 13.1650 -59.4320 20.00 15.00 5.00 230083 RPB 2007 02 21 13 05 00 2495-99 D sf6 CCGG 6.160 0.050 ... H4 2007 03 19 16 04 00 13.1650 -59.4320 20.00 15.00 5.00 230734 RPB 2007 02 21 13 05 00 2496-99 D sf6 CCGG 6.200 0.050 ... H4 2007 03 19 16 18 00 13.1650 -59.4320 20.00 15.00 5.00 230735 RPB 2007 02 28 10 05 00 3035-99 D sf6 CCGG 6.210 0.050 ... H4 2007 03 19 16 32 00 13.1650 -59.4320 20.00 15.00 5.00 230736 RPB 2007 02 28 10 05 00 3036-99 D sf6 CCGG 6.160 0.050 ... H4 2007 03 19 16 46 00 13.1650 -59.4320 20.00 15.00 5.00 230737 RPB 2007 03 07 20 50 00 1447-99 D sf6 CCGG 6.180 0.050 ... H4 2007 04 23 15 02 00 13.1650 -59.4320 20.00 15.00 5.00 232599 RPB 2007 03 07 20 50 00 1448-99 D sf6 CCGG 6.150 0.050 ... H4 2007 04 23 15 16 00 13.1650 -59.4320 20.00 15.00 5.00 232600 RPB 2007 03 14 18 55 00 2941-99 D sf6 CCGG 6.220 0.050 ... H4 2007 04 23 14 33 00 13.1650 -59.4320 20.00 15.00 5.00 232597 RPB 2007 03 14 18 55 00 2942-99 D sf6 CCGG 6.200 0.050 ... H4 2007 04 23 14 48 00 13.1650 -59.4320 20.00 15.00 5.00 232598 RPB 2007 03 21 12 45 00 1073-99 D sf6 CCGG 6.250 0.050 ... H4 2007 04 23 15 59 00 13.1650 -59.4320 20.00 15.00 5.00 232601 RPB 2007 03 21 12 45 00 1074-99 D sf6 CCGG 6.230 0.050 ... H4 2007 04 23 16 13 00 13.1650 -59.4320 20.00 15.00 5.00 232602 RPB 2007 03 28 18 40 00 6129-66 D sf6 CCGG 6.200 0.050 ... H4 2007 04 23 15 30 00 13.1650 -59.4320 20.00 15.00 5.00 232603 RPB 2007 03 28 18 40 00 6130-66 D sf6 CCGG 6.240 0.050 ... H4 2007 04 23 15 45 00 13.1650 -59.4320 20.00 15.00 5.00 232604 RPB 2007 04 04 15 45 00 3761-99 D sf6 CCGG 6.240 0.050 ... H4 2007 04 27 15 55 00 13.1650 -59.4320 20.00 15.00 5.00 232894 RPB 2007 04 04 15 45 00 3762-99 D sf6 CCGG 6.250 0.050 ... H4 2007 04 27 16 09 00 13.1650 -59.4320 20.00 15.00 5.00 232895 RPB 2007 04 11 13 05 00 4275-99 D sf6 CCGG 6.240 0.050 ... H4 2007 04 27 14 30 00 13.1650 -59.4320 20.00 15.00 5.00 232896 RPB 2007 04 11 13 05 00 4276-99 D sf6 CCGG 6.310 0.050 ... H4 2007 04 27 14 44 00 13.1650 -59.4320 20.00 15.00 5.00 232897 RPB 2007 04 18 12 40 00 503-99 D sf6 CCGG 6.300 0.040 ... H4 2007 05 07 13 11 00 13.1650 -59.4320 20.00 15.00 5.00 233613 RPB 2007 04 18 12 40 00 504-99 D sf6 CCGG 6.240 0.040 ... H4 2007 05 07 13 25 00 13.1650 -59.4320 20.00 15.00 5.00 233614 RPB 2007 04 25 10 05 00 2591-99 D sf6 CCGG 6.200 0.040 ... H4 2007 05 07 13 39 00 13.1650 -59.4320 20.00 15.00 5.00 233611 RPB 2007 04 25 10 05 00 2592-99 D sf6 CCGG 6.170 0.040 ... H4 2007 05 07 13 54 00 13.1650 -59.4320 20.00 15.00 5.00 233612 RPB 2007 05 02 10 05 00 2681-99 D sf6 CCGG 6.280 0.040 ... H4 2007 05 22 13 42 00 13.1650 -59.4320 20.00 15.00 5.00 234352 RPB 2007 05 02 10 05 00 2682-99 D sf6 CCGG 6.310 0.040 ... H4 2007 05 22 13 56 00 13.1650 -59.4320 20.00 15.00 5.00 234353 RPB 2007 05 09 12 35 00 4617-99 D sf6 CCGG 6.280 0.040 ... H4 2007 05 22 14 11 00 13.1650 -59.4320 20.00 15.00 5.00 234354 RPB 2007 05 09 12 35 00 4618-99 D sf6 CCGG 6.300 0.040 ... H4 2007 05 22 14 25 00 13.1650 -59.4320 20.00 15.00 5.00 234355 RPB 2007 05 16 13 05 00 1503-99 D sf6 CCGG 6.320 0.040 ... H4 2007 06 12 14 40 00 13.1650 -59.4320 20.00 15.00 5.00 235437 RPB 2007 05 16 13 05 00 1504-99 D sf6 CCGG 6.290 0.040 ... H4 2007 06 12 14 54 00 13.1650 -59.4320 20.00 15.00 5.00 235438 RPB 2007 05 23 12 40 00 4185-99 D sf6 CCGG 6.280 0.040 ... H4 2007 06 12 15 08 00 13.1650 -59.4320 20.00 15.00 5.00 235439 RPB 2007 05 23 12 40 00 4186-99 D sf6 CCGG 6.310 0.040 ... H4 2007 06 12 15 22 00 13.1650 -59.4320 20.00 15.00 5.00 235440 RPB 2007 06 02 09 50 00 2421-99 D sf6 CCGG 6.200 0.040 ... H4 2007 06 13 11 24 00 13.1650 -59.4320 20.00 15.00 5.00 236023 RPB 2007 06 02 09 50 00 2422-99 D sf6 CCGG 6.280 0.040 ... H4 2007 06 13 11 38 00 13.1650 -59.4320 20.00 15.00 5.00 236024 RPB 2007 06 06 12 55 00 4063-99 D sf6 CCGG 6.340 0.040 ... H4 2007 06 13 09 44 00 13.1650 -59.4320 20.00 15.00 5.00 236021 RPB 2007 06 06 12 55 00 4064-99 D sf6 CCGG 6.260 0.040 ... H4 2007 06 13 09 58 00 13.1650 -59.4320 20.00 15.00 5.00 236022 RPB 2007 06 13 13 40 00 681-99 D sf6 CCGG 6.230 0.040 ... H4 2007 06 27 13 07 00 13.1650 -59.4320 20.00 15.00 5.00 236916 RPB 2007 06 13 13 40 00 682-99 D sf6 CCGG 6.290 0.040 ... H4 2007 06 27 13 21 00 13.1650 -59.4320 20.00 15.00 5.00 236917 RPB 2007 06 20 13 25 00 747-99 D sf6 CCGG 6.260 0.040 ... H4 2007 06 27 13 35 00 13.1650 -59.4320 20.00 15.00 5.00 236918 RPB 2007 06 20 13 25 00 748-99 D sf6 CCGG 6.230 0.040 ... H4 2007 06 27 13 49 00 13.1650 -59.4320 20.00 15.00 5.00 236919 RPB 2007 06 27 13 20 00 3553-99 D sf6 CCGG 6.250 0.040 ... H4 2007 07 09 15 33 00 13.1650 -59.4320 20.00 15.00 5.00 237895 RPB 2007 06 27 13 20 00 3554-99 D sf6 CCGG 6.310 0.040 ... H4 2007 07 09 15 47 00 13.1650 -59.4320 20.00 15.00 5.00 237896 RPB 2007 07 04 09 45 00 4021-99 D sf6 CCGG 6.290 0.040 ... H4 2007 07 09 16 02 00 13.1650 -59.4320 20.00 15.00 5.00 237897 RPB 2007 07 04 09 45 00 4022-99 D sf6 CCGG 6.320 0.040 ... H4 2007 07 09 16 16 00 13.1650 -59.4320 20.00 15.00 5.00 237898 RPB 2007 07 11 10 00 00 3341-99 D sf6 CCGG 6.260 0.040 ... H4 2007 07 27 13 25 00 13.1650 -59.4320 20.00 15.00 5.00 238784 RPB 2007 07 11 10 00 00 3342-99 D sf6 CCGG 6.240 0.040 ... H4 2007 07 27 13 40 00 13.1650 -59.4320 20.00 15.00 5.00 238785 RPB 2007 07 18 10 00 00 4099-99 D sf6 CCGG 6.330 0.040 ... H4 2007 07 27 14 22 00 13.1650 -59.4320 20.00 15.00 5.00 238786 RPB 2007 07 18 10 00 00 4100-99 D sf6 CCGG 6.290 0.040 ... H4 2007 07 27 14 36 00 13.1650 -59.4320 20.00 15.00 5.00 238787 RPB 2007 07 25 14 20 00 1407-99 D sf6 CCGG 6.300 0.040 ... H4 2007 08 08 11 24 00 13.1650 -59.4320 20.00 15.00 5.00 239645 RPB 2007 07 25 14 20 00 1408-99 D sf6 CCGG 6.360 0.040 ... H4 2007 08 08 11 38 00 13.1650 -59.4320 20.00 15.00 5.00 239646 RPB 2007 08 01 09 55 00 3903-99 D sf6 CCGG 6.520 0.040 ... H4 2007 08 08 10 56 00 13.1650 -59.4320 20.00 15.00 5.00 239647 RPB 2007 08 01 09 55 00 3904-99 D sf6 CCGG 6.310 0.040 ... H4 2007 08 08 11 10 00 13.1650 -59.4320 20.00 15.00 5.00 239648 RPB 2007 08 11 10 10 00 431-99 D sf6 CCGG 6.410 0.040 ... H4 2007 08 21 12 51 00 13.1650 -59.4320 20.00 15.00 5.00 240390 RPB 2007 08 11 10 10 00 556-99 D sf6 CCGG 6.370 0.040 ... H4 2007 08 21 13 06 00 13.1650 -59.4320 20.00 15.00 5.00 240391 RPB 2007 08 15 10 05 00 3156-99 D sf6 CCGG 6.360 0.040 ... H4 2007 08 21 12 23 00 13.1650 -59.4320 20.00 15.00 5.00 240388 RPB 2007 08 15 10 05 00 4326-99 D sf6 CCGG 6.280 0.040 ... H4 2007 08 21 12 37 00 13.1650 -59.4320 20.00 15.00 5.00 240389 RPB 2007 08 25 10 00 00 867-99 D sf6 CCGG 6.290 0.040 ... H4 2007 09 07 10 31 00 13.1650 -59.4320 20.00 15.00 5.00 241107 RPB 2007 08 25 10 00 00 868-99 D sf6 CCGG 6.230 0.040 ... H4 2007 09 07 10 45 00 13.1650 -59.4320 20.00 15.00 5.00 241108 RPB 2007 08 29 10 00 00 1691-99 D sf6 CCGG 6.350 0.040 ... H4 2007 09 07 11 00 00 13.1650 -59.4320 20.00 15.00 5.00 241109 RPB 2007 08 29 10 00 00 1692-99 D sf6 CCGG 6.320 0.040 ... H4 2007 09 07 11 14 00 13.1650 -59.4320 20.00 15.00 5.00 241110 RPB 2007 09 05 10 00 00 897-99 D sf6 CCGG 6.320 0.040 ... H4 2007 09 17 15 41 00 13.1650 -59.4320 20.00 15.00 5.00 241820 RPB 2007 09 05 10 00 00 898-99 D sf6 CCGG 6.300 0.040 ... H4 2007 09 17 15 55 00 13.1650 -59.4320 20.00 15.00 5.00 241821 RPB 2007 09 12 10 00 00 6663-66 D sf6 CCGG 6.330 0.040 ... H4 2007 09 17 15 13 00 13.1650 -59.4320 20.00 15.00 5.00 241822 RPB 2007 09 12 10 00 00 6664-66 D sf6 CCGG 6.350 0.040 ... H4 2007 09 17 15 27 00 13.1650 -59.4320 20.00 15.00 5.00 241823 RPB 2007 09 19 10 00 00 1901-99 D sf6 CCGG 6.350 0.040 ... H4 2007 10 03 12 02 00 13.1650 -59.4320 20.00 15.00 5.00 242614 RPB 2007 09 19 10 00 00 1902-99 D sf6 CCGG 6.340 0.040 ... H4 2007 10 03 12 16 00 13.1650 -59.4320 20.00 15.00 5.00 242615 RPB 2007 09 26 10 00 00 4689-99 D sf6 CCGG 6.280 0.040 ... H4 2007 10 03 12 30 00 13.1650 -59.4320 20.00 15.00 5.00 242616 RPB 2007 09 26 10 00 00 4690-99 D sf6 CCGG 6.310 0.040 ... H4 2007 10 03 12 44 00 13.1650 -59.4320 20.00 15.00 5.00 242617 RPB 2007 10 03 10 00 00 3011-99 D sf6 CCGG 6.370 0.040 ... H4 2007 10 15 15 20 00 13.1650 -59.4320 20.00 15.00 5.00 243255 RPB 2007 10 03 10 00 00 3012-99 D sf6 CCGG 6.260 0.040 ... H4 2007 10 15 15 34 00 13.1650 -59.4320 20.00 15.00 5.00 243256 RPB 2007 10 10 10 00 00 3799-99 D sf6 CCGG 6.240 0.040 ... H4 2007 10 15 15 48 00 13.1650 -59.4320 20.00 15.00 5.00 243257 RPB 2007 10 10 10 00 00 3800-99 D sf6 CCGG 6.280 0.040 ... H4 2007 10 15 16 02 00 13.1650 -59.4320 20.00 15.00 5.00 243258 RPB 2007 10 17 10 00 00 801-99 D sf6 CCGG -999.990 -999.990 *.. H4 2007 11 01 15 15 00 13.1650 -59.4320 20.00 15.00 5.00 244044 RPB 2007 10 17 10 00 00 802-99 D sf6 CCGG -999.990 -999.990 *.. H4 2007 11 01 15 30 00 13.1650 -59.4320 20.00 15.00 5.00 244045 RPB 2007 10 24 10 00 00 4695-99 D sf6 CCGG 6.010 0.040 A.. H4 2007 11 01 15 44 00 13.1650 -59.4320 20.00 15.00 5.00 244046 RPB 2007 10 24 10 00 00 4696-99 D sf6 CCGG 6.210 0.040 ... H4 2007 11 01 15 58 00 13.1650 -59.4320 20.00 15.00 5.00 244047 RPB 2007 10 31 10 00 00 1317-99 D sf6 CCGG 6.280 0.040 ... H4 2007 11 14 14 39 00 13.1650 -59.4320 20.00 15.00 5.00 244955 RPB 2007 10 31 10 00 00 1318-99 D sf6 CCGG 6.380 0.040 ... H4 2007 11 14 14 53 00 13.1650 -59.4320 20.00 15.00 5.00 244956 RPB 2007 11 07 10 00 00 4789-99 D sf6 CCGG 6.300 0.040 ... H4 2007 11 26 10 27 00 13.1650 -59.4320 20.00 15.00 5.00 245126 RPB 2007 11 07 10 00 00 4790-99 D sf6 CCGG 6.300 0.040 ... H4 2007 11 26 10 41 00 13.1650 -59.4320 20.00 15.00 5.00 245127 RPB 2007 11 14 10 00 00 187-99 D sf6 CCGG 6.240 0.040 ... H4 2007 12 05 09 45 00 13.1650 -59.4320 20.00 15.00 5.00 245678 RPB 2007 11 14 10 00 00 188-99 D sf6 CCGG 6.360 0.040 ... H4 2007 12 05 09 59 00 13.1650 -59.4320 20.00 15.00 5.00 245679 RPB 2007 11 22 10 20 00 1869-99 D sf6 CCGG 6.390 0.040 ... H4 2007 12 05 11 11 00 13.1650 -59.4320 20.00 15.00 5.00 245680 RPB 2007 11 22 10 20 00 1870-99 D sf6 CCGG 6.390 0.040 ... H4 2007 12 05 11 25 00 13.1650 -59.4320 20.00 15.00 5.00 245681 RPB 2007 11 28 10 00 00 1173-99 D sf6 CCGG 6.380 0.040 ... H4 2007 12 21 11 22 00 13.1650 -59.4320 20.00 15.00 5.00 246575 RPB 2007 11 28 10 00 00 1174-99 D sf6 CCGG 6.450 0.040 ... H4 2007 12 21 11 36 00 13.1650 -59.4320 20.00 15.00 5.00 246576 RPB 2007 12 05 10 00 00 1633-99 D sf6 CCGG 6.340 0.040 ... H4 2007 12 21 11 50 00 13.1650 -59.4320 20.00 15.00 5.00 246577 RPB 2007 12 05 10 00 00 1634-99 D sf6 CCGG 6.370 0.040 ... H4 2007 12 21 12 05 00 13.1650 -59.4320 20.00 15.00 5.00 246578 RPB 2007 12 12 10 00 00 77-99 D sf6 CCGG 6.400 0.040 ... H4 2008 01 16 11 41 00 13.1650 -59.4320 20.00 15.00 5.00 247543 RPB 2007 12 12 10 00 00 78-99 D sf6 CCGG 6.440 0.040 ... H4 2008 01 16 11 55 00 13.1650 -59.4320 20.00 15.00 5.00 247544 RPB 2007 12 19 10 00 00 1913-99 D sf6 CCGG 6.310 0.040 ... H4 2008 01 16 11 12 00 13.1650 -59.4320 20.00 15.00 5.00 247541 RPB 2007 12 19 10 00 00 1914-99 D sf6 CCGG 6.430 0.040 ... H4 2008 01 16 11 26 00 13.1650 -59.4320 20.00 15.00 5.00 247542 RPB 2007 12 26 13 15 00 93-99 D sf6 CCGG 6.380 0.040 ... H4 2008 01 19 13 28 00 13.1650 -59.4320 20.00 15.00 5.00 247939 RPB 2007 12 26 13 15 00 94-99 D sf6 CCGG 6.350 0.040 ... H4 2008 01 19 13 42 00 13.1650 -59.4320 20.00 15.00 5.00 247940 RPB 2008 01 02 13 35 00 1399-99 D sf6 CCGG 6.380 0.040 ... H4 2008 01 19 13 56 00 13.1650 -59.4320 20.00 15.00 5.00 247937 RPB 2008 01 02 13 35 00 1400-99 D sf6 CCGG 6.410 0.040 ... H4 2008 01 19 14 10 00 13.1650 -59.4320 20.00 15.00 5.00 247938 RPB 2008 01 09 18 25 00 2829-99 D sf6 CCGG 6.370 0.040 ... H6 2008 01 30 12 30 00 13.1650 -59.4320 20.00 15.00 5.00 248593 RPB 2008 01 09 18 25 00 2830-99 D sf6 CCGG 6.400 0.040 ... H6 2008 01 30 12 45 00 13.1650 -59.4320 20.00 15.00 5.00 248594 RPB 2008 01 16 21 30 00 4035-99 D sf6 CCGG 6.490 0.040 ... H6 2008 01 30 13 01 00 13.1650 -59.4320 20.00 15.00 5.00 248595 RPB 2008 01 16 21 30 00 4036-99 D sf6 CCGG 6.440 0.040 ... H6 2008 01 30 13 16 00 13.1650 -59.4320 20.00 15.00 5.00 248596 RPB 2008 01 27 11 13 00 1089-99 D sf6 CCGG 6.460 0.040 ... H6 2008 02 12 10 31 00 13.1650 -59.4320 20.00 15.00 5.00 249301 RPB 2008 01 27 11 13 00 1090-99 D sf6 CCGG 6.470 0.040 ... H6 2008 02 12 10 47 00 13.1650 -59.4320 20.00 15.00 5.00 249302 RPB 2008 02 03 12 16 00 4671-99 D sf6 CCGG 6.460 0.040 ... H6 2008 02 12 11 02 00 13.1650 -59.4320 20.00 15.00 5.00 249299 RPB 2008 02 03 12 16 00 4672-99 D sf6 CCGG 6.430 0.040 ... H6 2008 02 12 11 17 00 13.1650 -59.4320 20.00 15.00 5.00 249300 RPB 2008 02 10 10 58 00 2835-99 D sf6 CCGG 6.510 0.040 ... H6 2008 02 29 12 57 00 13.1650 -59.4320 20.00 15.00 5.00 250161 RPB 2008 02 10 10 58 00 2836-99 D sf6 CCGG 6.480 0.040 ... H6 2008 02 29 13 13 00 13.1650 -59.4320 20.00 15.00 5.00 250162 RPB 2008 02 17 11 11 00 3983-99 D sf6 CCGG 6.500 0.040 ... H6 2008 02 29 13 28 00 13.1650 -59.4320 20.00 15.00 5.00 250163 RPB 2008 02 17 11 11 00 3984-99 D sf6 CCGG 6.510 0.040 ... H6 2008 02 29 13 43 00 13.1650 -59.4320 20.00 15.00 5.00 250164 RPB 2008 02 24 11 31 00 3007-99 D sf6 CCGG 6.100 0.040 A.. H4 2008 04 03 10 56 00 13.1650 -59.4320 20.00 15.00 5.00 251863 RPB 2008 02 24 11 31 00 3008-99 D sf6 CCGG 6.450 0.040 ... H4 2008 04 03 11 11 00 13.1650 -59.4320 20.00 15.00 5.00 251864 RPB 2008 03 02 10 00 00 2977-99 D sf6 CCGG 6.550 0.040 ... H4 2008 04 14 10 11 00 13.1650 -59.4320 20.00 15.00 5.00 252303 RPB 2008 03 02 10 00 00 2978-99 D sf6 CCGG 6.570 0.040 ... H4 2008 04 14 10 26 00 13.1650 -59.4320 20.00 15.00 5.00 252304 RPB 2008 03 02 14 41 00 2435-99 D sf6 CCGG -999.990 -999.990 *.. H4 2008 04 03 10 28 00 13.1650 -59.4320 20.00 15.00 5.00 251865 RPB 2008 03 02 14 41 00 2436-99 D sf6 CCGG -999.990 -999.990 *.. H4 2008 04 03 10 42 00 13.1650 -59.4320 20.00 15.00 5.00 251866 RPB 2008 03 09 14 41 00 1473-99 D sf6 CCGG 6.570 0.040 ... H4 2008 04 03 11 53 00 13.1650 -59.4320 20.00 15.00 5.00 251869 RPB 2008 03 09 14 41 00 1474-99 D sf6 CCGG 6.490 0.040 ... H4 2008 04 03 12 08 00 13.1650 -59.4320 20.00 15.00 5.00 251870 RPB 2008 03 16 14 04 00 2437-99 D sf6 CCGG 6.480 0.040 ... H4 2008 04 03 11 25 00 13.1650 -59.4320 20.00 15.00 5.00 251867 RPB 2008 03 16 14 04 00 2438-99 D sf6 CCGG 6.610 0.040 ... H4 2008 04 03 11 39 00 13.1650 -59.4320 20.00 15.00 5.00 251868 RPB 2008 03 26 10 00 00 121-99 D sf6 CCGG 6.520 0.040 ... H4 2008 04 11 16 48 00 13.1650 -59.4320 20.00 15.00 5.00 252301 RPB 2008 03 26 10 00 00 122-99 D sf6 CCGG 6.550 0.040 ... H4 2008 04 11 17 03 00 13.1650 -59.4320 20.00 15.00 5.00 252302 RPB 2008 04 09 10 00 00 197-99 D sf6 CCGG 6.540 0.040 ... H4 2008 04 30 08 55 00 13.1650 -59.4320 20.00 15.00 5.00 253178 RPB 2008 04 09 10 00 00 198-99 D sf6 CCGG 6.530 0.040 ... H4 2008 04 30 09 09 00 13.1650 -59.4320 20.00 15.00 5.00 253179 RPB 2008 04 16 15 15 00 1525-99 D sf6 CCGG 6.580 0.040 ... H4 2008 04 30 09 23 00 13.1650 -59.4320 20.00 15.00 5.00 253180 RPB 2008 04 16 15 15 00 1526-99 D sf6 CCGG 6.480 0.040 ... H4 2008 04 30 09 38 00 13.1650 -59.4320 20.00 15.00 5.00 253181 RPB 2008 04 23 10 00 00 1965-99 D sf6 CCGG 6.510 0.040 ... H6 2008 05 09 12 29 00 13.1650 -59.4320 20.00 15.00 5.00 253990 RPB 2008 04 23 10 00 00 1966-99 D sf6 CCGG 6.500 0.040 ... H6 2008 05 09 12 45 00 13.1650 -59.4320 20.00 15.00 5.00 253991 RPB 2008 04 30 10 15 00 4695-99 D sf6 CCGG 6.430 0.040 ... H6 2008 05 09 13 00 00 13.1650 -59.4320 20.00 15.00 5.00 253988 RPB 2008 04 30 10 15 00 4696-99 D sf6 CCGG 6.470 0.040 ... H6 2008 05 09 13 16 00 13.1650 -59.4320 20.00 15.00 5.00 253989 RPB 2008 08 08 18 30 00 2371-99 G sf6 CCGG 6.610 0.040 ... H6 2008 09 02 10 37 00 13.1650 -59.4320 20.00 15.00 5.00 259868 RPB 2008 08 08 18 30 00 2372-99 G sf6 CCGG 6.600 0.040 ... H6 2008 09 02 10 52 00 13.1650 -59.4320 20.00 15.00 5.00 259869 RPB 2008 08 16 10 40 00 4933-99 G sf6 CCGG 6.560 0.040 ... H6 2008 09 02 13 12 00 13.1650 -59.4320 20.00 15.00 5.00 259870 RPB 2008 08 16 10 40 00 4934-99 G sf6 CCGG 6.600 0.040 ... H6 2008 09 02 13 28 00 13.1650 -59.4320 20.00 15.00 5.00 259871 RPB 2008 08 20 10 00 00 2883-99 G sf6 CCGG 6.670 0.040 ... H4 2008 09 16 14 34 00 13.1650 -59.4320 20.00 15.00 5.00 260783 RPB 2008 08 20 10 00 00 2884-99 G sf6 CCGG 6.620 0.040 ... H4 2008 09 16 14 49 00 13.1650 -59.4320 20.00 15.00 5.00 260784 RPB 2008 08 29 10 25 00 4471-99 G sf6 CCGG 6.590 0.040 ... H4 2008 09 16 15 03 00 13.1650 -59.4320 20.00 15.00 5.00 260781 RPB 2008 08 29 10 25 00 4472-99 G sf6 CCGG 6.540 0.040 ... H4 2008 09 16 15 17 00 13.1650 -59.4320 20.00 15.00 5.00 260782 RPB 2008 09 03 19 30 00 1483-99 G sf6 CCGG 6.390 0.040 ... H6 2008 09 18 16 33 00 13.1650 -59.4320 20.00 15.00 5.00 261198 RPB 2008 09 03 19 30 00 1484-99 G sf6 CCGG 6.490 0.040 ... H6 2008 09 18 16 49 00 13.1650 -59.4320 20.00 15.00 5.00 261199 RPB 2008 09 10 17 20 00 4073-99 G sf6 CCGG 6.590 0.040 ... H6 2008 09 19 09 43 00 13.1650 -59.4320 20.00 15.00 5.00 261200 RPB 2008 09 10 17 20 00 4074-99 G sf6 CCGG 6.680 0.040 ... H6 2008 09 19 09 58 00 13.1650 -59.4320 20.00 15.00 5.00 261201 RPB 2008 09 17 10 05 00 1405-99 G sf6 CCGG 6.540 0.040 ... H4 2008 10 07 11 52 00 13.1650 -59.4320 20.00 15.00 5.00 261831 RPB 2008 09 17 10 05 00 1406-99 G sf6 CCGG 6.560 0.040 ... H4 2008 10 07 12 06 00 13.1650 -59.4320 20.00 15.00 5.00 261832 RPB 2008 09 24 10 05 00 2251-99 G sf6 CCGG 6.580 0.040 ... H4 2008 10 07 12 21 00 13.1650 -59.4320 20.00 15.00 5.00 261833 RPB 2008 09 24 10 05 00 2252-99 G sf6 CCGG 6.580 0.040 ... H4 2008 10 07 12 35 00 13.1650 -59.4320 20.00 15.00 5.00 261834 RPB 2008 10 05 10 00 00 1633-99 G sf6 CCGG 6.500 0.040 ... H6 2008 10 23 14 34 00 13.1650 -59.4320 20.00 15.00 5.00 262626 RPB 2008 10 05 10 00 00 1634-99 G sf6 CCGG 6.570 0.040 ... H6 2008 10 23 14 50 00 13.1650 -59.4320 20.00 15.00 5.00 262627 RPB 2008 10 08 10 00 00 2437-99 G sf6 CCGG 6.530 0.040 ... H6 2008 10 23 14 03 00 13.1650 -59.4320 20.00 15.00 5.00 262624 RPB 2008 10 08 10 00 00 2438-99 G sf6 CCGG 6.540 0.040 ... H6 2008 10 23 14 19 00 13.1650 -59.4320 20.00 15.00 5.00 262625 RPB 2008 10 18 10 05 00 1947-99 G sf6 CCGG 6.610 0.040 ... H6 2008 10 31 14 59 00 13.1650 -59.4320 20.00 15.00 5.00 263352 RPB 2008 10 18 10 05 00 1948-99 G sf6 CCGG 6.620 0.040 ... H6 2008 10 31 15 15 00 13.1650 -59.4320 20.00 15.00 5.00 263353 RPB 2008 10 22 10 05 00 3017-99 G sf6 CCGG 6.670 0.040 ... H6 2008 10 31 15 30 00 13.1650 -59.4320 20.00 15.00 5.00 263354 RPB 2008 10 22 10 05 00 3018-99 G sf6 CCGG 6.670 0.040 ... H6 2008 10 31 15 45 00 13.1650 -59.4320 20.00 15.00 5.00 263355 RPB 2008 10 29 14 02 00 1281-99 G sf6 CCGG 6.650 0.040 ... H6 2008 11 19 13 14 00 13.1650 -59.4320 20.00 15.00 5.00 264021 RPB 2008 10 29 14 02 00 1282-99 G sf6 CCGG 6.710 0.040 ... H6 2008 11 19 13 29 00 13.1650 -59.4320 20.00 15.00 5.00 264022 RPB 2008 11 05 13 45 00 5037-99 G sf6 CCGG 6.740 0.040 ... H6 2008 11 19 13 45 00 13.1650 -59.4320 20.00 15.00 5.00 264023 RPB 2008 11 05 13 45 00 5038-99 G sf6 CCGG 6.700 0.040 ... H6 2008 11 19 14 00 00 13.1650 -59.4320 20.00 15.00 5.00 264024 RPB 2008 11 12 10 00 00 3639-99 G sf6 CCGG 6.600 0.040 ... H6 2008 12 03 12 17 00 13.1650 -59.4320 20.00 15.00 5.00 264740 RPB 2008 11 12 10 00 00 3640-99 G sf6 CCGG 6.570 0.040 ... H6 2008 12 03 12 32 00 13.1650 -59.4320 20.00 15.00 5.00 264741 RPB 2008 11 19 10 05 00 3943-99 G sf6 CCGG 6.730 0.040 ... H6 2008 12 03 11 46 00 13.1650 -59.4320 20.00 15.00 5.00 264738 RPB 2008 11 19 10 05 00 3944-99 G sf6 CCGG 6.730 0.040 ... H6 2008 12 03 12 01 00 13.1650 -59.4320 20.00 15.00 5.00 264739 RPB 2008 11 29 10 00 00 3693-99 G sf6 CCGG 6.760 0.040 ... H6 2008 12 12 11 50 00 13.1650 -59.4320 20.00 15.00 5.00 265501 RPB 2008 11 29 10 00 00 3694-99 G sf6 CCGG 6.720 0.040 ... H6 2008 12 12 12 05 00 13.1650 -59.4320 20.00 15.00 5.00 265502 RPB 2008 12 03 15 15 00 3945-99 G sf6 CCGG 6.710 0.040 ... H6 2008 12 12 12 20 00 13.1650 -59.4320 20.00 15.00 5.00 265503 RPB 2008 12 03 15 15 00 3946-99 G sf6 CCGG 6.800 0.040 ... H6 2008 12 12 12 36 00 13.1650 -59.4320 20.00 15.00 5.00 265504 RPB 2008 12 10 10 00 00 2641-99 G sf6 CCGG 6.780 0.040 ... H6 2008 12 30 14 37 00 13.1650 -59.4320 20.00 15.00 5.00 266548 RPB 2008 12 10 10 00 00 2642-99 G sf6 CCGG 6.730 0.040 ... H6 2008 12 30 14 52 00 13.1650 -59.4320 20.00 15.00 5.00 266549 RPB 2008 12 17 10 05 00 4177-99 G sf6 CCGG 6.680 0.040 ... H6 2008 12 30 14 06 00 13.1650 -59.4320 20.00 15.00 5.00 266550 RPB 2008 12 17 10 05 00 4178-99 G sf6 CCGG 6.780 0.040 ... H6 2008 12 30 14 21 00 13.1650 -59.4320 20.00 15.00 5.00 266551 RPB 2008 12 27 10 05 00 1025-99 G sf6 CCGG 6.820 0.040 ... H6 2009 01 16 10 23 00 13.1650 -59.4320 20.00 15.00 5.00 267555 RPB 2008 12 27 10 05 00 1026-99 G sf6 CCGG 6.800 0.040 ... H6 2009 01 16 10 38 00 13.1650 -59.4320 20.00 15.00 5.00 267556 RPB 2009 01 02 10 10 00 1555-99 G sf6 CCGG 6.670 0.040 ... H6 2009 01 16 09 52 00 13.1650 -59.4320 20.00 15.00 5.00 267557 RPB 2009 01 02 10 10 00 1556-99 G sf6 CCGG 6.640 0.040 ... H6 2009 01 16 10 07 00 13.1650 -59.4320 20.00 15.00 5.00 267558 RPB 2009 01 07 10 05 00 2929-99 G sf6 CCGG 6.700 0.040 ... H6 2009 01 28 15 31 00 13.1650 -59.4320 20.00 15.00 5.00 268167 RPB 2009 01 07 10 05 00 2930-99 G sf6 CCGG 6.650 0.040 ... H6 2009 01 28 15 46 00 13.1650 -59.4320 20.00 15.00 5.00 268168 RPB 2009 01 15 10 05 00 4247-99 G sf6 CCGG 6.760 0.040 ... H4 2009 01 30 10 55 00 13.1650 -59.4320 20.00 15.00 5.00 268165 RPB 2009 01 15 10 05 00 4248-99 G sf6 CCGG 6.860 0.040 ... H4 2009 01 30 11 09 00 13.1650 -59.4320 20.00 15.00 5.00 268166 RPB 2009 01 23 16 25 00 3817-99 G sf6 CCGG 6.690 0.040 ... H6 2009 02 09 12 23 00 13.1650 -59.4320 20.00 15.00 5.00 269120 RPB 2009 01 23 16 25 00 3818-99 G sf6 CCGG 6.660 0.040 ... H6 2009 02 09 12 38 00 13.1650 -59.4320 20.00 15.00 5.00 269121 RPB 2009 01 28 10 06 00 5011-99 G sf6 CCGG 6.830 0.040 ... H6 2009 02 09 12 54 00 13.1650 -59.4320 20.00 15.00 5.00 269122 RPB 2009 01 28 10 06 00 5012-99 G sf6 CCGG 6.680 0.040 ... H6 2009 02 09 13 09 00 13.1650 -59.4320 20.00 15.00 5.00 269123 RPB 2009 02 04 10 05 00 867-99 G sf6 CCGG 6.720 0.040 ... H6 2009 02 23 14 36 00 13.1650 -59.4320 20.00 15.00 5.00 269949 RPB 2009 02 04 10 05 00 868-99 G sf6 CCGG 6.720 0.040 ... H6 2009 02 23 14 52 00 13.1650 -59.4320 20.00 15.00 5.00 269950 RPB 2009 02 11 10 15 00 963-99 G sf6 CCGG 6.790 0.040 ... H6 2009 02 23 15 07 00 13.1650 -59.4320 20.00 15.00 5.00 269951 RPB 2009 02 11 10 15 00 964-99 G sf6 CCGG 6.710 0.040 ... H6 2009 02 23 15 23 00 13.1650 -59.4320 20.00 15.00 5.00 269952 RPB 2009 02 18 10 05 00 1065-99 G sf6 CCGG 6.730 0.040 ... H6 2009 03 09 15 49 00 13.1650 -59.4320 20.00 15.00 5.00 271118 RPB 2009 02 18 10 05 00 1066-99 G sf6 CCGG 6.800 0.040 ... H6 2009 03 09 16 05 00 13.1650 -59.4320 20.00 15.00 5.00 271119 RPB 2009 02 28 10 05 00 1443-99 G sf6 CCGG 6.870 0.040 ... H6 2009 03 09 15 19 00 13.1650 -59.4320 20.00 15.00 5.00 271120 RPB 2009 02 28 10 05 00 1444-99 G sf6 CCGG 6.820 0.040 ... H6 2009 03 09 15 34 00 13.1650 -59.4320 20.00 15.00 5.00 271121 RPB 2009 03 06 10 05 00 2885-99 G sf6 CCGG 6.750 0.040 ... H6 2009 03 24 12 40 00 13.1650 -59.4320 20.00 15.00 5.00 271882 RPB 2009 03 06 10 05 00 2886-99 G sf6 CCGG 6.740 0.040 ... H6 2009 03 24 12 55 00 13.1650 -59.4320 20.00 15.00 5.00 271883 RPB 2009 03 11 10 05 00 4327-99 G sf6 CCGG 6.820 0.040 ... H6 2009 03 24 13 11 00 13.1650 -59.4320 20.00 15.00 5.00 271884 RPB 2009 03 11 10 05 00 4328-99 G sf6 CCGG 6.820 0.040 ... H6 2009 03 24 13 26 00 13.1650 -59.4320 20.00 15.00 5.00 271885 RPB 2009 03 18 10 05 00 483-99 G sf6 CCGG 6.800 0.040 ... H6 2009 04 10 14 21 00 13.1650 -59.4320 20.00 15.00 5.00 273249 RPB 2009 03 18 10 05 00 484-99 G sf6 CCGG 6.750 0.040 ... H6 2009 04 10 14 37 00 13.1650 -59.4320 20.00 15.00 5.00 273250 RPB 2009 03 26 18 55 00 879-99 G sf6 CCGG 6.740 0.040 ... H6 2009 04 10 13 51 00 13.1650 -59.4320 20.00 15.00 5.00 273251 RPB 2009 03 26 18 55 00 880-99 G sf6 CCGG 6.780 0.040 ... H6 2009 04 10 14 06 00 13.1650 -59.4320 20.00 15.00 5.00 273252 RPB 2009 04 01 10 05 00 599-99 G sf6 CCGG 6.890 0.040 ... H6 2009 04 18 16 04 00 13.1650 -59.4320 20.00 15.00 5.00 273993 RPB 2009 04 01 10 05 00 600-99 G sf6 CCGG 6.790 0.040 ... H6 2009 04 18 16 19 00 13.1650 -59.4320 20.00 15.00 5.00 273994 RPB 2009 04 08 10 15 00 3873-99 G sf6 CCGG 6.810 0.040 ... H6 2009 04 18 16 34 00 13.1650 -59.4320 20.00 15.00 5.00 273995 RPB 2009 04 08 10 15 00 3874-99 G sf6 CCGG 6.740 0.040 ... H6 2009 04 18 16 50 00 13.1650 -59.4320 20.00 15.00 5.00 273996 RPB 2009 04 15 10 05 00 929-99 G sf6 CCGG 6.790 0.040 ... H6 2009 05 02 16 06 00 13.1650 -59.4320 20.00 15.00 5.00 274647 RPB 2009 04 15 10 05 00 930-99 G sf6 CCGG 6.850 0.040 ... H6 2009 05 02 16 22 00 13.1650 -59.4320 20.00 15.00 5.00 274648 RPB 2009 04 22 10 05 00 2993-99 G sf6 CCGG 6.770 0.040 ... H6 2009 05 02 16 37 00 13.1650 -59.4320 20.00 15.00 5.00 274645 RPB 2009 04 22 10 05 00 2994-99 G sf6 CCGG 6.840 0.040 ... H6 2009 05 02 16 53 00 13.1650 -59.4320 20.00 15.00 5.00 274646 RPB 2009 04 30 18 43 00 1771-99 G sf6 CCGG 6.770 0.040 ... H6 2009 05 18 13 57 00 13.1650 -59.4320 20.00 15.00 5.00 275437 RPB 2009 04 30 18 43 00 1772-99 G sf6 CCGG 6.820 0.040 ... H6 2009 05 18 14 13 00 13.1650 -59.4320 20.00 15.00 5.00 275438 RPB 2009 05 06 10 05 00 2479-99 G sf6 CCGG 6.820 0.040 ... H6 2009 05 18 14 28 00 13.1650 -59.4320 20.00 15.00 5.00 275439 RPB 2009 05 06 10 05 00 2480-99 G sf6 CCGG 6.840 0.040 ... H6 2009 05 18 14 43 00 13.1650 -59.4320 20.00 15.00 5.00 275440 RPB 2009 05 13 19 12 00 3312-99 G sf6 CCGG 6.820 0.040 ... H6 2009 06 17 13 54 00 13.1650 -59.4320 20.00 15.00 5.00 276359 RPB 2009 05 13 19 12 00 745-99 G sf6 CCGG 6.800 0.040 ... H6 2009 06 17 13 39 00 13.1650 -59.4320 20.00 15.00 5.00 276358 RPB 2009 05 20 10 05 00 3765-99 G sf6 CCGG 6.820 0.040 ... H6 2009 06 17 14 09 00 13.1650 -59.4320 20.00 15.00 5.00 276360 RPB 2009 05 20 10 05 00 4333-99 G sf6 CCGG 6.790 0.040 ... H6 2009 06 17 14 25 00 13.1650 -59.4320 20.00 15.00 5.00 276361 RPB 2009 05 29 10 20 00 195-99 G sf6 CCGG 6.830 0.040 ... H4 2009 06 24 10 28 00 13.1650 -59.4320 20.00 15.00 5.00 277132 RPB 2009 05 29 10 20 00 196-99 G sf6 CCGG 6.820 0.040 ... H4 2009 06 24 10 42 00 13.1650 -59.4320 20.00 15.00 5.00 277133 RPB 2009 06 03 10 05 00 2321-99 G sf6 CCGG 6.870 0.040 ... H4 2009 06 24 13 50 00 13.1650 -59.4320 20.00 15.00 5.00 277134 RPB 2009 06 03 10 05 00 2322-99 G sf6 CCGG 6.860 0.040 ... H4 2009 06 24 14 04 00 13.1650 -59.4320 20.00 15.00 5.00 277135 RPB 2009 06 10 10 20 00 655-99 G sf6 CCGG 6.960 0.040 ... H6 2009 07 08 15 07 00 13.1650 -59.4320 20.00 15.00 5.00 278308 RPB 2009 06 10 10 20 00 656-99 G sf6 CCGG 6.820 0.040 ... H6 2009 07 08 15 22 00 13.1650 -59.4320 20.00 15.00 5.00 278309 RPB 2009 06 17 10 10 00 2017-99 G sf6 CCGG 6.810 0.040 ... H6 2009 07 08 15 37 00 13.1650 -59.4320 20.00 15.00 5.00 278310 RPB 2009 06 17 10 10 00 2018-99 G sf6 CCGG 6.970 0.040 ... H6 2009 07 08 15 53 00 13.1650 -59.4320 20.00 15.00 5.00 278311 RPB 2009 06 27 10 00 00 571-99 G sf6 CCGG 6.820 0.040 ... H6 2009 07 16 14 35 00 13.1650 -59.4320 20.00 15.00 5.00 278999 RPB 2009 06 27 10 00 00 572-99 G sf6 CCGG 6.670 0.040 ... H6 2009 07 16 14 51 00 13.1650 -59.4320 20.00 15.00 5.00 279000 RPB 2009 07 01 10 20 00 2839-99 G sf6 CCGG 6.640 0.040 ... H6 2009 07 16 15 06 00 13.1650 -59.4320 20.00 15.00 5.00 279001 RPB 2009 07 01 10 20 00 2840-99 G sf6 CCGG 6.770 0.040 ... H6 2009 07 16 15 22 00 13.1650 -59.4320 20.00 15.00 5.00 279002 RPB 2009 07 08 11 20 00 2207-99 G sf6 CCGG 6.830 0.040 ... H6 2009 07 28 16 25 00 13.1650 -59.4320 20.00 15.00 5.00 280112 RPB 2009 07 08 11 20 00 2208-99 G sf6 CCGG 6.840 0.040 ... H6 2009 07 28 16 40 00 13.1650 -59.4320 20.00 15.00 5.00 280113 RPB 2009 07 15 15 10 00 4973-99 G sf6 CCGG 6.950 0.040 ... H6 2009 07 28 15 54 00 13.1650 -59.4320 20.00 15.00 5.00 280114 RPB 2009 07 15 15 10 00 4974-99 G sf6 CCGG 6.890 0.040 ... H6 2009 07 28 16 09 00 13.1650 -59.4320 20.00 15.00 5.00 280115 RPB 2009 07 22 10 00 00 2871-99 G sf6 CCGG 6.910 0.040 ... H6 2009 08 06 15 26 00 13.1650 -59.4320 20.00 15.00 5.00 280771 RPB 2009 07 22 10 00 00 2872-99 G sf6 CCGG 6.870 0.040 ... H6 2009 08 06 15 42 00 13.1650 -59.4320 20.00 15.00 5.00 280772 RPB 2009 07 29 10 30 00 4937-99 G sf6 CCGG 6.850 0.040 ... H6 2009 08 06 15 57 00 13.1650 -59.4320 20.00 15.00 5.00 280773 RPB 2009 07 29 10 30 00 4938-99 G sf6 CCGG 6.890 0.040 ... H6 2009 08 06 16 13 00 13.1650 -59.4320 20.00 15.00 5.00 280774 RPB 2009 08 12 10 05 00 3945-99 G sf6 CCGG 6.920 0.040 ... H6 2009 08 26 09 20 00 13.1650 -59.4320 20.00 15.00 5.00 281720 RPB 2009 08 12 10 05 00 3946-99 G sf6 CCGG 6.880 0.040 ... H6 2009 08 26 09 35 00 13.1650 -59.4320 20.00 15.00 5.00 281721 RPB 2009 08 22 10 00 00 193-99 G sf6 CCGG 6.900 0.040 ... H6 2009 09 02 13 16 00 13.1650 -59.4320 20.00 15.00 5.00 282613 RPB 2009 08 22 10 00 00 194-99 G sf6 CCGG 6.870 0.040 ... H6 2009 09 02 13 32 00 13.1650 -59.4320 20.00 15.00 5.00 282614 RPB 2009 08 26 10 00 00 731-99 G sf6 CCGG 6.480 0.040 A.. H4 2009 09 02 12 16 00 13.1650 -59.4320 20.00 15.00 5.00 282615 RPB 2009 08 26 10 00 00 732-99 G sf6 CCGG 6.930 0.040 ... H4 2009 09 02 12 30 00 13.1650 -59.4320 20.00 15.00 5.00 282616 RPB 2009 09 02 10 45 00 1243-99 G sf6 CCGG 6.820 0.040 ... H6 2009 09 18 11 47 00 13.1650 -59.4320 20.00 15.00 5.00 283383 RPB 2009 09 02 10 45 00 1244-99 G sf6 CCGG 6.780 0.040 ... H6 2009 09 18 12 02 00 13.1650 -59.4320 20.00 15.00 5.00 283384 RPB 2009 09 09 10 05 00 4865-99 G sf6 CCGG 6.730 0.040 ... H6 2009 09 17 16 35 00 13.1650 -59.4320 20.00 15.00 5.00 283381 RPB 2009 09 09 10 05 00 4866-99 G sf6 CCGG 6.810 0.040 ... H6 2009 09 17 16 51 00 13.1650 -59.4320 20.00 15.00 5.00 283382 RPB 2009 09 16 11 15 00 2893-99 G sf6 CCGG 6.900 0.040 ... H6 2009 09 29 11 23 00 13.1650 -59.4320 20.00 15.00 5.00 284116 RPB 2009 09 16 11 15 00 2894-99 G sf6 CCGG 6.930 0.040 ... H6 2009 09 29 11 39 00 13.1650 -59.4320 20.00 15.00 5.00 284117 RPB 2009 09 23 10 00 00 4447-99 G sf6 CCGG 6.900 0.040 ... H6 2009 09 29 11 56 00 13.1650 -59.4320 20.00 15.00 5.00 284118 RPB 2009 09 23 10 00 00 4448-99 G sf6 CCGG 6.880 0.040 ... H6 2009 09 29 12 12 00 13.1650 -59.4320 20.00 15.00 5.00 284119 RPB 2009 09 30 10 20 00 1125-99 G sf6 CCGG 6.970 0.040 ... H6 2009 10 19 14 54 00 13.1650 -59.4320 20.00 15.00 5.00 285136 RPB 2009 09 30 10 20 00 1126-99 G sf6 CCGG 6.940 0.040 ... H6 2009 10 19 15 10 00 13.1650 -59.4320 20.00 15.00 5.00 285137 RPB 2009 10 07 10 05 00 1379-99 G sf6 CCGG 6.870 0.040 ... H6 2009 10 19 15 25 00 13.1650 -59.4320 20.00 15.00 5.00 285138 RPB 2009 10 07 10 05 00 1380-99 G sf6 CCGG 6.860 0.040 ... H6 2009 10 19 15 41 00 13.1650 -59.4320 20.00 15.00 5.00 285139 RPB 2009 10 14 10 05 00 2867-99 G sf6 CCGG 6.890 0.040 ... H6 2009 10 26 12 53 00 13.1650 -59.4320 20.00 15.00 5.00 285683 RPB 2009 10 14 10 05 00 2868-99 G sf6 CCGG 6.920 0.040 ... H6 2009 10 26 13 09 00 13.1650 -59.4320 20.00 15.00 5.00 285684 RPB 2009 10 21 10 00 00 4879-99 G sf6 CCGG 6.970 0.040 ... H6 2009 10 26 13 24 00 13.1650 -59.4320 20.00 15.00 5.00 285685 RPB 2009 10 21 10 00 00 4880-99 G sf6 CCGG 6.950 0.040 ... H6 2009 10 26 13 39 00 13.1650 -59.4320 20.00 15.00 5.00 285686 RPB 2009 10 28 10 00 00 1583-99 G sf6 CCGG 6.910 0.040 ... H6 2009 11 20 11 49 00 13.1650 -59.4320 20.00 15.00 5.00 286361 RPB 2009 10 28 10 00 00 1584-99 G sf6 CCGG 6.910 0.040 ... H6 2009 11 20 12 05 00 13.1650 -59.4320 20.00 15.00 5.00 286362 RPB 2009 11 04 13 50 00 2301-99 G sf6 CCGG 7.020 0.040 ... H6 2009 11 20 12 20 00 13.1650 -59.4320 20.00 15.00 5.00 286363 RPB 2009 11 04 13 50 00 2302-99 G sf6 CCGG 6.940 0.040 ... H6 2009 11 20 12 35 00 13.1650 -59.4320 20.00 15.00 5.00 286364 RPB 2009 11 11 12 40 00 1951-99 G sf6 CCGG 6.860 0.040 ... H6 2009 12 05 12 52 00 13.1650 -59.4320 20.00 15.00 5.00 287130 RPB 2009 11 11 12 40 00 1952-99 G sf6 CCGG 6.860 0.040 ... H6 2009 12 05 13 08 00 13.1650 -59.4320 20.00 15.00 5.00 287131 RPB 2009 11 18 10 05 00 3419-99 G sf6 CCGG 6.870 0.040 ... H6 2009 12 05 12 21 00 13.1650 -59.4320 20.00 15.00 5.00 287132 RPB 2009 11 18 10 05 00 3420-99 G sf6 CCGG 6.830 0.040 ... H6 2009 12 05 12 37 00 13.1650 -59.4320 20.00 15.00 5.00 287133 RPB 2009 11 25 10 00 00 2967-99 G sf6 CCGG 6.900 0.040 ... H6 2010 01 04 12 58 00 13.1650 -59.4320 20.00 15.00 5.00 287905 RPB 2009 11 25 10 00 00 2968-99 G sf6 CCGG 6.850 0.040 ... H6 2010 01 04 13 14 00 13.1650 -59.4320 20.00 15.00 5.00 287906 RPB 2009 12 02 10 10 00 4779-99 G sf6 CCGG 6.890 0.040 ... H6 2010 01 04 12 27 00 13.1650 -59.4320 20.00 15.00 5.00 287907 RPB 2009 12 02 10 10 00 4780-99 G sf6 CCGG 6.900 0.040 ... H6 2010 01 04 12 43 00 13.1650 -59.4320 20.00 15.00 5.00 287908 RPB 2009 12 09 10 00 00 485-99 G sf6 CCGG 7.040 0.040 ... H6 2010 01 19 16 07 00 13.1650 -59.4320 20.00 15.00 5.00 288546 RPB 2009 12 09 10 00 00 486-99 G sf6 CCGG 6.990 0.040 ... H6 2010 01 19 16 22 00 13.1650 -59.4320 20.00 15.00 5.00 288547 RPB 2009 12 16 18 10 00 4447-99 G sf6 CCGG 7.000 0.040 ... H6 2010 01 19 16 38 00 13.1650 -59.4320 20.00 15.00 5.00 288548 RPB 2009 12 16 18 10 00 4448-99 G sf6 CCGG 6.990 0.040 ... H6 2010 01 19 16 53 00 13.1650 -59.4320 20.00 15.00 5.00 288549 RPB 2009 12 26 10 10 00 905-99 G sf6 CCGG 6.920 0.040 ... H6 2010 02 03 10 38 00 13.1650 -59.4320 20.00 15.00 5.00 289307 RPB 2009 12 26 10 10 00 906-99 G sf6 CCGG 6.940 0.040 ... H6 2010 02 03 10 53 00 13.1650 -59.4320 20.00 15.00 5.00 289308 RPB 2009 12 31 10 10 00 4271-99 G sf6 CCGG 7.040 0.040 ... H6 2010 02 03 09 37 00 13.1650 -59.4320 20.00 15.00 5.00 289309 RPB 2009 12 31 10 10 00 4272-99 G sf6 CCGG 7.070 0.040 ... H6 2010 02 03 09 52 00 13.1650 -59.4320 20.00 15.00 5.00 289310 RPB 2010 01 06 10 05 00 353-99 G sf6 CCGG 6.970 0.040 ... H6 2010 02 11 12 34 00 13.1650 -59.4320 20.00 15.00 5.00 289766 RPB 2010 01 06 10 05 00 354-99 G sf6 CCGG 6.980 0.040 ... H6 2010 02 11 12 50 00 13.1650 -59.4320 20.00 15.00 5.00 289767 RPB 2010 01 13 10 05 00 1429-99 G sf6 CCGG 7.010 0.040 ... H6 2010 02 11 13 05 00 13.1650 -59.4320 20.00 15.00 5.00 289768 RPB 2010 01 13 10 05 00 1430-99 G sf6 CCGG 7.010 0.040 ... H6 2010 02 11 13 20 00 13.1650 -59.4320 20.00 15.00 5.00 289769 RPB 2010 01 20 12 50 00 2009-99 G sf6 CCGG 6.970 0.040 ... H6 2010 02 24 11 21 00 13.1650 -59.4320 20.00 15.00 5.00 290420 RPB 2010 01 20 12 50 00 2010-99 G sf6 CCGG 7.010 0.040 ... H6 2010 02 24 11 37 00 13.1650 -59.4320 20.00 15.00 5.00 290421 RPB 2010 01 27 10 10 00 2491-99 G sf6 CCGG 7.010 0.040 ... H6 2010 02 24 11 52 00 13.1650 -59.4320 20.00 15.00 5.00 290418 RPB 2010 01 27 10 10 00 2492-99 G sf6 CCGG 7.050 0.040 ... H6 2010 02 24 12 07 00 13.1650 -59.4320 20.00 15.00 5.00 290419 RPB 2010 02 03 10 30 00 3307-99 G sf6 CCGG 7.070 0.040 ... H6 2010 03 08 14 34 00 13.1650 -59.4320 20.00 15.00 5.00 291495 RPB 2010 02 03 10 30 00 3308-99 G sf6 CCGG 7.090 0.040 ... H6 2010 03 08 14 49 00 13.1650 -59.4320 20.00 15.00 5.00 291496 RPB 2010 02 11 10 05 00 3647-99 G sf6 CCGG 6.910 0.040 ... H6 2010 03 08 14 03 00 13.1650 -59.4320 20.00 15.00 5.00 291497 RPB 2010 02 11 10 05 00 3648-99 G sf6 CCGG 7.020 0.040 ... H6 2010 03 08 14 18 00 13.1650 -59.4320 20.00 15.00 5.00 291498 RPB 2010 02 19 10 10 00 561-99 G sf6 CCGG 7.110 0.040 ... H6 2010 03 23 11 11 00 13.1650 -59.4320 20.00 15.00 5.00 292161 RPB 2010 02 19 10 10 00 562-99 G sf6 CCGG 7.030 0.040 ... H6 2010 03 23 11 26 00 13.1650 -59.4320 20.00 15.00 5.00 292162 RPB 2010 02 24 10 20 00 2759-99 G sf6 CCGG 7.070 0.040 ... H6 2010 03 23 10 41 00 13.1650 -59.4320 20.00 15.00 5.00 292163 RPB 2010 02 24 10 20 00 2760-99 G sf6 CCGG 7.020 0.040 ... H6 2010 03 23 10 56 00 13.1650 -59.4320 20.00 15.00 5.00 292164 RPB 2010 03 03 10 35 00 3839-99 G sf6 CCGG 7.000 0.040 ... H4 2010 04 02 13 07 00 13.1650 -59.4320 20.00 15.00 5.00 292774 RPB 2010 03 03 10 35 00 3840-99 G sf6 CCGG 6.960 0.040 ... H4 2010 04 02 13 22 00 13.1650 -59.4320 20.00 15.00 5.00 292775 RPB 2010 03 10 10 10 00 4407-99 G sf6 CCGG 17.080 -999.990 N.. H4 2010 04 02 13 57 00 13.1650 -59.4320 20.00 15.00 5.00 292776 RPB 2010 03 17 10 00 00 2116-99 G sf6 CCGG 7.030 0.040 ... H6 2010 04 08 12 44 00 13.1650 -59.4320 20.00 15.00 5.00 293489 RPB 2010 03 17 10 00 00 579-99 G sf6 CCGG 7.010 0.040 ... H6 2010 04 08 12 59 00 13.1650 -59.4320 20.00 15.00 5.00 293490 RPB 2010 03 31 10 52 00 2779-99 G sf6 CCGG 7.080 0.040 ... H6 2010 04 16 15 54 00 13.1650 -59.4320 20.00 15.00 5.00 294263 RPB 2010 03 31 10 52 00 2780-99 G sf6 CCGG 7.070 0.040 ... H6 2010 04 16 16 09 00 13.1650 -59.4320 20.00 15.00 5.00 294264 RPB 2010 04 07 10 00 00 3421-99 G sf6 CCGG 7.110 0.040 ... H6 2010 04 19 11 17 00 13.1650 -59.4320 20.00 15.00 5.00 294261 RPB 2010 04 07 10 00 00 3422-99 G sf6 CCGG 7.160 0.040 ... H6 2010 04 19 11 32 00 13.1650 -59.4320 20.00 15.00 5.00 294262 RPB 2010 04 14 10 27 00 321-99 G sf6 CCGG 7.100 0.040 ... H4 2010 04 30 14 47 00 13.1650 -59.4320 20.00 15.00 5.00 295667 RPB 2010 04 14 10 27 00 322-99 G sf6 CCGG 7.080 0.040 ... H4 2010 04 30 15 02 00 13.1650 -59.4320 20.00 15.00 5.00 295668 RPB 2010 04 21 10 05 00 2055-99 G sf6 CCGG 7.130 0.040 ... H4 2010 04 30 15 17 00 13.1650 -59.4320 20.00 15.00 5.00 295669 RPB 2010 04 21 10 05 00 2056-99 G sf6 CCGG 7.140 0.040 ... H4 2010 04 30 15 31 00 13.1650 -59.4320 20.00 15.00 5.00 295670 RPB 2010 04 28 10 10 00 929-99 G sf6 CCGG 7.070 0.040 ... H4 2010 05 18 14 28 00 13.1650 -59.4320 20.00 15.00 5.00 296268 RPB 2010 04 28 10 10 00 930-99 G sf6 CCGG 7.070 0.040 ... H4 2010 05 18 14 43 00 13.1650 -59.4320 20.00 15.00 5.00 296269 RPB 2010 05 05 10 05 00 3579-99 G sf6 CCGG 7.190 0.040 ... H4 2010 05 18 13 59 00 13.1650 -59.4320 20.00 15.00 5.00 296270 RPB 2010 05 05 10 05 00 3580-99 G sf6 CCGG 7.080 0.040 ... H4 2010 05 18 14 13 00 13.1650 -59.4320 20.00 15.00 5.00 296271 RPB 2010 05 12 10 20 00 4963-99 G sf6 CCGG 7.130 0.040 ... H4 2010 05 27 13 26 00 13.1650 -59.4320 20.00 15.00 5.00 297060 RPB 2010 05 12 10 20 00 4964-99 G sf6 CCGG 7.200 0.040 ... H4 2010 05 27 13 40 00 13.1650 -59.4320 20.00 15.00 5.00 297061 RPB 2010 05 19 10 10 00 6037-66 G sf6 CCGG 7.180 0.040 ... H4 2010 05 27 12 56 00 13.1650 -59.4320 20.00 15.00 5.00 297062 RPB 2010 05 19 10 10 00 6038-66 G sf6 CCGG 7.150 0.040 ... H4 2010 05 27 13 11 00 13.1650 -59.4320 20.00 15.00 5.00 297063 RPB 2010 05 26 10 05 00 1513-99 G sf6 CCGG 7.140 0.040 ... H4 2010 06 09 12 22 00 13.1650 -59.4320 20.00 15.00 5.00 298066 RPB 2010 05 26 10 05 00 447-99 G sf6 CCGG 7.200 0.040 ... H4 2010 06 09 12 07 00 13.1650 -59.4320 20.00 15.00 5.00 298065 RPB 2010 06 02 10 40 00 3088-99 G sf6 CCGG 7.130 0.040 ... H4 2010 06 09 11 38 00 13.1650 -59.4320 20.00 15.00 5.00 298067 RPB 2010 06 02 10 40 00 4005-99 G sf6 CCGG 7.120 0.040 ... H4 2010 06 09 11 52 00 13.1650 -59.4320 20.00 15.00 5.00 298068 RPB 2010 06 09 10 05 00 3865-99 G sf6 CCGG 7.090 0.040 ... H4 2010 06 23 11 05 00 13.1650 -59.4320 20.00 15.00 5.00 298798 RPB 2010 06 09 10 05 00 3866-99 G sf6 CCGG 7.140 0.040 ... H4 2010 06 23 11 20 00 13.1650 -59.4320 20.00 15.00 5.00 298799 RPB 2010 06 16 10 50 00 5173-99 G sf6 CCGG 7.140 0.040 ... H4 2010 06 23 11 35 00 13.1650 -59.4320 20.00 15.00 5.00 298800 RPB 2010 06 16 10 50 00 5174-99 G sf6 CCGG 7.110 0.040 ... H4 2010 06 23 11 49 00 13.1650 -59.4320 20.00 15.00 5.00 298801 RPB 2010 06 25 10 10 00 482-99 G sf6 CCGG 7.140 0.040 ... H6 2010 07 07 15 34 00 13.1650 -59.4320 20.00 15.00 5.00 299656 RPB 2010 06 30 10 35 00 3881-99 G sf6 CCGG 7.180 0.040 ... H6 2010 07 07 15 49 00 13.1650 -59.4320 20.00 15.00 5.00 299654 RPB 2010 06 30 10 35 00 3882-99 G sf6 CCGG 7.180 0.040 ... H6 2010 07 07 16 05 00 13.1650 -59.4320 20.00 15.00 5.00 299655 RPB 2010 07 07 10 50 00 1905-99 G sf6 CCGG 7.430 0.040 N.. H4 2010 07 20 13 34 00 13.1650 -59.4320 20.00 15.00 5.00 300446 RPB 2010 07 07 10 50 00 1906-99 G sf6 CCGG 7.080 0.040 ... H4 2010 07 20 13 49 00 13.1650 -59.4320 20.00 15.00 5.00 300447 RPB 2010 07 14 10 05 00 3473-99 G sf6 CCGG 7.190 0.040 ... H4 2010 07 20 13 05 00 13.1650 -59.4320 20.00 15.00 5.00 300448 RPB 2010 07 14 10 05 00 3474-99 G sf6 CCGG 7.230 0.040 ... H4 2010 07 20 13 20 00 13.1650 -59.4320 20.00 15.00 5.00 300449 RPB 2010 07 24 10 00 00 2495-99 G sf6 CCGG 7.180 0.040 ... H6 2010 08 05 13 52 00 13.1650 -59.4320 20.00 15.00 5.00 301181 RPB 2010 07 24 10 00 00 2496-99 G sf6 CCGG 7.210 0.040 ... H6 2010 08 05 14 07 00 13.1650 -59.4320 20.00 15.00 5.00 301182 RPB 2010 07 28 10 05 00 3227-99 G sf6 CCGG 7.140 0.040 ... H6 2010 08 05 14 23 00 13.1650 -59.4320 20.00 15.00 5.00 301179 RPB 2010 07 28 10 05 00 3228-99 G sf6 CCGG 7.190 0.040 ... H6 2010 08 05 14 38 00 13.1650 -59.4320 20.00 15.00 5.00 301180 RPB 2010 08 03 11 11 00 1521-99 G sf6 CCGG 7.250 0.040 ... H4 2010 08 17 12 13 00 13.1650 -59.4320 20.00 15.00 5.00 301957 RPB 2010 08 03 11 11 00 1522-99 G sf6 CCGG 7.230 0.040 ... H4 2010 08 17 12 27 00 13.1650 -59.4320 20.00 15.00 5.00 301958 RPB 2010 08 11 10 10 00 4961-99 G sf6 CCGG 7.130 0.040 ... H4 2010 08 17 12 42 00 13.1650 -59.4320 20.00 15.00 5.00 301959 RPB 2010 08 11 10 10 00 4962-99 G sf6 CCGG 7.100 0.040 ... H4 2010 08 17 12 57 00 13.1650 -59.4320 20.00 15.00 5.00 301960 RPB 2010 08 18 10 25 00 1563-99 G sf6 CCGG 7.160 0.040 ... H6 2010 08 31 14 51 00 13.1650 -59.4320 20.00 15.00 5.00 302721 RPB 2010 08 18 10 25 00 1564-99 G sf6 CCGG 7.250 0.040 ... H6 2010 08 31 15 07 00 13.1650 -59.4320 20.00 15.00 5.00 302722 RPB 2010 08 25 10 55 00 2237-99 G sf6 CCGG 7.180 0.040 ... H6 2010 08 31 14 20 00 13.1650 -59.4320 20.00 15.00 5.00 302723 RPB 2010 08 25 10 55 00 2238-99 G sf6 CCGG 7.220 0.040 ... H6 2010 08 31 14 36 00 13.1650 -59.4320 20.00 15.00 5.00 302724 RPB 2010 09 01 10 40 00 331-99 G sf6 CCGG 7.100 0.040 ... H6 2010 09 14 13 09 00 13.1650 -59.4320 20.00 15.00 5.00 303691 RPB 2010 09 01 10 40 00 332-99 G sf6 CCGG 7.040 0.040 ... H6 2010 09 14 13 25 00 13.1650 -59.4320 20.00 15.00 5.00 303692 RPB 2010 09 08 10 16 00 1287-99 G sf6 CCGG 7.210 0.040 ... H6 2010 09 14 12 39 00 13.1650 -59.4320 20.00 15.00 5.00 303693 RPB 2010 09 08 10 16 00 1288-99 G sf6 CCGG 7.150 0.040 ... H6 2010 09 14 12 54 00 13.1650 -59.4320 20.00 15.00 5.00 303694 RPB 2010 09 19 12 53 00 2925-99 G sf6 CCGG 7.030 0.040 ... H6 2010 10 01 14 49 00 13.1650 -59.4320 20.00 15.00 5.00 304832 RPB 2010 09 19 12 53 00 2926-99 G sf6 CCGG 7.040 0.040 ... H6 2010 10 01 15 05 00 13.1650 -59.4320 20.00 15.00 5.00 304833 RPB 2010 09 26 11 43 00 3335-99 G sf6 CCGG 7.020 0.040 ... H6 2010 10 01 15 20 00 13.1650 -59.4320 20.00 15.00 5.00 304834 RPB 2010 09 26 11 43 00 3336-99 G sf6 CCGG 7.060 0.040 ... H6 2010 10 01 15 35 00 13.1650 -59.4320 20.00 15.00 5.00 304835 RPB 2010 10 03 15 29 00 295-99 G sf6 CCGG 7.020 0.040 ... H6 2010 11 02 15 12 00 13.1650 -59.4320 20.00 15.00 5.00 306790 RPB 2010 10 03 15 29 00 296-99 G sf6 CCGG 7.040 0.040 ... H6 2010 11 02 15 27 00 13.1650 -59.4320 20.00 15.00 5.00 306791 RPB 2010 10 10 11 50 00 4889-99 G sf6 CCGG 7.120 0.040 ... H4 2010 11 02 13 54 00 13.1650 -59.4320 20.00 15.00 5.00 306792 RPB 2010 10 10 11 50 00 4890-99 G sf6 CCGG 7.160 0.040 ... H4 2010 11 02 14 08 00 13.1650 -59.4320 20.00 15.00 5.00 306793 RPB 2010 10 17 12 05 00 331-99 G sf6 CCGG 7.150 0.040 ... H4 2010 11 02 16 21 00 13.1650 -59.4320 20.00 15.00 5.00 306784 RPB 2010 10 17 12 05 00 332-99 G sf6 CCGG 7.260 0.040 ... H4 2010 11 02 16 35 00 13.1650 -59.4320 20.00 15.00 5.00 306785 RPB 2010 10 24 17 30 00 565-99 G sf6 CCGG 7.280 0.040 ... H6 2010 11 02 15 42 00 13.1650 -59.4320 20.00 15.00 5.00 306782 RPB 2010 10 24 17 30 00 566-99 G sf6 CCGG 7.260 0.040 ... H6 2010 11 02 15 57 00 13.1650 -59.4320 20.00 15.00 5.00 306783 RPB 2010 10 27 21 10 00 1563-99 G sf6 CCGG 7.320 0.040 ... H6 2010 11 09 14 24 00 13.1650 -59.4320 20.00 15.00 5.00 307111 RPB 2010 10 27 21 10 00 1564-99 G sf6 CCGG 7.300 0.040 ... H6 2010 11 09 14 40 00 13.1650 -59.4320 20.00 15.00 5.00 307112 RPB 2010 11 03 10 05 00 2015-99 G sf6 CCGG 7.160 0.040 ... H6 2010 11 09 13 54 00 13.1650 -59.4320 20.00 15.00 5.00 307109 RPB 2010 11 03 10 05 00 2016-99 G sf6 CCGG 7.200 0.040 ... H6 2010 11 09 14 09 00 13.1650 -59.4320 20.00 15.00 5.00 307110 RPB 2010 11 10 10 43 00 347-99 G sf6 CCGG 7.130 0.040 ... H4 2010 11 30 16 51 00 13.1650 -59.4320 20.00 15.00 5.00 308239 RPB 2010 11 10 10 43 00 348-99 G sf6 CCGG 7.130 0.040 ... H4 2010 11 30 17 05 00 13.1650 -59.4320 20.00 15.00 5.00 308240 RPB 2010 11 17 10 20 00 3359-99 G sf6 CCGG 7.180 0.040 ... H4 2010 11 30 14 23 00 13.1650 -59.4320 20.00 15.00 5.00 308241 RPB 2010 11 17 10 20 00 3360-99 G sf6 CCGG 7.170 0.040 ... H4 2010 11 30 14 38 00 13.1650 -59.4320 20.00 15.00 5.00 308242 RPB 2010 11 26 15 40 00 849-99 G sf6 CCGG 7.200 0.040 ... H4 2010 12 08 14 30 00 13.1650 -59.4320 20.00 15.00 5.00 308941 RPB 2010 11 26 15 40 00 850-99 G sf6 CCGG 7.210 0.040 ... H4 2010 12 08 14 45 00 13.1650 -59.4320 20.00 15.00 5.00 308942 RPB 2010 11 30 11 35 00 1403-99 G sf6 CCGG 7.280 0.040 ... H4 2010 12 09 10 24 00 13.1650 -59.4320 20.00 15.00 5.00 308943 RPB 2010 11 30 11 35 00 1404-99 G sf6 CCGG 7.330 0.040 ... H4 2010 12 09 10 39 00 13.1650 -59.4320 20.00 15.00 5.00 308944 RPB 2010 12 08 10 05 00 157-99 G sf6 CCGG 7.280 0.040 ... H6 2010 12 27 15 55 00 13.1650 -59.4320 20.00 15.00 5.00 309816 RPB 2010 12 08 10 05 00 158-99 G sf6 CCGG 7.260 0.040 ... H6 2010 12 27 16 11 00 13.1650 -59.4320 20.00 15.00 5.00 309817 RPB 2010 12 15 10 25 00 5169-99 G sf6 CCGG 7.280 0.040 ... H4 2010 12 27 16 40 00 13.1650 -59.4320 20.00 15.00 5.00 309818 RPB 2010 12 15 10 25 00 5170-99 G sf6 CCGG 7.250 0.040 ... H4 2010 12 27 16 55 00 13.1650 -59.4320 20.00 15.00 5.00 309819 RPB 2010 12 23 15 48 00 2871-99 G sf6 CCGG 7.250 0.040 ... H4 2011 01 07 09 32 00 13.1650 -59.4320 20.00 15.00 5.00 310368 RPB 2010 12 23 15 48 00 2872-99 G sf6 CCGG 7.230 0.040 ... H4 2011 01 07 09 47 00 13.1650 -59.4320 20.00 15.00 5.00 310369 RPB 2010 12 29 10 12 00 4599-99 G sf6 CCGG 7.340 0.040 ... H4 2011 01 07 10 02 00 13.1650 -59.4320 20.00 15.00 5.00 310370 RPB 2010 12 29 10 12 00 4600-99 G sf6 CCGG 7.330 0.040 ... H4 2011 01 07 10 16 00 13.1650 -59.4320 20.00 15.00 5.00 310371 RPB 2011 01 05 10 15 00 1963-99 G sf6 CCGG 7.250 0.040 ... H4 2011 01 20 16 46 00 13.1650 -59.4320 20.00 15.00 5.00 311412 RPB 2011 01 05 10 15 00 1964-99 G sf6 CCGG 7.300 0.040 ... H4 2011 01 20 17 00 00 13.1650 -59.4320 20.00 15.00 5.00 311413 RPB 2011 01 12 10 08 00 3781-99 G sf6 CCGG 7.340 0.040 ... H4 2011 01 20 15 47 00 13.1650 -59.4320 20.00 15.00 5.00 311410 RPB 2011 01 12 10 08 00 3782-99 G sf6 CCGG 7.330 0.040 ... H4 2011 01 20 16 02 00 13.1650 -59.4320 20.00 15.00 5.00 311411 RPB 2011 01 19 10 30 00 1183-99 G sf6 CCGG 7.330 0.040 ... H6 2011 02 03 16 53 00 13.1650 -59.4320 20.00 15.00 5.00 312018 RPB 2011 01 19 10 30 00 1184-99 G sf6 CCGG 7.380 0.040 ... H6 2011 02 03 17 09 00 13.1650 -59.4320 20.00 15.00 5.00 312019 RPB 2011 01 26 10 10 00 3267-99 G sf6 CCGG 7.240 0.040 ... H6 2011 02 03 16 20 00 13.1650 -59.4320 20.00 15.00 5.00 312016 RPB 2011 01 26 10 10 00 3268-99 G sf6 CCGG 7.310 0.040 ... H6 2011 02 03 16 36 00 13.1650 -59.4320 20.00 15.00 5.00 312017 RPB 2011 02 02 10 30 00 3591-99 G sf6 CCGG 7.350 0.040 ... H4 2011 02 22 13 05 00 13.1650 -59.4320 20.00 15.00 5.00 312814 RPB 2011 02 02 10 30 00 3592-99 G sf6 CCGG 7.330 0.040 ... H4 2011 02 22 13 20 00 13.1650 -59.4320 20.00 15.00 5.00 312815 RPB 2011 02 09 19 42 00 4703-99 G sf6 CCGG 7.330 0.040 ... H4 2011 02 22 12 34 00 13.1650 -59.4320 20.00 15.00 5.00 312816 RPB 2011 02 09 19 42 00 4704-99 G sf6 CCGG 7.390 0.040 ... H4 2011 02 22 12 50 00 13.1650 -59.4320 20.00 15.00 5.00 312817 RPB 2011 02 16 10 40 00 850-99 G sf6 CCGG 7.330 0.040 ... H6 2011 03 03 16 46 00 13.1650 -59.4320 20.00 15.00 5.00 313477 RPB 2011 02 23 10 15 00 1403-99 G sf6 CCGG 7.300 0.040 ... H6 2011 03 03 16 14 00 13.1650 -59.4320 20.00 15.00 5.00 313478 RPB 2011 02 23 10 15 00 1404-99 G sf6 CCGG 7.320 0.040 ... H6 2011 03 03 16 30 00 13.1650 -59.4320 20.00 15.00 5.00 313479 RPB 2011 03 02 10 05 00 3485-99 G sf6 CCGG 7.240 0.040 ... H4 2011 03 16 14 37 00 13.1650 -59.4320 20.00 15.00 5.00 314146 RPB 2011 03 02 10 05 00 3486-99 G sf6 CCGG 7.270 0.040 ... H4 2011 03 16 14 53 00 13.1650 -59.4320 20.00 15.00 5.00 314147 RPB 2011 03 09 10 10 00 5277-99 G sf6 CCGG 7.280 0.040 ... H4 2011 03 16 14 07 00 13.1650 -59.4320 20.00 15.00 5.00 314148 RPB 2011 03 09 10 10 00 5278-99 G sf6 CCGG 7.220 0.040 ... H4 2011 03 16 14 22 00 13.1650 -59.4320 20.00 15.00 5.00 314149 RPB 2011 03 16 10 35 00 705-99 G sf6 CCGG 7.310 0.040 ... H6 2011 03 31 16 47 00 13.1650 -59.4320 20.00 15.00 5.00 315050 RPB 2011 03 16 10 35 00 706-99 G sf6 CCGG 7.280 0.040 ... H6 2011 03 31 17 03 00 13.1650 -59.4320 20.00 15.00 5.00 315049 RPB 2011 03 23 10 05 00 1599-99 G sf6 CCGG 7.380 0.040 ... H6 2011 03 31 17 20 00 13.1650 -59.4320 20.00 15.00 5.00 315051 RPB 2011 03 23 10 05 00 1600-99 G sf6 CCGG 7.360 0.040 ... H6 2011 03 31 17 36 00 13.1650 -59.4320 20.00 15.00 5.00 315052 RPB 2011 03 30 10 10 00 49-99 G sf6 CCGG 7.300 0.040 ... H4 2011 04 11 13 34 00 13.1650 -59.4320 20.00 15.00 5.00 315721 RPB 2011 03 30 10 10 00 50-99 G sf6 CCGG 7.350 0.040 ... H4 2011 04 11 13 50 00 13.1650 -59.4320 20.00 15.00 5.00 315722 RPB 2011 04 06 10 05 00 2313-99 G sf6 CCGG 7.310 0.040 ... H4 2011 04 11 13 04 00 13.1650 -59.4320 20.00 15.00 5.00 315723 RPB 2011 04 06 10 05 00 2314-99 G sf6 CCGG 7.340 0.040 ... H4 2011 04 11 13 19 00 13.1650 -59.4320 20.00 15.00 5.00 315724 RPB 2011 04 15 10 10 00 2161-99 G sf6 CCGG 7.400 0.040 ... H6 2011 04 28 15 08 00 13.1650 -59.4320 20.00 15.00 5.00 316514 RPB 2011 04 15 10 10 00 2162-99 G sf6 CCGG 7.330 0.040 ... H6 2011 04 28 15 24 00 13.1650 -59.4320 20.00 15.00 5.00 316515 RPB 2011 04 20 10 13 00 3235-99 G sf6 CCGG 7.400 0.040 ... H6 2011 04 28 15 40 00 13.1650 -59.4320 20.00 15.00 5.00 316516 RPB 2011 04 20 10 13 00 3236-99 G sf6 CCGG 7.390 0.040 ... H6 2011 04 28 15 56 00 13.1650 -59.4320 20.00 15.00 5.00 316517 RPB 2011 04 27 10 13 00 115-99 G sf6 CCGG 7.410 0.040 ... H6 2011 05 11 10 28 00 13.1650 -59.4320 20.00 15.00 5.00 317432 RPB 2011 04 27 10 13 00 116-99 G sf6 CCGG 7.390 0.040 ... H6 2011 05 11 10 44 00 13.1650 -59.4320 20.00 15.00 5.00 317433 RPB 2011 05 04 10 20 00 987-99 G sf6 CCGG 7.400 0.040 ... H4 2011 05 11 10 43 00 13.1650 -59.4320 20.00 15.00 5.00 317434 RPB 2011 05 04 10 20 00 988-99 G sf6 CCGG 7.420 0.040 ... H4 2011 05 11 10 59 00 13.1650 -59.4320 20.00 15.00 5.00 317435 RPB 2011 05 11 10 05 00 1161-99 G sf6 CCGG 7.300 0.040 ... H4 2011 05 31 14 02 00 13.1650 -59.4320 20.00 15.00 5.00 318104 RPB 2011 05 11 10 05 00 1162-99 G sf6 CCGG 7.370 0.040 ... H4 2011 05 31 14 17 00 13.1650 -59.4320 20.00 15.00 5.00 318105 RPB 2011 05 18 10 38 00 2527-99 G sf6 CCGG 7.320 0.040 ... H4 2011 05 31 14 40 00 13.1650 -59.4320 20.00 15.00 5.00 318106 RPB 2011 05 18 10 38 00 2528-99 G sf6 CCGG 7.340 0.040 ... H4 2011 05 31 14 55 00 13.1650 -59.4320 20.00 15.00 5.00 318107 RPB 2011 05 25 10 05 00 827-99 G sf6 CCGG 7.340 0.040 ... H4 2011 06 06 14 52 00 13.1650 -59.4320 20.00 15.00 5.00 318733 RPB 2011 05 25 10 05 00 828-99 G sf6 CCGG 7.310 0.040 ... H4 2011 06 06 15 07 00 13.1650 -59.4320 20.00 15.00 5.00 318734 RPB 2011 06 01 10 22 00 3449-99 G sf6 CCGG 7.380 0.040 ... H4 2011 06 06 15 22 00 13.1650 -59.4320 20.00 15.00 5.00 318732 RPB 2011 06 08 10 13 00 3023-99 G sf6 CCGG 7.250 0.040 ... H6 2011 06 20 15 59 00 13.1650 -59.4320 20.00 15.00 5.00 319429 RPB 2011 06 08 10 13 00 3024-99 G sf6 CCGG 7.240 0.040 ... H6 2011 06 20 16 16 00 13.1650 -59.4320 20.00 15.00 5.00 319430 RPB 2011 06 15 10 10 00 4963-99 G sf6 CCGG 7.330 0.040 ... H6 2011 06 20 16 32 00 13.1650 -59.4320 20.00 15.00 5.00 319431 RPB 2011 06 15 10 10 00 4964-99 G sf6 CCGG 7.350 0.040 ... H6 2011 06 20 16 48 00 13.1650 -59.4320 20.00 15.00 5.00 319432 RPB 2011 06 22 10 50 00 2419-99 G sf6 CCGG 7.470 0.040 ... H4 2011 07 08 11 48 00 13.1650 -59.4320 20.00 15.00 5.00 320169 RPB 2011 06 22 10 50 00 2420-99 G sf6 CCGG 7.370 0.040 ... H4 2011 07 08 12 03 00 13.1650 -59.4320 20.00 15.00 5.00 320170 RPB 2011 06 29 10 00 00 4927-99 G sf6 CCGG 7.400 0.040 ... H4 2011 07 07 17 00 00 13.1650 -59.4320 20.00 15.00 5.00 320137 RPB 2011 06 29 10 00 00 4928-99 G sf6 CCGG 7.340 0.040 ... H4 2011 07 07 17 16 00 13.1650 -59.4320 20.00 15.00 5.00 320136 RPB 2011 07 06 10 22 00 593-99 G sf6 CCGG 7.460 0.040 ... H4 2011 07 25 12 45 00 13.1650 -59.4320 20.00 15.00 5.00 321046 RPB 2011 07 06 10 22 00 594-99 G sf6 CCGG 7.400 0.040 ... H4 2011 07 25 13 01 00 13.1650 -59.4320 20.00 15.00 5.00 321047 RPB 2011 07 13 10 50 00 5329-99 G sf6 CCGG 7.370 0.040 ... H4 2011 07 25 12 15 00 13.1650 -59.4320 20.00 15.00 5.00 321048 RPB 2011 07 13 10 50 00 5330-99 G sf6 CCGG 7.490 0.040 ... H4 2011 07 25 12 30 00 13.1650 -59.4320 20.00 15.00 5.00 321049 RPB 2011 07 20 10 52 00 2993-99 G sf6 CCGG 7.470 0.040 ... H6 2011 08 10 14 46 00 13.1650 -59.4320 20.00 15.00 5.00 321981 RPB 2011 07 20 10 52 00 2994-99 G sf6 CCGG 7.430 0.040 ... H6 2011 08 10 15 02 00 13.1650 -59.4320 20.00 15.00 5.00 321982 RPB 2011 07 29 10 45 00 5063-99 G sf6 CCGG 7.470 0.040 ... H6 2011 08 11 11 20 00 13.1650 -59.4320 20.00 15.00 5.00 321979 RPB 2011 07 29 10 45 00 5064-99 G sf6 CCGG 7.420 0.040 ... H6 2011 08 11 11 36 00 13.1650 -59.4320 20.00 15.00 5.00 321980 RPB 2011 08 03 11 30 00 537-99 G sf6 CCGG 7.460 0.040 ... H6 2011 08 18 15 05 00 13.1650 -59.4320 20.00 15.00 5.00 322325 RPB 2011 08 03 11 30 00 538-99 G sf6 CCGG 7.410 0.040 ... H6 2011 08 18 15 21 00 13.1650 -59.4320 20.00 15.00 5.00 322326 RPB 2011 08 10 19 05 00 2033-99 G sf6 CCGG 7.220 0.040 ... H6 2011 08 18 15 37 00 13.1650 -59.4320 20.00 15.00 5.00 322327 RPB 2011 08 10 19 05 00 2034-99 G sf6 CCGG 7.240 0.040 ... H6 2011 08 18 15 53 00 13.1650 -59.4320 20.00 15.00 5.00 322328 RPB 2011 08 17 10 20 00 2619-99 G sf6 CCGG 7.470 0.040 ... H6 2011 08 29 13 59 00 13.1650 -59.4320 20.00 15.00 5.00 322891 RPB 2011 08 17 10 20 00 2620-99 G sf6 CCGG 7.420 0.040 ... H6 2011 08 29 14 16 00 13.1650 -59.4320 20.00 15.00 5.00 322892 RPB 2011 08 24 10 20 00 4771-99 G sf6 CCGG 7.370 0.040 ... H6 2011 08 30 11 49 00 13.1650 -59.4320 20.00 15.00 5.00 322889 RPB 2011 08 24 10 20 00 4772-99 G sf6 CCGG 7.410 0.040 ... H6 2011 08 30 12 05 00 13.1650 -59.4320 20.00 15.00 5.00 322890 RPB 2011 09 02 10 55 00 3171-99 G sf6 CCGG 7.280 0.040 ... H4 2011 09 15 10 40 00 13.1650 -59.4320 20.00 15.00 5.00 323491 RPB 2011 09 02 10 55 00 3172-99 G sf6 CCGG 7.290 0.040 ... H4 2011 09 15 10 55 00 13.1650 -59.4320 20.00 15.00 5.00 323492 RPB 2011 09 07 10 05 00 3383-99 G sf6 CCGG 7.370 0.040 ... H4 2011 09 14 14 08 00 13.1650 -59.4320 20.00 15.00 5.00 323558 RPB 2011 09 07 10 05 00 3384-99 G sf6 CCGG 7.350 0.040 ... H4 2011 09 14 14 23 00 13.1650 -59.4320 20.00 15.00 5.00 323559 RPB 2011 09 14 10 05 00 3419-99 G sf6 CCGG 7.410 0.040 ... H4 2011 09 28 14 08 00 13.1650 -59.4320 20.00 15.00 5.00 324245 RPB 2011 09 14 10 05 00 3420-99 G sf6 CCGG 7.380 0.040 ... H4 2011 09 28 14 23 00 13.1650 -59.4320 20.00 15.00 5.00 324246 RPB 2011 09 21 10 40 00 3979-99 G sf6 CCGG 7.470 0.040 ... H4 2011 09 28 13 37 00 13.1650 -59.4320 20.00 15.00 5.00 324243 RPB 2011 09 21 10 40 00 3980-99 G sf6 CCGG 7.490 0.040 ... H4 2011 09 28 13 52 00 13.1650 -59.4320 20.00 15.00 5.00 324244 RPB 2011 09 30 10 20 00 295-99 G sf6 CCGG 7.250 0.040 ... H6 2011 10 11 11 51 00 13.1650 -59.4320 20.00 15.00 5.00 325021 RPB 2011 09 30 10 20 00 296-99 G sf6 CCGG 7.260 0.040 ... H6 2011 10 11 12 07 00 13.1650 -59.4320 20.00 15.00 5.00 325022 RPB 2011 10 06 10 20 00 3013-99 G sf6 CCGG 7.490 0.040 ... H6 2011 10 11 11 18 00 13.1650 -59.4320 20.00 15.00 5.00 325023 RPB 2011 10 06 10 20 00 3014-99 G sf6 CCGG 7.540 0.040 ... H6 2011 10 11 11 35 00 13.1650 -59.4320 20.00 15.00 5.00 325024 RPB 2011 10 12 10 05 00 2037-99 G sf6 CCGG 7.380 0.040 ... H6 2011 11 02 15 12 00 13.1650 -59.4320 20.00 15.00 5.00 325788 RPB 2011 10 12 10 05 00 2038-99 G sf6 CCGG 7.480 0.040 ... H6 2011 11 02 15 29 00 13.1650 -59.4320 20.00 15.00 5.00 325789 RPB 2011 10 19 10 20 00 2105-99 G sf6 CCGG 7.510 0.040 ... H6 2011 11 02 15 45 00 13.1650 -59.4320 20.00 15.00 5.00 325790 RPB 2011 10 19 10 20 00 2106-99 G sf6 CCGG 7.490 0.040 ... H6 2011 11 02 16 01 00 13.1650 -59.4320 20.00 15.00 5.00 325791 RPB 2011 10 28 10 10 00 525-99 G sf6 CCGG 7.470 0.040 ... H4 2011 11 14 14 36 00 13.1650 -59.4320 20.00 15.00 5.00 326584 RPB 2011 10 28 10 10 00 526-99 G sf6 CCGG 7.510 0.040 ... H4 2011 11 14 14 51 00 13.1650 -59.4320 20.00 15.00 5.00 326585 RPB 2011 11 02 10 05 00 5077-99 G sf6 CCGG 7.450 0.040 ... H4 2011 11 14 15 07 00 13.1650 -59.4320 20.00 15.00 5.00 326582 RPB 2011 11 02 10 05 00 5078-99 G sf6 CCGG 7.450 0.040 ... H4 2011 11 14 15 22 00 13.1650 -59.4320 20.00 15.00 5.00 326583 RPB 2011 11 09 10 13 00 2791-99 G sf6 CCGG 7.510 0.040 ... H4 2011 11 29 10 51 00 13.1650 -59.4320 20.00 15.00 5.00 327201 RPB 2011 11 09 10 13 00 2792-99 G sf6 CCGG 7.450 0.040 ... H4 2011 11 29 11 06 00 13.1650 -59.4320 20.00 15.00 5.00 327202 RPB 2011 11 16 10 05 00 2961-99 G sf6 CCGG 7.520 0.040 ... H4 2011 11 29 10 21 00 13.1650 -59.4320 20.00 15.00 5.00 327199 RPB 2011 11 16 10 05 00 2962-99 G sf6 CCGG 7.420 0.040 ... H4 2011 11 29 10 36 00 13.1650 -59.4320 20.00 15.00 5.00 327200 RPB 2011 11 26 10 50 00 2081-99 G sf6 CCGG 7.500 0.040 ... H4 2011 12 15 11 51 00 13.1650 -59.4320 20.00 15.00 5.00 327748 RPB 2011 11 26 10 50 00 2082-99 G sf6 CCGG 7.480 0.040 ... H4 2011 12 15 12 06 00 13.1650 -59.4320 20.00 15.00 5.00 327749 RPB 2011 11 30 10 52 00 3979-99 G sf6 CCGG 7.430 0.040 ... H4 2011 12 15 11 21 00 13.1650 -59.4320 20.00 15.00 5.00 327750 RPB 2011 11 30 10 52 00 3980-99 G sf6 CCGG 7.430 0.040 ... H4 2011 12 15 11 36 00 13.1650 -59.4320 20.00 15.00 5.00 327751 RPB 2011 12 07 10 15 00 341-99 G sf6 CCGG 7.420 0.040 ... H4 2011 12 27 11 56 00 13.1650 -59.4320 20.00 15.00 5.00 328392 RPB 2011 12 07 10 15 00 342-99 G sf6 CCGG 7.390 0.040 ... H4 2011 12 27 12 11 00 13.1650 -59.4320 20.00 15.00 5.00 328393 RPB 2011 12 14 10 40 00 4533-99 G sf6 CCGG 7.450 0.040 ... H4 2011 12 27 12 26 00 13.1650 -59.4320 20.00 15.00 5.00 328390 RPB 2011 12 14 10 40 00 4534-99 G sf6 CCGG 7.490 0.040 ... H4 2011 12 27 12 42 00 13.1650 -59.4320 20.00 15.00 5.00 328391 RPB 2011 12 24 10 15 00 2935-99 G sf6 CCGG 7.510 0.040 ... H6 2012 01 10 10 41 00 13.1650 -59.4320 20.00 15.00 5.00 328897 RPB 2011 12 24 10 15 00 2936-99 G sf6 CCGG 7.570 0.040 ... H6 2012 01 10 10 57 00 13.1650 -59.4320 20.00 15.00 5.00 328898 RPB 2011 12 29 10 10 00 2957-99 G sf6 CCGG 7.550 0.040 ... H6 2012 01 10 11 13 00 13.1650 -59.4320 20.00 15.00 5.00 328895 RPB 2011 12 29 10 10 00 2958-99 G sf6 CCGG 7.490 0.040 ... H6 2012 01 10 11 29 00 13.1650 -59.4320 20.00 15.00 5.00 328896 RPB 2012 01 04 10 45 00 1361-99 G sf6 CCGG 7.540 0.040 ... H6 2012 01 25 13 40 00 13.1650 -59.4320 20.00 15.00 5.00 329954 RPB 2012 01 04 10 45 00 1362-99 G sf6 CCGG 7.480 0.040 ... H6 2012 01 25 13 56 00 13.1650 -59.4320 20.00 15.00 5.00 329955 RPB 2012 01 14 10 16 00 4523-99 G sf6 CCGG 7.590 0.040 ... H6 2012 01 25 14 12 00 13.1650 -59.4320 20.00 15.00 5.00 329956 RPB 2012 01 14 10 16 00 4524-99 G sf6 CCGG 7.640 0.040 ... H6 2012 01 25 14 29 00 13.1650 -59.4320 20.00 15.00 5.00 329957 RPB 2012 01 18 10 40 00 1675-99 G sf6 CCGG 7.520 0.040 ... H6 2012 02 01 09 46 00 13.1650 -59.4320 20.00 15.00 5.00 330412 RPB 2012 01 18 10 40 00 1676-99 G sf6 CCGG 7.580 0.040 ... H6 2012 02 01 10 02 00 13.1650 -59.4320 20.00 15.00 5.00 330413 RPB 2012 01 25 10 10 00 4445-99 G sf6 CCGG 7.570 0.040 ... H6 2012 02 01 09 13 00 13.1650 -59.4320 20.00 15.00 5.00 330410 RPB 2012 01 25 10 10 00 4446-99 G sf6 CCGG 7.620 0.040 ... H6 2012 02 01 09 29 00 13.1650 -59.4320 20.00 15.00 5.00 330411 RPB 2012 02 02 17 58 00 903-99 G sf6 CCGG 7.620 0.040 ... H4 2012 02 15 12 44 00 13.1650 -59.4320 20.00 15.00 5.00 331272 RPB 2012 02 02 17 58 00 904-99 G sf6 CCGG 7.630 0.040 ... H4 2012 02 15 13 00 00 13.1650 -59.4320 20.00 15.00 5.00 331273 RPB 2012 02 08 20 15 00 2893-99 G sf6 CCGG 7.590 0.040 ... H4 2012 02 15 12 14 00 13.1650 -59.4320 20.00 15.00 5.00 331271 RPB 2012 02 08 20 15 00 2894-99 G sf6 CCGG 7.640 0.040 ... H4 2012 02 15 12 29 00 13.1650 -59.4320 20.00 15.00 5.00 331270 RPB 2012 02 15 19 45 00 2351-99 G sf6 CCGG 7.610 0.040 ... H4 2012 03 08 10 26 00 13.1650 -59.4320 20.00 15.00 5.00 332121 RPB 2012 02 15 19 45 00 2352-99 G sf6 CCGG 7.570 0.040 ... H4 2012 03 08 10 42 00 13.1650 -59.4320 20.00 15.00 5.00 332122 RPB 2012 02 22 10 10 00 5139-99 G sf6 CCGG 7.630 0.040 ... H4 2012 03 08 09 56 00 13.1650 -59.4320 20.00 15.00 5.00 332123 RPB 2012 02 22 10 10 00 5140-99 G sf6 CCGG 7.610 0.040 ... H4 2012 03 08 10 11 00 13.1650 -59.4320 20.00 15.00 5.00 332124 RPB 2012 02 29 10 10 00 5331-99 G sf6 CCGG 7.620 0.040 ... H4 2012 03 16 15 36 00 13.1650 -59.4320 20.00 15.00 5.00 332694 RPB 2012 02 29 10 10 00 5332-99 G sf6 CCGG 7.640 0.040 ... H4 2012 03 16 15 51 00 13.1650 -59.4320 20.00 15.00 5.00 332695 RPB 2012 03 07 10 05 00 6047-66 G sf6 CCGG 7.610 0.040 ... H4 2012 03 16 15 06 00 13.1650 -59.4320 20.00 15.00 5.00 332692 RPB 2012 03 07 10 05 00 6048-66 G sf6 CCGG 7.650 0.040 ... H4 2012 03 16 15 21 00 13.1650 -59.4320 20.00 15.00 5.00 332693 RPB 2012 03 14 10 10 00 3455-99 G sf6 CCGG 7.600 0.040 ... H4 2012 03 26 14 47 00 13.1650 -59.4320 20.00 15.00 5.00 333257 RPB 2012 03 14 10 10 00 3456-99 G sf6 CCGG 7.650 0.040 ... H4 2012 03 26 15 02 00 13.1650 -59.4320 20.00 15.00 5.00 333256 RPB 2012 03 21 10 05 00 3611-99 G sf6 CCGG 7.580 0.040 ... H4 2012 03 26 14 16 00 13.1650 -59.4320 20.00 15.00 5.00 333254 RPB 2012 03 21 10 05 00 3612-99 G sf6 CCGG 7.580 0.040 ... H4 2012 03 26 14 31 00 13.1650 -59.4320 20.00 15.00 5.00 333255 RPB 2012 03 28 10 10 00 1945-99 G sf6 CCGG 7.620 0.040 ... H4 2012 04 18 13 42 00 13.1650 -59.4320 20.00 15.00 5.00 334137 RPB 2012 03 28 10 10 00 1946-99 G sf6 CCGG 7.680 0.040 ... H4 2012 04 18 13 58 00 13.1650 -59.4320 20.00 15.00 5.00 334138 RPB 2012 04 04 10 15 00 3333-99 G sf6 CCGG 7.680 0.040 ... H4 2012 04 18 14 13 00 13.1650 -59.4320 20.00 15.00 5.00 334135 RPB 2012 04 04 10 15 00 3334-99 G sf6 CCGG 7.720 0.040 ... H4 2012 04 18 14 28 00 13.1650 -59.4320 20.00 15.00 5.00 334136 RPB 2012 04 11 10 10 00 2137-99 G sf6 CCGG 7.720 0.040 ... H4 2012 05 08 12 49 00 13.1650 -59.4320 20.00 15.00 5.00 334623 RPB 2012 04 11 10 10 00 2138-99 G sf6 CCGG 7.680 0.040 ... H4 2012 05 08 13 04 00 13.1650 -59.4320 20.00 15.00 5.00 334624 RPB 2012 04 18 10 15 00 4445-99 G sf6 CCGG 7.680 0.040 ... H4 2012 05 08 12 18 00 13.1650 -59.4320 20.00 15.00 5.00 334621 RPB 2012 04 18 10 15 00 4446-99 G sf6 CCGG 7.680 0.040 ... H4 2012 05 08 12 33 00 13.1650 -59.4320 20.00 15.00 5.00 334622 RPB 2012 04 25 10 05 00 1861-99 G sf6 CCGG 7.720 0.040 ... H4 2012 05 16 14 11 00 13.1650 -59.4320 20.00 15.00 5.00 335140 RPB 2012 04 25 10 05 00 1862-99 G sf6 CCGG 7.700 0.040 ... H4 2012 05 16 14 26 00 13.1650 -59.4320 20.00 15.00 5.00 335141 RPB 2012 05 02 19 20 00 4549-99 G sf6 CCGG 7.560 0.040 ... H4 2012 05 16 14 41 00 13.1650 -59.4320 20.00 15.00 5.00 335142 RPB 2012 05 02 19 20 00 4550-99 G sf6 CCGG 7.620 0.040 ... H4 2012 05 16 14 57 00 13.1650 -59.4320 20.00 15.00 5.00 335143 RPB 2012 05 09 10 05 00 2419-99 G sf6 CCGG 7.640 0.040 ... H6 2012 05 24 14 49 00 13.1650 -59.4320 20.00 15.00 5.00 335804 RPB 2012 05 09 10 05 00 2420-99 G sf6 CCGG 7.640 0.040 ... H6 2012 05 24 15 05 00 13.1650 -59.4320 20.00 15.00 5.00 335805 RPB 2012 05 16 10 30 00 3601-99 G sf6 CCGG 7.610 0.040 ... H6 2012 05 24 15 21 00 13.1650 -59.4320 20.00 15.00 5.00 335806 RPB 2012 05 16 10 30 00 3602-99 G sf6 CCGG 7.620 0.040 ... H6 2012 05 24 15 37 00 13.1650 -59.4320 20.00 15.00 5.00 335807 RPB 2012 05 23 10 05 00 437-99 G sf6 CCGG 7.620 0.040 ... H6 2012 06 07 11 08 00 13.1650 -59.4320 20.00 15.00 5.00 336530 RPB 2012 05 23 10 05 00 438-99 G sf6 CCGG 7.710 0.040 ... H6 2012 06 07 11 24 00 13.1650 -59.4320 20.00 15.00 5.00 336531 RPB 2012 05 30 10 15 00 2375-99 G sf6 CCGG 7.730 0.040 ... H4 2012 06 07 10 06 00 13.1650 -59.4320 20.00 15.00 5.00 336528 RPB 2012 05 30 10 15 00 2376-99 G sf6 CCGG 7.750 0.040 ... H4 2012 06 07 10 21 00 13.1650 -59.4320 20.00 15.00 5.00 336529 RPB 2012 06 09 10 05 00 1527-99 G sf6 CCGG 7.660 0.040 ... H4 2012 06 21 16 13 00 13.1650 -59.4320 20.00 15.00 5.00 337263 RPB 2012 06 09 10 05 00 1528-99 G sf6 CCGG 7.700 0.040 ... H4 2012 06 21 16 28 00 13.1650 -59.4320 20.00 15.00 5.00 337264 RPB 2012 06 13 10 15 00 3283-99 G sf6 CCGG 7.790 0.040 ... H4 2012 06 21 15 43 00 13.1650 -59.4320 20.00 15.00 5.00 337261 RPB 2012 06 13 10 15 00 3284-99 G sf6 CCGG 7.720 0.040 ... H4 2012 06 21 15 58 00 13.1650 -59.4320 20.00 15.00 5.00 337262 RPB 2012 06 20 11 58 00 4203-99 G sf6 CCGG 7.720 0.040 ... H4 2012 07 10 16 45 00 13.1650 -59.4320 20.00 15.00 5.00 337886 RPB 2012 06 20 11 58 00 4204-99 G sf6 CCGG 7.710 0.040 ... H4 2012 07 10 17 00 00 13.1650 -59.4320 20.00 15.00 5.00 337887 RPB 2012 06 27 10 10 00 4637-99 G sf6 CCGG 7.690 0.040 ... H4 2012 07 10 16 14 00 13.1650 -59.4320 20.00 15.00 5.00 337884 RPB 2012 06 27 10 10 00 4638-99 G sf6 CCGG 7.660 0.040 ... H4 2012 07 10 16 30 00 13.1650 -59.4320 20.00 15.00 5.00 337885 RPB 2012 07 04 12 10 00 121-99 G sf6 CCGG 7.660 0.040 ... H4 2012 07 25 10 48 00 13.1650 -59.4320 20.00 15.00 5.00 338568 RPB 2012 07 04 12 10 00 122-99 G sf6 CCGG 7.750 0.040 ... H4 2012 07 25 11 03 00 13.1650 -59.4320 20.00 15.00 5.00 338569 RPB 2012 07 11 10 25 00 3305-99 G sf6 CCGG 7.850 0.040 ... H4 2012 07 25 11 18 00 13.1650 -59.4320 20.00 15.00 5.00 338566 RPB 2012 07 11 10 25 00 3306-99 G sf6 CCGG 7.800 0.040 ... H4 2012 07 25 11 33 00 13.1650 -59.4320 20.00 15.00 5.00 338567 RPB 2012 07 21 10 25 00 1165-99 G sf6 CCGG 7.730 0.040 ... H4 2012 08 10 10 12 00 13.1650 -59.4320 20.00 15.00 5.00 339170 RPB 2012 07 21 10 25 00 1166-99 G sf6 CCGG 7.730 0.040 ... H4 2012 08 10 10 28 00 13.1650 -59.4320 20.00 15.00 5.00 339171 RPB 2012 07 25 10 10 00 4641-99 G sf6 CCGG 7.690 0.040 ... H4 2012 08 10 10 43 00 13.1650 -59.4320 20.00 15.00 5.00 339172 RPB 2012 07 25 10 10 00 4642-99 G sf6 CCGG 7.740 0.040 ... H4 2012 08 10 10 58 00 13.1650 -59.4320 20.00 15.00 5.00 339173 RPB 2012 08 01 10 10 00 837-99 G sf6 CCGG 7.730 0.040 ... H4 2012 08 24 11 40 00 13.1650 -59.4320 20.00 15.00 5.00 339834 RPB 2012 08 01 10 10 00 838-99 G sf6 CCGG 7.600 0.040 ... H4 2012 08 24 11 56 00 13.1650 -59.4320 20.00 15.00 5.00 339835 RPB 2012 08 08 17 35 00 2149-99 G sf6 CCGG 7.740 0.040 ... H4 2012 08 24 12 11 00 13.1650 -59.4320 20.00 15.00 5.00 339836 RPB 2012 08 08 17 35 00 2150-99 G sf6 CCGG 7.730 0.040 ... H4 2012 08 24 12 26 00 13.1650 -59.4320 20.00 15.00 5.00 339837 RPB 2012 08 15 10 50 00 429-99 G sf6 CCGG 7.560 0.040 ... H4 2012 09 11 14 34 00 13.1650 -59.4320 20.00 15.00 5.00 340472 RPB 2012 08 15 10 50 00 430-99 G sf6 CCGG 7.620 0.040 ... H4 2012 09 11 14 50 00 13.1650 -59.4320 20.00 15.00 5.00 340473 RPB 2012 08 22 18 20 00 1725-99 G sf6 CCGG 7.670 0.040 ... H4 2012 09 07 13 30 00 13.1650 -59.4320 20.00 15.00 5.00 340474 RPB 2012 08 22 18 20 00 1726-99 G sf6 CCGG 7.680 0.040 ... H4 2012 09 07 13 46 00 13.1650 -59.4320 20.00 15.00 5.00 340475 RPB 2012 08 31 10 25 00 3045-99 G sf6 CCGG 7.740 0.040 ... H4 2012 09 19 11 17 00 13.1650 -59.4320 20.00 15.00 5.00 340941 RPB 2012 08 31 10 25 00 3046-99 G sf6 CCGG 7.780 0.040 ... H4 2012 09 19 11 32 00 13.1650 -59.4320 20.00 15.00 5.00 340942 RPB 2012 09 09 11 20 00 3477-99 G sf6 CCGG 7.820 0.040 ... H4 2012 09 19 11 48 00 13.1650 -59.4320 20.00 15.00 5.00 340943 RPB 2012 09 09 11 20 00 3478-99 G sf6 CCGG 7.750 0.040 ... H4 2012 09 19 12 03 00 13.1650 -59.4320 20.00 15.00 5.00 340944 RPB 2012 09 14 10 55 00 1811-99 G sf6 CCGG 7.630 0.040 ... H4 2012 10 02 13 24 00 13.1650 -59.4320 20.00 15.00 5.00 341662 RPB 2012 09 14 10 55 00 1812-99 G sf6 CCGG 7.660 0.040 ... H4 2012 10 02 13 40 00 13.1650 -59.4320 20.00 15.00 5.00 341663 RPB 2012 09 19 10 05 00 6571-66 G sf6 CCGG 7.670 0.040 ... H4 2012 10 02 12 53 00 13.1650 -59.4320 20.00 15.00 5.00 341660 RPB 2012 09 19 10 05 00 6572-66 G sf6 CCGG 7.620 0.040 ... H4 2012 10 02 13 08 00 13.1650 -59.4320 20.00 15.00 5.00 341661 RPB 2012 09 26 10 00 00 3629-99 G sf6 CCGG 7.740 0.040 ... H4 2012 10 17 13 17 00 13.1650 -59.4320 20.00 15.00 5.00 342390 RPB 2012 09 26 10 00 00 3630-99 G sf6 CCGG 7.760 0.040 ... H4 2012 10 17 13 32 00 13.1650 -59.4320 20.00 15.00 5.00 342391 RPB 2012 10 03 10 20 00 4239-99 G sf6 CCGG 7.690 0.040 ... H4 2012 10 16 15 47 00 13.1650 -59.4320 20.00 15.00 5.00 342384 RPB 2012 10 03 10 20 00 4240-99 G sf6 CCGG 7.690 0.040 ... H4 2012 10 16 16 02 00 13.1650 -59.4320 20.00 15.00 5.00 342385 RPB 2012 10 10 10 10 00 1261-99 G sf6 CCGG 7.790 0.040 ... H4 2012 11 06 16 58 00 13.1650 -59.4320 20.00 15.00 5.00 343218 RPB 2012 10 10 10 10 00 1262-99 G sf6 CCGG 7.800 0.040 ... H4 2012 11 06 17 14 00 13.1650 -59.4320 20.00 15.00 5.00 343219 RPB 2012 10 17 14 15 00 1349-99 G sf6 CCGG 7.730 0.040 ... H4 2012 11 06 16 28 00 13.1650 -59.4320 20.00 15.00 5.00 343216 RPB 2012 10 17 14 15 00 1350-99 G sf6 CCGG 7.730 0.040 ... H4 2012 11 06 16 43 00 13.1650 -59.4320 20.00 15.00 5.00 343217 RPB 2012 10 24 10 05 00 1691-99 G sf6 CCGG 7.780 0.040 ... H4 2012 11 14 14 18 00 13.1650 -59.4320 20.00 15.00 5.00 343526 RPB 2012 10 24 10 05 00 1692-99 G sf6 CCGG 7.750 0.040 ... H4 2012 11 14 14 33 00 13.1650 -59.4320 20.00 15.00 5.00 343527 RPB 2012 10 31 10 20 00 1851-99 G sf6 CCGG 7.760 0.040 ... H4 2012 11 14 13 47 00 13.1650 -59.4320 20.00 15.00 5.00 343528 RPB 2012 10 31 10 20 00 1852-99 G sf6 CCGG 7.840 0.040 ... H4 2012 11 14 14 03 00 13.1650 -59.4320 20.00 15.00 5.00 343529 RPB 2012 11 07 12 58 00 421-99 G sf6 CCGG 7.850 0.040 ... H4 2012 11 27 15 24 00 13.1650 -59.4320 20.00 15.00 5.00 344074 RPB 2012 11 07 12 58 00 422-99 G sf6 CCGG 7.880 0.040 ... H4 2012 11 27 15 40 00 13.1650 -59.4320 20.00 15.00 5.00 344075 RPB 2012 11 14 10 00 00 619-99 G sf6 CCGG 7.860 0.040 ... H4 2012 11 27 15 55 00 13.1650 -59.4320 20.00 15.00 5.00 344076 RPB 2012 11 14 10 00 00 620-99 G sf6 CCGG 7.780 0.040 ... H4 2012 11 27 16 10 00 13.1650 -59.4320 20.00 15.00 5.00 344077 RPB 2012 11 21 10 40 00 1095-99 G sf6 CCGG 7.900 0.040 ... H6 2012 12 14 11 18 00 13.1650 -59.4320 20.00 15.00 5.00 344722 RPB 2012 11 21 10 40 00 1096-99 G sf6 CCGG 7.860 0.040 ... H6 2012 12 14 11 35 00 13.1650 -59.4320 20.00 15.00 5.00 344723 RPB 2012 11 28 10 10 00 3997-99 G sf6 CCGG 7.850 0.040 ... H6 2012 12 14 10 46 00 13.1650 -59.4320 20.00 15.00 5.00 344724 RPB 2012 11 28 10 10 00 3998-99 G sf6 CCGG 7.810 0.040 ... H6 2012 12 14 11 02 00 13.1650 -59.4320 20.00 15.00 5.00 344725 RPB 2012 12 08 10 10 00 2091-99 G sf6 CCGG 7.980 0.040 ... H6 2012 12 26 12 15 00 13.1650 -59.4320 20.00 15.00 5.00 345262 RPB 2012 12 08 10 10 00 2092-99 G sf6 CCGG 7.930 0.040 ... H6 2012 12 26 12 31 00 13.1650 -59.4320 20.00 15.00 5.00 345263 RPB 2012 12 12 10 20 00 3353-99 G sf6 CCGG 7.840 0.040 ... H6 2012 12 26 11 43 00 13.1650 -59.4320 20.00 15.00 5.00 345264 RPB 2012 12 12 10 20 00 3354-99 G sf6 CCGG 7.870 0.040 ... H6 2012 12 26 11 59 00 13.1650 -59.4320 20.00 15.00 5.00 345265 RPB 2012 12 23 10 10 00 861-99 G sf6 CCGG 7.800 0.040 ... H6 2013 01 16 15 07 00 13.1650 -59.4320 20.00 15.00 5.00 345962 RPB 2012 12 23 10 10 00 862-99 G sf6 CCGG 7.810 0.040 ... H6 2013 01 16 15 23 00 13.1650 -59.4320 20.00 15.00 5.00 345963 RPB 2012 12 28 10 15 00 1379-99 G sf6 CCGG 7.770 0.040 ... H6 2013 01 16 15 39 00 13.1650 -59.4320 20.00 15.00 5.00 345964 RPB 2012 12 28 10 15 00 1380-99 G sf6 CCGG 7.890 0.040 ... H6 2013 01 16 15 55 00 13.1650 -59.4320 20.00 15.00 5.00 345965 RPB 2013 01 03 10 15 00 3543-99 G sf6 CCGG 7.880 0.040 ... H6 2013 01 23 11 17 00 13.1650 -59.4320 20.00 15.00 5.00 346426 RPB 2013 01 03 10 15 00 3544-99 G sf6 CCGG 7.860 0.040 ... H6 2013 01 23 11 33 00 13.1650 -59.4320 20.00 15.00 5.00 346427 RPB 2013 01 09 10 10 00 5195-99 G sf6 CCGG 7.890 0.040 ... H6 2013 01 23 11 49 00 13.1650 -59.4320 20.00 15.00 5.00 346428 RPB 2013 01 09 10 10 00 5196-99 G sf6 CCGG 7.870 0.040 ... H6 2013 01 23 12 05 00 13.1650 -59.4320 20.00 15.00 5.00 346429 RPB 2013 01 16 10 15 00 2521-99 G sf6 CCGG 7.940 0.040 ... H4 2013 01 29 16 42 00 13.1650 -59.4320 20.00 15.00 5.00 346849 RPB 2013 01 16 10 15 00 2522-99 G sf6 CCGG 7.960 0.040 ... H4 2013 01 29 16 57 00 13.1650 -59.4320 20.00 15.00 5.00 346850 RPB 2013 01 23 10 20 00 4645-99 G sf6 CCGG 7.900 0.040 ... H4 2013 01 29 16 12 00 13.1650 -59.4320 20.00 15.00 5.00 346851 RPB 2013 01 23 10 20 00 4646-99 G sf6 CCGG 7.850 0.040 ... H4 2013 01 29 16 27 00 13.1650 -59.4320 20.00 15.00 5.00 346852 RPB 2013 01 30 10 15 00 1355-99 G sf6 CCGG 7.920 0.040 ... H4 2013 02 13 15 30 00 13.1650 -59.4320 20.00 15.00 5.00 347536 RPB 2013 01 30 10 15 00 1356-99 G sf6 CCGG 7.900 0.040 ... H4 2013 02 13 15 45 00 13.1650 -59.4320 20.00 15.00 5.00 347537 RPB 2013 02 06 10 40 00 5057-99 G sf6 CCGG 7.960 0.040 ... H4 2013 02 13 14 59 00 13.1650 -59.4320 20.00 15.00 5.00 347538 RPB 2013 02 06 10 40 00 5058-99 G sf6 CCGG 7.950 0.040 ... H4 2013 02 13 15 15 00 13.1650 -59.4320 20.00 15.00 5.00 347539 RPB 2013 02 13 10 10 00 2015-99 G sf6 CCGG 7.930 0.040 ... H6 2013 03 01 10 03 00 13.1650 -59.4320 20.00 15.00 5.00 348121 RPB 2013 02 13 10 10 00 2016-99 G sf6 CCGG 7.870 0.040 ... H6 2013 03 01 10 20 00 13.1650 -59.4320 20.00 15.00 5.00 348122 RPB 2013 02 20 10 12 00 3283-99 G sf6 CCGG 7.890 0.040 ... H6 2013 03 01 09 31 00 13.1650 -59.4320 20.00 15.00 5.00 348119 RPB 2013 02 20 10 12 00 3284-99 G sf6 CCGG 7.920 0.040 ... H6 2013 03 01 09 47 00 13.1650 -59.4320 20.00 15.00 5.00 348120 RPB 2013 02 28 19 25 00 193-99 G sf6 CCGG 7.940 0.040 ... H6 2013 03 14 16 05 00 13.1650 -59.4320 20.00 15.00 5.00 348575 RPB 2013 02 28 19 25 00 194-99 G sf6 CCGG 7.900 0.040 ... H6 2013 03 14 16 21 00 13.1650 -59.4320 20.00 15.00 5.00 348576 RPB 2013 03 06 10 30 00 205-99 G sf6 CCGG 7.870 0.040 ... H6 2013 03 13 13 35 00 13.1650 -59.4320 20.00 15.00 5.00 348577 RPB 2013 03 06 10 30 00 206-99 G sf6 CCGG 7.930 0.040 ... H6 2013 03 13 13 51 00 13.1650 -59.4320 20.00 15.00 5.00 348578 RPB 2013 03 15 10 05 00 427-99 G sf6 CCGG 7.880 0.040 ... H6 2013 03 26 11 53 00 13.1650 -59.4320 20.00 15.00 5.00 349266 RPB 2013 03 15 10 05 00 428-99 G sf6 CCGG 7.830 0.040 ... H6 2013 03 26 12 09 00 13.1650 -59.4320 20.00 15.00 5.00 349267 RPB 2013 03 20 10 15 00 6061-66 G sf6 CCGG 7.890 0.040 ... H6 2013 03 26 12 26 00 13.1650 -59.4320 20.00 15.00 5.00 349268 RPB 2013 03 20 10 15 00 6062-66 G sf6 CCGG 7.930 0.040 ... H6 2013 03 26 12 42 00 13.1650 -59.4320 20.00 15.00 5.00 349269 RPB 2013 03 29 10 00 00 629-99 G sf6 CCGG 7.960 0.040 ... H4 2013 04 11 09 37 00 13.1650 -59.4320 20.00 15.00 5.00 349941 RPB 2013 03 29 10 00 00 630-99 G sf6 CCGG 7.900 0.040 ... H4 2013 04 11 09 53 00 13.1650 -59.4320 20.00 15.00 5.00 349942 RPB 2013 04 03 11 35 00 1063-99 G sf6 CCGG 7.960 0.040 ... H4 2013 04 10 16 04 00 13.1650 -59.4320 20.00 15.00 5.00 349943 RPB 2013 04 03 11 35 00 1064-99 G sf6 CCGG 7.960 0.040 ... H4 2013 04 10 16 20 00 13.1650 -59.4320 20.00 15.00 5.00 349944 RPB 2013 04 10 10 10 00 33-99 G sf6 CCGG 7.880 0.040 ... H6 2013 05 09 12 55 00 13.1650 -59.4320 20.00 15.00 5.00 351035 RPB 2013 04 10 10 10 00 34-99 G sf6 CCGG 7.940 0.040 ... H6 2013 05 09 13 12 00 13.1650 -59.4320 20.00 15.00 5.00 351036 RPB 2013 04 17 10 15 00 2521-99 G sf6 CCGG 7.940 0.040 ... H6 2013 05 09 12 23 00 13.1650 -59.4320 20.00 15.00 5.00 351037 RPB 2013 04 17 10 15 00 2522-99 G sf6 CCGG 7.950 0.040 ... H6 2013 05 09 12 39 00 13.1650 -59.4320 20.00 15.00 5.00 351038 RPB 2013 04 27 10 05 00 365-99 G sf6 CCGG 7.970 0.040 ... H6 2013 05 14 15 13 00 13.1650 -59.4320 20.00 15.00 5.00 351398 RPB 2013 04 27 10 05 00 366-99 G sf6 CCGG 8.000 0.040 ... H6 2013 05 14 15 29 00 13.1650 -59.4320 20.00 15.00 5.00 351399 RPB 2013 05 01 10 10 00 621-99 G sf6 CCGG 7.940 0.040 ... H6 2013 05 14 14 40 00 13.1650 -59.4320 20.00 15.00 5.00 351400 RPB 2013 05 01 10 10 00 622-99 G sf6 CCGG 7.880 0.040 ... H6 2013 05 14 14 56 00 13.1650 -59.4320 20.00 15.00 5.00 351401 RPB 2013 05 08 10 10 00 5033-99 G sf6 CCGG 7.950 0.040 ... H6 2013 05 29 11 17 00 13.1650 -59.4320 20.00 15.00 5.00 352100 RPB 2013 05 08 10 10 00 5034-99 G sf6 CCGG 7.990 0.040 ... H6 2013 05 29 11 33 00 13.1650 -59.4320 20.00 15.00 5.00 352101 RPB 2013 05 15 10 05 00 5297-99 G sf6 CCGG 8.040 0.040 ... H6 2013 05 29 10 45 00 13.1650 -59.4320 20.00 15.00 5.00 352098 RPB 2013 05 15 10 05 00 5298-99 G sf6 CCGG 7.990 0.040 ... H6 2013 05 29 11 01 00 13.1650 -59.4320 20.00 15.00 5.00 352099 RPB 2013 05 24 10 25 00 1303-99 G sf6 CCGG 7.980 0.040 ... H6 2013 06 07 15 28 00 13.1650 -59.4320 20.00 15.00 5.00 352815 RPB 2013 05 24 10 25 00 1304-99 G sf6 CCGG 8.060 0.040 ... H6 2013 06 07 15 44 00 13.1650 -59.4320 20.00 15.00 5.00 352816 RPB 2013 05 29 11 15 00 5337-99 G sf6 CCGG 8.010 0.040 ... H6 2013 06 07 16 01 00 13.1650 -59.4320 20.00 15.00 5.00 352817 RPB 2013 05 29 11 15 00 5338-99 G sf6 CCGG 7.980 0.040 ... H6 2013 06 07 16 17 00 13.1650 -59.4320 20.00 15.00 5.00 352818 RPB 2013 06 05 10 05 00 355-99 G sf6 CCGG 8.100 0.040 ... H4 2013 06 17 13 33 00 13.1650 -59.4320 20.00 15.00 5.00 353470 RPB 2013 06 05 10 05 00 356-99 G sf6 CCGG 8.050 0.040 ... H4 2013 06 17 13 49 00 13.1650 -59.4320 20.00 15.00 5.00 353471 RPB 2013 06 12 10 15 00 4851-99 G sf6 CCGG 8.060 0.040 ... H6 2013 06 17 14 39 00 13.1650 -59.4320 20.00 15.00 5.00 353484 RPB 2013 06 12 10 15 00 4852-99 G sf6 CCGG 8.000 0.040 ... H6 2013 06 17 14 56 00 13.1650 -59.4320 20.00 15.00 5.00 353485 RPB 2013 06 19 10 15 00 2007-99 G sf6 CCGG 7.970 0.040 ... H4 2013 07 11 15 27 00 13.1650 -59.4320 20.00 15.00 5.00 354142 RPB 2013 06 19 10 15 00 2008-99 G sf6 CCGG 7.990 0.040 ... H4 2013 07 11 15 43 00 13.1650 -59.4320 20.00 15.00 5.00 354143 RPB 2013 06 26 10 10 00 5327-99 G sf6 CCGG 8.060 0.040 ... H4 2013 07 11 14 55 00 13.1650 -59.4320 20.00 15.00 5.00 354144 RPB 2013 06 26 10 10 00 5328-99 G sf6 CCGG 8.040 0.040 ... H4 2013 07 11 15 11 00 13.1650 -59.4320 20.00 15.00 5.00 354145 RPB 2013 07 03 10 05 00 1269-99 G sf6 CCGG 8.040 0.040 ... H4 2013 07 26 09 52 00 13.1650 -59.4320 20.00 15.00 5.00 354806 RPB 2013 07 03 10 05 00 1270-99 G sf6 CCGG 8.000 0.040 ... H4 2013 07 26 10 08 00 13.1650 -59.4320 20.00 15.00 5.00 354807 RPB 2013 07 10 10 05 00 4665-99 G sf6 CCGG 7.990 0.040 ... H4 2013 07 25 16 38 00 13.1650 -59.4320 20.00 15.00 5.00 354804 RPB 2013 07 10 10 05 00 4666-99 G sf6 CCGG 7.980 0.040 ... H4 2013 07 25 16 54 00 13.1650 -59.4320 20.00 15.00 5.00 354805 RPB 2013 07 18 10 10 00 1651-99 G sf6 CCGG 8.050 0.040 ... H4 2013 08 09 10 03 00 13.1650 -59.4320 20.00 15.00 5.00 355494 RPB 2013 07 18 10 10 00 1652-99 G sf6 CCGG 8.080 0.040 ... H4 2013 08 09 10 19 00 13.1650 -59.4320 20.00 15.00 5.00 355495 RPB 2013 07 24 10 20 00 3837-99 G sf6 CCGG 8.090 0.040 ... H4 2013 08 09 09 31 00 13.1650 -59.4320 20.00 15.00 5.00 355508 RPB 2013 07 24 10 20 00 3838-99 G sf6 CCGG 8.080 0.040 ... H4 2013 08 09 09 47 00 13.1650 -59.4320 20.00 15.00 5.00 355509 RPB 2013 07 30 19 50 00 2055-99 G sf6 CCGG 8.100 0.040 ... H4 2013 08 28 15 03 00 13.1650 -59.4320 20.00 15.00 5.00 356593 RPB 2013 07 30 19 50 00 2056-99 G sf6 CCGG 8.120 0.040 ... H4 2013 08 28 15 19 00 13.1650 -59.4320 20.00 15.00 5.00 356594 RPB 2013 08 11 10 00 00 3371-99 G sf6 CCGG 8.070 0.040 ... H4 2013 08 28 15 35 00 13.1650 -59.4320 20.00 15.00 5.00 356595 RPB 2013 08 11 10 00 00 3372-99 G sf6 CCGG 8.140 0.040 ... H4 2013 08 28 15 51 00 13.1650 -59.4320 20.00 15.00 5.00 356596 RPB 2013 08 14 10 05 00 1243-99 G sf6 CCGG 8.150 0.040 ... H4 2013 09 05 12 44 00 13.1650 -59.4320 20.00 15.00 5.00 356872 RPB 2013 08 14 10 05 00 1244-99 G sf6 CCGG 8.150 0.040 ... H4 2013 09 05 13 00 00 13.1650 -59.4320 20.00 15.00 5.00 356873 RPB 2013 08 21 10 15 00 4549-99 G sf6 CCGG 8.040 0.040 ... H4 2013 09 05 13 16 00 13.1650 -59.4320 20.00 15.00 5.00 356874 RPB 2013 08 21 10 15 00 4550-99 G sf6 CCGG 8.020 0.040 ... H4 2013 09 05 13 32 00 13.1650 -59.4320 20.00 15.00 5.00 356875 RPB 2013 08 28 19 55 00 479-99 G sf6 CCGG 8.020 0.040 ... H6 2013 09 30 16 21 00 13.1650 -59.4320 20.00 15.00 5.00 357448 RPB 2013 08 28 19 55 00 480-99 G sf6 CCGG 8.030 0.040 ... H6 2013 09 30 16 37 00 13.1650 -59.4320 20.00 15.00 5.00 357449 RPB 2013 09 04 10 15 00 3223-99 G sf6 CCGG 7.960 0.040 ... H6 2013 10 17 13 37 00 13.1650 -59.4320 20.00 15.00 5.00 357458 RPB 2013 09 04 10 15 00 3224-99 G sf6 CCGG 7.980 0.040 ... H6 2013 10 17 13 53 00 13.1650 -59.4320 20.00 15.00 5.00 357459 RPB 2013 09 14 10 05 00 47-99 G sf6 CCGG 7.930 0.040 ... H4 2013 10 25 14 19 00 13.1650 -59.4320 20.00 15.00 5.00 358126 RPB 2013 09 14 10 05 00 48-99 G sf6 CCGG 7.940 0.040 ... H4 2013 10 25 14 35 00 13.1650 -59.4320 20.00 15.00 5.00 358127 RPB 2013 09 18 14 35 00 373-99 G sf6 CCGG 8.110 0.040 ... H4 2013 10 24 14 15 00 13.1650 -59.4320 20.00 15.00 5.00 358118 RPB 2013 09 18 14 35 00 374-99 G sf6 CCGG 8.070 0.040 ... H4 2013 10 24 14 31 00 13.1650 -59.4320 20.00 15.00 5.00 358119 RPB 2013 09 25 10 15 00 2007-99 G sf6 CCGG 8.060 0.040 ... H6 2013 10 28 13 36 00 13.1650 -59.4320 20.00 15.00 5.00 358586 RPB 2013 09 25 10 15 00 2008-99 G sf6 CCGG 8.110 0.040 ... H6 2013 10 28 13 52 00 13.1650 -59.4320 20.00 15.00 5.00 358587 RPB 2013 10 02 10 20 00 5327-99 G sf6 CCGG 8.150 0.040 ... H4 2013 10 28 14 06 00 13.1650 -59.4320 20.00 15.00 5.00 358588 RPB 2013 10 02 10 20 00 5328-99 G sf6 CCGG 8.190 0.040 ... H4 2013 10 28 14 22 00 13.1650 -59.4320 20.00 15.00 5.00 358589 RPB 2013 10 09 10 05 00 2351-99 G sf6 CCGG 7.890 0.040 N.. H6 2013 11 05 12 45 00 13.1650 -59.4320 20.00 15.00 5.00 358802 RPB 2013 10 09 10 05 00 2352-99 G sf6 CCGG 8.110 0.040 N.. H6 2013 11 05 13 01 00 13.1650 -59.4320 20.00 15.00 5.00 358803 RPB 2013 10 16 10 05 00 6681-66 G sf6 CCGG 8.020 0.040 ... H6 2013 11 05 13 17 00 13.1650 -59.4320 20.00 15.00 5.00 358804 RPB 2013 10 16 10 05 00 6682-66 G sf6 CCGG 8.080 0.040 ... H6 2013 11 05 13 33 00 13.1650 -59.4320 20.00 15.00 5.00 358805 RPB 2013 10 23 10 15 00 1143-99 G sf6 CCGG 8.070 0.040 ... H6 2013 11 15 12 15 00 13.1650 -59.4320 20.00 15.00 5.00 359770 RPB 2013 10 23 10 15 00 1144-99 G sf6 CCGG 8.110 0.040 ... H6 2013 11 15 12 31 00 13.1650 -59.4320 20.00 15.00 5.00 359771 RPB 2013 10 30 17 15 00 2187-99 G sf6 CCGG 8.180 0.040 ... H6 2013 11 15 12 48 00 13.1650 -59.4320 20.00 15.00 5.00 359772 RPB 2013 10 30 17 15 00 2188-99 G sf6 CCGG 8.160 0.040 ... H6 2013 11 15 13 04 00 13.1650 -59.4320 20.00 15.00 5.00 359773 RPB 2013 11 06 10 05 00 1207-99 G sf6 CCGG 8.260 0.040 ... H4 2013 11 21 14 32 00 13.1650 -59.4320 20.00 15.00 5.00 360322 RPB 2013 11 06 10 05 00 1208-99 G sf6 CCGG 8.220 0.040 ... H4 2013 11 21 14 48 00 13.1650 -59.4320 20.00 15.00 5.00 360323 RPB 2013 11 13 11 00 00 4709-99 G sf6 CCGG 8.150 0.040 ... H4 2013 11 21 15 04 00 13.1650 -59.4320 20.00 15.00 5.00 360320 RPB 2013 11 13 11 00 00 4710-99 G sf6 CCGG 8.190 0.040 ... H4 2013 11 21 15 20 00 13.1650 -59.4320 20.00 15.00 5.00 360321 RPB 2013 11 20 10 20 00 1095-99 G sf6 CCGG 7.990 0.040 ... H6 2013 12 05 08 39 00 13.1650 -59.4320 20.00 15.00 5.00 360994 RPB 2013 11 20 10 20 00 1096-99 G sf6 CCGG 8.020 0.040 ... H6 2013 12 05 08 55 00 13.1650 -59.4320 20.00 15.00 5.00 360995 RPB 2013 11 27 10 20 00 6023-66 G sf6 CCGG 8.170 0.040 ... H4 2013 12 04 16 46 00 13.1650 -59.4320 20.00 15.00 5.00 360996 RPB 2013 11 27 10 20 00 6024-66 G sf6 CCGG 8.170 0.040 ... H4 2013 12 04 17 02 00 13.1650 -59.4320 20.00 15.00 5.00 360997 RPB 2013 12 04 10 15 00 1339-99 G sf6 CCGG 8.250 0.040 ... H6 2013 12 18 15 31 00 13.1650 -59.4320 20.00 15.00 5.00 361621 RPB 2013 12 04 10 15 00 1340-99 G sf6 CCGG 8.250 0.040 ... H6 2013 12 18 15 47 00 13.1650 -59.4320 20.00 15.00 5.00 361622 RPB 2013 12 11 10 20 00 4239-99 G sf6 CCGG 8.200 0.040 ... H4 2013 12 18 15 59 00 13.1650 -59.4320 20.00 15.00 5.00 361619 RPB 2013 12 11 10 20 00 4240-99 G sf6 CCGG 8.210 0.040 ... H4 2013 12 18 16 15 00 13.1650 -59.4320 20.00 15.00 5.00 361620 RPB 2013 12 18 10 05 00 1063-99 G sf6 CCGG 8.220 0.040 ... H4 2014 01 09 12 30 00 13.1650 -59.4320 20.00 15.00 5.00 362392 RPB 2013 12 18 10 05 00 1064-99 G sf6 CCGG 8.230 0.040 ... H4 2014 01 09 12 46 00 13.1650 -59.4320 20.00 15.00 5.00 362393 RPB 2013 12 28 10 10 00 2469-99 G sf6 CCGG 8.210 0.040 ... H4 2014 01 09 13 02 00 13.1650 -59.4320 20.00 15.00 5.00 362394 RPB 2013 12 28 10 10 00 2470-99 G sf6 CCGG 8.230 0.040 ... H4 2014 01 09 13 18 00 13.1650 -59.4320 20.00 15.00 5.00 362395 RPB 2014 01 03 10 10 00 4607-99 G sf6 CCGG 8.150 0.040 ... H4 2014 01 27 15 48 00 13.1650 -59.4320 20.00 15.00 5.00 362878 RPB 2014 01 03 10 10 00 4608-99 G sf6 CCGG 8.150 0.040 ... H4 2014 01 27 16 04 00 13.1650 -59.4320 20.00 15.00 5.00 362879 RPB 2014 01 08 11 15 00 4973-99 G sf6 CCGG 8.170 0.040 ... H4 2014 01 27 16 20 00 13.1650 -59.4320 20.00 15.00 5.00 362880 RPB 2014 01 08 11 15 00 4974-99 G sf6 CCGG 8.190 0.040 ... H4 2014 01 27 16 36 00 13.1650 -59.4320 20.00 15.00 5.00 362881 RPB 2014 01 15 10 25 00 749-99 G sf6 CCGG 8.260 0.040 ... H6 2014 02 10 13 35 00 13.1650 -59.4320 20.00 15.00 5.00 363392 RPB 2014 01 15 10 25 00 750-99 G sf6 CCGG 8.250 0.040 ... H6 2014 02 10 13 51 00 13.1650 -59.4320 20.00 15.00 5.00 363393 RPB 2014 01 22 10 05 00 4181-99 G sf6 CCGG 8.210 0.040 ... H6 2014 02 10 13 02 00 13.1650 -59.4320 20.00 15.00 5.00 363394 RPB 2014 01 22 10 05 00 4182-99 G sf6 CCGG 8.230 0.040 ... H6 2014 02 10 13 18 00 13.1650 -59.4320 20.00 15.00 5.00 363395 RPB 2014 01 29 10 20 00 3081-99 G sf6 CCGG 8.280 0.040 ... H6 2014 02 20 11 34 00 13.1650 -59.4320 20.00 15.00 5.00 363982 RPB 2014 01 29 10 20 00 3082-99 G sf6 CCGG 8.270 0.040 ... H6 2014 02 20 11 50 00 13.1650 -59.4320 20.00 15.00 5.00 363983 RPB 2014 02 05 10 20 00 4645-99 G sf6 CCGG 8.240 0.040 ... H6 2014 02 20 12 07 00 13.1650 -59.4320 20.00 15.00 5.00 363984 RPB 2014 02 05 10 20 00 4646-99 G sf6 CCGG 8.230 0.040 ... H6 2014 02 20 12 23 00 13.1650 -59.4320 20.00 15.00 5.00 363985 RPB 2014 03 12 18 50 00 3801-99 G sf6 CCGG 8.230 0.040 ... H4 2014 03 31 10 16 00 13.1650 -59.4320 20.00 15.00 5.00 365787 RPB 2014 03 12 18 50 00 3802-99 G sf6 CCGG 8.230 0.040 ... H4 2014 03 31 10 32 00 13.1650 -59.4320 20.00 15.00 5.00 365788 RPB 2014 03 19 10 30 00 3971-99 G sf6 CCGG 8.270 0.040 ... H4 2014 03 28 15 18 00 13.1650 -59.4320 20.00 15.00 5.00 365789 RPB 2014 03 19 10 30 00 3972-99 G sf6 CCGG 8.290 0.040 ... H4 2014 03 28 15 34 00 13.1650 -59.4320 20.00 15.00 5.00 365790 RPB 2014 03 26 10 40 00 3719-99 G sf6 CCGG 8.240 0.040 ... H4 2014 04 11 12 02 00 13.1650 -59.4320 20.00 15.00 5.00 366355 RPB 2014 03 26 10 40 00 3720-99 G sf6 CCGG 8.220 0.040 ... H4 2014 04 11 12 18 00 13.1650 -59.4320 20.00 15.00 5.00 366356 RPB 2014 04 02 10 20 00 4797-99 G sf6 CCGG 8.260 0.040 ... H4 2014 04 11 12 34 00 13.1650 -59.4320 20.00 15.00 5.00 366353 RPB 2014 04 02 10 20 00 4798-99 G sf6 CCGG 8.350 0.040 ... H4 2014 04 11 12 50 00 13.1650 -59.4320 20.00 15.00 5.00 366354 RPB 2014 04 09 10 20 00 2751-99 G sf6 CCGG 8.280 0.040 ... H4 2014 04 23 12 15 00 13.1650 -59.4320 20.00 15.00 5.00 366979 RPB 2014 04 09 10 20 00 2752-99 G sf6 CCGG 8.250 0.040 ... H4 2014 04 23 12 31 00 13.1650 -59.4320 20.00 15.00 5.00 366980 RPB 2014 04 16 10 10 00 5341-99 G sf6 CCGG 8.360 0.040 ... H4 2014 04 23 14 23 00 13.1650 -59.4320 20.00 15.00 5.00 366977 RPB 2014 04 16 10 10 00 5342-99 G sf6 CCGG 8.340 0.040 ... H4 2014 04 23 14 39 00 13.1650 -59.4320 20.00 15.00 5.00 366978 RPB 2014 04 25 10 10 00 467-99 G sf6 CCGG 8.240 0.040 ... H4 2014 05 06 10 30 00 13.1650 -59.4320 20.00 15.00 5.00 367331 RPB 2014 04 25 10 10 00 468-99 G sf6 CCGG 8.260 0.040 ... H4 2014 05 06 10 46 00 13.1650 -59.4320 20.00 15.00 5.00 367332 RPB 2014 04 30 10 05 00 2447-99 G sf6 CCGG 8.390 0.040 ... H4 2014 05 06 09 57 00 13.1650 -59.4320 20.00 15.00 5.00 367329 RPB 2014 04 30 10 05 00 2448-99 G sf6 CCGG 8.370 0.040 ... H4 2014 05 06 10 14 00 13.1650 -59.4320 20.00 15.00 5.00 367330 RPB 2014 05 07 10 10 00 1609-99 G sf6 CCGG 8.290 0.040 ... H4 2014 05 30 13 44 00 13.1650 -59.4320 20.00 15.00 5.00 368214 RPB 2014 05 07 10 10 00 1610-99 G sf6 CCGG 8.320 0.040 ... H4 2014 05 30 14 00 00 13.1650 -59.4320 20.00 15.00 5.00 368215 RPB 2014 05 14 10 00 00 2791-99 G sf6 CCGG 8.290 0.040 ... H4 2014 05 30 14 16 00 13.1650 -59.4320 20.00 15.00 5.00 368216 RPB 2014 05 14 10 00 00 2792-99 G sf6 CCGG 8.280 0.040 ... H4 2014 05 30 14 33 00 13.1650 -59.4320 20.00 15.00 5.00 368217 RPB 2014 05 21 10 05 00 131-99 G sf6 CCGG 8.300 0.040 ... H4 2014 06 18 16 27 00 13.1650 -59.4320 20.00 15.00 5.00 368913 RPB 2014 05 21 10 05 00 132-99 G sf6 CCGG 8.310 0.040 ... H4 2014 06 18 16 43 00 13.1650 -59.4320 20.00 15.00 5.00 368914 RPB 2014 05 28 10 10 00 563-99 G sf6 CCGG 8.280 0.040 ... H4 2014 06 18 15 55 00 13.1650 -59.4320 20.00 15.00 5.00 368915 RPB 2014 05 28 10 10 00 564-99 G sf6 CCGG 8.270 0.040 ... H4 2014 06 18 16 11 00 13.1650 -59.4320 20.00 15.00 5.00 368916 RPB 2014 06 04 10 15 00 47-99 G sf6 CCGG 8.320 0.040 ... H4 2014 07 01 15 08 00 13.1650 -59.4320 20.00 15.00 5.00 369517 RPB 2014 06 04 10 15 00 48-99 G sf6 CCGG 8.370 0.040 ... H4 2014 07 01 15 24 00 13.1650 -59.4320 20.00 15.00 5.00 369518 RPB 2014 06 11 10 05 00 4197-99 G sf6 CCGG 8.340 0.040 ... H4 2014 07 01 14 36 00 13.1650 -59.4320 20.00 15.00 5.00 369519 RPB 2014 06 11 10 05 00 4198-99 G sf6 CCGG 8.360 0.040 ... H4 2014 07 01 14 52 00 13.1650 -59.4320 20.00 15.00 5.00 369520 RPB 2014 06 17 10 15 00 4505-99 G sf6 CCGG 8.350 0.040 ... H4 2014 07 11 16 44 00 13.1650 -59.4320 20.00 15.00 5.00 370121 RPB 2014 06 17 10 15 00 4506-99 G sf6 CCGG 8.370 0.040 ... H4 2014 07 11 17 00 00 13.1650 -59.4320 20.00 15.00 5.00 370122 RPB 2014 06 25 10 10 00 5367-99 G sf6 CCGG 8.350 0.040 ... H4 2014 07 14 10 27 00 13.1650 -59.4320 20.00 15.00 5.00 370119 RPB 2014 06 25 10 10 00 5368-99 G sf6 CCGG 8.370 0.040 ... H4 2014 07 14 10 43 00 13.1650 -59.4320 20.00 15.00 5.00 370120 RPB 2014 07 03 10 20 00 3045-99 G sf6 CCGG 8.400 0.040 ... H4 2014 07 24 09 45 00 13.1650 -59.4320 20.00 15.00 5.00 370760 RPB 2014 07 03 10 20 00 3046-99 G sf6 CCGG 8.410 0.040 ... H4 2014 07 24 10 01 00 13.1650 -59.4320 20.00 15.00 5.00 370761 RPB 2014 07 09 10 05 00 4557-99 G sf6 CCGG 8.420 0.040 ... H4 2014 07 24 09 13 00 13.1650 -59.4320 20.00 15.00 5.00 370762 RPB 2014 07 09 10 05 00 4558-99 G sf6 CCGG 8.390 0.040 ... H4 2014 07 24 09 29 00 13.1650 -59.4320 20.00 15.00 5.00 370763 RPB 2014 07 16 10 05 00 747-99 G sf6 CCGG 8.380 0.040 ... H4 2014 08 05 08 38 00 13.1650 -59.4320 20.00 15.00 5.00 371410 RPB 2014 07 16 10 05 00 748-99 G sf6 CCGG 8.340 0.040 ... H4 2014 08 05 08 54 00 13.1650 -59.4320 20.00 15.00 5.00 371411 RPB 2014 07 23 10 15 00 6197-66 G sf6 CCGG 8.380 0.040 ... H4 2014 08 04 15 19 00 13.1650 -59.4320 20.00 15.00 5.00 371408 RPB 2014 07 23 10 15 00 6198-66 G sf6 CCGG 8.340 0.040 ... H4 2014 08 04 15 35 00 13.1650 -59.4320 20.00 15.00 5.00 371409 RPB 2014 07 30 10 20 00 1375-99 G sf6 CCGG 8.440 0.040 ... H4 2014 08 18 15 59 00 13.1650 -59.4320 20.00 15.00 5.00 372148 RPB 2014 07 30 10 20 00 1376-99 G sf6 CCGG 8.450 0.040 ... H4 2014 08 18 16 15 00 13.1650 -59.4320 20.00 15.00 5.00 372149 RPB 2014 08 06 10 20 00 3401-99 G sf6 CCGG 8.380 0.040 ... H4 2014 08 18 15 27 00 13.1650 -59.4320 20.00 15.00 5.00 372150 RPB 2014 08 06 10 20 00 3402-99 G sf6 CCGG 8.390 0.040 ... H4 2014 08 18 15 43 00 13.1650 -59.4320 20.00 15.00 5.00 372151 RPB 2014 08 14 18 25 00 3801-99 G sf6 CCGG 8.490 0.040 ... H4 2014 08 27 12 41 00 13.1650 -59.4320 20.00 15.00 5.00 372999 RPB 2014 08 14 18 25 00 3802-99 G sf6 CCGG 8.420 0.040 ... H4 2014 08 27 12 57 00 13.1650 -59.4320 20.00 15.00 5.00 372998 RPB 2014 08 20 10 05 00 3971-99 G sf6 CCGG 8.330 0.040 ... H4 2014 08 27 13 13 00 13.1650 -59.4320 20.00 15.00 5.00 373000 RPB 2014 08 20 10 05 00 3972-99 G sf6 CCGG 8.370 0.040 ... H4 2014 08 27 13 29 00 13.1650 -59.4320 20.00 15.00 5.00 373001 RPB 2014 08 29 10 10 00 2551-99 G sf6 CCGG 8.450 0.040 ... H4 2014 09 10 09 27 00 13.1650 -59.4320 20.00 15.00 5.00 373640 RPB 2014 08 29 10 10 00 2552-99 G sf6 CCGG 8.490 0.040 ... H4 2014 09 10 09 43 00 13.1650 -59.4320 20.00 15.00 5.00 373641 RPB 2014 09 03 10 15 00 5023-99 G sf6 CCGG 8.380 0.040 ... H4 2014 09 10 09 59 00 13.1650 -59.4320 20.00 15.00 5.00 373642 RPB 2014 09 03 10 15 00 5024-99 G sf6 CCGG 8.390 0.040 ... H4 2014 09 10 10 15 00 13.1650 -59.4320 20.00 15.00 5.00 373643 RPB 2014 09 10 10 10 00 1257-99 G sf6 CCGG 8.390 0.040 ... H4 2014 09 23 15 09 00 13.1650 -59.4320 20.00 15.00 5.00 374403 RPB 2014 09 10 10 10 00 1258-99 G sf6 CCGG 8.410 0.040 ... H4 2014 09 23 15 25 00 13.1650 -59.4320 20.00 15.00 5.00 374404 RPB 2014 09 17 10 05 00 4125-99 G sf6 CCGG 8.350 0.040 ... H4 2014 09 23 15 41 00 13.1650 -59.4320 20.00 15.00 5.00 374405 RPB 2014 09 17 10 05 00 4126-99 G sf6 CCGG 8.380 0.040 ... H4 2014 09 23 15 57 00 13.1650 -59.4320 20.00 15.00 5.00 374406 RPB 2014 09 24 10 05 00 759-99 G sf6 CCGG 8.450 0.040 ... H4 2014 10 08 11 37 00 13.1650 -59.4320 20.00 15.00 5.00 375116 RPB 2014 09 24 10 05 00 760-99 G sf6 CCGG 8.440 0.040 ... H4 2014 10 08 11 53 00 13.1650 -59.4320 20.00 15.00 5.00 375117 RPB 2014 10 01 10 05 00 3951-99 G sf6 CCGG 8.460 0.040 ... H4 2014 10 08 12 09 00 13.1650 -59.4320 20.00 15.00 5.00 375118 RPB 2014 10 01 10 05 00 3952-99 G sf6 CCGG 8.480 0.040 ... H4 2014 10 08 12 25 00 13.1650 -59.4320 20.00 15.00 5.00 375119 RPB 2014 10 08 10 10 00 3629-99 G sf6 CCGG 8.240 0.040 .X. H4 2014 10 21 10 56 00 13.1650 -59.4320 20.00 15.00 5.00 375833 RPB 2014 10 08 10 10 00 3630-99 G sf6 CCGG 8.230 0.040 .X. H4 2014 10 21 11 12 00 13.1650 -59.4320 20.00 15.00 5.00 375834 RPB 2014 10 15 10 20 00 4499-99 G sf6 CCGG 8.410 0.040 ... H4 2014 10 21 10 24 00 13.1650 -59.4320 20.00 15.00 5.00 375835 RPB 2014 10 15 10 20 00 4500-99 G sf6 CCGG 8.480 0.040 ... H4 2014 10 21 10 40 00 13.1650 -59.4320 20.00 15.00 5.00 375836 RPB 2014 10 22 10 10 00 1357-99 G sf6 CCGG 8.400 0.040 ... H4 2014 11 13 14 46 00 13.1650 -59.4320 20.00 15.00 5.00 376948 RPB 2014 10 22 10 10 00 1358-99 G sf6 CCGG 8.390 0.040 ... H4 2014 11 13 15 02 00 13.1650 -59.4320 20.00 15.00 5.00 376949 RPB 2014 10 28 17 20 00 1565-99 G sf6 CCGG 8.370 0.040 ... H4 2014 11 13 15 18 00 13.1650 -59.4320 20.00 15.00 5.00 376950 RPB 2014 10 28 17 20 00 1566-99 G sf6 CCGG 8.350 0.040 ... H4 2014 11 13 15 34 00 13.1650 -59.4320 20.00 15.00 5.00 376951 RPB 2014 11 05 10 05 00 27-99 G sf6 CCGG 8.520 0.040 ... H4 2014 12 03 09 45 00 13.1650 -59.4320 20.00 15.00 5.00 377614 RPB 2014 11 05 10 05 00 28-99 G sf6 CCGG 8.500 0.040 ... H4 2014 12 03 10 01 00 13.1650 -59.4320 20.00 15.00 5.00 377615 RPB 2014 11 12 10 25 00 1387-99 G sf6 CCGG 8.550 0.040 ... H4 2014 12 03 10 17 00 13.1650 -59.4320 20.00 15.00 5.00 377616 RPB 2014 11 12 10 25 00 1388-99 G sf6 CCGG 8.490 0.040 ... H4 2014 12 03 10 33 00 13.1650 -59.4320 20.00 15.00 5.00 377617 RPB 2014 11 22 10 10 00 1361-99 G sf6 CCGG 8.560 0.040 ... H4 2014 12 15 15 13 00 13.1650 -59.4320 20.00 15.00 5.00 378376 RPB 2014 11 22 10 10 00 1362-99 G sf6 CCGG 8.520 0.040 ... H4 2014 12 15 15 29 00 13.1650 -59.4320 20.00 15.00 5.00 378377 RPB 2014 11 26 10 15 00 2893-99 G sf6 CCGG 8.520 0.040 ... H4 2014 12 15 15 45 00 13.1650 -59.4320 20.00 15.00 5.00 378378 RPB 2014 11 26 10 15 00 2894-99 G sf6 CCGG 8.510 0.040 ... H4 2014 12 15 16 01 00 13.1650 -59.4320 20.00 15.00 5.00 378379 RPB 2014 12 03 10 05 00 721-99 G sf6 CCGG 8.650 0.040 ... H4 2014 12 23 13 01 00 13.1650 -59.4320 20.00 15.00 5.00 379003 RPB 2014 12 03 10 05 00 722-99 G sf6 CCGG 8.570 0.040 ... H4 2014 12 23 13 17 00 13.1650 -59.4320 20.00 15.00 5.00 379004 RPB 2014 12 10 10 15 00 3773-99 G sf6 CCGG 8.550 0.040 ... H4 2014 12 23 13 33 00 13.1650 -59.4320 20.00 15.00 5.00 379005 RPB 2014 12 10 10 15 00 3774-99 G sf6 CCGG 8.570 0.040 ... H4 2014 12 23 13 49 00 13.1650 -59.4320 20.00 15.00 5.00 379006 RPB 2014 12 19 13 35 00 185-99 G sf6 CCGG 8.560 0.040 ... H4 2015 01 22 13 53 00 13.1650 -59.4320 20.00 15.00 5.00 379962 RPB 2014 12 19 13 35 00 186-99 G sf6 CCGG 8.580 0.040 ... H4 2015 01 22 14 09 00 13.1650 -59.4320 20.00 15.00 5.00 379963 RPB 2014 12 25 10 05 00 4037-99 G sf6 CCGG 8.570 0.040 ... H4 2015 01 15 14 18 00 13.1650 -59.4320 20.00 15.00 5.00 379948 RPB 2014 12 25 10 05 00 4038-99 G sf6 CCGG 8.590 0.040 ... H4 2015 01 15 14 34 00 13.1650 -59.4320 20.00 15.00 5.00 379949 RPB 2014 12 31 10 20 00 1203-99 G sf6 CCGG 8.480 0.040 ... H4 2015 02 02 11 51 00 13.1650 -59.4320 20.00 15.00 5.00 380411 RPB 2014 12 31 10 20 00 1204-99 G sf6 CCGG 8.480 0.040 ... H4 2015 02 02 12 07 00 13.1650 -59.4320 20.00 15.00 5.00 380412 RPB 2015 01 07 10 20 00 4845-99 G sf6 CCGG 8.500 0.040 ... H4 2015 02 02 12 23 00 13.1650 -59.4320 20.00 15.00 5.00 380413 RPB 2015 01 07 10 20 00 4846-99 G sf6 CCGG 8.620 0.040 ... H4 2015 02 02 12 39 00 13.1650 -59.4320 20.00 15.00 5.00 380414 RPB 2015 01 14 10 15 00 267-99 G sf6 CCGG 8.600 0.040 ... H4 2015 02 12 11 21 00 13.1650 -59.4320 20.00 15.00 5.00 380979 RPB 2015 01 14 10 15 00 268-99 G sf6 CCGG 8.540 0.040 ... H4 2015 02 12 11 37 00 13.1650 -59.4320 20.00 15.00 5.00 380978 RPB 2015 01 21 10 05 00 2977-99 G sf6 CCGG 8.460 0.040 ... H4 2015 02 12 10 49 00 13.1650 -59.4320 20.00 15.00 5.00 380976 RPB 2015 01 21 10 05 00 2978-99 G sf6 CCGG 8.620 0.040 ... H4 2015 02 12 11 05 00 13.1650 -59.4320 20.00 15.00 5.00 380977 RPB 2015 01 28 10 15 00 3515-99 G sf6 CCGG 8.600 0.040 ... H4 2015 03 02 09 50 00 13.1650 -59.4320 20.00 15.00 5.00 381843 RPB 2015 01 28 10 15 00 3516-99 G sf6 CCGG 8.560 0.040 ... H4 2015 03 02 10 06 00 13.1650 -59.4320 20.00 15.00 5.00 381844 RPB 2015 02 04 10 15 00 3957-99 G sf6 CCGG 8.560 0.040 ... H4 2015 03 02 10 22 00 13.1650 -59.4320 20.00 15.00 5.00 381846 RPB 2015 02 04 10 15 00 3958-99 G sf6 CCGG 8.560 0.040 ... H4 2015 03 02 10 38 00 13.1650 -59.4320 20.00 15.00 5.00 381845 RPB 2015 02 11 10 15 00 245-99 G sf6 CCGG 8.550 0.040 ... H4 2015 03 20 15 54 00 13.1650 -59.4320 20.00 15.00 5.00 382506 RPB 2015 02 11 10 15 00 246-99 G sf6 CCGG 8.560 0.040 ... H4 2015 03 20 16 10 00 13.1650 -59.4320 20.00 15.00 5.00 382507 RPB 2015 02 18 10 20 00 2305-99 G sf6 CCGG 8.640 0.040 ... H4 2015 03 20 15 22 00 13.1650 -59.4320 20.00 15.00 5.00 382508 RPB 2015 02 18 10 20 00 2306-99 G sf6 CCGG 8.610 0.040 ... H4 2015 03 20 15 38 00 13.1650 -59.4320 20.00 15.00 5.00 382509 RPB 2015 02 25 10 25 00 1205-99 G sf6 CCGG 8.630 0.040 ... H4 2015 03 27 11 57 00 13.1650 -59.4320 20.00 15.00 5.00 383878 RPB 2015 02 25 10 25 00 1206-99 G sf6 CCGG 8.640 0.040 ... H4 2015 03 27 12 13 00 13.1650 -59.4320 20.00 15.00 5.00 383879 RPB 2015 03 05 10 15 00 2451-99 G sf6 CCGG 8.590 0.040 ... H4 2015 03 27 12 29 00 13.1650 -59.4320 20.00 15.00 5.00 383880 RPB 2015 03 05 10 15 00 2452-99 G sf6 CCGG 8.650 0.040 ... H4 2015 03 27 12 45 00 13.1650 -59.4320 20.00 15.00 5.00 383881 RPB 2015 03 11 10 20 00 641-99 G sf6 CCGG 8.560 0.040 ... H4 2015 04 08 11 33 00 13.1650 -59.4320 20.00 15.00 5.00 384114 RPB 2015 03 11 10 20 00 642-99 G sf6 CCGG 8.630 0.040 ... H4 2015 04 08 11 49 00 13.1650 -59.4320 20.00 15.00 5.00 384115 RPB 2015 03 18 10 30 00 1951-99 G sf6 CCGG 8.590 0.040 ... H4 2015 04 08 12 05 00 13.1650 -59.4320 20.00 15.00 5.00 384112 RPB 2015 03 18 10 30 00 1952-99 G sf6 CCGG 8.620 0.040 ... H4 2015 04 08 12 21 00 13.1650 -59.4320 20.00 15.00 5.00 384113 RPB 2015 03 25 10 15 00 79-99 G sf6 CCGG 8.610 0.040 ... H4 2015 04 24 14 32 00 13.1650 -59.4320 20.00 15.00 5.00 384866 RPB 2015 03 25 10 15 00 80-99 G sf6 CCGG 8.540 0.040 ... H4 2015 04 24 14 47 00 13.1650 -59.4320 20.00 15.00 5.00 384867 RPB 2015 04 01 10 30 00 4645-99 G sf6 CCGG 8.730 0.040 ... H4 2015 04 24 15 03 00 13.1650 -59.4320 20.00 15.00 5.00 384868 RPB 2015 04 01 10 30 00 4646-99 G sf6 CCGG 8.690 0.040 ... H4 2015 04 24 15 19 00 13.1650 -59.4320 20.00 15.00 5.00 384869 RPB 2015 04 08 10 05 00 3303-99 G sf6 CCGG 8.600 0.040 ... H4 2015 05 06 11 42 00 13.1650 -59.4320 20.00 15.00 5.00 385708 RPB 2015 04 08 10 05 00 3304-99 G sf6 CCGG 8.570 0.040 ... H4 2015 05 06 11 58 00 13.1650 -59.4320 20.00 15.00 5.00 385709 RPB 2015 04 15 10 20 00 3701-99 G sf6 CCGG 8.620 0.040 ... H4 2015 05 06 11 10 00 13.1650 -59.4320 20.00 15.00 5.00 385710 RPB 2015 04 15 10 20 00 3702-99 G sf6 CCGG 8.650 0.040 ... H4 2015 05 06 11 26 00 13.1650 -59.4320 20.00 15.00 5.00 385711 RPB 2015 04 22 10 10 00 1947-99 G sf6 CCGG 8.600 0.040 ... H4 2015 05 20 11 25 00 13.1650 -59.4320 20.00 15.00 5.00 386581 RPB 2015 04 22 10 10 00 1948-99 G sf6 CCGG 8.670 0.040 ... H4 2015 05 20 11 41 00 13.1650 -59.4320 20.00 15.00 5.00 386582 RPB 2015 04 29 10 20 00 3775-99 G sf6 CCGG 8.700 0.040 ... H4 2015 05 20 11 57 00 13.1650 -59.4320 20.00 15.00 5.00 386583 RPB 2015 04 29 10 20 00 3776-99 G sf6 CCGG 8.680 0.040 ... H4 2015 05 20 12 13 00 13.1650 -59.4320 20.00 15.00 5.00 386584 RPB 2015 05 06 10 15 00 1825-99 G sf6 CCGG 8.570 0.040 ... H4 2015 06 11 12 14 00 13.1650 -59.4320 20.00 15.00 5.00 387212 RPB 2015 05 06 10 15 00 1826-99 G sf6 CCGG 8.620 0.040 ... H4 2015 06 11 12 30 00 13.1650 -59.4320 20.00 15.00 5.00 387213 RPB 2015 05 13 10 10 00 5373-99 G sf6 CCGG 8.670 0.040 ... H4 2015 06 11 11 43 00 13.1650 -59.4320 20.00 15.00 5.00 387214 RPB 2015 05 13 10 10 00 5374-99 G sf6 CCGG 8.600 0.040 ... H4 2015 06 11 11 59 00 13.1650 -59.4320 20.00 15.00 5.00 387215 RPB 2015 05 23 10 05 00 2955-99 G sf6 CCGG 8.630 0.040 ... H4 2015 06 22 12 45 00 13.1650 -59.4320 20.00 15.00 5.00 388067 RPB 2015 05 23 10 05 00 2956-99 G sf6 CCGG 8.670 0.040 ... H4 2015 06 22 13 01 00 13.1650 -59.4320 20.00 15.00 5.00 388068 RPB 2015 05 27 10 05 00 4245-99 G sf6 CCGG 8.730 0.040 ... H4 2015 06 22 13 17 00 13.1650 -59.4320 20.00 15.00 5.00 388069 RPB 2015 05 27 10 05 00 4246-99 G sf6 CCGG 8.730 0.040 ... H4 2015 06 22 13 32 00 13.1650 -59.4320 20.00 15.00 5.00 388070 RPB 2015 06 03 10 05 00 1277-99 G sf6 CCGG 8.670 0.040 ... H4 2015 07 13 16 43 00 13.1650 -59.4320 20.00 15.00 5.00 389089 RPB 2015 06 03 10 05 00 1278-99 G sf6 CCGG 8.640 0.040 ... H4 2015 07 13 16 59 00 13.1650 -59.4320 20.00 15.00 5.00 389090 RPB 2015 06 10 10 05 00 4441-99 G sf6 CCGG 8.710 0.040 ... H4 2015 07 13 17 14 00 13.1650 -59.4320 20.00 15.00 5.00 389091 RPB 2015 06 10 10 05 00 4442-99 G sf6 CCGG 8.720 0.040 ... H4 2015 07 13 17 30 00 13.1650 -59.4320 20.00 15.00 5.00 389092 RPB 2015 06 17 10 05 00 1323-99 G sf6 CCGG 8.660 0.040 ... H4 2015 07 28 09 38 00 13.1650 -59.4320 20.00 15.00 5.00 389862 RPB 2015 06 17 10 05 00 1324-99 G sf6 CCGG 8.640 0.040 ... H4 2015 07 28 09 54 00 13.1650 -59.4320 20.00 15.00 5.00 389863 RPB 2015 06 24 10 05 00 3191-99 G sf6 CCGG 8.720 0.040 ... H4 2015 07 28 10 10 00 13.1650 -59.4320 20.00 15.00 5.00 389864 RPB 2015 06 24 10 05 00 3192-99 G sf6 CCGG 8.740 0.040 ... H4 2015 07 28 10 25 00 13.1650 -59.4320 20.00 15.00 5.00 389865 RPB 2015 07 01 10 05 00 397-99 G sf6 CCGG 8.730 0.040 ... H4 2015 08 04 13 52 00 13.1650 -59.4320 20.00 15.00 5.00 390529 RPB 2015 07 01 10 05 00 398-99 G sf6 CCGG 8.730 0.040 ... H4 2015 08 04 14 08 00 13.1650 -59.4320 20.00 15.00 5.00 390530 RPB 2015 07 08 10 05 00 4981-99 G sf6 CCGG 8.720 0.040 ... H4 2015 08 04 14 24 00 13.1650 -59.4320 20.00 15.00 5.00 390531 RPB 2015 07 08 10 05 00 4982-99 G sf6 CCGG 8.700 0.040 ... H4 2015 08 04 14 40 00 13.1650 -59.4320 20.00 15.00 5.00 390532 RPB 2015 07 15 10 05 00 1529-99 G sf6 CCGG 8.780 0.040 ... H4 2015 08 17 15 07 00 13.1650 -59.4320 20.00 15.00 5.00 391324 RPB 2015 07 15 10 05 00 1530-99 G sf6 CCGG 8.700 0.040 ... H4 2015 08 17 15 23 00 13.1650 -59.4320 20.00 15.00 5.00 391325 RPB 2015 07 22 10 05 00 5163-99 G sf6 CCGG 8.630 0.040 ... H4 2015 08 17 12 29 00 13.1650 -59.4320 20.00 15.00 5.00 391345 RPB 2015 07 22 10 05 00 5164-99 G sf6 CCGG 8.620 0.040 ... H4 2015 08 17 12 45 00 13.1650 -59.4320 20.00 15.00 5.00 391346 RPB 2015 07 26 10 48 00 641-99 G sf6 CCGG 8.720 0.040 ... H4 2015 08 24 13 58 00 13.1650 -59.4320 20.00 15.00 5.00 391909 RPB 2015 07 26 10 48 00 642-99 G sf6 CCGG 8.710 0.040 ... H4 2015 08 24 14 14 00 13.1650 -59.4320 20.00 15.00 5.00 391910 RPB 2015 08 02 13 21 00 4709-99 G sf6 CCGG 8.710 0.040 ... H4 2015 08 24 13 26 00 13.1650 -59.4320 20.00 15.00 5.00 391907 RPB 2015 08 02 13 21 00 4710-99 G sf6 CCGG 8.700 0.040 ... H4 2015 08 24 13 42 00 13.1650 -59.4320 20.00 15.00 5.00 391908 RPB 2015 08 09 13 18 00 2105-99 G sf6 CCGG 8.810 0.040 ... H4 2015 09 09 13 05 00 13.1650 -59.4320 20.00 15.00 5.00 392927 RPB 2015 08 09 13 18 00 2106-99 G sf6 CCGG 8.720 0.040 ... H4 2015 09 09 13 21 00 13.1650 -59.4320 20.00 15.00 5.00 392928 RPB 2015 08 16 13 08 00 6233-66 G sf6 CCGG 8.730 0.040 ... H4 2015 09 09 13 37 00 13.1650 -59.4320 20.00 15.00 5.00 392925 RPB 2015 08 16 13 08 00 6234-66 G sf6 CCGG 8.710 0.040 ... H4 2015 09 09 13 52 00 13.1650 -59.4320 20.00 15.00 5.00 392926 RPB 2015 08 23 10 45 00 175-99 G sf6 CCGG 8.680 0.040 ... H4 2015 09 17 12 01 00 13.1650 -59.4320 20.00 15.00 5.00 393748 RPB 2015 08 23 10 45 00 176-99 G sf6 CCGG 8.690 0.040 ... H4 2015 09 17 12 17 00 13.1650 -59.4320 20.00 15.00 5.00 393749 RPB 2015 08 31 11 10 00 1821-99 G sf6 CCGG 8.710 0.040 ... H4 2015 09 17 12 32 00 13.1650 -59.4320 20.00 15.00 5.00 393746 RPB 2015 08 31 11 10 00 1822-99 G sf6 CCGG 8.740 0.040 ... H4 2015 09 17 12 48 00 13.1650 -59.4320 20.00 15.00 5.00 393747 RPB 2015 09 13 14 50 00 323-99 G sf6 CCGG 8.730 0.040 ... H4 2015 09 29 15 07 00 13.1650 -59.4320 20.00 15.00 5.00 394660 RPB 2015 09 13 14 50 00 324-99 G sf6 CCGG 8.740 0.040 ... H4 2015 09 29 15 22 00 13.1650 -59.4320 20.00 15.00 5.00 394661 RPB 2015 09 20 10 34 00 1667-99 G sf6 CCGG 8.720 0.040 ... H4 2015 10 13 10 35 00 13.1650 -59.4320 20.00 15.00 5.00 395140 RPB 2015 09 20 10 34 00 1668-99 G sf6 CCGG 8.790 0.040 ... H4 2015 10 13 10 50 00 13.1650 -59.4320 20.00 15.00 5.00 395141 RPB 2015 09 27 14 55 00 5209-99 G sf6 CCGG 8.540 0.040 ... H4 2015 10 13 12 10 00 13.1650 -59.4320 20.00 15.00 5.00 395138 RPB 2015 09 27 14 55 00 5210-99 G sf6 CCGG 8.600 0.040 ... H4 2015 10 13 12 25 00 13.1650 -59.4320 20.00 15.00 5.00 395139 RPB 2015 10 04 13 20 00 3149-99 G sf6 CCGG 8.680 0.040 ... H4 2015 10 30 12 57 00 13.1650 -59.4320 20.00 15.00 5.00 396615 RPB 2015 10 04 13 20 00 3150-99 G sf6 CCGG 8.670 0.040 ... H4 2015 10 30 13 13 00 13.1650 -59.4320 20.00 15.00 5.00 396616 RPB 2015 10 11 12 26 00 5289-99 G sf6 CCGG 8.840 0.040 ... H4 2015 10 28 11 48 00 13.1650 -59.4320 20.00 15.00 5.00 396445 RPB 2015 10 11 12 26 00 5290-99 G sf6 CCGG 8.810 0.040 ... H4 2015 10 28 12 04 00 13.1650 -59.4320 20.00 15.00 5.00 396446 RPB 2015 10 18 13 14 00 3531-99 G sf6 CCGG 8.790 0.040 ... H4 2015 11 12 11 49 00 13.1650 -59.4320 20.00 15.00 5.00 397208 RPB 2015 10 18 13 14 00 3532-99 G sf6 CCGG 8.790 0.040 ... H4 2015 11 12 12 04 00 13.1650 -59.4320 20.00 15.00 5.00 397209 RPB 2015 10 25 10 26 00 3849-99 G sf6 CCGG 8.680 0.040 ... H4 2015 11 12 10 45 00 13.1650 -59.4320 20.00 15.00 5.00 397206 RPB 2015 10 25 10 26 00 3850-99 G sf6 CCGG 8.740 0.040 ... H4 2015 11 12 11 01 00 13.1650 -59.4320 20.00 15.00 5.00 397207 RPB 2015 11 01 10 53 00 2273-99 G sf6 CCGG 8.880 0.040 ... H4 2015 11 17 16 11 00 13.1650 -59.4320 20.00 15.00 5.00 397728 RPB 2015 11 01 10 53 00 2274-99 G sf6 CCGG 8.860 0.040 ... H4 2015 11 17 16 27 00 13.1650 -59.4320 20.00 15.00 5.00 397729 RPB 2015 11 08 13 29 00 3283-99 G sf6 CCGG 8.800 0.040 ... H4 2015 11 18 11 44 00 13.1650 -59.4320 20.00 15.00 5.00 397726 RPB 2015 11 08 13 29 00 3284-99 G sf6 CCGG 8.650 0.040 ... H4 2015 11 18 11 59 00 13.1650 -59.4320 20.00 15.00 5.00 397727 RPB 2015 11 15 11 05 00 1523-99 G sf6 CCGG 8.850 0.040 ... H4 2015 12 17 16 52 00 13.1650 -59.4320 20.00 15.00 5.00 398877 RPB 2015 11 15 11 05 00 1524-99 G sf6 CCGG 8.820 0.040 ... H4 2015 12 17 17 08 00 13.1650 -59.4320 20.00 15.00 5.00 398878 RPB 2015 11 22 11 42 00 4937-99 G sf6 CCGG 8.800 0.040 ... H4 2015 12 11 14 34 00 13.1650 -59.4320 20.00 15.00 5.00 398675 RPB 2015 11 22 11 42 00 4938-99 G sf6 CCGG 8.770 0.040 ... H4 2015 12 11 14 50 00 13.1650 -59.4320 20.00 15.00 5.00 398676 RPB 2015 11 29 12 12 00 453-99 G sf6 CCGG 8.850 0.040 ... H4 2015 12 29 15 25 00 13.1650 -59.4320 20.00 15.00 5.00 399037 RPB 2015 11 29 12 12 00 454-99 G sf6 CCGG 8.910 0.040 ... H4 2015 12 29 15 40 00 13.1650 -59.4320 20.00 15.00 5.00 399038 RPB 2015 12 06 12 52 00 811-99 G sf6 CCGG 8.920 0.040 ... H4 2015 12 29 14 53 00 13.1650 -59.4320 20.00 15.00 5.00 399039 RPB 2015 12 06 12 52 00 812-99 G sf6 CCGG 8.950 0.040 ... H4 2015 12 29 15 09 00 13.1650 -59.4320 20.00 15.00 5.00 399040 RPB 2015 12 13 13 14 00 1319-99 G sf6 CCGG 8.810 0.040 ... H4 2016 01 08 15 58 00 13.1650 -59.4320 20.00 15.00 5.00 399854 RPB 2015 12 13 13 14 00 1320-99 G sf6 CCGG 8.790 0.040 ... H4 2016 01 08 16 14 00 13.1650 -59.4320 20.00 15.00 5.00 399855 RPB 2015 12 20 12 38 00 5411-99 G sf6 CCGG 8.780 0.040 ... H4 2016 01 11 09 35 00 13.1650 -59.4320 20.00 15.00 5.00 399856 RPB 2015 12 20 12 38 00 5412-99 G sf6 CCGG 8.860 0.040 ... H4 2016 01 11 09 51 00 13.1650 -59.4320 20.00 15.00 5.00 399857 RPB 2015 12 27 14 32 00 3723-99 G sf6 CCGG 8.900 0.040 ... H4 2016 01 19 10 04 00 13.1650 -59.4320 20.00 15.00 5.00 400354 RPB 2015 12 27 14 32 00 3724-99 G sf6 CCGG 8.930 0.040 ... H4 2016 01 19 10 20 00 13.1650 -59.4320 20.00 15.00 5.00 400355 RPB 2016 01 03 14 21 00 3737-99 G sf6 CCGG 8.850 0.040 ... H4 2016 01 19 10 36 00 13.1650 -59.4320 20.00 15.00 5.00 400356 RPB 2016 01 03 14 21 00 3738-99 G sf6 CCGG 8.850 0.040 ... H4 2016 01 19 10 52 00 13.1650 -59.4320 20.00 15.00 5.00 400357 RPB 2016 01 10 12 40 00 2241-99 G sf6 CCGG 8.880 0.040 ... H4 2016 01 27 14 19 00 13.1650 -59.4320 20.00 15.00 5.00 400878 RPB 2016 01 10 12 40 00 2242-99 G sf6 CCGG 8.840 0.040 ... H4 2016 01 27 14 35 00 13.1650 -59.4320 20.00 15.00 5.00 400879 RPB 2016 01 17 12 21 00 2977-99 G sf6 CCGG 8.890 0.040 ... H4 2016 01 27 15 22 00 13.1650 -59.4320 20.00 15.00 5.00 400876 RPB 2016 01 17 12 21 00 2978-99 G sf6 CCGG 8.930 0.040 ... H4 2016 01 27 15 38 00 13.1650 -59.4320 20.00 15.00 5.00 400877 RPB 2016 01 24 14 07 00 1403-99 G sf6 CCGG 8.860 0.040 ... H4 2016 02 16 13 13 00 13.1650 -59.4320 20.00 15.00 5.00 401997 RPB 2016 01 24 14 07 00 1404-99 G sf6 CCGG 8.890 0.040 ... H4 2016 02 16 13 29 00 13.1650 -59.4320 20.00 15.00 5.00 401998 RPB 2016 01 31 12 50 00 3149-99 G sf6 CCGG 8.870 0.040 ... H4 2016 02 16 12 41 00 13.1650 -59.4320 20.00 15.00 5.00 401995 RPB 2016 01 31 12 50 00 3150-99 G sf6 CCGG 8.860 0.040 ... H4 2016 02 16 12 57 00 13.1650 -59.4320 20.00 15.00 5.00 401996 RPB 2016 02 07 10 49 00 723-99 G sf6 CCGG 8.920 0.040 ... H4 2016 03 01 16 52 00 13.1650 -59.4320 20.00 15.00 5.00 402738 RPB 2016 02 07 10 49 00 724-99 G sf6 CCGG 8.910 0.040 ... H4 2016 03 01 17 08 00 13.1650 -59.4320 20.00 15.00 5.00 402739 RPB 2016 02 14 13 54 00 2853-99 G sf6 CCGG 8.880 0.040 ... H4 2016 03 01 16 21 00 13.1650 -59.4320 20.00 15.00 5.00 402736 RPB 2016 02 14 13 54 00 2854-99 G sf6 CCGG 8.890 0.040 ... H4 2016 03 01 16 36 00 13.1650 -59.4320 20.00 15.00 5.00 402737 RPB 2016 02 21 12 50 00 1055-99 G sf6 CCGG 8.920 0.040 ... H4 2016 03 10 10 00 00 13.1650 -59.4320 20.00 15.00 5.00 403260 RPB 2016 02 21 12 50 00 1056-99 G sf6 CCGG 8.900 0.040 ... H4 2016 03 10 10 16 00 13.1650 -59.4320 20.00 15.00 5.00 403261 RPB 2016 02 28 12 19 00 2447-99 G sf6 CCGG 8.910 0.040 ... H4 2016 03 10 09 28 00 13.1650 -59.4320 20.00 15.00 5.00 403262 RPB 2016 02 28 12 19 00 2448-99 G sf6 CCGG 8.910 0.040 ... H4 2016 03 10 09 44 00 13.1650 -59.4320 20.00 15.00 5.00 403263 RPB 2016 03 06 13 01 00 3849-99 G sf6 CCGG 8.910 0.040 ... H4 2016 03 21 10 44 00 13.1650 -59.4320 20.00 15.00 5.00 403709 RPB 2016 03 06 13 01 00 3850-99 G sf6 CCGG 8.910 0.040 ... H4 2016 03 21 11 00 00 13.1650 -59.4320 20.00 15.00 5.00 403710 RPB 2016 03 13 16 10 00 3569-99 G sf6 CCGG 8.890 0.040 ... H4 2016 04 07 12 23 00 13.1650 -59.4320 20.00 15.00 5.00 404569 RPB 2016 03 13 16 10 00 3570-99 G sf6 CCGG 8.960 0.040 ... H4 2016 04 07 12 38 00 13.1650 -59.4320 20.00 15.00 5.00 404570 RPB 2016 03 20 14 12 00 4709-99 G sf6 CCGG 8.970 0.040 ... H4 2016 04 07 11 51 00 13.1650 -59.4320 20.00 15.00 5.00 404567 RPB 2016 03 20 14 12 00 4710-99 G sf6 CCGG 8.950 0.040 ... H4 2016 04 07 12 07 00 13.1650 -59.4320 20.00 15.00 5.00 404568 RPB 2016 03 27 13 23 00 2637-99 G sf6 CCGG 8.910 0.040 ... H4 2016 04 19 13 40 00 13.1650 -59.4320 20.00 15.00 5.00 405387 RPB 2016 03 27 13 23 00 2638-99 G sf6 CCGG 9.010 0.040 ... H4 2016 04 19 13 56 00 13.1650 -59.4320 20.00 15.00 5.00 405388 RPB 2016 04 03 12 34 56 5233-99 G sf6 CCGG 8.910 0.040 ... H4 2016 04 20 14 47 00 13.1650 -59.4320 20.00 15.00 5.00 405457 RPB 2016 04 03 12 34 56 5234-99 G sf6 CCGG 8.990 0.040 ... H4 2016 04 20 15 02 00 13.1650 -59.4320 20.00 15.00 5.00 405458 RPB 2016 04 10 13 35 00 2713-99 G sf6 CCGG 8.950 0.040 ... H4 2016 04 26 09 55 00 13.1650 -59.4320 20.00 15.00 5.00 405753 RPB 2016 04 10 13 35 00 2714-99 G sf6 CCGG 9.020 0.040 ... H4 2016 04 26 10 11 00 13.1650 -59.4320 20.00 15.00 5.00 405754 RPB 2016 04 17 14 37 00 4305-99 G sf6 CCGG 8.990 0.040 ... H4 2016 04 26 10 26 00 13.1650 -59.4320 20.00 15.00 5.00 405751 RPB 2016 04 17 14 37 00 4306-99 G sf6 CCGG 8.980 0.040 ... H4 2016 04 26 10 42 00 13.1650 -59.4320 20.00 15.00 5.00 405752 RPB 2016 04 24 14 32 00 2941-99 G sf6 CCGG 8.950 0.040 ... H4 2016 05 16 15 39 00 13.1650 -59.4320 20.00 15.00 5.00 406810 RPB 2016 04 24 14 32 00 2942-99 G sf6 CCGG 8.930 0.040 ... H4 2016 05 16 15 55 00 13.1650 -59.4320 20.00 15.00 5.00 406811 RPB 2016 05 01 14 06 00 3125-99 G sf6 CCGG 8.890 0.040 ... H4 2016 05 16 16 11 00 13.1650 -59.4320 20.00 15.00 5.00 406808 RPB 2016 05 01 14 06 00 3126-99 G sf6 CCGG 8.970 0.040 ... H4 2016 05 16 16 27 00 13.1650 -59.4320 20.00 15.00 5.00 406809 RPB 2016 05 08 12 37 00 1443-99 G sf6 CCGG 9.030 0.040 ... H4 2016 05 26 13 38 00 13.1650 -59.4320 20.00 15.00 5.00 407441 RPB 2016 05 08 12 37 00 1444-99 G sf6 CCGG 9.000 0.040 ... H4 2016 05 26 13 54 00 13.1650 -59.4320 20.00 15.00 5.00 407442 RPB 2016 05 15 11 03 00 3749-99 G sf6 CCGG 9.000 0.040 ... H4 2016 05 26 13 06 00 13.1650 -59.4320 20.00 15.00 5.00 407439 RPB 2016 05 15 11 03 00 3750-99 G sf6 CCGG 8.980 0.040 ... H4 2016 05 26 13 22 00 13.1650 -59.4320 20.00 15.00 5.00 407440 RPB 2016 05 22 14 36 00 727-99 G sf6 CCGG 9.010 0.040 ... H4 2016 06 16 13 23 00 13.1650 -59.4320 20.00 15.00 5.00 408419 RPB 2016 05 22 14 36 00 728-99 G sf6 CCGG 9.040 0.040 ... H4 2016 06 16 13 39 00 13.1650 -59.4320 20.00 15.00 5.00 408420 RPB 2016 05 29 12 44 00 827-99 G sf6 CCGG 9.000 0.040 ... H4 2016 06 16 17 05 00 13.1650 -59.4320 20.00 15.00 5.00 408433 RPB 2016 05 29 12 44 00 828-99 G sf6 CCGG 9.000 0.040 ... H4 2016 06 16 17 21 00 13.1650 -59.4320 20.00 15.00 5.00 408434 RPB 2016 06 05 10 42 00 1819-99 G sf6 CCGG 9.050 0.040 ... H4 2016 07 12 13 54 00 13.1650 -59.4320 20.00 15.00 5.00 409967 RPB 2016 06 05 10 42 00 1820-99 G sf6 CCGG 9.030 0.040 ... H4 2016 07 12 14 10 00 13.1650 -59.4320 20.00 15.00 5.00 409968 RPB 2016 06 12 10 50 00 4729-99 G sf6 CCGG 9.030 0.040 ... H4 2016 07 12 14 26 00 13.1650 -59.4320 20.00 15.00 5.00 409965 RPB 2016 06 12 10 50 00 4730-99 G sf6 CCGG 8.940 0.040 ... H4 2016 07 12 14 42 00 13.1650 -59.4320 20.00 15.00 5.00 409966 RPB 2016 06 19 11 05 00 4061-99 G sf6 CCGG 8.980 0.040 ... H4 2016 07 12 16 01 00 13.1650 -59.4320 20.00 15.00 5.00 409969 RPB 2016 06 19 11 05 00 4062-99 G sf6 CCGG 9.030 0.040 ... H4 2016 07 12 16 17 00 13.1650 -59.4320 20.00 15.00 5.00 409970 RPB 2016 06 26 12 28 00 5037-99 G sf6 CCGG 9.070 0.040 ... H4 2016 07 07 12 42 00 13.1650 -59.4320 20.00 15.00 5.00 409948 RPB 2016 06 26 12 28 00 5038-99 G sf6 CCGG 9.090 0.040 ... H4 2016 07 07 12 58 00 13.1650 -59.4320 20.00 15.00 5.00 409949 RPB 2016 07 03 11 43 00 879-99 G sf6 CCGG 9.150 0.040 ... H4 2016 07 20 16 13 00 13.1650 -59.4320 20.00 15.00 5.00 410616 RPB 2016 07 03 11 43 00 880-99 G sf6 CCGG 9.140 0.040 ... H4 2016 07 20 16 29 00 13.1650 -59.4320 20.00 15.00 5.00 410617 RPB 2016 07 10 15 13 00 3413-99 G sf6 CCGG 9.040 0.040 ... H4 2016 07 20 14 06 00 13.1650 -59.4320 20.00 15.00 5.00 410618 RPB 2016 07 10 15 13 00 3414-99 G sf6 CCGG 9.070 0.040 ... H4 2016 07 20 14 22 00 13.1650 -59.4320 20.00 15.00 5.00 410619 RPB 2016 07 17 11 45 00 43-99 G sf6 CCGG 9.090 0.040 ... H4 2016 08 01 14 45 00 13.1650 -59.4320 20.00 15.00 5.00 411379 RPB 2016 07 17 11 45 00 44-99 G sf6 CCGG 9.130 0.040 ... H4 2016 08 01 15 01 00 13.1650 -59.4320 20.00 15.00 5.00 411380 RPB 2016 07 24 15 30 00 1139-99 G sf6 CCGG 9.190 0.040 ... H4 2016 08 02 09 53 00 13.1650 -59.4320 20.00 15.00 5.00 411377 RPB 2016 07 24 15 30 00 1140-99 G sf6 CCGG 9.130 0.040 ... H4 2016 08 02 10 09 00 13.1650 -59.4320 20.00 15.00 5.00 411378 RPB 2016 07 31 12 25 00 3663-99 G sf6 CCGG 9.060 0.040 ... H4 2016 08 11 13 10 00 13.1650 -59.4320 20.00 15.00 5.00 411881 RPB 2016 08 01 11 15 00 5163-99 G sf6 CCGG 9.050 0.040 ... H4 2016 08 11 14 14 00 13.1650 -59.4320 20.00 15.00 5.00 411882 RPB 2016 08 01 11 15 00 5164-99 G sf6 CCGG 9.050 0.040 ... H4 2016 08 11 14 30 00 13.1650 -59.4320 20.00 15.00 5.00 411883 RPB 2016 08 07 13 20 00 883-99 G sf6 CCGG 8.920 0.040 ... H4 2016 08 25 10 39 00 13.1650 -59.4320 20.00 15.00 5.00 412788 RPB 2016 08 07 13 20 00 884-99 G sf6 CCGG 8.920 0.040 ... H4 2016 08 25 10 55 00 13.1650 -59.4320 20.00 15.00 5.00 412789 RPB 2016 08 14 12 01 00 1443-99 G sf6 CCGG 9.000 0.040 ... H4 2016 08 25 11 11 00 13.1650 -59.4320 20.00 15.00 5.00 412786 RPB 2016 08 14 12 01 00 1444-99 G sf6 CCGG 9.040 0.040 ... H4 2016 08 25 11 27 00 13.1650 -59.4320 20.00 15.00 5.00 412787 RPB 2016 08 21 13 06 00 4113-99 G sf6 CCGG 9.500 0.040 N.. H4 2016 09 12 15 08 00 13.1650 -59.4320 20.00 15.00 5.00 413585 RPB 2016 08 21 13 06 00 4114-99 G sf6 CCGG 9.090 0.040 N.. H4 2016 09 12 15 24 00 13.1650 -59.4320 20.00 15.00 5.00 413586 RPB 2016 08 28 14 07 00 4583-99 G sf6 CCGG 9.040 0.040 ... H4 2016 09 16 15 54 00 13.1650 -59.4320 20.00 15.00 5.00 413628 RPB 2016 09 04 13 53 00 5507-99 G sf6 CCGG 9.090 0.040 ... H4 2016 10 03 11 09 00 13.1650 -59.4320 20.00 15.00 5.00 414353 RPB 2016 09 04 13 53 00 5508-99 G sf6 CCGG 9.080 0.040 ... H4 2016 10 03 11 25 00 13.1650 -59.4320 20.00 15.00 5.00 414354 RPB 2016 09 11 12 31 00 5705-99 G sf6 CCGG 9.150 0.040 ... H4 2016 10 03 11 41 00 13.1650 -59.4320 20.00 15.00 5.00 414355 RPB 2016 09 11 12 31 00 5706-99 G sf6 CCGG 9.120 0.040 ... H4 2016 10 03 11 57 00 13.1650 -59.4320 20.00 15.00 5.00 414356 RPB 2016 09 18 10 30 00 5537-99 G sf6 CCGG 9.120 0.040 ... H4 2016 10 06 16 26 00 13.1650 -59.4320 20.00 15.00 5.00 414840 RPB 2016 09 18 10 30 00 5538-99 G sf6 CCGG 9.060 0.040 ... H4 2016 10 06 16 42 00 13.1650 -59.4320 20.00 15.00 5.00 414841 RPB 2016 09 25 13 55 00 5593-99 G sf6 CCGG 9.060 0.040 ... H4 2016 10 14 12 22 00 13.1650 -59.4320 20.00 15.00 5.00 414960 RPB 2016 09 25 13 55 00 5594-99 G sf6 CCGG 9.010 0.040 ... H4 2016 10 14 12 38 00 13.1650 -59.4320 20.00 15.00 5.00 414961 RPB 2016 10 02 13 06 00 4787-99 G sf6 CCGG 9.030 0.040 ... H4 2016 10 20 17 27 00 13.1650 -59.4320 20.00 15.00 5.00 415229 RPB 2016 10 02 13 06 00 4788-99 G sf6 CCGG 9.070 0.040 ... H4 2016 10 20 17 43 00 13.1650 -59.4320 20.00 15.00 5.00 415228 RPB 2016 10 09 12 50 00 5249-99 G sf6 CCGG 9.090 0.040 ... H4 2016 10 20 16 55 00 13.1650 -59.4320 20.00 15.00 5.00 415226 RPB 2016 10 09 12 50 00 5250-99 G sf6 CCGG 9.070 0.040 ... H4 2016 10 20 17 11 00 13.1650 -59.4320 20.00 15.00 5.00 415227 RPB 2016 10 16 11 20 00 1169-99 G sf6 CCGG 8.920 0.040 ... H4 2016 11 08 11 14 00 13.1650 -59.4320 20.00 15.00 5.00 416365 RPB 2016 10 16 11 20 00 1170-99 G sf6 CCGG 8.940 0.040 ... H4 2016 11 08 11 30 00 13.1650 -59.4320 20.00 15.00 5.00 416366 RPB 2016 10 23 10 58 00 3927-99 G sf6 CCGG 9.110 0.040 ... H4 2016 11 08 11 46 00 13.1650 -59.4320 20.00 15.00 5.00 416363 RPB 2016 10 23 10 58 00 3928-99 G sf6 CCGG 9.110 0.040 ... H4 2016 11 08 12 01 00 13.1650 -59.4320 20.00 15.00 5.00 416364 RPB 2016 10 30 14 59 00 1675-99 G sf6 CCGG 9.110 0.040 ... H4 2016 11 16 12 52 00 13.1650 -59.4320 20.00 15.00 5.00 416647 RPB 2016 10 30 14 59 00 1676-99 G sf6 CCGG 9.080 0.040 ... H4 2016 11 16 13 08 00 13.1650 -59.4320 20.00 15.00 5.00 416648 RPB 2016 11 06 15 30 00 4941-99 G sf6 CCGG 9.050 0.040 ... H4 2016 11 16 13 24 00 13.1650 -59.4320 20.00 15.00 5.00 416645 RPB 2016 11 06 15 30 00 4942-99 G sf6 CCGG 9.070 0.040 ... H4 2016 11 16 13 40 00 13.1650 -59.4320 20.00 15.00 5.00 416646 RPB 2016 11 13 14 28 00 5225-99 G sf6 CCGG 9.260 0.040 ... H4 2016 12 06 15 31 00 13.1650 -59.4320 20.00 15.00 5.00 417602 RPB 2016 11 13 14 28 00 5226-99 G sf6 CCGG 9.170 0.040 ... H4 2016 12 06 15 47 00 13.1650 -59.4320 20.00 15.00 5.00 417603 RPB 2016 11 20 15 00 00 5411-99 G sf6 CCGG 9.230 0.040 ... H4 2016 12 06 13 56 00 13.1650 -59.4320 20.00 15.00 5.00 417604 RPB 2016 11 20 15 00 00 5412-99 G sf6 CCGG 9.250 0.040 ... H4 2016 12 06 14 12 00 13.1650 -59.4320 20.00 15.00 5.00 417605 RPB 2016 11 27 15 43 00 3957-99 G sf6 CCGG 9.210 0.040 ... H4 2016 12 19 14 13 00 13.1650 -59.4320 20.00 15.00 5.00 418236 RPB 2016 11 27 15 43 00 3958-99 G sf6 CCGG 9.190 0.040 ... H4 2016 12 19 14 29 00 13.1650 -59.4320 20.00 15.00 5.00 418237 RPB 2016 12 04 13 41 00 4973-99 G sf6 CCGG 9.200 0.040 ... H4 2016 12 19 13 41 00 13.1650 -59.4320 20.00 15.00 5.00 418234 RPB 2016 12 04 13 41 00 4974-99 G sf6 CCGG 9.180 0.040 ... H4 2016 12 19 13 57 00 13.1650 -59.4320 20.00 15.00 5.00 418235 RPB 2016 12 11 14 07 00 1343-99 G sf6 CCGG 9.090 0.040 ... H4 2017 01 11 12 08 00 13.1650 -59.4320 20.00 15.00 5.00 418780 RPB 2016 12 11 14 07 00 1344-99 G sf6 CCGG 9.130 0.040 N.. H4 2017 01 11 12 23 00 13.1650 -59.4320 20.00 15.00 5.00 418781 RPB 2016 12 18 14 11 00 3529-99 G sf6 CCGG 9.300 0.040 ... H4 2017 01 11 11 36 00 13.1650 -59.4320 20.00 15.00 5.00 418782 RPB 2016 12 18 14 11 00 3530-99 G sf6 CCGG 9.160 0.040 ... H4 2017 01 11 11 52 00 13.1650 -59.4320 20.00 15.00 5.00 418783 RPB 2016 12 25 14 42 00 2149-99 G sf6 CCGG 9.300 0.040 ... H4 2017 01 17 17 00 00 13.1650 -59.4320 20.00 15.00 5.00 419181 RPB 2016 12 25 14 42 00 2150-99 G sf6 CCGG 9.270 0.040 ... H4 2017 01 17 17 16 00 13.1650 -59.4320 20.00 15.00 5.00 419182 RPB 2017 01 01 12 06 00 2305-99 G sf6 CCGG 9.220 0.040 ... H4 2017 01 17 16 29 00 13.1650 -59.4320 20.00 15.00 5.00 419179 RPB 2017 01 01 12 06 00 2306-99 G sf6 CCGG 9.270 0.040 ... H4 2017 01 17 16 45 00 13.1650 -59.4320 20.00 15.00 5.00 419180 RPB 2017 01 08 14 41 00 895-99 G sf6 CCGG 9.310 0.040 ... H4 2017 01 31 16 32 00 13.1650 -59.4320 20.00 15.00 5.00 419799 RPB 2017 01 08 14 41 00 896-99 G sf6 CCGG 9.260 0.040 ... H4 2017 01 31 16 48 00 13.1650 -59.4320 20.00 15.00 5.00 419800 RPB 2017 01 15 14 10 00 1225-99 G sf6 CCGG 9.240 0.040 ... H4 2017 01 31 16 00 00 13.1650 -59.4320 20.00 15.00 5.00 419797 RPB 2017 01 15 14 10 00 1226-99 G sf6 CCGG 9.280 0.040 ... H4 2017 01 31 16 16 00 13.1650 -59.4320 20.00 15.00 5.00 419798 RPB 2017 01 22 15 44 00 2507-99 G sf6 CCGG 9.210 0.040 ... H4 2017 02 10 09 08 00 13.1650 -59.4320 20.00 15.00 5.00 420412 RPB 2017 01 22 15 44 00 2508-99 G sf6 CCGG 9.300 0.040 ... H4 2017 02 10 09 24 00 13.1650 -59.4320 20.00 15.00 5.00 420413 RPB 2017 01 29 13 55 00 5545-99 G sf6 CCGG 9.330 0.040 ... H4 2017 02 10 09 40 00 13.1650 -59.4320 20.00 15.00 5.00 420410 RPB 2017 01 29 13 55 00 5546-99 G sf6 CCGG 9.290 0.040 ... H4 2017 02 10 09 56 00 13.1650 -59.4320 20.00 15.00 5.00 420411 RPB 2017 02 05 14 11 00 17-99 G sf6 CCGG 9.220 0.040 ... H4 2017 03 06 13 06 00 13.1650 -59.4320 20.00 15.00 5.00 421580 RPB 2017 02 05 14 11 00 18-99 G sf6 CCGG 9.250 0.040 ... H4 2017 03 06 13 22 00 13.1650 -59.4320 20.00 15.00 5.00 421581 RPB 2017 02 12 13 50 00 4959-99 G sf6 CCGG 9.150 0.040 ... H4 2017 03 06 12 35 00 13.1650 -59.4320 20.00 15.00 5.00 421578 RPB 2017 02 12 13 50 00 4960-99 G sf6 CCGG 9.160 0.040 ... H4 2017 03 06 12 51 00 13.1650 -59.4320 20.00 15.00 5.00 421579 RPB 2017 02 19 11 50 00 3575-99 G sf6 CCGG 9.350 0.040 ... H4 2017 03 13 16 57 00 13.1650 -59.4320 20.00 15.00 5.00 422270 RPB 2017 02 19 11 50 00 3576-99 G sf6 CCGG 9.340 0.040 ... H4 2017 03 13 17 12 00 13.1650 -59.4320 20.00 15.00 5.00 422271 RPB 2017 02 26 14 46 00 5621-99 G sf6 CCGG 9.200 0.040 ... H4 2017 03 13 16 25 00 13.1650 -59.4320 20.00 15.00 5.00 422272 RPB 2017 02 26 14 46 00 5622-99 G sf6 CCGG 9.210 0.040 ... H4 2017 03 13 16 41 00 13.1650 -59.4320 20.00 15.00 5.00 422273 RPB 2017 03 05 13 34 00 2285-99 G sf6 CCGG 9.300 0.040 ... H4 2017 03 31 16 45 00 13.1650 -59.4320 20.00 15.00 5.00 422967 RPB 2017 03 05 13 34 00 2286-99 G sf6 CCGG 9.260 0.040 ... H4 2017 03 31 17 01 00 13.1650 -59.4320 20.00 15.00 5.00 422968 RPB 2017 03 12 12 20 00 2635-99 G sf6 CCGG 9.280 0.040 ... H4 2017 04 03 11 33 00 13.1650 -59.4320 20.00 15.00 5.00 422969 RPB 2017 03 12 12 20 00 2636-99 G sf6 CCGG 9.340 0.040 ... H4 2017 04 03 11 48 00 13.1650 -59.4320 20.00 15.00 5.00 422970 RPB 2017 03 19 12 34 00 747-99 G sf6 CCGG 9.320 0.040 ... H4 2017 04 11 16 53 00 13.1650 -59.4320 20.00 15.00 5.00 423546 RPB 2017 03 19 12 34 00 748-99 G sf6 CCGG 9.280 0.040 ... H4 2017 04 11 17 08 00 13.1650 -59.4320 20.00 15.00 5.00 423547 RPB 2017 03 26 10 50 00 4887-99 G sf6 CCGG 9.280 0.040 ... H4 2017 04 11 16 21 00 13.1650 -59.4320 20.00 15.00 5.00 423544 RPB 2017 03 26 10 50 00 4888-99 G sf6 CCGG 9.260 0.040 ... H4 2017 04 11 16 37 00 13.1650 -59.4320 20.00 15.00 5.00 423545 RPB 2017 04 02 15 40 00 2947-99 G sf6 CCGG 9.290 0.040 ... H4 2017 04 24 15 28 00 13.1650 -59.4320 20.00 15.00 5.00 424070 RPB 2017 04 02 15 40 00 2948-99 G sf6 CCGG 9.240 0.040 ... H4 2017 04 24 15 43 00 13.1650 -59.4320 20.00 15.00 5.00 424071 RPB 2017 04 09 13 17 00 4973-99 G sf6 CCGG 2.510 0.040 N.. H4 2017 04 24 17 03 00 13.1650 -59.4320 20.00 15.00 5.00 424072 RPB 2017 04 09 13 17 00 4974-99 G sf6 CCGG 5.810 0.040 N.. H4 2017 04 24 17 19 00 13.1650 -59.4320 20.00 15.00 5.00 424073 RPB 2017 04 16 15 28 00 115-99 G sf6 CCGG 9.250 0.040 ... H4 2017 05 04 11 18 00 13.1650 -59.4320 20.00 15.00 5.00 424616 RPB 2017 04 16 15 28 00 116-99 G sf6 CCGG 9.340 0.040 ... H4 2017 05 04 11 34 00 13.1650 -59.4320 20.00 15.00 5.00 424617 RPB 2017 04 23 12 53 00 1169-99 G sf6 CCGG 9.470 0.040 ... H4 2017 05 04 11 50 00 13.1650 -59.4320 20.00 15.00 5.00 424618 RPB 2017 04 23 12 53 00 1170-99 G sf6 CCGG 9.410 0.040 ... H4 2017 05 04 12 05 00 13.1650 -59.4320 20.00 15.00 5.00 424619 RPB 2017 04 30 14 43 00 3493-99 G sf6 CCGG 9.440 0.040 ... H4 2017 05 22 10 48 00 13.1650 -59.4320 20.00 15.00 5.00 425547 RPB 2017 04 30 14 43 00 3494-99 G sf6 CCGG 9.380 0.040 ... H4 2017 05 22 11 04 00 13.1650 -59.4320 20.00 15.00 5.00 425546 RPB 2017 05 07 14 37 00 5561-99 G sf6 CCGG 9.400 0.040 ... H4 2017 05 22 11 52 00 13.1650 -59.4320 20.00 15.00 5.00 425544 RPB 2017 05 07 14 37 00 5562-99 G sf6 CCGG 9.410 0.040 ... H4 2017 05 22 12 07 00 13.1650 -59.4320 20.00 15.00 5.00 425545 RPB 2017 05 14 11 26 00 971-99 G sf6 CCGG 9.320 0.040 ... H4 2017 06 07 13 33 00 13.1650 -59.4320 20.00 15.00 5.00 426258 RPB 2017 05 14 11 26 00 972-99 G sf6 CCGG 9.310 0.040 ... H4 2017 06 07 13 49 00 13.1650 -59.4320 20.00 15.00 5.00 426259 RPB 2017 05 21 11 04 00 5313-99 G sf6 CCGG 9.320 0.040 ... H4 2017 06 07 14 05 00 13.1650 -59.4320 20.00 15.00 5.00 426260 RPB 2017 05 21 11 04 00 5314-99 G sf6 CCGG 9.300 0.040 ... H4 2017 06 07 14 21 00 13.1650 -59.4320 20.00 15.00 5.00 426261 RPB 2017 05 28 10 48 00 3899-99 G sf6 CCGG 9.440 0.040 ... H4 2017 06 21 14 39 00 13.1650 -59.4320 20.00 15.00 5.00 426944 RPB 2017 05 28 10 48 00 3900-99 G sf6 CCGG 9.380 0.040 ... H4 2017 06 21 14 55 00 13.1650 -59.4320 20.00 15.00 5.00 426945 RPB 2017 06 04 10 33 00 5169-99 G sf6 CCGG 9.280 0.040 ... H4 2017 06 21 15 11 00 13.1650 -59.4320 20.00 15.00 5.00 426942 RPB 2017 06 04 10 33 00 5170-99 G sf6 CCGG 9.380 0.040 ... H4 2017 06 21 15 27 00 13.1650 -59.4320 20.00 15.00 5.00 426943 RPB 2017 06 11 11 28 00 3575-99 G sf6 CCGG 9.400 0.040 ... H4 2017 06 29 14 45 00 13.1650 -59.4320 20.00 15.00 5.00 427330 RPB 2017 06 11 11 28 00 3576-99 G sf6 CCGG 9.390 0.040 ... H4 2017 06 29 15 01 00 13.1650 -59.4320 20.00 15.00 5.00 427331 RPB 2017 06 18 13 48 00 4043-99 G sf6 CCGG 9.430 0.040 ... H4 2017 06 29 13 10 00 13.1650 -59.4320 20.00 15.00 5.00 427332 RPB 2017 06 18 13 48 00 4044-99 G sf6 CCGG 9.380 0.040 ... H4 2017 06 29 13 26 00 13.1650 -59.4320 20.00 15.00 5.00 427333 RPB 2017 06 25 13 52 00 1579-99 G sf6 CCGG 9.480 0.040 ... H4 2017 07 20 12 14 00 13.1650 -59.4320 20.00 15.00 5.00 427837 RPB 2017 06 25 13 52 00 1580-99 G sf6 CCGG 9.400 0.040 ... H4 2017 07 20 12 30 00 13.1650 -59.4320 20.00 15.00 5.00 427838 RPB 2017 07 02 14 34 00 5007-99 G sf6 CCGG 9.400 0.040 ... H4 2017 07 20 11 11 00 13.1650 -59.4320 20.00 15.00 5.00 427839 RPB 2017 07 02 14 34 00 5008-99 G sf6 CCGG 9.530 0.040 ... H4 2017 07 20 11 27 00 13.1650 -59.4320 20.00 15.00 5.00 427840 RPB 2017 07 09 14 41 00 3401-99 G sf6 CCGG 9.510 0.040 ... H4 2017 08 03 12 16 00 13.1650 -59.4320 20.00 15.00 5.00 428479 RPB 2017 07 09 14 41 00 3402-99 G sf6 CCGG 9.440 0.040 ... H4 2017 08 03 12 32 00 13.1650 -59.4320 20.00 15.00 5.00 428480 RPB 2017 07 16 13 03 00 3911-99 G sf6 CCGG 9.530 0.040 ... H4 2017 08 04 08 41 00 13.1650 -59.4320 20.00 15.00 5.00 428493 RPB 2017 07 16 13 03 00 3912-99 G sf6 CCGG 9.510 0.040 ... H4 2017 08 04 08 57 00 13.1650 -59.4320 20.00 15.00 5.00 428494 RPB 2017 07 23 11 40 00 3605-99 G sf6 CCGG 9.360 0.040 ... H4 2017 08 14 17 01 00 13.1650 -59.4320 20.00 15.00 5.00 429154 RPB 2017 07 23 11 40 00 3606-99 G sf6 CCGG 9.380 0.040 ... H4 2017 08 14 17 16 00 13.1650 -59.4320 20.00 15.00 5.00 429155 RPB 2017 07 30 15 00 00 5153-99 G sf6 CCGG 9.420 0.040 ... H4 2017 08 14 16 29 00 13.1650 -59.4320 20.00 15.00 5.00 429152 RPB 2017 07 30 15 00 00 5154-99 G sf6 CCGG 9.460 0.040 ... H4 2017 08 14 16 45 00 13.1650 -59.4320 20.00 15.00 5.00 429153 RPB 2017 08 06 11 25 00 2863-99 G sf6 CCGG 9.440 0.040 ... H4 2017 09 06 14 39 00 13.1650 -59.4320 20.00 15.00 5.00 430022 RPB 2017 08 06 11 25 00 2864-99 G sf6 CCGG 9.450 0.040 ... H4 2017 09 06 14 55 00 13.1650 -59.4320 20.00 15.00 5.00 430023 RPB 2017 08 13 11 54 00 3797-99 G sf6 CCGG 9.480 0.040 ... H4 2017 09 06 13 36 00 13.1650 -59.4320 20.00 15.00 5.00 430024 RPB 2017 08 13 11 54 00 3798-99 G sf6 CCGG 9.450 0.040 ... H4 2017 09 06 13 51 00 13.1650 -59.4320 20.00 15.00 5.00 430025 RPB 2017 08 20 10 43 00 1999-99 G sf6 CCGG 9.460 0.040 ... H4 2017 09 12 12 43 00 13.1650 -59.4320 20.00 15.00 5.00 430339 RPB 2017 08 20 10 43 00 2000-99 G sf6 CCGG 9.420 0.040 ... H4 2017 09 12 12 59 00 13.1650 -59.4320 20.00 15.00 5.00 430340 RPB 2017 08 27 10 34 00 5613-99 G sf6 CCGG 9.430 0.040 ... H4 2017 09 12 12 11 00 13.1650 -59.4320 20.00 15.00 5.00 430337 RPB 2017 08 27 10 34 00 5614-99 G sf6 CCGG 9.430 0.040 ... H4 2017 09 12 12 27 00 13.1650 -59.4320 20.00 15.00 5.00 430338 RPB 2017 09 03 12 22 00 1149-99 G sf6 CCGG 9.410 0.040 ... H4 2017 09 21 13 55 00 13.1650 -59.4320 20.00 15.00 5.00 431071 RPB 2017 09 03 12 22 00 1150-99 G sf6 CCGG 9.430 0.040 ... H4 2017 09 21 14 11 00 13.1650 -59.4320 20.00 15.00 5.00 431072 RPB 2017 09 10 14 29 00 5233-99 G sf6 CCGG 9.460 0.040 ... H4 2017 09 21 15 31 00 13.1650 -59.4320 20.00 15.00 5.00 431073 RPB 2017 09 10 14 29 00 5234-99 G sf6 CCGG 9.400 0.040 ... H4 2017 09 21 15 46 00 13.1650 -59.4320 20.00 15.00 5.00 431074 RPB 2017 09 17 12 41 00 2949-99 G sf6 CCGG 9.380 0.040 ... H4 2017 10 10 14 28 00 13.1650 -59.4320 20.00 15.00 5.00 431994 RPB 2017 09 17 12 41 00 2950-99 G sf6 CCGG 9.400 0.040 ... H4 2017 10 10 14 44 00 13.1650 -59.4320 20.00 15.00 5.00 431995 RPB 2017 09 24 14 06 00 5665-99 G sf6 CCGG 9.240 0.040 .X. H4 2017 10 10 13 57 00 13.1650 -59.4320 20.00 15.00 5.00 431993 RPB 2017 09 24 14 06 00 5666-99 G sf6 CCGG 9.270 0.040 .X. H4 2017 10 10 14 12 00 13.1650 -59.4320 20.00 15.00 5.00 431992 RPB 2017 10 01 12 44 00 879-99 G sf6 CCGG 9.530 0.040 ... H4 2017 10 19 11 17 00 13.1650 -59.4320 20.00 15.00 5.00 432593 RPB 2017 10 01 12 44 00 880-99 G sf6 CCGG 9.550 0.040 ... H4 2017 10 19 11 32 00 13.1650 -59.4320 20.00 15.00 5.00 432594 RPB 2017 10 08 14 21 00 3467-99 G sf6 CCGG 9.490 0.040 ... H4 2017 10 18 17 04 00 13.1650 -59.4320 20.00 15.00 5.00 432591 RPB 2017 10 08 14 21 00 3468-99 G sf6 CCGG 9.500 0.040 ... H4 2017 10 18 17 20 00 13.1650 -59.4320 20.00 15.00 5.00 432592 RPB 2017 10 15 10 21 00 721-99 G sf6 CCGG 9.270 0.040 A.. H4 2017 11 09 10 26 00 13.1650 -59.4320 20.00 15.00 5.00 433821 RPB 2017 10 15 10 21 00 722-99 G sf6 CCGG 9.260 0.040 A.. H4 2017 11 09 10 41 00 13.1650 -59.4320 20.00 15.00 5.00 433822 RPB 2017 10 22 10 19 00 5829-99 G sf6 CCGG 9.430 0.040 A.. H4 2017 11 09 10 57 00 13.1650 -59.4320 20.00 15.00 5.00 433823 RPB 2017 10 22 10 19 00 5830-99 G sf6 CCGG 9.570 0.040 A.. H4 2017 11 09 11 13 00 13.1650 -59.4320 20.00 15.00 5.00 433824 RPB 2017 10 29 14 45 00 2521-99 G sf6 CCGG 9.480 0.040 ... H4 2017 11 17 15 48 00 13.1650 -59.4320 20.00 15.00 5.00 434255 RPB 2017 10 29 14 45 00 2522-99 G sf6 CCGG 9.490 0.040 ... H4 2017 11 17 16 04 00 13.1650 -59.4320 20.00 15.00 5.00 434256 RPB 2017 11 05 13 40 00 5339-99 G sf6 CCGG 9.380 0.040 ... H4 2017 11 17 15 17 00 13.1650 -59.4320 20.00 15.00 5.00 434253 RPB 2017 11 05 13 40 00 5340-99 G sf6 CCGG 9.370 0.040 ... H4 2017 11 17 15 33 00 13.1650 -59.4320 20.00 15.00 5.00 434254 RPB 2017 11 12 10 28 00 4543-99 G sf6 CCGG 9.530 0.040 ... H4 2017 12 04 15 47 00 13.1650 -59.4320 20.00 15.00 5.00 434891 RPB 2017 11 12 10 28 00 4544-99 G sf6 CCGG 9.480 0.040 ... H4 2017 12 04 16 03 00 13.1650 -59.4320 20.00 15.00 5.00 434892 RPB 2017 11 19 10 57 00 1121-99 G sf6 CCGG 9.540 0.040 ... H4 2017 12 04 15 15 00 13.1650 -59.4320 20.00 15.00 5.00 434893 RPB 2017 11 19 10 57 00 1122-99 G sf6 CCGG 9.500 0.040 ... H4 2017 12 04 15 31 00 13.1650 -59.4320 20.00 15.00 5.00 434894 RPB 2017 11 26 13 42 00 757-99 G sf6 CCGG 9.430 0.040 ... H4 2017 12 18 12 54 00 13.1650 -59.4320 20.00 15.00 5.00 435404 RPB 2017 11 26 13 42 00 758-99 G sf6 CCGG 9.500 0.040 ... H4 2017 12 18 13 09 00 13.1650 -59.4320 20.00 15.00 5.00 435405 RPB 2017 12 03 21 05 00 3421-99 G sf6 CCGG 9.460 0.040 ... H4 2017 12 18 13 25 00 13.1650 -59.4320 20.00 15.00 5.00 435406 RPB 2017 12 03 21 05 00 3422-99 G sf6 CCGG 9.550 0.040 ... H4 2017 12 18 13 41 00 13.1650 -59.4320 20.00 15.00 5.00 435407 RPB 2017 12 10 12 10 00 3413-99 G sf6 CCGG 9.620 0.040 ... H4 2018 01 03 11 28 00 13.1650 -59.4320 20.00 15.00 5.00 436176 RPB 2017 12 10 12 10 00 3414-99 G sf6 CCGG 9.630 0.040 ... H4 2018 01 03 11 44 00 13.1650 -59.4320 20.00 15.00 5.00 436177 RPB 2017 12 17 13 15 00 3487-99 G sf6 CCGG 9.610 0.040 ... H4 2018 01 03 12 34 00 13.1650 -59.4320 20.00 15.00 5.00 436174 RPB 2017 12 17 13 15 00 3488-99 G sf6 CCGG 9.640 0.040 ... H4 2018 01 03 12 50 00 13.1650 -59.4320 20.00 15.00 5.00 436175 RPB 2017 12 24 15 59 00 81-99 G sf6 CCGG 9.540 0.040 ... H4 2018 01 30 15 35 00 13.1650 -59.4320 20.00 15.00 5.00 437541 RPB 2017 12 24 15 59 00 82-99 G sf6 CCGG 9.600 0.040 ... H4 2018 01 30 15 50 00 13.1650 -59.4320 20.00 15.00 5.00 437542 RPB 2017 12 31 14 43 00 1377-99 G sf6 CCGG 9.540 0.040 ... H4 2018 01 30 15 03 00 13.1650 -59.4320 20.00 15.00 5.00 437539 RPB 2017 12 31 14 43 00 1378-99 G sf6 CCGG 9.610 0.040 ... H4 2018 01 30 15 19 00 13.1650 -59.4320 20.00 15.00 5.00 437540 RPB 2018 01 07 16 31 00 1555-99 G sf6 CCGG 9.580 0.040 ... H4 2018 02 01 09 03 00 13.1650 -59.4320 20.00 15.00 5.00 437575 RPB 2018 01 07 16 31 00 1556-99 G sf6 CCGG 9.610 0.040 ... H4 2018 02 01 09 19 00 13.1650 -59.4320 20.00 15.00 5.00 437576 RPB 2018 01 14 13 39 00 2975-99 G sf6 CCGG 9.480 0.040 ... H4 2018 02 02 09 43 00 13.1650 -59.4320 20.00 15.00 5.00 437545 RPB 2018 01 14 13 39 00 2976-99 G sf6 CCGG 9.570 0.040 ... H4 2018 02 02 09 59 00 13.1650 -59.4320 20.00 15.00 5.00 437546 RPB 2018 01 16 15 43 00 181-99 G sf6 CCGG 9.800 0.040 ... H4 2018 02 21 11 57 00 13.1650 -59.4320 20.00 15.00 5.00 438205 RPB 2018 01 16 15 43 00 182-99 G sf6 CCGG 9.680 0.040 ... H4 2018 02 21 12 13 00 13.1650 -59.4320 20.00 15.00 5.00 438206 RPB 2018 01 21 13 46 00 419-99 G sf6 CCGG 9.520 0.040 ... H4 2018 02 20 12 12 00 13.1650 -59.4320 20.00 15.00 5.00 438217 RPB 2018 01 21 13 46 00 420-99 G sf6 CCGG 9.500 0.040 ... H4 2018 02 20 12 28 00 13.1650 -59.4320 20.00 15.00 5.00 438218 RPB 2018 01 28 11 17 00 5297-99 G sf6 CCGG 9.580 0.040 ... H4 2018 02 20 13 15 00 13.1650 -59.4320 20.00 15.00 5.00 438215 RPB 2018 01 28 11 17 00 5298-99 G sf6 CCGG 9.650 0.040 ... H4 2018 02 20 13 31 00 13.1650 -59.4320 20.00 15.00 5.00 438216 RPB 2018 02 04 11 29 00 847-99 G sf6 CCGG 9.550 0.040 ... H4 2018 02 28 11 10 00 13.1650 -59.4320 20.00 15.00 5.00 438944 RPB 2018 02 04 11 29 00 848-99 G sf6 CCGG 9.610 0.040 ... H4 2018 02 28 11 26 00 13.1650 -59.4320 20.00 15.00 5.00 438945 RPB 2018 02 11 12 49 00 3831-99 G sf6 CCGG 9.700 0.040 ... H4 2018 02 27 12 11 00 13.1650 -59.4320 20.00 15.00 5.00 438942 RPB 2018 02 11 12 49 00 3832-99 G sf6 CCGG 9.720 0.040 ... H4 2018 02 27 12 27 00 13.1650 -59.4320 20.00 15.00 5.00 438943 RPB 2018 02 18 13 15 00 811-99 G sf6 CCGG -999.990 -999.990 *.. H4 2018 03 01 14 15 00 13.1650 -59.4320 20.00 15.00 5.00 439480 RPB 2018 02 18 13 22 00 5555-99 G sf6 CCGG 9.600 0.040 ... H4 2018 03 05 16 58 00 13.1650 -59.4320 20.00 15.00 5.00 439553 RPB 2018 02 18 13 22 00 5556-99 G sf6 CCGG 9.640 0.040 ... H4 2018 03 05 17 14 00 13.1650 -59.4320 20.00 15.00 5.00 439554 RPB 2018 02 25 13 25 00 1927-99 G sf6 CCGG 9.670 0.040 ... H4 2018 03 14 16 57 00 13.1650 -59.4320 20.00 15.00 5.00 440068 RPB 2018 02 25 13 25 00 1928-99 G sf6 CCGG 9.590 0.040 ... H4 2018 03 14 17 12 00 13.1650 -59.4320 20.00 15.00 5.00 440069 RPB 2018 03 04 15 53 00 3783-99 G sf6 CCGG 9.600 0.040 ... H4 2018 03 15 10 07 00 13.1650 -59.4320 20.00 15.00 5.00 440070 RPB 2018 03 04 15 53 00 3784-99 G sf6 CCGG 9.580 0.040 ... H4 2018 03 15 10 22 00 13.1650 -59.4320 20.00 15.00 5.00 440071 RPB 2018 03 11 13 45 00 5079-99 G sf6 CCGG 9.580 0.040 ... H4 2018 03 27 09 17 00 13.1650 -59.4320 20.00 15.00 5.00 440668 RPB 2018 03 11 13 45 00 5080-99 G sf6 CCGG 9.600 0.040 ... H4 2018 03 27 09 33 00 13.1650 -59.4320 20.00 15.00 5.00 440669 RPB 2018 03 18 12 54 00 5367-99 G sf6 CCGG 9.590 0.040 ... H4 2018 03 26 10 15 00 13.1650 -59.4320 20.00 15.00 5.00 440576 RPB 2018 03 18 12 54 00 5368-99 G sf6 CCGG 9.640 0.040 ... H4 2018 03 26 10 31 00 13.1650 -59.4320 20.00 15.00 5.00 440577 RPB 2018 03 25 13 26 00 5085-99 G sf6 CCGG 9.600 0.040 ... H4 2018 04 10 13 01 00 13.1650 -59.4320 20.00 15.00 5.00 441186 RPB 2018 03 25 13 26 00 831-99 G sf6 CCGG 9.650 0.040 ... H4 2018 04 10 12 46 00 13.1650 -59.4320 20.00 15.00 5.00 441187 RPB 2018 04 01 12 51 00 5305-99 G sf6 CCGG 9.640 0.040 ... H4 2018 04 10 12 14 00 13.1650 -59.4320 20.00 15.00 5.00 441184 RPB 2018 04 01 12 51 00 5341-99 G sf6 CCGG 9.570 0.040 ... H4 2018 04 10 12 30 00 13.1650 -59.4320 20.00 15.00 5.00 441185 RPB 2018 04 08 13 55 00 3001-99 G sf6 CCGG 9.670 0.040 ... H4 2018 04 23 11 09 00 13.1650 -59.4320 20.00 15.00 5.00 441928 RPB 2018 04 08 13 55 00 3002-99 G sf6 CCGG 9.590 0.040 ... H4 2018 04 23 11 25 00 13.1650 -59.4320 20.00 15.00 5.00 441929 RPB 2018 04 15 13 36 00 3537-99 G sf6 CCGG 9.630 0.040 ... H4 2018 04 23 10 37 00 13.1650 -59.4320 20.00 15.00 5.00 441926 RPB 2018 04 15 13 36 00 3538-99 G sf6 CCGG 9.610 0.040 ... H4 2018 04 23 10 53 00 13.1650 -59.4320 20.00 15.00 5.00 441927 RPB 2018 04 22 13 50 00 2289-99 G sf6 CCGG 9.630 0.040 ... H4 2018 05 10 15 56 00 13.1650 -59.4320 20.00 15.00 5.00 443002 RPB 2018 04 22 13 50 00 2290-99 G sf6 CCGG 9.730 0.040 ... H4 2018 05 10 16 11 00 13.1650 -59.4320 20.00 15.00 5.00 443003 RPB 2018 04 29 14 14 00 4531-99 G sf6 CCGG 9.640 0.040 ... H4 2018 05 10 16 27 00 13.1650 -59.4320 20.00 15.00 5.00 443004 RPB 2018 04 29 14 14 00 4532-99 G sf6 CCGG 9.640 0.040 ... H4 2018 05 10 16 43 00 13.1650 -59.4320 20.00 15.00 5.00 443005 RPB 2018 05 06 11 43 00 1059-99 G sf6 CCGG 9.760 0.040 ... H4 2018 05 30 14 23 00 13.1650 -59.4320 20.00 15.00 5.00 444023 RPB 2018 05 06 11 43 00 1060-99 G sf6 CCGG 9.730 0.040 ... H4 2018 05 30 14 39 00 13.1650 -59.4320 20.00 15.00 5.00 444024 RPB 2018 05 13 13 41 00 3471-99 G sf6 CCGG 9.710 0.040 ... H4 2018 05 30 13 51 00 13.1650 -59.4320 20.00 15.00 5.00 444021 RPB 2018 05 13 13 41 00 3472-99 G sf6 CCGG 9.750 0.040 ... H4 2018 05 30 14 07 00 13.1650 -59.4320 20.00 15.00 5.00 444022 RPB 2018 05 20 12 21 00 2351-99 G sf6 CCGG 9.670 0.040 ... H4 2018 06 06 11 47 00 13.1650 -59.4320 20.00 15.00 5.00 444715 RPB 2018 05 20 12 21 00 2352-99 G sf6 CCGG 9.750 0.040 ... H4 2018 06 06 12 03 00 13.1650 -59.4320 20.00 15.00 5.00 444716 RPB 2018 05 27 12 40 00 5613-99 G sf6 CCGG 9.710 0.040 ... H4 2018 06 06 11 15 00 13.1650 -59.4320 20.00 15.00 5.00 444713 RPB 2018 05 27 12 40 00 5614-99 G sf6 CCGG 9.680 0.040 ... H4 2018 06 06 11 31 00 13.1650 -59.4320 20.00 15.00 5.00 444714 RPB 2018 06 03 13 30 00 559-99 G sf6 CCGG 9.660 0.040 ... H4 2018 06 27 10 46 00 13.1650 -59.4320 20.00 15.00 5.00 445605 RPB 2018 06 03 13 30 00 560-99 G sf6 CCGG 9.640 0.040 N.. H4 2018 06 27 11 02 00 13.1650 -59.4320 20.00 15.00 5.00 445606 RPB 2018 06 10 11 18 00 2039-99 G sf6 CCGG 9.690 0.040 ... H4 2018 06 27 10 14 00 13.1650 -59.4320 20.00 15.00 5.00 445603 RPB 2018 06 10 11 18 00 2040-99 G sf6 CCGG 9.700 0.040 ... H4 2018 06 27 10 30 00 13.1650 -59.4320 20.00 15.00 5.00 445604 RPB 2018 06 17 14 17 00 4311-99 G sf6 CCGG 9.750 0.040 ... H4 2018 07 03 11 19 00 13.1650 -59.4320 20.00 15.00 5.00 445908 RPB 2018 06 17 14 17 00 4312-99 G sf6 CCGG 9.660 0.040 ... H4 2018 07 03 11 34 00 13.1650 -59.4320 20.00 15.00 5.00 445909 RPB 2018 06 24 13 11 00 4418-99 G sf6 CCGG 9.780 0.040 ... H4 2018 07 03 14 13 00 13.1650 -59.4320 20.00 15.00 5.00 445900 RPB 2018 07 01 12 15 00 4043-99 G sf6 CCGG 9.780 0.040 ... H4 2018 07 23 13 31 00 13.1650 -59.4320 20.00 15.00 5.00 446569 RPB 2018 07 01 12 15 00 4044-99 G sf6 CCGG 9.760 0.040 ... H4 2018 07 23 13 47 00 13.1650 -59.4320 20.00 15.00 5.00 446570 RPB 2018 07 08 09 54 00 5777-99 G sf6 CCGG 9.750 0.040 ... H4 2018 07 23 14 03 00 13.1650 -59.4320 20.00 15.00 5.00 446571 RPB 2018 07 08 09 54 00 5778-99 G sf6 CCGG 9.770 0.040 ... H4 2018 07 23 14 18 00 13.1650 -59.4320 20.00 15.00 5.00 446572 RPB 2018 07 15 13 26 00 2341-99 G sf6 CCGG 9.730 0.042 ... H4 2018 08 01 11 45 00 13.1650 -59.4320 20.00 15.00 5.00 447008 RPB 2018 07 15 13 26 00 2342-99 G sf6 CCGG 9.740 0.042 ... H4 2018 08 01 12 00 00 13.1650 -59.4320 20.00 15.00 5.00 447009 RPB 2018 07 22 13 10 00 3191-99 G sf6 CCGG 9.850 0.042 ... H4 2018 08 01 11 13 00 13.1650 -59.4320 20.00 15.00 5.00 447006 RPB 2018 07 22 13 10 00 3192-99 G sf6 CCGG 9.790 0.042 ... H4 2018 08 01 11 29 00 13.1650 -59.4320 20.00 15.00 5.00 447007 RPB 2018 07 29 18 43 00 1823-99 G sf6 CCGG 9.750 0.042 ... H4 2018 08 15 11 03 00 13.1650 -59.4320 20.00 15.00 5.00 447445 RPB 2018 07 29 18 43 00 1824-99 G sf6 CCGG 9.730 0.042 ... H4 2018 08 15 11 19 00 13.1650 -59.4320 20.00 15.00 5.00 447444 RPB 2018 08 05 12 29 00 2541-99 G sf6 CCGG 9.780 0.042 ... H4 2018 08 15 10 00 00 13.1650 -59.4320 20.00 15.00 5.00 447442 RPB 2018 08 05 12 29 00 2542-99 G sf6 CCGG 9.770 0.042 ... H4 2018 08 15 10 16 00 13.1650 -59.4320 20.00 15.00 5.00 447443 RPB 2018 08 12 11 35 00 3017-99 G sf6 CCGG 9.740 0.042 ... H4 2018 09 04 13 54 00 13.1650 -59.4320 20.00 15.00 5.00 448487 RPB 2018 08 12 11 35 00 3018-99 G sf6 CCGG 9.810 0.042 ... H4 2018 09 04 14 10 00 13.1650 -59.4320 20.00 15.00 5.00 448488 RPB 2018 08 19 14 33 00 4017-99 G sf6 CCGG 9.700 0.042 ... H4 2018 09 04 13 22 00 13.1650 -59.4320 20.00 15.00 5.00 448489 RPB 2018 08 19 14 33 00 4018-99 G sf6 CCGG 9.690 0.042 ... H4 2018 09 04 13 38 00 13.1650 -59.4320 20.00 15.00 5.00 448490 RPB 2018 08 26 13 54 00 1203-99 G sf6 CCGG 9.740 0.042 ... H4 2018 09 19 14 23 00 13.1650 -59.4320 20.00 15.00 5.00 448941 RPB 2018 08 26 13 54 00 1204-99 G sf6 CCGG 9.740 0.042 ... H4 2018 09 19 14 39 00 13.1650 -59.4320 20.00 15.00 5.00 448942 RPB 2018 09 02 14 18 00 2737-99 G sf6 CCGG 9.770 0.042 ... H4 2018 09 11 11 01 00 13.1650 -59.4320 20.00 15.00 5.00 448757 RPB 2018 09 02 14 18 00 2738-99 G sf6 CCGG 9.770 0.042 ... H4 2018 09 11 11 17 00 13.1650 -59.4320 20.00 15.00 5.00 448758 RPB 2018 09 09 13 58 00 1101-99 G sf6 CCGG 9.770 0.042 ... H4 2018 09 28 12 18 00 13.1650 -59.4320 20.00 15.00 5.00 449638 RPB 2018 09 09 13 58 00 1102-99 G sf6 CCGG 9.750 0.042 ... H4 2018 09 28 12 34 00 13.1650 -59.4320 20.00 15.00 5.00 449639 RPB 2018 09 16 10 14 00 5399-99 G sf6 CCGG 9.790 0.042 ... H4 2018 09 28 11 46 00 13.1650 -59.4320 20.00 15.00 5.00 449636 RPB 2018 09 16 10 14 00 5400-99 G sf6 CCGG 9.780 0.042 ... H4 2018 09 28 12 02 00 13.1650 -59.4320 20.00 15.00 5.00 449637 RPB 2018 09 23 14 22 00 5207-99 G sf6 CCGG 9.700 0.042 ... H4 2018 10 10 11 33 00 13.1650 -59.4320 20.00 15.00 5.00 449940 RPB 2018 09 23 14 22 00 5208-99 G sf6 CCGG 9.660 0.042 ... H4 2018 10 10 11 49 00 13.1650 -59.4320 20.00 15.00 5.00 449941 RPB 2018 09 30 14 39 00 5691-99 G sf6 CCGG 9.880 0.042 ... H4 2018 10 09 12 38 00 13.1650 -59.4320 20.00 15.00 5.00 449859 RPB 2018 09 30 14 39 00 5692-99 G sf6 CCGG 9.760 0.042 ... H4 2018 10 09 12 53 00 13.1650 -59.4320 20.00 15.00 5.00 449860 RPB 2018 10 07 13 01 00 2197-99 G sf6 CCGG 9.780 0.042 ... H4 2018 10 19 09 03 00 13.1650 -59.4320 20.00 15.00 5.00 450389 RPB 2018 10 07 13 01 00 2198-99 G sf6 CCGG 9.820 0.042 ... H4 2018 10 19 09 19 00 13.1650 -59.4320 20.00 15.00 5.00 450390 RPB 2018 10 14 14 40 00 5225-99 G sf6 CCGG 9.740 0.042 ... H4 2018 10 19 09 35 00 13.1650 -59.4320 20.00 15.00 5.00 450387 RPB 2018 10 14 14 40 00 5226-99 G sf6 CCGG 9.770 0.042 ... H4 2018 10 19 09 50 00 13.1650 -59.4320 20.00 15.00 5.00 450388 RPB 2018 10 21 13 45 00 1083-99 G sf6 CCGG 9.750 0.042 ... H4 2018 11 02 08 58 00 13.1650 -59.4320 20.00 15.00 5.00 450979 RPB 2018 10 21 13 45 00 1084-99 G sf6 CCGG 9.760 0.042 ... H4 2018 11 02 09 14 00 13.1650 -59.4320 20.00 15.00 5.00 450980 RPB 2018 10 28 15 08 00 4089-99 G sf6 CCGG 9.890 0.042 ... H4 2018 11 02 09 30 00 13.1650 -59.4320 20.00 15.00 5.00 450981 RPB 2018 10 28 15 08 00 4090-99 G sf6 CCGG 9.850 0.042 ... H4 2018 11 02 09 46 00 13.1650 -59.4320 20.00 15.00 5.00 450982 RPB 2018 11 04 15 16 00 3099-99 G sf6 CCGG 9.920 0.042 ... H4 2018 11 26 12 22 00 13.1650 -59.4320 20.00 15.00 5.00 451641 RPB 2018 11 04 15 16 00 3100-99 G sf6 CCGG 9.900 0.042 ... H4 2018 11 26 12 38 00 13.1650 -59.4320 20.00 15.00 5.00 451642 RPB 2018 11 11 20 48 00 3923-99 G sf6 CCGG 9.880 0.042 ... H4 2018 11 26 12 54 00 13.1650 -59.4320 20.00 15.00 5.00 451639 RPB 2018 11 11 20 48 00 3924-99 G sf6 CCGG 9.890 0.042 ... H4 2018 11 26 13 10 00 13.1650 -59.4320 20.00 15.00 5.00 451640 RPB 2018 11 18 11 09 00 159-99 G sf6 CCGG 9.890 0.042 ... H4 2018 12 17 12 52 00 13.1650 -59.4320 20.00 15.00 5.00 452656 RPB 2018 11 18 11 09 00 160-99 G sf6 CCGG 9.850 0.042 ... H4 2018 12 17 13 08 00 13.1650 -59.4320 20.00 15.00 5.00 452657 RPB 2018 11 25 13 01 00 4803-99 G sf6 CCGG 9.940 0.042 ... H4 2018 12 17 15 30 00 13.1650 -59.4320 20.00 15.00 5.00 452646 RPB 2018 11 25 13 01 00 4804-99 G sf6 CCGG 9.940 0.042 ... H4 2018 12 17 15 46 00 13.1650 -59.4320 20.00 15.00 5.00 452647 RPB 2018 12 02 15 08 00 1149-99 G sf6 CCGG 9.900 0.042 ... H4 2018 12 20 13 31 00 13.1650 -59.4320 20.00 15.00 5.00 452782 RPB 2018 12 02 15 08 00 1150-99 G sf6 CCGG 9.890 0.042 ... H4 2018 12 20 13 47 00 13.1650 -59.4320 20.00 15.00 5.00 452783 RPB 2018 12 09 14 08 00 4443-99 G sf6 CCGG 9.930 0.042 ... H4 2018 12 20 12 59 00 13.1650 -59.4320 20.00 15.00 5.00 452780 RPB 2018 12 09 14 08 00 4444-99 G sf6 CCGG 9.900 0.042 ... H4 2018 12 20 13 15 00 13.1650 -59.4320 20.00 15.00 5.00 452781 RPB 2018 12 16 11 40 00 1885-99 G sf6 CCGG 9.940 0.042 ... H4 2019 01 28 13 54 00 13.1650 -59.4320 20.00 15.00 5.00 453414 RPB 2018 12 16 11 40 00 1886-99 G sf6 CCGG 9.890 0.042 ... H4 2019 01 28 14 09 00 13.1650 -59.4320 20.00 15.00 5.00 453415 RPB 2018 12 23 14 06 00 479-99 G sf6 CCGG 9.910 0.042 ... H4 2019 01 28 14 25 00 13.1650 -59.4320 20.00 15.00 5.00 453416 RPB 2018 12 23 14 06 00 480-99 G sf6 CCGG 9.900 0.042 ... H4 2019 01 28 14 41 00 13.1650 -59.4320 20.00 15.00 5.00 453417 RPB 2018 12 30 11 10 00 2133-99 G sf6 CCGG 10.030 0.042 ... H4 2019 01 28 13 22 00 13.1650 -59.4320 20.00 15.00 5.00 453466 RPB 2018 12 30 11 10 00 2134-99 G sf6 CCGG 9.960 0.042 ... H4 2019 01 28 13 38 00 13.1650 -59.4320 20.00 15.00 5.00 453467 RPB 2019 01 06 17 16 00 2867-99 G sf6 CCGG 9.990 0.042 ... H4 2019 01 28 12 50 00 13.1650 -59.4320 20.00 15.00 5.00 453468 RPB 2019 01 06 17 16 00 2868-99 G sf6 CCGG 9.990 0.042 ... H4 2019 01 28 13 06 00 13.1650 -59.4320 20.00 15.00 5.00 453469 RPB 2019 01 13 11 58 00 3957-99 G sf6 CCGG 9.890 0.042 ... H4 2019 02 14 09 29 00 13.1650 -59.4320 20.00 15.00 5.00 454036 RPB 2019 01 13 11 58 00 3958-99 G sf6 CCGG 9.960 0.042 ... H4 2019 02 14 09 45 00 13.1650 -59.4320 20.00 15.00 5.00 454037 RPB 2019 01 20 13 34 00 5555-99 G sf6 CCGG 9.870 0.042 ... H4 2019 02 14 10 01 00 13.1650 -59.4320 20.00 15.00 5.00 454034 RPB 2019 01 20 13 34 00 5556-99 G sf6 CCGG 9.830 0.042 ... H4 2019 02 14 10 17 00 13.1650 -59.4320 20.00 15.00 5.00 454035 RPB 2019 01 27 14 38 00 2355-99 G sf6 CCGG 9.990 0.042 ... H4 2019 02 26 16 38 00 13.1650 -59.4320 20.00 15.00 5.00 454475 RPB 2019 01 27 14 38 00 2356-99 G sf6 CCGG 9.990 0.042 ... H4 2019 02 26 16 54 00 13.1650 -59.4320 20.00 15.00 5.00 454476 RPB 2019 02 03 13 09 00 4639-99 G sf6 CCGG 9.960 0.042 ... H4 2019 02 26 17 09 00 13.1650 -59.4320 20.00 15.00 5.00 454473 RPB 2019 02 03 13 09 00 4640-99 G sf6 CCGG 9.920 0.042 ... H4 2019 02 26 17 25 00 13.1650 -59.4320 20.00 15.00 5.00 454474 RPB 2019 02 10 13 56 00 5387-99 G sf6 CCGG 9.960 0.042 ... H4 2019 03 04 13 01 00 13.1650 -59.4320 20.00 15.00 5.00 454967 RPB 2019 02 10 13 56 00 5388-99 G sf6 CCGG 9.920 0.042 ... H4 2019 03 04 13 17 00 13.1650 -59.4320 20.00 15.00 5.00 454968 RPB 2019 02 17 13 02 00 4107-99 G sf6 CCGG 9.940 0.042 ... H4 2019 03 04 12 29 00 13.1650 -59.4320 20.00 15.00 5.00 454969 RPB 2019 02 17 13 02 00 4108-99 G sf6 CCGG 9.850 0.042 ... H4 2019 03 04 12 45 00 13.1650 -59.4320 20.00 15.00 5.00 454970 RPB 2019 02 24 15 16 00 513-99 G sf6 CCGG 9.960 0.042 ... H4 2019 03 18 13 52 00 13.1650 -59.4320 20.00 15.00 5.00 455701 RPB 2019 02 24 15 16 00 514-99 G sf6 CCGG 9.970 0.042 ... H4 2019 03 18 14 08 00 13.1650 -59.4320 20.00 15.00 5.00 455702 RPB 2019 03 03 14 04 00 3195-99 G sf6 CCGG 10.010 0.042 ... H4 2019 03 18 14 55 00 13.1650 -59.4320 20.00 15.00 5.00 455703 RPB 2019 03 03 14 04 00 3196-99 G sf6 CCGG 10.000 0.042 ... H4 2019 03 18 15 11 00 13.1650 -59.4320 20.00 15.00 5.00 455704 RPB 2019 03 10 12 54 00 2635-99 G sf6 CCGG 9.950 0.042 ... H4 2019 03 22 11 12 00 13.1650 -59.4320 20.00 15.00 5.00 456017 RPB 2019 03 10 12 54 00 2636-99 G sf6 CCGG 9.910 0.042 ... H4 2019 03 22 11 27 00 13.1650 -59.4320 20.00 15.00 5.00 456018 RPB 2019 03 17 13 39 00 3375-99 G sf6 CCGG 9.930 0.042 ... H4 2019 03 22 10 40 00 13.1650 -59.4320 20.00 15.00 5.00 456015 RPB 2019 03 17 13 39 00 3376-99 G sf6 CCGG 9.930 0.042 ... H4 2019 03 22 10 56 00 13.1650 -59.4320 20.00 15.00 5.00 456016 RPB 2019 03 24 14 52 00 1201-99 G sf6 CCGG 9.960 0.042 ... H4 2019 04 16 11 42 00 13.1650 -59.4320 20.00 15.00 5.00 456758 RPB 2019 03 24 14 52 00 1202-99 G sf6 CCGG 9.960 0.042 ... H4 2019 04 16 11 58 00 13.1650 -59.4320 20.00 15.00 5.00 456759 RPB 2019 03 31 12 00 00 5123-99 G sf6 CCGG 9.960 0.042 ... H4 2019 04 16 12 13 00 13.1650 -59.4320 20.00 15.00 5.00 456756 RPB 2019 03 31 12 00 00 5124-99 G sf6 CCGG 9.990 0.042 ... H4 2019 04 16 12 29 00 13.1650 -59.4320 20.00 15.00 5.00 456757 RPB 2019 04 07 12 36 00 3657-99 G sf6 CCGG 10.030 0.042 ... H4 2019 05 08 10 48 00 13.1650 -59.4320 20.00 15.00 5.00 457824 RPB 2019 04 07 12 36 00 3658-99 G sf6 CCGG 10.110 0.042 ... H4 2019 05 08 11 04 00 13.1650 -59.4320 20.00 15.00 5.00 457823 RPB 2019 04 14 12 55 00 5301-99 G sf6 CCGG 9.970 0.042 ... H4 2019 05 08 10 16 00 13.1650 -59.4320 20.00 15.00 5.00 457821 RPB 2019 04 14 12 55 00 5302-99 G sf6 CCGG 9.990 0.042 ... H4 2019 05 08 10 32 00 13.1650 -59.4320 20.00 15.00 5.00 457822 RPB 2019 04 21 13 15 00 119-99 G sf6 CCGG 10.070 0.042 ... H4 2019 05 16 11 38 00 13.1650 -59.4320 20.00 15.00 5.00 458557 RPB 2019 04 21 13 15 00 120-99 G sf6 CCGG 10.020 0.042 ... H4 2019 05 16 11 54 00 13.1650 -59.4320 20.00 15.00 5.00 458558 RPB 2019 04 28 15 27 00 2785-99 G sf6 CCGG 9.950 0.042 ... H4 2019 05 15 13 53 00 13.1650 -59.4320 20.00 15.00 5.00 458489 RPB 2019 04 28 15 27 00 2786-99 G sf6 CCGG 10.020 0.042 ... H4 2019 05 15 14 08 00 13.1650 -59.4320 20.00 15.00 5.00 458490 RPB 2019 05 05 13 40 00 1393-99 G sf6 CCGG 10.060 0.042 ... H4 2019 05 31 12 01 00 13.1650 -59.4320 20.00 15.00 5.00 459238 RPB 2019 05 05 13 40 00 1394-99 G sf6 CCGG 10.050 0.042 ... H4 2019 05 31 12 17 00 13.1650 -59.4320 20.00 15.00 5.00 459239 RPB 2019 05 12 13 56 00 1555-99 G sf6 CCGG 10.060 0.042 ... H4 2019 05 31 12 33 00 13.1650 -59.4320 20.00 15.00 5.00 459236 RPB 2019 05 12 13 56 00 1556-99 G sf6 CCGG 10.040 0.042 ... H4 2019 05 31 12 49 00 13.1650 -59.4320 20.00 15.00 5.00 459237 RPB 2019 05 19 21 19 00 4531-99 G sf6 CCGG 10.050 0.042 ... H4 2019 06 17 12 39 00 13.1650 -59.4320 20.00 15.00 5.00 459429 RPB 2019 05 19 21 19 00 4532-99 G sf6 CCGG 10.050 0.042 ... H4 2019 06 17 12 55 00 13.1650 -59.4320 20.00 15.00 5.00 459430 RPB 2019 05 26 13 13 00 4815-99 G sf6 CCGG 9.970 0.042 ... H4 2019 06 17 12 02 00 13.1650 -59.4320 20.00 15.00 5.00 459431 RPB 2019 05 26 13 13 00 4816-99 G sf6 CCGG 9.950 0.042 ... H4 2019 06 17 12 18 00 13.1650 -59.4320 20.00 15.00 5.00 459432 RPB 2019 06 02 12 40 00 345-99 G sf6 CCGG 10.060 0.042 ... H4 2019 06 20 14 49 00 13.1650 -59.4320 20.00 15.00 5.00 460114 RPB 2019 06 02 12 40 00 346-99 G sf6 CCGG 9.960 0.042 ... H4 2019 06 20 15 05 00 13.1650 -59.4320 20.00 15.00 5.00 460115 RPB 2019 06 09 14 04 00 5545-99 G sf6 CCGG 10.050 0.042 ... H4 2019 06 20 14 17 00 13.1650 -59.4320 20.00 15.00 5.00 460116 RPB 2019 06 09 14 04 00 5546-99 G sf6 CCGG 9.990 0.042 ... H4 2019 06 20 14 33 00 13.1650 -59.4320 20.00 15.00 5.00 460117 RPB 2019 06 16 12 39 00 2683-99 G sf6 CCGG 10.060 0.042 ... H4 2019 07 10 12 59 00 13.1650 -59.4320 20.00 15.00 5.00 460746 RPB 2019 06 16 12 39 00 2684-99 G sf6 CCGG 10.110 0.042 ... H4 2019 07 10 13 15 00 13.1650 -59.4320 20.00 15.00 5.00 460747 RPB 2019 06 23 13 39 00 3953-99 G sf6 CCGG 10.010 0.042 ... H4 2019 07 10 13 30 00 13.1650 -59.4320 20.00 15.00 5.00 460748 RPB 2019 06 23 13 39 00 3954-99 G sf6 CCGG 9.950 0.042 ... H4 2019 07 10 13 46 00 13.1650 -59.4320 20.00 15.00 5.00 460749 RPB 2019 06 30 13 19 00 935-99 G sf6 CCGG 10.110 0.042 ... H4 2019 07 26 09 37 00 13.1650 -59.4320 20.00 15.00 5.00 461640 RPB 2019 06 30 13 19 00 936-99 G sf6 CCGG 10.100 0.042 ... H4 2019 07 26 09 53 00 13.1650 -59.4320 20.00 15.00 5.00 461641 RPB 2019 07 07 13 07 00 2329-99 G sf6 CCGG 10.090 0.042 ... H4 2019 07 26 09 05 00 13.1650 -59.4320 20.00 15.00 5.00 461638 RPB 2019 07 07 13 07 00 2330-99 G sf6 CCGG 10.110 0.042 ... H4 2019 07 26 09 21 00 13.1650 -59.4320 20.00 15.00 5.00 461639 RPB 2019 07 14 14 31 00 2341-99 G sf6 CCGG 10.170 0.042 ... H6 2019 08 22 11 27 47 13.1650 -59.4320 20.00 15.00 5.00 463601 RPB 2019 07 14 14 31 00 2342-99 G sf6 CCGG 10.120 0.042 ... H6 2019 08 22 11 42 07 13.1650 -59.4320 20.00 15.00 5.00 463602 RPB 2019 07 21 13 06 00 5447-99 G sf6 CCGG 10.120 0.042 ... H6 2019 08 22 11 56 24 13.1650 -59.4320 20.00 15.00 5.00 463599 RPB 2019 07 21 13 06 00 5448-99 G sf6 CCGG 10.110 0.042 ... H6 2019 08 22 12 10 41 13.1650 -59.4320 20.00 15.00 5.00 463600 RPB 2019 07 28 12 22 00 1683-99 G sf6 CCGG 10.050 0.042 ... H6 2019 08 21 15 17 11 13.1650 -59.4320 20.00 15.00 5.00 463433 RPB 2019 07 28 12 22 00 1684-99 G sf6 CCGG 10.090 0.042 ... H6 2019 08 21 15 31 31 13.1650 -59.4320 20.00 15.00 5.00 463434 RPB 2019 08 04 14 18 00 2805-99 G sf6 CCGG 10.160 0.042 ... H6 2019 08 21 15 02 54 13.1650 -59.4320 20.00 15.00 5.00 463432 RPB 2019 08 04 14 18 00 2806-99 G sf6 CCGG 10.170 0.042 ... H6 2019 08 21 14 48 34 13.1650 -59.4320 20.00 15.00 5.00 463431 RPB 2019 08 11 14 06 00 1203-99 G sf6 CCGG 10.160 0.042 ... H6 2019 08 28 12 32 42 13.1650 -59.4320 20.00 15.00 5.00 463753 RPB 2019 08 11 14 06 00 1204-99 G sf6 CCGG 10.110 0.042 ... H6 2019 08 28 12 47 02 13.1650 -59.4320 20.00 15.00 5.00 463754 RPB 2019 08 18 12 08 00 5625-99 G sf6 CCGG 10.110 0.042 ... H6 2019 08 28 12 03 55 13.1650 -59.4320 20.00 15.00 5.00 463751 RPB 2019 08 18 12 08 00 5626-99 G sf6 CCGG 10.130 0.042 ... H6 2019 08 28 12 18 18 13.1650 -59.4320 20.00 15.00 5.00 463752 RPB 2019 08 25 12 36 00 1372-99 G sf6 CCGG 10.130 0.042 ... H6 2019 09 19 12 12 09 13.1650 -59.4320 20.00 15.00 5.00 464824 RPB 2019 08 25 12 36 00 769-99 G sf6 CCGG 10.110 0.042 ... H6 2019 09 19 11 57 53 13.1650 -59.4320 20.00 15.00 5.00 464823 RPB 2019 09 01 11 31 00 4056-99 G sf6 CCGG 10.120 0.042 ... H6 2019 09 19 11 29 22 13.1650 -59.4320 20.00 15.00 5.00 464825 RPB 2019 09 01 11 31 00 5131-99 G sf6 CCGG 10.100 0.042 ... H6 2019 09 19 11 43 38 13.1650 -59.4320 20.00 15.00 5.00 464826 RPB 2019 09 08 15 34 00 3404-99 G sf6 CCGG 9.980 0.042 ... H6 2019 10 07 14 30 49 13.1650 -59.4320 20.00 15.00 5.00 465114 RPB 2019 09 08 15 34 00 4305-99 G sf6 CCGG 10.010 0.042 ... H6 2019 10 07 14 45 11 13.1650 -59.4320 20.00 15.00 5.00 465115 RPB 2019 09 15 15 03 00 3403-99 G sf6 CCGG 10.090 0.042 ... H6 2019 10 07 14 02 02 13.1650 -59.4320 20.00 15.00 5.00 465112 RPB 2019 09 15 15 03 00 4306-99 G sf6 CCGG 10.150 0.042 ... H6 2019 10 07 14 16 25 13.1650 -59.4320 20.00 15.00 5.00 465113 RPB 2019 09 22 13 37 00 2443-99 G sf6 CCGG 9.910 0.042 .X. H6 2019 10 24 17 18 05 13.1650 -59.4320 20.00 15.00 5.00 466231 RPB 2019 09 22 13 37 00 2444-99 G sf6 CCGG 9.920 0.042 .X. H6 2019 10 24 17 32 25 13.1650 -59.4320 20.00 15.00 5.00 466232 RPB 2019 09 29 13 33 00 3133-99 G sf6 CCGG 10.170 0.042 ... H6 2019 10 24 17 03 45 13.1650 -59.4320 20.00 15.00 5.00 466233 RPB 2019 09 29 13 33 00 3134-99 G sf6 CCGG 10.100 0.042 ... H6 2019 10 24 16 49 25 13.1650 -59.4320 20.00 15.00 5.00 466234 RPB 2019 10 06 12 18 00 3471-99 G sf6 CCGG 10.170 0.042 ... H6 2019 11 07 14 09 25 13.1650 -59.4320 20.00 15.00 5.00 466521 RPB 2019 10 06 12 18 00 3472-99 G sf6 CCGG 10.160 0.042 ... H6 2019 11 07 14 23 41 13.1650 -59.4320 20.00 15.00 5.00 466522 RPB 2019 10 13 12 34 00 5547-99 G sf6 CCGG 10.090 0.042 ... H6 2019 11 07 14 37 57 13.1650 -59.4320 20.00 15.00 5.00 466523 RPB 2019 10 13 12 34 00 5548-99 G sf6 CCGG 10.100 0.042 ... H6 2019 11 07 14 52 16 13.1650 -59.4320 20.00 15.00 5.00 466524 RPB 2019 10 20 14 16 00 23-99 G sf6 CCGG 10.150 0.042 ... H6 2019 11 18 12 04 30 13.1650 -59.4320 20.00 15.00 5.00 467417 RPB 2019 10 20 14 16 00 24-99 G sf6 CCGG 10.100 0.042 ... H6 2019 11 18 12 18 50 13.1650 -59.4320 20.00 15.00 5.00 467418 RPB 2019 10 27 13 35 00 3493-99 G sf6 CCGG 10.120 0.042 ... H6 2019 11 18 11 35 44 13.1650 -59.4320 20.00 15.00 5.00 467419 RPB 2019 10 27 13 35 00 3494-99 G sf6 CCGG 10.110 0.042 ... H6 2019 11 18 11 50 10 13.1650 -59.4320 20.00 15.00 5.00 467420 RPB 2019 11 03 11 33 00 779-99 G sf6 CCGG 10.170 0.042 ... H6 2019 11 25 11 37 08 13.1650 -59.4320 20.00 15.00 5.00 467638 RPB 2019 11 03 11 33 00 780-99 G sf6 CCGG 10.170 0.042 ... H6 2019 11 25 11 51 25 13.1650 -59.4320 20.00 15.00 5.00 467639 RPB 2019 11 10 12 27 00 5387-99 G sf6 CCGG 9.720 0.042 N.. H6 2019 11 25 11 08 38 13.1650 -59.4320 20.00 15.00 5.00 467640 RPB 2019 11 10 12 27 00 5388-99 G sf6 CCGG 10.150 0.042 ... H6 2019 11 25 11 22 52 13.1650 -59.4320 20.00 15.00 5.00 467641 RPB 2019 11 17 13 10 00 1081-99 G sf6 CCGG 10.130 0.042 ... H6 2019 12 19 11 50 02 13.1650 -59.4320 20.00 15.00 5.00 468108 RPB 2019 11 17 13 10 00 2754-99 G sf6 CCGG 10.190 0.042 ... H6 2019 12 19 12 04 22 13.1650 -59.4320 20.00 15.00 5.00 468109 RPB 2019 11 24 15 13 00 2456-99 G sf6 CCGG 10.150 0.042 ... H6 2019 12 23 10 21 08 13.1650 -59.4320 20.00 15.00 5.00 468177 RPB 2019 11 24 15 13 00 4396-99 G sf6 CCGG 10.140 0.042 ... H6 2019 12 23 10 35 24 13.1650 -59.4320 20.00 15.00 5.00 468178 RPB 2019 12 01 13 12 00 4025-99 G sf6 CCGG 10.080 0.042 ... H6 2020 01 02 15 53 10 13.1650 -59.4320 20.00 15.00 5.00 468503 RPB 2019 12 01 13 12 00 4026-99 G sf6 CCGG 10.120 0.042 ... H6 2020 01 02 16 07 28 13.1650 -59.4320 20.00 15.00 5.00 468504 RPB 2019 12 08 14 20 00 3246-99 G sf6 CCGG 10.240 0.042 ... H6 2020 01 02 15 24 22 13.1650 -59.4320 20.00 15.00 5.00 468501 RPB 2019 12 08 14 20 00 5446-99 G sf6 CCGG 10.240 0.042 ... H6 2020 01 02 15 38 48 13.1650 -59.4320 20.00 15.00 5.00 468502 RPB 2019 12 16 10 27 00 385-99 G sf6 CCGG 10.210 0.042 ... H6 2020 01 27 11 21 44 13.1650 -59.4320 20.00 15.00 5.00 469258 RPB 2019 12 16 10 27 00 386-99 G sf6 CCGG 10.200 0.042 ... H6 2020 01 27 11 36 01 13.1650 -59.4320 20.00 15.00 5.00 469259 RPB 2019 12 22 12 48 00 5829-99 G sf6 CCGG 10.190 0.042 ... H6 2020 01 27 10 53 04 13.1650 -59.4320 20.00 15.00 5.00 469256 RPB 2019 12 22 12 48 00 5830-99 G sf6 CCGG 10.210 0.042 ... H6 2020 01 27 11 07 24 13.1650 -59.4320 20.00 15.00 5.00 469257 RPB 2019 12 29 11 58 00 125-99 G sf6 CCGG 10.180 0.042 ... H6 2020 02 03 14 20 38 13.1650 -59.4320 20.00 15.00 5.00 469673 RPB 2019 12 29 11 58 00 126-99 G sf6 CCGG 10.190 0.042 ... H6 2020 02 03 14 35 01 13.1650 -59.4320 20.00 15.00 5.00 469674 RPB 2020 01 05 13 31 00 5207-99 G sf6 CCGG 10.280 0.042 ... H6 2020 02 03 13 51 58 13.1650 -59.4320 20.00 15.00 5.00 469669 RPB 2020 01 05 13 31 00 5208-99 G sf6 CCGG 10.260 0.042 ... H6 2020 02 03 14 06 18 13.1650 -59.4320 20.00 15.00 5.00 469670 RPB 2020 01 12 12 18 00 4029-99 G sf6 CCGG 10.270 0.042 ... H6 2020 02 10 14 56 22 13.1650 -59.4320 20.00 15.00 5.00 470381 RPB 2020 01 12 12 18 00 4030-99 G sf6 CCGG 10.320 0.042 ... H6 2020 02 10 15 10 43 13.1650 -59.4320 20.00 15.00 5.00 470382 RPB 2020 01 19 12 49 00 5527-99 G sf6 CCGG 10.240 0.042 ... H6 2020 02 10 14 27 40 13.1650 -59.4320 20.00 15.00 5.00 470379 RPB 2020 01 19 12 49 00 5528-99 G sf6 CCGG 10.270 0.042 ... H6 2020 02 10 14 42 01 13.1650 -59.4320 20.00 15.00 5.00 470380 RPB 2020 01 26 14 29 00 1219-99 G sf6 CCGG 10.270 0.042 ... H6 2020 02 28 11 55 49 13.1650 -59.4320 20.00 15.00 5.00 471119 RPB 2020 01 26 14 29 00 4882-99 G sf6 CCGG 10.240 0.042 ... H6 2020 02 28 12 10 10 13.1650 -59.4320 20.00 15.00 5.00 471120 RPB 2020 02 02 13 44 00 1910-99 G sf6 CCGG 9.490 0.042 N.. H6 2020 02 28 12 24 31 13.1650 -59.4320 20.00 15.00 5.00 471117 RPB 2020 02 02 13 44 00 4392-99 G sf6 CCGG 10.210 0.042 ... H6 2020 02 28 12 38 45 13.1650 -59.4320 20.00 15.00 5.00 471118 RPB 2020 02 09 13 56 00 2215-99 G sf6 CCGG 10.260 0.042 ... H6 2020 03 24 14 09 07 13.1650 -59.4320 20.00 15.00 5.00 471767 RPB 2020 02 09 13 56 00 2216-99 G sf6 CCGG 10.290 0.042 ... H6 2020 03 24 14 23 32 13.1650 -59.4320 20.00 15.00 5.00 471768 RPB 2020 02 16 15 44 00 3485-99 G sf6 CCGG 10.240 0.042 ... H6 2020 03 24 14 37 53 13.1650 -59.4320 20.00 15.00 5.00 471765 RPB 2020 02 16 15 44 00 3486-99 G sf6 CCGG 10.260 0.042 ... H6 2020 03 24 14 52 13 13.1650 -59.4320 20.00 15.00 5.00 471766 RPB 2020 02 23 11 44 00 1732-99 G sf6 CCGG 10.250 0.042 ... H6 2020 03 27 12 43 59 13.1650 -59.4320 20.00 15.00 5.00 472090 RPB 2020 02 23 11 44 00 3293-99 G sf6 CCGG 10.240 0.042 ... H6 2020 03 27 12 58 20 13.1650 -59.4320 20.00 15.00 5.00 472091 RPB 2020 03 01 14 32 00 1879-99 G sf6 CCGG 10.270 0.042 ... H6 2020 03 27 12 15 18 13.1650 -59.4320 20.00 15.00 5.00 472088 RPB 2020 03 01 14 32 00 3294-99 G sf6 CCGG 10.290 0.042 ... H6 2020 03 27 12 29 40 13.1650 -59.4320 20.00 15.00 5.00 472089 RPB 2020 03 08 15 24 00 67-99 G sf6 CCGG 10.260 0.042 ... H6 2020 04 06 14 21 05 13.1650 -59.4320 20.00 15.00 5.00 472630 RPB 2020 03 08 15 24 00 68-99 G sf6 CCGG 10.230 0.042 ... H6 2020 04 06 14 35 24 13.1650 -59.4320 20.00 15.00 5.00 472631 RPB 2020 03 15 12 59 00 2217-99 G sf6 CCGG 10.300 0.042 ... H6 2020 04 06 13 52 17 13.1650 -59.4320 20.00 15.00 5.00 472628 RPB 2020 03 15 12 59 00 2218-99 G sf6 CCGG 10.300 0.042 ... H6 2020 04 06 14 06 44 13.1650 -59.4320 20.00 15.00 5.00 472629 RPB 2020 03 22 13 16 00 2105-99 G sf6 CCGG 10.290 0.042 ... H6 2020 06 22 10 33 06 13.1650 -59.4320 20.00 15.00 5.00 475757 RPB 2020 03 22 13 16 00 2106-99 G sf6 CCGG 10.260 0.042 ... H6 2020 06 22 10 47 27 13.1650 -59.4320 20.00 15.00 5.00 475758 RPB 2020 03 29 14 42 00 5121-99 G sf6 CCGG 10.390 0.042 ... H6 2020 06 19 16 35 45 13.1650 -59.4320 20.00 15.00 5.00 475755 RPB 2020 03 29 14 42 00 5122-99 G sf6 CCGG 10.350 0.042 ... H6 2020 06 19 16 50 10 13.1650 -59.4320 20.00 15.00 5.00 475756 RPB 2020 06 07 14 26 00 261-99 G sf6 CCGG 10.410 0.042 ... H6 2020 07 07 09 33 25 13.1650 -59.4320 20.00 15.00 5.00 476290 RPB 2020 06 07 14 26 00 262-99 G sf6 CCGG 10.410 0.042 ... H6 2020 07 07 09 47 49 13.1650 -59.4320 20.00 15.00 5.00 476291 RPB 2020 06 14 12 59 00 3531-99 G sf6 CCGG 10.340 0.042 ... H6 2020 07 08 16 01 46 13.1650 -59.4320 20.00 15.00 5.00 476284 RPB 2020 06 14 12 59 00 3532-99 G sf6 CCGG 10.330 0.042 ... H6 2020 07 08 16 16 07 13.1650 -59.4320 20.00 15.00 5.00 476285 RPB 2020 06 21 14 52 00 4029-99 G sf6 CCGG 10.390 0.042 ... H6 2020 07 20 16 30 39 13.1650 -59.4320 20.00 15.00 5.00 477152 RPB 2020 06 21 14 52 00 4030-99 G sf6 CCGG 10.420 0.042 ... H6 2020 07 20 16 45 04 13.1650 -59.4320 20.00 15.00 5.00 477153 RPB 2020 06 28 11 25 00 5007-99 G sf6 CCGG 10.400 0.042 ... H6 2020 07 20 16 59 29 13.1650 -59.4320 20.00 15.00 5.00 477154 RPB 2020 06 28 11 25 00 5008-99 G sf6 CCGG 10.380 0.042 ... H6 2020 07 20 17 13 51 13.1650 -59.4320 20.00 15.00 5.00 477155 RPB 2020 07 05 14 34 00 1029-99 G sf6 CCGG 10.440 0.042 ... H6 2020 07 23 14 07 18 13.1650 -59.4320 20.00 15.00 5.00 477535 RPB 2020 07 05 14 34 00 4708-99 G sf6 CCGG 10.410 0.042 ... H6 2020 07 23 14 21 47 13.1650 -59.4320 20.00 15.00 5.00 477536 RPB 2020 07 12 11 18 00 1458-99 G sf6 CCGG 10.380 0.042 ... H6 2020 07 23 14 36 13 13.1650 -59.4320 20.00 15.00 5.00 477537 RPB 2020 07 12 11 18 00 5788-99 G sf6 CCGG 10.400 0.042 ... H6 2020 07 23 14 50 37 13.1650 -59.4320 20.00 15.00 5.00 477538 RPB 2020 07 19 12 12 00 67-99 G sf6 CCGG 10.370 0.042 ... H6 2020 08 06 16 01 26 13.1650 -59.4320 20.00 15.00 5.00 478084 RPB 2020 07 19 12 12 00 68-99 G sf6 CCGG 10.390 0.042 ... H6 2020 08 06 16 15 50 13.1650 -59.4320 20.00 15.00 5.00 478085 RPB 2020 07 26 12 49 00 1377-99 G sf6 CCGG 10.450 0.042 ... H6 2020 08 06 10 45 14 13.1650 -59.4320 20.00 15.00 5.00 478086 RPB 2020 07 26 12 49 00 1378-99 G sf6 CCGG 10.430 0.042 ... H6 2020 08 06 10 59 41 13.1650 -59.4320 20.00 15.00 5.00 478087 RPB 2020 08 02 14 39 00 3411-99 G sf6 CCGG 10.400 0.042 ... H6 2020 08 24 10 37 37 13.1650 -59.4320 20.00 15.00 5.00 478897 RPB 2020 08 02 14 39 00 3412-99 G sf6 CCGG 10.430 0.042 ... H6 2020 08 24 10 51 56 13.1650 -59.4320 20.00 15.00 5.00 478898 RPB 2020 08 09 15 26 00 4871-99 G sf6 CCGG 10.430 0.042 ... H6 2020 08 24 11 06 18 13.1650 -59.4320 20.00 15.00 5.00 478895 RPB 2020 08 09 15 26 00 4872-99 G sf6 CCGG 10.400 0.042 ... H6 2020 08 24 11 20 36 13.1650 -59.4320 20.00 15.00 5.00 478896 RPB 2020 08 16 13 52 00 33-99 G sf6 CCGG 10.450 0.042 ... H6 2020 09 01 12 46 04 13.1650 -59.4320 20.00 15.00 5.00 479318 RPB 2020 08 16 13 52 00 34-99 G sf6 CCGG 10.450 0.042 ... H6 2020 09 01 13 00 39 13.1650 -59.4320 20.00 15.00 5.00 479319 RPB 2020 08 23 11 41 00 1143-99 G sf6 CCGG 10.450 0.042 ... H6 2020 09 01 12 16 53 13.1650 -59.4320 20.00 15.00 5.00 479320 RPB 2020 08 23 11 41 00 1144-99 G sf6 CCGG 10.420 0.042 ... H6 2020 09 01 12 31 28 13.1650 -59.4320 20.00 15.00 5.00 479321 RPB 2020 08 30 13 38 00 3327-99 G sf6 CCGG 10.440 0.042 ... H6 2020 09 25 14 46 15 13.1650 -59.4320 20.00 15.00 5.00 480027 RPB 2020 08 30 13 38 00 3328-99 G sf6 CCGG 10.400 0.042 ... H6 2020 09 25 15 00 32 13.1650 -59.4320 20.00 15.00 5.00 480028 RPB 2020 09 06 14 06 00 4043-99 G sf6 CCGG 10.440 0.042 ... H6 2020 09 25 14 17 41 13.1650 -59.4320 20.00 15.00 5.00 480029 RPB 2020 09 06 14 06 00 4044-99 G sf6 CCGG 10.480 0.042 ... H6 2020 09 25 14 31 58 13.1650 -59.4320 20.00 15.00 5.00 480030 RPB 2020 09 13 14 02 00 3605-99 G sf6 CCGG 10.270 0.042 ... H6 2020 10 01 11 47 21 13.1650 -59.4320 20.00 15.00 5.00 480244 RPB 2020 09 13 14 02 00 3606-99 G sf6 CCGG 10.250 0.042 ... H6 2020 10 01 12 01 38 13.1650 -59.4320 20.00 15.00 5.00 480245 RPB 2020 09 20 15 08 00 5431-99 G sf6 CCGG 10.290 0.042 ... H6 2020 10 01 12 15 56 13.1650 -59.4320 20.00 15.00 5.00 480242 RPB 2020 09 20 15 08 00 5432-99 G sf6 CCGG 10.250 0.042 ... H6 2020 10 01 12 30 08 13.1650 -59.4320 20.00 15.00 5.00 480243 RPB 2020 09 27 12 56 00 1354-99 G sf6 CCGG 10.380 0.042 ... H6 2020 10 21 13 49 43 13.1650 -59.4320 20.00 15.00 5.00 481057 RPB 2020 09 27 12 56 00 1996-99 G sf6 CCGG 10.430 0.042 ... H6 2020 10 21 14 04 01 13.1650 -59.4320 20.00 15.00 5.00 481058 RPB 2020 10 04 12 11 00 4913-99 G sf6 CCGG 10.510 0.042 ... H6 2020 10 21 14 18 21 13.1650 -59.4320 20.00 15.00 5.00 481055 RPB 2020 10 04 12 11 00 5485-99 G sf6 CCGG 10.540 0.042 ... H6 2020 10 21 14 32 39 13.1650 -59.4320 20.00 15.00 5.00 481056 RPB 2020 10 11 13 37 00 2043-99 G sf6 CCGG 10.380 0.042 ... H6 2020 11 04 13 37 08 13.1650 -59.4320 20.00 15.00 5.00 481846 RPB 2020 10 11 13 37 00 3509-99 G sf6 CCGG 10.420 0.042 ... H6 2020 11 04 13 51 25 13.1650 -59.4320 20.00 15.00 5.00 481847 RPB 2020 10 18 13 50 00 2749-99 G sf6 CCGG 10.510 0.042 ... H6 2020 11 04 14 05 41 13.1650 -59.4320 20.00 15.00 5.00 481844 RPB 2020 10 18 13 50 00 5278-99 G sf6 CCGG 10.500 0.042 ... H6 2020 11 04 14 19 52 13.1650 -59.4320 20.00 15.00 5.00 481845 RPB 2020 10 25 13 28 00 5755-99 G sf6 CCGG 10.480 0.042 ... H6 2020 11 16 15 08 34 13.1650 -59.4320 20.00 15.00 5.00 482080 RPB 2020 10 25 13 28 00 5756-99 G sf6 CCGG 10.510 0.042 ... H6 2020 11 16 15 22 53 13.1650 -59.4320 20.00 15.00 5.00 482081 RPB 2020 11 01 13 50 00 5909-99 G sf6 CCGG 10.480 0.042 ... H6 2020 11 16 15 37 09 13.1650 -59.4320 20.00 15.00 5.00 482078 RPB 2020 11 01 13 50 00 5910-99 G sf6 CCGG 10.470 0.042 ... H6 2020 11 16 15 51 23 13.1650 -59.4320 20.00 15.00 5.00 482079 RPB 2020 11 08 13 57 00 3526-99 G sf6 CCGG 10.330 0.042 ... H6 2020 11 23 15 52 18 13.1650 -59.4320 20.00 15.00 5.00 482508 RPB 2020 11 08 13 57 00 5892-99 G sf6 CCGG 10.350 0.042 ... H6 2020 11 23 16 06 35 13.1650 -59.4320 20.00 15.00 5.00 482507 RPB 2020 11 15 13 28 00 5070-99 G sf6 CCGG 10.540 0.042 ... H6 2020 11 24 10 56 20 13.1650 -59.4320 20.00 15.00 5.00 482505 RPB 2020 11 15 13 28 00 5114-99 G sf6 CCGG 10.510 0.042 ... H6 2020 11 24 11 10 37 13.1650 -59.4320 20.00 15.00 5.00 482506 RPB 2020 11 22 14 45 00 1533-99 G sf6 CCGG 10.510 0.042 ... H6 2020 12 09 13 23 01 13.1650 -59.4320 20.00 15.00 5.00 483048 RPB 2020 11 22 14 45 00 2896-99 G sf6 CCGG 10.550 0.042 ... H6 2020 12 09 13 37 17 13.1650 -59.4320 20.00 15.00 5.00 483047 RPB 2020 11 29 14 40 00 1994-99 G sf6 CCGG 10.470 0.042 ... H6 2020 12 09 12 54 31 13.1650 -59.4320 20.00 15.00 5.00 483045 RPB 2020 11 29 14 40 00 4358-99 G sf6 CCGG 10.440 0.042 ... H6 2020 12 09 13 08 46 13.1650 -59.4320 20.00 15.00 5.00 483046 RPB 2020 12 09 21 14 00 1741-99 G sf6 CCGG 10.470 0.042 ... H6 2020 12 22 10 18 59 13.1650 -59.4320 20.00 15.00 5.00 483593 RPB 2020 12 09 21 14 00 4650-99 G sf6 CCGG 10.500 0.042 ... H6 2020 12 22 10 33 17 13.1650 -59.4320 20.00 15.00 5.00 483594 RPB 2020 12 13 14 21 00 2287-99 G sf6 CCGG 10.500 0.042 ... H6 2020 12 22 09 50 25 13.1650 -59.4320 20.00 15.00 5.00 483591 RPB 2020 12 13 14 21 00 4331-99 G sf6 CCGG 10.470 0.042 ... H6 2020 12 22 10 04 42 13.1650 -59.4320 20.00 15.00 5.00 483592 RPB 2020 12 20 13 23 00 3903-99 G sf6 CCGG 10.580 0.042 ... H6 2021 01 06 14 07 54 13.1650 -59.4320 20.00 15.00 5.00 484011 RPB 2020 12 20 13 23 00 3904-99 G sf6 CCGG 10.530 0.042 ... H6 2021 01 06 14 22 10 13.1650 -59.4320 20.00 15.00 5.00 484012 RPB 2020 12 27 12 37 00 4821-99 G sf6 CCGG 10.560 0.042 ... H6 2021 01 06 14 36 26 13.1650 -59.4320 20.00 15.00 5.00 484009 RPB 2020 12 27 12 37 00 4822-99 G sf6 CCGG 10.550 0.042 ... H6 2021 01 06 14 50 42 13.1650 -59.4320 20.00 15.00 5.00 484010