# number_of_header_lines: 71 # comment: # comment: ************ USE OF ESRL GMD DATA **************** # comment: # comment: These data are made freely available to the public and the # comment: scientific community in the belief that their wide dissemination # comment: will lead to greater understanding and new scientific insights. # comment: The availability of these data does not constitute publication # comment: of the data. NOAA relies on the ethics and integrity of the user to # comment: ensure that GML receives fair credit for their work. If the data # comment: are obtained for potential use in a publication or presentation, # comment: GML should be informed at the outset of the nature of this work. # comment: If the GML data are essential to the work, or if an important # comment: result or conclusion depends on the GML data, co-authorship # comment: may be appropriate. This should be discussed at an early stage in # comment: the work. Manuscripts using the GML data should be sent to GML # comment: for review before they are submitted for publication so we can # comment: ensure that the quality and limitations of the data are accurately # comment: represented. # comment: Please see accompanying README file, if available, for citation text. # comment: # comment: Every effort is made to produce the most accurate and precise # comment: measurements possible. However, we reserve the right to make # comment: corrections to the data based on recalibration of standard gases # comment: or for other reasons deemed scientifically justified. # comment: # comment: We are not responsible for results and conclusions based on use # comment: of these data without regard to this warning. # comment: # contact_parameter: C2H6 ARL (Individual Flasks) # contact_name: John Mund # contact_telephone: (303) 497-5472 # contact_email: John.Mund@noaa.gov # comment: # comment: ************ COLLABORATORS *************** # comment: # comment: NOAA thanks the following collaborators without # comment: whom these measurements would not be possible. # comment: # collaborator_name: NOAA Earth System Research Laboratory, Global # collaborator_name: Monitoring Division [NOAA ESRL GMD] # collaborator_url: http://www.esrl.noaa.gov/gmd # comment: # comment: ************ RECIPROCITY AGREEMENT *************** # comment: # comment: Use of these data implies an agreement to reciprocate. # comment: Laboratories making similar measurements agree to make their # comment: own data available to the general public and to the scientific # comment: community in an equally complete and easily accessible form. # comment: Modelers are encouraged to make available to the community, # comment: upon request, their own tools used in the interpretation # comment: of the GML data, namely well documented model code, transport # comment: fields, and additional information necessary for other # comment: scientists to repeat the work and to run modified versions. # comment: Model availability includes collaborative support for new # comment: users of the models. # comment: # comment: ************ DATA DESCRIPTION *************** # comment: # description_site-code: brw # description_project-abbr: ccg_surface # description_strategy-abbr: flask # description_sample-constraints: date:1900-01-01,2016-12-31 # description_creation-time: 2021-05-04 10:08:36 # comment: # comment: ************ DATA DOCUMENTATION *************** # comment: # comment: Please refer to the species-specific README file in the # comment: appropriate directory folder at ftp://aftp.cmdl.noaa.gov/data/trace_gases/. # comment: # data_fields: sample_site_code sample_year sample_month sample_day sample_hour sample_minute sample_seconds sample_id sample_method parameter_formula analysis_group_abbr analysis_value analysis_uncertainty analysis_flag analysis_instrument analysis_year analysis_month analysis_day analysis_hour analysis_minute analysis_seconds sample_latitude sample_longitude sample_altitude sample_elevation sample_intake_height event_number BRW 2005 05 20 22 30 00 1459-99 P C2H6 ARL 578.488 -999.990 .X. v1 2005 08 31 00 14 00 71.3100 -156.5800 16.00 11.00 5.00 199980 BRW 2005 05 20 22 30 00 1460-99 P C2H6 ARL 673.036 -999.990 ... v1 2005 08 31 00 13 00 71.3100 -156.5800 16.00 11.00 5.00 199981 BRW 2005 06 10 18 19 00 3449-99 S C2H6 ARL 896.455 -999.990 ... v1 2005 10 08 10 09 00 71.3100 -156.5800 27.50 11.00 16.50 201102 BRW 2005 06 10 18 19 00 3450-99 S C2H6 ARL 836.561 -999.990 ... v1 2005 10 08 10 10 00 71.3100 -156.5800 27.50 11.00 16.50 201103 BRW 2005 06 10 23 10 00 3087-99 P C2H6 ARL 840.452 -999.990 ... v1 2005 08 24 00 13 00 71.3100 -156.5800 16.00 11.00 5.00 201100 BRW 2005 06 10 23 10 00 3088-99 P C2H6 ARL 889.250 -999.990 ... v1 2005 08 24 00 14 00 71.3100 -156.5800 16.00 11.00 5.00 201101 BRW 2005 06 17 21 11 00 3851-99 P C2H6 ARL 881.762 -999.990 ... v1 2005 08 24 10 07 00 71.3100 -156.5800 16.00 11.00 5.00 201851 BRW 2005 06 17 21 11 00 3852-99 P C2H6 ARL 913.500 -999.990 ... v1 2005 08 24 10 08 00 71.3100 -156.5800 16.00 11.00 5.00 201852 BRW 2005 07 01 23 50 00 2027-99 P C2H6 ARL 1256.515 -999.990 .X. v1 2005 10 07 00 12 00 71.3100 -156.5800 16.00 11.00 5.00 202419 BRW 2005 07 01 23 50 00 2028-99 P C2H6 ARL 1246.515 -999.990 .X. v1 2005 10 07 00 11 00 71.3100 -156.5800 16.00 11.00 5.00 202420 BRW 2005 07 08 22 15 00 1343-99 P C2H6 ARL 492.172 -999.990 ... v1 2006 01 17 00 11 00 71.3100 -156.5800 16.00 11.00 5.00 202777 BRW 2005 07 08 22 15 00 1344-99 P C2H6 ARL 470.701 -999.990 ... v1 2006 01 17 00 12 00 71.3100 -156.5800 16.00 11.00 5.00 202778 BRW 2005 07 22 22 40 00 1345-99 P C2H6 ARL -999.990 -999.990 A.. v1 2005 11 07 00 03 00 71.3100 -156.5800 16.00 11.00 5.00 203503 BRW 2005 07 22 22 40 00 1346-99 P C2H6 ARL -999.990 -999.990 A.. v1 2005 11 07 00 04 00 71.3100 -156.5800 16.00 11.00 5.00 203504 BRW 2005 08 01 23 59 00 567-99 P C2H6 ARL 454.412 -999.990 ... v1 2005 10 29 10 03 00 71.3100 -156.5800 16.00 11.00 5.00 203821 BRW 2005 08 12 23 25 00 12-99 P C2H6 ARL 870.045 -999.990 P.. v1 2005 10 28 10 09 00 71.3100 -156.5800 16.00 11.00 5.00 204459 BRW 2005 08 12 23 25 00 210-99 P C2H6 ARL 697.376 -999.990 P.. v1 2005 10 28 10 10 00 71.3100 -156.5800 16.00 11.00 5.00 204460 BRW 2005 09 02 18 22 00 6015-66 P C2H6 ARL 2270.543 -999.990 .X. v1 2005 10 26 00 05 00 71.3100 -156.5800 16.00 11.00 5.00 205740 BRW 2005 09 02 18 22 00 6016-66 P C2H6 ARL 2330.928 -999.990 .X. v1 2005 10 26 00 06 00 71.3100 -156.5800 16.00 11.00 5.00 205741 BRW 2005 09 15 18 16 00 3881-99 P C2H6 ARL 1175.633 -999.990 ... v1 2005 12 03 00 11 00 71.3100 -156.5800 16.00 11.00 5.00 206400 BRW 2005 09 15 18 16 00 3882-99 P C2H6 ARL 1289.842 -999.990 ... v1 2005 12 03 00 12 00 71.3100 -156.5800 16.00 11.00 5.00 206401 BRW 2005 09 23 18 03 00 6217-66 P C2H6 ARL 458.508 -999.990 .X. v1 2006 03 17 10 07 00 71.3100 -156.5800 16.00 11.00 5.00 206802 BRW 2005 09 23 18 03 00 6218-66 P C2H6 ARL 439.307 -999.990 .X. v1 2006 03 17 10 08 00 71.3100 -156.5800 16.00 11.00 5.00 206803 BRW 2005 09 30 22 35 00 3651-99 P C2H6 ARL 907.715 -999.990 ... v1 2006 01 12 00 12 00 71.3100 -156.5800 16.00 11.00 5.00 207125 BRW 2005 09 30 22 35 00 376-99 P C2H6 ARL 786.674 -999.990 .X. v1 2006 01 12 00 11 00 71.3100 -156.5800 16.00 11.00 5.00 207126 BRW 2005 10 07 18 35 00 171-99 P C2H6 ARL -999.990 -999.990 A.. v1 2006 03 10 10 05 00 71.3100 -156.5800 16.00 11.00 5.00 207418 BRW 2005 10 07 18 35 00 172-99 P C2H6 ARL 720.777 -999.990 .X. v1 2006 03 10 10 06 00 71.3100 -156.5800 16.00 11.00 5.00 207419 BRW 2005 10 14 19 35 00 265-99 P C2H6 ARL 1748.552 -999.990 ... v1 2006 01 10 00 12 00 71.3100 -156.5800 16.00 11.00 5.00 207841 BRW 2005 10 14 19 35 00 3209-99 P C2H6 ARL 1624.050 -999.990 ... v1 2006 01 10 00 11 00 71.3100 -156.5800 16.00 11.00 5.00 207842 BRW 2005 10 28 23 55 00 2139-99 P C2H6 ARL 1721.177 -999.990 ... v1 2006 01 13 00 08 00 71.3100 -156.5800 16.00 11.00 5.00 209300 BRW 2005 10 28 23 55 00 2899-99 P C2H6 ARL 1686.267 -999.990 ... v1 2006 01 13 00 07 00 71.3100 -156.5800 16.00 11.00 5.00 209301 BRW 2005 11 04 23 50 00 3595-99 P C2H6 ARL 1362.127 -999.990 ... v1 2006 01 13 00 09 00 71.3100 -156.5800 16.00 11.00 5.00 209097 BRW 2005 11 04 23 50 00 3596-99 P C2H6 ARL 1243.032 -999.990 ... v1 2006 01 13 00 10 00 71.3100 -156.5800 16.00 11.00 5.00 209098 BRW 2005 11 11 23 44 00 1771-99 P C2H6 ARL 1230.475 -999.990 ... v1 2006 01 24 00 04 00 71.3100 -156.5800 16.00 11.00 5.00 209295 BRW 2005 11 11 23 44 00 214-99 P C2H6 ARL 1237.964 -999.990 ... v1 2006 01 24 00 03 00 71.3100 -156.5800 16.00 11.00 5.00 209294 BRW 2005 11 18 22 30 00 325-99 P C2H6 ARL 968.168 -999.990 .X. v1 2006 01 24 00 09 00 71.3100 -156.5800 16.00 11.00 5.00 210066 BRW 2005 11 18 22 30 00 326-99 P C2H6 ARL 969.208 -999.990 .X. v1 2006 01 24 00 10 00 71.3100 -156.5800 16.00 11.00 5.00 210067 BRW 2005 11 23 20 48 00 75-99 P C2H6 ARL 1857.579 -999.990 ... v1 2006 01 19 10 05 00 71.3100 -156.5800 16.00 11.00 5.00 209882 BRW 2005 11 23 20 48 00 76-99 P C2H6 ARL 1721.674 -999.990 ... v1 2006 01 19 10 06 00 71.3100 -156.5800 16.00 11.00 5.00 209883 BRW 2005 12 02 23 55 00 3649-99 P C2H6 ARL 1426.493 -999.990 ... v1 2006 01 24 00 05 00 71.3100 -156.5800 16.00 11.00 5.00 210372 BRW 2005 12 02 23 55 00 3650-99 P C2H6 ARL 1559.774 -999.990 ... v1 2006 01 24 00 06 00 71.3100 -156.5800 16.00 11.00 5.00 210373 BRW 2005 12 09 23 59 00 3119-99 P C2H6 ARL 1345.543 -999.990 ... v1 2006 01 27 00 11 00 71.3100 -156.5800 16.00 11.00 5.00 210662 BRW 2005 12 09 23 59 00 3120-99 P C2H6 ARL 1312.217 -999.990 ... v1 2006 01 27 00 12 00 71.3100 -156.5800 16.00 11.00 5.00 210663 BRW 2005 12 14 18 48 00 3060-99 P C2H6 ARL 1370.498 -999.990 ... v1 2006 01 27 00 10 00 71.3100 -156.5800 16.00 11.00 5.00 210824 BRW 2005 12 14 18 48 00 3441-99 P C2H6 ARL 1269.050 -999.990 ... v1 2006 01 27 00 09 00 71.3100 -156.5800 16.00 11.00 5.00 210823 BRW 2005 12 22 19 30 00 236-99 P C2H6 ARL -999.990 -999.990 A.. v1 2006 02 27 10 08 00 71.3100 -156.5800 16.00 11.00 5.00 211387 BRW 2005 12 22 19 30 00 500-99 P C2H6 ARL -999.990 -999.990 A.. v1 2006 02 27 10 07 00 71.3100 -156.5800 16.00 11.00 5.00 211388 BRW 2005 12 30 00 00 00 12-99 P C2H6 ARL 1248.403 -999.990 ... v1 2006 03 17 00 06 00 71.3100 -156.5800 16.00 11.00 5.00 211823 BRW 2005 12 30 00 00 00 996-99 P C2H6 ARL 1454.979 -999.990 ... v1 2006 03 17 00 05 00 71.3100 -156.5800 16.00 11.00 5.00 211822 BRW 2006 01 06 20 10 00 1143-99 P C2H6 ARL -999.990 -999.990 A.. v1 2006 03 17 00 03 00 71.3100 -156.5800 16.00 11.00 5.00 211826 BRW 2006 01 06 20 10 00 1144-99 P C2H6 ARL 2180.966 -999.990 .X. v1 2006 03 17 00 04 00 71.3100 -156.5800 16.00 11.00 5.00 211827 BRW 2006 01 13 22 55 00 1533-99 P C2H6 ARL 794.496 -999.990 .X. v1 2006 03 07 00 07 00 71.3100 -156.5800 16.00 11.00 5.00 211920 BRW 2006 01 13 22 55 00 1533-99 P C2H6 ARL 210.651 -999.990 .X. v1 2006 03 08 00 07 00 71.3100 -156.5800 16.00 11.00 5.00 211920 BRW 2006 01 13 22 55 00 1534-99 P C2H6 ARL 857.395 -999.990 .X. v1 2006 03 07 00 08 00 71.3100 -156.5800 16.00 11.00 5.00 211921 BRW 2006 01 13 22 55 00 1534-99 P C2H6 ARL 250.147 -999.990 .X. v1 2006 03 08 00 08 00 71.3100 -156.5800 16.00 11.00 5.00 211921 BRW 2006 01 20 23 50 00 3279-99 P C2H6 ARL 1548.088 -999.990 ... v1 2006 03 09 00 11 00 71.3100 -156.5800 16.00 11.00 5.00 212329 BRW 2006 01 20 23 50 00 3280-99 P C2H6 ARL 1648.844 -999.990 ... v1 2006 03 09 00 12 00 71.3100 -156.5800 16.00 11.00 5.00 212330 BRW 2006 01 27 23 24 00 619-99 P C2H6 ARL 1786.933 -999.990 ... v1 2006 03 15 00 05 00 71.3100 -156.5800 16.00 11.00 5.00 212432 BRW 2006 02 13 22 55 00 565-99 P C2H6 ARL 3069.349 -999.990 ... v1 2006 03 27 00 09 00 71.3100 -156.5800 16.00 11.00 5.00 213224 BRW 2006 02 13 22 55 00 566-99 P C2H6 ARL 3192.794 -999.990 .X. v1 2006 03 27 00 10 00 71.3100 -156.5800 16.00 11.00 5.00 213225 BRW 2006 02 24 23 05 00 3975-99 P C2H6 ARL 2816.738 -999.990 ... v1 2006 05 03 00 07 00 71.3100 -156.5800 16.00 11.00 5.00 214047 BRW 2006 02 24 23 05 00 3976-99 P C2H6 ARL 3023.384 -999.990 ... v1 2006 05 03 00 08 00 71.3100 -156.5800 16.00 11.00 5.00 214048 BRW 2006 03 03 19 15 00 4257-99 P C2H6 ARL 3174.177 -999.990 ... v1 2006 05 03 00 11 00 71.3100 -156.5800 16.00 11.00 5.00 213874 BRW 2006 03 03 19 15 00 4258-99 P C2H6 ARL 3190.717 -999.990 ... v1 2006 05 03 00 12 00 71.3100 -156.5800 16.00 11.00 5.00 213875 BRW 2006 03 10 19 56 00 3747-99 P C2H6 ARL 3018.826 -999.990 ... v1 2006 05 03 00 09 00 71.3100 -156.5800 16.00 11.00 5.00 214436 BRW 2006 03 10 19 56 00 3748-99 P C2H6 ARL 2913.689 -999.990 ... v1 2006 05 03 00 10 00 71.3100 -156.5800 16.00 11.00 5.00 214437 BRW 2006 03 17 23 55 00 4627-99 P C2H6 ARL 3318.719 -999.990 .X. v1 2006 05 08 00 09 00 71.3100 -156.5800 16.00 11.00 5.00 214373 BRW 2006 03 17 23 55 00 4628-99 P C2H6 ARL 3576.585 -999.990 .X. v1 2006 05 08 00 10 00 71.3100 -156.5800 16.00 11.00 5.00 214374 BRW 2006 03 24 23 50 00 471-99 P C2H6 ARL 2826.128 -999.990 ... v1 2006 05 18 00 13 00 71.3100 -156.5800 16.00 11.00 5.00 214780 BRW 2006 03 24 23 50 00 472-99 P C2H6 ARL 2647.851 -999.990 ... v1 2006 05 18 00 14 00 71.3100 -156.5800 16.00 11.00 5.00 214781 BRW 2006 03 29 23 35 00 4689-99 P C2H6 ARL 1688.375 -999.990 .X. v1 2006 08 27 00 11 00 71.3100 -156.5800 16.00 11.00 5.00 214782 BRW 2006 03 29 23 35 00 4690-99 P C2H6 ARL 1631.406 -999.990 .X. v1 2006 08 27 00 12 00 71.3100 -156.5800 16.00 11.00 5.00 214783 BRW 2006 04 07 23 04 00 1975-99 P C2H6 ARL 1785.796 -999.990 ... v1 2006 06 12 00 05 00 71.3100 -156.5800 16.00 11.00 5.00 215506 BRW 2006 04 07 23 04 00 1976-99 P C2H6 ARL 1812.148 -999.990 ... v1 2006 06 12 00 06 00 71.3100 -156.5800 16.00 11.00 5.00 215507 BRW 2006 04 14 00 00 00 4367-99 P C2H6 ARL 1674.555 -999.990 ... v1 2006 06 08 00 10 00 71.3100 -156.5800 16.00 11.00 5.00 215884 BRW 2006 04 14 00 00 00 796-99 P C2H6 ARL 1677.611 -999.990 ... v1 2006 06 08 00 09 00 71.3100 -156.5800 16.00 11.00 5.00 215885 BRW 2006 04 21 18 15 00 3440-99 S C2H6 ARL 1293.247 -999.990 ... v1 2006 05 25 00 13 00 71.3100 -156.5800 27.50 11.00 16.50 216793 BRW 2006 04 21 18 45 00 3439-99 P C2H6 ARL 1438.481 -999.990 ... v1 2006 05 27 00 07 00 71.3100 -156.5800 16.00 11.00 5.00 216794 BRW 2006 04 21 18 45 00 6232-66 P C2H6 ARL 1228.611 -999.990 ... v1 2006 05 27 00 08 00 71.3100 -156.5800 16.00 11.00 5.00 216795 BRW 2006 04 28 18 56 00 3531-99 P C2H6 ARL 1713.019 -999.990 ... v1 2006 07 04 00 10 00 71.3100 -156.5800 16.00 11.00 5.00 216557 BRW 2006 04 28 18 56 00 3572-99 P C2H6 ARL 1394.685 -999.990 ... v1 2006 07 04 00 09 00 71.3100 -156.5800 16.00 11.00 5.00 216556 BRW 2006 05 05 18 57 00 2411-99 P C2H6 ARL 1449.444 -999.990 ... v1 2006 06 23 00 07 00 71.3100 -156.5800 16.00 11.00 5.00 217483 BRW 2006 05 05 18 57 00 944-99 P C2H6 ARL 1255.870 -999.990 ... v1 2006 06 23 00 08 00 71.3100 -156.5800 16.00 11.00 5.00 217484 BRW 2006 05 19 20 12 00 1297-99 P C2H6 ARL 1541.704 -999.990 ... v1 2006 06 23 00 03 00 71.3100 -156.5800 16.00 11.00 5.00 217491 BRW 2006 05 19 20 12 00 3432-99 P C2H6 ARL 1502.982 -999.990 ... v1 2006 06 23 00 04 00 71.3100 -156.5800 16.00 11.00 5.00 217492 BRW 2006 06 02 22 30 00 3989-99 P C2H6 ARL 1056.738 -999.990 ... v1 2006 07 27 00 07 00 71.3100 -156.5800 16.00 11.00 5.00 218274 BRW 2006 06 02 22 30 00 3990-99 P C2H6 ARL 1161.479 -999.990 ... v1 2006 07 27 00 08 00 71.3100 -156.5800 16.00 11.00 5.00 218275 BRW 2006 06 07 23 55 00 4168-99 P C2H6 ARL 1511.326 -999.990 P.. v1 2006 07 31 12 05 00 71.3100 -156.5800 16.00 11.00 5.00 218587 BRW 2006 06 07 23 55 00 6572-66 P C2H6 ARL 1163.613 -999.990 P.. v1 2006 07 31 12 06 00 71.3100 -156.5800 16.00 11.00 5.00 218588 BRW 2006 07 06 21 00 00 1813-99 P C2H6 ARL 803.438 -999.990 ... v1 2006 09 20 00 03 00 71.3100 -156.5800 16.00 11.00 5.00 219502 BRW 2006 07 06 21 00 00 1814-99 P C2H6 ARL 820.438 -999.990 ... v1 2006 09 20 00 04 00 71.3100 -156.5800 16.00 11.00 5.00 219503 BRW 2006 07 14 20 05 00 365-99 P C2H6 ARL 744.000 -999.990 ... v1 2006 09 15 12 05 00 71.3100 -156.5800 16.00 11.00 5.00 220198 BRW 2006 07 14 20 05 00 366-99 P C2H6 ARL 788.125 -999.990 ... v1 2006 09 15 12 06 00 71.3100 -156.5800 16.00 11.00 5.00 220199 BRW 2006 07 21 23 20 00 3373-99 P C2H6 ARL 664.406 -999.990 ... v1 2006 09 08 00 05 00 71.3100 -156.5800 16.00 11.00 5.00 220338 BRW 2006 07 21 23 20 00 6292-66 P C2H6 ARL 728.453 -999.990 ... v1 2006 09 08 00 06 00 71.3100 -156.5800 16.00 11.00 5.00 220339 BRW 2006 07 28 22 33 00 2541-99 P C2H6 ARL 876.344 -999.990 ... v1 2006 09 08 00 08 00 71.3100 -156.5800 16.00 11.00 5.00 220645 BRW 2006 07 28 22 33 00 552-99 P C2H6 ARL 799.906 -999.990 ... v1 2006 09 08 00 07 00 71.3100 -156.5800 16.00 11.00 5.00 220644 BRW 2006 08 03 23 50 00 6394-66 P C2H6 ARL 558.125 -999.990 ... v1 2006 09 19 12 09 00 71.3100 -156.5800 16.00 11.00 5.00 220879 BRW 2006 08 18 12 34 56 1930-99 P C2H6 ARL 716.726 -999.990 ... v1 2006 10 25 00 11 00 71.3100 -156.5800 16.00 11.00 5.00 221594 BRW 2006 08 18 12 34 56 3312-99 P C2H6 ARL 630.089 -999.990 ... v1 2006 10 25 00 12 00 71.3100 -156.5800 16.00 11.00 5.00 221595 BRW 2006 08 25 17 25 00 3744-99 S C2H6 ARL 635.134 -999.990 ... v1 2006 10 25 00 06 00 71.3100 -156.5800 27.50 11.00 16.50 221915 BRW 2006 08 25 23 21 00 3743-99 P C2H6 ARL 625.045 -999.990 ... v1 2006 10 25 00 05 00 71.3100 -156.5800 16.00 11.00 5.00 221914 BRW 2006 08 31 23 50 00 6280-66 P C2H6 ARL 911.190 -999.990 ... v1 2006 10 16 00 13 00 71.3100 -156.5800 16.00 11.00 5.00 222338 BRW 2006 08 31 23 50 00 6917-66 P C2H6 ARL 852.872 -999.990 ... v1 2006 10 16 00 14 00 71.3100 -156.5800 16.00 11.00 5.00 222339 BRW 2006 09 15 23 16 00 1497-99 P C2H6 ARL -999.990 -999.990 A.. v1 2006 10 18 12 03 00 71.3100 -156.5800 16.00 11.00 5.00 222905 BRW 2006 09 15 23 16 00 618-99 P C2H6 ARL -999.990 -999.990 A.. v1 2006 10 18 12 04 00 71.3100 -156.5800 16.00 11.00 5.00 222906 BRW 2006 09 22 21 52 00 2704-99 P C2H6 ARL 639.554 -999.990 ... v1 2006 11 09 12 10 00 71.3100 -156.5800 16.00 11.00 5.00 223907 BRW 2006 09 22 21 52 00 623-99 P C2H6 ARL 678.303 -999.990 ... v1 2006 11 09 12 09 00 71.3100 -156.5800 16.00 11.00 5.00 223906 BRW 2006 10 13 19 35 00 3371-99 P C2H6 ARL 1086.302 -999.990 ... v1 2007 02 01 00 11 00 71.3100 -156.5800 16.00 11.00 5.00 224206 BRW 2006 10 13 19 35 00 799-99 P C2H6 ARL 1063.380 -999.990 ... v1 2007 02 01 00 12 00 71.3100 -156.5800 16.00 11.00 5.00 224207 BRW 2006 10 20 19 06 00 2515-99 P C2H6 ARL 986.339 -999.990 ... v1 2006 11 09 12 05 00 71.3100 -156.5800 16.00 11.00 5.00 224368 BRW 2006 10 20 19 06 00 2947-99 P C2H6 ARL 957.262 -999.990 ... v1 2006 11 09 12 06 00 71.3100 -156.5800 16.00 11.00 5.00 224369 BRW 2006 10 26 18 37 00 2056-99 S C2H6 ARL 1074.757 -999.990 ... v1 2006 12 04 00 08 00 71.3100 -156.5800 27.50 11.00 16.50 224788 BRW 2006 10 26 20 20 00 462-99 P C2H6 ARL 1188.229 -999.990 ... v1 2006 12 04 00 07 00 71.3100 -156.5800 16.00 11.00 5.00 224787 BRW 2006 11 03 21 00 00 2331-99 P C2H6 ARL 1126.427 -999.990 ... v1 2007 02 07 12 05 00 71.3100 -156.5800 16.00 11.00 5.00 225140 BRW 2006 11 03 21 00 00 872-99 P C2H6 ARL 1160.790 -999.990 ... v1 2007 02 07 12 06 00 71.3100 -156.5800 16.00 11.00 5.00 225141 BRW 2006 11 22 20 41 00 6407-66 P C2H6 ARL 1546.981 -999.990 ... v1 2007 02 10 00 03 00 71.3100 -156.5800 16.00 11.00 5.00 226347 BRW 2006 11 22 20 41 00 934-99 P C2H6 ARL 1546.551 -999.990 ... v1 2007 02 10 00 04 00 71.3100 -156.5800 16.00 11.00 5.00 226348 BRW 2006 12 01 23 55 00 2248-99 P C2H6 ARL 1720.762 -999.990 ... v1 2007 02 09 12 10 00 71.3100 -156.5800 16.00 11.00 5.00 226830 BRW 2006 12 01 23 55 00 3376-99 P C2H6 ARL 1693.089 -999.990 ... v1 2007 02 09 12 09 00 71.3100 -156.5800 16.00 11.00 5.00 226829 BRW 2006 12 15 23 55 00 1505-99 P C2H6 ARL 2067.922 -999.990 ... v1 2007 02 06 12 06 00 71.3100 -156.5800 16.00 11.00 5.00 227050 BRW 2006 12 15 23 55 00 3918-99 P C2H6 ARL 1886.939 -999.990 ... v1 2007 02 06 12 05 00 71.3100 -156.5800 16.00 11.00 5.00 227049 BRW 2006 12 29 19 37 00 3872-99 P C2H6 ARL 2505.490 -999.990 ... v1 2007 04 05 12 10 00 71.3100 -156.5800 16.00 11.00 5.00 227874 BRW 2006 12 29 19 37 00 4536-99 P C2H6 ARL 2505.411 -999.990 ... v1 2007 04 05 12 09 00 71.3100 -156.5800 16.00 11.00 5.00 227873 BRW 2007 01 05 23 22 00 1297-99 P C2H6 ARL 3082.493 -999.990 ... v1 2007 04 05 00 06 00 71.3100 -156.5800 16.00 11.00 5.00 228190 BRW 2007 01 05 23 22 00 616-99 P C2H6 ARL 3141.618 -999.990 ... v1 2007 04 05 00 05 00 71.3100 -156.5800 16.00 11.00 5.00 228189 BRW 2007 01 19 22 45 00 3893-99 P C2H6 ARL 2458.143 -999.990 ... v1 2007 04 05 00 08 00 71.3100 -156.5800 16.00 11.00 5.00 228598 BRW 2007 01 19 22 45 00 510-99 P C2H6 ARL 2420.385 -999.990 ... v1 2007 04 05 00 07 00 71.3100 -156.5800 16.00 11.00 5.00 228597 BRW 2007 02 02 22 15 00 1497-99 P C2H6 ARL 2304.377 -999.990 ... v1 2007 04 09 00 05 00 71.3100 -156.5800 16.00 11.00 5.00 229531 BRW 2007 02 02 22 15 00 900-99 P C2H6 ARL 2314.841 -999.990 ... v1 2007 04 09 00 06 00 71.3100 -156.5800 16.00 11.00 5.00 229532 BRW 2007 02 16 23 20 00 162-99 P C2H6 ARL 2218.213 -999.990 ... v1 2007 05 17 12 09 00 71.3100 -156.5800 16.00 11.00 5.00 231470 BRW 2007 02 16 23 20 00 3281-99 P C2H6 ARL 2276.413 -999.990 ... v1 2007 05 17 12 10 00 71.3100 -156.5800 16.00 11.00 5.00 231469 BRW 2007 03 09 22 56 00 3319-99 P C2H6 ARL 2379.778 -999.990 ... v1 2007 05 04 00 03 00 71.3100 -156.5800 16.00 11.00 5.00 231483 BRW 2007 03 09 22 56 00 3706-99 P C2H6 ARL 2389.585 -999.990 ... v1 2007 05 04 00 04 00 71.3100 -156.5800 16.00 11.00 5.00 231484 BRW 2007 03 16 22 25 00 1010-99 P C2H6 ARL 2432.770 -999.990 ... v1 2007 05 22 00 05 00 71.3100 -156.5800 16.00 11.00 5.00 231859 BRW 2007 03 16 22 25 00 6052-66 P C2H6 ARL 2404.626 -999.990 ... v1 2007 05 22 00 06 00 71.3100 -156.5800 16.00 11.00 5.00 231860 BRW 2007 03 23 23 35 00 2464-99 P C2H6 ARL 2265.097 -999.990 ... v1 2007 05 17 00 04 00 71.3100 -156.5800 16.00 11.00 5.00 232309 BRW 2007 03 23 23 35 00 623-99 P C2H6 ARL 2218.989 -999.990 ... v1 2007 05 17 00 03 00 71.3100 -156.5800 16.00 11.00 5.00 232308 BRW 2007 03 30 19 17 00 3092-99 P C2H6 ARL 2343.989 -999.990 ... v1 2007 05 29 00 03 00 71.3100 -156.5800 16.00 11.00 5.00 233481 BRW 2007 03 30 19 17 00 4082-99 P C2H6 ARL 2371.164 -999.990 ... v1 2007 05 29 00 04 00 71.3100 -156.5800 16.00 11.00 5.00 233482 BRW 2007 04 06 22 50 00 4027-99 P C2H6 ARL 2019.737 -999.990 ... v1 2007 05 22 00 03 00 71.3100 -156.5800 16.00 11.00 5.00 233445 BRW 2007 04 06 22 50 00 4104-99 P C2H6 ARL 2036.205 -999.990 ... v1 2007 05 22 00 04 00 71.3100 -156.5800 16.00 11.00 5.00 233446 BRW 2007 04 13 21 58 00 3035-99 P C2H6 ARL 1671.593 -999.990 ... v1 2007 05 26 00 11 00 71.3100 -156.5800 16.00 11.00 5.00 233443 BRW 2007 04 13 21 58 00 6257-66 P C2H6 ARL 1693.573 -999.990 ... v1 2007 05 26 00 12 00 71.3100 -156.5800 16.00 11.00 5.00 233444 BRW 2007 04 20 23 35 00 2339-99 P C2H6 ARL 1661.205 -999.990 ... v1 2007 05 26 00 13 00 71.3100 -156.5800 16.00 11.00 5.00 233649 BRW 2007 04 20 23 35 00 2505-99 P C2H6 ARL 1644.114 -999.990 ... v1 2007 05 26 00 14 00 71.3100 -156.5800 16.00 11.00 5.00 233650 BRW 2007 04 27 22 35 00 1789-99 P C2H6 ARL 1345.496 -999.990 ... v1 2007 06 15 12 08 00 71.3100 -156.5800 16.00 11.00 5.00 234078 BRW 2007 04 27 22 35 00 923-99 P C2H6 ARL 1379.973 -999.990 ... v1 2007 06 15 12 07 00 71.3100 -156.5800 16.00 11.00 5.00 234077 BRW 2007 05 04 19 38 00 2340-99 P C2H6 ARL 1362.039 -999.990 ... v1 2007 06 15 12 09 00 71.3100 -156.5800 16.00 11.00 5.00 234208 BRW 2007 05 04 19 38 00 3466-99 P C2H6 ARL 1316.818 -999.990 ... v1 2007 06 15 12 10 00 71.3100 -156.5800 16.00 11.00 5.00 234207 BRW 2007 05 11 21 40 00 3257-99 P C2H6 ARL 1355.610 -999.990 ... v1 2007 08 08 00 03 00 71.3100 -156.5800 16.00 11.00 5.00 235009 BRW 2007 05 11 21 40 00 6187-66 P C2H6 ARL 1327.493 -999.990 ... v1 2007 08 08 00 04 00 71.3100 -156.5800 16.00 11.00 5.00 235010 BRW 2007 05 18 21 27 00 3319-99 P C2H6 ARL -999.990 -999.990 A.. v1 2007 07 25 00 09 00 71.3100 -156.5800 16.00 11.00 5.00 235361 BRW 2007 05 18 21 27 00 5198-99 P C2H6 ARL 1385.334 -999.990 ... v1 2007 07 25 00 10 00 71.3100 -156.5800 16.00 11.00 5.00 235362 BRW 2007 05 25 23 30 00 4430-99 P C2H6 ARL 1007.230 -999.990 ... v1 2008 12 23 00 06 00 71.3100 -156.5800 16.00 11.00 5.00 235820 BRW 2007 05 25 23 30 00 555-99 P C2H6 ARL 1092.146 -999.990 ... v1 2008 12 23 00 05 00 71.3100 -156.5800 16.00 11.00 5.00 235819 BRW 2007 06 15 22 38 00 4432-99 P C2H6 ARL 1061.621 -999.990 ... v1 2007 09 13 12 09 00 71.3100 -156.5800 16.00 11.00 5.00 236961 BRW 2007 06 15 22 38 00 4739-99 P C2H6 ARL 1085.082 -999.990 ... v1 2007 09 13 12 10 00 71.3100 -156.5800 16.00 11.00 5.00 236960 BRW 2007 06 22 23 10 00 4528-99 P C2H6 ARL 1020.769 -999.990 ... v1 2007 09 08 12 08 00 71.3100 -156.5800 16.00 11.00 5.00 237456 BRW 2007 06 22 23 10 00 817-99 P C2H6 ARL 1021.484 -999.990 ... v1 2007 09 08 12 07 00 71.3100 -156.5800 16.00 11.00 5.00 237455 BRW 2007 06 29 21 33 00 2338-99 P C2H6 ARL 918.146 -999.990 ... v1 2007 09 08 12 06 00 71.3100 -156.5800 16.00 11.00 5.00 239947 BRW 2007 06 29 21 33 00 922-99 P C2H6 ARL 919.959 -999.990 ... v1 2007 09 08 12 05 00 71.3100 -156.5800 16.00 11.00 5.00 239946 BRW 2007 07 20 00 46 00 1247-99 P C2H6 ARL 732.885 -999.990 ... v1 2007 09 09 00 11 00 71.3100 -156.5800 16.00 11.00 5.00 239379 BRW 2007 07 20 00 46 00 1739-99 P C2H6 ARL 712.212 -999.990 ... v1 2007 09 09 00 12 00 71.3100 -156.5800 16.00 11.00 5.00 239380 BRW 2007 07 28 00 11 00 1212-99 P C2H6 ARL 669.203 -999.990 ... v1 2007 09 09 00 13 00 71.3100 -156.5800 16.00 11.00 5.00 239570 BRW 2007 07 28 00 11 00 3834-99 P C2H6 ARL 678.475 -999.990 ... v1 2007 09 09 00 14 00 71.3100 -156.5800 16.00 11.00 5.00 239569 BRW 2007 08 03 19 25 00 1248-99 P C2H6 ARL 605.453 -999.990 ... v1 2007 09 06 00 11 00 71.3100 -156.5800 16.00 11.00 5.00 239945 BRW 2007 08 03 19 25 00 4829-99 P C2H6 ARL 583.063 -999.990 ... v1 2007 09 06 00 12 00 71.3100 -156.5800 16.00 11.00 5.00 239944 BRW 2007 08 10 18 11 00 2567-99 P C2H6 ARL 726.168 -999.990 ... v1 2007 12 12 00 13 00 71.3100 -156.5800 16.00 11.00 5.00 241218 BRW 2007 08 10 18 11 00 4661-99 P C2H6 ARL 749.510 -999.990 ... v1 2007 12 12 00 14 00 71.3100 -156.5800 16.00 11.00 5.00 241217 BRW 2007 08 17 23 27 00 1237-99 P C2H6 ARL -999.990 -999.990 A.. v1 2007 09 17 00 07 00 71.3100 -156.5800 16.00 11.00 5.00 240507 BRW 2007 08 17 23 27 00 4536-99 P C2H6 ARL -999.990 -999.990 A.. v1 2007 09 17 00 08 00 71.3100 -156.5800 16.00 11.00 5.00 240508 BRW 2007 10 19 21 55 00 2645-99 P C2H6 ARL -999.990 -999.990 D.. v1 2007 11 26 00 11 00 71.3100 -156.5800 16.00 11.00 5.00 244311 BRW 2007 10 19 21 55 00 460-99 P C2H6 ARL -999.990 -999.990 D.. v1 2007 11 26 00 12 00 71.3100 -156.5800 16.00 11.00 5.00 244312 BRW 2007 10 26 22 46 00 4782-99 P C2H6 ARL 1163.430 -999.990 ... v1 2007 12 07 00 07 00 71.3100 -156.5800 16.00 11.00 5.00 244521 BRW 2007 10 26 22 46 00 6187-66 P C2H6 ARL 1179.573 -999.990 ... v1 2007 12 07 00 08 00 71.3100 -156.5800 16.00 11.00 5.00 244520 BRW 2007 11 01 21 57 00 4899-99 P C2H6 ARL 1123.342 -999.990 ... v1 2007 12 01 00 04 00 71.3100 -156.5800 16.00 11.00 5.00 244854 BRW 2007 11 01 21 57 00 669-99 P C2H6 ARL 1120.565 -999.990 ... v1 2007 12 01 00 03 00 71.3100 -156.5800 16.00 11.00 5.00 244853 BRW 2007 11 09 23 15 00 2287-99 P C2H6 ARL 1341.156 -999.990 ... v1 2007 12 06 12 07 00 71.3100 -156.5800 16.00 11.00 5.00 245304 BRW 2007 11 09 23 15 00 3281-99 P C2H6 ARL 1334.724 -999.990 ... v1 2007 12 06 12 08 00 71.3100 -156.5800 16.00 11.00 5.00 245305 BRW 2007 11 16 23 03 00 2834-99 P C2H6 ARL 1128.453 -999.990 ... v1 2008 12 23 00 04 00 71.3100 -156.5800 16.00 11.00 5.00 245933 BRW 2007 11 16 23 03 00 609-99 P C2H6 ARL 1142.014 -999.990 ... v1 2008 12 23 00 03 00 71.3100 -156.5800 16.00 11.00 5.00 245932 BRW 2007 11 30 23 05 00 2498-99 P C2H6 ARL 1480.130 -999.990 ... v1 2008 02 05 00 09 00 71.3100 -156.5800 16.00 11.00 5.00 246543 BRW 2007 11 30 23 05 00 2846-99 P C2H6 ARL 1489.151 -999.990 ... v1 2008 02 05 00 10 00 71.3100 -156.5800 16.00 11.00 5.00 246544 BRW 2007 12 07 23 55 00 4121-99 P C2H6 ARL 1472.960 -999.990 ... v1 2008 02 05 12 09 00 71.3100 -156.5800 16.00 11.00 5.00 247214 BRW 2007 12 07 23 55 00 4231-99 P C2H6 ARL 1474.481 -999.990 ... v1 2008 02 05 12 10 00 71.3100 -156.5800 16.00 11.00 5.00 247215 BRW 2007 12 14 23 30 00 2220-99 P C2H6 ARL 1618.207 -999.990 ... v1 2008 02 01 00 13 00 71.3100 -156.5800 16.00 11.00 5.00 247609 BRW 2007 12 14 23 30 00 6917-66 P C2H6 ARL 1742.571 -999.990 ... v1 2008 02 01 00 14 00 71.3100 -156.5800 16.00 11.00 5.00 247608 BRW 2007 12 21 12 34 56 1424-99 P C2H6 ARL 2095.814 -999.990 ... v1 2008 02 18 00 07 00 71.3100 -156.5800 16.00 11.00 5.00 247754 BRW 2007 12 21 12 34 56 5198-99 P C2H6 ARL 2052.123 -999.990 ... v1 2008 02 18 00 08 00 71.3100 -156.5800 16.00 11.00 5.00 247755 BRW 2007 12 29 01 10 00 4643-99 P C2H6 ARL 2213.844 -999.990 ... v1 2008 02 23 00 05 00 71.3200 -156.5800 16.00 11.00 5.00 248377 BRW 2007 12 29 01 10 00 6187-66 P C2H6 ARL 2250.378 -999.990 ... v1 2008 02 23 00 06 00 71.3200 -156.5800 16.00 11.00 5.00 248378 BRW 2008 01 09 01 05 00 6465-66 P C2H6 ARL 2540.236 -999.990 ... v1 2008 02 23 00 04 00 71.3200 -156.5800 16.00 11.00 5.00 248374 BRW 2008 01 09 01 05 00 926-99 P C2H6 ARL 2565.766 -999.990 ... v1 2008 02 23 00 03 00 71.3200 -156.5800 16.00 11.00 5.00 248373 BRW 2008 01 12 00 10 00 3887-99 P C2H6 ARL 2152.897 -999.990 ... v1 2008 04 10 00 09 00 71.3200 -156.5800 16.00 11.00 5.00 249115 BRW 2008 01 12 00 10 00 4300-99 P C2H6 ARL 2089.930 -999.990 ... v1 2008 04 10 00 10 00 71.3200 -156.5800 16.00 11.00 5.00 249116 BRW 2008 01 25 21 55 00 2902-99 P C2H6 ARL -999.990 -999.990 A.. v1 2008 03 18 00 13 00 71.3200 -156.5800 16.00 11.00 5.00 249165 BRW 2008 01 25 21 55 00 6052-66 P C2H6 ARL -999.990 -999.990 A.. v1 2008 03 18 00 14 00 71.3200 -156.5800 16.00 11.00 5.00 249164 BRW 2008 02 04 21 15 00 1238-99 P C2H6 ARL 3572.535 -999.990 ... v1 2008 04 14 12 07 00 71.3200 -156.5800 16.00 11.00 5.00 249949 BRW 2008 02 04 21 15 00 1940-99 P C2H6 ARL 3562.103 -999.990 ... v1 2008 04 14 12 08 00 71.3200 -156.5800 16.00 11.00 5.00 249950 BRW 2008 02 14 21 00 00 609-99 P C2H6 ARL 3215.315 -999.990 ... v1 2008 04 05 00 13 00 71.3200 -156.5800 16.00 11.00 5.00 249951 BRW 2008 02 14 21 00 00 784-99 P C2H6 ARL 3195.946 -999.990 ... v1 2008 04 05 00 14 00 71.3200 -156.5800 16.00 11.00 5.00 249952 BRW 2008 02 22 22 50 00 2971-99 P C2H6 ARL 2991.347 -999.990 ... v1 2008 05 06 00 10 00 71.3200 -156.5800 16.00 11.00 5.00 250533 BRW 2008 02 22 22 50 00 634-99 P C2H6 ARL 3016.452 -999.990 ... v1 2008 05 06 00 09 00 71.3200 -156.5800 16.00 11.00 5.00 250532 BRW 2008 02 28 22 03 00 1672-99 P C2H6 ARL 2946.758 -999.990 ... v1 2008 06 10 12 04 00 71.3200 -156.5800 16.00 11.00 5.00 251049 BRW 2008 02 28 22 03 00 6258-66 P C2H6 ARL 3085.701 -999.990 ... v1 2008 06 10 12 03 00 71.3200 -156.5800 16.00 11.00 5.00 251048 BRW 2008 03 07 22 15 00 224-99 P C2H6 ARL 2636.323 -999.990 ... v1 2008 05 01 00 13 00 71.3200 -156.5800 16.00 11.00 5.00 251323 BRW 2008 03 07 22 15 00 6292-66 P C2H6 ARL 2692.541 -999.990 ... v1 2008 05 01 00 14 00 71.3200 -156.5800 16.00 11.00 5.00 251324 BRW 2008 03 17 21 10 00 1176-99 P C2H6 ARL 2126.600 -999.990 ... v1 2008 04 17 00 07 00 71.3200 -156.5800 16.00 11.00 5.00 251552 BRW 2008 03 17 21 10 00 4402-99 P C2H6 ARL 2128.400 -999.990 ... v1 2008 04 17 00 08 00 71.3200 -156.5800 16.00 11.00 5.00 251553 BRW 2008 04 02 23 55 00 3545-99 P C2H6 ARL 2046.322 -999.990 ... v1 2008 08 29 00 05 00 71.3200 -156.5800 16.00 11.00 5.00 252470 BRW 2008 04 02 23 55 00 98-99 P C2H6 ARL 2043.954 -999.990 ... v1 2008 08 29 00 06 00 71.3200 -156.5800 16.00 11.00 5.00 252471 BRW 2008 04 12 21 10 00 2087-99 P C2H6 ARL 1909.169 -999.990 ... v1 2008 05 15 00 07 00 71.3200 -156.5800 16.00 11.00 5.00 253175 BRW 2008 04 12 21 10 00 4283-99 P C2H6 ARL 1910.152 -999.990 ... v1 2008 05 15 00 08 00 71.3200 -156.5800 16.00 11.00 5.00 253174 BRW 2008 05 07 20 15 00 1372-99 P C2H6 ARL 1377.597 -999.990 ... v1 2008 09 10 00 05 00 71.3200 -156.6000 16.00 11.00 5.00 254481 BRW 2008 05 07 20 15 00 4592-99 P C2H6 ARL 1361.165 -999.990 ... v1 2008 09 10 00 06 00 71.3200 -156.6000 16.00 11.00 5.00 254482 BRW 2008 05 09 21 45 00 1004-99 P C2H6 ARL 1641.207 -999.990 ... v1 2008 10 21 12 05 00 71.3200 -156.6000 16.00 11.00 5.00 254668 BRW 2008 05 09 21 45 00 1297-99 P C2H6 ARL 1642.561 -999.990 ... v1 2008 10 21 12 06 00 71.3200 -156.6000 16.00 11.00 5.00 254667 BRW 2008 05 17 22 14 00 2506-99 P C2H6 ARL 1350.550 -999.990 ... v1 2008 07 17 00 09 00 71.3200 -156.6000 16.00 11.00 5.00 254924 BRW 2008 05 17 22 14 00 2865-99 P C2H6 ARL 1318.254 -999.990 ... v1 2008 07 17 00 10 00 71.3200 -156.6000 16.00 11.00 5.00 254925 BRW 2008 05 24 00 58 00 4104-99 P C2H6 ARL 1418.971 -999.990 ... v1 2008 07 29 00 09 00 71.3200 -156.6000 16.00 11.00 5.00 255303 BRW 2008 05 24 00 58 00 4929-99 P C2H6 ARL 1408.337 -999.990 ... v1 2008 07 29 00 10 00 71.3200 -156.6000 16.00 11.00 5.00 255302 BRW 2008 05 27 22 33 00 3789-99 P C2H6 ARL 1008.653 -999.990 ... v1 2008 09 16 00 05 00 71.3200 -156.6000 16.00 11.00 5.00 255284 BRW 2008 05 27 22 33 00 6052-66 P C2H6 ARL 1003.362 -999.990 ... v1 2008 09 16 00 06 00 71.3200 -156.6000 16.00 11.00 5.00 255285 BRW 2008 06 03 22 32 00 2280-99 P C2H6 ARL 1160.886 -999.990 ... v1 2008 09 11 12 03 00 71.3200 -156.6000 16.00 11.00 5.00 255948 BRW 2008 06 03 22 32 00 4370-99 P C2H6 ARL 1156.141 -999.990 ... v1 2008 09 11 12 04 00 71.3200 -156.6000 16.00 11.00 5.00 255949 BRW 2008 06 11 23 30 00 2340-99 P C2H6 ARL 1099.381 -999.990 ... v1 2008 09 10 00 04 00 71.3200 -156.6000 16.00 11.00 5.00 255946 BRW 2008 06 11 23 30 00 4875-99 P C2H6 ARL 1101.687 -999.990 ... v1 2008 09 10 00 03 00 71.3200 -156.6000 16.00 11.00 5.00 255947 BRW 2008 06 20 22 55 00 240-99 P C2H6 ARL 813.095 -999.990 ... v1 2008 09 12 00 04 00 71.3200 -156.6000 16.00 11.00 5.00 256836 BRW 2008 06 20 22 55 00 3844-99 P C2H6 ARL 906.117 -999.990 ... v1 2008 09 12 00 03 00 71.3200 -156.6000 16.00 11.00 5.00 256835 BRW 2008 06 27 19 40 00 172-99 P C2H6 ARL 899.636 -999.990 ... v1 2008 09 10 12 05 00 71.3200 -156.6000 16.00 11.00 5.00 257252 BRW 2008 06 27 19 40 00 2174-99 P C2H6 ARL 931.226 -999.990 ... v1 2008 09 10 12 06 00 71.3200 -156.6000 16.00 11.00 5.00 257253 BRW 2008 07 03 19 52 00 1531-99 P C2H6 ARL 835.388 -999.990 ... v1 2008 09 18 12 02 00 71.3200 -156.6000 16.00 11.00 5.00 257638 BRW 2008 07 03 19 52 00 4847-99 P C2H6 ARL 830.473 -999.990 ... v1 2008 09 18 12 01 00 71.3200 -156.6000 16.00 11.00 5.00 257639 BRW 2008 07 08 21 15 00 1449-99 P C2H6 ARL 804.293 -999.990 ... v1 2009 09 15 12 06 00 71.3200 -156.6000 16.00 11.00 5.00 258358 BRW 2008 07 08 21 15 00 668-99 P C2H6 ARL 833.037 -999.990 ... v1 2009 09 15 12 05 00 71.3200 -156.6000 16.00 11.00 5.00 258359 BRW 2008 07 17 21 33 00 51-99 P C2H6 ARL 726.305 -999.990 ... v1 2008 10 21 12 07 00 71.3200 -156.6000 16.00 11.00 5.00 258116 BRW 2008 07 17 21 33 00 6230-66 P C2H6 ARL 713.037 -999.990 ... v1 2008 10 21 12 08 00 71.3200 -156.6000 16.00 11.00 5.00 258115 BRW 2008 07 25 18 55 00 1237-99 P C2H6 ARL 838.183 -999.990 ... v1 2009 09 16 12 01 00 71.3200 -156.6000 16.00 11.00 5.00 258567 BRW 2008 07 25 18 55 00 3297-99 P C2H6 ARL 825.366 -999.990 ... v1 2009 09 16 12 02 00 71.3200 -156.6000 16.00 11.00 5.00 258568 BRW 2008 08 01 20 20 00 1452-99 P C2H6 ARL 735.084 -999.990 ... v1 2008 12 09 00 05 00 71.3200 -156.6000 16.00 11.00 5.00 258864 BRW 2008 08 01 20 20 00 6379-66 P C2H6 ARL 746.427 -999.990 ... v1 2008 12 09 00 06 00 71.3200 -156.6000 16.00 11.00 5.00 258865 BRW 2008 08 08 19 15 00 1939-99 P C2H6 ARL 749.215 -999.990 ... v1 2008 11 04 12 01 00 71.3200 -156.6000 16.00 11.00 5.00 259503 BRW 2008 08 08 19 15 00 4299-99 P C2H6 ARL 688.273 -999.990 ... v1 2008 11 04 12 02 00 71.3200 -156.6000 16.00 11.00 5.00 259504 BRW 2008 08 14 20 00 00 1279-99 P C2H6 ARL 652.146 -999.990 ... v1 2008 12 17 12 05 00 71.3200 -156.6000 16.00 11.00 5.00 259651 BRW 2008 08 14 20 00 00 474-99 P C2H6 ARL 640.935 -999.990 ... v1 2008 12 17 12 06 00 71.3200 -156.6000 16.00 11.00 5.00 259652 BRW 2008 09 02 23 45 00 114-99 P C2H6 ARL 631.437 -999.990 P.. v1 2008 11 10 12 02 00 71.3200 -156.6000 16.00 11.00 5.00 260920 BRW 2008 09 02 23 45 00 3041-99 P C2H6 ARL 852.597 -999.990 P.. v1 2008 11 10 12 01 00 71.3200 -156.6000 16.00 11.00 5.00 260919 BRW 2008 09 30 21 05 00 3337-99 P C2H6 ARL 787.158 -999.990 ... v1 2008 12 05 00 05 00 71.3200 -156.6000 16.00 11.00 5.00 262556 BRW 2008 09 30 21 05 00 6232-66 P C2H6 ARL 815.504 -999.990 ... v1 2008 12 05 00 06 00 71.3200 -156.6000 16.00 11.00 5.00 262557 BRW 2008 10 07 20 25 00 1699-99 P C2H6 ARL 893.058 -999.990 ... v1 2008 12 05 00 07 00 71.3200 -156.6000 16.00 11.00 5.00 262554 BRW 2008 10 07 20 25 00 4629-99 P C2H6 ARL 879.005 -999.990 ... v1 2008 12 05 00 08 00 71.3200 -156.6000 16.00 11.00 5.00 262555 BRW 2008 10 10 23 15 00 1131-99 P C2H6 ARL 816.605 -999.990 ... v1 2009 04 27 12 02 00 71.3200 -156.6000 16.00 11.00 5.00 263311 BRW 2008 10 10 23 15 00 2468-99 P C2H6 ARL 820.735 -999.990 ... v1 2009 04 27 12 01 00 71.3200 -156.6000 16.00 11.00 5.00 263310 BRW 2008 10 18 00 05 00 2271-99 P C2H6 ARL 1717.402 -999.990 ... v1 2009 04 17 12 02 00 71.3200 -156.6000 16.00 11.00 5.00 263305 BRW 2008 10 18 00 05 00 4766-99 P C2H6 ARL 1768.848 -999.990 ... v1 2009 04 17 12 01 00 71.3200 -156.6000 16.00 11.00 5.00 263304 BRW 2008 10 24 21 14 00 2431-99 P C2H6 ARL 966.703 -999.990 ... v1 2009 04 17 12 04 00 71.3200 -156.6000 16.00 11.00 5.00 263303 BRW 2008 10 24 21 14 00 4957-99 P C2H6 ARL 952.953 -999.990 ... v1 2009 04 17 12 03 00 71.3200 -156.6000 16.00 11.00 5.00 263302 BRW 2008 10 31 22 07 00 4619-99 P C2H6 ARL 1157.098 -999.990 ... v1 2008 12 11 00 13 00 71.3200 -156.6000 16.00 11.00 5.00 263987 BRW 2008 10 31 22 07 00 785-99 P C2H6 ARL 1180.504 -999.990 ... v1 2008 12 11 00 14 00 71.3200 -156.6000 16.00 11.00 5.00 263988 BRW 2008 11 07 21 45 00 1631-99 P C2H6 ARL 1178.093 -999.990 ... v1 2008 12 22 00 10 00 71.3200 -156.6000 16.00 11.00 5.00 264300 BRW 2008 11 07 21 45 00 333-99 P C2H6 ARL 1351.139 -999.990 ... v1 2008 12 22 00 09 00 71.3200 -156.6000 16.00 11.00 5.00 264299 BRW 2008 11 14 22 43 00 1531-99 P C2H6 ARL 1248.305 -999.990 ... v1 2009 09 10 00 07 00 71.3200 -156.6000 16.00 11.00 5.00 264722 BRW 2008 11 14 22 43 00 4797-99 P C2H6 ARL 1246.854 -999.990 ... v1 2009 09 10 00 08 00 71.3200 -156.6000 16.00 11.00 5.00 264723 BRW 2008 11 22 22 24 00 3978-99 P C2H6 ARL 1853.046 -999.990 ... v1 2008 12 22 12 08 00 71.3200 -156.6000 16.00 11.00 5.00 265097 BRW 2008 11 22 22 24 00 4116-99 P C2H6 ARL 1973.105 -999.990 ... v1 2008 12 22 12 07 00 71.3200 -156.6000 16.00 11.00 5.00 265098 BRW 2008 12 01 22 30 00 107-99 P C2H6 ARL 1737.202 -999.990 ... v1 2009 01 14 12 01 00 71.3200 -156.6000 16.00 11.00 5.00 265541 BRW 2008 12 01 22 30 00 1392-99 P C2H6 ARL 1602.690 -999.990 ... v1 2009 01 14 12 02 00 71.3200 -156.6000 16.00 11.00 5.00 265542 BRW 2008 12 05 21 36 00 2721-99 P C2H6 ARL 1386.043 -999.990 ... v1 2008 12 30 00 10 00 71.3200 -156.6000 16.00 11.00 5.00 266041 BRW 2008 12 05 21 36 00 4551-99 P C2H6 ARL 1538.369 -999.990 ... v1 2008 12 30 00 09 00 71.3200 -156.6000 16.00 11.00 5.00 266042 BRW 2008 12 11 21 30 00 2178-99 P C2H6 ARL 1683.512 -999.990 ... v1 2009 01 21 12 03 00 71.3200 -156.6000 16.00 11.00 5.00 266080 BRW 2008 12 11 21 30 00 3207-99 P C2H6 ARL 1680.226 -999.990 ... v1 2009 01 21 12 04 00 71.3200 -156.6000 16.00 11.00 5.00 266079 BRW 2008 12 17 12 34 56 2135-99 P C2H6 ARL 3415.726 -999.990 ... v1 2009 01 23 00 08 00 71.3200 -156.6000 16.00 11.00 5.00 266825 BRW 2008 12 17 12 34 56 2704-99 P C2H6 ARL 3254.238 -999.990 ... v1 2009 01 23 00 07 00 71.3200 -156.6000 16.00 11.00 5.00 266824 BRW 2008 12 28 22 54 00 1769-99 P C2H6 ARL 2486.054 -999.990 ... v1 2009 04 20 00 03 00 71.3200 -156.6000 16.00 11.00 5.00 267419 BRW 2008 12 28 22 54 00 1994-99 P C2H6 ARL 2430.662 -999.990 ... v1 2009 04 20 00 04 00 71.3200 -156.6000 16.00 11.00 5.00 267418 BRW 2009 01 02 22 28 00 2606-99 P C2H6 ARL 2023.958 -999.990 ... v1 2009 04 27 12 06 00 71.3200 -156.6000 16.00 11.00 5.00 267615 BRW 2009 01 02 22 28 00 541-99 P C2H6 ARL 2017.365 -999.990 ... v1 2009 04 27 12 05 00 71.3200 -156.6000 16.00 11.00 5.00 267614 BRW 2009 01 09 22 41 00 2625-99 P C2H6 ARL 2520.988 -999.990 ... v1 2009 09 16 12 03 00 71.3200 -156.6000 16.00 11.00 5.00 267970 BRW 2009 01 09 22 41 00 4564-99 P C2H6 ARL 2493.354 -999.990 ... v1 2009 09 16 12 04 00 71.3200 -156.6000 16.00 11.00 5.00 267971 BRW 2009 01 16 22 39 00 1699-99 P C2H6 ARL 2257.549 -999.990 ... v1 2009 09 25 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 269116 BRW 2009 01 16 22 39 00 6596-66 P C2H6 ARL 2261.439 -999.990 ... v1 2009 09 25 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 269117 BRW 2009 02 05 21 11 00 1998-99 P C2H6 ARL 2263.244 -999.990 ... v1 2009 09 22 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 269467 BRW 2009 02 05 21 11 00 3669-99 P C2H6 ARL 2259.049 -999.990 ... v1 2009 09 22 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 269468 BRW 2009 03 04 21 23 00 2907-99 P C2H6 ARL 2693.844 -999.990 ... v1 2009 07 20 00 07 00 71.3230 -156.6114 16.00 11.00 5.00 271910 BRW 2009 03 04 21 23 00 3257-99 P C2H6 ARL 2691.472 -999.990 ... v1 2009 07 20 00 08 00 71.3230 -156.6114 16.00 11.00 5.00 271911 BRW 2009 03 12 20 20 00 2084-99 P C2H6 ARL 2696.764 -999.990 ... v1 2009 07 13 12 03 00 71.3230 -156.6114 16.00 11.00 5.00 272405 BRW 2009 03 12 20 20 00 2393-99 P C2H6 ARL 2715.937 -999.990 ... v1 2009 07 13 12 04 00 71.3230 -156.6114 16.00 11.00 5.00 272404 BRW 2009 03 18 20 50 00 2909-99 P C2H6 ARL 2343.598 -999.990 ... v1 2009 09 24 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 272556 BRW 2009 03 18 20 50 00 3681-99 P C2H6 ARL 2337.403 -999.990 ... v1 2009 09 24 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 272555 BRW 2009 03 26 23 16 00 3044-99 P C2H6 ARL 1803.304 -999.990 ... v1 2009 05 01 12 03 00 71.3230 -156.6114 16.00 11.00 5.00 273241 BRW 2009 03 26 23 16 00 4388-99 P C2H6 ARL 1802.631 -999.990 ... v1 2009 05 01 12 04 00 71.3230 -156.6114 16.00 11.00 5.00 273242 BRW 2009 03 31 20 49 00 1553-99 P C2H6 ARL 1771.707 -999.990 ... v1 2009 09 28 12 03 00 71.3230 -156.6114 16.00 11.00 5.00 273372 BRW 2009 03 31 20 49 00 4215-99 P C2H6 ARL 1762.695 -999.990 ... v1 2009 09 28 12 04 00 71.3230 -156.6114 16.00 11.00 5.00 273373 BRW 2009 04 07 20 18 00 4027-99 P C2H6 ARL 1890.696 -999.990 ... v1 2009 06 02 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 274016 BRW 2009 04 07 20 18 00 4722-99 P C2H6 ARL 1897.575 -999.990 ... v1 2009 06 02 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 274015 BRW 2009 04 17 20 22 00 2746-99 P C2H6 ARL 1605.598 -999.990 ... v1 2009 05 29 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 274421 BRW 2009 04 17 20 22 00 4653-99 P C2H6 ARL 1604.202 -999.990 ... v1 2009 05 29 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 274420 BRW 2009 04 23 20 41 00 3041-99 P C2H6 ARL 1427.799 -999.990 ... v1 2009 06 02 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 274874 BRW 2009 04 23 20 41 00 4356-99 P C2H6 ARL 1414.229 -999.990 ... v1 2009 06 02 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 274875 BRW 2009 05 02 00 35 00 1019-99 P C2H6 ARL 1293.793 -999.990 ... v1 2009 06 23 12 04 00 71.3230 -156.6114 16.00 11.00 5.00 275813 BRW 2009 05 02 00 35 00 4392-99 P C2H6 ARL 1270.336 -999.990 ... v1 2009 06 23 12 03 00 71.3230 -156.6114 16.00 11.00 5.00 275812 BRW 2009 05 09 20 40 00 2902-99 P C2H6 ARL 1040.162 -999.990 ... v1 2009 06 23 12 01 00 71.3230 -156.6114 16.00 11.00 5.00 275798 BRW 2009 05 09 20 40 00 3643-99 P C2H6 ARL 1034.664 -999.990 ... v1 2009 06 23 12 02 00 71.3230 -156.6114 16.00 11.00 5.00 275799 BRW 2009 05 16 18 22 00 1107-99 P C2H6 ARL 1381.411 -999.990 ... v1 2009 07 21 12 05 00 71.3230 -156.6114 16.00 11.00 5.00 276322 BRW 2009 05 16 18 22 00 2349-99 P C2H6 ARL 1383.844 -999.990 ... v1 2009 07 21 12 06 00 71.3230 -156.6114 16.00 11.00 5.00 276323 BRW 2009 05 22 18 35 00 1211-99 P C2H6 ARL 1314.793 -999.990 ... v1 2009 09 22 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 276564 BRW 2009 05 22 18 35 00 3185-99 P C2H6 ARL 1318.378 -999.990 ... v1 2009 09 22 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 276565 BRW 2009 05 29 18 33 00 156-99 P C2H6 ARL 926.971 -999.990 ... v1 2009 07 21 12 03 00 71.3230 -156.6114 16.00 11.00 5.00 277080 BRW 2009 05 29 18 33 00 3035-99 P C2H6 ARL 925.925 -999.990 ... v1 2009 07 21 12 04 00 71.3230 -156.6114 16.00 11.00 5.00 277081 BRW 2009 06 03 19 25 00 413-99 P C2H6 ARL 1153.820 -999.990 ... v1 2009 07 20 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 277283 BRW 2009 06 03 19 25 00 4323-99 P C2H6 ARL 1158.163 -999.990 ... v1 2009 07 20 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 277282 BRW 2009 06 10 02 21 00 1690-99 P C2H6 ARL 944.988 -999.990 ... v1 2009 10 30 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 277619 BRW 2009 06 10 02 21 00 3734-99 P C2H6 ARL 855.113 -999.990 ... v1 2010 03 16 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 277618 BRW 2009 06 18 18 20 00 1366-99 P C2H6 ARL 875.255 -999.990 ... v1 2009 10 07 12 06 00 71.3230 -156.6114 16.00 11.00 5.00 278464 BRW 2009 06 18 18 20 00 951-99 P C2H6 ARL 878.662 -999.990 ... v1 2009 10 07 12 05 00 71.3230 -156.6114 16.00 11.00 5.00 278465 BRW 2009 06 25 18 32 00 288-99 P C2H6 ARL 838.406 -999.990 ... v1 2009 10 15 12 10 00 71.3230 -156.6114 16.00 11.00 5.00 279050 BRW 2009 06 25 18 32 00 2927-99 P C2H6 ARL 826.947 -999.990 ... v1 2009 10 15 12 09 00 71.3230 -156.6114 16.00 11.00 5.00 279049 BRW 2009 07 05 08 16 00 244-99 P C2H6 ARL 677.244 -999.990 ... v1 2009 09 22 12 01 00 71.3230 -156.6114 16.00 11.00 5.00 279903 BRW 2009 07 05 08 16 00 4133-99 P C2H6 ARL 682.963 -999.990 ... v1 2009 09 22 12 02 00 71.3230 -156.6114 16.00 11.00 5.00 279904 BRW 2009 07 12 01 53 00 3817-99 P C2H6 ARL 887.981 -999.990 ... v1 2009 10 12 00 03 00 71.3230 -156.6114 16.00 11.00 5.00 279749 BRW 2009 07 12 01 53 00 6056-66 P C2H6 ARL 910.328 -999.990 ... v1 2009 10 12 00 04 00 71.3230 -156.6114 16.00 11.00 5.00 279748 BRW 2009 07 17 18 12 00 1648-99 P C2H6 ARL 577.963 -999.990 ... v1 2009 09 22 12 04 00 71.3230 -156.6114 16.00 11.00 5.00 280545 BRW 2009 07 17 18 12 00 1711-99 P C2H6 ARL 713.122 -999.990 ... v1 2009 09 22 12 03 00 71.3230 -156.6114 16.00 11.00 5.00 280544 BRW 2009 07 28 00 30 00 1190-99 P C2H6 ARL 703.439 -999.990 ... v1 2009 09 28 12 05 00 71.3230 -156.6114 16.00 11.00 5.00 281258 BRW 2009 07 28 00 30 00 3950-99 P C2H6 ARL 712.610 -999.990 ... v1 2009 09 28 12 06 00 71.3230 -156.6114 16.00 11.00 5.00 281259 BRW 2009 08 10 19 06 00 1219-99 P C2H6 ARL 647.463 -999.990 ... v1 2009 09 10 12 02 00 71.3230 -156.6114 16.00 11.00 5.00 282620 BRW 2009 08 10 19 06 00 1363-99 P C2H6 ARL 643.573 -999.990 ... v1 2009 09 10 12 01 00 71.3230 -156.6114 16.00 11.00 5.00 282619 BRW 2009 08 16 22 41 00 114-99 P C2H6 ARL 685.037 -999.990 ... v1 2009 09 08 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 282153 BRW 2009 08 16 22 41 00 1245-99 P C2H6 ARL 702.378 -999.990 ... v1 2009 09 08 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 282154 BRW 2009 08 22 00 20 00 1613-99 P C2H6 ARL 743.616 -999.990 ... v1 2009 11 02 12 01 00 71.3230 -156.6114 16.00 11.00 5.00 282471 BRW 2009 08 22 00 20 00 1876-99 P C2H6 ARL 734.102 -999.990 ... v1 2009 11 02 12 02 00 71.3230 -156.6114 16.00 11.00 5.00 282472 BRW 2009 08 31 00 30 00 1450-99 P C2H6 ARL 689.565 -999.990 ... v1 2009 12 22 00 07 00 71.3230 -156.6114 16.00 11.00 5.00 282965 BRW 2009 08 31 00 30 00 4831-99 P C2H6 ARL -999.990 -999.990 A.. v1 2009 12 22 00 08 00 71.3230 -156.6114 16.00 11.00 5.00 282966 BRW 2009 09 07 08 20 00 3029-99 P C2H6 ARL 732.061 -999.990 ... v1 2009 09 25 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 283453 BRW 2009 09 07 08 20 00 4232-99 P C2H6 ARL 731.098 -999.990 ... v1 2009 09 25 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 283452 BRW 2009 09 11 03 51 00 2963-99 P C2H6 ARL 754.867 -999.990 ... v1 2009 12 21 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 283725 BRW 2009 09 11 03 51 00 4570-99 P C2H6 ARL 773.237 -999.990 ... v1 2009 12 21 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 283726 BRW 2009 09 18 23 43 00 2349-99 P C2H6 ARL 581.942 -999.990 ... v1 2009 11 24 12 07 00 71.3230 -156.6114 16.00 11.00 5.00 284100 BRW 2009 09 18 23 43 00 4323-99 P C2H6 ARL 732.051 -999.990 ... v1 2009 11 24 12 08 00 71.3230 -156.6114 16.00 11.00 5.00 284101 BRW 2009 09 24 18 34 00 2603-99 P C2H6 ARL 798.152 -999.990 P.. v1 2009 12 22 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 285128 BRW 2009 09 24 18 34 00 3434-99 P C2H6 ARL 634.662 -999.990 P.. v1 2009 12 22 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 285129 BRW 2009 10 09 19 43 00 4285-99 P C2H6 ARL 1551.857 -999.990 ... v1 2009 11 05 12 08 00 71.3230 -156.6114 16.00 11.00 5.00 285678 BRW 2009 10 09 19 43 00 4429-99 P C2H6 ARL 1562.209 -999.990 ... v1 2009 11 05 12 07 00 71.3230 -156.6114 16.00 11.00 5.00 285677 BRW 2009 10 19 08 33 00 2823-99 P C2H6 ARL 723.104 -999.990 ... v1 2009 12 08 00 03 00 71.3230 -156.6114 16.00 11.00 5.00 285661 BRW 2009 10 19 08 33 00 4891-99 P C2H6 ARL 728.696 -999.990 ... v1 2009 12 08 00 04 00 71.3230 -156.6114 16.00 11.00 5.00 285662 BRW 2009 10 30 23 40 00 4722-99 P C2H6 ARL 1595.254 -999.990 ... v1 2009 12 29 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 286386 BRW 2009 10 30 23 40 00 5198-99 P C2H6 ARL 1602.573 -999.990 ... v1 2009 12 29 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 286385 BRW 2009 11 02 21 33 00 1370-99 P C2H6 ARL 1056.449 -999.990 ... v1 2009 12 22 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 286387 BRW 2009 11 02 21 33 00 283-99 P C2H6 ARL 1052.065 -999.990 ... v1 2009 12 22 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 286388 BRW 2009 11 14 00 33 00 1190-99 P C2H6 ARL 392.464 -999.990 ... v1 2010 01 11 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 287114 BRW 2009 11 14 00 33 00 545-99 P C2H6 ARL 398.309 -999.990 ... v1 2010 01 11 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 287115 BRW 2009 11 22 00 22 00 4082-99 P C2H6 ARL 1195.012 -999.990 ... v1 2009 12 14 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 287577 BRW 2009 11 22 00 22 00 4745-99 P C2H6 ARL 1189.722 -999.990 ... v1 2009 12 14 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 287576 BRW 2009 11 25 23 30 00 1838-99 P C2H6 ARL 608.442 -999.990 ... v1 2010 01 11 00 04 00 71.3230 -156.6114 16.00 11.00 5.00 287898 BRW 2009 11 25 23 30 00 2991-99 P C2H6 ARL 624.179 -999.990 ... v1 2010 01 11 00 03 00 71.3230 -156.6114 16.00 11.00 5.00 287897 BRW 2009 12 05 22 22 00 3000-99 P C2H6 ARL 1740.399 -999.990 ... v1 2010 01 22 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 288324 BRW 2009 12 05 22 22 00 3637-99 P C2H6 ARL 1730.821 -999.990 ... v1 2010 01 22 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 288325 BRW 2009 12 11 23 12 00 413-99 P C2H6 ARL 1520.327 -999.990 ... v1 2010 02 11 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 288556 BRW 2009 12 11 23 12 00 4734-99 P C2H6 ARL 1508.930 -999.990 ... v1 2010 02 11 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 288557 BRW 2009 12 18 20 15 00 4163-99 P C2H6 ARL 2028.018 -999.990 ... v1 2010 02 03 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 288837 BRW 2009 12 18 20 15 00 667-99 P C2H6 ARL 1988.536 -999.990 ... v1 2010 02 03 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 288836 BRW 2009 12 23 20 25 00 4717-99 P C2H6 ARL 1904.302 -999.990 ... v1 2010 02 10 12 03 00 71.3230 -156.6114 16.00 11.00 5.00 289113 BRW 2009 12 23 20 25 00 4860-99 P C2H6 ARL 1913.525 -999.990 ... v1 2010 02 10 12 04 00 71.3230 -156.6114 16.00 11.00 5.00 289114 BRW 2010 01 04 22 30 00 1497-99 P C2H6 ARL 2196.047 -999.990 ... v1 2010 02 11 00 07 00 71.3230 -156.6114 16.00 11.00 5.00 289399 BRW 2010 01 04 22 30 00 2271-99 P C2H6 ARL 2207.016 -999.990 ... v1 2010 02 11 00 08 00 71.3230 -156.6114 16.00 11.00 5.00 289400 BRW 2010 02 09 22 34 00 4184-99 P C2H6 ARL 1944.076 -999.990 ... v1 2010 03 17 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 291424 BRW 2010 02 09 22 34 00 4215-99 P C2H6 ARL 1793.041 -999.990 ... v1 2010 03 17 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 291425 BRW 2010 02 12 19 15 00 2985-99 P C2H6 ARL 2815.935 -999.990 ... v1 2010 03 30 12 07 00 71.3230 -156.6114 16.00 11.00 5.00 291448 BRW 2010 02 12 19 15 00 6072-66 P C2H6 ARL 2634.831 -999.990 ... v1 2010 03 30 12 08 00 71.3230 -156.6114 16.00 11.00 5.00 291449 BRW 2010 03 05 21 08 00 1533-99 P C2H6 ARL 2175.924 -999.990 ... v1 2010 03 30 12 06 00 71.3230 -156.6114 16.00 11.00 5.00 292722 BRW 2010 03 05 21 08 00 412-99 P C2H6 ARL 2054.257 -999.990 ... v1 2010 03 30 12 05 00 71.3230 -156.6114 16.00 11.00 5.00 292723 BRW 2010 03 12 09 16 00 3816-99 P C2H6 ARL 4130.090 -999.990 ... v1 2010 04 14 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 292890 BRW 2010 03 12 09 16 00 950-99 P C2H6 ARL 4694.944 -999.990 ... v1 2010 04 14 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 292889 BRW 2010 03 19 18 10 00 4014-99 P C2H6 ARL -999.990 -999.990 A.. v1 2010 04 21 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 293265 BRW 2010 03 19 18 10 00 552-99 P C2H6 ARL 2033.991 -999.990 ... v1 2010 04 21 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 293264 BRW 2010 03 26 20 11 00 1690-99 P C2H6 ARL 1852.960 -999.990 ... v1 2010 05 11 00 07 00 71.3230 -156.6114 16.00 11.00 5.00 294255 BRW 2010 03 26 20 11 00 4255-99 P C2H6 ARL 1845.976 -999.990 ... v1 2010 05 11 00 08 00 71.3230 -156.6114 16.00 11.00 5.00 294256 BRW 2010 04 02 19 02 00 463-99 P C2H6 ARL 1823.094 -999.990 ... v1 2010 05 12 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 294402 BRW 2010 04 02 19 02 00 4737-99 P C2H6 ARL 1850.572 -999.990 ... v1 2010 05 12 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 294403 BRW 2010 04 09 18 32 00 2186-99 P C2H6 ARL 2016.054 -999.990 ... v1 2010 05 13 12 02 00 71.3230 -156.6114 16.00 11.00 5.00 294962 BRW 2010 04 09 18 32 00 250-99 P C2H6 ARL 2000.774 -999.990 ... v1 2010 05 13 12 01 00 71.3230 -156.6114 16.00 11.00 5.00 294961 BRW 2010 04 30 19 05 00 2100-99 P C2H6 ARL 1720.549 -999.990 ... v1 2010 07 28 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 296265 BRW 2010 04 30 19 05 00 51-99 P C2H6 ARL 1711.525 -999.990 ... v1 2010 07 28 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 296264 BRW 2010 05 14 23 05 00 2778-99 P C2H6 ARL 1093.520 -999.990 ... v1 2010 07 13 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 297646 BRW 2010 05 14 23 05 00 3524-99 P C2H6 ARL 1102.455 -999.990 ... v1 2010 07 13 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 297647 BRW 2010 05 21 20 19 00 1363-99 P C2H6 ARL 1160.303 -999.990 ... v1 2010 07 14 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 297795 BRW 2010 05 21 20 19 00 2513-99 P C2H6 ARL 1160.953 -999.990 ... v1 2010 07 14 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 297796 BRW 2010 05 28 19 18 00 3184-99 P C2H6 ARL 1044.327 -999.990 ... v1 2010 07 13 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 297651 BRW 2010 05 28 19 18 00 4877-99 P C2H6 ARL 1027.511 -999.990 ... v1 2010 07 13 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 297650 BRW 2010 06 10 23 23 00 4088-99 P C2H6 ARL 2716.278 -999.990 P.. v1 2010 07 13 12 04 00 71.3230 -156.6114 16.00 11.00 5.00 298496 BRW 2010 06 10 23 23 00 41-99 P C2H6 ARL 2193.812 -999.990 P.. v1 2010 07 13 12 03 00 71.3230 -156.6114 16.00 11.00 5.00 298497 BRW 2010 06 18 19 03 00 1040-99 P C2H6 ARL 932.948 -999.990 ... v1 2010 07 12 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 298914 BRW 2010 06 18 19 03 00 954-99 P C2H6 ARL 918.150 -999.990 ... v1 2010 07 12 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 298913 BRW 2010 07 16 20 11 00 1093-99 P C2H6 ARL 880.318 -999.990 ... v1 2010 10 22 12 05 00 71.3230 -156.6114 16.00 11.00 5.00 300510 BRW 2010 07 16 20 11 00 4400-99 P C2H6 ARL 866.102 -999.990 ... v1 2010 10 22 12 06 00 71.3230 -156.6114 16.00 11.00 5.00 300511 BRW 2010 09 03 19 08 00 2778-99 P C2H6 ARL 873.727 -999.990 ... v1 2010 10 14 00 07 00 71.3230 -156.6114 16.00 11.00 5.00 304025 BRW 2010 09 03 19 08 00 2790-99 P C2H6 ARL 862.307 -999.990 ... v1 2010 10 14 00 08 00 71.3230 -156.6114 16.00 11.00 5.00 304026 BRW 2010 09 10 20 16 00 2125-99 P C2H6 ARL 848.068 -999.990 ... v1 2010 10 18 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 304247 BRW 2010 09 10 20 16 00 797-99 P C2H6 ARL 815.761 -999.990 ... v1 2010 10 18 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 304248 BRW 2010 09 16 23 07 00 4094-99 P C2H6 ARL 896.318 -999.990 ... v1 2010 10 04 12 05 00 71.3230 -156.6114 16.00 11.00 5.00 304460 BRW 2010 09 16 23 07 00 4220-99 P C2H6 ARL 814.318 -999.990 ... v1 2010 10 04 12 06 00 71.3230 -156.6114 16.00 11.00 5.00 304461 BRW 2010 09 24 22 11 00 1870-99 P C2H6 ARL 924.898 -999.990 ... v1 2010 10 07 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 304944 BRW 2010 09 24 22 11 00 4141-99 P C2H6 ARL 842.489 -999.990 ... v1 2010 10 07 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 304945 BRW 2010 10 01 18 10 00 2264-99 P C2H6 ARL 995.261 -999.990 ... v1 2010 10 19 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 305176 BRW 2010 10 01 18 10 00 3550-99 P C2H6 ARL 937.864 -999.990 ... v1 2010 10 19 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 305177 BRW 2010 10 08 18 06 00 3821-99 P C2H6 ARL 903.216 -999.990 ... v1 2010 10 25 00 03 00 71.3230 -156.6114 16.00 11.00 5.00 305590 BRW 2010 10 08 18 06 00 4365-99 P C2H6 ARL 918.955 -999.990 ... v1 2010 10 25 00 04 00 71.3230 -156.6114 16.00 11.00 5.00 305589 BRW 2010 10 15 18 11 00 2798-99 P C2H6 ARL 979.644 -999.990 ... v1 2010 12 07 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 305835 BRW 2010 10 15 18 11 00 3323-99 P C2H6 ARL 1038.800 -999.990 ... v1 2010 12 07 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 305836 BRW 2010 10 22 18 08 00 3297-99 P C2H6 ARL 1026.444 -999.990 ... v1 2010 12 06 00 08 00 71.3230 -156.6114 16.00 11.00 5.00 307306 BRW 2010 10 22 18 08 00 53-99 P C2H6 ARL 1006.067 -999.990 ... v1 2010 12 06 00 07 00 71.3230 -156.6114 16.00 11.00 5.00 307305 BRW 2010 10 29 19 12 00 1572-99 S C2H6 ARL 1119.944 -999.990 ... v1 2010 11 23 00 10 00 71.3230 -156.6114 27.50 11.00 16.50 306780 BRW 2010 10 29 19 12 00 4009-99 S C2H6 ARL 1133.960 -999.990 ... v1 2010 11 23 00 09 00 71.3230 -156.6114 27.50 11.00 16.50 306781 BRW 2010 11 05 19 13 00 2393-99 P C2H6 ARL 1404.448 -999.990 ... v1 2011 04 01 12 05 00 71.3230 -156.6114 16.00 11.00 5.00 307377 BRW 2010 11 05 19 13 00 4908-99 P C2H6 ARL 1397.570 -999.990 ... v1 2011 04 01 12 06 00 71.3230 -156.6114 16.00 11.00 5.00 307378 BRW 2010 11 12 23 10 00 1567-99 P C2H6 ARL 1224.767 -999.990 ... v1 2010 12 22 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 308175 BRW 2010 11 12 23 10 00 4957-99 P C2H6 ARL 1218.033 -999.990 ... v1 2010 12 22 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 308176 BRW 2010 11 19 20 14 00 288-99 P C2H6 ARL 1447.967 -999.990 ... v1 2010 12 23 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 308462 BRW 2010 11 19 20 14 00 2927-99 P C2H6 ARL 1435.411 -999.990 ... v1 2010 12 23 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 308463 BRW 2010 11 26 23 57 00 2939-99 P C2H6 ARL 1459.722 -999.990 ... v1 2010 12 22 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 308938 BRW 2010 11 26 23 57 00 4614-99 P C2H6 ARL 1466.867 -999.990 ... v1 2010 12 22 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 308937 BRW 2010 12 03 22 08 00 2279-99 P C2H6 ARL 1681.494 -999.990 ... v1 2011 01 06 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 309181 BRW 2010 12 03 22 08 00 4201-99 P C2H6 ARL 1693.315 -999.990 ... v1 2011 01 06 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 309182 BRW 2010 12 10 22 10 00 1972-99 P C2H6 ARL 1626.405 -999.990 ... v1 2011 01 07 12 07 00 71.3230 -156.6114 16.00 11.00 5.00 309529 BRW 2010 12 10 22 10 00 3821-99 P C2H6 ARL 1634.663 -999.990 ... v1 2011 01 07 12 08 00 71.3230 -156.6114 16.00 11.00 5.00 309530 BRW 2010 12 17 21 14 00 1411-99 P C2H6 ARL 4130.399 -999.990 ... v1 2011 02 02 12 03 00 71.3230 -156.6114 16.00 11.00 5.00 310096 BRW 2010 12 17 21 14 00 1672-99 P C2H6 ARL 4132.124 -999.990 ... v1 2011 02 02 12 04 00 71.3230 -156.6114 16.00 11.00 5.00 310097 BRW 2010 12 22 20 10 00 1441-99 P C2H6 ARL 1912.160 -999.990 ... v1 2011 02 10 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 310114 BRW 2010 12 22 20 10 00 1915-99 P C2H6 ARL 1908.592 -999.990 ... v1 2011 02 10 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 310115 BRW 2010 12 30 20 15 00 2794-99 P C2H6 ARL 2638.000 -999.990 ... v1 2011 01 14 00 03 00 71.3230 -156.6114 16.00 11.00 5.00 310582 BRW 2010 12 30 20 15 00 424-99 P C2H6 ARL 2616.124 -999.990 ... v1 2011 01 14 00 04 00 71.3230 -156.6114 16.00 11.00 5.00 310583 BRW 2011 01 07 21 21 00 2981-99 P C2H6 ARL 855.528 -999.990 ... v1 2011 02 07 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 311067 BRW 2011 01 07 21 21 00 3348-99 P C2H6 ARL 842.559 -999.990 ... v1 2011 02 07 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 311066 BRW 2011 01 14 21 06 00 4308-99 P C2H6 ARL 2054.049 -999.990 ... v1 2011 02 11 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 311513 BRW 2011 01 14 21 06 00 5382-99 P C2H6 ARL 2055.610 -999.990 ... v1 2011 02 11 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 311512 BRW 2011 01 21 21 09 00 2567-99 P C2H6 ARL 3419.636 -999.990 ... v1 2011 02 04 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 311735 BRW 2011 01 21 21 09 00 26-99 P C2H6 ARL 3397.911 -999.990 ... v1 2011 02 04 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 311736 BRW 2011 01 28 20 09 00 1017-99 P C2H6 ARL 2204.941 -999.990 ... v1 2011 02 17 00 08 00 71.3230 -156.6114 16.00 11.00 5.00 312193 BRW 2011 01 28 20 09 00 928-99 P C2H6 ARL 2219.237 -999.990 ... v1 2011 02 17 00 07 00 71.3230 -156.6114 16.00 11.00 5.00 312192 BRW 2011 02 04 19 21 00 1371-99 P C2H6 ARL 2167.035 -999.990 ... v1 2011 03 10 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 312543 BRW 2011 02 04 19 21 00 4280-99 P C2H6 ARL 2170.395 -999.990 ... v1 2011 03 10 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 312544 BRW 2011 02 11 20 10 00 288-99 P C2H6 ARL 2067.919 -999.990 ... v1 2011 03 09 12 07 00 71.3230 -156.6114 16.00 11.00 5.00 312894 BRW 2011 02 11 20 10 00 2927-99 P C2H6 ARL 2067.837 -999.990 ... v1 2011 03 09 12 08 00 71.3230 -156.6114 16.00 11.00 5.00 312895 BRW 2011 02 21 19 07 00 2272-99 P C2H6 ARL 2277.372 -999.990 ... v1 2011 03 17 00 03 00 71.3230 -156.6114 16.00 11.00 5.00 313674 BRW 2011 02 21 19 07 00 51-99 P C2H6 ARL 2272.488 -999.990 ... v1 2011 03 17 00 04 00 71.3230 -156.6114 16.00 11.00 5.00 313673 BRW 2011 02 28 21 12 00 107-99 P C2H6 ARL 2198.593 -999.990 ... v1 2011 03 30 12 01 00 71.3230 -156.6114 16.00 11.00 5.00 313955 BRW 2011 02 28 21 12 00 1211-99 P C2H6 ARL 2147.826 -999.990 ... v1 2011 03 30 12 02 00 71.3230 -156.6114 16.00 11.00 5.00 313956 BRW 2011 03 04 19 26 00 1118-99 P C2H6 ARL 2461.640 -999.990 ... v1 2011 03 30 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 313953 BRW 2011 03 04 19 26 00 2746-99 P C2H6 ARL 2442.221 -999.990 ... v1 2011 03 30 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 313954 BRW 2011 03 10 20 12 00 1656-99 P C2H6 ARL 2002.116 -999.990 ... v1 2011 03 29 12 02 00 71.3230 -156.6114 16.00 11.00 5.00 314321 BRW 2011 03 10 20 12 00 557-99 P C2H6 ARL 1995.430 -999.990 ... v1 2011 03 29 12 01 00 71.3230 -156.6114 16.00 11.00 5.00 314322 BRW 2011 03 18 18 11 00 249-99 P C2H6 ARL 2000.035 -999.990 ... v1 2011 04 06 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 314805 BRW 2011 03 18 18 11 00 934-99 P C2H6 ARL 1999.824 -999.990 ... v1 2011 04 06 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 314804 BRW 2011 03 24 19 07 00 4184-99 P C2H6 ARL 1693.897 -999.990 ... v1 2011 04 11 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 315134 BRW 2011 03 24 19 07 00 4321-99 P C2H6 ARL 1676.984 -999.990 ... v1 2011 04 11 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 315133 BRW 2011 04 01 19 07 00 1711-99 P C2H6 ARL 1995.059 -999.990 ... v1 2011 04 25 00 03 00 71.3230 -156.6114 16.00 11.00 5.00 315772 BRW 2011 04 01 19 07 00 3319-99 P C2H6 ARL 1941.456 -999.990 ... v1 2011 04 25 00 04 00 71.3230 -156.6114 16.00 11.00 5.00 315771 BRW 2011 04 07 20 03 00 1408-99 P C2H6 ARL 1283.322 -999.990 ... v1 2011 04 26 00 07 00 71.3230 -156.6114 16.00 11.00 5.00 315770 BRW 2011 04 07 20 03 00 1855-99 P C2H6 ARL 1290.974 -999.990 ... v1 2011 04 26 00 08 00 71.3230 -156.6114 16.00 11.00 5.00 315769 BRW 2011 04 15 00 09 00 3009-99 P C2H6 ARL 1855.738 -999.990 ... v1 2011 08 11 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 316163 BRW 2011 04 15 00 09 00 4171-99 P C2H6 ARL 1810.786 -999.990 ... v1 2011 08 11 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 316162 BRW 2011 04 21 22 12 00 1410-99 P C2H6 ARL 1025.664 -999.990 ... v1 2011 06 07 00 08 00 71.3230 -156.6114 16.00 11.00 5.00 317049 BRW 2011 04 21 22 12 00 2960-99 P C2H6 ARL 1019.905 -999.990 ... v1 2011 06 07 00 07 00 71.3230 -156.6114 16.00 11.00 5.00 317048 BRW 2011 04 26 18 07 00 1336-99 P C2H6 ARL 877.967 -999.990 ... v1 2011 07 13 00 03 00 71.3230 -156.6114 16.00 11.00 5.00 317094 BRW 2011 04 26 18 07 00 3041-99 P C2H6 ARL 898.773 -999.990 ... v1 2011 07 13 00 04 00 71.3230 -156.6114 16.00 11.00 5.00 317095 BRW 2011 05 05 18 18 00 2825-99 P C2H6 ARL 1299.801 -999.990 ... v1 2011 06 10 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 317682 BRW 2011 05 05 18 18 00 4106-99 P C2H6 ARL 1368.072 -999.990 ... v1 2011 06 10 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 317681 BRW 2011 05 10 20 17 00 4715-99 P C2H6 ARL 1114.264 -999.990 ... v1 2011 07 26 12 03 00 71.3230 -156.6114 16.00 11.00 5.00 317875 BRW 2011 05 10 20 17 00 4885-99 P C2H6 ARL 1100.701 -999.990 ... v1 2011 07 26 12 04 00 71.3230 -156.6114 16.00 11.00 5.00 317876 BRW 2011 05 18 19 17 00 6528-66 P C2H6 ARL 985.654 -999.990 ... v1 2011 06 10 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 318405 BRW 2011 05 18 19 17 00 687-99 P C2H6 ARL 975.339 -999.990 ... v1 2011 06 10 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 318406 BRW 2011 05 25 18 12 00 2383-99 P C2H6 ARL 989.159 -999.990 ... v1 2011 06 23 12 05 00 71.3230 -156.6114 16.00 11.00 5.00 318520 BRW 2011 05 25 18 12 00 4528-99 P C2H6 ARL 999.649 -999.990 ... v1 2011 06 23 12 06 00 71.3230 -156.6114 16.00 11.00 5.00 318521 BRW 2011 05 31 20 16 00 21-99 P C2H6 ARL 1073.528 -999.990 ... v1 2011 07 26 12 01 00 71.3230 -156.6114 16.00 11.00 5.00 318864 BRW 2011 05 31 20 16 00 5216-99 P C2H6 ARL 1078.388 -999.990 ... v1 2011 07 26 12 02 00 71.3230 -156.6114 16.00 11.00 5.00 318865 BRW 2011 06 06 19 10 00 1212-99 P C2H6 ARL 905.631 -999.990 ... v1 2011 07 29 12 02 00 71.3230 -156.6114 16.00 11.00 5.00 319111 BRW 2011 06 06 19 10 00 411-99 P C2H6 ARL 914.054 -999.990 ... v1 2011 07 29 12 01 00 71.3230 -156.6114 16.00 11.00 5.00 319110 BRW 2011 06 13 19 06 00 2181-99 P C2H6 ARL 892.196 -999.990 ... v1 2011 07 14 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 319532 BRW 2011 06 13 19 06 00 4509-99 P C2H6 ARL 892.290 -999.990 ... v1 2011 07 14 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 319533 BRW 2011 06 20 20 10 00 1279-99 P C2H6 ARL 858.563 -999.990 ... v1 2011 07 22 12 01 00 71.3230 -156.6114 16.00 11.00 5.00 319801 BRW 2011 06 20 20 10 00 1496-99 P C2H6 ARL 867.839 -999.990 ... v1 2011 07 22 12 02 00 71.3230 -156.6114 16.00 11.00 5.00 319800 BRW 2011 06 27 19 12 00 1181-99 P C2H6 ARL 728.143 -999.990 ... v1 2011 07 19 12 05 00 71.3230 -156.6114 16.00 11.00 5.00 320201 BRW 2011 06 27 19 12 00 1975-99 P C2H6 ARL 754.019 -999.990 ... v1 2011 07 19 12 06 00 71.3230 -156.6114 16.00 11.00 5.00 320202 BRW 2011 07 08 17 15 00 2746-99 P C2H6 ARL 747.891 -999.990 ... v1 2011 09 19 00 04 00 71.3230 -156.6114 16.00 11.00 5.00 320967 BRW 2011 07 08 17 15 00 667-99 P C2H6 ARL 754.775 -999.990 ... v1 2011 09 19 00 03 00 71.3230 -156.6114 16.00 11.00 5.00 320966 BRW 2011 07 13 22 00 00 1153-99 P C2H6 ARL 668.128 -999.990 ... v1 2011 09 13 12 05 00 71.3230 -156.6114 16.00 11.00 5.00 321422 BRW 2011 07 13 22 00 00 5054-99 P C2H6 ARL 667.441 -999.990 ... v1 2011 09 13 12 06 00 71.3230 -156.6114 16.00 11.00 5.00 321423 BRW 2011 07 24 05 16 00 2907-99 P C2H6 ARL 623.235 -999.990 ... v1 2011 09 14 12 02 00 71.3230 -156.6114 16.00 11.00 5.00 321929 BRW 2011 07 24 05 16 00 54-99 P C2H6 ARL 632.796 -999.990 ... v1 2011 09 14 12 01 00 71.3230 -156.6114 16.00 11.00 5.00 321930 BRW 2011 07 26 23 12 00 2825-99 P C2H6 ARL 588.643 -999.990 ... v1 2011 08 22 12 07 00 71.3230 -156.6114 16.00 11.00 5.00 321715 BRW 2011 07 26 23 12 00 4106-99 P C2H6 ARL 584.905 -999.990 ... v1 2011 08 22 12 08 00 71.3230 -156.6114 16.00 11.00 5.00 321714 BRW 2011 08 01 19 17 00 2446-99 P C2H6 ARL 592.251 -999.990 ... v1 2011 09 09 00 03 00 71.3230 -156.6114 16.00 11.00 5.00 322046 BRW 2011 08 01 19 17 00 4542-99 P C2H6 ARL 599.881 -999.990 ... v1 2011 09 09 00 04 00 71.3230 -156.6114 16.00 11.00 5.00 322047 BRW 2011 08 10 00 14 00 1828-99 P C2H6 ARL 734.976 -999.990 ... v1 2011 09 23 00 03 00 71.3230 -156.6114 16.00 11.00 5.00 322975 BRW 2011 08 10 00 14 00 3173-99 P C2H6 ARL 729.194 -999.990 ... v1 2011 09 23 00 04 00 71.3230 -156.6114 16.00 11.00 5.00 322976 BRW 2011 08 15 19 12 00 235-99 P C2H6 ARL 578.471 -999.990 ... v1 2011 09 14 12 03 00 71.3230 -156.6114 16.00 11.00 5.00 322569 BRW 2011 08 15 19 12 00 2534-99 P C2H6 ARL 585.178 -999.990 ... v1 2011 09 14 12 04 00 71.3230 -156.6114 16.00 11.00 5.00 322570 BRW 2011 08 23 23 05 00 1038-99 P C2H6 ARL 552.263 -999.990 ... v1 2011 09 23 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 322972 BRW 2011 08 23 23 05 00 606-99 P C2H6 ARL 557.891 -999.990 ... v1 2011 09 23 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 322971 BRW 2011 08 30 18 16 00 1212-99 P C2H6 ARL 705.142 -999.990 ... v1 2011 09 26 12 02 00 71.3230 -156.6114 16.00 11.00 5.00 323200 BRW 2011 08 30 18 16 00 411-99 P C2H6 ARL 702.512 -999.990 ... v1 2011 09 26 12 01 00 71.3230 -156.6114 16.00 11.00 5.00 323199 BRW 2011 09 10 00 08 00 1869-99 P C2H6 ARL 675.592 -999.990 ... v1 2011 10 16 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 323972 BRW 2011 09 10 00 08 00 4958-99 P C2H6 ARL 617.654 -999.990 ... v1 2011 10 16 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 323973 BRW 2011 09 13 18 10 00 1189-99 P C2H6 ARL 917.607 -999.990 ... v1 2012 01 12 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 324076 BRW 2011 09 13 18 10 00 184-99 P C2H6 ARL 913.093 -999.990 ... v1 2012 01 12 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 324075 BRW 2011 09 19 18 08 00 2100-99 P C2H6 ARL 860.972 -999.990 ... v1 2011 10 17 00 07 00 71.3230 -156.6114 16.00 11.00 5.00 324359 BRW 2011 09 19 18 08 00 4509-99 P C2H6 ARL 863.104 -999.990 ... v1 2011 10 17 00 08 00 71.3230 -156.6114 16.00 11.00 5.00 324360 BRW 2011 09 26 23 06 00 311-99 P C2H6 ARL 771.161 -999.990 ... v1 2011 10 28 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 324734 BRW 2011 09 26 23 06 00 663-99 P C2H6 ARL 800.592 -999.990 ... v1 2011 10 28 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 324735 BRW 2011 10 04 19 06 00 2694-99 P C2H6 ARL 801.780 -999.990 ... v1 2012 04 21 00 07 00 71.3230 -156.6114 16.00 11.00 5.00 325101 BRW 2011 10 13 19 06 00 1069-99 P C2H6 ARL 994.388 -999.990 ... v1 2011 12 09 12 01 00 71.3230 -156.6114 16.00 11.00 5.00 325810 BRW 2011 10 13 19 06 00 3967-99 P C2H6 ARL 986.526 -999.990 ... v1 2011 12 09 12 02 00 71.3230 -156.6114 16.00 11.00 5.00 325811 BRW 2011 10 17 21 19 00 4508-99 P C2H6 ARL 884.822 -999.990 ... v1 2011 12 12 00 08 00 71.3230 -156.6114 16.00 11.00 5.00 325887 BRW 2011 10 17 21 19 00 4690-99 P C2H6 ARL 884.744 -999.990 ... v1 2011 12 12 00 07 00 71.3230 -156.6114 16.00 11.00 5.00 325886 BRW 2011 10 26 20 17 00 1302-99 P C2H6 ARL 1009.413 -999.990 ... v1 2012 01 05 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 326190 BRW 2011 10 26 20 17 00 1305-99 P C2H6 ARL 1013.770 -999.990 ... v1 2012 01 05 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 326191 BRW 2011 11 04 19 18 00 2584-99 P C2H6 ARL 1127.540 -999.990 ... v1 2012 01 15 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 327198 BRW 2011 11 04 19 18 00 499-99 P C2H6 ARL 1126.411 -999.990 ... v1 2012 01 15 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 327197 BRW 2011 11 08 00 16 00 2746-99 P C2H6 ARL 1144.042 -999.990 ... v1 2011 12 12 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 327046 BRW 2011 11 08 00 16 00 4236-99 P C2H6 ARL 1153.541 -999.990 ... v1 2011 12 12 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 327047 BRW 2011 11 18 20 08 00 1392-99 P C2H6 ARL 1370.334 -999.990 ... v1 2011 12 14 12 05 00 71.3230 -156.6114 16.00 11.00 5.00 327205 BRW 2011 11 18 20 08 00 6051-66 P C2H6 ARL 1359.154 -999.990 ... v1 2011 12 14 12 06 00 71.3230 -156.6114 16.00 11.00 5.00 327206 BRW 2011 11 23 00 33 00 1211-99 P C2H6 ARL 1928.894 -999.990 ... v1 2012 01 12 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 327769 BRW 2011 11 23 00 33 00 2300-99 P C2H6 ARL 1935.666 -999.990 ... v1 2012 01 12 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 327770 BRW 2011 11 28 20 08 00 2974-99 P C2H6 ARL -999.990 -999.990 A.. v1 2012 02 19 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 327872 BRW 2011 11 28 20 08 00 4331-99 P C2H6 ARL 1619.313 -999.990 ... v1 2012 02 19 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 327873 BRW 2011 12 07 19 17 00 501-99 P C2H6 ARL 1795.368 -999.990 ... v1 2012 05 04 12 03 00 71.3230 -156.6114 16.00 11.00 5.00 328338 BRW 2011 12 07 19 17 00 968-99 P C2H6 ARL 1791.804 -999.990 ... v1 2012 05 04 12 04 00 71.3230 -156.6114 16.00 11.00 5.00 328337 BRW 2011 12 13 21 42 00 2036-99 P C2H6 ARL -999.990 -999.990 D.. v1 2012 05 29 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 328637 BRW 2011 12 13 21 42 00 5141-99 P C2H6 ARL 1769.287 -999.990 ... v1 2012 05 29 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 328638 BRW 2011 12 20 00 15 00 1363-99 P C2H6 ARL 2159.674 -999.990 ... v1 2012 03 23 12 05 00 71.3230 -156.6114 16.00 11.00 5.00 328745 BRW 2011 12 20 00 15 00 4307-99 P C2H6 ARL 2159.456 -999.990 ... v1 2012 03 23 12 06 00 71.3230 -156.6114 16.00 11.00 5.00 328746 BRW 2011 12 27 19 13 00 4507-99 P C2H6 ARL 2085.455 -999.990 ... v1 2012 02 21 00 04 00 71.3230 -156.6114 16.00 11.00 5.00 328906 BRW 2011 12 27 19 13 00 965-99 P C2H6 ARL 2098.758 -999.990 ... v1 2012 02 21 00 03 00 71.3230 -156.6114 16.00 11.00 5.00 328905 BRW 2012 01 03 19 19 00 2054-99 P C2H6 ARL 2182.550 -999.990 ... v1 2012 02 28 00 04 00 71.3230 -156.6114 16.00 11.00 5.00 329316 BRW 2012 01 03 19 19 00 786-99 P C2H6 ARL 2200.311 -999.990 ... v1 2012 02 28 00 03 00 71.3230 -156.6114 16.00 11.00 5.00 329315 BRW 2012 01 11 19 10 00 1102-99 P C2H6 ARL 2000.725 -999.990 ... v1 2012 04 10 12 07 00 71.3230 -156.6114 16.00 11.00 5.00 329702 BRW 2012 01 11 19 10 00 2130-99 P C2H6 ARL 2007.956 -999.990 ... v1 2012 04 10 12 08 00 71.3230 -156.6114 16.00 11.00 5.00 329703 BRW 2012 01 20 20 18 00 2625-99 P C2H6 ARL 1954.440 -999.990 ... v1 2012 04 11 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 330204 BRW 2012 01 20 20 18 00 506-99 P C2H6 ARL 1944.143 -999.990 ... v1 2012 04 11 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 330203 BRW 2012 01 31 21 11 00 4232-99 P C2H6 ARL 2288.118 -999.990 ... v1 2012 05 03 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 331144 BRW 2012 01 31 21 11 00 4429-99 P C2H6 ARL 2288.530 -999.990 ... v1 2012 05 03 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 331145 BRW 2012 02 06 23 15 00 4193-99 P C2H6 ARL 2444.811 -999.990 ... v1 2012 05 21 00 08 00 71.3230 -156.6114 16.00 11.00 5.00 331312 BRW 2012 02 06 23 15 00 882-99 P C2H6 ARL 2443.485 -999.990 ... v1 2012 05 21 00 07 00 71.3230 -156.6114 16.00 11.00 5.00 331311 BRW 2012 02 13 21 18 00 3154-99 P C2H6 ARL 1981.978 -999.990 ... v1 2012 03 12 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 331785 BRW 2012 02 13 21 18 00 4541-99 P C2H6 ARL 1993.848 -999.990 ... v1 2012 03 12 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 331784 BRW 2012 02 21 23 15 00 1870-99 P C2H6 ARL 2323.964 -999.990 ... v1 2012 05 22 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 332132 BRW 2012 02 21 23 15 00 625-99 P C2H6 ARL 2347.751 -999.990 ... v1 2012 05 22 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 332131 BRW 2012 03 01 21 15 00 265-99 P C2H6 ARL 2172.044 -999.990 ... v1 2012 04 16 12 03 00 71.3230 -156.6114 16.00 11.00 5.00 333030 BRW 2012 03 01 21 15 00 3094-99 P C2H6 ARL 2176.176 -999.990 ... v1 2012 04 16 12 04 00 71.3230 -156.6114 16.00 11.00 5.00 333031 BRW 2012 03 09 22 18 00 3028-99 P C2H6 ARL 1906.923 -999.990 ... v1 2012 04 20 00 04 00 71.3230 -156.6114 16.00 11.00 5.00 333296 BRW 2012 03 09 22 18 00 583-99 P C2H6 ARL 1905.187 -999.990 ... v1 2012 04 20 00 03 00 71.3230 -156.6114 16.00 11.00 5.00 333297 BRW 2012 03 12 20 12 00 2836-99 P C2H6 ARL 2099.758 -999.990 ... v1 2012 04 06 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 333026 BRW 2012 03 12 20 12 00 770-99 P C2H6 ARL 2099.428 -999.990 ... v1 2012 04 06 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 333027 BRW 2012 03 21 18 16 00 1586-99 P C2H6 ARL 2071.417 -999.990 ... v1 2012 04 20 12 07 00 71.3230 -156.6114 16.00 11.00 5.00 333301 BRW 2012 03 21 18 16 00 5105-99 P C2H6 ARL 2065.374 -999.990 ... v1 2012 04 20 12 08 00 71.3230 -156.6114 16.00 11.00 5.00 333300 BRW 2012 03 26 12 34 56 3876-99 P C2H6 ARL 1829.009 -999.990 ... v1 2012 05 10 00 03 00 71.3230 -156.6114 16.00 11.00 5.00 333800 BRW 2012 03 26 12 34 56 4400-99 P C2H6 ARL 1831.570 -999.990 ... v1 2012 05 10 00 04 00 71.3230 -156.6114 16.00 11.00 5.00 333799 BRW 2012 04 02 22 17 00 3661-99 P C2H6 ARL 1804.846 -999.990 ... v1 2012 04 25 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 334016 BRW 2012 04 02 22 17 00 894-99 P C2H6 ARL 1765.297 -999.990 ... v1 2012 04 25 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 334015 BRW 2012 04 09 19 15 00 1878-99 P C2H6 ARL 1549.131 -999.990 ... v1 2012 05 20 00 07 00 71.3230 -156.6114 16.00 11.00 5.00 334303 BRW 2012 04 09 19 15 00 2909-99 P C2H6 ARL 1569.354 -999.990 ... v1 2012 05 20 00 08 00 71.3230 -156.6114 16.00 11.00 5.00 334304 BRW 2012 04 17 18 11 00 6113-66 P C2H6 ARL 1618.085 -999.990 ... v1 2012 05 22 12 05 00 71.3230 -156.6114 16.00 11.00 5.00 334791 BRW 2012 04 17 18 11 00 6413-66 P C2H6 ARL 1628.196 -999.990 ... v1 2012 05 22 12 06 00 71.3230 -156.6114 16.00 11.00 5.00 334792 BRW 2012 05 02 18 15 00 1505-99 P C2H6 ARL 949.866 -999.990 ... v1 2012 06 19 00 04 00 71.3230 -156.6114 16.00 11.00 5.00 335270 BRW 2012 05 02 18 15 00 1681-99 P C2H6 ARL 952.762 -999.990 ... v1 2012 06 19 00 03 00 71.3230 -156.6114 16.00 11.00 5.00 335269 BRW 2012 05 07 19 16 00 1137-99 P C2H6 ARL 1006.158 -999.990 ... v1 2012 06 19 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 335506 BRW 2012 05 07 19 16 00 167-99 P C2H6 ARL 1019.554 -999.990 ... v1 2012 06 19 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 335505 BRW 2012 05 18 19 13 00 4860-99 P C2H6 ARL 1375.612 -999.990 ... v1 2012 06 15 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 335861 BRW 2012 05 18 19 13 00 5278-99 P C2H6 ARL 1331.347 -999.990 ... v1 2012 06 15 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 335862 BRW 2012 05 21 20 09 00 2481-99 P C2H6 ARL 1241.960 -999.990 ... v1 2012 06 17 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 336025 BRW 2012 05 28 19 16 00 1786-99 P C2H6 ARL 1022.561 -999.990 ... v1 2012 06 19 12 01 00 71.3230 -156.6114 16.00 11.00 5.00 336681 BRW 2012 05 28 19 16 00 4775-99 P C2H6 ARL 1007.773 -999.990 ... v1 2012 06 19 12 02 00 71.3230 -156.6114 16.00 11.00 5.00 336682 BRW 2012 06 11 19 16 00 807-99 P C2H6 ARL 886.067 -999.990 ... v1 2012 08 02 12 08 00 71.3230 -156.6114 16.00 11.00 5.00 337260 BRW 2012 06 11 19 16 00 929-99 P C2H6 ARL 896.832 -999.990 ... v1 2012 08 02 12 07 00 71.3230 -156.6114 16.00 11.00 5.00 337259 BRW 2012 06 18 18 17 00 2300-99 P C2H6 ARL 926.484 -999.990 ... v1 2012 12 23 12 03 00 71.3230 -156.6114 16.00 11.00 5.00 337661 BRW 2012 06 18 18 17 00 3075-99 P C2H6 ARL 911.868 -999.990 ... v1 2012 12 23 12 04 00 71.3230 -156.6114 16.00 11.00 5.00 337662 BRW 2012 06 27 22 17 00 3445-99 S C2H6 ARL 782.168 -999.990 ... v1 2012 08 08 12 01 00 71.3230 -156.6114 27.50 11.00 16.50 338181 BRW 2012 06 27 22 17 00 5161-99 S C2H6 ARL 776.640 -999.990 ... v1 2012 08 08 12 02 00 71.3230 -156.6114 27.50 11.00 16.50 338182 BRW 2012 06 27 22 20 00 3785-99 P C2H6 ARL 780.964 -999.990 ... v1 2012 07 28 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 338184 BRW 2012 06 27 22 20 00 4866-99 P C2H6 ARL 758.632 -999.990 ... v1 2012 07 28 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 338183 BRW 2012 07 03 00 08 00 1518-99 P C2H6 ARL 836.202 -999.990 ... v1 2012 08 14 12 04 00 71.3230 -156.6114 16.00 11.00 5.00 338383 BRW 2012 07 03 00 08 00 4595-99 P C2H6 ARL 884.506 -999.990 ... v1 2012 08 14 12 03 00 71.3230 -156.6114 16.00 11.00 5.00 338382 BRW 2012 07 09 19 19 00 1641-99 P C2H6 ARL 732.308 -999.990 ... v1 2012 12 28 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 339179 BRW 2012 07 09 19 19 00 623-99 P C2H6 ARL 729.516 -999.990 ... v1 2012 12 28 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 339178 BRW 2012 07 20 00 12 00 1645-99 P C2H6 ARL 700.090 -999.990 ... v1 2012 08 09 00 07 00 71.3230 -156.6114 16.00 11.00 5.00 338861 BRW 2012 07 20 00 12 00 5262-99 P C2H6 ARL 690.899 -999.990 ... v1 2012 08 09 00 08 00 71.3230 -156.6114 16.00 11.00 5.00 338862 BRW 2012 07 25 19 21 00 273-99 P C2H6 ARL 825.626 -999.990 ... v1 2012 12 28 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 339181 BRW 2012 07 25 19 21 00 4929-99 P C2H6 ARL 820.484 -999.990 ... v1 2012 12 28 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 339180 BRW 2012 08 01 18 12 00 1860-99 P C2H6 ARL 704.832 -999.990 ... v1 2012 11 12 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 339506 BRW 2012 08 01 18 12 00 4382-99 P C2H6 ARL 698.434 -999.990 ... v1 2012 11 12 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 339507 BRW 2012 08 10 19 09 00 2103-99 P C2H6 ARL 673.893 -999.990 ... v1 2012 10 30 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 339804 BRW 2012 08 10 19 09 00 4407-99 P C2H6 ARL 672.610 -999.990 ... v1 2012 10 30 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 339805 BRW 2012 08 23 20 22 00 3497-99 P C2H6 ARL 2242.615 -999.990 ... v1 2012 12 28 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 340443 BRW 2012 08 23 20 22 00 4034-99 P C2H6 ARL 2235.011 -999.990 ... v1 2012 12 28 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 340442 BRW 2012 08 30 22 11 00 5188-99 P C2H6 ARL 889.597 -999.990 ... v1 2012 11 17 00 07 00 71.3230 -156.6114 16.00 11.00 5.00 340831 BRW 2012 08 30 22 11 00 5408-99 P C2H6 ARL 891.409 -999.990 ... v1 2012 11 17 00 08 00 71.3230 -156.6114 16.00 11.00 5.00 340830 BRW 2012 09 10 23 15 00 455-99 P C2H6 ARL 964.496 -999.990 ... v1 2012 10 04 00 03 00 71.3230 -156.6114 16.00 11.00 5.00 341358 BRW 2012 09 10 23 15 00 4756-99 P C2H6 ARL 940.099 -999.990 ... v1 2012 10 04 00 04 00 71.3230 -156.6114 16.00 11.00 5.00 341359 BRW 2012 09 28 19 10 00 1246-99 P C2H6 ARL 1076.040 -999.990 ... v1 2012 11 01 12 07 00 71.3230 -156.6114 16.00 11.00 5.00 342217 BRW 2012 09 28 19 10 00 3289-99 P C2H6 ARL 1087.215 -999.990 ... v1 2012 11 01 12 08 00 71.3230 -156.6114 16.00 11.00 5.00 342218 BRW 2012 10 04 18 11 00 3153-99 P C2H6 ARL 1129.911 -999.990 ... v1 2012 11 01 12 01 00 71.3230 -156.6114 16.00 11.00 5.00 342511 BRW 2012 10 04 18 11 00 4717-99 P C2H6 ARL 1124.978 -999.990 ... v1 2012 11 01 12 02 00 71.3230 -156.6114 16.00 11.00 5.00 342510 BRW 2012 10 12 19 05 00 1414-99 P C2H6 ARL 1009.978 -999.990 ... v1 2012 12 03 00 07 00 71.3230 -156.6114 16.00 11.00 5.00 342734 BRW 2012 10 12 19 05 00 4905-99 P C2H6 ARL 1006.890 -999.990 ... v1 2012 12 03 00 08 00 71.3230 -156.6114 16.00 11.00 5.00 342735 BRW 2012 10 19 19 11 00 3670-99 P C2H6 ARL 1145.157 -999.990 ... v1 2012 11 07 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 343153 BRW 2012 10 19 19 11 00 4356-99 P C2H6 ARL 1134.161 -999.990 ... v1 2012 11 07 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 343154 BRW 2012 10 26 18 10 00 439-99 P C2H6 ARL 1222.879 -999.990 ... v1 2012 12 25 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 343512 BRW 2012 10 26 18 10 00 4689-99 P C2H6 ARL 1223.978 -999.990 ... v1 2012 12 25 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 343513 BRW 2012 11 09 19 09 00 2468-99 P C2H6 ARL 1641.033 -999.990 ... v1 2012 12 28 00 07 00 71.3230 -156.6114 16.00 11.00 5.00 343895 BRW 2012 11 09 19 09 00 4875-99 P C2H6 ARL 1636.857 -999.990 ... v1 2012 12 28 00 08 00 71.3230 -156.6114 16.00 11.00 5.00 343896 BRW 2012 11 16 19 09 00 3296-99 P C2H6 ARL 1567.835 -999.990 ... v1 2012 12 13 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 344402 BRW 2012 11 16 19 09 00 4833-99 P C2H6 ARL 1562.374 -999.990 ... v1 2012 12 13 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 344403 BRW 2012 11 22 20 01 00 4111-99 P C2H6 ARL 1573.632 -999.990 ... v1 2013 01 01 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 344774 BRW 2012 11 22 20 01 00 4159-99 P C2H6 ARL 1579.847 -999.990 ... v1 2013 01 01 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 344775 BRW 2012 11 26 20 31 00 3277-99 P C2H6 ARL 1533.401 -999.990 ... v1 2013 03 13 00 07 00 71.3230 -156.6114 16.00 11.00 5.00 344872 BRW 2012 11 26 20 31 00 6414-66 P C2H6 ARL 1544.099 -999.990 ... v1 2013 03 13 00 08 00 71.3230 -156.6114 16.00 11.00 5.00 344873 BRW 2012 12 05 19 09 00 3410-99 P C2H6 ARL 1649.945 -999.990 ... v1 2013 01 10 00 03 00 71.3230 -156.6114 16.00 11.00 5.00 345076 BRW 2012 12 05 19 09 00 4184-99 P C2H6 ARL 1647.877 -999.990 ... v1 2013 01 10 00 04 00 71.3230 -156.6114 16.00 11.00 5.00 345077 BRW 2012 12 10 23 08 00 1671-99 P C2H6 ARL 1700.722 -999.990 ... v1 2013 01 16 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 345221 BRW 2012 12 10 23 08 00 4762-99 P C2H6 ARL 1697.112 -999.990 ... v1 2013 01 16 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 345222 BRW 2012 12 17 19 16 00 2773-99 P C2H6 ARL 1727.713 -999.990 ... v1 2013 01 24 00 07 00 71.3230 -156.6114 16.00 11.00 5.00 345602 BRW 2012 12 17 19 16 00 2798-99 P C2H6 ARL 1731.444 -999.990 ... v1 2013 01 24 00 08 00 71.3230 -156.6114 16.00 11.00 5.00 345603 BRW 2012 12 26 19 04 00 168-99 P C2H6 ARL 1887.286 -999.990 ... v1 2013 01 28 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 345874 BRW 2012 12 26 19 04 00 640-99 P C2H6 ARL 1880.810 -999.990 ... v1 2013 01 28 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 345875 BRW 2012 12 31 19 13 00 3699-99 P C2H6 ARL 2224.103 -999.990 ... v1 2013 02 05 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 346640 BRW 2012 12 31 19 13 00 4372-99 P C2H6 ARL 2227.870 -999.990 ... v1 2013 02 05 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 346641 BRW 2013 01 07 20 06 00 3057-99 P C2H6 ARL 2037.870 -999.990 ... v1 2013 02 06 12 07 00 71.3230 -156.6114 16.00 11.00 5.00 346402 BRW 2013 01 07 20 06 00 4174-99 P C2H6 ARL 2042.052 -999.990 ... v1 2013 02 06 12 08 00 71.3230 -156.6114 16.00 11.00 5.00 346403 BRW 2013 01 16 01 15 00 1553-99 P C2H6 ARL 2235.090 -999.990 ... v1 2013 03 01 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 346652 BRW 2013 01 16 01 15 00 2440-99 P C2H6 ARL 2231.926 -999.990 ... v1 2013 03 01 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 346653 BRW 2013 01 22 20 09 00 1286-99 P C2H6 ARL 3593.543 -999.990 ... v1 2013 02 22 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 346902 BRW 2013 01 22 20 09 00 5325-99 P C2H6 ARL 3601.345 -999.990 ... v1 2013 02 22 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 346903 BRW 2013 01 30 20 06 00 2053-99 P C2H6 ARL 2266.704 -999.990 ... v1 2013 02 18 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 347257 BRW 2013 01 30 20 06 00 4324-99 P C2H6 ARL 2253.901 -999.990 ... v1 2013 02 18 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 347258 BRW 2013 02 08 21 04 00 1866-99 P C2H6 ARL 2836.036 -999.990 ... v1 2013 03 06 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 347769 BRW 2013 02 08 21 04 00 1957-99 P C2H6 ARL 2811.374 -999.990 ... v1 2013 03 06 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 347770 BRW 2013 02 11 21 10 00 4158-99 P C2H6 ARL 3465.079 -999.990 ... v1 2013 03 09 00 03 00 71.3230 -156.6114 16.00 11.00 5.00 347867 BRW 2013 02 11 21 10 00 4292-99 P C2H6 ARL 3454.482 -999.990 ... v1 2013 03 09 00 04 00 71.3230 -156.6114 16.00 11.00 5.00 347868 BRW 2013 02 20 20 14 00 2535-99 P C2H6 ARL 2437.140 -999.990 ... v1 2013 03 14 00 03 00 71.3230 -156.6114 16.00 11.00 5.00 348183 BRW 2013 02 20 20 14 00 4128-99 P C2H6 ARL 2434.572 -999.990 ... v1 2013 03 14 00 04 00 71.3230 -156.6114 16.00 11.00 5.00 348182 BRW 2013 02 25 21 08 00 2155-99 P C2H6 ARL 2402.202 -999.990 ... v1 2013 04 05 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 348739 BRW 2013 02 25 21 08 00 4753-99 P C2H6 ARL 2398.247 -999.990 ... v1 2013 04 05 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 348740 BRW 2013 03 05 01 16 00 3891-99 P C2H6 ARL 2538.562 -999.990 ... v1 2013 04 05 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 348654 BRW 2013 03 05 01 16 00 4103-99 P C2H6 ARL 2546.921 -999.990 ... v1 2013 04 05 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 348653 BRW 2013 03 13 23 08 00 2902-99 P C2H6 ARL 3168.247 -999.990 ... v1 2013 04 15 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 348936 BRW 2013 03 13 23 08 00 3085-99 P C2H6 ARL 3188.113 -999.990 ... v1 2013 04 15 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 348937 BRW 2013 03 20 23 23 00 252-99 P C2H6 ARL 2693.753 -999.990 ... v1 2013 04 15 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 349375 BRW 2013 03 20 23 23 00 4367-99 P C2H6 ARL 2667.303 -999.990 ... v1 2013 04 15 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 349376 BRW 2013 03 25 23 13 00 2172-99 P C2H6 ARL 1651.457 -999.990 ... v1 2013 05 06 12 05 00 71.3230 -156.6114 16.00 11.00 5.00 349636 BRW 2013 03 25 23 13 00 3225-99 P C2H6 ARL 1643.587 -999.990 ... v1 2013 05 06 12 06 00 71.3230 -156.6114 16.00 11.00 5.00 349635 BRW 2013 04 01 18 05 00 1271-99 P C2H6 ARL 2077.011 -999.990 ... v1 2013 04 26 12 07 00 71.3230 -156.6114 16.00 11.00 5.00 349939 BRW 2013 04 01 18 05 00 3785-99 P C2H6 ARL 2088.966 -999.990 ... v1 2013 04 26 12 08 00 71.3230 -156.6114 16.00 11.00 5.00 349940 BRW 2013 04 12 22 06 00 1218-99 S C2H6 ARL 1677.813 -999.990 ... v1 2013 07 15 00 03 00 71.3230 -156.6114 27.50 11.00 16.50 350777 BRW 2013 04 12 22 06 00 4767-99 S C2H6 ARL 1727.539 -999.990 ... v1 2013 07 15 00 04 00 71.3230 -156.6114 27.50 11.00 16.50 350776 BRW 2013 04 12 22 09 00 4287-99 P C2H6 ARL 1684.967 -999.990 ... v1 2013 06 06 12 08 00 71.3230 -156.6114 16.00 11.00 5.00 350771 BRW 2013 04 12 22 09 00 509-99 P C2H6 ARL 1679.956 -999.990 ... v1 2013 06 06 12 07 00 71.3230 -156.6114 16.00 11.00 5.00 350770 BRW 2013 04 16 02 08 00 2917-99 S C2H6 ARL 1250.286 -999.990 ... v1 2013 07 15 00 05 00 71.3230 -156.6114 27.50 11.00 16.50 350774 BRW 2013 04 16 02 08 00 6780-66 S C2H6 ARL 1256.022 -999.990 ... v1 2013 07 15 00 06 00 71.3230 -156.6114 27.50 11.00 16.50 350775 BRW 2013 04 16 02 09 00 168-99 P C2H6 ARL 1373.252 -999.990 ... v1 2013 06 04 00 03 00 71.3230 -156.6114 16.00 11.00 5.00 350773 BRW 2013 04 16 02 09 00 241-99 P C2H6 ARL 1362.784 -999.990 ... v1 2013 06 04 00 04 00 71.3230 -156.6114 16.00 11.00 5.00 350772 BRW 2013 04 26 18 09 00 2466-99 P C2H6 ARL 995.605 -999.990 ... v1 2013 05 14 00 07 00 71.3230 -156.6114 16.00 11.00 5.00 351169 BRW 2013 04 26 18 09 00 3876-99 P C2H6 ARL 947.444 -999.990 ... v1 2013 05 14 00 08 00 71.3230 -156.6114 16.00 11.00 5.00 351168 BRW 2013 04 30 19 13 00 1533-99 P C2H6 ARL 783.022 -999.990 ... v1 2013 07 08 00 07 00 71.3230 -156.6114 16.00 11.00 5.00 351524 BRW 2013 04 30 19 13 00 1878-99 P C2H6 ARL 795.099 -999.990 ... v1 2013 07 08 00 08 00 71.3230 -156.6114 16.00 11.00 5.00 351525 BRW 2013 05 09 22 14 00 1809-99 P C2H6 ARL 1408.374 -999.990 ... v1 2013 07 09 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 351822 BRW 2013 05 09 22 14 00 4292-99 P C2H6 ARL 1391.505 -999.990 ... v1 2013 07 09 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 351823 BRW 2013 05 16 19 08 00 3926-99 P C2H6 ARL 2033.029 -999.990 ... v1 2013 06 07 12 01 00 71.3230 -156.6114 16.00 11.00 5.00 352246 BRW 2013 05 16 19 08 00 4214-99 P C2H6 ARL 2035.501 -999.990 ... v1 2013 06 07 12 02 00 71.3230 -156.6114 16.00 11.00 5.00 352247 BRW 2013 05 20 19 15 00 2992-99 P C2H6 ARL 1023.073 -999.990 ... v1 2013 06 17 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 352511 BRW 2013 05 20 19 15 00 4695-99 P C2H6 ARL 1022.149 -999.990 ... v1 2013 06 17 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 352512 BRW 2013 05 28 19 14 00 3167-99 P C2H6 ARL 1224.450 -999.990 ... v1 2013 07 03 12 08 00 71.3230 -156.6114 16.00 11.00 5.00 352897 BRW 2013 05 28 19 14 00 408-99 P C2H6 ARL 1228.681 -999.990 ... v1 2013 07 03 12 07 00 71.3230 -156.6114 16.00 11.00 5.00 352898 BRW 2013 06 03 20 20 00 3174-99 P C2H6 ARL 859.429 -999.990 ... v1 2013 07 10 00 07 00 71.3230 -156.6114 16.00 11.00 5.00 353274 BRW 2013 06 03 20 20 00 4950-99 P C2H6 ARL 859.022 -999.990 ... v1 2013 07 10 00 08 00 71.3230 -156.6114 16.00 11.00 5.00 353273 BRW 2013 06 13 22 23 00 3312-99 P C2H6 ARL 912.762 -999.990 ... v1 2013 10 15 12 05 00 71.3230 -156.6114 16.00 11.00 5.00 353770 BRW 2013 06 13 22 23 00 4284-99 P C2H6 ARL 914.833 -999.990 ... v1 2013 10 15 12 06 00 71.3230 -156.6114 16.00 11.00 5.00 353769 BRW 2013 06 17 19 16 00 2646-99 P C2H6 ARL 1053.252 -999.990 ... v1 2013 10 10 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 353863 BRW 2013 06 17 19 16 00 6255-66 P C2H6 ARL 1055.334 -999.990 ... v1 2013 10 10 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 353862 BRW 2013 06 24 23 20 00 4094-99 P C2H6 ARL 804.477 -999.990 ... v1 2013 10 10 00 04 00 71.3230 -156.6114 16.00 11.00 5.00 354312 BRW 2013 06 24 23 20 00 648-99 P C2H6 ARL 805.445 -999.990 ... v1 2013 10 10 00 03 00 71.3230 -156.6114 16.00 11.00 5.00 354311 BRW 2013 07 02 19 17 00 3128-99 P C2H6 ARL 804.877 -999.990 ... v1 2013 09 27 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 354437 BRW 2013 07 02 19 17 00 4554-99 P C2H6 ARL 804.564 -999.990 ... v1 2013 09 27 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 354438 BRW 2013 07 08 18 15 00 4522-99 P C2H6 ARL 768.820 -999.990 ... v1 2013 08 26 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 354857 BRW 2013 07 08 18 15 00 4589-99 P C2H6 ARL 768.942 -999.990 ... v1 2013 08 26 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 354858 BRW 2013 07 16 23 08 00 3366-99 P C2H6 ARL 870.278 -999.990 ... v1 2013 10 15 12 04 00 71.3230 -156.6114 16.00 11.00 5.00 355218 BRW 2013 07 16 23 08 00 349-99 P C2H6 ARL 869.298 -999.990 ... v1 2013 10 15 12 03 00 71.3230 -156.6114 16.00 11.00 5.00 355219 BRW 2013 07 26 19 23 00 3852-99 P C2H6 ARL 797.884 -999.990 ... v1 2013 10 02 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 355656 BRW 2013 07 26 19 23 00 5071-99 P C2H6 ARL 811.960 -999.990 ... v1 2013 10 02 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 355657 BRW 2013 08 01 00 04 00 1615-99 P C2H6 ARL 646.793 -999.990 ... v1 2013 10 02 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 355933 BRW 2013 08 01 00 04 00 5069-99 P C2H6 ARL 647.706 -999.990 ... v1 2013 10 02 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 355932 BRW 2013 08 06 18 23 00 1957-99 P C2H6 ARL 636.600 -999.990 ... v1 2013 09 03 00 07 00 71.3230 -156.6114 16.00 11.00 5.00 356157 BRW 2013 08 06 18 23 00 2831-99 P C2H6 ARL 638.468 -999.990 ... v1 2013 09 03 00 08 00 71.3230 -156.6114 16.00 11.00 5.00 356158 BRW 2013 08 12 18 22 00 3190-99 P C2H6 ARL 1276.376 -999.990 ... v1 2013 09 18 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 356702 BRW 2013 08 12 18 22 00 407-99 P C2H6 ARL 1263.982 -999.990 ... v1 2013 09 18 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 356703 BRW 2013 08 19 21 20 00 3085-99 P C2H6 ARL 597.225 -999.990 ... v1 2013 11 01 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 357522 BRW 2013 08 19 21 20 00 689-99 P C2H6 ARL 595.044 -999.990 ... v1 2013 11 01 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 357521 BRW 2013 08 26 18 19 00 1047-99 P C2H6 ARL 637.639 -999.990 ... v1 2013 10 04 12 05 00 71.3230 -156.6114 16.00 11.00 5.00 357284 BRW 2013 08 26 18 19 00 1763-99 P C2H6 ARL 644.621 -999.990 ... v1 2013 10 04 12 06 00 71.3230 -156.6114 16.00 11.00 5.00 357283 BRW 2013 09 04 00 19 00 183-99 P C2H6 ARL 722.918 -999.990 ... v1 2013 10 29 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 357542 BRW 2013 09 04 00 19 00 4370-99 P C2H6 ARL 710.590 -999.990 ... v1 2013 10 29 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 357541 BRW 2013 09 09 23 17 00 1317-99 P C2H6 ARL 742.405 -999.990 ... v1 2013 10 25 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 357782 BRW 2013 09 09 23 17 00 1923-99 P C2H6 ARL 736.414 -999.990 ... v1 2013 10 25 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 357783 BRW 2013 09 16 18 20 00 2909-99 P C2H6 ARL 732.929 -999.990 ... v1 2013 11 05 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 358192 BRW 2013 09 16 18 20 00 4237-99 P C2H6 ARL 743.194 -999.990 ... v1 2013 11 05 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 358191 BRW 2013 09 27 18 15 00 1512-99 P C2H6 ARL -999.990 -999.990 A.. v1 2013 11 04 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 358694 BRW 2013 09 27 18 15 00 4800-99 P C2H6 ARL -999.990 -999.990 A.. v1 2013 11 04 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 358693 BRW 2013 10 01 18 07 00 1211-99 P C2H6 ARL 785.903 -999.990 ... v1 2013 11 13 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 358690 BRW 2013 10 01 18 07 00 1700-99 P C2H6 ARL 791.201 -999.990 ... v1 2013 11 13 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 358689 BRW 2013 10 07 18 14 00 4387-99 P C2H6 ARL 935.463 -999.990 ... v1 2013 11 07 12 01 00 71.3230 -156.6114 16.00 11.00 5.00 358633 BRW 2013 10 07 18 14 00 4541-99 P C2H6 ARL 938.084 -999.990 ... v1 2013 11 07 12 02 00 71.3230 -156.6114 16.00 11.00 5.00 358634 BRW 2013 10 16 19 05 00 2387-99 P C2H6 ARL 1000.217 -999.990 ... v1 2013 12 04 00 07 00 71.3230 -156.6114 16.00 11.00 5.00 359862 BRW 2013 10 16 19 05 00 4861-99 P C2H6 ARL 1031.985 -999.990 ... v1 2013 12 04 00 08 00 71.3230 -156.6114 16.00 11.00 5.00 359863 BRW 2013 10 25 00 09 00 1274-99 P C2H6 ARL 1240.358 -999.990 ... v1 2013 12 04 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 359340 BRW 2013 10 25 00 09 00 2821-99 P C2H6 ARL 1243.427 -999.990 ... v1 2013 12 04 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 359341 BRW 2013 10 30 18 13 00 2116-99 P C2H6 ARL 1228.937 -999.990 ... v1 2013 12 19 00 08 00 71.3230 -156.6114 16.00 11.00 5.00 359864 BRW 2013 10 30 18 13 00 56-99 P C2H6 ARL 1231.410 -999.990 ... v1 2013 12 19 00 07 00 71.3230 -156.6114 16.00 11.00 5.00 359865 BRW 2013 11 07 19 04 00 516-99 P C2H6 ARL 1309.755 -999.990 ... v1 2014 01 15 12 05 00 71.3230 -156.6114 16.00 11.00 5.00 360156 BRW 2013 11 07 19 04 00 5309-99 P C2H6 ARL 1307.611 -999.990 ... v1 2014 01 15 12 06 00 71.3230 -156.6114 16.00 11.00 5.00 360157 BRW 2013 11 15 20 07 00 1961-99 P C2H6 ARL 1395.488 -999.990 ... v1 2013 12 17 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 360533 BRW 2013 11 15 20 07 00 3839-99 P C2H6 ARL 1393.601 -999.990 ... v1 2013 12 17 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 360534 BRW 2013 11 22 19 13 00 1220-99 P C2H6 ARL 1404.859 -999.990 ... v1 2013 12 16 12 01 00 71.3230 -156.6114 16.00 11.00 5.00 361006 BRW 2013 11 22 19 13 00 4049-99 P C2H6 ARL 1395.488 -999.990 ... v1 2013 12 16 12 02 00 71.3230 -156.6114 16.00 11.00 5.00 361007 BRW 2013 11 25 20 17 00 501-99 P C2H6 ARL 1542.245 -999.990 ... v1 2013 12 20 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 361023 BRW 2013 11 25 20 17 00 769-99 P C2H6 ARL 1545.033 -999.990 ... v1 2013 12 20 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 361022 BRW 2013 12 02 19 13 00 1648-99 P C2H6 ARL 1695.956 -999.990 ... v1 2014 01 29 12 04 00 71.3230 -156.6114 16.00 11.00 5.00 361439 BRW 2013 12 02 19 13 00 1674-99 P C2H6 ARL 1676.800 -999.990 ... v1 2014 01 29 12 03 00 71.3230 -156.6114 16.00 11.00 5.00 361440 BRW 2013 12 11 19 03 00 3915-99 P C2H6 ARL 2274.400 -999.990 ... v1 2014 01 30 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 361677 BRW 2013 12 11 19 03 00 6217-66 P C2H6 ARL 2277.089 -999.990 ... v1 2014 01 30 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 361676 BRW 2013 12 20 20 05 00 1615-99 P C2H6 ARL 2084.701 -999.990 ... v1 2014 02 03 00 08 00 71.3230 -156.6114 16.00 11.00 5.00 362138 BRW 2013 12 20 20 05 00 602-99 P C2H6 ARL 2100.287 -999.990 ... v1 2014 02 03 00 07 00 71.3230 -156.6114 16.00 11.00 5.00 362137 BRW 2013 12 27 20 15 00 1026-99 P C2H6 ARL 2429.022 -999.990 ... v1 2014 01 31 00 07 00 71.3230 -156.6114 16.00 11.00 5.00 362400 BRW 2013 12 27 20 15 00 3945-99 P C2H6 ARL 2471.022 -999.990 ... v1 2014 01 31 00 08 00 71.3230 -156.6114 16.00 11.00 5.00 362401 BRW 2013 12 30 22 14 00 2350-99 P C2H6 ARL 2531.521 -999.990 ... v1 2014 04 01 12 01 00 71.3230 -156.6114 16.00 11.00 5.00 363123 BRW 2013 12 30 22 14 00 2593-99 P C2H6 ARL 2540.000 -999.990 ... v1 2014 04 01 12 02 00 71.3230 -156.6114 16.00 11.00 5.00 363124 BRW 2014 01 06 20 08 00 3984-99 P C2H6 ARL 2207.024 -999.990 ... v1 2014 03 31 00 08 00 71.3230 -156.6114 16.00 11.00 5.00 362866 BRW 2014 01 06 20 08 00 625-99 P C2H6 ARL 2248.238 -999.990 ... v1 2014 03 31 00 07 00 71.3230 -156.6114 16.00 11.00 5.00 362867 BRW 2014 01 17 20 05 00 1663-99 P C2H6 ARL 2287.794 -999.990 ... v1 2014 03 31 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 363524 BRW 2014 01 17 20 05 00 2410-99 P C2H6 ARL 2312.846 -999.990 ... v1 2014 03 31 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 363523 BRW 2014 01 27 20 10 00 3351-99 P C2H6 ARL 2257.494 -999.990 ... v1 2014 03 03 12 05 00 71.3230 -156.6114 16.00 11.00 5.00 363786 BRW 2014 01 27 20 10 00 4251-99 P C2H6 ARL 2312.702 -999.990 ... v1 2014 03 03 12 06 00 71.3230 -156.6114 16.00 11.00 5.00 363787 BRW 2014 02 04 00 14 00 2349-99 P C2H6 ARL 2331.857 -999.990 ... v1 2014 04 02 12 01 00 71.3230 -156.6114 16.00 11.00 5.00 364059 BRW 2014 02 04 00 14 00 5190-99 P C2H6 ARL 2306.689 -999.990 ... v1 2014 04 02 12 02 00 71.3230 -156.6114 16.00 11.00 5.00 364060 BRW 2014 02 12 23 07 00 140-99 P C2H6 ARL 3487.315 -999.990 ... v1 2014 04 27 12 07 00 71.3230 -156.6114 16.00 11.00 5.00 364458 BRW 2014 02 12 23 07 00 5348-99 P C2H6 ARL 3510.492 -999.990 ... v1 2014 04 27 12 08 00 71.3230 -156.6114 16.00 11.00 5.00 364459 BRW 2014 02 21 20 17 00 4928-99 P C2H6 ARL 2080.559 -999.990 ... v1 2014 04 02 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 364885 BRW 2014 02 21 20 17 00 5141-99 P C2H6 ARL 2187.964 -999.990 ... v1 2014 04 02 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 364886 BRW 2014 02 24 20 12 00 3482-99 P C2H6 ARL 2928.217 -999.990 ... v1 2014 11 26 00 08 00 71.3230 -156.6114 16.00 11.00 5.00 365033 BRW 2014 03 07 19 06 00 2177-99 P C2H6 ARL 2202.886 -999.990 ... v1 2014 04 29 12 06 00 71.3230 -156.6114 16.00 11.00 5.00 365172 BRW 2014 03 07 19 06 00 836-99 P C2H6 ARL 2168.345 -999.990 ... v1 2014 04 29 12 05 00 71.3230 -156.6114 16.00 11.00 5.00 365183 BRW 2014 03 11 18 10 00 582-99 P C2H6 ARL 2749.537 -999.990 ... v1 2014 08 14 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 365653 BRW 2014 03 11 18 10 00 822-99 P C2H6 ARL 2748.786 -999.990 ... v1 2014 08 14 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 365654 BRW 2014 03 17 19 15 00 2823-99 P C2H6 ARL 2328.057 -999.990 ... v1 2014 08 14 00 07 00 71.3230 -156.6114 16.00 11.00 5.00 365980 BRW 2014 03 17 19 15 00 4864-99 P C2H6 ARL 2328.256 -999.990 ... v1 2014 08 14 00 08 00 71.3230 -156.6114 16.00 11.00 5.00 365981 BRW 2014 03 26 00 14 00 1590-99 P C2H6 ARL 2131.137 -999.990 ... v1 2014 08 08 00 03 00 71.3230 -156.6114 16.00 11.00 5.00 366507 BRW 2014 03 26 00 14 00 3325-99 P C2H6 ARL 2124.834 -999.990 ... v1 2014 08 08 00 04 00 71.3230 -156.6114 16.00 11.00 5.00 366508 BRW 2014 03 31 18 17 00 2398-99 P C2H6 ARL 1929.536 -999.990 ... v1 2014 08 18 12 07 00 71.3230 -156.6114 16.00 11.00 5.00 366501 BRW 2014 03 31 18 17 00 2846-99 P C2H6 ARL 1958.013 -999.990 ... v1 2014 08 18 12 08 00 71.3230 -156.6114 16.00 11.00 5.00 366502 BRW 2014 04 18 21 03 00 3709-99 P C2H6 ARL 1602.875 -999.990 ... v1 2014 10 05 00 07 00 71.3230 -156.6114 16.00 11.00 5.00 366987 BRW 2014 04 18 21 03 00 4636-99 P C2H6 ARL 1609.732 -999.990 ... v1 2014 10 05 00 08 00 71.3230 -156.6114 16.00 11.00 5.00 366988 BRW 2014 04 21 19 09 00 42-99 P C2H6 ARL 1860.342 -999.990 ... v1 2014 08 25 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 367121 BRW 2014 04 21 19 09 00 530-99 P C2H6 ARL -999.990 -999.990 A.. v1 2014 08 25 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 367122 BRW 2014 04 28 18 08 00 3288-99 P C2H6 ARL 1336.175 -999.990 ... v1 2014 10 03 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 367592 BRW 2014 04 28 18 08 00 4618-99 P C2H6 ARL 1331.879 -999.990 ... v1 2014 10 03 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 367593 BRW 2014 05 09 18 05 00 3153-99 P C2H6 ARL 592.946 -999.990 ... v1 2014 09 14 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 368032 BRW 2014 05 09 18 05 00 5046-99 P C2H6 ARL 573.205 -999.990 ... v1 2014 09 14 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 368031 BRW 2014 05 16 18 08 00 3942-99 P C2H6 ARL 1410.067 -999.990 ... v1 2014 07 14 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 369100 BRW 2014 05 16 18 08 00 4795-99 P C2H6 ARL 1411.214 -999.990 ... v1 2014 07 14 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 369099 BRW 2014 05 23 22 02 00 1525-99 P C2H6 ARL 921.197 -999.990 ... v1 2014 10 03 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 368733 BRW 2014 05 23 22 02 00 2407-99 P C2H6 ARL 910.358 -999.990 ... v1 2014 10 03 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 368734 BRW 2014 05 27 18 02 00 4253-99 P C2H6 ARL 788.976 -999.990 ... v1 2014 07 25 12 07 00 71.3230 -156.6114 16.00 11.00 5.00 369095 BRW 2014 05 27 18 02 00 4389-99 P C2H6 ARL 775.100 -999.990 ... v1 2014 07 25 12 08 00 71.3230 -156.6114 16.00 11.00 5.00 369096 BRW 2014 06 02 18 14 00 1103-99 P C2H6 ARL 791.505 -999.990 ... v1 2015 02 24 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 369355 BRW 2014 06 02 18 14 00 5042-99 P C2H6 ARL 794.248 -999.990 ... v1 2015 02 24 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 369354 BRW 2014 06 09 19 09 00 4088-99 P C2H6 ARL 1013.984 -999.990 ... v1 2014 09 12 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 369524 BRW 2014 06 09 19 09 00 5065-99 P C2H6 ARL 1029.729 -999.990 ... v1 2014 09 12 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 369523 BRW 2014 06 16 19 01 00 1498-99 P C2H6 ARL 1252.084 -999.990 ... v1 2015 01 12 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 369982 BRW 2014 06 16 19 01 00 5137-99 P C2H6 ARL 1280.080 -999.990 ... v1 2015 01 12 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 369981 BRW 2014 06 25 22 05 00 3277-99 P C2H6 ARL 888.837 -999.990 ... v1 2014 10 13 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 370289 BRW 2014 06 25 22 05 00 4886-99 P C2H6 ARL 902.125 -999.990 ... v1 2014 10 13 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 370290 BRW 2014 06 30 18 06 00 5299-99 P C2H6 ARL 1055.262 -999.990 ... v1 2015 01 07 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 370505 BRW 2014 06 30 18 06 00 876-99 P C2H6 ARL 1054.579 -999.990 ... v1 2015 01 07 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 370504 BRW 2014 07 07 18 11 00 2264-99 P C2H6 ARL 762.264 -999.990 ... v1 2014 12 29 00 03 00 71.3230 -156.6114 16.00 11.00 5.00 371339 BRW 2014 07 07 18 11 00 2535-99 P C2H6 ARL 751.198 -999.990 ... v1 2014 12 29 00 04 00 71.3230 -156.6114 16.00 11.00 5.00 371340 BRW 2014 07 23 18 06 00 4075-99 S C2H6 ARL 702.254 -999.990 ... v1 2014 11 23 00 08 00 71.3230 -156.6114 27.50 11.00 16.50 371638 BRW 2014 07 23 18 06 00 618-99 S C2H6 ARL 674.256 -999.990 ... v1 2014 11 23 00 07 00 71.3230 -156.6114 27.50 11.00 16.50 371637 BRW 2014 07 28 18 06 00 4267-99 P C2H6 ARL 649.595 -999.990 ... v1 2014 11 24 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 372030 BRW 2014 07 28 18 06 00 4745-99 P C2H6 ARL 640.197 -999.990 ... v1 2014 11 24 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 372029 BRW 2014 08 04 18 06 00 2953-99 P C2H6 ARL 657.066 -999.990 ... v1 2014 12 18 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 372891 BRW 2014 08 04 18 06 00 3208-99 P C2H6 ARL 657.945 -999.990 ... v1 2014 12 18 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 372892 BRW 2014 08 11 18 10 00 1577-99 P C2H6 ARL 706.346 -999.990 ... v1 2014 11 28 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 373176 BRW 2014 08 11 18 10 00 2337-99 P C2H6 ARL 712.582 -999.990 ... v1 2014 11 28 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 373177 BRW 2014 08 22 19 05 00 1474-99 P C2H6 ARL 793.107 -999.990 ... v1 2014 11 10 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 373375 BRW 2014 08 22 19 05 00 5355-99 P C2H6 ARL 789.825 -999.990 ... v1 2014 11 10 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 373374 BRW 2014 08 25 18 04 00 1053-99 P C2H6 ARL 882.845 -999.990 ... v1 2014 11 20 00 03 00 71.3230 -156.6114 16.00 11.00 5.00 373377 BRW 2014 08 25 18 04 00 2034-99 P C2H6 ARL 887.768 -999.990 ... v1 2014 11 20 00 04 00 71.3230 -156.6114 16.00 11.00 5.00 373376 BRW 2014 09 05 18 08 00 1494-99 P C2H6 ARL 912.232 -999.990 ... v1 2014 11 12 00 03 00 71.3230 -156.6114 16.00 11.00 5.00 373775 BRW 2014 09 05 18 08 00 4589-99 P C2H6 ARL 930.153 -999.990 ... v1 2014 11 12 00 04 00 71.3230 -156.6114 16.00 11.00 5.00 373776 BRW 2014 09 09 18 06 00 4807-99 P C2H6 ARL 950.066 -999.990 ... v1 2014 12 01 12 04 00 71.3230 -156.6114 16.00 11.00 5.00 374215 BRW 2014 09 09 18 06 00 850-99 P C2H6 ARL 983.956 -999.990 ... v1 2014 12 01 12 03 00 71.3230 -156.6114 16.00 11.00 5.00 374214 BRW 2014 09 15 16 07 00 4862-99 P C2H6 ARL 1016.521 -999.990 ... v1 2014 11 04 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 374401 BRW 2014 09 15 16 07 00 5286-99 P C2H6 ARL 1010.667 -999.990 ... v1 2014 11 04 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 374402 BRW 2014 09 26 18 08 00 456-99 P C2H6 ARL 1030.438 -999.990 ... v1 2014 11 11 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 374966 BRW 2014 09 26 18 08 00 5179-99 P C2H6 ARL 1030.263 -999.990 ... v1 2014 11 11 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 374967 BRW 2014 10 03 18 02 00 4157-99 P C2H6 ARL 1163.758 -999.990 ... v1 2015 01 06 12 05 00 71.3230 -156.6114 16.00 11.00 5.00 375206 BRW 2014 10 03 18 02 00 4837-99 P C2H6 ARL 1161.071 -999.990 ... v1 2015 01 06 12 06 00 71.3230 -156.6114 16.00 11.00 5.00 375207 BRW 2014 10 10 18 03 00 1410-99 P C2H6 ARL 1210.000 -999.990 ... v1 2015 02 13 12 01 00 71.3230 -156.6114 16.00 11.00 5.00 375556 BRW 2014 10 10 18 03 00 2288-99 P C2H6 ARL 1208.783 -999.990 ... v1 2015 02 13 12 02 00 71.3230 -156.6114 16.00 11.00 5.00 375555 BRW 2014 10 13 19 03 00 2185-99 P C2H6 ARL 1096.085 -999.990 ... v1 2014 10 27 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 376126 BRW 2014 10 13 19 03 00 992-99 P C2H6 ARL 1092.729 -999.990 ... v1 2014 10 27 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 376127 BRW 2014 10 20 18 05 00 2446-99 P C2H6 ARL 1209.934 -999.990 ... v1 2015 02 07 00 03 00 71.3230 -156.6114 16.00 11.00 5.00 376510 BRW 2014 10 20 18 05 00 4507-99 P C2H6 ARL 1243.894 -999.990 ... v1 2015 02 07 00 04 00 71.3230 -156.6114 16.00 11.00 5.00 376511 BRW 2014 10 31 18 04 00 2944-99 P C2H6 ARL 1220.044 -999.990 ... v1 2014 12 22 00 08 00 71.3230 -156.6114 16.00 11.00 5.00 377263 BRW 2014 10 31 18 04 00 77-99 P C2H6 ARL 1236.132 -999.990 ... v1 2014 12 22 00 07 00 71.3230 -156.6114 16.00 11.00 5.00 377264 BRW 2014 11 03 19 09 00 2686-99 P C2H6 ARL 1273.474 -999.990 ... v1 2015 01 28 12 06 00 71.3230 -156.6114 16.00 11.00 5.00 377261 BRW 2014 11 03 19 09 00 489-99 P C2H6 ARL 1276.242 -999.990 ... v1 2015 01 28 12 05 00 71.3230 -156.6114 16.00 11.00 5.00 377262 BRW 2014 11 14 19 05 00 4284-99 P C2H6 ARL 1400.000 -999.990 ... v1 2015 02 12 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 378249 BRW 2014 11 14 19 05 00 889-99 P C2H6 ARL 1409.281 -999.990 ... v1 2015 02 12 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 378250 BRW 2014 11 17 19 03 00 3499-99 P C2H6 ARL 1499.336 -999.990 ... v1 2015 02 19 00 07 00 71.3230 -156.6114 16.00 11.00 5.00 378234 BRW 2014 11 17 19 03 00 4127-99 P C2H6 ARL 1540.819 -999.990 ... v1 2015 02 19 00 08 00 71.3230 -156.6114 16.00 11.00 5.00 378233 BRW 2014 11 24 21 04 00 2163-99 P C2H6 ARL 1874.351 -999.990 ... v1 2015 01 13 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 378394 BRW 2014 11 24 21 04 00 4712-99 P C2H6 ARL 1877.244 -999.990 ... v1 2015 01 13 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 378395 BRW 2014 12 01 19 03 00 2407-99 P C2H6 ARL 1991.149 -999.990 ... v1 2015 06 09 12 05 00 71.3230 -156.6114 16.00 11.00 5.00 378846 BRW 2014 12 08 20 09 00 1365-99 P C2H6 ARL 2040.478 -999.990 ... v1 2015 01 27 12 07 00 71.3230 -156.6114 16.00 11.00 5.00 379228 BRW 2014 12 08 20 09 00 3513-99 P C2H6 ARL 2042.119 -999.990 ... v1 2015 01 27 12 08 00 71.3230 -156.6114 16.00 11.00 5.00 379229 BRW 2014 12 15 21 05 00 145-99 P C2H6 ARL 2334.934 -999.990 ... v1 2015 02 03 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 379509 BRW 2014 12 15 21 05 00 1653-99 P C2H6 ARL 2323.540 -999.990 ... v1 2015 02 03 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 379508 BRW 2014 12 24 21 15 00 1457-99 P C2H6 ARL 2094.518 -999.990 ... v1 2015 03 30 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 380039 BRW 2014 12 24 21 15 00 5306-99 P C2H6 ARL 2072.657 -999.990 ... v1 2015 03 30 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 380040 BRW 2014 12 30 21 05 00 2921-99 P C2H6 ARL 2135.034 -999.990 ... v1 2015 04 16 12 03 00 71.3230 -156.6114 16.00 11.00 5.00 380489 BRW 2014 12 30 21 05 00 4967-99 P C2H6 ARL 2153.677 -999.990 ... v1 2015 04 16 12 04 00 71.3230 -156.6114 16.00 11.00 5.00 380490 BRW 2015 01 06 23 04 00 1737-99 P C2H6 ARL 2297.662 -999.990 ... v1 2015 10 20 00 03 00 71.3230 -156.6114 16.00 11.00 5.00 380678 BRW 2015 01 06 23 04 00 4143-99 P C2H6 ARL 2302.554 -999.990 ... v1 2015 10 20 00 04 00 71.3230 -156.6114 16.00 11.00 5.00 380677 BRW 2015 01 12 19 03 00 5196-99 P C2H6 ARL 2677.646 -999.990 ... v1 2015 04 16 12 02 00 71.3230 -156.6114 16.00 11.00 5.00 380692 BRW 2015 01 12 19 03 00 698-99 P C2H6 ARL 2693.722 -999.990 ... v1 2015 04 16 12 01 00 71.3230 -156.6114 16.00 11.00 5.00 380691 BRW 2015 01 19 21 16 00 1086-99 P C2H6 ARL 2437.057 -999.990 ... v1 2015 02 27 12 05 00 71.3230 -156.6114 16.00 11.00 5.00 381212 BRW 2015 01 19 21 16 00 4333-99 P C2H6 ARL 2424.093 -999.990 ... v1 2015 02 27 12 06 00 71.3230 -156.6114 16.00 11.00 5.00 381211 BRW 2015 01 30 19 12 00 2-99 P C2H6 ARL 2342.948 -999.990 ... v1 2015 03 17 12 01 00 71.3230 -156.6114 16.00 11.00 5.00 381804 BRW 2015 01 30 19 12 00 695-99 P C2H6 ARL 2348.273 -999.990 ... v1 2015 03 17 12 02 00 71.3230 -156.6114 16.00 11.00 5.00 381805 BRW 2015 02 05 19 04 00 4657-99 P C2H6 ARL 3950.807 -999.990 ... v1 2015 04 29 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 382083 BRW 2015 02 05 19 04 00 4717-99 P C2H6 ARL 3994.361 -999.990 ... v1 2015 04 29 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 382084 BRW 2015 02 11 19 02 00 1957-99 P C2H6 ARL 3190.920 -999.990 ... v1 2015 05 01 00 04 00 71.3230 -156.6114 16.00 11.00 5.00 382458 BRW 2015 02 11 19 02 00 258-99 P C2H6 ARL 3202.605 -999.990 ... v1 2015 05 01 00 03 00 71.3230 -156.6114 16.00 11.00 5.00 382459 BRW 2015 02 16 19 03 00 1940-99 P C2H6 ARL 2572.915 -999.990 ... v1 2015 04 01 00 03 00 71.3230 -156.6114 16.00 11.00 5.00 382805 BRW 2015 02 16 19 03 00 4378-99 P C2H6 ARL 2585.191 -999.990 ... v1 2015 04 01 00 04 00 71.3230 -156.6114 16.00 11.00 5.00 382806 BRW 2015 02 23 19 02 00 3207-99 P C2H6 ARL 2857.395 -999.990 ... v1 2015 05 04 12 07 00 71.3230 -156.6114 16.00 11.00 5.00 383030 BRW 2015 02 23 19 02 00 4861-99 P C2H6 ARL 3023.392 -999.990 ... v1 2015 05 04 12 08 00 71.3230 -156.6114 16.00 11.00 5.00 383029 BRW 2015 03 02 19 15 00 4014-99 S C2H6 ARL 2835.314 -999.990 ... v1 2015 04 30 00 03 00 71.3230 -156.6114 16.00 11.00 5.00 383882 BRW 2015 03 02 19 15 00 6264-66 S C2H6 ARL 2862.960 -999.990 ... v1 2015 04 30 00 04 00 71.3230 -156.6114 16.00 11.00 5.00 383883 BRW 2015 03 13 18 04 00 2899-99 P C2H6 ARL 2474.911 -999.990 ... v1 2015 05 15 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 383836 BRW 2015 03 13 18 04 00 5201-99 P C2H6 ARL 2494.912 -999.990 ... v1 2015 05 15 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 383837 BRW 2015 03 16 18 05 00 1148-99 P C2H6 ARL 2438.818 -999.990 ... v1 2015 06 17 12 05 00 71.3230 -156.6114 16.00 11.00 5.00 384116 BRW 2015 03 16 18 05 00 3662-99 P C2H6 ARL 2525.484 -999.990 ... v1 2015 06 17 12 06 00 71.3230 -156.6114 16.00 11.00 5.00 384117 BRW 2015 03 24 22 02 00 3746-99 P C2H6 ARL 1942.635 -999.990 ... v1 2015 06 17 12 01 00 71.3230 -156.6114 16.00 11.00 5.00 385090 BRW 2015 03 24 22 02 00 4864-99 P C2H6 ARL 1938.468 -999.990 ... v1 2015 06 17 12 02 00 71.3230 -156.6114 16.00 11.00 5.00 385089 BRW 2015 03 30 18 10 00 238-99 P C2H6 ARL 2253.311 -999.990 ... v1 2015 06 03 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 384848 BRW 2015 03 30 18 10 00 4547-99 P C2H6 ARL 2251.385 -999.990 ... v1 2015 06 03 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 384849 BRW 2015 04 06 18 03 00 3063-99 P C2H6 ARL 2252.984 -999.990 ... v1 2015 06 05 00 04 00 71.3230 -156.6114 16.00 11.00 5.00 385082 BRW 2015 04 06 18 03 00 970-99 P C2H6 ARL 2233.469 -999.990 ... v1 2015 06 05 00 03 00 71.3230 -156.6114 16.00 11.00 5.00 385081 BRW 2015 04 14 18 02 00 1251-99 P C2H6 ARL 1487.725 -999.990 ... v1 2015 06 04 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 385795 BRW 2015 04 14 18 02 00 4634-99 P C2H6 ARL 1487.117 -999.990 ... v1 2015 06 04 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 385794 BRW 2015 04 20 18 12 00 1526-99 P C2H6 ARL 2050.698 -999.990 ... v1 2015 06 18 12 05 00 71.3230 -156.6114 16.00 11.00 5.00 386173 BRW 2015 04 20 18 12 00 2030-99 P C2H6 ARL 2026.216 -999.990 ... v1 2015 06 18 12 06 00 71.3230 -156.6114 16.00 11.00 5.00 386174 BRW 2015 04 30 18 04 00 1217-99 P C2H6 ARL 1570.447 -999.990 ... v1 2015 07 03 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 386553 BRW 2015 04 30 18 04 00 2340-99 P C2H6 ARL 1574.955 -999.990 ... v1 2015 07 03 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 386554 BRW 2015 05 06 18 02 00 3209-99 P C2H6 ARL 1461.484 -999.990 ... v1 2015 07 15 12 03 00 71.3230 -156.6114 16.00 11.00 5.00 387150 BRW 2015 05 06 18 02 00 4012-99 P C2H6 ARL 1498.013 -999.990 ... v1 2015 07 15 12 04 00 71.3230 -156.6114 16.00 11.00 5.00 387151 BRW 2015 05 13 21 01 00 4953-99 P C2H6 ARL 1195.045 -999.990 ... v1 2015 07 20 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 387346 BRW 2015 05 13 21 01 00 520-99 P C2H6 ARL 1170.246 -999.990 ... v1 2015 07 20 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 387347 BRW 2015 05 18 23 03 00 281-99 P C2H6 ARL 1807.051 -999.990 ... v1 2015 08 06 12 05 00 71.3230 -156.6114 16.00 11.00 5.00 387811 BRW 2015 05 18 23 03 00 2940-99 P C2H6 ARL 1799.335 -999.990 ... v1 2015 08 06 12 06 00 71.3230 -156.6114 16.00 11.00 5.00 387812 BRW 2015 05 27 23 12 00 2768-99 P C2H6 ARL 1308.969 -999.990 ... v1 2015 08 12 00 04 00 71.3230 -156.6114 16.00 11.00 5.00 388463 BRW 2015 05 27 23 12 00 833-99 P C2H6 ARL 1316.663 -999.990 ... v1 2015 08 12 00 03 00 71.3230 -156.6114 16.00 11.00 5.00 388464 BRW 2015 06 04 17 11 00 4789-99 P C2H6 ARL 1080.931 -999.990 ... v1 2015 08 12 12 08 00 71.3230 -156.6114 16.00 11.00 5.00 389127 BRW 2015 06 04 17 11 00 698-99 P C2H6 ARL 1044.346 -999.990 ... v1 2015 08 12 12 07 00 71.3230 -156.6114 16.00 11.00 5.00 389128 BRW 2015 06 12 19 13 00 2067-99 P C2H6 ARL 1135.355 -999.990 ... v1 2015 08 21 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 389069 BRW 2015 06 12 19 13 00 3568-99 P C2H6 ARL 1139.956 -999.990 ... v1 2015 08 21 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 389070 BRW 2015 06 19 18 02 00 3628-99 P C2H6 ARL 1024.200 -999.990 ... v1 2015 09 03 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 389844 BRW 2015 06 19 18 02 00 4136-99 P C2H6 ARL 1050.222 -999.990 ... v1 2015 09 03 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 389845 BRW 2015 06 26 18 05 00 3977-99 P C2H6 ARL -999.990 -999.990 D.. v1 2015 09 15 00 07 00 71.3230 -156.6114 16.00 11.00 5.00 390154 BRW 2015 06 26 18 05 00 5137-99 P C2H6 ARL 1160.022 -999.990 ... v1 2015 09 15 00 08 00 71.3230 -156.6114 16.00 11.00 5.00 390155 BRW 2015 06 29 20 02 00 3653-99 P C2H6 ARL 1158.467 -999.990 ... v1 2015 09 03 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 390062 BRW 2015 06 29 20 02 00 5029-99 P C2H6 ARL 1170.333 -999.990 ... v1 2015 09 03 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 390063 BRW 2015 07 06 18 05 00 1869-99 P C2H6 ARL 1006.867 -999.990 ... v1 2015 09 23 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 390505 BRW 2015 07 06 18 05 00 4525-99 P C2H6 ARL 1021.711 -999.990 ... v1 2015 09 23 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 390504 BRW 2015 07 13 18 05 00 3063-99 P C2H6 ARL 934.444 -999.990 ... v1 2015 09 23 12 09 00 71.3230 -156.6114 16.00 11.00 5.00 391131 BRW 2015 07 13 18 05 00 5027-99 P C2H6 ARL 966.667 -999.990 ... v1 2015 09 23 12 10 00 71.3230 -156.6114 16.00 11.00 5.00 391132 BRW 2015 07 21 22 04 00 2189-99 P C2H6 ARL 763.478 -999.990 ... v1 2015 09 02 00 04 00 71.3230 -156.6114 16.00 11.00 5.00 391496 BRW 2015 07 21 22 04 00 590-99 P C2H6 ARL 752.911 -999.990 ... v1 2015 09 02 00 03 00 71.3230 -156.6114 16.00 11.00 5.00 391497 BRW 2015 07 29 22 04 00 1947-99 P C2H6 ARL 907.578 -999.990 ... v1 2015 09 25 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 392006 BRW 2015 07 29 22 04 00 1948-99 P C2H6 ARL 944.156 -999.990 ... v1 2015 09 25 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 392007 BRW 2015 08 06 18 02 00 1-99 P C2H6 ARL 2785.789 -999.990 ... v1 2015 09 28 12 01 00 71.3230 -156.6114 16.00 11.00 5.00 392523 BRW 2015 08 06 18 02 00 2068-99 P C2H6 ARL 2793.900 -999.990 ... v1 2015 09 28 12 02 00 71.3230 -156.6114 16.00 11.00 5.00 392524 BRW 2015 08 11 19 05 00 3029-99 P C2H6 ARL 33.467 -999.990 ... v1 2015 09 30 12 02 00 71.3230 -156.6114 16.00 11.00 5.00 392847 BRW 2015 08 17 18 10 00 4431-99 P C2H6 ARL 740.736 -999.990 ... v1 2015 10 05 00 04 00 71.3230 -156.6114 16.00 11.00 5.00 393193 BRW 2015 08 17 18 10 00 506-99 P C2H6 ARL 739.881 -999.990 ... v1 2015 10 05 00 03 00 71.3230 -156.6114 16.00 11.00 5.00 393194 BRW 2015 08 24 18 23 00 1212-99 P C2H6 ARL 722.814 -999.990 ... v1 2015 10 13 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 393478 BRW 2015 08 24 18 23 00 5135-99 P C2H6 ARL 761.104 -999.990 ... v1 2015 10 13 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 393479 BRW 2015 09 02 22 05 00 215-99 P C2H6 ARL 848.485 -999.990 ... v1 2015 10 05 12 07 00 71.3230 -156.6114 16.00 11.00 5.00 393962 BRW 2015 09 02 22 05 00 4669-99 P C2H6 ARL 837.662 -999.990 ... v1 2015 10 05 12 08 00 71.3230 -156.6114 16.00 11.00 5.00 393961 BRW 2015 09 09 19 05 00 2397-99 P C2H6 ARL 969.368 -999.990 ... v1 2016 05 19 12 07 00 71.3230 -156.6114 16.00 11.00 5.00 394634 BRW 2015 09 09 19 05 00 4315-99 P C2H6 ARL 959.486 -999.990 ... v1 2016 05 19 12 08 00 71.3230 -156.6114 16.00 11.00 5.00 394633 BRW 2015 09 14 22 05 00 1016-99 P C2H6 ARL 876.344 -999.990 ... v1 2016 05 13 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 394688 BRW 2015 09 14 22 05 00 4958-99 P C2H6 ARL 958.083 -999.990 ... v1 2016 05 13 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 394689 BRW 2015 09 21 19 05 00 3474-99 P C2H6 ARL 974.654 -999.990 ... v1 2016 05 23 00 03 00 71.3230 -156.6114 27.50 11.00 16.50 395109 BRW 2015 09 21 19 05 00 6280-66 P C2H6 ARL 976.482 -999.990 ... v1 2016 05 23 00 04 00 71.3230 -156.6114 27.50 11.00 16.50 395108 BRW 2015 10 02 18 08 00 3326-99 P C2H6 ARL 1039.397 -999.990 ... v1 2016 05 27 12 02 00 71.3230 -156.6114 16.00 11.00 5.00 396110 BRW 2015 10 02 18 08 00 956-99 P C2H6 ARL 1051.561 -999.990 ... v1 2016 05 27 12 01 00 71.3230 -156.6114 16.00 11.00 5.00 396111 BRW 2015 10 05 18 06 00 1029-99 P C2H6 ARL 1103.607 -999.990 ... v1 2016 04 14 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 396272 BRW 2015 10 05 18 06 00 769-99 P C2H6 ARL 1053.576 -999.990 ... v1 2016 04 14 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 396273 BRW 2015 10 12 19 08 00 219-99 P C2H6 ARL 1179.555 -999.990 ... v1 2016 06 10 12 03 00 71.3230 -156.6114 16.00 11.00 5.00 396437 BRW 2015 10 19 19 06 00 1247-99 P C2H6 ARL 1059.098 -999.990 ... v1 2016 04 17 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 396607 BRW 2015 10 19 19 06 00 2189-99 P C2H6 ARL 1041.803 -999.990 ... v1 2016 04 17 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 396608 BRW 2015 10 28 01 06 00 1976-99 P C2H6 ARL 1038.996 -999.990 ... v1 2016 03 21 12 01 00 71.3230 -156.6114 16.00 11.00 5.00 397260 BRW 2015 10 28 01 06 00 3337-99 P C2H6 ARL 1038.402 -999.990 ... v1 2016 03 21 12 02 00 71.3230 -156.6114 16.00 11.00 5.00 397261 BRW 2015 11 02 20 05 00 4827-99 P C2H6 ARL 1145.943 -999.990 ... v1 2016 04 25 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 397570 BRW 2015 11 02 20 05 00 4874-99 P C2H6 ARL 1125.533 -999.990 ... v1 2016 04 25 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 397571 BRW 2015 11 09 19 08 00 145-99 P C2H6 ARL 1471.601 -999.990 ... v1 2016 05 01 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 397816 BRW 2015 11 09 19 08 00 4920-99 P C2H6 ARL 1480.237 -999.990 ... v1 2016 05 01 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 397817 BRW 2015 11 17 02 06 00 4095-99 P C2H6 ARL 1457.116 -999.990 ... v1 2016 01 14 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 398315 BRW 2015 11 17 02 06 00 4688-99 P C2H6 ARL 1445.280 -999.990 ... v1 2016 01 14 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 398314 BRW 2015 11 24 00 05 00 1615-99 P C2H6 ARL 1536.805 -999.990 ... v1 2016 01 12 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 398471 BRW 2015 11 24 00 05 00 618-99 P C2H6 ARL 1550.176 -999.990 ... v1 2016 01 12 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 398472 BRW 2015 11 30 20 07 00 464-99 P C2H6 ARL 1989.668 -999.990 ... v1 2016 01 07 12 03 00 71.3230 -156.6114 16.00 11.00 5.00 398896 BRW 2015 11 30 20 07 00 545-99 P C2H6 ARL 2020.664 -999.990 ... v1 2016 01 07 12 04 00 71.3230 -156.6114 16.00 11.00 5.00 398895 BRW 2015 12 07 19 09 00 3638-99 P C2H6 ARL 2042.385 -999.990 ... v1 2016 08 12 12 03 00 71.3230 -156.6114 16.00 11.00 5.00 399260 BRW 2015 12 07 19 09 00 4864-99 P C2H6 ARL 2037.634 -999.990 ... v1 2016 08 12 12 04 00 71.3230 -156.6114 16.00 11.00 5.00 399259 BRW 2015 12 14 19 11 00 1497-99 P C2H6 ARL 1995.943 -999.990 ... v1 2016 03 07 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 399863 BRW 2015 12 14 19 11 00 2163-99 P C2H6 ARL 1999.344 -999.990 ... v1 2016 03 07 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 399862 BRW 2015 12 23 00 10 00 2462-99 P C2H6 ARL 1945.205 -999.990 ... v1 2016 04 15 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 400143 BRW 2015 12 23 00 10 00 4189-99 P C2H6 ARL 1871.926 -999.990 ... v1 2016 04 15 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 400144 BRW 2016 01 04 19 10 00 3879-99 P C2H6 ARL 3638.873 -999.990 ... v1 2016 03 11 00 04 00 71.3230 -156.6114 16.00 11.00 5.00 400575 BRW 2016 01 04 19 10 00 586-99 P C2H6 ARL 3645.553 -999.990 ... v1 2016 03 11 00 03 00 71.3230 -156.6114 16.00 11.00 5.00 400574 BRW 2016 01 11 19 05 00 2386-99 P C2H6 ARL 2097.584 -999.990 ... v1 2016 02 22 12 05 00 71.3230 -156.6114 16.00 11.00 5.00 400902 BRW 2016 01 11 19 05 00 4007-99 P C2H6 ARL 2087.605 -999.990 ... v1 2016 02 22 12 06 00 71.3230 -156.6114 16.00 11.00 5.00 400903 BRW 2016 01 22 19 15 00 2676-99 P C2H6 ARL 3027.971 -999.990 ... v1 2016 03 14 12 01 00 71.3230 -156.6114 16.00 11.00 5.00 401644 BRW 2016 01 22 19 15 00 3127-99 P C2H6 ARL 3035.000 -999.990 ... v1 2016 03 14 12 02 00 71.3230 -156.6114 16.00 11.00 5.00 401645 BRW 2016 01 25 19 10 00 510-99 P C2H6 ARL 2672.164 -999.990 ... v1 2016 02 16 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 401642 BRW 2016 01 25 19 10 00 639-99 P C2H6 ARL 2661.470 -999.990 ... v1 2016 02 16 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 401643 BRW 2016 02 01 19 02 00 1318-99 P C2H6 ARL 2324.713 -999.990 ... v1 2016 04 11 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 402085 BRW 2016 02 01 19 02 00 3460-99 P C2H6 ARL 2325.061 -999.990 ... v1 2016 04 11 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 402086 BRW 2016 02 08 20 13 00 311-99 P C2H6 ARL 2381.352 -999.990 ... v1 2016 04 19 12 03 00 71.3230 -156.6114 16.00 11.00 5.00 402786 BRW 2016 02 15 21 13 00 1428-99 P C2H6 ARL 2286.619 -999.990 ... v1 2016 03 07 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 402814 BRW 2016 02 15 21 13 00 3941-99 P C2H6 ARL 2298.688 -999.990 ... v1 2016 03 07 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 402813 BRW 2016 02 22 19 06 00 4351-99 P C2H6 ARL 2356.002 -999.990 ... v1 2016 06 29 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 403268 BRW 2016 02 22 19 06 00 909-99 P C2H6 ARL 2351.893 -999.990 ... v1 2016 06 29 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 403269 BRW 2016 02 29 21 05 00 1867-99 P C2H6 ARL 2318.484 -999.990 ... v1 2016 04 13 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 403491 BRW 2016 02 29 21 05 00 5396-99 P C2H6 ARL 2309.344 -999.990 ... v1 2016 04 13 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 403492 BRW 2016 03 07 19 05 00 312-99 P C2H6 ARL 2372.446 -999.990 ... v1 2016 07 15 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 403711 BRW 2016 03 07 19 05 00 592-99 P C2H6 ARL 2349.753 -999.990 ... v1 2016 07 15 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 403712 BRW 2016 03 17 20 06 00 4235-99 P C2H6 ARL 2181.015 -999.990 ... v1 2016 08 05 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 404241 BRW 2016 03 17 20 06 00 4530-99 P C2H6 ARL 2181.628 -999.990 ... v1 2016 08 05 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 404240 BRW 2016 03 21 19 04 00 2359-99 P C2H6 ARL 2324.447 -999.990 ... v1 2016 05 26 00 07 00 71.3230 -156.6114 16.00 11.00 5.00 404505 BRW 2016 03 21 19 04 00 3447-99 P C2H6 ARL 2306.996 -999.990 ... v1 2016 05 26 00 08 00 71.3230 -156.6114 16.00 11.00 5.00 404506 BRW 2016 04 04 18 12 00 1711-99 P C2H6 ARL 2139.138 -999.990 ... v1 2016 08 29 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 405173 BRW 2016 04 04 18 12 00 4950-99 P C2H6 ARL 2137.758 -999.990 ... v1 2016 08 29 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 405174 BRW 2016 04 11 20 04 00 390-99 P C2H6 ARL 2239.103 -999.990 ... v1 2016 07 13 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 405550 BRW 2016 04 11 20 04 00 4313-99 P C2H6 ARL 2240.651 -999.990 ... v1 2016 07 13 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 405549 BRW 2016 04 18 18 02 00 3562-99 P C2H6 ARL 1279.013 -999.990 ... v1 2016 08 28 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 406898 BRW 2016 04 18 18 02 00 4252-99 P C2H6 ARL 1272.979 -999.990 ... v1 2016 08 28 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 406899 BRW 2016 04 26 18 01 00 4963-99 P C2H6 ARL 1729.960 -999.990 ... v1 2016 10 04 12 04 00 71.3230 -156.6114 16.00 11.00 5.00 406583 BRW 2016 04 26 18 01 00 664-99 P C2H6 ARL 1726.172 -999.990 ... v1 2016 10 04 12 03 00 71.3230 -156.6114 16.00 11.00 5.00 406582 BRW 2016 05 02 18 05 00 1737-99 P C2H6 ARL 1243.688 -999.990 ... v1 2016 07 29 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 406859 BRW 2016 05 02 18 05 00 4271-99 P C2H6 ARL 1239.349 -999.990 ... v1 2016 07 29 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 406858 BRW 2016 05 09 19 01 00 3489-99 P C2H6 ARL 1258.889 -999.990 ... v1 2016 08 18 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 407223 BRW 2016 05 09 19 01 00 4489-99 P C2H6 ARL 1270.402 -999.990 ... v1 2016 08 18 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 407222 BRW 2016 05 16 18 02 00 268-99 P C2H6 ARL 1126.897 -999.990 ... v1 2016 08 23 00 08 00 71.3230 -156.6114 16.00 11.00 5.00 407693 BRW 2016 05 16 18 02 00 27-99 P C2H6 ARL 1124.416 -999.990 ... v1 2016 08 23 00 07 00 71.3230 -156.6114 16.00 11.00 5.00 407692 BRW 2016 05 23 18 01 00 2492-99 P C2H6 ARL 1314.980 -999.990 ... v1 2016 09 20 00 03 00 71.3230 -156.6114 27.50 11.00 16.50 408414 BRW 2016 05 23 18 01 00 4686-99 P C2H6 ARL 1285.230 -999.990 ... v1 2016 09 20 00 04 00 71.3230 -156.6114 27.50 11.00 16.50 408415 BRW 2016 06 03 19 11 00 2629-99 P C2H6 ARL 1041.273 -999.990 ... v1 2016 10 05 00 04 00 71.3230 -156.6114 16.00 11.00 5.00 408817 BRW 2016 06 03 19 11 00 575-99 P C2H6 ARL 1044.424 -999.990 ... v1 2016 10 05 00 03 00 71.3230 -156.6114 16.00 11.00 5.00 408816 BRW 2016 06 10 19 19 00 2171-99 P C2H6 ARL 982.675 -999.990 ... v1 2016 09 20 12 08 00 71.3230 -156.6114 16.00 11.00 5.00 409928 BRW 2016 06 10 19 19 00 329-99 P C2H6 ARL 984.128 -999.990 ... v1 2016 09 20 12 07 00 71.3230 -156.6114 16.00 11.00 5.00 409929 BRW 2016 06 16 21 22 00 4253-99 P C2H6 ARL 975.212 -999.990 ... v1 2016 10 12 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 409481 BRW 2016 06 16 21 22 00 5144-99 P C2H6 ARL 975.626 -999.990 ... v1 2016 10 12 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 409482 BRW 2016 06 23 00 05 00 3281-99 P C2H6 ARL 1015.747 -999.990 ... v1 2016 08 24 12 05 00 71.3230 -156.6114 16.00 11.00 5.00 409942 BRW 2016 06 23 00 05 00 4743-99 P C2H6 ARL 1009.578 -999.990 ... v1 2016 08 24 12 06 00 71.3230 -156.6114 16.00 11.00 5.00 409943 BRW 2016 06 30 18 02 00 2708-99 P C2H6 ARL 819.496 -999.990 ... v1 2016 11 17 00 03 00 71.3230 -156.6114 16.00 11.00 5.00 410131 BRW 2016 06 30 18 02 00 4975-99 P C2H6 ARL 819.597 -999.990 ... v1 2016 11 17 00 04 00 71.3230 -156.6114 16.00 11.00 5.00 410132 BRW 2016 07 06 18 06 00 327-99 P C2H6 ARL 797.435 -999.990 ... v1 2016 09 19 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 410621 BRW 2016 07 06 18 06 00 5407-99 P C2H6 ARL 864.058 -999.990 ... v1 2016 09 19 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 410620 BRW 2016 07 15 19 01 00 5199-99 P C2H6 ARL 754.208 -999.990 ... v1 2016 09 09 00 04 00 71.3230 -156.6114 16.00 11.00 5.00 410908 BRW 2016 07 15 19 01 00 56-99 P C2H6 ARL 760.842 -999.990 ... v1 2016 09 09 00 03 00 71.3230 -156.6114 16.00 11.00 5.00 410907 BRW 2016 07 21 18 04 00 296-99 P C2H6 ARL 642.949 -999.990 ... v1 2016 10 26 12 03 00 71.3230 -156.6114 16.00 11.00 5.00 411222 BRW 2016 07 21 18 04 00 5005-99 P C2H6 ARL 647.859 -999.990 ... v1 2016 10 26 12 04 00 71.3230 -156.6114 16.00 11.00 5.00 411221 BRW 2016 07 25 19 10 00 4231-99 P C2H6 ARL 597.054 -999.990 ... v1 2016 09 29 12 03 00 71.3230 -156.6114 16.00 11.00 5.00 411547 BRW 2016 07 25 19 10 00 4867-99 P C2H6 ARL 598.938 -999.990 ... v1 2016 09 29 12 04 00 71.3230 -156.6114 16.00 11.00 5.00 411548 BRW 2016 08 04 18 11 00 1779-99 P C2H6 ARL 625.556 -999.990 ... v1 2016 10 11 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 412632 BRW 2016 08 04 18 11 00 2996-99 P C2H6 ARL 620.242 -999.990 ... v1 2016 10 11 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 412633 BRW 2016 08 10 23 42 00 3120-99 P C2H6 ARL 599.980 -999.990 ... v1 2016 10 07 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 412790 BRW 2016 08 10 23 42 00 4690-99 P C2H6 ARL 603.758 -999.990 ... v1 2016 10 07 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 412791 BRW 2016 08 19 20 08 00 2796-99 P C2H6 ARL 643.364 -999.990 ... v1 2016 10 19 00 11 00 71.3230 -156.6114 16.00 11.00 5.00 412923 BRW 2016 08 19 20 08 00 5640-99 P C2H6 ARL 639.212 -999.990 ... v1 2016 10 19 00 12 00 71.3230 -156.6114 16.00 11.00 5.00 412924 BRW 2016 08 23 18 17 00 5573-99 P C2H6 ARL 616.119 -999.990 ... v1 2016 11 09 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 413370 BRW 2016 08 23 18 17 00 5717-99 P C2H6 ARL 621.814 -999.990 ... v1 2016 11 09 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 413369 BRW 2016 08 29 19 05 00 424-99 P C2H6 ARL 675.655 -999.990 ... v1 2016 11 09 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 413724 BRW 2016 08 29 19 05 00 4769-99 P C2H6 ARL 673.478 -999.990 ... v1 2016 11 09 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 413725 BRW 2016 09 09 18 00 00 2023-99 S C2H6 ARL 687.901 -999.990 ... v1 2017 03 09 00 06 00 71.3230 -156.6114 27.50 11.00 16.50 414229 BRW 2016 09 09 18 02 00 3258-99 P C2H6 ARL 725.168 -999.990 ... v1 2017 03 09 00 07 00 71.3230 -156.6114 16.00 11.00 5.00 414231 BRW 2016 09 12 18 04 00 290-99 P C2H6 ARL 715.272 -999.990 ... v1 2016 11 18 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 414323 BRW 2016 09 12 18 04 00 825-99 P C2H6 ARL 722.470 -999.990 ... v1 2016 11 18 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 414324 BRW 2016 09 22 00 25 00 3415-99 P C2H6 ARL 738.046 -999.990 ... v1 2016 12 08 12 06 00 71.3230 -156.6114 16.00 11.00 5.00 414947 BRW 2016 09 22 00 25 00 41-99 P C2H6 ARL 708.868 -999.990 ... v1 2016 12 08 12 05 00 71.3230 -156.6114 16.00 11.00 5.00 414946 BRW 2016 09 30 18 01 00 4525-99 P C2H6 ARL 889.319 -999.990 ... v1 2016 12 10 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 415359 BRW 2016 09 30 18 01 00 481-99 P C2H6 ARL 901.373 -999.990 ... v1 2016 12 10 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 415360 BRW 2016 10 07 18 03 00 4909-99 P C2H6 ARL 1288.296 -999.990 ... v1 2016 12 20 00 07 00 71.3230 -156.6114 16.00 11.00 5.00 415539 BRW 2016 10 07 18 03 00 5217-99 P C2H6 ARL 1296.222 -999.990 ... v1 2016 12 20 00 08 00 71.3230 -156.6114 16.00 11.00 5.00 415538 BRW 2016 10 11 18 22 00 1976-99 P C2H6 ARL 1044.810 -999.990 ... v1 2016 12 21 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 415540 BRW 2016 10 11 18 22 00 2156-99 P C2H6 ARL 1071.934 -999.990 ... v1 2016 12 21 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 415541 BRW 2016 10 21 19 03 00 452-99 P C2H6 ARL 1011.673 -999.990 ... v1 2016 12 30 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 416312 BRW 2016 10 21 19 03 00 5291-99 P C2H6 ARL 1035.441 -999.990 ... v1 2016 12 30 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 416313 BRW 2016 10 28 18 03 00 3978-99 P C2H6 ARL 1302.217 -999.990 ... v1 2017 01 17 00 05 00 71.3230 -156.6114 16.00 11.00 5.00 416617 BRW 2016 10 28 18 03 00 4480-99 P C2H6 ARL 1326.392 -999.990 ... v1 2017 01 17 00 06 00 71.3230 -156.6114 16.00 11.00 5.00 416618 BRW 2016 10 31 16 04 00 1233-99 P C2H6 ARL 1346.153 -999.990 ... v1 2017 01 19 12 03 00 71.3230 -156.6114 16.00 11.00 5.00 416611 BRW 2016 10 31 16 04 00 3609-99 P C2H6 ARL 1343.181 -999.990 ... v1 2017 01 19 12 04 00 71.3230 -156.6114 16.00 11.00 5.00 416612 BRW 2016 11 08 20 06 00 2350-99 P C2H6 ARL 1271.313 -999.990 ... v1 2016 12 29 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 416821 BRW 2016 11 08 20 06 00 5714-99 P C2H6 ARL 1247.274 -999.990 ... v1 2016 12 29 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 416822 BRW 2016 11 18 02 14 00 4508-99 P C2H6 ARL 1298.360 -999.990 ... v1 2017 01 19 12 02 00 71.3230 -156.6114 16.00 11.00 5.00 417465 BRW 2016 11 18 02 14 00 489-99 P C2H6 ARL 1298.111 -999.990 ... v1 2017 01 19 12 01 00 71.3230 -156.6114 16.00 11.00 5.00 417464 BRW 2016 11 22 02 04 00 4836-99 P C2H6 ARL 1264.374 -999.990 ... v1 2017 01 24 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 417718 BRW 2016 11 22 02 04 00 4921-99 P C2H6 ARL 1257.853 -999.990 ... v1 2017 01 24 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 417717 BRW 2016 12 02 23 21 00 4244-99 P C2H6 ARL 1463.247 -999.990 ... v1 2017 03 13 00 10 00 71.3230 -156.6114 16.00 11.00 5.00 418479 BRW 2016 12 02 23 21 00 56-99 P C2H6 ARL 1469.475 -999.990 ... v1 2017 03 13 00 09 00 71.3230 -156.6114 16.00 11.00 5.00 418480 BRW 2016 12 09 20 05 00 4064-99 P C2H6 ARL 2042.604 -999.990 ... v1 2017 03 06 00 03 00 71.3230 -156.6114 16.00 11.00 5.00 418837 BRW 2016 12 09 20 05 00 4232-99 P C2H6 ARL 2027.693 -999.990 ... v1 2017 03 06 00 04 00 71.3230 -156.6114 16.00 11.00 5.00 418838 BRW 2016 12 13 23 04 00 1175-99 P C2H6 ARL 2052.475 -999.990 ... v1 2017 03 13 00 03 00 71.3230 -156.6114 16.00 11.00 5.00 418634 BRW 2016 12 13 23 04 00 5600-99 P C2H6 ARL 2042.218 -999.990 ... v1 2017 03 13 00 04 00 71.3230 -156.6114 16.00 11.00 5.00 418635 BRW 2016 12 23 19 01 00 2333-99 P C2H6 ARL 2231.961 -999.990 ... v1 2017 03 20 00 13 00 71.3230 -156.6114 16.00 11.00 5.00 418902 BRW 2016 12 23 19 01 00 5439-99 P C2H6 ARL 2278.792 -999.990 ... v1 2017 03 20 00 14 00 71.3230 -156.6114 16.00 11.00 5.00 418903 BRW 2016 12 26 20 09 00 4514-99 P C2H6 ARL 2242.893 -999.990 ... v1 2017 04 03 12 05 00 71.3230 -156.6114 16.00 11.00 5.00 419049 BRW 2016 12 26 20 09 00 4791-99 P C2H6 ARL 2019.026 -999.990 ... v1 2017 04 03 12 06 00 71.3230 -156.6114 16.00 11.00 5.00 419050