# number_of_header_lines: 97 # comment: # comment: ************ USE OF ESRL GMD DATA **************** # comment: # comment: These data are made freely available to the public and the # comment: scientific community in the belief that their wide dissemination # comment: will lead to greater understanding and new scientific insights. # comment: The availability of these data does not constitute publication # comment: of the data. NOAA relies on the ethics and integrity of the user to # comment: ensure that GML receives fair credit for their work. If the data # comment: are obtained for potential use in a publication or presentation, # comment: GML should be informed at the outset of the nature of this work. # comment: If the GML data are essential to the work, or if an important # comment: result or conclusion depends on the GML data, co-authorship # comment: may be appropriate. This should be discussed at an early stage in # comment: the work. Manuscripts using the GML data should be sent to GML # comment: for review before they are submitted for publication so we can # comment: ensure that the quality and limitations of the data are accurately # comment: represented. # comment: Please see accompanying README file, if available, for citation text. # comment: # comment: Every effort is made to produce the most accurate and precise # comment: measurements possible. However, we reserve the right to make # comment: corrections to the data based on recalibration of standard gases # comment: or for other reasons deemed scientifically justified. # comment: # comment: We are not responsible for results and conclusions based on use # comment: of these data without regard to this warning. # comment: # contact_parameter: C2H6 ARL (Individual Flasks) # contact_name: John Mund # contact_telephone: (303) 497-5472 # contact_email: John.Mund@noaa.gov # comment: # comment: ************ COLLABORATORS *************** # comment: # comment: NOAA thanks the following collaborators without # comment: whom these measurements would not be possible. # comment: # collaborator_name: Lawrence Berkeley National Laboratory [LBNL] # collaborator_url: http://esd.lbl.gov/about/staff/sebastienbiraud/ # collaborator_comment: SGP Principal Investigator: # collaborator_comment: Sebastien C. Biraud, Research Scientist # collaborator_comment: Atmospheric Science Dept. # collaborator_comment: Lawrence Berkeley National Laboratory # collaborator_comment: MS 84R0171 # collaborator_comment: 1 Cyclotron Road # collaborator_comment: Berkeley, CA 94720 # collaborator_comment: # collaborator_comment: SCBiraud@lbl.gov email # collaborator_comment: phone 510-486-6084 # collaborator_comment: fax 510-486-7775 # collaborator_comment: # collaborator_comment: If the data are obtained for potential use # collaborator_comment: in a publication or presentation, LBNL and # collaborator_comment: NOAA should be informed at the outset of # collaborator_comment: the nature of this work. If the LBNL-NOAA # collaborator_comment: data are essential to the work, or if an # collaborator_comment: important result or conclusion depends on # collaborator_comment: the LBNL-NOAA data, co-authorship may be # collaborator_comment: appropriate. This should be discussed at # collaborator_comment: an early stage in the work. Manuscripts # collaborator_comment: using the LBNL-NOAA data should be sent # collaborator_comment: to LBNL and NOAA for review before they # collaborator_comment: are submitted for publication so we can # collaborator_comment: insure that the quality and limitations # collaborator_comment: of the data are accurately represented. # collaborator_comment: # comment: # comment: ************ RECIPROCITY AGREEMENT *************** # comment: # comment: Use of these data implies an agreement to reciprocate. # comment: Laboratories making similar measurements agree to make their # comment: own data available to the general public and to the scientific # comment: community in an equally complete and easily accessible form. # comment: Modelers are encouraged to make available to the community, # comment: upon request, their own tools used in the interpretation # comment: of the GML data, namely well documented model code, transport # comment: fields, and additional information necessary for other # comment: scientists to repeat the work and to run modified versions. # comment: Model availability includes collaborative support for new # comment: users of the models. # comment: # comment: ************ DATA DESCRIPTION *************** # comment: # description_site-code: sgp # description_project-abbr: ccg_surface # description_strategy-abbr: flask # description_sample-constraints: date:1900-01-01,2016-12-31 # description_creation-time: 2021-05-04 10:09:02 # comment: # comment: ************ DATA DOCUMENTATION *************** # comment: # comment: Please refer to the species-specific README file in the # comment: appropriate directory folder at ftp://aftp.cmdl.noaa.gov/data/trace_gases/. # comment: # data_fields: sample_site_code sample_year sample_month sample_day sample_hour sample_minute sample_seconds sample_id sample_method parameter_formula analysis_group_abbr analysis_value analysis_uncertainty analysis_flag analysis_instrument analysis_year analysis_month analysis_day analysis_hour analysis_minute analysis_seconds sample_latitude sample_longitude sample_altitude sample_elevation sample_intake_height event_number SGP 2005 11 17 21 16 00 2507-99 D C2H6 ARL 10087.194 -999.990 ... v1 2005 12 15 10 07 00 36.7800 -97.5000 374.00 314.00 60.00 209676 SGP 2005 11 17 21 16 00 2508-99 D C2H6 ARL 10248.711 -999.990 ... v1 2005 12 15 10 08 00 36.7800 -97.5000 374.00 314.00 60.00 209677 SGP 2005 11 23 17 25 00 53-99 D C2H6 ARL 11275.000 -999.990 ... v1 2005 12 15 10 09 00 36.7800 -97.5000 374.00 314.00 60.00 209674 SGP 2005 11 23 17 25 00 54-99 D C2H6 ARL 10248.711 -999.990 ... v1 2005 12 15 10 10 00 36.7800 -97.5000 374.00 314.00 60.00 209675 SGP 2005 12 01 19 25 00 1997-99 D C2H6 ARL 7766.516 -999.990 ... v1 2006 01 28 00 13 00 36.7800 -97.5000 374.00 314.00 60.00 211482 SGP 2005 12 01 19 25 00 1998-99 D C2H6 ARL 8028.031 -999.990 ... v1 2006 01 28 00 14 00 36.7800 -97.5000 374.00 314.00 60.00 211483 SGP 2006 01 05 21 07 00 277-99 G C2H6 ARL 1435.588 -999.990 ... v1 2006 01 29 00 03 00 36.7800 -97.5000 374.00 314.00 60.00 211480 SGP 2006 01 05 21 07 00 278-99 G C2H6 ARL 1532.783 -999.990 ... v1 2006 01 29 00 04 00 36.7800 -97.5000 374.00 314.00 60.00 211481 SGP 2006 01 19 20 04 00 2075-99 G C2H6 ARL 13016.470 -999.990 ... v1 2006 02 21 00 03 00 36.7800 -97.5000 374.00 314.00 60.00 211922 SGP 2006 01 19 20 04 00 2075-99 G C2H6 ARL 3984.095 -999.990 ... v1 2006 02 21 00 05 00 36.7800 -97.5000 374.00 314.00 60.00 211922 SGP 2006 01 19 20 04 00 2076-99 G C2H6 ARL 14902.420 -999.990 .X. v1 2006 02 21 00 04 00 36.7800 -97.5000 374.00 314.00 60.00 211923 SGP 2006 01 19 20 04 00 2076-99 G C2H6 ARL 4606.561 -999.990 ... v1 2006 02 21 00 06 00 36.7800 -97.5000 374.00 314.00 60.00 211923 SGP 2006 02 09 19 58 00 4189-99 G C2H6 ARL 209.040 -999.990 ... v1 2006 05 01 00 13 00 36.7800 -97.5000 374.00 314.00 60.00 213209 SGP 2006 02 09 19 58 00 4190-99 G C2H6 ARL 169.253 -999.990 ... v1 2006 05 01 00 14 00 36.7800 -97.5000 374.00 314.00 60.00 213210 SGP 2006 02 16 20 21 00 2911-99 G C2H6 ARL 2833.803 -999.990 ... v1 2006 03 22 00 09 00 36.7800 -97.5000 374.00 314.00 60.00 213207 SGP 2006 02 16 20 21 00 2912-99 G C2H6 ARL 2709.643 -999.990 ... v1 2006 03 22 00 10 00 36.7800 -97.5000 374.00 314.00 60.00 213208 SGP 2006 03 09 20 02 00 689-99 G C2H6 ARL 3775.808 -999.990 ... v1 2006 04 21 00 11 00 36.7800 -97.5000 374.00 314.00 60.00 214190 SGP 2006 03 09 20 02 00 690-99 G C2H6 ARL 3599.299 -999.990 ... v1 2006 04 21 00 12 00 36.7800 -97.5000 374.00 314.00 60.00 214191 SGP 2006 03 16 20 00 00 3665-99 G C2H6 ARL 3597.409 -999.990 ... v1 2006 04 28 00 13 00 36.7800 -97.5000 374.00 314.00 60.00 214188 SGP 2006 03 16 20 00 00 3666-99 G C2H6 ARL 4063.567 -999.990 ... v1 2006 04 28 00 14 00 36.7800 -97.5000 374.00 314.00 60.00 214189 SGP 2006 03 23 20 00 00 267-99 G C2H6 ARL 2989.954 -999.990 ... v1 2006 05 03 00 13 00 36.7800 -97.5000 374.00 314.00 60.00 214821 SGP 2006 03 23 20 00 00 268-99 G C2H6 ARL 2862.637 -999.990 ... v1 2006 05 03 00 14 00 36.7800 -97.5000 374.00 314.00 60.00 214822 SGP 2006 03 30 20 10 00 3459-99 G C2H6 ARL 5444.725 -999.990 ... v1 2006 05 02 00 03 00 36.7800 -97.5000 374.00 314.00 60.00 214823 SGP 2006 03 30 20 10 00 3460-99 G C2H6 ARL 5610.793 -999.990 ... v1 2006 05 02 00 04 00 36.7800 -97.5000 374.00 314.00 60.00 214824 SGP 2006 04 06 19 23 00 3947-99 G C2H6 ARL 4537.134 -999.990 ... v1 2006 05 17 12 05 00 36.7800 -97.5000 374.00 314.00 60.00 215485 SGP 2006 04 06 19 23 00 3948-99 G C2H6 ARL 4621.509 -999.990 ... v1 2006 05 17 12 06 00 36.7800 -97.5000 374.00 314.00 60.00 215486 SGP 2006 04 13 19 52 00 2745-99 G C2H6 ARL 3513.750 -999.990 ... v1 2006 05 17 12 03 00 36.7800 -97.5000 374.00 314.00 60.00 215483 SGP 2006 04 13 19 52 00 2746-99 G C2H6 ARL 3999.162 -999.990 ... v1 2006 05 17 12 04 00 36.7800 -97.5000 374.00 314.00 60.00 215484 SGP 2006 04 20 19 00 00 3295-99 G C2H6 ARL -999.990 -999.990 A.. v1 2006 06 12 00 07 00 36.7800 -97.5000 374.00 314.00 60.00 216455 SGP 2006 04 20 19 00 00 3296-99 G C2H6 ARL -999.990 -999.990 A.. v1 2006 06 12 00 08 00 36.7800 -97.5000 374.00 314.00 60.00 216456 SGP 2006 04 27 19 01 00 1071-99 G C2H6 ARL -999.990 -999.990 A.. v1 2006 06 12 00 09 00 36.7800 -97.5000 374.00 314.00 60.00 216453 SGP 2006 04 27 19 01 00 1072-99 G C2H6 ARL -999.990 -999.990 A.. v1 2006 06 12 00 10 00 36.7800 -97.5000 374.00 314.00 60.00 216454 SGP 2006 05 04 19 22 00 1569-99 G C2H6 ARL 2195.018 -999.990 ... v1 2006 06 29 00 09 00 36.7800 -97.5000 374.00 314.00 60.00 216932 SGP 2006 05 04 19 22 00 1570-99 G C2H6 ARL 2178.222 -999.990 ... v1 2006 06 29 00 10 00 36.7800 -97.5000 374.00 314.00 60.00 216933 SGP 2006 06 08 18 45 00 3397-99 G C2H6 ARL 2587.515 -999.990 P.. v1 2006 08 04 00 09 00 36.7800 -97.5000 374.00 314.00 60.00 218394 SGP 2006 06 08 18 45 00 3398-99 G C2H6 ARL 2188.095 -999.990 P.. v1 2006 08 04 00 10 00 36.7800 -97.5000 374.00 314.00 60.00 218395 SGP 2006 06 15 18 00 00 695-99 G C2H6 ARL 3997.591 -999.990 ... v1 2006 08 11 12 09 00 36.7800 -97.5000 374.00 314.00 60.00 218827 SGP 2006 06 15 18 00 00 696-99 G C2H6 ARL 11357.546 -999.990 ... v1 2006 08 02 00 04 00 36.7800 -97.5000 374.00 314.00 60.00 218828 SGP 2006 06 22 18 55 00 3923-99 G C2H6 ARL 2200.229 -999.990 ... v1 2006 07 25 00 03 00 36.7800 -97.5000 374.00 314.00 60.00 218829 SGP 2006 06 22 18 55 00 3924-99 G C2H6 ARL 2232.790 -999.990 ... v1 2006 07 25 00 04 00 36.7800 -97.5000 374.00 314.00 60.00 218830 SGP 2006 06 29 18 51 00 3743-99 G C2H6 ARL 2696.692 -999.990 ... v1 2006 07 29 00 09 00 36.7800 -97.5000 374.00 314.00 60.00 219410 SGP 2006 06 29 18 51 00 3744-99 G C2H6 ARL 2777.271 -999.990 ... v1 2006 07 29 00 10 00 36.7800 -97.5000 374.00 314.00 60.00 219411 SGP 2006 07 06 19 09 00 2965-99 G C2H6 ARL 1777.485 -999.990 ... v1 2006 07 29 00 05 00 36.7800 -97.5000 374.00 314.00 60.00 219408 SGP 2006 07 06 19 09 00 2966-99 G C2H6 ARL 1924.436 -999.990 ... v1 2006 07 29 00 06 00 36.7800 -97.5000 374.00 314.00 60.00 219409 SGP 2006 07 27 19 00 00 443-99 G C2H6 ARL 3194.328 -999.990 ... v1 2006 08 27 00 13 00 36.7800 -97.5000 374.00 314.00 60.00 220650 SGP 2006 07 27 19 00 00 444-99 G C2H6 ARL 3074.328 -999.990 ... v1 2006 08 27 00 14 00 36.7800 -97.5000 374.00 314.00 60.00 220651 SGP 2006 08 03 19 15 00 1181-99 G C2H6 ARL 2254.453 -999.990 ... v1 2006 09 05 12 03 00 36.7800 -97.5000 374.00 314.00 60.00 220648 SGP 2006 08 03 19 15 00 1182-99 G C2H6 ARL 2171.234 -999.990 ... v1 2006 09 05 12 04 00 36.7800 -97.5000 374.00 314.00 60.00 220649 SGP 2006 08 10 20 20 00 3201-99 G C2H6 ARL 3173.438 -999.990 ... v1 2006 09 17 00 11 00 36.7800 -97.5000 374.00 314.00 60.00 221557 SGP 2006 08 10 20 20 00 3202-99 G C2H6 ARL 3191.391 -999.990 ... v1 2006 09 17 00 12 00 36.7800 -97.5000 374.00 314.00 60.00 221558 SGP 2006 08 17 18 20 00 873-99 G C2H6 ARL 7397.938 -999.990 ... v1 2006 09 14 00 05 00 36.7800 -97.5000 374.00 314.00 60.00 221555 SGP 2006 08 17 18 20 00 874-99 G C2H6 ARL 8025.859 -999.990 ... v1 2006 09 14 00 06 00 36.7800 -97.5000 374.00 314.00 60.00 221556 SGP 2006 08 24 19 30 00 2823-99 G C2H6 ARL 6774.985 -999.990 ... v1 2006 09 28 00 09 00 36.7800 -97.5000 374.00 314.00 60.00 222168 SGP 2006 08 24 19 30 00 2824-99 G C2H6 ARL 7357.203 -999.990 ... v1 2006 09 28 00 10 00 36.7800 -97.5000 374.00 314.00 60.00 222169 SGP 2006 08 31 19 15 00 1433-99 G C2H6 ARL 4556.324 -999.990 ... v1 2006 10 18 00 09 00 36.7800 -97.5000 374.00 314.00 60.00 222166 SGP 2006 08 31 19 15 00 1434-99 G C2H6 ARL 4575.372 -999.990 ... v1 2006 10 18 00 10 00 36.7800 -97.5000 374.00 314.00 60.00 222167 SGP 2006 09 07 19 07 00 241-99 G C2H6 ARL 1979.836 -999.990 ... v1 2006 10 25 12 07 00 36.7800 -97.5000 374.00 314.00 60.00 222781 SGP 2006 09 07 19 07 00 242-99 G C2H6 ARL 1752.738 -999.990 ... v1 2006 10 25 12 08 00 36.7800 -97.5000 374.00 314.00 60.00 222782 SGP 2006 09 14 19 16 00 1735-99 G C2H6 ARL 4288.542 -999.990 ... v1 2006 10 25 12 09 00 36.7800 -97.5000 374.00 314.00 60.00 222783 SGP 2006 09 14 19 16 00 1736-99 G C2H6 ARL 4127.545 -999.990 ... v1 2006 10 25 12 10 00 36.7800 -97.5000 374.00 314.00 60.00 222784 SGP 2006 09 21 19 00 00 917-99 G C2H6 ARL 4946.444 -999.990 ... v1 2006 10 26 00 07 00 36.7800 -97.5000 374.00 314.00 60.00 223454 SGP 2006 09 21 19 00 00 918-99 G C2H6 ARL 4975.923 -999.990 ... v1 2006 10 26 00 08 00 36.7800 -97.5000 374.00 314.00 60.00 223455 SGP 2006 09 27 18 12 00 4607-99 G C2H6 ARL 1780.610 -999.990 ... v1 2006 10 26 00 05 00 36.7800 -97.5000 374.00 314.00 60.00 223452 SGP 2006 09 27 18 12 00 4608-99 G C2H6 ARL 1780.804 -999.990 ... v1 2006 10 26 00 06 00 36.7800 -97.5000 374.00 314.00 60.00 223453 SGP 2006 10 19 19 00 00 1709-99 G C2H6 ARL 2397.028 -999.990 ... v1 2006 12 06 12 09 00 36.7800 -97.5000 374.00 314.00 60.00 224529 SGP 2006 10 19 19 00 00 1710-99 G C2H6 ARL 2418.914 -999.990 ... v1 2006 12 06 12 10 00 36.7800 -97.5000 374.00 314.00 60.00 224530 SGP 2006 10 26 20 10 00 2871-99 G C2H6 ARL 6905.772 -999.990 ... v1 2006 12 06 12 03 00 36.7800 -97.5000 374.00 314.00 60.00 224531 SGP 2006 10 26 20 10 00 2872-99 G C2H6 ARL 6788.671 -999.990 ... v1 2006 12 06 12 04 00 36.7800 -97.5000 374.00 314.00 60.00 224532 SGP 2006 11 09 20 19 00 6217-66 G C2H6 ARL 11766.157 -999.990 ... v1 2006 11 28 00 03 00 36.7800 -97.5000 374.00 314.00 60.00 225282 SGP 2006 11 09 20 19 00 6218-66 G C2H6 ARL 12203.286 -999.990 ... v1 2006 11 28 00 04 00 36.7800 -97.5000 374.00 314.00 60.00 225283 SGP 2006 12 21 18 42 00 4117-99 G C2H6 ARL 10085.347 -999.990 ... v1 2007 02 21 00 11 00 36.7800 -97.5000 374.00 314.00 60.00 227378 SGP 2006 12 21 18 42 00 4118-99 G C2H6 ARL 10112.577 -999.990 ... v1 2007 02 21 00 12 00 36.7800 -97.5000 374.00 314.00 60.00 227379 SGP 2006 12 28 20 00 00 345-99 G C2H6 ARL 4238.490 -999.990 ... v1 2007 02 05 00 07 00 36.7800 -97.5000 374.00 314.00 60.00 227741 SGP 2006 12 28 20 00 00 346-99 G C2H6 ARL 4211.261 -999.990 ... v1 2007 02 05 00 08 00 36.7800 -97.5000 374.00 314.00 60.00 227742 SGP 2007 01 04 21 06 00 2583-99 G C2H6 ARL 12875.942 -999.990 ... v1 2007 02 05 00 09 00 36.7800 -97.5000 374.00 314.00 60.00 227739 SGP 2007 01 04 21 06 00 2584-99 G C2H6 ARL 12899.238 -999.990 ... v1 2007 02 05 00 10 00 36.7800 -97.5000 374.00 314.00 60.00 227740 SGP 2007 01 11 21 13 00 3913-99 G C2H6 ARL 7516.565 -999.990 ... v1 2007 04 15 00 03 00 36.7800 -97.5000 374.00 314.00 60.00 228384 SGP 2007 01 11 21 13 00 3914-99 G C2H6 ARL 7526.658 -999.990 ... v1 2007 04 15 00 04 00 36.7800 -97.5000 374.00 314.00 60.00 228385 SGP 2007 01 18 20 43 00 2181-99 G C2H6 ARL 11460.384 -999.990 ... v1 2007 04 15 00 13 00 36.7800 -97.5000 374.00 314.00 60.00 228382 SGP 2007 01 18 20 43 00 2182-99 G C2H6 ARL 11557.454 -999.990 ... v1 2007 04 15 00 14 00 36.7800 -97.5000 374.00 314.00 60.00 228383 SGP 2007 01 25 20 04 00 3427-99 G C2H6 ARL 14588.859 -999.990 ... v1 2007 04 14 00 11 00 36.7800 -97.5000 374.00 314.00 60.00 229288 SGP 2007 01 25 20 04 00 3428-99 G C2H6 ARL 14464.191 -999.990 ... v1 2007 04 14 00 12 00 36.7800 -97.5000 374.00 314.00 60.00 229289 SGP 2007 02 01 20 59 00 829-99 G C2H6 ARL 20481.432 -999.990 ... v1 2007 04 26 12 07 00 36.7800 -97.5000 374.00 314.00 60.00 229286 SGP 2007 02 01 20 59 00 830-99 G C2H6 ARL 20468.170 -999.990 ... v1 2007 04 26 12 08 00 36.7800 -97.5000 374.00 314.00 60.00 229287 SGP 2007 02 08 21 56 00 3403-99 G C2H6 ARL 3842.042 -999.990 ... v1 2007 04 19 00 05 00 36.7800 -97.5000 374.00 314.00 60.00 230140 SGP 2007 02 08 21 56 00 3404-99 G C2H6 ARL 3759.284 -999.990 ... v1 2007 04 19 00 06 00 36.7800 -97.5000 374.00 314.00 60.00 230141 SGP 2007 02 15 20 11 00 2865-99 G C2H6 ARL 3906.154 -999.990 ... v1 2007 04 19 00 07 00 36.7800 -97.5000 374.00 314.00 60.00 230142 SGP 2007 02 15 20 11 00 2866-99 G C2H6 ARL 4202.202 -999.990 ... v1 2007 04 19 00 08 00 36.7800 -97.5000 374.00 314.00 60.00 230143 SGP 2007 02 22 19 51 00 6053-66 G C2H6 ARL 2879.848 -999.990 ... v1 2007 05 04 12 09 00 36.7800 -97.5000 374.00 314.00 60.00 230885 SGP 2007 02 22 19 51 00 6054-66 G C2H6 ARL 2920.124 -999.990 ... v1 2007 05 04 12 10 00 36.7800 -97.5000 374.00 314.00 60.00 230886 SGP 2007 03 01 20 00 00 1131-99 G C2H6 ARL 2778.395 -999.990 ... v1 2007 04 27 00 13 00 36.7800 -97.5000 374.00 314.00 60.00 230883 SGP 2007 03 01 20 00 00 1132-99 G C2H6 ARL 2838.793 -999.990 ... v1 2007 04 27 00 14 00 36.7800 -97.5000 374.00 314.00 60.00 230884 SGP 2007 03 08 21 05 00 3011-99 G C2H6 ARL 8783.302 -999.990 ... v1 2007 04 29 00 09 00 36.7800 -97.5000 374.00 314.00 60.00 231667 SGP 2007 03 08 21 05 00 3012-99 G C2H6 ARL 8913.249 -999.990 ... v1 2007 04 29 00 10 00 36.7800 -97.5000 374.00 314.00 60.00 231668 SGP 2007 03 15 18 30 00 1125-99 G C2H6 ARL 2945.849 -999.990 ... v1 2007 04 29 00 07 00 36.7800 -97.5000 374.00 314.00 60.00 231665 SGP 2007 03 15 18 30 00 1126-99 G C2H6 ARL 2802.454 -999.990 ... v1 2007 04 29 00 08 00 36.7800 -97.5000 374.00 314.00 60.00 231666 SGP 2007 03 22 19 56 00 393-99 G C2H6 ARL 5403.989 -999.990 ... v1 2007 05 08 00 09 00 36.7800 -97.5000 374.00 314.00 60.00 232326 SGP 2007 03 22 19 56 00 394-99 G C2H6 ARL 5411.524 -999.990 ... v1 2007 05 08 00 10 00 36.7800 -97.5000 374.00 314.00 60.00 232327 SGP 2007 03 29 19 10 00 1955-99 G C2H6 ARL 3846.620 -999.990 ... v1 2007 05 08 00 07 00 36.7800 -97.5000 374.00 314.00 60.00 232324 SGP 2007 03 29 19 10 00 1956-99 G C2H6 ARL 3976.787 -999.990 ... v1 2007 05 08 00 08 00 36.7800 -97.5000 374.00 314.00 60.00 232325 SGP 2007 04 05 19 43 00 2273-99 G C2H6 ARL 3518.601 -999.990 ... v1 2007 05 25 12 03 00 36.7800 -97.5000 374.00 314.00 60.00 233132 SGP 2007 04 05 19 43 00 2274-99 G C2H6 ARL 3092.369 -999.990 ... v1 2007 05 25 12 04 00 36.7800 -97.5000 374.00 314.00 60.00 233133 SGP 2007 04 12 20 50 00 803-99 G C2H6 ARL 3498.836 -999.990 ... v1 2007 05 26 00 07 00 36.7800 -97.5000 374.00 314.00 60.00 233130 SGP 2007 04 12 20 50 00 804-99 G C2H6 ARL 3490.845 -999.990 ... v1 2007 05 26 00 08 00 36.7800 -97.5000 374.00 314.00 60.00 233131 SGP 2007 04 26 19 03 00 1250-99 G C2H6 ARL 2372.465 -999.990 ... v1 2007 05 31 00 13 00 36.7800 -97.5000 374.00 314.00 60.00 234071 SGP 2007 04 26 19 03 00 1997-99 G C2H6 ARL 2237.784 -999.990 ... v1 2007 05 31 00 14 00 36.7800 -97.5000 374.00 314.00 60.00 234072 SGP 2007 05 03 20 14 00 3298-99 G C2H6 ARL 7624.474 -999.990 ... v1 2007 05 31 00 11 00 36.7800 -97.5000 374.00 314.00 60.00 234069 SGP 2007 05 03 20 14 00 4536-99 G C2H6 ARL 7398.476 -999.990 ... v1 2007 05 31 00 12 00 36.7800 -97.5000 374.00 314.00 60.00 234070 SGP 2007 05 10 19 22 00 625-99 G C2H6 ARL -999.990 -999.990 *.. v1 2007 08 09 00 09 00 36.7800 -97.5000 374.00 314.00 60.00 235352 SGP 2007 05 10 19 22 00 626-99 G C2H6 ARL 2749.309 -999.990 ... v1 2007 08 09 00 10 00 36.7800 -97.5000 374.00 314.00 60.00 235353 SGP 2007 05 17 20 23 00 3385-99 G C2H6 ARL 9600.056 -999.990 ... v1 2007 07 26 12 05 00 36.7800 -97.5000 374.00 314.00 60.00 235350 SGP 2007 05 17 20 23 00 3386-99 G C2H6 ARL 9603.273 -999.990 ... v1 2007 07 26 12 06 00 36.7800 -97.5000 374.00 314.00 60.00 235351 SGP 2007 05 24 19 06 00 1355-99 G C2H6 ARL 1755.515 -999.990 ... v1 2007 08 14 00 11 00 36.7800 -97.5000 374.00 314.00 60.00 235973 SGP 2007 05 24 19 06 00 1356-99 G C2H6 ARL 1728.401 -999.990 ... v1 2007 08 14 00 12 00 36.7800 -97.5000 374.00 314.00 60.00 235974 SGP 2007 05 31 20 17 00 2941-99 G C2H6 ARL 4828.062 -999.990 ... v1 2007 08 14 00 13 00 36.7800 -97.5000 374.00 314.00 60.00 235971 SGP 2007 05 31 20 17 00 2942-99 G C2H6 ARL 4692.399 -999.990 ... v1 2007 08 14 00 14 00 36.7800 -97.5000 374.00 314.00 60.00 235972 SGP 2007 06 07 18 26 00 2959-99 G C2H6 ARL 3650.569 -999.990 ... v1 2007 08 20 12 07 00 36.7800 -97.5000 374.00 314.00 60.00 236625 SGP 2007 06 07 18 26 00 2960-99 G C2H6 ARL 3652.737 -999.990 ... v1 2007 08 20 12 08 00 36.7800 -97.5000 374.00 314.00 60.00 236626 SGP 2007 06 14 19 51 00 3539-99 G C2H6 ARL -999.990 -999.990 C.. v1 2007 08 01 00 05 00 36.7800 -97.5000 374.00 314.00 60.00 236623 SGP 2007 06 14 19 51 00 3540-99 G C2H6 ARL -999.990 -999.990 C.. v1 2007 08 01 00 06 00 36.7800 -97.5000 374.00 314.00 60.00 236624 SGP 2007 06 20 19 47 00 1645-99 G C2H6 ARL 5648.537 -999.990 ... v1 2007 08 16 12 07 00 36.7800 -97.5000 374.00 314.00 60.00 238029 SGP 2007 06 28 20 57 00 2547-99 G C2H6 ARL 1848.252 -999.990 ... v1 2007 08 28 00 13 00 36.7800 -97.5000 374.00 314.00 60.00 238027 SGP 2007 06 28 20 57 00 2548-99 G C2H6 ARL 1890.447 -999.990 ... v1 2007 08 28 00 14 00 36.7800 -97.5000 374.00 314.00 60.00 238028 SGP 2007 07 05 19 27 00 4759-99 G C2H6 ARL 3351.545 -999.990 ... v1 2007 08 03 00 07 00 36.7800 -97.5000 374.00 314.00 60.00 238571 SGP 2007 07 05 19 27 00 4760-99 G C2H6 ARL 3403.523 -999.990 ... v1 2007 08 03 00 08 00 36.7800 -97.5000 374.00 314.00 60.00 238572 SGP 2007 07 12 20 13 00 3563-99 G C2H6 ARL 4495.827 -999.990 ... v1 2007 08 24 12 09 00 36.7800 -97.5000 374.00 314.00 60.00 238569 SGP 2007 07 12 20 13 00 3564-99 G C2H6 ARL 4157.913 -999.990 ... v1 2007 08 24 12 10 00 36.7800 -97.5000 374.00 314.00 60.00 238570 SGP 2007 07 19 19 53 00 919-99 G C2H6 ARL 2930.233 -999.990 ... v1 2007 09 05 00 05 00 36.7800 -97.5000 374.00 314.00 60.00 239583 SGP 2007 07 19 19 53 00 920-99 G C2H6 ARL 2933.407 -999.990 ... v1 2007 09 05 00 06 00 36.7800 -97.5000 374.00 314.00 60.00 239584 SGP 2007 07 26 20 22 00 1107-99 G C2H6 ARL 4029.506 -999.990 ... v1 2007 09 05 00 03 00 36.7800 -97.5000 374.00 314.00 60.00 239581 SGP 2007 07 26 20 22 00 1108-99 G C2H6 ARL 3997.486 -999.990 ... v1 2007 09 05 00 04 00 36.7800 -97.5000 374.00 314.00 60.00 239582 SGP 2007 08 02 19 03 00 2965-99 G C2H6 ARL 3272.500 -999.990 ... v1 2007 09 03 00 11 00 36.7800 -97.5000 374.00 314.00 60.00 239964 SGP 2007 08 02 19 03 00 2966-99 G C2H6 ARL 3229.313 -999.990 ... v1 2007 09 03 00 12 00 36.7800 -97.5000 374.00 314.00 60.00 239965 SGP 2007 08 09 18 16 00 1659-99 G C2H6 ARL 9852.967 -999.990 ... v1 2007 09 03 00 09 00 36.7800 -97.5000 374.00 314.00 60.00 239966 SGP 2007 08 09 18 16 00 1660-99 G C2H6 ARL 9633.860 -999.990 ... v1 2007 09 03 00 10 00 36.7800 -97.5000 374.00 314.00 60.00 239967 SGP 2007 08 16 20 11 00 3385-99 G C2H6 ARL 5154.258 -999.990 ... v1 2007 09 18 12 05 00 36.7800 -97.5000 374.00 314.00 60.00 240794 SGP 2007 08 16 20 11 00 3386-99 G C2H6 ARL 5313.599 -999.990 ... v1 2007 09 18 12 06 00 36.7800 -97.5000 374.00 314.00 60.00 240795 SGP 2007 08 23 19 33 00 1595-99 G C2H6 ARL 2464.863 -999.990 ... v1 2007 09 18 12 07 00 36.7800 -97.5000 374.00 314.00 60.00 240792 SGP 2007 08 23 19 33 00 1596-99 G C2H6 ARL 2494.382 -999.990 ... v1 2007 09 18 12 08 00 36.7800 -97.5000 374.00 314.00 60.00 240793 SGP 2007 08 30 19 58 00 1173-99 G C2H6 ARL 2184.121 -999.990 ... v1 2007 09 23 00 07 00 36.7800 -97.5000 374.00 314.00 60.00 241521 SGP 2007 08 30 19 58 00 1174-99 G C2H6 ARL 2177.170 -999.990 ... v1 2007 09 23 00 08 00 36.7800 -97.5000 374.00 314.00 60.00 241522 SGP 2007 09 06 19 34 00 4575-99 G C2H6 ARL 4177.280 -999.990 ... v1 2007 09 23 00 09 00 36.7800 -97.5000 374.00 314.00 60.00 241519 SGP 2007 09 06 19 34 00 4576-99 G C2H6 ARL 4120.357 -999.990 ... v1 2007 09 23 00 10 00 36.7800 -97.5000 374.00 314.00 60.00 241520 SGP 2007 09 13 19 59 00 2993-99 G C2H6 ARL 6350.744 -999.990 ... v1 2007 10 10 00 07 00 36.7800 -97.5000 374.00 314.00 60.00 242349 SGP 2007 09 13 19 59 00 4237-99 G C2H6 ARL 6314.141 -999.990 ... v1 2007 10 10 00 08 00 36.7800 -97.5000 374.00 314.00 60.00 242350 SGP 2007 09 20 18 57 00 6665-66 G C2H6 ARL 3365.282 -999.990 ... v1 2007 10 12 00 13 00 36.7800 -97.5000 374.00 314.00 60.00 242347 SGP 2007 09 20 18 57 00 6666-66 G C2H6 ARL 3562.128 -999.990 ... v1 2007 10 12 00 14 00 36.7800 -97.5000 374.00 314.00 60.00 242348 SGP 2007 10 11 19 35 00 3055-99 G C2H6 ARL 3503.245 -999.990 ... v1 2007 11 14 00 13 00 36.7800 -97.5000 374.00 314.00 60.00 243894 SGP 2007 10 11 19 35 00 3056-99 G C2H6 ARL 3488.939 -999.990 ... v1 2007 11 14 00 14 00 36.7800 -97.5000 374.00 314.00 60.00 243895 SGP 2007 10 18 19 57 00 39-99 G C2H6 ARL 2314.103 -999.990 ... v1 2007 11 14 00 11 00 36.7800 -97.5000 374.00 314.00 60.00 243892 SGP 2007 10 18 19 57 00 40-99 G C2H6 ARL 2300.316 -999.990 ... v1 2007 11 14 00 12 00 36.7800 -97.5000 374.00 314.00 60.00 243893 SGP 2007 10 25 19 42 00 3743-99 G C2H6 ARL 2133.561 -999.990 ... v1 2007 11 28 00 09 00 36.7800 -97.5000 374.00 314.00 60.00 244867 SGP 2007 10 25 19 42 00 3744-99 G C2H6 ARL 2100.354 -999.990 ... v1 2007 11 28 00 10 00 36.7800 -97.5000 374.00 314.00 60.00 244868 SGP 2007 11 01 20 03 00 3455-99 G C2H6 ARL 5975.732 -999.990 ... v1 2007 11 28 00 05 00 36.7800 -97.5000 374.00 314.00 60.00 244869 SGP 2007 11 01 20 03 00 3456-99 G C2H6 ARL 5976.654 -999.990 ... v1 2007 11 28 00 06 00 36.7800 -97.5000 374.00 314.00 60.00 244870 SGP 2007 11 08 12 34 56 2751-99 G C2H6 ARL 13707.412 -999.990 ... v1 2007 12 06 00 11 00 36.7800 -97.5000 374.00 314.00 60.00 245478 SGP 2007 11 08 12 34 56 2752-99 G C2H6 ARL 13579.774 -999.990 ... v1 2007 12 06 00 12 00 36.7800 -97.5000 374.00 314.00 60.00 245479 SGP 2007 11 15 21 02 00 2341-99 G C2H6 ARL 2820.880 -999.990 ... v1 2007 12 06 00 13 00 36.7800 -97.5000 374.00 314.00 60.00 245476 SGP 2007 11 15 21 02 00 2342-99 G C2H6 ARL 2846.658 -999.990 ... v1 2007 12 06 00 14 00 36.7800 -97.5000 374.00 314.00 60.00 245477 SGP 2007 11 21 20 13 00 1951-99 G C2H6 ARL 355.012 -999.990 ... v1 2008 12 22 00 07 00 36.7800 -97.5000 374.00 314.00 60.00 246121 SGP 2007 11 21 20 13 00 1952-99 G C2H6 ARL 305.647 -999.990 ... v1 2008 12 22 00 08 00 36.7800 -97.5000 374.00 314.00 60.00 246122 SGP 2007 11 29 20 40 00 1753-99 G C2H6 ARL 2996.655 -999.990 ... v1 2008 12 22 00 09 00 36.7800 -97.5000 374.00 314.00 60.00 246119 SGP 2007 11 29 20 40 00 1754-99 G C2H6 ARL 3185.468 -999.990 ... v1 2008 12 22 00 10 00 36.7800 -97.5000 374.00 314.00 60.00 246120 SGP 2007 12 06 21 31 00 1976-99 G C2H6 ARL 7999.764 -999.990 ... v1 2008 02 05 12 05 00 36.7800 -97.5000 374.00 314.00 60.00 247163 SGP 2007 12 06 21 31 00 4411-99 G C2H6 ARL 8007.346 -999.990 ... v1 2008 02 05 12 06 00 36.7800 -97.5000 374.00 314.00 60.00 247162 SGP 2007 12 13 12 34 56 1114-99 G C2H6 ARL 16966.263 -999.990 ... v1 2008 02 05 12 03 00 36.7800 -97.5000 374.00 314.00 60.00 247160 SGP 2007 12 13 12 34 56 4792-99 G C2H6 ARL 16968.903 -999.990 ... v1 2008 02 05 12 04 00 36.7800 -97.5000 374.00 314.00 60.00 247161 SGP 2007 12 21 20 26 00 2017-99 G C2H6 ARL 18330.366 -999.990 ... v1 2008 02 06 12 07 00 36.7800 -97.5000 374.00 314.00 60.00 247756 SGP 2007 12 21 20 26 00 2018-99 G C2H6 ARL 18161.393 -999.990 ... v1 2008 02 06 12 08 00 36.7800 -97.5000 374.00 314.00 60.00 247757 SGP 2007 12 27 20 05 00 535-99 G C2H6 ARL 8619.670 -999.990 ... v1 2008 02 06 12 09 00 36.7800 -97.5000 374.00 314.00 60.00 247758 SGP 2007 12 27 20 05 00 536-99 G C2H6 ARL 8705.448 -999.990 ... v1 2008 02 06 12 10 00 36.7800 -97.5000 374.00 314.00 60.00 247759 SGP 2008 01 03 20 24 00 4937-99 G C2H6 ARL 6926.380 -999.990 ... v1 2008 02 19 00 11 00 36.7800 -97.5000 374.00 314.00 60.00 248552 SGP 2008 01 03 20 24 00 4938-99 G C2H6 ARL 6951.132 -999.990 ... v1 2008 02 19 00 12 00 36.7800 -97.5000 374.00 314.00 60.00 248553 SGP 2008 01 10 20 57 00 4927-99 G C2H6 ARL 3077.913 -999.990 ... v1 2008 02 19 00 13 00 36.7800 -97.5000 374.00 314.00 60.00 248554 SGP 2008 01 10 20 57 00 4928-99 G C2H6 ARL 3120.743 -999.990 ... v1 2008 02 19 00 14 00 36.7800 -97.5000 374.00 314.00 60.00 248555 SGP 2008 01 17 20 58 00 2003-99 G C2H6 ARL 3080.613 -999.990 ... v1 2008 02 15 12 09 00 36.7800 -97.5000 374.00 314.00 60.00 248949 SGP 2008 01 17 20 58 00 2004-99 G C2H6 ARL 3052.323 -999.990 ... v1 2008 02 15 12 10 00 36.7800 -97.5000 374.00 314.00 60.00 248950 SGP 2008 01 24 20 13 00 4235-99 G C2H6 ARL 7133.974 -999.990 ... v1 2008 02 20 00 03 00 36.7800 -97.5000 374.00 314.00 60.00 248951 SGP 2008 01 24 20 13 00 4236-99 G C2H6 ARL 7188.561 -999.990 ... v1 2008 02 20 00 04 00 36.7800 -97.5000 374.00 314.00 60.00 248952 SGP 2008 02 01 12 34 56 2181-99 G C2H6 ARL 14380.094 -999.990 ... v1 2008 02 28 00 03 00 36.7800 -97.5000 374.00 314.00 60.00 249681 SGP 2008 02 01 12 34 56 2182-99 G C2H6 ARL 14328.668 -999.990 ... v1 2008 02 28 00 04 00 36.7800 -97.5000 374.00 314.00 60.00 249682 SGP 2008 02 07 19 53 00 725-99 G C2H6 ARL 3122.288 -999.990 ... v1 2008 02 28 00 05 00 36.7800 -97.5000 374.00 314.00 60.00 249679 SGP 2008 02 07 19 53 00 726-99 G C2H6 ARL 3090.778 -999.990 ... v1 2008 02 28 00 06 00 36.7800 -97.5000 374.00 314.00 60.00 249680 SGP 2008 02 14 20 36 00 4575-99 G C2H6 ARL 14806.220 -999.990 ... v1 2008 03 25 00 13 00 36.7800 -97.5000 374.00 314.00 60.00 250258 SGP 2008 02 14 20 36 00 4576-99 G C2H6 ARL 15129.217 -999.990 ... v1 2008 03 25 00 14 00 36.7800 -97.5000 374.00 314.00 60.00 250259 SGP 2008 02 21 20 25 00 6035-66 G C2H6 ARL 5052.465 -999.990 ... v1 2008 03 25 00 11 00 36.7800 -97.5000 374.00 314.00 60.00 250256 SGP 2008 02 21 20 25 00 6036-66 G C2H6 ARL 4888.329 -999.990 ... v1 2008 03 25 00 12 00 36.7800 -97.5000 374.00 314.00 60.00 250257 SGP 2008 02 28 20 45 00 3461-99 G C2H6 ARL 7855.315 -999.990 ... v1 2008 04 15 00 11 00 36.7800 -97.5000 374.00 314.00 60.00 251101 SGP 2008 02 28 20 45 00 3462-99 G C2H6 ARL 7891.613 -999.990 ... v1 2008 04 15 00 12 00 36.7800 -97.5000 374.00 314.00 60.00 251102 SGP 2008 03 06 20 47 00 1847-99 G C2H6 ARL 3270.210 -999.990 ... v1 2008 04 15 00 09 00 36.7800 -97.5000 374.00 314.00 60.00 251099 SGP 2008 03 06 20 47 00 1848-99 G C2H6 ARL 3213.400 -999.990 ... v1 2008 04 15 00 10 00 36.7800 -97.5000 374.00 314.00 60.00 251100 SGP 2008 03 13 18 56 00 1375-99 G C2H6 ARL 11092.991 -999.990 ... v1 2008 04 10 12 09 00 36.7800 -97.5000 374.00 314.00 60.00 251861 SGP 2008 03 13 18 56 00 1376-99 G C2H6 ARL 11258.691 -999.990 ... v1 2008 04 10 12 10 00 36.7800 -97.5000 374.00 314.00 60.00 251862 SGP 2008 03 20 20 06 00 2905-99 G C2H6 ARL 5694.042 -999.990 ... v1 2008 04 10 12 07 00 36.7800 -97.5000 374.00 314.00 60.00 251859 SGP 2008 03 20 20 06 00 2906-99 G C2H6 ARL 5772.921 -999.990 ... v1 2008 04 10 12 08 00 36.7800 -97.5000 374.00 314.00 60.00 251860 SGP 2008 04 03 18 54 00 4139-99 G C2H6 ARL 10646.878 -999.990 ... v1 2008 07 01 00 05 00 36.7800 -97.5000 374.00 314.00 60.00 252580 SGP 2008 04 03 18 54 00 4140-99 G C2H6 ARL 10702.811 -999.990 ... v1 2008 07 01 00 06 00 36.7800 -97.5000 374.00 314.00 60.00 252581 SGP 2008 04 10 19 30 00 4379-99 G C2H6 ARL 3003.173 -999.990 ... v1 2008 05 11 00 09 00 36.7800 -97.5000 374.00 314.00 60.00 253289 SGP 2008 04 10 19 30 00 4380-99 G C2H6 ARL 2967.143 -999.990 ... v1 2008 05 11 00 10 00 36.7800 -97.5000 374.00 314.00 60.00 253290 SGP 2008 04 17 19 19 00 3113-99 G C2H6 ARL 5785.410 -999.990 ... v1 2008 05 11 00 13 00 36.7800 -97.5000 374.00 314.00 60.00 253287 SGP 2008 04 17 19 19 00 3114-99 G C2H6 ARL 5794.555 -999.990 ... v1 2008 05 11 00 14 00 36.7800 -97.5000 374.00 314.00 60.00 253288 SGP 2008 04 24 19 45 00 461-99 G C2H6 ARL 5571.104 -999.990 ... v1 2008 06 01 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 254282 SGP 2008 04 24 19 45 00 462-99 G C2H6 ARL 5449.299 -999.990 ... v1 2008 06 01 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 254283 SGP 2008 05 01 19 18 00 2565-99 G C2H6 ARL 4249.358 -999.990 ... v1 2008 06 01 00 11 00 36.8000 -97.5000 374.00 314.00 60.00 254284 SGP 2008 05 01 19 18 00 2566-99 G C2H6 ARL 4270.535 -999.990 ... v1 2008 06 01 00 12 00 36.8000 -97.5000 374.00 314.00 60.00 254285 SGP 2008 05 08 18 56 00 3361-99 G C2H6 ARL 3417.981 -999.990 ... v1 2008 06 11 12 07 00 36.8000 -97.5000 374.00 314.00 60.00 254839 SGP 2008 05 08 18 56 00 3362-99 G C2H6 ARL 3434.858 -999.990 ... v1 2008 06 11 12 08 00 36.8000 -97.5000 374.00 314.00 60.00 254840 SGP 2008 05 15 19 24 00 327-99 G C2H6 ARL 2116.568 -999.990 ... v1 2008 06 11 12 09 00 36.8000 -97.5000 374.00 314.00 60.00 254837 SGP 2008 05 15 19 24 00 328-99 G C2H6 ARL 2079.406 -999.990 ... v1 2008 06 11 12 10 00 36.8000 -97.5000 374.00 314.00 60.00 254838 SGP 2008 05 22 19 44 00 4953-99 G C2H6 ARL 2975.641 -999.990 ... v1 2008 06 25 00 05 00 36.8000 -97.5000 374.00 314.00 60.00 255340 SGP 2008 05 22 19 44 00 4954-99 G C2H6 ARL 3054.715 -999.990 ... v1 2008 06 25 00 06 00 36.8000 -97.5000 374.00 314.00 60.00 255341 SGP 2008 05 29 20 28 00 4961-99 G C2H6 ARL 4585.000 -999.990 ... v1 2008 06 25 00 07 00 36.8000 -97.5000 374.00 314.00 60.00 255338 SGP 2008 05 29 20 28 00 4962-99 G C2H6 ARL 4589.513 -999.990 ... v1 2008 06 25 00 08 00 36.8000 -97.5000 374.00 314.00 60.00 255339 SGP 2008 06 05 19 14 00 3113-99 G C2H6 ARL 3014.438 -999.990 ... v1 2008 07 03 00 05 00 36.8000 -97.5000 374.00 314.00 60.00 256280 SGP 2008 06 05 19 14 00 3114-99 G C2H6 ARL 3041.113 -999.990 ... v1 2008 07 03 00 06 00 36.8000 -97.5000 374.00 314.00 60.00 256281 SGP 2008 06 12 20 16 00 2759-99 G C2H6 ARL 3419.222 -999.990 ... v1 2008 07 03 00 07 00 36.8000 -97.5000 374.00 314.00 60.00 256282 SGP 2008 06 12 20 16 00 2760-99 G C2H6 ARL 3427.871 -999.990 ... v1 2008 07 03 00 08 00 36.8000 -97.5000 374.00 314.00 60.00 256283 SGP 2008 06 19 19 19 00 2615-99 G C2H6 ARL 3099.462 -999.990 ... v1 2008 07 24 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 257357 SGP 2008 06 19 19 19 00 2616-99 G C2H6 ARL 3234.605 -999.990 ... v1 2008 07 24 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 257358 SGP 2008 06 26 18 51 00 4473-99 G C2H6 ARL 3208.050 -999.990 ... v1 2008 07 24 00 11 00 36.8000 -97.5000 374.00 314.00 60.00 257359 SGP 2008 06 26 18 51 00 4474-99 G C2H6 ARL 3209.916 -999.990 ... v1 2008 07 24 00 12 00 36.8000 -97.5000 374.00 314.00 60.00 257360 SGP 2008 07 03 19 09 00 2653-99 G C2H6 ARL 2945.709 -999.990 ... v1 2008 08 15 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 257781 SGP 2008 07 03 19 09 00 2654-99 G C2H6 ARL 2985.709 -999.990 ... v1 2008 08 15 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 257782 SGP 2008 07 10 19 09 00 6921-66 G C2H6 ARL 11127.608 -999.990 ... v1 2008 07 30 12 09 00 36.8000 -97.5000 374.00 314.00 60.00 257779 SGP 2008 07 10 19 09 00 6922-66 G C2H6 ARL 11103.960 -999.990 ... v1 2008 07 30 12 10 00 36.8000 -97.5000 374.00 314.00 60.00 257780 SGP 2008 07 17 19 48 00 4219-99 G C2H6 ARL 4863.022 -999.990 ... v1 2008 09 17 12 05 00 36.8000 -97.5000 374.00 314.00 60.00 258740 SGP 2008 07 17 19 48 00 4220-99 G C2H6 ARL 4796.638 -999.990 ... v1 2008 09 17 12 06 00 36.8000 -97.5000 374.00 314.00 60.00 258741 SGP 2008 07 24 19 25 00 1331-99 G C2H6 ARL 5691.080 -999.990 ... v1 2008 09 17 00 09 00 36.8000 -97.5000 374.00 314.00 60.00 258738 SGP 2008 07 24 19 25 00 1332-99 G C2H6 ARL 5820.158 -999.990 ... v1 2008 09 17 00 10 00 36.8000 -97.5000 374.00 314.00 60.00 258739 SGP 2008 07 31 19 30 00 3701-99 G C2H6 ARL 3855.934 -999.990 ... v1 2008 09 18 00 09 00 36.8000 -97.5000 374.00 314.00 60.00 259372 SGP 2008 07 31 19 30 00 3702-99 G C2H6 ARL 3766.918 -999.990 ... v1 2008 09 18 00 10 00 36.8000 -97.5000 374.00 314.00 60.00 259373 SGP 2008 08 07 19 08 00 2171-99 G C2H6 ARL 2467.670 -999.990 ... v1 2008 09 22 12 05 00 36.8000 -97.5000 374.00 314.00 60.00 259374 SGP 2008 08 07 19 08 00 2172-99 G C2H6 ARL 2477.876 -999.990 ... v1 2008 09 22 12 06 00 36.8000 -97.5000 374.00 314.00 60.00 259375 SGP 2008 08 14 19 13 00 1549-99 G C2H6 ARL 4681.463 -999.990 ... v1 2008 10 24 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 260026 SGP 2008 08 14 19 13 00 1550-99 G C2H6 ARL 4703.110 -999.990 ... v1 2008 10 24 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 260027 SGP 2008 08 21 19 23 00 5011-99 G C2H6 ARL 4807.098 -999.990 ... v1 2008 10 24 00 11 00 36.8000 -97.5000 374.00 314.00 60.00 260024 SGP 2008 08 21 19 23 00 5012-99 G C2H6 ARL 4912.878 -999.990 ... v1 2008 10 24 00 12 00 36.8000 -97.5000 374.00 314.00 60.00 260025 SGP 2008 08 28 19 18 00 4351-99 G C2H6 ARL 3177.755 -999.990 ... v1 2008 09 25 00 03 00 36.8000 -97.5000 374.00 314.00 60.00 261095 SGP 2008 08 28 19 18 00 4352-99 G C2H6 ARL 3126.675 -999.990 ... v1 2008 09 25 00 04 00 36.8000 -97.5000 374.00 314.00 60.00 261096 SGP 2008 09 04 19 35 00 3393-99 G C2H6 ARL 1131.456 -999.990 ... v1 2008 09 29 00 05 00 36.8000 -97.5000 374.00 314.00 60.00 261097 SGP 2008 09 04 19 35 00 3394-99 G C2H6 ARL 1136.978 -999.990 ... v1 2008 09 29 00 06 00 36.8000 -97.5000 374.00 314.00 60.00 261098 SGP 2008 09 11 19 12 00 4917-99 G C2H6 ARL 5754.646 -999.990 ... v1 2008 10 20 12 01 00 36.8000 -97.5000 374.00 314.00 60.00 261722 SGP 2008 09 11 19 12 00 4918-99 G C2H6 ARL 5732.158 -999.990 ... v1 2008 10 20 12 02 00 36.8000 -97.5000 374.00 314.00 60.00 261723 SGP 2008 09 18 19 28 00 247-99 G C2H6 ARL 4605.256 -999.990 ... v1 2008 10 14 12 07 00 36.8000 -97.5000 374.00 314.00 60.00 261724 SGP 2008 09 18 19 28 00 248-99 G C2H6 ARL 4516.085 -999.990 ... v1 2008 10 14 12 08 00 36.8000 -97.5000 374.00 314.00 60.00 261725 SGP 2008 09 25 19 04 00 359-99 G C2H6 ARL 5585.761 -999.990 ... v1 2008 11 12 00 09 00 36.8000 -97.5000 374.00 314.00 60.00 262373 SGP 2008 09 25 19 04 00 360-99 G C2H6 ARL 5501.365 -999.990 ... v1 2008 11 12 00 10 00 36.8000 -97.5000 374.00 314.00 60.00 262374 SGP 2008 10 02 19 23 00 3051-99 G C2H6 ARL 3782.862 -999.990 ... v1 2008 11 12 00 03 00 36.8000 -97.5000 374.00 314.00 60.00 262371 SGP 2008 10 02 19 23 00 3052-99 G C2H6 ARL 3666.932 -999.990 ... v1 2008 11 12 00 04 00 36.8000 -97.5000 374.00 314.00 60.00 262372 SGP 2008 10 09 19 02 00 4979-99 G C2H6 ARL 7683.587 -999.990 ... v1 2008 11 17 12 03 00 36.8000 -97.5000 374.00 314.00 60.00 263127 SGP 2008 10 09 19 02 00 4980-99 G C2H6 ARL 7673.321 -999.990 ... v1 2008 11 17 12 04 00 36.8000 -97.5000 374.00 314.00 60.00 263128 SGP 2008 10 16 21 07 00 1015-99 G C2H6 ARL 1831.244 -999.990 ... v1 2008 11 11 12 05 00 36.8000 -97.5000 374.00 314.00 60.00 263129 SGP 2008 10 16 21 07 00 1016-99 G C2H6 ARL 1845.882 -999.990 ... v1 2008 11 11 12 06 00 36.8000 -97.5000 374.00 314.00 60.00 263130 SGP 2008 10 24 19 10 00 288-99 G C2H6 ARL 2795.338 -999.990 ... v1 2008 11 21 00 03 00 36.8000 -97.5000 374.00 314.00 60.00 263761 SGP 2008 10 24 19 10 00 4046-99 G C2H6 ARL 2693.575 -999.990 ... v1 2008 11 21 00 04 00 36.8000 -97.5000 374.00 314.00 60.00 263762 SGP 2008 10 30 19 18 00 2603-99 G C2H6 ARL 14085.628 -999.990 ... v1 2008 11 24 12 08 00 36.8000 -97.5000 374.00 314.00 60.00 263760 SGP 2008 10 30 19 18 00 745-99 G C2H6 ARL 13954.589 -999.990 ... v1 2008 11 24 12 07 00 36.8000 -97.5000 374.00 314.00 60.00 263759 SGP 2008 11 06 20 11 00 975-99 G C2H6 ARL 1861.345 -999.990 ... v1 2009 02 13 12 03 00 36.8000 -97.5000 374.00 314.00 60.00 264619 SGP 2008 11 06 20 11 00 976-99 G C2H6 ARL 1806.143 -999.990 ... v1 2009 02 13 12 04 00 36.8000 -97.5000 374.00 314.00 60.00 264620 SGP 2008 11 13 20 08 00 1205-99 G C2H6 ARL 10191.952 -999.990 ... v1 2009 02 13 12 01 00 36.8000 -97.5000 374.00 314.00 60.00 264617 SGP 2008 11 13 20 08 00 1206-99 G C2H6 ARL 10028.024 -999.990 ... v1 2009 02 13 12 02 00 36.8000 -97.5000 374.00 314.00 60.00 264618 SGP 2008 11 20 20 40 00 2977-99 G C2H6 ARL 3288.762 -999.990 ... v1 2009 01 26 00 07 00 36.8000 -97.5000 374.00 314.00 60.00 265281 SGP 2008 11 20 20 40 00 2978-99 G C2H6 ARL 3301.940 -999.990 ... v1 2009 01 26 00 08 00 36.8000 -97.5000 374.00 314.00 60.00 265282 SGP 2008 11 28 19 59 00 929-99 G C2H6 ARL 3521.036 -999.990 ... v1 2009 01 22 00 09 00 36.8000 -97.5000 374.00 314.00 60.00 265283 SGP 2008 11 28 19 59 00 930-99 G C2H6 ARL 3672.845 -999.990 ... v1 2009 01 22 00 10 00 36.8000 -97.5000 374.00 314.00 60.00 265284 SGP 2008 12 04 20 56 00 2753-99 G C2H6 ARL 2529.405 -999.990 ... v1 2009 01 26 00 11 00 36.8000 -97.5000 374.00 314.00 60.00 266262 SGP 2008 12 04 20 56 00 2754-99 G C2H6 ARL 2518.845 -999.990 ... v1 2009 01 26 00 12 00 36.8000 -97.5000 374.00 314.00 60.00 266261 SGP 2008 12 11 19 21 00 1977-99 G C2H6 ARL 19197.381 -999.990 ... v1 2009 01 26 00 09 00 36.8000 -97.5000 374.00 314.00 60.00 266263 SGP 2008 12 11 19 21 00 1978-99 G C2H6 ARL 19190.000 -999.990 ... v1 2009 01 26 00 10 00 36.8000 -97.5000 374.00 314.00 60.00 266264 SGP 2008 12 19 19 35 00 3179-99 G C2H6 ARL 14982.262 -999.990 ... v1 2009 02 23 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 267366 SGP 2008 12 19 19 35 00 3180-99 G C2H6 ARL 15068.690 -999.990 ... v1 2009 02 23 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 267367 SGP 2008 12 26 19 53 00 2077-99 G C2H6 ARL 4364.536 -999.990 ... v1 2009 02 23 00 11 00 36.8000 -97.5000 374.00 314.00 60.00 267364 SGP 2008 12 26 19 53 00 2078-99 G C2H6 ARL 4366.155 -999.990 ... v1 2009 02 23 00 12 00 36.8000 -97.5000 374.00 314.00 60.00 267365 SGP 2009 01 29 20 55 00 3001-99 G C2H6 ARL 2523.143 -999.990 ... v1 2009 03 04 00 11 00 36.8000 -97.5000 374.00 314.00 60.00 269821 SGP 2009 01 29 20 55 00 3002-99 G C2H6 ARL 2524.126 -999.990 ... v1 2009 03 04 00 12 00 36.8000 -97.5000 374.00 314.00 60.00 269822 SGP 2009 02 05 20 35 00 727-99 G C2H6 ARL 11671.808 -999.990 ... v1 2009 03 04 00 09 00 36.8000 -97.5000 374.00 314.00 60.00 269819 SGP 2009 02 05 20 35 00 728-99 G C2H6 ARL 11674.333 -999.990 ... v1 2009 03 04 00 10 00 36.8000 -97.5000 374.00 314.00 60.00 269820 SGP 2009 02 12 20 31 00 2178-99 G C2H6 ARL 13400.364 -999.990 ... v1 2009 03 10 12 03 00 36.8000 -97.5000 374.00 314.00 60.00 270479 SGP 2009 02 12 20 31 00 2338-99 G C2H6 ARL 13524.636 -999.990 ... v1 2009 03 10 12 04 00 36.8000 -97.5000 374.00 314.00 60.00 270480 SGP 2009 02 19 19 10 00 3207-99 G C2H6 ARL 6271.141 -999.990 ... v1 2009 03 10 12 01 00 36.8000 -97.5000 374.00 314.00 60.00 270477 SGP 2009 02 19 19 10 00 3700-99 G C2H6 ARL 6005.594 -999.990 ... v1 2009 03 10 12 02 00 36.8000 -97.5000 374.00 314.00 60.00 270478 SGP 2009 03 12 20 29 00 3451-99 G C2H6 ARL 6279.927 -999.990 ... v1 2009 04 10 12 07 00 36.8000 -97.5000 374.00 314.00 60.00 272847 SGP 2009 03 12 20 29 00 3452-99 G C2H6 ARL 6231.520 -999.990 ... v1 2009 04 10 12 08 00 36.8000 -97.5000 374.00 314.00 60.00 272848 SGP 2009 03 19 19 30 00 1707-99 G C2H6 ARL 3803.383 -999.990 ... v1 2009 04 19 00 05 00 36.8000 -97.5000 374.00 314.00 60.00 272845 SGP 2009 03 19 19 30 00 1708-99 G C2H6 ARL 3809.179 -999.990 ... v1 2009 04 19 00 06 00 36.8000 -97.5000 374.00 314.00 60.00 272846 SGP 2009 03 26 19 05 00 2791-99 G C2H6 ARL 4737.745 -999.990 ... v1 2009 04 28 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 273555 SGP 2009 03 26 19 05 00 2792-99 G C2H6 ARL 4754.154 -999.990 ... v1 2009 04 28 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 273556 SGP 2009 04 02 19 48 00 2457-99 G C2H6 ARL 2746.908 -999.990 ... v1 2009 05 01 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 273557 SGP 2009 04 02 19 48 00 2458-99 G C2H6 ARL 2721.035 -999.990 ... v1 2009 05 01 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 273558 SGP 2009 04 09 19 31 00 4359-99 G C2H6 ARL 7324.626 -999.990 ... v1 2009 05 11 12 05 00 36.8000 -97.5000 374.00 314.00 60.00 274384 SGP 2009 04 09 19 31 00 4360-99 G C2H6 ARL 7289.052 -999.990 ... v1 2009 05 11 12 06 00 36.8000 -97.5000 374.00 314.00 60.00 274385 SGP 2009 04 16 20 08 00 4361-99 G C2H6 ARL 3278.828 -999.990 ... v1 2009 05 11 12 07 00 36.8000 -97.5000 374.00 314.00 60.00 274382 SGP 2009 04 16 20 08 00 4362-99 G C2H6 ARL 3254.788 -999.990 ... v1 2009 05 11 12 08 00 36.8000 -97.5000 374.00 314.00 60.00 274383 SGP 2009 04 23 20 02 00 4244-99 G C2H6 ARL 5743.570 -999.990 ... v1 2009 06 16 00 12 00 36.8000 -97.5000 374.00 314.00 60.00 275292 SGP 2009 04 23 20 02 00 970-99 G C2H6 ARL 5705.597 -999.990 ... v1 2009 06 16 00 11 00 36.8000 -97.5000 374.00 314.00 60.00 275293 SGP 2009 04 30 18 11 00 3037-99 G C2H6 ARL 4578.918 -999.990 ... v1 2009 06 22 12 07 00 36.8000 -97.5000 374.00 314.00 60.00 275290 SGP 2009 04 30 18 11 00 4781-99 G C2H6 ARL 4659.042 -999.990 ... v1 2009 06 22 12 08 00 36.8000 -97.5000 374.00 314.00 60.00 275291 SGP 2009 05 07 19 33 00 483-99 G C2H6 ARL 13263.682 -999.990 ... v1 2009 06 19 00 11 00 36.8000 -97.5000 374.00 314.00 60.00 276259 SGP 2009 05 07 19 33 00 484-99 G C2H6 ARL 13233.831 -999.990 ... v1 2009 06 19 00 12 00 36.8000 -97.5000 374.00 314.00 60.00 276260 SGP 2009 05 14 20 01 00 3877-99 G C2H6 ARL 3514.639 -999.990 ... v1 2009 06 19 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 276261 SGP 2009 05 14 20 01 00 3878-99 G C2H6 ARL 3516.393 -999.990 ... v1 2009 06 19 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 276262 SGP 2009 05 21 18 55 00 4587-99 G C2H6 ARL 5438.893 -999.990 ... v1 2009 06 26 00 11 00 36.8000 -97.5000 374.00 314.00 60.00 277020 SGP 2009 05 21 18 55 00 4588-99 G C2H6 ARL 5530.870 -999.990 ... v1 2009 06 26 00 12 00 36.8000 -97.5000 374.00 314.00 60.00 277021 SGP 2009 05 28 19 25 00 1059-99 G C2H6 ARL 1874.042 -999.990 ... v1 2009 06 26 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 277018 SGP 2009 05 28 19 25 00 1060-99 G C2H6 ARL 1845.697 -999.990 ... v1 2009 06 26 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 277019 SGP 2009 06 04 19 03 00 173-99 G C2H6 ARL 1127.749 -999.990 ... v1 2009 07 29 12 05 00 36.8000 -97.5000 374.00 314.00 60.00 278314 SGP 2009 06 04 19 03 00 174-99 G C2H6 ARL 1107.299 -999.990 ... v1 2009 07 29 12 06 00 36.8000 -97.5000 374.00 314.00 60.00 278315 SGP 2009 06 11 19 22 00 3271-99 G C2H6 ARL 2221.691 -999.990 ... v1 2009 07 29 12 07 00 36.8000 -97.5000 374.00 314.00 60.00 278312 SGP 2009 06 11 19 22 00 3272-99 G C2H6 ARL 1926.326 -999.990 ... v1 2009 07 29 12 08 00 36.8000 -97.5000 374.00 314.00 60.00 278313 SGP 2009 06 18 19 02 00 425-99 G C2H6 ARL 1066.217 -999.990 P.. v1 2009 07 23 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 278775 SGP 2009 06 18 19 02 00 426-99 G C2H6 ARL 611.083 -999.990 P.. v1 2009 07 23 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 278776 SGP 2009 06 25 19 12 00 3129-99 G C2H6 ARL 3413.516 -999.990 ... v1 2009 07 24 00 05 00 36.8000 -97.5000 374.00 314.00 60.00 278773 SGP 2009 06 25 19 12 00 3130-99 G C2H6 ARL 3392.433 -999.990 ... v1 2009 07 24 00 06 00 36.8000 -97.5000 374.00 314.00 60.00 278774 SGP 2009 07 02 20 22 00 723-99 G C2H6 ARL 3113.350 -999.990 ... v1 2009 08 15 00 07 00 36.8000 -97.5000 374.00 314.00 60.00 279600 SGP 2009 07 02 20 22 00 724-99 G C2H6 ARL 3156.121 -999.990 ... v1 2009 08 15 00 08 00 36.8000 -97.5000 374.00 314.00 60.00 279601 SGP 2009 07 09 19 47 00 4999-99 G C2H6 ARL 4520.961 -999.990 ... v1 2009 08 15 00 09 00 36.8000 -97.5000 374.00 314.00 60.00 279602 SGP 2009 07 09 19 47 00 5000-99 G C2H6 ARL 4373.461 -999.990 ... v1 2009 08 15 00 10 00 36.8000 -97.5000 374.00 314.00 60.00 279603 SGP 2009 07 16 20 30 00 3043-99 G C2H6 ARL 2667.771 -999.990 ... v1 2009 08 12 00 03 00 36.8000 -97.5000 374.00 314.00 60.00 280658 SGP 2009 07 16 20 30 00 3153-99 G C2H6 ARL 2573.744 -999.990 ... v1 2009 08 12 00 04 00 36.8000 -97.5000 374.00 314.00 60.00 280659 SGP 2009 07 23 20 23 00 169-99 G C2H6 ARL 4191.699 -999.990 ... v1 2009 08 14 12 01 00 36.8000 -97.5000 374.00 314.00 60.00 280660 SGP 2009 07 23 20 23 00 3822-99 G C2H6 ARL 3910.197 -999.990 ... v1 2009 08 14 12 02 00 36.8000 -97.5000 374.00 314.00 60.00 280661 SGP 2009 07 29 20 20 00 2017-99 G C2H6 ARL 2636.219 -999.990 ... v1 2009 08 26 00 11 00 36.8000 -97.5000 374.00 314.00 60.00 281318 SGP 2009 07 29 20 20 00 2018-99 G C2H6 ARL 2661.576 -999.990 ... v1 2009 08 26 00 12 00 36.8000 -97.5000 374.00 314.00 60.00 281319 SGP 2009 08 06 20 17 00 481-99 G C2H6 ARL 6752.672 -999.990 ... v1 2009 08 27 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 281320 SGP 2009 08 06 20 17 00 482-99 G C2H6 ARL 6787.672 -999.990 ... v1 2009 08 27 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 281321 SGP 2009 08 13 19 00 00 2755-99 G C2H6 ARL 3727.951 -999.990 ... v1 2009 09 08 00 11 00 36.8000 -97.5000 374.00 314.00 60.00 282287 SGP 2009 08 13 19 00 00 2756-99 G C2H6 ARL 3679.110 -999.990 ... v1 2009 09 08 00 12 00 36.8000 -97.5000 374.00 314.00 60.00 282288 SGP 2009 08 20 20 01 00 4963-99 G C2H6 ARL 1070.817 -999.990 ... v1 2009 09 08 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 282285 SGP 2009 08 20 20 01 00 4964-99 G C2H6 ARL 1070.232 -999.990 ... v1 2009 09 08 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 282286 SGP 2009 08 27 19 17 00 3131-99 G C2H6 ARL 2136.585 -999.990 ... v1 2009 09 23 00 11 00 36.8000 -97.5000 374.00 314.00 60.00 283408 SGP 2009 08 27 19 17 00 3132-99 G C2H6 ARL 2233.622 -999.990 ... v1 2009 09 23 00 12 00 36.8000 -97.5000 374.00 314.00 60.00 283409 SGP 2009 09 03 19 09 00 3083-99 G C2H6 ARL 6781.000 -999.990 ... v1 2009 09 24 00 05 00 36.8000 -97.5000 374.00 314.00 60.00 283406 SGP 2009 09 03 19 09 00 3084-99 G C2H6 ARL 6777.805 -999.990 ... v1 2009 09 24 00 06 00 36.8000 -97.5000 374.00 314.00 60.00 283407 SGP 2009 09 10 19 32 00 2880-99 G C2H6 ARL 2235.985 -999.990 P.. v1 2009 10 02 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 284092 SGP 2009 09 10 19 32 00 4603-99 G C2H6 ARL 2766.983 -999.990 P.. v1 2009 10 02 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 284093 SGP 2009 09 18 18 32 00 2583-99 G C2H6 ARL 2468.297 -999.990 ... v1 2009 10 04 00 08 00 36.8000 -97.5000 374.00 314.00 60.00 284095 SGP 2009 09 18 18 32 00 2719-99 G C2H6 ARL 2457.810 -999.990 ... v1 2009 10 04 00 07 00 36.8000 -97.5000 374.00 314.00 60.00 284094 SGP 2009 09 24 19 45 00 1037-99 G C2H6 ARL 6070.012 -999.990 ... v1 2009 10 16 00 11 00 36.8000 -97.5000 374.00 314.00 60.00 284641 SGP 2009 09 24 19 45 00 3860-99 G C2H6 ARL 5866.678 -999.990 ... v1 2009 10 16 00 12 00 36.8000 -97.5000 374.00 314.00 60.00 284642 SGP 2009 10 01 20 31 00 881-99 G C2H6 ARL 1753.114 -999.990 ... v1 2009 10 16 00 09 00 36.8000 -97.5000 374.00 314.00 60.00 284639 SGP 2009 10 01 20 31 00 882-99 G C2H6 ARL 1672.932 -999.990 ... v1 2009 10 16 00 10 00 36.8000 -97.5000 374.00 314.00 60.00 284640 SGP 2009 10 09 19 10 00 2720-99 G C2H6 ARL 1622.932 -999.990 ... v1 2009 10 26 00 03 00 36.8000 -97.5000 374.00 314.00 60.00 285392 SGP 2009 10 09 19 10 00 2750-99 G C2H6 ARL 1560.620 -999.990 ... v1 2009 10 26 00 04 00 36.8000 -97.5000 374.00 314.00 60.00 285393 SGP 2009 10 15 18 49 00 3766-99 G C2H6 ARL 3488.759 -999.990 ... v1 2009 10 27 12 01 00 36.8000 -97.5000 374.00 314.00 60.00 285394 SGP 2009 10 15 18 49 00 832-99 G C2H6 ARL 3469.647 -999.990 ... v1 2009 10 27 12 02 00 36.8000 -97.5000 374.00 314.00 60.00 285395 SGP 2009 10 22 19 26 00 1359-99 G C2H6 ARL 2387.172 -999.990 ... v1 2009 11 27 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 286034 SGP 2009 10 22 19 26 00 1360-99 G C2H6 ARL 2380.316 -999.990 ... v1 2009 11 27 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 286035 SGP 2009 10 29 21 00 00 4035-99 G C2H6 ARL 2875.170 -999.990 ... v1 2009 11 27 00 11 00 36.8000 -97.5000 374.00 314.00 60.00 286032 SGP 2009 10 29 21 00 00 4036-99 G C2H6 ARL 2886.505 -999.990 ... v1 2009 11 27 00 12 00 36.8000 -97.5000 374.00 314.00 60.00 286033 SGP 2009 11 05 20 42 00 4055-99 G C2H6 ARL 397.669 -999.990 ... v1 2009 12 14 12 07 00 36.8000 -97.5000 374.00 314.00 60.00 286866 SGP 2009 11 05 20 42 00 4056-99 G C2H6 ARL 334.010 -999.990 ... v1 2009 12 14 12 08 00 36.8000 -97.5000 374.00 314.00 60.00 286867 SGP 2009 11 12 21 14 00 2037-99 G C2H6 ARL 10109.818 -999.990 P.. v1 2009 12 11 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 286864 SGP 2009 11 12 21 14 00 2038-99 G C2H6 ARL 8686.014 -999.990 P.. v1 2009 12 11 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 286865 SGP 2009 11 19 20 42 00 561-99 G C2H6 ARL 10660.060 -999.990 ... v1 2009 12 17 00 03 00 36.8000 -97.5000 374.00 314.00 60.00 287594 SGP 2009 11 19 20 42 00 562-99 G C2H6 ARL 10643.333 -999.990 ... v1 2009 12 17 00 04 00 36.8000 -97.5000 374.00 314.00 60.00 287595 SGP 2009 11 25 20 47 00 75-99 G C2H6 ARL 1675.773 -999.990 ... v1 2009 12 17 00 05 00 36.8000 -97.5000 374.00 314.00 60.00 287592 SGP 2009 11 25 20 47 00 76-99 G C2H6 ARL 1678.454 -999.990 ... v1 2009 12 17 00 06 00 36.8000 -97.5000 374.00 314.00 60.00 287593 SGP 2009 12 10 20 27 00 3879-99 G C2H6 ARL 8671.014 -999.990 ... v1 2010 01 20 00 11 00 36.8000 -97.5000 374.00 314.00 60.00 288332 SGP 2009 12 10 20 27 00 3880-99 G C2H6 ARL 9628.587 -999.990 ... v1 2010 01 20 00 12 00 36.8000 -97.5000 374.00 314.00 60.00 288333 SGP 2009 12 17 20 48 00 2873-99 G C2H6 ARL 9840.237 -999.990 ... v1 2010 02 08 00 07 00 36.8000 -97.5000 374.00 314.00 60.00 289101 SGP 2009 12 17 20 48 00 2874-99 G C2H6 ARL 9492.715 -999.990 ... v1 2010 02 08 00 08 00 36.8000 -97.5000 374.00 314.00 60.00 289102 SGP 2009 12 23 20 10 00 4505-99 G C2H6 ARL 7830.947 -999.990 ... v1 2010 02 05 00 03 00 36.8000 -97.5000 374.00 314.00 60.00 289099 SGP 2009 12 23 20 10 00 4506-99 G C2H6 ARL 7493.243 -999.990 ... v1 2010 02 05 00 04 00 36.8000 -97.5000 374.00 314.00 60.00 289100 SGP 2009 12 31 20 04 00 2466-99 G C2H6 ARL 5713.345 -999.990 ... v1 2010 02 16 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 289655 SGP 2009 12 31 20 04 00 786-99 G C2H6 ARL 5665.011 -999.990 ... v1 2010 02 16 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 289654 SGP 2010 01 07 23 11 00 35-99 G C2H6 ARL 2865.709 -999.990 ... v1 2010 02 16 00 11 00 36.8000 -97.5000 374.00 314.00 60.00 289656 SGP 2010 01 07 23 11 00 4230-99 G C2H6 ARL 2951.903 -999.990 ... v1 2010 02 16 00 12 00 36.8000 -97.5000 374.00 314.00 60.00 289657 SGP 2010 01 14 20 27 00 2544-99 G C2H6 ARL 11983.108 -999.990 ... v1 2010 02 26 00 11 00 36.8000 -97.5000 374.00 314.00 60.00 290241 SGP 2010 01 14 20 27 00 3385-99 G C2H6 ARL 12087.838 -999.990 ... v1 2010 02 26 00 12 00 36.8000 -97.5000 374.00 314.00 60.00 290242 SGP 2010 01 21 21 25 00 1842-99 G C2H6 ARL 9964.516 -999.990 ... v1 2010 02 27 00 10 00 36.8000 -97.5000 374.00 314.00 60.00 290240 SGP 2010 01 21 21 25 00 99-99 G C2H6 ARL 9935.733 -999.990 ... v1 2010 02 27 00 09 00 36.8000 -97.5000 374.00 314.00 60.00 290239 SGP 2010 02 05 20 14 00 2630-99 G C2H6 ARL 22020.383 -999.990 ... v1 2010 03 17 12 05 00 36.8000 -97.5000 374.00 314.00 60.00 291650 SGP 2010 02 05 20 14 00 2798-99 G C2H6 ARL 21891.892 -999.990 ... v1 2010 03 17 12 06 00 36.8000 -97.5000 374.00 314.00 60.00 291651 SGP 2010 02 11 20 03 00 3254-99 G C2H6 ARL 10537.861 -999.990 ... v1 2010 03 17 12 04 00 36.8000 -97.5000 374.00 314.00 60.00 291649 SGP 2010 02 11 20 03 00 3323-99 G C2H6 ARL 11241.779 -999.990 ... v1 2010 03 17 12 03 00 36.8000 -97.5000 374.00 314.00 60.00 291648 SGP 2010 02 18 20 27 00 5083-99 G C2H6 ARL 12893.161 -999.990 ... v1 2010 05 06 12 08 00 36.8000 -97.5000 374.00 314.00 60.00 292323 SGP 2010 02 18 20 27 00 5084-99 G C2H6 ARL 12725.000 -999.990 ... v1 2010 05 06 12 07 00 36.8000 -97.5000 374.00 314.00 60.00 292324 SGP 2010 02 25 21 12 00 3399-99 G C2H6 ARL 5287.085 -999.990 ... v1 2010 04 03 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 292321 SGP 2010 02 25 21 12 00 3400-99 G C2H6 ARL 5262.803 -999.990 ... v1 2010 04 03 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 292322 SGP 2010 03 03 21 28 00 5125-99 G C2H6 ARL 13539.238 -999.990 ... v1 2010 04 14 00 07 00 36.8000 -97.5000 374.00 314.00 60.00 293064 SGP 2010 03 03 21 28 00 5126-99 G C2H6 ARL 12741.031 -999.990 ... v1 2010 04 14 00 08 00 36.8000 -97.5000 374.00 314.00 60.00 293065 SGP 2010 03 12 20 07 00 5121-99 G C2H6 ARL 3702.545 -999.990 ... v1 2010 04 14 00 05 00 36.8000 -97.5000 374.00 314.00 60.00 293066 SGP 2010 03 12 20 07 00 5122-99 G C2H6 ARL 3342.836 -999.990 ... v1 2010 04 14 00 06 00 36.8000 -97.5000 374.00 314.00 60.00 293067 SGP 2010 03 18 19 37 00 3269-99 G C2H6 ARL 8204.003 -999.990 ... v1 2010 04 15 12 01 00 36.8000 -97.5000 374.00 314.00 60.00 293543 SGP 2010 03 18 19 37 00 3270-99 G C2H6 ARL 8232.142 -999.990 ... v1 2010 04 15 12 02 00 36.8000 -97.5000 374.00 314.00 60.00 293544 SGP 2010 03 25 20 03 00 3425-99 G C2H6 ARL 2019.619 -999.990 ... v1 2010 04 15 12 03 00 36.8000 -97.5000 374.00 314.00 60.00 293545 SGP 2010 03 25 20 03 00 3426-99 G C2H6 ARL 2014.283 -999.990 ... v1 2010 04 15 12 04 00 36.8000 -97.5000 374.00 314.00 60.00 293546 SGP 2010 04 01 19 20 00 1375-99 G C2H6 ARL 6454.900 -999.990 ... v1 2010 05 06 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 294420 SGP 2010 04 01 19 20 00 1376-99 G C2H6 ARL 6471.850 -999.990 ... v1 2010 05 06 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 294421 SGP 2010 04 08 18 51 00 581-99 G C2H6 ARL 3582.679 -999.990 ... v1 2010 04 26 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 294418 SGP 2010 04 08 18 51 00 582-99 G C2H6 ARL 3614.305 -999.990 ... v1 2010 04 26 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 294419 SGP 2010 04 15 20 10 00 2152-99 G C2H6 ARL 2363.509 -999.990 ... v1 2010 05 27 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 295744 SGP 2010 04 15 20 10 00 2505-99 G C2H6 ARL 2385.516 -999.990 ... v1 2010 05 27 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 295743 SGP 2010 04 22 19 34 00 1920-99 G C2H6 ARL 7569.495 -999.990 ... v1 2010 05 27 00 11 00 36.8000 -97.5000 374.00 314.00 60.00 295741 SGP 2010 04 22 19 34 00 2465-99 G C2H6 ARL 7663.419 -999.990 ... v1 2010 05 27 00 12 00 36.8000 -97.5000 374.00 314.00 60.00 295742 SGP 2010 04 29 19 46 00 239-99 G C2H6 ARL 4759.468 -999.990 ... v1 2010 06 11 12 07 00 36.8000 -97.5000 374.00 314.00 60.00 296521 SGP 2010 04 29 19 46 00 4958-99 G C2H6 ARL 4680.769 -999.990 ... v1 2010 06 11 12 08 00 36.8000 -97.5000 374.00 314.00 60.00 296522 SGP 2010 05 06 19 48 00 244-99 G C2H6 ARL 11820.136 -999.990 ... v1 2010 06 11 12 05 00 36.8000 -97.5000 374.00 314.00 60.00 296519 SGP 2010 05 06 19 48 00 2566-99 G C2H6 ARL 11720.588 -999.990 ... v1 2010 06 11 12 06 00 36.8000 -97.5000 374.00 314.00 60.00 296520 SGP 2010 05 13 21 10 00 4129-99 G C2H6 ARL 2365.803 -999.990 ... v1 2010 06 14 12 07 00 36.8000 -97.5000 374.00 314.00 60.00 297205 SGP 2010 05 13 21 10 00 4130-99 G C2H6 ARL 2221.934 -999.990 ... v1 2010 06 14 12 08 00 36.8000 -97.5000 374.00 314.00 60.00 297206 SGP 2010 05 20 19 47 00 4981-99 G C2H6 ARL 2276.120 -999.990 ... v1 2010 06 09 00 09 00 36.8000 -97.5000 374.00 314.00 60.00 297203 SGP 2010 05 20 19 47 00 4982-99 G C2H6 ARL 2348.496 -999.990 ... v1 2010 06 09 00 10 00 36.8000 -97.5000 374.00 314.00 60.00 297204 SGP 2010 05 27 19 15 00 971-99 G C2H6 ARL 5267.081 -999.990 ... v1 2010 06 18 12 07 00 36.8000 -97.5000 374.00 314.00 60.00 298264 SGP 2010 05 27 19 15 00 972-99 G C2H6 ARL 5402.228 -999.990 ... v1 2010 06 18 12 08 00 36.8000 -97.5000 374.00 314.00 60.00 298265 SGP 2010 06 03 19 29 00 2081-99 G C2H6 ARL 4822.444 -999.990 ... v1 2010 06 18 12 05 00 36.8000 -97.5000 374.00 314.00 60.00 298262 SGP 2010 06 03 19 29 00 2082-99 G C2H6 ARL 4881.527 -999.990 ... v1 2010 06 18 12 06 00 36.8000 -97.5000 374.00 314.00 60.00 298263 SGP 2010 06 11 20 12 00 6605-66 G C2H6 ARL 5287.085 -999.990 ... v1 2010 07 09 00 03 00 36.8000 -97.5000 374.00 314.00 60.00 298937 SGP 2010 06 11 20 12 00 6606-66 G C2H6 ARL 5382.153 -999.990 ... v1 2010 07 09 00 04 00 36.8000 -97.5000 374.00 314.00 60.00 298938 SGP 2010 06 17 20 25 00 5081-99 G C2H6 ARL 2160.292 -999.990 ... v1 2010 07 08 00 03 00 36.8000 -97.5000 374.00 314.00 60.00 298935 SGP 2010 06 24 21 40 00 1505-99 G C2H6 ARL 4655.874 -999.990 ... v1 2010 07 21 00 11 00 36.8000 -97.5000 374.00 314.00 60.00 299975 SGP 2010 06 24 21 40 00 1506-99 G C2H6 ARL 4628.789 -999.990 ... v1 2010 07 21 00 12 00 36.8000 -97.5000 374.00 314.00 60.00 299976 SGP 2010 09 02 20 01 00 911-99 G C2H6 ARL 3675.739 -999.990 ... v1 2010 10 11 12 01 00 36.8000 -97.5000 374.00 314.00 60.00 304231 SGP 2010 09 02 20 01 00 912-99 G C2H6 ARL 3808.034 -999.990 ... v1 2010 10 11 12 02 00 36.8000 -97.5000 374.00 314.00 60.00 304232 SGP 2010 09 16 19 26 00 3007-99 G C2H6 ARL 2650.262 -999.990 ... v1 2010 10 06 00 09 00 36.8000 -97.5000 374.00 314.00 60.00 304878 SGP 2010 09 16 19 26 00 3008-99 G C2H6 ARL 2633.875 -999.990 ... v1 2010 10 06 00 10 00 36.8000 -97.5000 374.00 314.00 60.00 304879 SGP 2010 09 23 20 01 00 2247-99 G C2H6 ARL 2794.341 -999.990 ... v1 2010 10 13 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 304876 SGP 2010 09 23 20 01 00 2248-99 G C2H6 ARL 2754.329 -999.990 ... v1 2010 10 13 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 304877 SGP 2010 09 30 19 57 00 2609-99 G C2H6 ARL 1334.508 -999.990 ... v1 2010 11 01 12 07 00 36.8000 -97.5000 374.00 314.00 60.00 305817 SGP 2010 09 30 19 57 00 2610-99 G C2H6 ARL 1339.497 -999.990 ... v1 2010 11 01 12 08 00 36.8000 -97.5000 374.00 314.00 60.00 305818 SGP 2010 10 07 20 16 00 5105-99 G C2H6 ARL 6794.375 -999.990 ... v1 2010 10 27 12 01 00 36.8000 -97.5000 374.00 314.00 60.00 305815 SGP 2010 10 07 20 16 00 5106-99 G C2H6 ARL 6785.205 -999.990 ... v1 2010 10 27 12 02 00 36.8000 -97.5000 374.00 314.00 60.00 305816 SGP 2010 10 14 19 29 00 2175-99 G C2H6 ARL 3514.385 -999.990 ... v1 2010 11 16 12 08 00 36.8000 -97.5000 374.00 314.00 60.00 306775 SGP 2010 10 14 19 29 00 254-99 G C2H6 ARL 3811.599 -999.990 ... v1 2010 11 16 12 07 00 36.8000 -97.5000 374.00 314.00 60.00 306774 SGP 2010 10 21 20 46 00 1476-99 G C2H6 ARL 11369.911 -999.990 ... v1 2010 11 16 12 05 00 36.8000 -97.5000 374.00 314.00 60.00 306776 SGP 2010 10 21 20 46 00 2384-99 G C2H6 ARL 11306.488 -999.990 ... v1 2010 11 16 12 06 00 36.8000 -97.5000 374.00 314.00 60.00 306777 SGP 2010 10 28 19 56 00 1657-99 G C2H6 ARL 1946.107 -999.990 ... v1 2010 11 17 12 07 00 36.8000 -97.5000 374.00 314.00 60.00 307303 SGP 2010 10 28 19 56 00 1658-99 G C2H6 ARL 1947.226 -999.990 ... v1 2010 11 17 12 08 00 36.8000 -97.5000 374.00 314.00 60.00 307304 SGP 2010 11 04 20 15 00 241-99 G C2H6 ARL 1799.541 -999.990 ... v1 2010 11 15 12 05 00 36.8000 -97.5000 374.00 314.00 60.00 307301 SGP 2010 11 04 20 15 00 242-99 G C2H6 ARL -999.990 -999.990 A.. v1 2010 11 15 12 06 00 36.8000 -97.5000 374.00 314.00 60.00 307302 SGP 2010 11 12 19 28 00 3553-99 G C2H6 ARL 2388.722 -999.990 ... v1 2010 12 07 00 11 00 36.8000 -97.5000 374.00 314.00 60.00 308323 SGP 2010 11 12 19 28 00 3554-99 G C2H6 ARL 2414.811 -999.990 ... v1 2010 12 07 00 12 00 36.8000 -97.5000 374.00 314.00 60.00 308324 SGP 2010 11 18 19 38 00 4057-99 G C2H6 ARL 5229.300 -999.990 ... v1 2010 12 07 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 308321 SGP 2010 11 18 19 38 00 4058-99 G C2H6 ARL 5456.722 -999.990 ... v1 2010 12 07 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 308322 SGP 2010 11 26 18 58 00 3937-99 G C2H6 ARL 12741.111 -999.990 ... v1 2010 12 27 00 11 00 36.8000 -97.5000 374.00 314.00 60.00 309167 SGP 2010 11 26 18 58 00 3938-99 G C2H6 ARL 12917.778 -999.990 ... v1 2010 12 27 00 12 00 36.8000 -97.5000 374.00 314.00 60.00 309168 SGP 2010 12 02 20 00 00 3889-99 G C2H6 ARL 15691.111 -999.990 ... v1 2010 12 27 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 309165 SGP 2010 12 02 20 00 00 3890-99 G C2H6 ARL 14966.667 -999.990 ... v1 2010 12 27 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 309166 SGP 2010 12 09 18 37 00 4509-99 G C2H6 ARL 20593.708 -999.990 ... v1 2011 01 06 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 309931 SGP 2010 12 09 18 37 00 4905-99 G C2H6 ARL 19841.461 -999.990 ... v1 2011 01 06 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 309932 SGP 2010 12 16 20 53 00 228-99 G C2H6 ARL 2601.011 -999.990 ... v1 2011 01 06 00 11 00 36.8000 -97.5000 374.00 314.00 60.00 309933 SGP 2010 12 16 20 53 00 3853-99 G C2H6 ARL 2583.551 -999.990 ... v1 2011 01 06 00 12 00 36.8000 -97.5000 374.00 314.00 60.00 309934 SGP 2010 12 23 19 17 00 5145-99 G C2H6 ARL 10143.495 -999.990 ... v1 2011 01 12 00 11 00 36.8000 -97.5000 374.00 314.00 60.00 310374 SGP 2010 12 23 19 17 00 5146-99 G C2H6 ARL 10084.415 -999.990 ... v1 2011 01 12 00 12 00 36.8000 -97.5000 374.00 314.00 60.00 310375 SGP 2010 12 29 21 11 00 1473-99 G C2H6 ARL 15583.146 -999.990 ... v1 2011 01 12 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 310372 SGP 2010 12 29 21 11 00 1474-99 G C2H6 ARL 15547.191 -999.990 ... v1 2011 01 12 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 310373 SGP 2011 01 06 19 31 00 3393-99 G C2H6 ARL 2716.978 -999.990 ... v1 2011 01 31 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 311508 SGP 2011 01 06 19 31 00 3394-99 G C2H6 ARL 2875.269 -999.990 ... v1 2011 01 31 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 311509 SGP 2011 01 14 21 00 00 5051-99 G C2H6 ARL 23166.292 -999.990 ... v1 2011 01 31 00 09 00 36.8000 -97.5000 374.00 314.00 60.00 311506 SGP 2011 01 14 21 00 00 5052-99 G C2H6 ARL 23225.843 -999.990 ... v1 2011 01 31 00 10 00 36.8000 -97.5000 374.00 314.00 60.00 311507 SGP 2011 01 20 20 30 00 4635-99 G C2H6 ARL 2620.845 -999.990 ... v1 2011 02 10 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 312104 SGP 2011 01 20 20 30 00 589-99 G C2H6 ARL 2621.596 -999.990 ... v1 2011 02 10 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 312105 SGP 2011 01 27 20 37 00 2182-99 G C2H6 ARL 5884.601 -999.990 ... v1 2011 02 11 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 312102 SGP 2011 01 27 20 37 00 3968-99 G C2H6 ARL 5882.946 -999.990 ... v1 2011 02 11 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 312103 SGP 2011 02 04 16 40 00 3694-99 G C2H6 ARL 17884.884 -999.990 ... v1 2011 03 03 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 313116 SGP 2011 02 04 16 40 00 4101-99 G C2H6 ARL 18159.302 -999.990 ... v1 2011 03 03 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 313115 SGP 2011 02 10 19 31 00 1727-99 G C2H6 ARL 24841.860 -999.990 ... v1 2011 03 01 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 313117 SGP 2011 02 10 19 31 00 3621-99 G C2H6 ARL 24747.674 -999.990 ... v1 2011 03 01 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 313118 SGP 2011 02 17 21 02 00 4860-99 G C2H6 ARL 9024.976 -999.990 ... v1 2011 03 14 12 07 00 36.8000 -97.5000 374.00 314.00 60.00 313740 SGP 2011 02 17 21 02 00 4971-99 G C2H6 ARL 9021.919 -999.990 ... v1 2011 03 14 12 08 00 36.8000 -97.5000 374.00 314.00 60.00 313739 SGP 2011 02 24 21 24 00 2531-99 G C2H6 ARL 3830.302 -999.990 ... v1 2011 03 14 12 05 00 36.8000 -97.5000 374.00 314.00 60.00 313737 SGP 2011 02 24 21 24 00 3257-99 G C2H6 ARL 3761.814 -999.990 ... v1 2011 03 14 12 06 00 36.8000 -97.5000 374.00 314.00 60.00 313738 SGP 2011 03 03 23 33 00 1336-99 G C2H6 ARL 10611.538 -999.990 ... v1 2011 04 01 12 07 00 36.8000 -97.5000 374.00 314.00 60.00 314325 SGP 2011 03 03 23 33 00 4180-99 G C2H6 ARL 10787.583 -999.990 ... v1 2011 04 01 12 08 00 36.8000 -97.5000 374.00 314.00 60.00 314326 SGP 2011 03 10 19 58 00 1127-99 G C2H6 ARL 4653.790 -999.990 ... v1 2011 03 30 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 314327 SGP 2011 03 10 19 58 00 5131-99 G C2H6 ARL 4613.070 -999.990 ... v1 2011 03 30 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 314328 SGP 2011 03 24 19 25 00 2959-99 G C2H6 ARL 3047.688 -999.990 ... v1 2011 04 11 00 11 00 36.8000 -97.5000 374.00 314.00 60.00 315488 SGP 2011 03 24 19 25 00 4101-99 G C2H6 ARL 2992.958 -999.990 ... v1 2011 04 11 00 12 00 36.8000 -97.5000 374.00 314.00 60.00 315489 SGP 2011 03 31 17 55 00 1630-99 G C2H6 ARL 8712.265 -999.990 ... v1 2011 04 11 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 315486 SGP 2011 03 31 17 55 00 1860-99 G C2H6 ARL 8686.221 -999.990 ... v1 2011 04 11 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 315487 SGP 2011 04 07 20 48 00 4675-99 G C2H6 ARL 14383.803 -999.990 ... v1 2011 04 28 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 316304 SGP 2011 04 07 20 48 00 4676-99 G C2H6 ARL 14379.460 -999.990 ... v1 2011 04 28 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 316305 SGP 2011 04 14 12 34 56 3947-99 G C2H6 ARL 6574.918 -999.990 ... v1 2011 04 28 12 01 00 36.8000 -97.5000 374.00 314.00 60.00 316302 SGP 2011 04 14 12 34 56 3948-99 G C2H6 ARL 6623.697 -999.990 ... v1 2011 04 28 12 02 00 36.8000 -97.5000 374.00 314.00 60.00 316303 SGP 2011 04 21 20 14 00 265-99 G C2H6 ARL 7380.415 -999.990 ... v1 2011 05 16 12 07 00 36.8000 -97.5000 374.00 314.00 60.00 317127 SGP 2011 04 21 20 14 00 333-99 G C2H6 ARL 7193.756 -999.990 ... v1 2011 05 16 12 08 00 36.8000 -97.5000 374.00 314.00 60.00 317126 SGP 2011 04 28 18 22 00 2265-99 G C2H6 ARL 5093.803 -999.990 ... v1 2011 05 23 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 317125 SGP 2011 04 28 18 22 00 2654-99 G C2H6 ARL 4708.128 -999.990 ... v1 2011 05 23 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 317124 SGP 2011 05 05 20 09 00 4385-99 G C2H6 ARL 2317.418 -999.990 ... v1 2011 06 10 12 05 00 36.8000 -97.5000 374.00 314.00 60.00 317839 SGP 2011 05 05 20 09 00 4386-99 G C2H6 ARL 2301.612 -999.990 ... v1 2011 06 10 12 06 00 36.8000 -97.5000 374.00 314.00 60.00 317840 SGP 2011 05 13 19 31 00 2137-99 G C2H6 ARL 1537.547 -999.990 ... v1 2011 06 10 12 03 00 36.8000 -97.5000 374.00 314.00 60.00 317837 SGP 2011 05 13 19 31 00 2138-99 G C2H6 ARL 1625.362 -999.990 ... v1 2011 06 10 12 04 00 36.8000 -97.5000 374.00 314.00 60.00 317838 SGP 2011 05 19 20 00 00 5389-99 G C2H6 ARL 4178.483 -999.990 ... v1 2011 06 08 12 07 00 36.8000 -97.5000 374.00 314.00 60.00 318514 SGP 2011 05 19 20 00 00 5390-99 G C2H6 ARL 4388.554 -999.990 ... v1 2011 06 08 12 08 00 36.8000 -97.5000 374.00 314.00 60.00 318515 SGP 2011 05 26 18 13 00 5403-99 G C2H6 ARL 1860.355 -999.990 ... v1 2011 06 08 12 05 00 36.8000 -97.5000 374.00 314.00 60.00 318516 SGP 2011 05 26 18 13 00 5404-99 G C2H6 ARL 1857.535 -999.990 ... v1 2011 06 08 12 06 00 36.8000 -97.5000 374.00 314.00 60.00 318517 SGP 2011 06 02 19 53 00 1740-99 G C2H6 ARL 3140.023 -999.990 ... v1 2011 06 28 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 319150 SGP 2011 06 02 19 53 00 3207-99 G C2H6 ARL 3145.304 -999.990 ... v1 2011 06 28 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 319151 SGP 2011 06 09 18 18 00 2465-99 G C2H6 ARL 6093.189 -999.990 ... v1 2011 06 28 00 12 00 36.8000 -97.5000 374.00 314.00 60.00 319152 SGP 2011 06 09 18 18 00 4905-99 G C2H6 ARL 6637.920 -999.990 ... v1 2011 06 28 00 11 00 36.8000 -97.5000 374.00 314.00 60.00 319153 SGP 2011 06 16 20 36 00 2921-99 G C2H6 ARL 4261.846 -999.990 ... v1 2011 07 06 12 05 00 36.8000 -97.5000 374.00 314.00 60.00 319886 SGP 2011 06 16 20 36 00 4762-99 G C2H6 ARL 4173.037 -999.990 ... v1 2011 07 06 12 06 00 36.8000 -97.5000 374.00 314.00 60.00 319887 SGP 2011 06 23 18 53 00 4202-99 G C2H6 ARL 6083.575 -999.990 ... v1 2011 07 06 12 07 00 36.8000 -97.5000 374.00 314.00 60.00 319888 SGP 2011 06 23 18 53 00 4746-99 G C2H6 ARL 6068.283 -999.990 ... v1 2011 07 06 12 08 00 36.8000 -97.5000 374.00 314.00 60.00 319889 SGP 2011 06 30 20 32 00 2397-99 G C2H6 ARL 3079.218 -999.990 ... v1 2011 09 13 12 07 00 36.8000 -97.5000 374.00 314.00 60.00 320472 SGP 2011 06 30 20 32 00 2398-99 G C2H6 ARL 3132.867 -999.990 ... v1 2011 09 13 12 08 00 36.8000 -97.5000 374.00 314.00 60.00 320473 SGP 2011 07 14 20 30 00 559-99 G C2H6 ARL 4417.810 -999.990 ... v1 2011 08 05 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 321572 SGP 2011 07 14 20 30 00 560-99 G C2H6 ARL 4483.643 -999.990 ... v1 2011 08 05 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 321573 SGP 2011 07 21 19 28 00 5389-99 G C2H6 ARL 4797.619 -999.990 ... v1 2011 08 08 12 07 00 36.8000 -97.5000 374.00 314.00 60.00 321574 SGP 2011 07 21 19 28 00 5390-99 G C2H6 ARL 4808.166 -999.990 ... v1 2011 08 08 12 08 00 36.8000 -97.5000 374.00 314.00 60.00 321575 SGP 2011 07 27 20 26 00 2465-99 G C2H6 ARL 9424.023 -999.990 ... v1 2011 08 25 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 322099 SGP 2011 07 27 20 26 00 391-99 G C2H6 ARL 9264.309 -999.990 ... v1 2011 08 25 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 322098 SGP 2011 08 04 18 43 00 2602-99 G C2H6 ARL 3707.964 -999.990 ... v1 2011 08 25 00 11 00 36.8000 -97.5000 374.00 314.00 60.00 322094 SGP 2011 08 04 18 43 00 3344-99 G C2H6 ARL 3727.643 -999.990 ... v1 2011 08 25 00 12 00 36.8000 -97.5000 374.00 314.00 60.00 322095 SGP 2011 08 11 19 37 00 1778-99 G C2H6 ARL 5218.223 -999.990 ... v1 2011 10 03 12 07 00 36.8000 -97.5000 374.00 314.00 60.00 322664 SGP 2011 08 11 19 37 00 3051-99 G C2H6 ARL 5459.218 -999.990 ... v1 2011 10 03 12 08 00 36.8000 -97.5000 374.00 314.00 60.00 322663 SGP 2011 08 18 18 33 00 1835-99 G C2H6 ARL 5755.355 -999.990 ... v1 2011 10 03 12 05 00 36.8000 -97.5000 374.00 314.00 60.00 322665 SGP 2011 08 18 18 33 00 4130-99 G C2H6 ARL 6173.104 -999.990 ... v1 2011 10 03 12 06 00 36.8000 -97.5000 374.00 314.00 60.00 322666 SGP 2011 08 25 20 12 00 4825-99 G C2H6 ARL 2181.694 -999.990 ... v1 2011 09 23 00 11 00 36.8000 -97.5000 374.00 314.00 60.00 323489 SGP 2011 08 25 20 12 00 4826-99 G C2H6 ARL 2177.583 -999.990 ... v1 2011 09 23 00 12 00 36.8000 -97.5000 374.00 314.00 60.00 323490 SGP 2011 09 01 19 10 00 5109-99 G C2H6 ARL 3599.976 -999.990 ... v1 2011 09 23 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 323487 SGP 2011 09 01 19 10 00 5110-99 G C2H6 ARL -999.990 -999.990 A.. v1 2011 09 23 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 323488 SGP 2011 09 08 19 18 00 1699-99 G C2H6 ARL 1971.813 -999.990 ... v1 2011 10 06 12 08 00 36.8000 -97.5000 374.00 314.00 60.00 324134 SGP 2011 09 08 19 18 00 846-99 G C2H6 ARL 1683.649 -999.990 ... v1 2011 10 06 12 07 00 36.8000 -97.5000 374.00 314.00 60.00 324133 SGP 2011 09 15 19 03 00 317-99 G C2H6 ARL 3207.867 -999.990 ... v1 2011 10 05 12 08 00 36.8000 -97.5000 374.00 314.00 60.00 324132 SGP 2011 09 15 19 03 00 35-99 G C2H6 ARL 3159.692 -999.990 ... v1 2011 10 05 12 07 00 36.8000 -97.5000 374.00 314.00 60.00 324131 SGP 2011 09 22 22 04 00 2845-99 G C2H6 ARL 5190.308 -999.990 ... v1 2011 10 17 00 11 00 36.8000 -97.5000 374.00 314.00 60.00 324670 SGP 2011 09 22 22 04 00 5060-99 G C2H6 ARL 5141.919 -999.990 ... v1 2011 10 17 00 12 00 36.8000 -97.5000 374.00 314.00 60.00 324671 SGP 2011 09 29 18 20 00 2606-99 G C2H6 ARL 1610.853 -999.990 ... v1 2011 10 17 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 324672 SGP 2011 09 29 18 20 00 4830-99 G C2H6 ARL 1609.336 -999.990 ... v1 2011 10 17 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 324673 SGP 2011 10 06 20 07 00 1274-99 G C2H6 ARL 1975.142 -999.990 ... v1 2011 11 08 00 12 00 36.8000 -97.5000 374.00 314.00 60.00 325567 SGP 2011 10 06 20 07 00 4143-99 G C2H6 ARL 2014.752 -999.990 ... v1 2011 11 08 00 11 00 36.8000 -97.5000 374.00 314.00 60.00 325568 SGP 2011 10 13 20 09 00 3228-99 G C2H6 ARL 1690.849 -999.990 ... v1 2011 11 12 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 325569 SGP 2011 10 13 20 09 00 4237-99 G C2H6 ARL 1672.335 -999.990 ... v1 2011 11 12 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 325570 SGP 2011 10 20 19 10 00 1037-99 G C2H6 ARL 18306.347 -999.990 ... v1 2011 12 12 00 11 00 36.8000 -97.5000 374.00 314.00 60.00 326317 SGP 2011 10 20 19 10 00 1218-99 G C2H6 ARL 18439.421 -999.990 ... v1 2011 12 12 00 12 00 36.8000 -97.5000 374.00 314.00 60.00 326318 SGP 2011 10 27 19 29 00 2339-99 G C2H6 ARL 3955.167 -999.990 ... v1 2011 12 12 00 10 00 36.8000 -97.5000 374.00 314.00 60.00 326320 SGP 2011 10 27 19 29 00 606-99 G C2H6 ARL 3990.724 -999.990 ... v1 2011 12 12 00 09 00 36.8000 -97.5000 374.00 314.00 60.00 326319 SGP 2011 11 04 01 49 00 4113-99 G C2H6 ARL 1738.998 -999.990 ... v1 2011 12 08 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 327082 SGP 2011 11 04 01 49 00 4114-99 G C2H6 ARL 1757.572 -999.990 ... v1 2011 12 08 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 327083 SGP 2011 11 10 19 58 00 727-99 G C2H6 ARL 9020.023 -999.990 ... v1 2011 12 08 00 11 00 36.8000 -97.5000 374.00 314.00 60.00 327080 SGP 2011 11 10 19 58 00 728-99 G C2H6 ARL 8779.086 -999.990 ... v1 2011 12 08 00 12 00 36.8000 -97.5000 374.00 314.00 60.00 327081 SGP 2011 11 17 20 07 00 879-99 G C2H6 ARL 4954.321 -999.990 ... v1 2011 12 29 00 11 00 36.8000 -97.5000 374.00 314.00 60.00 327740 SGP 2011 11 17 20 07 00 880-99 G C2H6 ARL 4996.982 -999.990 ... v1 2011 12 29 00 12 00 36.8000 -97.5000 374.00 314.00 60.00 327741 SGP 2011 11 23 20 41 00 81-99 G C2H6 ARL 14323.384 -999.990 ... v1 2011 12 23 12 07 00 36.8000 -97.5000 374.00 314.00 60.00 327742 SGP 2011 11 23 20 41 00 82-99 G C2H6 ARL 13928.953 -999.990 ... v1 2011 12 23 12 08 00 36.8000 -97.5000 374.00 314.00 60.00 327743 SGP 2011 12 01 19 48 00 4634-99 G C2H6 ARL 19427.765 -999.990 ... v1 2012 01 28 00 11 00 36.8000 -97.5000 374.00 314.00 60.00 329062 SGP 2011 12 01 19 48 00 5144-99 G C2H6 ARL 19457.111 -999.990 ... v1 2012 01 28 00 12 00 36.8000 -97.5000 374.00 314.00 60.00 329063 SGP 2011 12 08 15 15 00 1247-99 G C2H6 ARL 47072.235 -999.990 ... v1 2012 01 28 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 329060 SGP 2011 12 08 15 15 00 1325-99 G C2H6 ARL 47900.677 -999.990 ... v1 2012 01 28 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 329061 SGP 2011 12 15 21 04 00 1415-99 G C2H6 ARL 2214.447 -999.990 ... v1 2012 01 14 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 328739 SGP 2011 12 15 21 04 00 1416-99 G C2H6 ARL 2216.704 -999.990 ... v1 2012 01 14 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 328740 SGP 2011 12 22 19 40 00 3375-99 G C2H6 ARL 2974.041 -999.990 ... v1 2012 01 11 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 328737 SGP 2011 12 22 19 40 00 3376-99 G C2H6 ARL 2981.941 -999.990 ... v1 2012 01 11 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 328738 SGP 2011 12 29 21 06 00 1300-99 G C2H6 ARL 37273.836 -999.990 ... v1 2012 02 06 12 07 00 36.8000 -97.5000 374.00 314.00 60.00 329512 SGP 2011 12 29 21 06 00 3747-99 G C2H6 ARL 37217.295 -999.990 ... v1 2012 02 06 12 08 00 36.8000 -97.5000 374.00 314.00 60.00 329513 SGP 2012 01 05 20 14 00 154-99 G C2H6 ARL 11290.466 -999.990 ... v1 2012 02 04 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 329511 SGP 2012 01 05 20 14 00 84-99 G C2H6 ARL 11228.381 -999.990 ... v1 2012 02 04 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 329510 SGP 2012 01 12 20 30 00 2800-99 G C2H6 ARL 2410.776 -999.990 ... v1 2012 02 11 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 330374 SGP 2012 01 12 20 30 00 4005-99 G C2H6 ARL 2424.435 -999.990 ... v1 2012 02 11 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 330375 SGP 2012 01 19 20 16 00 606-99 G C2H6 ARL 6773.260 -999.990 ... v1 2012 02 12 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 330372 SGP 2012 01 19 20 16 00 689-99 G C2H6 ARL 6776.253 -999.990 ... v1 2012 02 12 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 330373 SGP 2012 01 26 20 19 00 4863-99 G C2H6 ARL 2112.328 -999.990 ... v1 2012 02 27 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 331130 SGP 2012 01 26 20 19 00 4864-99 G C2H6 ARL 2016.763 -999.990 ... v1 2012 02 27 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 331131 SGP 2012 02 02 21 30 00 2639-99 G C2H6 ARL 9489.690 -999.990 ... v1 2012 02 27 00 11 00 36.8000 -97.5000 374.00 314.00 60.00 331132 SGP 2012 02 02 21 30 00 2640-99 G C2H6 ARL 9499.423 -999.990 ... v1 2012 02 27 00 12 00 36.8000 -97.5000 374.00 314.00 60.00 331133 SGP 2012 02 09 20 25 00 1268-99 G C2H6 ARL 12175.043 -999.990 ... v1 2012 03 08 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 331875 SGP 2012 02 09 20 25 00 4566-99 G C2H6 ARL 12175.109 -999.990 ... v1 2012 03 08 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 331876 SGP 2012 02 16 19 52 00 1190-99 G C2H6 ARL 5573.522 -999.990 ... v1 2012 03 15 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 331877 SGP 2012 02 16 19 52 00 5378-99 G C2H6 ARL 5527.163 -999.990 ... v1 2012 03 15 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 331878 SGP 2012 02 23 20 26 00 2105-99 G C2H6 ARL 1876.717 -999.990 ... v1 2012 03 23 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 332644 SGP 2012 02 23 20 26 00 2106-99 G C2H6 ARL 1788.065 -999.990 ... v1 2012 03 23 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 332645 SGP 2012 03 01 21 18 00 2193-99 G C2H6 ARL 13050.184 -999.990 ... v1 2012 03 23 00 11 00 36.8000 -97.5000 374.00 314.00 60.00 332642 SGP 2012 03 01 21 18 00 2194-99 G C2H6 ARL 13170.305 -999.990 ... v1 2012 03 23 00 12 00 36.8000 -97.5000 374.00 314.00 60.00 332643 SGP 2012 03 08 20 23 00 1369-99 G C2H6 ARL 3961.912 -999.990 ... v1 2012 04 03 00 09 00 36.8000 -97.5000 374.00 314.00 60.00 333020 SGP 2012 03 08 20 23 00 4913-99 G C2H6 ARL 3981.648 -999.990 ... v1 2012 04 03 00 10 00 36.8000 -97.5000 374.00 314.00 60.00 333021 SGP 2012 03 15 19 46 00 2824-99 G C2H6 ARL 5435.868 -999.990 ... v1 2012 04 06 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 333022 SGP 2012 03 15 19 46 00 3715-99 G C2H6 ARL 5642.220 -999.990 ... v1 2012 04 06 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 333023 SGP 2012 03 22 19 24 00 3407-99 G C2H6 ARL 6801.648 -999.990 ... v1 2012 04 18 00 11 00 36.8000 -97.5000 374.00 314.00 60.00 333785 SGP 2012 03 22 19 24 00 6179-66 G C2H6 ARL 6832.143 -999.990 ... v1 2012 04 18 00 12 00 36.8000 -97.5000 374.00 314.00 60.00 333786 SGP 2012 03 29 19 27 00 191-99 G C2H6 ARL 6457.121 -999.990 ... v1 2012 04 17 12 07 00 36.8000 -97.5000 374.00 314.00 60.00 333787 SGP 2012 03 29 19 27 00 2135-99 G C2H6 ARL 6370.890 -999.990 ... v1 2012 04 17 12 08 00 36.8000 -97.5000 374.00 314.00 60.00 333788 SGP 2012 04 05 19 14 00 81-99 G C2H6 ARL 3865.345 -999.990 ... v1 2012 05 16 12 07 00 36.8000 -97.5000 374.00 314.00 60.00 334249 SGP 2012 04 05 19 14 00 82-99 G C2H6 ARL 4031.203 -999.990 ... v1 2012 05 16 12 08 00 36.8000 -97.5000 374.00 314.00 60.00 334250 SGP 2012 04 12 17 55 00 4937-99 G C2H6 ARL 8364.110 -999.990 ... v1 2012 05 16 12 05 00 36.8000 -97.5000 374.00 314.00 60.00 334251 SGP 2012 04 12 17 55 00 4938-99 G C2H6 ARL 8032.851 -999.990 ... v1 2012 05 16 12 06 00 36.8000 -97.5000 374.00 314.00 60.00 334252 SGP 2012 04 19 19 20 00 2989-99 G C2H6 ARL 10415.913 -999.990 ... v1 2012 05 31 00 11 00 36.8000 -97.5000 374.00 314.00 60.00 335255 SGP 2012 04 19 19 20 00 2990-99 G C2H6 ARL 10373.653 -999.990 ... v1 2012 05 31 00 12 00 36.8000 -97.5000 374.00 314.00 60.00 335256 SGP 2012 04 26 18 57 00 661-99 G C2H6 ARL 2932.595 -999.990 ... v1 2012 05 31 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 335257 SGP 2012 04 26 18 57 00 662-99 G C2H6 ARL 2945.880 -999.990 ... v1 2012 05 31 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 335258 SGP 2012 05 03 19 35 00 507-99 G C2H6 ARL 7500.156 -999.990 ... v1 2012 06 12 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 335559 SGP 2012 05 03 19 35 00 5187-99 G C2H6 ARL 7498.230 -999.990 ... v1 2012 06 12 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 335560 SGP 2012 05 17 19 07 00 2995-99 G C2H6 ARL 6806.993 -999.990 ... v1 2012 06 10 00 11 00 36.8000 -97.5000 374.00 314.00 60.00 336227 SGP 2012 05 17 19 07 00 5124-99 G C2H6 ARL 6818.118 -999.990 ... v1 2012 06 10 00 12 00 36.8000 -97.5000 374.00 314.00 60.00 336228 SGP 2012 05 24 18 30 00 2996-99 G C2H6 ARL 7087.082 -999.990 ... v1 2012 06 10 00 13 00 36.8000 -97.5000 374.00 314.00 60.00 336225 SGP 2012 05 24 18 30 00 5123-99 G C2H6 ARL 7326.636 -999.990 ... v1 2012 06 10 00 14 00 36.8000 -97.5000 374.00 314.00 60.00 336226 SGP 2012 06 07 19 03 00 1073-99 G C2H6 ARL 6934.067 -999.990 ... v1 2012 08 14 00 06 00 36.8000 -97.5000 374.00 314.00 60.00 337020 SGP 2012 06 07 19 03 00 542-99 G C2H6 ARL 6914.775 -999.990 ... v1 2012 08 14 00 05 00 36.8000 -97.5000 374.00 314.00 60.00 337019 SGP 2012 06 28 21 32 00 2794-99 G C2H6 ARL 6310.090 -999.990 ... v1 2012 08 17 00 03 00 36.8000 -97.5000 374.00 314.00 60.00 338330 SGP 2012 06 28 21 32 00 3735-99 G C2H6 ARL 6223.528 -999.990 ... v1 2012 08 17 00 04 00 36.8000 -97.5000 374.00 314.00 60.00 338331 SGP 2012 07 05 19 34 00 2360-99 G C2H6 ARL 3470.697 -999.990 ... v1 2012 08 20 00 11 00 36.8000 -97.5000 374.00 314.00 60.00 338332 SGP 2012 07 05 19 34 00 2857-99 G C2H6 ARL 3536.202 -999.990 ... v1 2012 08 20 00 12 00 36.8000 -97.5000 374.00 314.00 60.00 338333 SGP 2012 07 12 19 11 00 2385-99 G C2H6 ARL 3402.873 -999.990 ... v1 2012 10 04 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 339053 SGP 2012 07 12 19 11 00 2385-99 G C2H6 ARL -999.990 -999.990 A.. v1 2012 10 25 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 339053 SGP 2012 07 12 19 11 00 2386-99 G C2H6 ARL -999.990 -999.990 A.. v1 2012 10 04 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 339054 SGP 2012 07 12 19 11 00 2386-99 G C2H6 ARL -999.990 -999.990 A.. v1 2012 10 25 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 339054 SGP 2012 07 19 19 13 00 3707-99 G C2H6 ARL 3318.684 -999.990 ... v1 2012 10 04 00 11 00 36.6070 -97.4890 374.00 314.00 60.00 339055 SGP 2012 07 19 19 13 00 3708-99 G C2H6 ARL 3330.483 -999.990 ... v1 2012 10 04 00 12 00 36.6070 -97.4890 374.00 314.00 60.00 339056 SGP 2012 07 26 20 59 00 5189-99 G C2H6 ARL 9460.246 -999.990 ... v1 2012 09 05 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 339820 SGP 2012 07 26 20 59 00 5190-99 G C2H6 ARL 9426.342 -999.990 ... v1 2012 09 05 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 339821 SGP 2012 08 02 19 29 00 5247-99 G C2H6 ARL 8223.042 -999.990 ... v1 2012 11 03 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 339815 SGP 2012 08 09 19 31 00 4101-99 G C2H6 ARL 1240.447 -999.990 ... v1 2012 09 20 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 340140 SGP 2012 08 09 19 31 00 439-99 G C2H6 ARL 1245.257 -999.990 ... v1 2012 09 20 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 340139 SGP 2012 08 16 19 32 00 288-99 G C2H6 ARL 5576.365 -999.990 ... v1 2012 09 11 00 11 00 36.6070 -97.4890 374.00 314.00 60.00 340137 SGP 2012 08 16 19 32 00 412-99 G C2H6 ARL 5547.181 -999.990 ... v1 2012 09 11 00 12 00 36.6070 -97.4890 374.00 314.00 60.00 340138 SGP 2012 08 23 19 02 00 2743-99 G C2H6 ARL 5323.509 -999.990 ... v1 2012 10 15 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 340836 SGP 2012 08 23 19 02 00 2743-99 G C2H6 ARL -999.990 -999.990 A.. v1 2012 11 03 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 340836 SGP 2012 08 23 19 02 00 4201-99 G C2H6 ARL 5538.114 -999.990 ... v1 2012 10 15 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 340837 SGP 2012 08 30 19 49 00 1968-99 G C2H6 ARL 1851.173 -999.990 ... v1 2012 10 13 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 340834 SGP 2012 08 30 19 49 00 3549-99 G C2H6 ARL 1842.259 -999.990 ... v1 2012 10 13 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 340835 SGP 2012 09 06 19 34 00 275-99 G C2H6 ARL 4502.500 -999.990 ... v1 2012 10 23 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 341666 SGP 2012 09 06 19 34 00 276-99 G C2H6 ARL 4507.720 -999.990 ... v1 2012 10 23 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 341667 SGP 2012 09 13 20 19 00 4203-99 G C2H6 ARL 1658.640 -999.990 ... v1 2012 10 21 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 341664 SGP 2012 09 13 20 19 00 4204-99 G C2H6 ARL 1666.974 -999.990 ... v1 2012 10 21 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 341665 SGP 2012 09 20 19 58 00 1723-99 G C2H6 ARL 26887.313 -999.990 ... v1 2012 10 20 00 11 00 36.6070 -97.4890 374.00 314.00 60.00 342233 SGP 2012 09 20 19 58 00 1724-99 G C2H6 ARL 24495.066 -999.990 ... v1 2012 10 20 00 12 00 36.6070 -97.4890 374.00 314.00 60.00 342234 SGP 2012 09 27 18 25 00 957-99 G C2H6 ARL 11284.693 -999.990 ... v1 2012 10 20 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 342235 SGP 2012 09 27 18 25 00 958-99 G C2H6 ARL 11281.777 -999.990 ... v1 2012 10 20 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 342236 SGP 2012 10 04 17 41 00 1185-99 G C2H6 ARL 3839.038 -999.990 ... v1 2012 11 07 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 342927 SGP 2012 10 04 17 41 00 1195-99 G C2H6 ARL 3730.850 -999.990 ... v1 2012 11 07 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 342928 SGP 2012 10 12 19 57 00 4738-99 G C2H6 ARL 13618.881 -999.990 ... v1 2012 11 05 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 342929 SGP 2012 10 12 19 57 00 930-99 G C2H6 ARL 13789.240 -999.990 ... v1 2012 11 05 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 342930 SGP 2012 10 18 19 46 00 7-99 G C2H6 ARL 1375.187 -999.990 ... v1 2012 12 20 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 343524 SGP 2012 10 18 19 46 00 8-99 G C2H6 ARL 1391.033 -999.990 ... v1 2012 12 20 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 343525 SGP 2012 10 25 19 20 00 4271-99 G C2H6 ARL 2396.044 -999.990 ... v1 2012 12 20 00 11 00 36.6070 -97.4890 374.00 314.00 60.00 343522 SGP 2012 10 25 19 20 00 4272-99 G C2H6 ARL 2412.286 -999.990 ... v1 2012 12 20 00 12 00 36.6070 -97.4890 374.00 314.00 60.00 343523 SGP 2012 11 01 19 02 00 1549-99 G C2H6 ARL 14628.337 -999.990 ... v1 2013 01 06 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 344149 SGP 2012 11 01 19 02 00 1550-99 G C2H6 ARL 14653.392 -999.990 ... v1 2013 01 06 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 344150 SGP 2012 11 08 21 03 00 4471-99 G C2H6 ARL 11527.571 -999.990 ... v1 2013 01 03 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 344151 SGP 2012 11 08 21 03 00 4472-99 G C2H6 ARL 11562.363 -999.990 ... v1 2013 01 03 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 344152 SGP 2012 11 15 20 24 00 1969-99 G C2H6 ARL 8489.955 -999.990 ... v1 2013 03 16 00 11 00 36.6070 -97.4890 374.00 314.00 60.00 344935 SGP 2012 11 15 20 24 00 2461-99 G C2H6 ARL 8654.099 -999.990 ... v1 2013 03 16 00 12 00 36.6070 -97.4890 374.00 314.00 60.00 344936 SGP 2012 11 29 20 29 00 2398-99 G C2H6 ARL 16841.441 -999.990 ... v1 2013 03 17 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 344933 SGP 2012 11 29 20 29 00 3055-99 G C2H6 ARL 16957.207 -999.990 ... v1 2013 03 17 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 344934 SGP 2012 12 06 21 19 00 3177-99 G C2H6 ARL 20837.637 -999.990 ... v1 2013 01 18 12 07 00 36.6070 -97.4890 374.00 314.00 60.00 345542 SGP 2012 12 06 21 19 00 3178-99 G C2H6 ARL 20929.212 -999.990 ... v1 2013 01 18 12 08 00 36.6070 -97.4890 374.00 314.00 60.00 345543 SGP 2012 12 13 20 13 00 163-99 G C2H6 ARL 22108.972 -999.990 ... v1 2013 01 27 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 345540 SGP 2012 12 13 20 13 00 164-99 G C2H6 ARL 22072.757 -999.990 ... v1 2013 01 27 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 345541 SGP 2012 12 20 20 35 00 5053-99 G C2H6 ARL 2639.204 -999.990 ... v1 2013 02 01 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 346417 SGP 2012 12 20 20 35 00 959-99 G C2H6 ARL 2645.953 -999.990 ... v1 2013 02 01 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 346416 SGP 2012 12 27 21 10 00 507-99 G C2H6 ARL 16939.716 -999.990 ... v1 2013 01 30 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 346415 SGP 2012 12 27 21 10 00 701-99 G C2H6 ARL 17762.691 -999.990 ... v1 2013 01 30 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 346414 SGP 2013 01 03 19 38 00 1024-99 G C2H6 ARL 3314.664 -999.990 ... v1 2013 02 05 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 346496 SGP 2013 01 03 19 38 00 1345-99 G C2H6 ARL 3402.803 -999.990 ... v1 2013 02 05 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 346497 SGP 2013 01 10 20 42 00 1568-99 G C2H6 ARL 12449.781 -999.990 ... v1 2013 01 31 12 07 00 36.6070 -97.4890 374.00 314.00 60.00 346494 SGP 2013 01 10 20 42 00 1838-99 G C2H6 ARL 12456.783 -999.990 ... v1 2013 01 31 12 08 00 36.6070 -97.4890 374.00 314.00 60.00 346495 SGP 2013 01 17 21 00 00 1845-99 G C2H6 ARL 3477.791 -999.990 ... v1 2013 02 07 12 07 00 36.6070 -97.4890 374.00 314.00 60.00 346910 SGP 2013 01 17 21 00 00 1846-99 G C2H6 ARL 3473.565 -999.990 ... v1 2013 02 07 12 08 00 36.6070 -97.4890 374.00 314.00 60.00 346911 SGP 2013 01 24 21 37 00 1733-99 G C2H6 ARL 3598.184 -999.990 ... v1 2013 02 16 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 346908 SGP 2013 01 24 21 37 00 1734-99 G C2H6 ARL 3609.126 -999.990 ... v1 2013 02 16 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 346909 SGP 2013 01 31 21 18 00 1642-99 G C2H6 ARL 4283.919 -999.990 ... v1 2013 03 13 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 347611 SGP 2013 01 31 21 18 00 4655-99 G C2H6 ARL 4290.146 -999.990 ... v1 2013 03 13 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 347612 SGP 2013 02 06 19 00 00 2860-99 G C2H6 ARL 9085.090 -999.990 ... v1 2013 03 12 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 347609 SGP 2013 02 06 19 00 00 5168-99 G C2H6 ARL 9135.350 -999.990 ... v1 2013 03 12 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 347610 SGP 2013 02 14 19 47 00 4035-99 G C2H6 ARL 3016.227 -999.990 ... v1 2013 03 29 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 348443 SGP 2013 02 14 19 47 00 4036-99 G C2H6 ARL 2982.399 -999.990 ... v1 2013 03 29 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 348444 SGP 2013 02 22 21 00 00 3133-99 G C2H6 ARL 12434.347 -999.990 ... v1 2013 03 26 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 348441 SGP 2013 02 22 21 00 00 3134-99 G C2H6 ARL 12660.360 -999.990 ... v1 2013 03 26 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 348442 SGP 2013 02 28 19 46 00 1261-99 G C2H6 ARL 5970.405 -999.990 ... v1 2013 04 01 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 348707 SGP 2013 02 28 19 46 00 1262-99 G C2H6 ARL 5923.618 -999.990 ... v1 2013 04 01 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 348708 SGP 2013 03 14 19 17 00 4475-99 G C2H6 ARL 14551.124 -999.990 ... v1 2013 04 27 00 11 00 36.6070 -97.4890 374.00 314.00 60.00 349429 SGP 2013 03 14 19 17 00 4476-99 G C2H6 ARL 14593.146 -999.990 ... v1 2013 04 27 00 12 00 36.6070 -97.4890 374.00 314.00 60.00 349430 SGP 2013 03 21 19 25 00 1637-99 G C2H6 ARL 6679.303 -999.990 ... v1 2013 04 27 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 349431 SGP 2013 03 21 19 25 00 1638-99 G C2H6 ARL 6301.124 -999.990 ... v1 2013 04 27 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 349432 SGP 2013 03 29 17 53 00 3457-99 G C2H6 ARL 13315.618 -999.990 ... v1 2013 04 29 00 11 00 36.6070 -97.4890 374.00 314.00 60.00 350091 SGP 2013 03 29 17 53 00 3710-99 G C2H6 ARL 13378.989 -999.990 ... v1 2013 04 29 00 12 00 36.6070 -97.4890 374.00 314.00 60.00 350092 SGP 2013 04 05 18 25 00 3547-99 G C2H6 ARL 12615.281 -999.990 P.. v1 2013 04 29 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 350089 SGP 2013 04 05 18 25 00 570-99 G C2H6 ARL 15016.292 -999.990 P.. v1 2013 04 29 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 350090 SGP 2013 04 11 20 21 00 3607-99 G C2H6 ARL 5377.137 -999.990 ... v1 2013 12 10 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 351025 SGP 2013 04 19 18 34 00 1664-99 G C2H6 ARL 5408.037 -999.990 ... v1 2013 12 10 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 351028 SGP 2013 04 25 19 59 00 2535-99 G C2H6 ARL 9350.979 -999.990 ... v1 2013 07 01 12 07 00 36.6070 -97.4890 374.00 314.00 60.00 351828 SGP 2013 04 25 19 59 00 5168-99 G C2H6 ARL 9342.264 -999.990 ... v1 2013 07 01 12 08 00 36.6070 -97.4890 374.00 314.00 60.00 351829 SGP 2013 05 02 19 50 00 1386-99 G C2H6 ARL 2274.176 -999.990 ... v1 2013 06 21 00 11 00 36.6070 -97.4890 374.00 314.00 60.00 351830 SGP 2013 05 02 19 50 00 4290-99 G C2H6 ARL 2354.655 -999.990 ... v1 2013 06 21 00 12 00 36.6070 -97.4890 374.00 314.00 60.00 351831 SGP 2013 05 08 19 18 00 5222-99 G C2H6 ARL 11081.209 -999.990 ... v1 2013 07 17 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 352380 SGP 2013 05 08 19 18 00 6510-66 G C2H6 ARL -999.990 -999.990 A.. v1 2013 07 17 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 352381 SGP 2013 05 17 18 09 00 4866-99 G C2H6 ARL 9756.527 -999.990 ... v1 2013 07 16 00 07 00 36.6070 -97.4890 374.00 314.00 60.00 352378 SGP 2013 05 17 18 09 00 4967-99 G C2H6 ARL 9726.506 -999.990 ... v1 2013 07 16 00 08 00 36.6070 -97.4890 374.00 314.00 60.00 352379 SGP 2013 05 24 16 16 00 3042-99 G C2H6 ARL 6434.588 -999.990 ... v1 2013 06 27 12 07 00 36.6070 -97.4890 374.00 314.00 60.00 353197 SGP 2013 05 24 16 16 00 4792-99 G C2H6 ARL 6414.232 -999.990 ... v1 2013 06 27 12 08 00 36.6070 -97.4890 374.00 314.00 60.00 353198 SGP 2013 05 31 19 44 00 13-99 G C2H6 ARL 10575.234 -999.990 ... v1 2013 06 20 12 07 00 36.6070 -97.4890 374.00 314.00 60.00 353199 SGP 2013 05 31 19 44 00 836-99 G C2H6 ARL 10686.503 -999.990 ... v1 2013 06 20 12 08 00 36.6070 -97.4890 374.00 314.00 60.00 353200 SGP 2013 06 06 18 58 00 131-99 G C2H6 ARL 1750.978 -999.990 ... v1 2013 07 09 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 353920 SGP 2013 06 06 18 58 00 132-99 G C2H6 ARL 1713.461 -999.990 ... v1 2013 07 09 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 353921 SGP 2013 06 20 20 05 00 3469-99 G C2H6 ARL 6865.022 -999.990 ... v1 2013 07 09 00 11 00 36.6070 -97.4890 374.00 314.00 60.00 353922 SGP 2013 06 20 20 05 00 3470-99 G C2H6 ARL 6818.209 -999.990 ... v1 2013 07 09 00 12 00 36.6070 -97.4890 374.00 314.00 60.00 353923 SGP 2013 06 27 19 07 00 3051-99 G C2H6 ARL 11076.242 -999.990 ... v1 2013 09 11 00 11 00 36.6070 -97.4890 374.00 314.00 60.00 354594 SGP 2013 06 27 19 07 00 3172-99 G C2H6 ARL 11219.239 -999.990 ... v1 2013 09 11 00 12 00 36.6070 -97.4890 374.00 314.00 60.00 354595 SGP 2013 07 05 18 54 00 2918-99 G C2H6 ARL 5652.550 -999.990 ... v1 2013 09 11 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 354592 SGP 2013 07 05 18 54 00 5406-99 G C2H6 ARL 5655.973 -999.990 ... v1 2013 09 11 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 354593 SGP 2013 07 12 18 50 00 3543-99 G C2H6 ARL 5645.548 -999.990 ... v1 2013 09 17 00 11 00 36.6070 -97.4890 374.00 314.00 60.00 355246 SGP 2013 07 12 18 50 00 3544-99 G C2H6 ARL 5691.521 -999.990 ... v1 2013 09 17 00 12 00 36.6070 -97.4890 374.00 314.00 60.00 355247 SGP 2013 07 18 19 05 00 4531-99 G C2H6 ARL 4091.342 -999.990 ... v1 2013 09 17 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 355244 SGP 2013 07 18 19 05 00 4532-99 G C2H6 ARL 4132.796 -999.990 ... v1 2013 09 17 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 355245 SGP 2013 07 25 19 26 00 2189-99 G C2H6 ARL 7220.155 -999.990 ... v1 2013 08 28 12 08 00 36.6070 -97.4890 374.00 314.00 60.00 356031 SGP 2013 07 25 19 26 00 881-99 G C2H6 ARL 7216.258 -999.990 ... v1 2013 08 28 12 07 00 36.6070 -97.4890 374.00 314.00 60.00 356030 SGP 2013 08 01 19 00 00 1576-99 G C2H6 ARL 5662.417 -999.990 ... v1 2013 10 21 12 08 00 36.6070 -97.4890 374.00 314.00 60.00 356029 SGP 2013 08 09 18 00 00 2824-99 G C2H6 ARL 2378.096 -999.990 ... v1 2013 10 14 00 09 00 36.6070 -97.4890 374.00 314.00 60.00 356993 SGP 2013 08 09 18 00 00 6037-66 G C2H6 ARL 2372.272 -999.990 ... v1 2013 10 14 00 10 00 36.6070 -97.4890 374.00 314.00 60.00 356994 SGP 2013 08 15 19 40 00 168-99 G C2H6 ARL 9328.076 -999.990 ... v1 2013 09 13 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 356991 SGP 2013 08 15 19 40 00 1870-99 G C2H6 ARL 9352.260 -999.990 ... v1 2013 09 13 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 356992 SGP 2013 08 22 18 23 00 5373-99 G C2H6 ARL 7696.370 -999.990 ... v1 2013 10 29 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 357772 SGP 2013 08 22 18 23 00 5374-99 G C2H6 ARL 7587.784 -999.990 ... v1 2013 10 29 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 357773 SGP 2013 08 29 19 13 00 2627-99 G C2H6 ARL 3341.425 -999.990 ... v1 2013 10 29 00 11 00 36.6070 -97.4890 374.00 314.00 60.00 357770 SGP 2013 08 29 19 13 00 2628-99 G C2H6 ARL 3347.216 -999.990 ... v1 2013 10 29 00 12 00 36.6070 -97.4890 374.00 314.00 60.00 357771 SGP 2013 09 05 19 36 00 867-99 G C2H6 ARL 5376.674 -999.990 ... v1 2013 11 08 12 03 00 36.6070 -97.4890 374.00 314.00 60.00 358319 SGP 2013 09 05 19 36 00 868-99 G C2H6 ARL 5593.679 -999.990 ... v1 2013 11 08 12 04 00 36.6070 -97.4890 374.00 314.00 60.00 358320 SGP 2013 09 12 18 40 00 49-99 G C2H6 ARL 5434.846 -999.990 ... v1 2013 11 08 12 01 00 36.6070 -97.4890 374.00 314.00 60.00 358317 SGP 2013 09 12 18 40 00 50-99 G C2H6 ARL 5446.167 -999.990 ... v1 2013 11 08 12 02 00 36.6070 -97.4890 374.00 314.00 60.00 358318 SGP 2013 09 19 19 22 00 2036-99 G C2H6 ARL 7425.167 -999.990 ... v1 2013 10 31 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 358592 SGP 2013 09 19 19 22 00 3257-99 G C2H6 ARL 7214.299 -999.990 ... v1 2013 10 31 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 358593 SGP 2013 09 30 18 00 00 155-99 G C2H6 ARL 6820.000 -999.990 ... v1 2013 11 27 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 358590 SGP 2013 09 30 18 00 00 1607-99 G C2H6 ARL 6874.427 -999.990 ... v1 2013 11 27 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 358591 SGP 2013 10 03 20 00 00 4244-99 G C2H6 ARL 5164.549 -999.990 ... v1 2013 11 19 00 09 00 36.6070 -97.4890 374.00 314.00 60.00 359010 SGP 2013 10 03 20 00 00 5099-99 G C2H6 ARL 5046.454 -999.990 ... v1 2013 11 19 00 10 00 36.6070 -97.4890 374.00 314.00 60.00 359011 SGP 2013 10 11 16 17 00 211-99 G C2H6 ARL 8381.696 -999.990 ... v1 2013 11 19 00 11 00 36.6070 -97.4890 374.00 314.00 60.00 359008 SGP 2013 10 11 16 17 00 3611-99 G C2H6 ARL 8418.821 -999.990 ... v1 2013 11 19 00 12 00 36.6070 -97.4890 374.00 314.00 60.00 359009 SGP 2013 10 17 19 39 00 258-99 G C2H6 ARL 19198.789 -999.990 ... v1 2013 11 21 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 359698 SGP 2013 10 17 19 39 00 4746-99 G C2H6 ARL 19423.348 -999.990 ... v1 2013 11 21 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 359699 SGP 2013 10 28 18 38 00 1946-99 G C2H6 ARL 14648.018 -999.990 ... v1 2013 11 21 00 11 00 36.6070 -97.4890 374.00 314.00 60.00 359696 SGP 2013 10 28 18 38 00 3458-99 G C2H6 ARL 14729.405 -999.990 ... v1 2013 11 21 00 12 00 36.6070 -97.4890 374.00 314.00 60.00 359697 SGP 2013 11 01 19 20 00 25-99 G C2H6 ARL 2399.002 -999.990 ... v1 2013 12 16 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 360154 SGP 2013 11 01 19 20 00 3632-99 G C2H6 ARL 2334.284 -999.990 ... v1 2013 12 16 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 360155 SGP 2013 11 07 18 00 00 6340-66 G C2H6 ARL 19835.033 -999.990 ... v1 2013 12 16 00 11 00 36.6070 -97.4890 374.00 314.00 60.00 360170 SGP 2013 11 07 18 00 00 6825-66 G C2H6 ARL 19708.785 -999.990 ... v1 2013 12 16 00 12 00 36.6070 -97.4890 374.00 314.00 60.00 360171 SGP 2013 11 15 19 27 00 1038-99 G C2H6 ARL 24725.922 -999.990 ... v1 2013 12 11 12 05 00 36.6070 -97.4890 374.00 314.00 60.00 360872 SGP 2013 11 15 19 27 00 4683-99 G C2H6 ARL 24647.722 -999.990 ... v1 2013 12 11 12 06 00 36.6070 -97.4890 374.00 314.00 60.00 360873 SGP 2013 11 27 19 07 00 3852-99 G C2H6 ARL 4440.745 -999.990 ... v1 2014 01 22 12 05 00 36.6070 -97.4890 374.00 314.00 60.00 361923 SGP 2013 11 27 19 07 00 5071-99 G C2H6 ARL 4444.478 -999.990 ... v1 2014 01 22 12 06 00 36.6070 -97.4890 374.00 314.00 60.00 361924 SGP 2013 12 06 18 54 00 5286-99 G C2H6 ARL 1996.878 -999.990 ... v1 2014 01 30 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 361922 SGP 2013 12 06 18 54 00 970-99 G C2H6 ARL 1997.411 -999.990 ... v1 2014 01 30 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 361921 SGP 2013 12 12 19 43 00 1548-99 G C2H6 ARL 11932.667 -999.990 ... v1 2014 01 29 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 362261 SGP 2013 12 12 19 43 00 432-99 G C2H6 ARL 11883.556 -999.990 ... v1 2014 01 29 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 362260 SGP 2013 12 12 19 55 00 3325-99 G C2H6 ARL 13378.444 -999.990 ... v1 2014 01 24 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 362263 SGP 2013 12 12 19 55 00 425-99 G C2H6 ARL 13256.556 -999.990 ... v1 2014 01 24 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 362262 SGP 2013 12 26 19 06 00 2801-99 G C2H6 ARL 25395.262 -999.990 ... v1 2014 02 07 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 362406 SGP 2013 12 26 19 06 00 4424-99 G C2H6 ARL 25825.436 -999.990 ... v1 2014 02 07 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 362407 SGP 2014 01 02 19 00 00 1533-99 G C2H6 ARL 13013.222 -999.990 ... v1 2014 01 31 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 362404 SGP 2014 01 02 19 00 00 4717-99 G C2H6 ARL 12854.000 -999.990 ... v1 2014 01 31 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 362405 SGP 2014 01 09 18 45 00 2937-99 G C2H6 ARL 21544.176 -999.990 ... v1 2014 05 09 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 363507 SGP 2014 01 09 18 45 00 3853-99 G C2H6 ARL 21674.066 -999.990 ... v1 2014 05 09 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 363508 SGP 2014 01 16 19 20 00 2385-99 G C2H6 ARL 2353.352 -999.990 ... v1 2014 05 09 00 12 00 36.6070 -97.4890 374.00 314.00 60.00 363510 SGP 2014 01 16 19 20 00 318-99 G C2H6 ARL 2305.231 -999.990 ... v1 2014 05 09 00 11 00 36.6070 -97.4890 374.00 314.00 60.00 363509 SGP 2014 01 23 21 00 00 365-99 G C2H6 ARL 2450.850 -999.990 ... v1 2014 04 07 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 364244 SGP 2014 01 23 21 00 00 366-99 G C2H6 ARL 2514.094 -999.990 ... v1 2014 04 07 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 364245 SGP 2014 01 30 20 00 00 4065-99 G C2H6 ARL 20769.463 -999.990 ... v1 2014 04 08 12 07 00 36.6070 -97.4890 374.00 314.00 60.00 364242 SGP 2014 01 30 20 00 00 4066-99 G C2H6 ARL 20751.790 -999.990 ... v1 2014 04 08 12 08 00 36.6070 -97.4890 374.00 314.00 60.00 364243 SGP 2014 02 14 19 31 00 1161-99 G C2H6 ARL 1960.033 -999.990 ... v1 2014 08 18 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 364750 SGP 2014 02 14 19 31 00 1162-99 G C2H6 ARL 1974.040 -999.990 ... v1 2014 08 18 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 364749 SGP 2014 02 20 20 13 00 3273-99 G C2H6 ARL 2282.450 -999.990 ... v1 2014 04 25 12 05 00 36.6070 -97.4890 374.00 314.00 60.00 364753 SGP 2014 02 20 20 13 00 3274-99 G C2H6 ARL 2263.356 -999.990 ... v1 2014 04 25 12 06 00 36.6070 -97.4890 374.00 314.00 60.00 364754 SGP 2014 02 27 20 18 00 3088-99 G C2H6 ARL 9690.758 -999.990 ... v1 2014 05 04 00 05 00 36.6070 -97.4890 374.00 314.00 60.00 365703 SGP 2014 02 27 20 18 00 4712-99 G C2H6 ARL -999.990 -999.990 A.. v1 2014 05 04 00 06 00 36.6070 -97.4890 374.00 314.00 60.00 365704 SGP 2014 03 06 19 00 00 5268-99 G C2H6 ARL 7615.302 -999.990 ... v1 2014 04 24 12 08 00 36.6070 -97.4890 374.00 314.00 60.00 365702 SGP 2014 03 06 19 00 00 872-99 G C2H6 ARL 7629.575 -999.990 ... v1 2014 04 24 12 07 00 36.6070 -97.4890 374.00 314.00 60.00 365701 SGP 2014 03 27 20 10 00 1398-99 G C2H6 ARL 3525.280 -999.990 ... v1 2014 04 28 00 08 00 36.6070 -97.4890 374.00 314.00 60.00 366476 SGP 2014 03 27 20 10 00 646-99 G C2H6 ARL 3545.145 -999.990 ... v1 2014 04 28 00 07 00 36.6070 -97.4890 374.00 314.00 60.00 366477 SGP 2014 04 03 19 42 00 4835-99 G C2H6 ARL 5697.159 -999.990 ... v1 2014 04 28 00 05 00 36.6070 -97.4890 374.00 314.00 60.00 366475 SGP 2014 04 03 19 42 00 6052-66 G C2H6 ARL 5670.090 -999.990 ... v1 2014 04 28 00 06 00 36.6070 -97.4890 374.00 314.00 60.00 366474 SGP 2014 04 11 17 47 00 1197-99 G C2H6 ARL 8844.357 -999.990 ... v1 2014 09 16 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 366973 SGP 2014 04 11 17 47 00 4262-99 G C2H6 ARL 8828.962 -999.990 ... v1 2014 09 16 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 366974 SGP 2014 04 17 18 39 00 1972-99 G C2H6 ARL 4349.065 -999.990 ... v1 2014 07 21 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 366971 SGP 2014 04 17 18 39 00 4287-99 G C2H6 ARL 4532.651 -999.990 ... v1 2014 07 21 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 366972 SGP 2014 04 24 19 20 00 1411-99 G C2H6 ARL 2207.386 -999.990 ... v1 2014 06 16 00 11 00 36.6070 -97.4890 374.00 314.00 60.00 368514 SGP 2014 04 24 19 20 00 2757-99 G C2H6 ARL 2200.086 -999.990 ... v1 2014 06 16 00 12 00 36.6070 -97.4890 374.00 314.00 60.00 368515 SGP 2014 05 13 18 47 00 3878-99 G C2H6 ARL -999.990 -999.990 A.. v1 2014 06 16 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 368512 SGP 2014 05 13 18 47 00 4592-99 G C2H6 ARL 2405.821 -999.990 ... v1 2014 06 16 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 368513 SGP 2014 05 16 19 00 00 4552-99 G C2H6 ARL 7856.817 -999.990 ... v1 2014 09 13 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 369444 SGP 2014 05 16 19 00 00 4662-99 G C2H6 ARL 7968.759 -999.990 ... v1 2014 09 13 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 369445 SGP 2014 05 22 18 36 00 3642-99 G C2H6 ARL 7440.700 -999.990 ... v1 2014 09 17 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 369442 SGP 2014 05 22 18 36 00 4150-99 G C2H6 ARL 7633.386 -999.990 ... v1 2014 09 17 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 369443 SGP 2014 06 05 19 48 00 591-99 G C2H6 ARL 9066.636 -999.990 ... v1 2014 09 25 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 370133 SGP 2014 06 05 19 48 00 966-99 G C2H6 ARL 8941.106 -999.990 ... v1 2014 09 25 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 370134 SGP 2014 06 19 18 24 00 3708-99 G C2H6 ARL 5023.841 -999.990 ... v1 2014 08 19 12 07 00 36.6070 -97.4890 374.00 314.00 60.00 370131 SGP 2014 06 19 18 24 00 4324-99 G C2H6 ARL 4978.764 -999.990 ... v1 2014 08 19 12 08 00 36.6070 -97.4890 374.00 314.00 60.00 370132 SGP 2014 06 26 18 25 00 1342-99 G C2H6 ARL 7191.170 -999.990 ... v1 2014 08 01 00 11 00 36.6070 -97.4890 374.00 314.00 60.00 371151 SGP 2014 06 26 18 25 00 2054-99 G C2H6 ARL 7138.444 -999.990 ... v1 2014 08 01 00 12 00 36.6070 -97.4890 374.00 314.00 60.00 371152 SGP 2014 07 03 19 43 00 1438-99 G C2H6 ARL 5083.952 -999.990 ... v1 2014 08 01 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 371149 SGP 2014 07 03 19 43 00 5423-99 G C2H6 ARL 5070.839 -999.990 ... v1 2014 08 01 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 371150 SGP 2014 07 11 18 00 00 2686-99 G C2H6 ARL 5404.774 -999.990 ... v1 2014 09 27 00 11 00 36.6070 -97.4890 374.00 314.00 60.00 371333 SGP 2014 07 11 18 00 00 4279-99 G C2H6 ARL 5591.986 -999.990 ... v1 2014 09 27 00 12 00 36.6070 -97.4890 374.00 314.00 60.00 371334 SGP 2014 07 18 19 12 00 3611-99 G C2H6 ARL 2836.253 -999.990 ... v1 2014 09 30 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 371331 SGP 2014 07 18 19 12 00 6195-66 G C2H6 ARL 2949.041 -999.990 ... v1 2014 09 30 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 371332 SGP 2014 08 01 19 24 00 6340-66 G C2H6 ARL -999.990 -999.990 A.. v1 2014 08 29 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 372447 SGP 2014 08 01 19 24 00 6825-66 G C2H6 ARL 7299.647 -999.990 ... v1 2014 08 29 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 372448 SGP 2014 08 11 19 34 00 1228-99 G C2H6 ARL 1827.438 -999.990 ... v1 2014 09 02 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 372445 SGP 2014 08 11 19 34 00 4231-99 G C2H6 ARL 1820.564 -999.990 ... v1 2014 09 02 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 372446 SGP 2014 08 14 19 00 00 185-99 G C2H6 ARL 7122.957 -999.990 ... v1 2014 09 27 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 373004 SGP 2014 08 14 19 00 00 186-99 G C2H6 ARL 7084.346 -999.990 ... v1 2014 09 27 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 373005 SGP 2014 08 21 18 45 00 1843-99 G C2H6 ARL 4684.583 -999.990 ... v1 2014 09 19 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 373002 SGP 2014 08 21 18 45 00 1844-99 G C2H6 ARL 4726.851 -999.990 ... v1 2014 09 19 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 373003 SGP 2014 08 28 17 46 00 1753-99 G C2H6 ARL 7314.206 -999.990 ... v1 2014 10 15 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 374024 SGP 2014 08 28 17 46 00 2516-99 G C2H6 ARL 7340.380 -999.990 ... v1 2014 10 15 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 374025 SGP 2014 09 12 17 50 00 6681-66 G C2H6 ARL -999.990 -999.990 A.. v1 2014 11 09 00 11 00 36.6070 -97.4890 374.00 314.00 60.00 374764 SGP 2014 09 12 17 50 00 6682-66 G C2H6 ARL 1360.131 -999.990 ... v1 2014 11 09 00 12 00 36.6070 -97.4890 374.00 314.00 60.00 374765 SGP 2014 09 18 18 00 00 295-99 G C2H6 ARL 4370.602 -999.990 ... v1 2014 11 09 00 09 00 36.6070 -97.4890 374.00 314.00 60.00 374762 SGP 2014 09 18 18 00 00 296-99 G C2H6 ARL 4207.243 -999.990 ... v1 2014 11 09 00 10 00 36.6070 -97.4890 374.00 314.00 60.00 374763 SGP 2014 09 25 18 00 00 3555-99 G C2H6 ARL 16996.532 -999.990 ... v1 2014 10 23 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 375251 SGP 2014 09 25 18 00 00 3556-99 G C2H6 ARL 17499.776 -999.990 ... v1 2014 10 23 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 375252 SGP 2014 10 02 18 45 00 3441-99 G C2H6 ARL 2170.755 -999.990 ... v1 2014 11 09 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 375249 SGP 2014 10 02 18 45 00 3442-99 G C2H6 ARL 2198.074 -999.990 ... v1 2014 11 09 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 375250 SGP 2014 10 09 19 57 00 2577-99 G C2H6 ARL 5462.746 -999.990 ... v1 2014 11 18 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 376118 SGP 2014 10 09 19 57 00 2578-99 G C2H6 ARL 5530.503 -999.990 ... v1 2014 11 18 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 376119 SGP 2014 10 16 18 46 00 3931-99 G C2H6 ARL 26095.638 -999.990 ... v1 2014 10 28 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 376122 SGP 2014 10 16 18 46 00 3932-99 G C2H6 ARL 26152.349 -999.990 ... v1 2014 10 28 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 376123 SGP 2014 10 23 19 38 00 3036-99 G C2H6 ARL 16810.000 -999.990 ... v1 2014 12 12 12 04 00 36.6070 -97.4890 374.00 314.00 60.00 377275 SGP 2014 10 23 19 38 00 312-99 G C2H6 ARL 16868.791 -999.990 ... v1 2014 12 12 12 03 00 36.6070 -97.4890 374.00 314.00 60.00 377276 SGP 2014 10 30 18 15 00 2969-99 G C2H6 ARL 2552.000 -999.990 ... v1 2014 12 12 12 06 00 36.6070 -97.4890 374.00 314.00 60.00 377273 SGP 2014 10 30 18 15 00 954-99 G C2H6 ARL 2554.121 -999.990 ... v1 2014 12 12 12 05 00 36.6070 -97.4890 374.00 314.00 60.00 377274 SGP 2014 11 06 19 47 00 250-99 G C2H6 ARL 5433.165 -999.990 ... v1 2014 12 10 00 11 00 36.6070 -97.4890 374.00 314.00 60.00 377861 SGP 2014 11 06 19 47 00 4978-99 G C2H6 ARL 5456.582 -999.990 ... v1 2014 12 10 00 12 00 36.6070 -97.4890 374.00 314.00 60.00 377862 SGP 2014 11 13 19 30 00 1727-99 G C2H6 ARL 3046.033 -999.990 ... v1 2014 12 10 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 377859 SGP 2014 11 13 19 30 00 2834-99 G C2H6 ARL 3045.989 -999.990 ... v1 2014 12 10 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 377860 SGP 2014 11 20 20 28 00 1257-99 G C2H6 ARL 15561.503 -999.990 ... v1 2015 01 07 00 05 00 36.6070 -97.4890 374.00 314.00 60.00 378372 SGP 2014 11 20 20 28 00 1258-99 G C2H6 ARL 15542.825 -999.990 ... v1 2015 01 07 00 06 00 36.6070 -97.4890 374.00 314.00 60.00 378373 SGP 2014 11 26 20 42 00 4125-99 G C2H6 ARL 4612.722 -999.990 ... v1 2015 01 07 00 07 00 36.6070 -97.4890 374.00 314.00 60.00 378374 SGP 2014 11 26 20 42 00 4126-99 G C2H6 ARL 4564.954 -999.990 ... v1 2015 01 07 00 08 00 36.6070 -97.4890 374.00 314.00 60.00 378375 SGP 2014 12 04 19 42 00 179-99 G C2H6 ARL 29110.841 -999.990 ... v1 2015 02 02 00 09 00 36.6070 -97.4890 374.00 314.00 60.00 379594 SGP 2014 12 04 19 42 00 240-99 G C2H6 ARL 29164.270 -999.990 ... v1 2015 02 02 00 10 00 36.6070 -97.4890 374.00 314.00 60.00 379595 SGP 2014 12 11 19 31 00 3614-99 G C2H6 ARL 25575.442 -999.990 ... v1 2015 02 02 00 11 00 36.6070 -97.4890 374.00 314.00 60.00 379592 SGP 2014 12 11 19 31 00 4780-99 G C2H6 ARL 25428.208 -999.990 ... v1 2015 02 02 00 12 00 36.6070 -97.4890 374.00 314.00 60.00 379593 SGP 2014 12 19 19 44 00 1487-99 G C2H6 ARL 12782.960 -999.990 ... v1 2015 04 23 00 07 00 36.6070 -97.4890 374.00 314.00 60.00 380069 SGP 2014 12 19 19 44 00 1569-99 G C2H6 ARL 12661.211 -999.990 ... v1 2015 04 23 00 08 00 36.6070 -97.4890 374.00 314.00 60.00 380070 SGP 2014 12 26 19 38 00 1462-99 G C2H6 ARL 12395.354 -999.990 ... v1 2015 02 05 00 05 00 36.6070 -97.4890 374.00 314.00 60.00 379956 SGP 2014 12 26 19 38 00 4607-99 G C2H6 ARL 12368.584 -999.990 ... v1 2015 02 05 00 06 00 36.6070 -97.4890 374.00 314.00 60.00 379957 SGP 2015 01 02 18 54 00 4231-99 G C2H6 ARL 40427.466 -999.990 ... v1 2015 04 13 12 05 00 36.6070 -97.4890 374.00 314.00 60.00 380814 SGP 2015 01 02 18 54 00 5321-99 G C2H6 ARL 40671.188 -999.990 ... v1 2015 04 13 12 06 00 36.6070 -97.4890 374.00 314.00 60.00 380815 SGP 2015 01 08 20 39 00 3716-99 G C2H6 ARL 10694.205 -999.990 ... v1 2015 04 13 12 07 00 36.6070 -97.4890 374.00 314.00 60.00 380812 SGP 2015 01 08 20 39 00 4695-99 G C2H6 ARL 10653.162 -999.990 ... v1 2015 04 13 12 08 00 36.6070 -97.4890 374.00 314.00 60.00 380813 SGP 2015 01 16 20 00 00 4573-99 G C2H6 ARL 13226.906 -999.990 ... v1 2015 03 03 00 03 00 36.6070 -97.4890 374.00 314.00 60.00 381439 SGP 2015 01 16 20 00 00 4574-99 G C2H6 ARL 13180.381 -999.990 ... v1 2015 03 03 00 04 00 36.6070 -97.4890 374.00 314.00 60.00 381438 SGP 2015 01 21 20 10 00 2841-99 G C2H6 ARL 4553.924 -999.990 ... v1 2015 03 05 12 07 00 36.6070 -97.4890 374.00 314.00 60.00 381436 SGP 2015 01 21 20 10 00 2842-99 G C2H6 ARL 4588.980 -999.990 ... v1 2015 03 05 12 08 00 36.6070 -97.4890 374.00 314.00 60.00 381437 SGP 2015 01 30 20 30 00 4723-99 G C2H6 ARL 6974.193 -999.990 ... v1 2015 03 17 00 05 00 36.6070 -97.4890 374.00 314.00 60.00 382021 SGP 2015 01 30 20 30 00 4724-99 G C2H6 ARL 6985.964 -999.990 ... v1 2015 03 17 00 06 00 36.6070 -97.4890 374.00 314.00 60.00 382022 SGP 2015 02 06 20 22 00 3439-99 G C2H6 ARL 33061.211 -999.990 ... v1 2015 03 19 00 11 00 36.6070 -97.4890 374.00 314.00 60.00 382085 SGP 2015 02 06 20 22 00 3440-99 G C2H6 ARL 33366.143 -999.990 ... v1 2015 03 19 00 12 00 36.6070 -97.4890 374.00 314.00 60.00 382086 SGP 2015 02 12 20 10 00 531-99 G C2H6 ARL 5369.249 -999.990 ... v1 2015 04 14 00 03 00 36.6070 -97.4890 374.00 314.00 60.00 382954 SGP 2015 02 12 20 10 00 532-99 G C2H6 ARL 5271.458 -999.990 ... v1 2015 04 14 00 04 00 36.6070 -97.4890 374.00 314.00 60.00 382955 SGP 2015 02 19 20 28 00 2017-99 G C2H6 ARL 13822.982 -999.990 ... v1 2015 03 27 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 382952 SGP 2015 02 19 20 28 00 2018-99 G C2H6 ARL 13741.928 -999.990 ... v1 2015 03 27 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 382953 SGP 2015 03 12 18 24 00 3529-99 G C2H6 ARL 7692.340 -999.990 ... v1 2015 05 20 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 384328 SGP 2015 03 12 18 24 00 3530-99 G C2H6 ARL 7696.829 -999.990 ... v1 2015 05 20 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 384329 SGP 2015 04 23 19 21 00 2363-99 G C2H6 ARL 5652.140 -999.990 ... v1 2015 06 24 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 386712 SGP 2015 04 23 19 21 00 2364-99 G C2H6 ARL 5587.365 -999.990 ... v1 2015 06 24 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 386713 SGP 2015 04 30 19 51 00 2045-99 G C2H6 ARL 8727.410 -999.990 ... v1 2015 06 29 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 386710 SGP 2015 04 30 19 51 00 2046-99 G C2H6 ARL 8867.162 -999.990 ... v1 2015 06 29 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 386711 SGP 2015 05 06 19 25 00 2131-99 G C2H6 ARL 4916.596 -999.990 ... v1 2015 07 20 12 07 00 36.6070 -97.4890 374.00 314.00 60.00 387394 SGP 2015 05 06 19 25 00 3915-99 G C2H6 ARL 4940.647 -999.990 ... v1 2015 07 20 12 08 00 36.6070 -97.4890 374.00 314.00 60.00 387395 SGP 2015 05 13 19 11 00 2790-99 G C2H6 ARL 5051.295 -999.990 ... v1 2015 07 20 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 387392 SGP 2015 05 13 19 11 00 4697-99 G C2H6 ARL 5006.273 -999.990 ... v1 2015 07 20 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 387393 SGP 2015 05 21 18 47 00 3408-99 G C2H6 ARL 2074.330 -999.990 ... v1 2015 07 31 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 388473 SGP 2015 05 21 18 47 00 4940-99 G C2H6 ARL -999.990 -999.990 D.. v1 2015 07 31 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 388474 SGP 2015 05 29 18 26 00 1300-99 G C2H6 ARL 17478.795 -999.990 ... v1 2015 07 31 12 09 00 36.6070 -97.4890 374.00 314.00 60.00 388471 SGP 2015 05 29 18 26 00 2997-99 G C2H6 ARL -999.990 -999.990 D.. v1 2015 07 31 12 10 00 36.6070 -97.4890 374.00 314.00 60.00 388472 SGP 2015 06 04 19 50 00 3579-99 G C2H6 ARL 10664.424 -999.990 ... v1 2015 08 04 12 07 00 36.6070 -97.4890 374.00 314.00 60.00 389443 SGP 2015 06 04 19 50 00 3580-99 G C2H6 ARL 10429.324 -999.990 ... v1 2015 08 04 12 08 00 36.6070 -97.4890 374.00 314.00 60.00 389444 SGP 2015 06 11 18 22 00 525-99 G C2H6 ARL 6580.900 -999.990 ... v1 2015 09 04 12 07 00 36.6070 -97.4890 374.00 314.00 60.00 389445 SGP 2015 06 11 18 22 00 526-99 G C2H6 ARL 6529.144 -999.990 ... v1 2015 09 04 12 08 00 36.6070 -97.4890 374.00 314.00 60.00 389446 SGP 2015 06 19 19 08 00 3813-99 G C2H6 ARL 2624.945 -999.990 ... v1 2015 08 06 00 09 00 36.6070 -97.4890 374.00 314.00 60.00 389967 SGP 2015 06 19 19 08 00 3814-99 G C2H6 ARL 2642.805 -999.990 ... v1 2015 08 06 00 10 00 36.6070 -97.4890 374.00 314.00 60.00 389966 SGP 2015 06 26 19 55 00 247-99 G C2H6 ARL 3913.880 -999.990 ... v1 2015 08 06 00 07 00 36.6070 -97.4890 374.00 314.00 60.00 389968 SGP 2015 06 26 19 55 00 248-99 G C2H6 ARL 3925.465 -999.990 ... v1 2015 08 06 00 08 00 36.6070 -97.4890 374.00 314.00 60.00 389969 SGP 2015 07 01 19 07 00 3614-99 G C2H6 ARL 12435.698 -999.990 ... v1 2015 08 19 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 390693 SGP 2015 07 01 19 07 00 803-99 G C2H6 ARL 12494.346 -999.990 ... v1 2015 08 19 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 390694 SGP 2015 07 09 19 24 00 4780-99 G C2H6 ARL 7652.993 -999.990 ... v1 2015 08 25 12 10 00 36.6070 -97.4890 374.00 314.00 60.00 390692 SGP 2015 07 09 19 24 00 894-99 G C2H6 ARL 7616.408 -999.990 ... v1 2015 08 25 12 09 00 36.6070 -97.4890 374.00 314.00 60.00 390691 SGP 2015 07 17 16 16 00 2627-99 G C2H6 ARL 15367.960 -999.990 ... v1 2015 08 31 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 391559 SGP 2015 07 17 16 16 00 735-99 G C2H6 ARL 15452.661 -999.990 ... v1 2015 08 31 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 391558 SGP 2015 07 23 20 38 00 2463-99 G C2H6 ARL 9194.502 -999.990 ... v1 2015 08 31 00 11 00 36.6070 -97.4890 374.00 314.00 60.00 391561 SGP 2015 07 23 20 38 00 4135-99 G C2H6 ARL 9355.387 -999.990 ... v1 2015 08 31 00 12 00 36.6070 -97.4890 374.00 314.00 60.00 391560 SGP 2015 07 30 20 48 00 4703-99 G C2H6 ARL 3573.311 -999.990 ... v1 2015 09 21 00 11 00 36.6070 -97.4890 374.00 314.00 60.00 392114 SGP 2015 07 30 20 48 00 4704-99 G C2H6 ARL 3478.356 -999.990 ... v1 2015 09 21 00 12 00 36.6070 -97.4890 374.00 314.00 60.00 392115 SGP 2015 08 05 18 31 00 217-99 G C2H6 ARL 9501.033 -999.990 ... v1 2015 09 21 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 392116 SGP 2015 08 05 18 31 00 218-99 G C2H6 ARL 9499.400 -999.990 ... v1 2015 09 21 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 392117 SGP 2015 08 12 20 30 00 1369-99 G C2H6 ARL 5199.833 -999.990 ... v1 2015 09 28 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 393202 SGP 2015 08 12 20 30 00 180-99 G C2H6 ARL 5240.244 -999.990 ... v1 2015 09 28 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 393201 SGP 2015 08 19 20 47 00 2211-99 G C2H6 ARL 1501.111 -999.990 ... v1 2015 09 29 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 393203 SGP 2015 08 19 20 47 00 3496-99 G C2H6 ARL 1495.300 -999.990 ... v1 2015 09 29 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 393204 SGP 2015 08 26 20 00 00 4649-99 G C2H6 ARL 6520.227 -999.990 ... v1 2015 10 12 12 07 00 36.6070 -97.4890 374.00 314.00 60.00 393736 SGP 2015 08 26 20 00 00 4650-99 G C2H6 ARL 6711.926 -999.990 ... v1 2015 10 12 12 08 00 36.6070 -97.4890 374.00 314.00 60.00 393737 SGP 2015 09 02 19 14 00 5399-99 G C2H6 ARL 5107.230 -999.990 ... v1 2015 10 09 00 05 00 36.6070 -97.4890 374.00 314.00 60.00 393734 SGP 2015 09 02 19 14 00 5400-99 G C2H6 ARL 5104.903 -999.990 ... v1 2015 10 09 00 06 00 36.6070 -97.4890 374.00 314.00 60.00 393735 SGP 2015 09 09 19 30 00 1972-99 G C2H6 ARL 3018.398 -999.990 ... v1 2015 10 27 12 09 00 36.6070 -97.4890 374.00 314.00 60.00 394641 SGP 2015 09 09 19 30 00 3245-99 G C2H6 ARL 3024.892 -999.990 ... v1 2015 10 27 12 10 00 36.6070 -97.4890 374.00 314.00 60.00 394642 SGP 2015 09 09 19 48 00 2300-99 G C2H6 ARL 5207.792 -999.990 ... v1 2015 10 27 12 07 00 36.6070 -97.4890 374.00 314.00 60.00 394639 SGP 2015 09 09 19 48 00 2353-99 G C2H6 ARL 5220.779 -999.990 ... v1 2015 10 27 12 08 00 36.6070 -97.4890 374.00 314.00 60.00 394640 SGP 2015 09 25 17 32 00 3910-99 G C2H6 ARL 13379.978 -999.990 ... v1 2015 10 29 00 09 00 36.6070 -97.4890 374.00 314.00 60.00 395591 SGP 2015 09 25 17 32 00 4518-99 G C2H6 ARL 13319.372 -999.990 ... v1 2015 10 29 00 10 00 36.6070 -97.4890 374.00 314.00 60.00 395592 SGP 2015 10 02 15 34 00 3504-99 G C2H6 ARL 4827.045 -999.990 ... v1 2015 10 31 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 395594 SGP 2015 10 02 15 34 00 738-99 G C2H6 ARL 4717.402 -999.990 ... v1 2015 10 31 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 395593 SGP 2015 10 08 14 07 00 5301-99 G C2H6 ARL 37700.327 -999.990 ... v1 2015 11 04 00 05 00 36.6070 -97.4890 374.00 314.00 60.00 396553 SGP 2015 10 08 14 07 00 5302-99 G C2H6 ARL 55924.724 -999.990 ... v1 2015 11 04 00 06 00 36.6070 -97.4890 374.00 314.00 60.00 396554 SGP 2015 10 15 19 15 00 3963-99 G C2H6 ARL 17197.277 -999.990 ... v1 2015 11 03 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 396451 SGP 2015 10 15 19 15 00 3964-99 G C2H6 ARL 17126.253 -999.990 ... v1 2015 11 03 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 396452 SGP 2015 10 22 20 45 00 1636-99 G C2H6 ARL 10116.046 -999.990 ... v1 2015 11 18 00 10 00 36.6070 -97.4890 374.00 314.00 60.00 397362 SGP 2015 10 22 20 45 00 517-99 G C2H6 ARL 9986.231 -999.990 ... v1 2015 11 18 00 09 00 36.6070 -97.4890 374.00 314.00 60.00 397363 SGP 2015 10 29 15 27 00 1026-99 G C2H6 ARL 2596.558 -999.990 ... v1 2015 11 20 12 07 00 36.6070 -97.4890 374.00 314.00 60.00 397364 SGP 2015 10 29 15 27 00 5385-99 G C2H6 ARL 2639.390 -999.990 ... v1 2015 11 20 12 08 00 36.6070 -97.4890 374.00 314.00 60.00 397365 SGP 2015 11 05 15 14 00 109-99 G C2H6 ARL 15528.947 -999.990 ... v1 2015 12 14 12 07 00 36.6070 -97.4890 374.00 314.00 60.00 398155 SGP 2015 11 05 15 14 00 2314-99 G C2H6 ARL 15655.870 -999.990 ... v1 2015 12 14 12 08 00 36.6070 -97.4890 374.00 314.00 60.00 398156 SGP 2015 11 12 16 50 00 2027-99 G C2H6 ARL 7821.802 -999.990 ... v1 2015 12 11 12 08 00 36.6070 -97.4890 374.00 314.00 60.00 398154 SGP 2015 11 12 16 50 00 440-99 G C2H6 ARL 7661.731 -999.990 ... v1 2015 12 11 12 07 00 36.6070 -97.4890 374.00 314.00 60.00 398153 SGP 2015 11 19 15 31 00 1106-99 G C2H6 ARL 2001.255 -999.990 ... v1 2015 12 29 12 07 00 36.6070 -97.4890 374.00 314.00 60.00 398671 SGP 2015 11 19 15 31 00 5104-99 G C2H6 ARL 1941.761 -999.990 ... v1 2015 12 29 12 08 00 36.6070 -97.4890 374.00 314.00 60.00 398672 SGP 2015 11 25 15 13 00 1197-99 G C2H6 ARL 10491.296 -999.990 ... v1 2015 12 29 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 398670 SGP 2015 11 25 15 13 00 3186-99 G C2H6 ARL 10491.093 -999.990 ... v1 2015 12 29 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 398669 SGP 2015 12 03 15 13 00 3526-99 G C2H6 ARL 19005.042 -999.990 ... v1 2016 02 05 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 399265 SGP 2015 12 03 15 13 00 4064-99 G C2H6 ARL 18476.681 -999.990 ... v1 2016 02 05 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 399266 SGP 2015 12 10 20 00 00 1764-99 G C2H6 ARL 2544.751 -999.990 ... v1 2016 01 29 12 08 00 36.6070 -97.4890 374.00 314.00 60.00 399263 SGP 2015 12 10 20 00 00 312-99 G C2H6 ARL 2498.786 -999.990 ... v1 2016 01 29 12 07 00 36.6070 -97.4890 374.00 314.00 60.00 399264 SGP 2015 12 17 19 56 00 1081-99 G C2H6 ARL 3891.681 -999.990 ... v1 2016 01 27 12 07 00 36.6070 -97.4890 374.00 314.00 60.00 400360 SGP 2015 12 17 19 56 00 2333-99 G C2H6 ARL 3930.809 -999.990 ... v1 2016 01 27 12 08 00 36.6070 -97.4890 374.00 314.00 60.00 400359 SGP 2015 12 23 20 03 00 1998-99 G C2H6 ARL 4396.266 -999.990 ... v1 2016 01 27 12 05 00 36.6070 -97.4890 374.00 314.00 60.00 400358 SGP 2015 12 23 20 03 00 4279-99 G C2H6 ARL 4474.813 -999.990 ... v1 2016 01 27 12 06 00 36.6070 -97.4890 374.00 314.00 60.00 400361 SGP 2015 12 31 20 00 00 1371-99 G C2H6 ARL 15660.373 -999.990 ... v1 2016 01 28 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 400436 SGP 2015 12 31 20 00 00 3236-99 G C2H6 ARL 15630.187 -999.990 ... v1 2016 01 28 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 400437 SGP 2016 01 07 20 00 00 2573-99 G C2H6 ARL 14239.004 -999.990 ... v1 2016 01 28 00 12 00 36.6070 -97.4890 374.00 314.00 60.00 400434 SGP 2016 01 07 20 00 00 376-99 G C2H6 ARL 14228.320 -999.990 ... v1 2016 01 28 00 11 00 36.6070 -97.4890 374.00 314.00 60.00 400435 SGP 2016 01 14 20 00 00 3445-99 G C2H6 ARL 27325.315 -999.990 ... v1 2016 02 18 00 10 00 36.6070 -97.4890 374.00 314.00 60.00 401391 SGP 2016 01 14 20 00 00 800-99 G C2H6 ARL 27010.189 -999.990 ... v1 2016 02 18 00 09 00 36.6070 -97.4890 374.00 314.00 60.00 401390 SGP 2016 01 21 20 00 00 2173-99 G C2H6 ARL 5851.975 -999.990 ... v1 2016 02 19 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 401392 SGP 2016 01 21 20 00 00 340-99 G C2H6 ARL 5768.782 -999.990 ... v1 2016 02 19 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 401393 SGP 2016 01 28 20 00 00 2021-99 G C2H6 ARL 5595.210 -999.990 ... v1 2016 02 29 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 402173 SGP 2016 01 28 20 00 00 390-99 G C2H6 ARL 5548.004 -999.990 ... v1 2016 02 29 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 402174 SGP 2016 02 04 20 00 00 2022-99 G C2H6 ARL 7902.101 -999.990 ... v1 2016 02 29 12 08 00 36.6070 -97.4890 374.00 314.00 60.00 402171 SGP 2016 02 04 20 00 00 389-99 G C2H6 ARL 8125.126 -999.990 ... v1 2016 02 29 12 07 00 36.6070 -97.4890 374.00 314.00 60.00 402172 SGP 2016 02 11 20 00 00 2830-99 G C2H6 ARL 4893.709 -999.990 ... v1 2016 03 14 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 402768 SGP 2016 02 11 20 00 00 5424-99 G C2H6 ARL 4791.106 -999.990 ... v1 2016 03 14 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 402769 SGP 2016 02 25 20 00 00 1475-99 G C2H6 ARL 3358.689 -999.990 ... v1 2016 03 30 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 403393 SGP 2016 02 25 20 00 00 4199-99 G C2H6 ARL 3352.224 -999.990 ... v1 2016 03 30 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 403394 SGP 2016 03 03 20 00 00 3194-99 G C2H6 ARL 2242.807 -999.990 ... v1 2016 03 31 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 403395 SGP 2016 03 03 20 00 00 4509-99 G C2H6 ARL 2257.930 -999.990 ... v1 2016 03 31 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 403396 SGP 2016 03 10 22 30 00 1933-99 G C2H6 ARL 3548.750 -999.990 ... v1 2016 04 11 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 404258 SGP 2016 03 10 22 30 00 3959-99 G C2H6 ARL 3552.900 -999.990 ... v1 2016 04 11 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 404259 SGP 2016 03 17 19 00 00 1371-99 G C2H6 ARL 3571.967 -999.990 ... v1 2016 04 08 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 404256 SGP 2016 03 17 19 00 00 1547-99 G C2H6 ARL 3702.110 -999.990 ... v1 2016 04 08 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 404257 SGP 2016 03 24 19 00 00 3114-99 G C2H6 ARL 2387.930 -999.990 ... v1 2016 04 19 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 405094 SGP 2016 03 24 19 00 00 575-99 G C2H6 ARL 2461.434 -999.990 ... v1 2016 04 19 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 405093 SGP 2016 03 31 19 00 00 744-99 G C2H6 ARL 3590.911 -999.990 ... v1 2016 06 10 12 08 00 36.6070 -97.4890 374.00 314.00 60.00 405121 SGP 2016 04 07 19 10 00 2757-99 G C2H6 ARL 2058.393 -999.990 ... v1 2016 07 20 12 08 00 36.6070 -97.4890 374.00 314.00 60.00 405800 SGP 2016 04 14 19 00 00 1411-99 G C2H6 ARL 10801.581 -999.990 ... v1 2016 05 20 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 405801 SGP 2016 04 14 19 00 00 4450-99 G C2H6 ARL 11297.332 -999.990 ... v1 2016 05 20 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 405802 SGP 2016 04 21 19 07 00 3338-99 G C2H6 ARL 3520.131 -999.990 ... v1 2016 06 03 12 08 00 36.6070 -97.4890 374.00 314.00 60.00 406697 SGP 2016 04 21 19 07 00 915-99 G C2H6 ARL 3571.255 -999.990 ... v1 2016 06 03 12 07 00 36.6070 -97.4890 374.00 314.00 60.00 406698 SGP 2016 04 28 19 00 00 2515-99 G C2H6 ARL 3062.763 -999.990 ... v1 2016 06 03 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 406699 SGP 2016 04 28 19 00 00 570-99 G C2H6 ARL 2991.255 -999.990 ... v1 2016 06 03 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 406700 SGP 2016 05 05 19 10 00 1250-99 G C2H6 ARL 2340.506 -999.990 ... v1 2016 06 16 12 07 00 36.6070 -97.4890 374.00 314.00 60.00 407321 SGP 2016 05 05 19 10 00 1997-99 G C2H6 ARL 2340.506 -999.990 ... v1 2016 06 16 12 08 00 36.6070 -97.4890 374.00 314.00 60.00 407322 SGP 2016 05 12 19 00 00 1841-99 G C2H6 ARL 2255.111 -999.990 ... v1 2016 06 14 00 03 00 36.6070 -97.4890 374.00 314.00 60.00 407401 SGP 2016 05 12 19 00 00 5028-99 G C2H6 ARL 2237.044 -999.990 ... v1 2016 06 14 00 04 00 36.6070 -97.4890 374.00 314.00 60.00 407402 SGP 2016 05 19 19 00 00 2622-99 G C2H6 ARL 4203.866 -999.990 ... v1 2016 06 30 00 12 00 36.6070 -97.4890 374.00 314.00 60.00 407847 SGP 2016 05 19 19 00 00 992-99 G C2H6 ARL 4270.931 -999.990 ... v1 2016 06 30 00 11 00 36.6070 -97.4890 374.00 314.00 60.00 407848 SGP 2016 05 26 19 07 00 3565-99 G C2H6 ARL 5123.198 -999.990 ... v1 2016 06 30 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 407849 SGP 2016 05 26 19 07 00 894-99 G C2H6 ARL 5181.741 -999.990 ... v1 2016 06 30 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 407850 SGP 2016 06 02 19 00 00 1636-99 G C2H6 ARL 2099.617 -999.990 ... v1 2016 08 17 12 09 00 36.6070 -97.4890 374.00 314.00 60.00 409272 SGP 2016 06 02 19 00 00 3162-99 G C2H6 ARL 2203.065 -999.990 ... v1 2016 08 17 12 10 00 36.6070 -97.4890 374.00 314.00 60.00 409273 SGP 2016 06 09 19 00 00 3022-99 G C2H6 ARL 7042.902 -999.990 ... v1 2016 08 16 00 06 00 36.6070 -97.4890 374.00 314.00 60.00 409274 SGP 2016 06 09 19 00 00 3491-99 G C2H6 ARL 7125.105 -999.990 ... v1 2016 08 16 00 05 00 36.6070 -97.4890 374.00 314.00 60.00 409275 SGP 2016 06 16 19 00 00 206-99 G C2H6 ARL 10105.460 -999.990 ... v1 2016 08 25 00 05 00 36.6070 -97.4890 374.00 314.00 60.00 409905 SGP 2016 06 16 19 00 00 4766-99 G C2H6 ARL 10051.724 -999.990 ... v1 2016 08 25 00 06 00 36.6070 -97.4890 374.00 314.00 60.00 409906 SGP 2016 06 23 19 12 00 99-99 G C2H6 ARL 8100.791 -999.990 ... v1 2016 09 16 12 08 00 36.6070 -97.4890 374.00 314.00 60.00 409907 SGP 2016 06 30 19 30 00 2440-99 G C2H6 ARL 4350.910 -999.990 ... v1 2016 08 29 00 09 00 36.6070 -97.4890 374.00 314.00 60.00 410254 SGP 2016 06 30 19 30 00 3165-99 G C2H6 ARL 4351.044 -999.990 ... v1 2016 08 29 00 10 00 36.6070 -97.4890 374.00 314.00 60.00 410255 SGP 2016 07 07 19 10 00 5219-99 G C2H6 ARL 5840.316 -999.990 ... v1 2016 08 29 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 410257 SGP 2016 07 07 19 10 00 599-99 G C2H6 ARL 5863.314 -999.990 ... v1 2016 08 29 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 410256 SGP 2016 07 14 19 15 00 3708-99 G C2H6 ARL 2875.481 -999.990 ... v1 2016 09 24 00 09 00 36.6070 -97.4890 374.00 314.00 60.00 411225 SGP 2016 07 14 19 15 00 4947-99 G C2H6 ARL 2818.948 -999.990 ... v1 2016 09 24 00 10 00 36.6070 -97.4890 374.00 314.00 60.00 411226 SGP 2016 07 21 19 14 00 2491-99 G C2H6 ARL 4895.702 -999.990 ... v1 2016 09 24 00 07 00 36.6070 -97.4890 374.00 314.00 60.00 411227 SGP 2016 07 21 19 14 00 4356-99 G C2H6 ARL 4709.088 -999.990 ... v1 2016 09 24 00 08 00 36.6070 -97.4890 374.00 314.00 60.00 411228 SGP 2016 07 28 19 00 00 2907-99 G C2H6 ARL 6650.141 -999.990 ... v1 2016 11 07 12 07 00 36.6070 -97.4890 374.00 314.00 60.00 412620 SGP 2016 07 28 19 00 00 5598-99 G C2H6 ARL 6699.717 -999.990 ... v1 2016 11 07 12 08 00 36.6070 -97.4890 374.00 314.00 60.00 412621 SGP 2016 08 04 18 24 00 2779-99 G C2H6 ARL 4937.157 -999.990 ... v1 2016 11 07 12 05 00 36.6070 -97.4890 374.00 314.00 60.00 412622 SGP 2016 08 04 18 24 00 4761-99 G C2H6 ARL 5078.649 -999.990 ... v1 2016 11 07 12 06 00 36.6070 -97.4890 374.00 314.00 60.00 412623 SGP 2016 08 11 19 08 00 5517-99 G C2H6 ARL 8023.293 -999.990 ... v1 2016 10 12 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 412831 SGP 2016 08 11 19 08 00 5518-99 G C2H6 ARL 7990.364 -999.990 ... v1 2016 10 12 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 412832 SGP 2016 08 18 19 08 00 5725-99 G C2H6 ARL 2567.359 -999.990 ... v1 2016 11 15 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 412829 SGP 2016 08 18 19 08 00 5726-99 G C2H6 ARL 2658.629 -999.990 ... v1 2016 11 15 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 412830 SGP 2016 08 25 19 56 00 5445-99 G C2H6 ARL 5220.616 -999.990 ... v1 2016 10 23 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 414109 SGP 2016 08 25 19 56 00 5663-99 G C2H6 ARL 5254.242 -999.990 ... v1 2016 10 23 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 414110 SGP 2016 09 08 19 38 00 2354-99 G C2H6 ARL 10162.298 -999.990 ... v1 2016 11 10 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 414521 SGP 2016 09 08 19 38 00 5264-99 G C2H6 ARL 10190.524 -999.990 ... v1 2016 11 10 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 414522 SGP 2016 09 15 19 00 00 1961-99 G C2H6 ARL 14647.177 -999.990 ... v1 2016 11 13 00 03 00 36.6070 -97.4890 374.00 314.00 60.00 414517 SGP 2016 09 15 19 00 00 2725-99 G C2H6 ARL 14428.427 -999.990 ... v1 2016 11 13 00 04 00 36.6070 -97.4890 374.00 314.00 60.00 414518 SGP 2016 09 22 19 00 00 1408-99 G C2H6 ARL 5493.871 -999.990 ... v1 2016 11 21 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 415006 SGP 2016 09 22 19 00 00 4576-99 G C2H6 ARL 5486.774 -999.990 ... v1 2016 11 21 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 415007 SGP 2016 10 06 19 00 00 4682-99 G C2H6 ARL 4400.421 -999.990 ... v1 2016 12 10 00 12 00 36.6070 -97.4890 374.00 314.00 60.00 415715 SGP 2016 10 06 19 00 00 519-99 G C2H6 ARL 4386.253 -999.990 ... v1 2016 12 10 00 11 00 36.6070 -97.4890 374.00 314.00 60.00 415714 SGP 2016 10 13 19 00 00 2136-99 G C2H6 ARL 2695.872 -999.990 ... v1 2016 12 09 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 415712 SGP 2016 10 13 19 00 00 5265-99 G C2H6 ARL 2694.228 -999.990 ... v1 2016 12 09 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 415713 SGP 2016 10 20 19 25 00 1662-99 G C2H6 ARL 1495.862 -999.990 ... v1 2016 12 29 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 416407 SGP 2016 10 20 19 25 00 2154-99 G C2H6 ARL 1501.653 -999.990 ... v1 2016 12 29 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 416408 SGP 2016 10 27 19 24 00 4840-99 G C2H6 ARL 16324.499 -999.990 ... v1 2016 12 19 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 416406 SGP 2016 10 27 19 24 00 591-99 G C2H6 ARL 16377.986 -999.990 ... v1 2016 12 19 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 416405 SGP 2016 11 03 20 00 00 2955-99 G C2H6 ARL 3154.589 -999.990 ... v1 2016 12 22 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 417084 SGP 2016 11 03 20 00 00 361-99 G C2H6 ARL 3185.862 -999.990 ... v1 2016 12 22 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 417083 SGP 2016 11 10 20 01 00 1032-99 G C2H6 ARL 14489.360 -999.990 ... v1 2016 12 23 12 01 00 36.6070 -97.4890 374.00 314.00 60.00 417085 SGP 2016 11 10 20 01 00 2574-99 G C2H6 ARL 14615.843 -999.990 ... v1 2016 12 23 12 02 00 36.6070 -97.4890 374.00 314.00 60.00 417086 SGP 2016 11 16 22 37 00 2796-99 G C2H6 ARL 15536.363 -999.990 ... v1 2017 01 04 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 417677 SGP 2016 11 16 22 37 00 4319-99 G C2H6 ARL 15529.900 -999.990 ... v1 2017 01 04 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 417678 SGP 2016 11 23 20 00 00 1574-99 G C2H6 ARL 7230.795 -999.990 ... v1 2017 01 06 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 417679 SGP 2016 11 23 20 00 00 5526-99 G C2H6 ARL 7253.697 -999.990 ... v1 2017 01 06 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 417680 SGP 2016 12 01 20 00 00 5493-99 G C2H6 ARL 20807.797 -999.990 ... v1 2017 02 09 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 418473 SGP 2016 12 01 20 00 00 5571-99 G C2H6 ARL 20434.369 -999.990 ... v1 2017 02 09 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 418474 SGP 2016 12 08 20 00 00 5496-99 G C2H6 ARL 3503.795 -999.990 ... v1 2017 02 08 00 13 00 36.6070 -97.4890 374.00 314.00 60.00 418475 SGP 2016 12 08 20 00 00 5567-99 G C2H6 ARL 3338.607 -999.990 ... v1 2017 02 08 00 14 00 36.6070 -97.4890 374.00 314.00 60.00 418476 SGP 2016 12 15 20 00 00 1338-99 G C2H6 ARL 4373.280 -999.990 ... v1 2017 02 15 12 07 00 36.6070 -97.4890 374.00 314.00 60.00 419045 SGP 2016 12 15 20 00 00 4990-99 G C2H6 ARL 4217.529 -999.990 ... v1 2017 02 15 12 08 00 36.6070 -97.4890 374.00 314.00 60.00 419046 SGP 2016 12 22 20 00 00 2311-99 G C2H6 ARL 3929.664 -999.990 ... v1 2017 02 16 00 15 00 36.6070 -97.4890 374.00 314.00 60.00 419043 SGP 2016 12 22 20 00 00 4006-99 G C2H6 ARL 3974.990 -999.990 ... v1 2017 02 16 00 16 00 36.6070 -97.4890 374.00 314.00 60.00 419044 SGP 2016 12 29 20 00 00 1811-99 G C2H6 ARL 1806.373 -999.990 ... v1 2017 02 04 00 09 00 36.6070 -97.4890 374.00 314.00 60.00 419382 SGP 2016 12 29 20 00 00 5596-99 G C2H6 ARL 1814.852 -999.990 ... v1 2017 02 04 00 10 00 36.6070 -97.4890 374.00 314.00 60.00 419383