# number_of_header_lines: 70 # comment: # comment: ************ USE OF ESRL GMD DATA **************** # comment: # comment: These data are made freely available to the public and the # comment: scientific community in the belief that their wide dissemination # comment: will lead to greater understanding and new scientific insights. # comment: The availability of these data does not constitute publication # comment: of the data. NOAA relies on the ethics and integrity of the user to # comment: ensure that GML receives fair credit for their work. If the data # comment: are obtained for potential use in a publication or presentation, # comment: GML should be informed at the outset of the nature of this work. # comment: If the GML data are essential to the work, or if an important # comment: result or conclusion depends on the GML data, co-authorship # comment: may be appropriate. This should be discussed at an early stage in # comment: the work. Manuscripts using the GML data should be sent to GML # comment: for review before they are submitted for publication so we can # comment: ensure that the quality and limitations of the data are accurately # comment: represented. # comment: Please see accompanying README file, if available, for citation text. # comment: # comment: Every effort is made to produce the most accurate and precise # comment: measurements possible. However, we reserve the right to make # comment: corrections to the data based on recalibration of standard gases # comment: or for other reasons deemed scientifically justified. # comment: # comment: We are not responsible for results and conclusions based on use # comment: of these data without regard to this warning. # comment: # contact_parameter: C5H8 ARL (Individual Flasks) # contact_name: John Mund # contact_telephone: (303) 497-5472 # contact_email: John.Mund@noaa.gov # comment: # comment: ************ COLLABORATORS *************** # comment: # comment: NOAA thanks the following collaborators without # comment: whom these measurements would not be possible. # comment: # collaborator_name: Beth Anderson/ NWS Cooperative Observer [NWS # collaborator_name: COOP] # comment: # comment: ************ RECIPROCITY AGREEMENT *************** # comment: # comment: Use of these data implies an agreement to reciprocate. # comment: Laboratories making similar measurements agree to make their # comment: own data available to the general public and to the scientific # comment: community in an equally complete and easily accessible form. # comment: Modelers are encouraged to make available to the community, # comment: upon request, their own tools used in the interpretation # comment: of the GML data, namely well documented model code, transport # comment: fields, and additional information necessary for other # comment: scientists to repeat the work and to run modified versions. # comment: Model availability includes collaborative support for new # comment: users of the models. # comment: # comment: ************ DATA DESCRIPTION *************** # comment: # description_site-code: uta # description_project-abbr: ccg_surface # description_strategy-abbr: flask # description_sample-constraints: date:1900-01-01,2016-12-31 # description_creation-time: 2021-05-04 10:10:52 # comment: # comment: ************ DATA DOCUMENTATION *************** # comment: # comment: Please refer to the species-specific README file in the # comment: appropriate directory folder at ftp://aftp.cmdl.noaa.gov/data/trace_gases/. # comment: # data_fields: sample_site_code sample_year sample_month sample_day sample_hour sample_minute sample_seconds sample_id sample_method parameter_formula analysis_group_abbr analysis_value analysis_uncertainty analysis_flag analysis_instrument analysis_year analysis_month analysis_day analysis_hour analysis_minute analysis_seconds sample_latitude sample_longitude sample_altitude sample_elevation sample_intake_height event_number UTA 2007 01 15 23 45 00 2923-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 04 17 12 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 228605 UTA 2007 01 15 23 45 00 2924-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 04 17 12 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 228606 UTA 2007 01 21 23 03 00 2914-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 05 01 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 228604 UTA 2007 01 21 23 03 00 2914-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 05 14 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 228604 UTA 2007 01 29 19 52 00 3223-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 04 16 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 230019 UTA 2007 01 29 19 52 00 3224-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 04 16 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 230020 UTA 2007 02 09 17 22 00 3201-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 04 16 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 230021 UTA 2007 02 09 17 22 00 3202-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 04 16 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 230022 UTA 2007 02 15 23 53 00 75-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 04 30 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 230465 UTA 2007 02 15 23 53 00 76-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 04 30 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 230466 UTA 2007 02 21 21 24 00 3275-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 05 03 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 230463 UTA 2007 02 21 21 24 00 3276-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 05 03 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 230464 UTA 2007 02 28 20 08 00 67-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 05 04 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 231019 UTA 2007 02 28 20 08 00 68-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 05 04 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 231020 UTA 2007 03 06 20 15 00 2473-99 P C5H8 ARL 8.639 -999.990 ... v1 2007 05 01 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 231017 UTA 2007 03 06 20 15 00 2473-99 P C5H8 ARL 12.077 -999.990 P.. v1 2007 05 14 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 231017 UTA 2007 03 06 20 15 00 2474-99 P C5H8 ARL 10.036 -999.990 ... v1 2007 05 01 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 231018 UTA 2007 03 06 20 15 00 2474-99 P C5H8 ARL 22.683 -999.990 P.. v1 2007 05 14 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 231018 UTA 2007 03 13 18 45 00 4165-99 P C5H8 ARL 39.160 -999.990 P.. v1 2007 04 30 12 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 231833 UTA 2007 03 13 18 45 00 4166-99 P C5H8 ARL 20.165 -999.990 P.. v1 2007 04 30 12 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 231834 UTA 2007 03 19 21 11 00 943-99 P C5H8 ARL 115.677 -999.990 ... v1 2007 04 30 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 231831 UTA 2007 03 19 21 11 00 944-99 P C5H8 ARL 137.601 -999.990 ... v1 2007 04 30 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 231832 UTA 2007 03 26 19 33 00 233-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 05 02 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 232435 UTA 2007 03 26 19 33 00 234-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 05 02 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 232436 UTA 2007 04 02 02 25 00 49-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 05 02 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 232437 UTA 2007 04 02 02 25 00 50-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 05 02 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 232438 UTA 2007 04 16 01 20 00 3315-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 05 25 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 233094 UTA 2007 04 16 01 20 00 3316-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 05 25 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 233095 UTA 2007 04 21 19 34 00 133-99 P C5H8 ARL 79.344 -999.990 P.. v1 2007 05 22 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 233919 UTA 2007 04 21 19 34 00 134-99 P C5H8 ARL 34.859 -999.990 P.. v1 2007 05 22 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 233920 UTA 2007 04 27 15 00 00 2845-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 05 22 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 233917 UTA 2007 04 27 15 00 00 2846-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 05 22 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 233918 UTA 2007 05 03 17 00 00 3-99 P C5H8 ARL 109.486 -999.990 ... v1 2007 06 13 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 234219 UTA 2007 05 03 17 00 00 4-99 P C5H8 ARL 117.620 -999.990 ... v1 2007 06 13 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 234220 UTA 2007 05 10 02 15 00 4419-99 P C5H8 ARL 18.265 -999.990 ... v1 2007 06 13 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 234217 UTA 2007 05 10 02 15 00 4420-99 P C5H8 ARL 19.750 -999.990 ... v1 2007 06 13 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 234218 UTA 2007 05 17 15 50 00 2115-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 09 11 12 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 235340 UTA 2007 05 24 19 35 00 2343-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 08 01 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 235338 UTA 2007 05 24 19 35 00 2344-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 08 01 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 235339 UTA 2007 06 14 00 32 00 1801-99 P C5H8 ARL 1009.674 -999.990 ... v1 2007 07 22 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 237139 UTA 2007 06 14 00 32 00 1802-99 P C5H8 ARL 1288.626 -999.990 ... v1 2007 07 22 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 237140 UTA 2007 06 21 21 40 00 1447-99 P C5H8 ARL 1145.657 -999.990 ... v1 2007 08 01 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 237153 UTA 2007 06 27 19 15 00 1977-99 P C5H8 ARL 459.107 -999.990 ... v1 2007 08 16 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 237869 UTA 2007 06 27 19 15 00 1978-99 P C5H8 ARL 509.520 -999.990 ... v1 2007 08 16 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 237870 UTA 2007 07 04 19 51 00 2013-99 P C5H8 ARL 2017.386 -999.990 ... v1 2007 08 23 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 237871 UTA 2007 07 04 19 51 00 2014-99 P C5H8 ARL 2643.441 -999.990 ... v1 2007 08 23 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 237872 UTA 2007 07 11 23 43 00 3459-99 P C5H8 ARL 16.413 -999.990 ... v1 2007 08 14 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 238798 UTA 2007 07 11 23 43 00 3460-99 P C5H8 ARL 17.070 -999.990 ... v1 2007 08 14 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 238799 UTA 2007 07 17 15 45 00 4383-99 P C5H8 ARL 301.634 -999.990 ... v1 2007 08 26 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 238796 UTA 2007 07 17 15 45 00 4384-99 P C5H8 ARL 228.614 -999.990 ... v1 2007 08 26 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 238797 UTA 2007 07 25 17 05 00 1250-99 P C5H8 ARL 748.725 -999.990 ... v1 2007 09 05 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 239601 UTA 2007 07 25 17 05 00 2323-99 P C5H8 ARL 713.105 -999.990 ... v1 2007 09 05 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 239602 UTA 2007 08 01 02 05 00 3670-99 P C5H8 ARL 21.243 -999.990 ... v1 2007 09 05 12 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 239603 UTA 2007 08 01 02 05 00 4209-99 P C5H8 ARL 13.630 -999.990 ... v1 2007 09 05 12 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 239604 UTA 2007 08 07 19 40 00 3755-99 P C5H8 ARL 120.412 -999.990 ... v1 2007 09 07 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 240288 UTA 2007 08 07 19 40 00 3756-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 09 07 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 240289 UTA 2007 08 19 23 31 00 4167-99 P C5H8 ARL 39.913 -999.990 ... v1 2007 09 19 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 241119 UTA 2007 08 19 23 31 00 4168-99 P C5H8 ARL 46.129 -999.990 ... v1 2007 09 19 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 241120 UTA 2007 08 27 17 40 00 3961-99 P C5H8 ARL 19.970 -999.990 ... v1 2007 09 14 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 241117 UTA 2007 08 27 17 40 00 3962-99 P C5H8 ARL 29.967 -999.990 ... v1 2007 09 14 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 241118 UTA 2007 09 04 21 20 00 3149-99 P C5H8 ARL 30.621 -999.990 ... v1 2007 10 15 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 241926 UTA 2007 09 04 21 20 00 3150-99 P C5H8 ARL 33.186 -999.990 ... v1 2007 10 15 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 241927 UTA 2007 09 12 02 01 00 1675-99 P C5H8 ARL 94.030 -999.990 P.. v1 2007 10 15 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 241924 UTA 2007 09 12 02 01 00 1676-99 P C5H8 ARL 27.765 -999.990 P.. v1 2007 10 15 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 241925 UTA 2007 09 18 00 55 00 2829-99 P C5H8 ARL 28.861 -999.990 ... v1 2007 10 22 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 242633 UTA 2007 09 18 00 55 00 2830-99 P C5H8 ARL 26.395 -999.990 ... v1 2007 10 22 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 242634 UTA 2007 09 24 15 40 00 2171-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 10 24 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 242631 UTA 2007 09 24 15 40 00 2172-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 10 24 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 242632 UTA 2007 10 10 17 25 00 893-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 11 02 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 243768 UTA 2007 10 10 17 25 00 894-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 11 02 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 243769 UTA 2007 10 17 22 55 00 3161-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 11 02 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 243766 UTA 2007 10 17 22 55 00 3162-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 11 02 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 243767 UTA 2007 10 24 00 05 00 2115-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 11 26 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 244510 UTA 2007 10 24 00 05 00 4103-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 11 26 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 244511 UTA 2007 10 29 23 10 00 4278-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 11 16 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 244509 UTA 2007 10 29 23 10 00 4829-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 11 16 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 244508 UTA 2007 11 07 16 32 00 67-99 P C5H8 ARL 42.928 -999.990 ... v1 2007 11 30 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 245350 UTA 2007 11 07 16 32 00 68-99 P C5H8 ARL 57.109 -999.990 ... v1 2007 11 30 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 245351 UTA 2007 11 14 00 05 00 3181-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 11 30 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 245348 UTA 2007 11 14 00 05 00 3182-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 11 30 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 245349 UTA 2007 11 19 21 24 00 3223-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 12 18 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 245936 UTA 2007 11 19 21 24 00 3224-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 12 18 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 245937 UTA 2007 11 27 22 19 00 4487-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 12 18 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 245934 UTA 2007 11 27 22 19 00 4488-99 P C5H8 ARL -999.990 -999.990 D.. v1 2007 12 18 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 245935 UTA 2007 12 03 21 55 00 675-99 P C5H8 ARL 14.690 -999.990 ... v1 2008 02 08 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 246974 UTA 2007 12 03 21 55 00 676-99 P C5H8 ARL 11.840 -999.990 ... v1 2008 02 08 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 246975 UTA 2007 12 10 17 25 00 3269-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 02 25 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 246972 UTA 2007 12 10 17 25 00 3270-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 02 25 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 246973 UTA 2007 12 17 23 52 00 3651-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 02 01 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 247578 UTA 2007 12 17 23 52 00 3652-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 02 01 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 247579 UTA 2007 12 23 21 55 00 4311-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 02 01 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 247576 UTA 2007 12 23 21 55 00 4312-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 02 01 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 247577 UTA 2007 12 31 20 06 00 3297-99 P C5H8 ARL 13.605 -999.990 ... v1 2008 02 08 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 248217 UTA 2007 12 31 20 06 00 4299-99 P C5H8 ARL 10.097 -999.990 ... v1 2008 02 08 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 248218 UTA 2008 01 06 23 35 00 2054-99 P C5H8 ARL 13.799 -999.990 ... v1 2008 02 08 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 248215 UTA 2008 01 06 23 35 00 3816-99 P C5H8 ARL 13.490 -999.990 ... v1 2008 02 08 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 248216 UTA 2008 01 22 23 10 00 4265-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 02 25 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 248795 UTA 2008 01 22 23 10 00 4266-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 02 25 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 248794 UTA 2008 01 28 18 13 00 4913-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 02 26 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 249377 UTA 2008 01 28 18 13 00 4914-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 02 26 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 249378 UTA 2008 02 03 23 05 00 4915-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 02 26 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 249379 UTA 2008 02 03 23 05 00 4916-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 02 26 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 249380 UTA 2008 02 11 23 02 00 2935-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 04 09 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 250076 UTA 2008 02 11 23 02 00 2936-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 04 09 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 250077 UTA 2008 02 18 23 20 00 5057-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 04 01 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 250074 UTA 2008 02 18 23 20 00 5058-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 04 01 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 250075 UTA 2008 03 03 18 12 00 1633-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 04 09 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 250920 UTA 2008 03 03 18 12 00 1634-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 04 09 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 250921 UTA 2008 03 10 01 15 00 1483-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 04 10 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 251509 UTA 2008 03 10 01 15 00 1484-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 04 10 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 251510 UTA 2008 03 16 00 16 00 577-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 04 10 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 251507 UTA 2008 03 16 00 16 00 578-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 04 10 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 251508 UTA 2008 03 31 20 05 00 4687-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 08 05 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 252323 UTA 2008 03 31 20 05 00 4688-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 08 05 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 252324 UTA 2008 04 08 00 24 00 3619-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 05 11 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 253069 UTA 2008 04 08 00 24 00 3620-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 05 11 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 253070 UTA 2008 04 14 02 30 00 17-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 05 29 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 253405 UTA 2008 04 14 02 30 00 18-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 05 29 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 253406 UTA 2008 05 06 02 10 00 3057-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 06 11 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 254750 UTA 2008 05 06 02 10 00 3058-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 06 11 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 254751 UTA 2008 05 14 17 16 00 2367-99 P C5H8 ARL 58.275 -999.990 ... v1 2008 06 28 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 254748 UTA 2008 05 14 17 16 00 2368-99 P C5H8 ARL 52.987 -999.990 ... v1 2008 06 28 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 254749 UTA 2008 06 02 20 05 00 3069-99 P C5H8 ARL 222.619 -999.990 ... v1 2008 07 01 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 256017 UTA 2008 06 02 20 05 00 3070-99 P C5H8 ARL 92.725 -999.990 ... v1 2008 07 01 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 256018 UTA 2008 06 02 23 45 00 1011-99 P C5H8 ARL 1044.671 -999.990 P.. v1 2008 08 08 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 257666 UTA 2008 06 02 23 45 00 1012-99 P C5H8 ARL 448.212 -999.990 P.. v1 2008 08 08 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 257667 UTA 2008 06 09 16 35 00 4637-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 06 29 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 256015 UTA 2008 06 09 16 35 00 4638-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 06 29 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 256016 UTA 2008 06 20 00 55 00 4807-99 P C5H8 ARL 830.481 -999.990 ... v1 2008 07 29 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 257072 UTA 2008 06 20 00 55 00 4808-99 P C5H8 ARL 654.591 -999.990 ... v1 2008 07 29 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 257073 UTA 2008 06 25 21 35 00 2697-99 P C5H8 ARL 299.511 -999.990 ... v1 2008 07 29 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 257070 UTA 2008 06 25 21 35 00 2698-99 P C5H8 ARL 474.432 -999.990 ... v1 2008 07 29 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 257071 UTA 2008 07 09 19 05 00 2851-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 08 02 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 257664 UTA 2008 07 09 19 05 00 2852-99 P C5H8 ARL 1423.658 -999.990 ... v1 2008 08 02 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 257665 UTA 2008 07 16 00 34 00 3739-99 P C5H8 ARL 24.673 -999.990 ... v1 2008 09 23 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 258522 UTA 2008 07 16 00 34 00 3740-99 P C5H8 ARL 26.895 -999.990 ... v1 2008 09 23 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 258523 UTA 2008 07 21 16 15 00 1055-99 P C5H8 ARL 10.382 -999.990 ... v1 2008 09 24 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 258520 UTA 2008 07 21 16 15 00 1056-99 P C5H8 ARL 12.918 -999.990 ... v1 2008 09 24 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 258521 UTA 2008 07 27 23 25 00 2029-99 P C5H8 ARL 104.111 -999.990 ... v1 2008 09 22 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 258989 UTA 2008 07 27 23 25 00 2030-99 P C5H8 ARL 103.126 -999.990 ... v1 2008 09 22 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 258990 UTA 2008 08 02 17 10 00 4589-99 P C5H8 ARL 793.005 -999.990 ... v1 2008 09 23 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 258988 UTA 2008 08 11 15 25 00 3151-99 P C5H8 ARL 190.657 -999.990 ... v1 2008 10 02 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 259940 UTA 2008 08 11 15 25 00 3152-99 P C5H8 ARL 177.380 -999.990 ... v1 2008 10 02 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 259941 UTA 2008 08 18 21 56 00 965-99 P C5H8 ARL 79.579 -999.990 ... v1 2008 10 22 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 259938 UTA 2008 08 18 21 56 00 966-99 P C5H8 ARL 62.665 -999.990 ... v1 2008 10 22 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 259939 UTA 2008 08 25 00 50 00 1213-99 P C5H8 ARL 83.843 -999.990 P.. v1 2008 09 30 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 260787 UTA 2008 08 25 00 50 00 1214-99 P C5H8 ARL 129.148 -999.990 P.. v1 2008 09 30 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 260788 UTA 2008 09 01 17 10 00 1507-99 P C5H8 ARL 11.272 -999.990 ... v1 2008 10 02 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 260785 UTA 2008 09 01 17 10 00 1508-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 10 02 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 260786 UTA 2008 09 11 00 20 00 3999-99 P C5H8 ARL 286.124 -999.990 ... v1 2008 11 10 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 261397 UTA 2008 09 11 00 20 00 4000-99 P C5H8 ARL 253.573 -999.990 ... v1 2008 11 10 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 261398 UTA 2008 09 24 19 05 00 4751-99 P C5H8 ARL 225.747 -999.990 P.. v1 2008 10 31 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 262261 UTA 2008 09 24 19 05 00 4752-99 P C5H8 ARL 113.295 -999.990 P.. v1 2008 10 31 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 262262 UTA 2008 10 01 00 20 00 1169-99 P C5H8 ARL 614.447 -999.990 ... v1 2009 01 07 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 262259 UTA 2008 10 01 00 20 00 1170-99 P C5H8 ARL 608.318 -999.990 ... v1 2009 01 07 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 262260 UTA 2008 10 07 20 55 00 3065-99 P C5H8 ARL 186.066 -999.990 ... v1 2008 12 02 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 262936 UTA 2008 10 07 20 55 00 3066-99 P C5H8 ARL 190.212 -999.990 ... v1 2008 12 02 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 262937 UTA 2008 10 13 21 38 00 875-99 P C5H8 ARL 16.123 -999.990 ... v1 2008 12 02 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 262938 UTA 2008 10 13 21 38 00 876-99 P C5H8 ARL 13.571 -999.990 ... v1 2008 12 02 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 262939 UTA 2008 10 20 19 05 00 153-99 P C5H8 ARL 16.976 -999.990 ... v1 2008 11 13 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 263624 UTA 2008 10 20 19 05 00 154-99 P C5H8 ARL 11.110 -999.990 ... v1 2008 11 13 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 263625 UTA 2008 10 27 20 40 00 3483-99 P C5H8 ARL 84.391 -999.990 P.. v1 2008 11 13 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 263622 UTA 2008 10 27 20 40 00 3484-99 P C5H8 ARL 58.416 -999.990 P.. v1 2008 11 13 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 263623 UTA 2008 11 03 23 20 00 3455-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 12 19 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 264330 UTA 2008 11 03 23 20 00 3456-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 12 19 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 264331 UTA 2008 11 10 18 50 00 1031-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 12 19 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 264328 UTA 2008 11 10 18 50 00 1032-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 12 19 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 264329 UTA 2008 11 18 23 00 00 5041-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 12 16 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 265053 UTA 2008 11 18 23 00 00 5042-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 12 16 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 265054 UTA 2008 11 24 22 35 00 1331-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 12 16 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 265051 UTA 2008 11 24 22 35 00 1332-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 12 16 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 265052 UTA 2008 12 01 00 05 00 1793-99 P C5H8 ARL 12.830 -999.990 ... v1 2009 01 02 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 265897 UTA 2008 12 01 00 05 00 1794-99 P C5H8 ARL 14.566 -999.990 ... v1 2009 01 02 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 265896 UTA 2008 12 06 23 20 00 1491-99 P C5H8 ARL 12.760 -999.990 ... v1 2008 12 30 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 265898 UTA 2008 12 06 23 20 00 1492-99 P C5H8 ARL -999.990 -999.990 D.. v1 2008 12 30 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 265899 UTA 2008 12 14 00 00 00 1433-99 P C5H8 ARL -999.990 -999.990 D.. v1 2009 02 13 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 266776 UTA 2008 12 14 00 00 00 1434-99 P C5H8 ARL -999.990 -999.990 D.. v1 2009 02 13 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 266777 UTA 2008 12 21 23 45 00 4471-99 P C5H8 ARL -999.990 -999.990 D.. v1 2009 01 13 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 266778 UTA 2008 12 21 23 45 00 4472-99 P C5H8 ARL 24.666 -999.990 ... v1 2009 01 13 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 266779 UTA 2009 01 01 00 06 00 3873-99 P C5H8 ARL -999.990 -999.990 D.. v1 2009 02 10 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 267732 UTA 2009 01 01 00 06 00 3874-99 P C5H8 ARL -999.990 -999.990 D.. v1 2009 02 10 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 267733 UTA 2009 01 07 00 35 00 763-99 P C5H8 ARL -999.990 -999.990 D.. v1 2009 01 27 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 267770 UTA 2009 01 07 00 35 00 764-99 P C5H8 ARL -999.990 -999.990 D.. v1 2009 01 27 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 267771 UTA 2009 01 12 17 30 00 3483-99 P C5H8 ARL -999.990 -999.990 D.. v1 2009 02 16 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 268573 UTA 2009 01 12 17 30 00 3484-99 P C5H8 ARL -999.990 -999.990 D.. v1 2009 02 16 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 268574 UTA 2009 01 19 00 05 00 5033-99 P C5H8 ARL -999.990 -999.990 D.. v1 2009 02 16 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 268571 UTA 2009 01 19 00 05 00 5034-99 P C5H8 ARL -999.990 -999.990 D.. v1 2009 02 16 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 268572 UTA 2009 01 26 17 30 00 2737-99 P C5H8 ARL 8.846 -999.990 ... v1 2009 03 11 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 269445 UTA 2009 01 26 17 30 00 2738-99 P C5H8 ARL 8.681 -999.990 ... v1 2009 03 11 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 269446 UTA 2009 02 03 00 20 00 2079-99 P C5H8 ARL 11.443 -999.990 ... v1 2009 03 11 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 269443 UTA 2009 02 03 00 20 00 2080-99 P C5H8 ARL 10.685 -999.990 ... v1 2009 03 11 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 269444 UTA 2009 02 09 00 45 00 3917-99 P C5H8 ARL -999.990 -999.990 D.. v1 2009 04 14 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 270307 UTA 2009 02 09 00 45 00 3918-99 P C5H8 ARL 12.745 -999.990 ... v1 2009 04 14 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 270308 UTA 2009 02 15 23 30 00 3959-99 P C5H8 ARL -999.990 -999.990 D.. v1 2009 04 14 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 270305 UTA 2009 02 15 23 30 00 3960-99 P C5H8 ARL -999.990 -999.990 D.. v1 2009 04 14 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 270306 UTA 2009 02 22 01 20 00 3101-99 P C5H8 ARL 25.979 -999.990 ... v1 2009 04 17 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 270983 UTA 2009 02 22 01 20 00 3102-99 P C5H8 ARL 27.610 -999.990 ... v1 2009 04 17 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 270984 UTA 2009 03 01 00 20 00 1491-99 P C5H8 ARL 14.761 -999.990 ... v1 2009 04 17 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 270981 UTA 2009 03 01 00 20 00 1492-99 P C5H8 ARL 10.958 -999.990 ... v1 2009 04 17 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 270982 UTA 2009 03 04 18 40 00 2759-99 P C5H8 ARL 8.007 -999.990 ... v1 2009 04 06 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 272129 UTA 2009 03 04 18 40 00 2760-99 P C5H8 ARL -999.990 -999.990 D.. v1 2009 04 06 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 272130 UTA 2009 03 12 01 10 00 4127-99 P C5H8 ARL -999.990 -999.990 D.. v1 2009 04 04 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 272127 UTA 2009 03 12 01 10 00 4128-99 P C5H8 ARL -999.990 -999.990 D.. v1 2009 04 04 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 272128 UTA 2009 03 17 15 35 00 4639-99 P C5H8 ARL 11.637 -999.990 ... v1 2009 04 21 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 272851 UTA 2009 03 17 15 35 00 4640-99 P C5H8 ARL -999.990 -999.990 D.. v1 2009 04 21 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 272852 UTA 2009 03 24 16 15 00 1125-99 P C5H8 ARL 13.962 -999.990 ... v1 2009 04 18 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 272849 UTA 2009 03 24 16 15 00 1126-99 P C5H8 ARL 15.843 -999.990 ... v1 2009 04 18 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 272850 UTA 2009 03 30 00 35 00 3296-99 P C5H8 ARL -999.990 -999.990 D.. v1 2009 05 01 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 273936 UTA 2009 03 30 00 35 00 3345-99 P C5H8 ARL -999.990 -999.990 D.. v1 2009 05 01 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 273937 UTA 2009 04 05 00 10 00 1496-99 P C5H8 ARL -999.990 -999.990 D.. v1 2009 05 01 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 273934 UTA 2009 04 05 00 10 00 1961-99 P C5H8 ARL -999.990 -999.990 D.. v1 2009 05 01 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 273935 UTA 2009 04 10 21 00 00 3477-99 P C5H8 ARL 20.131 -999.990 ... v1 2009 05 12 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 274657 UTA 2009 04 10 21 00 00 3478-99 P C5H8 ARL 17.528 -999.990 ... v1 2009 05 12 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 274658 UTA 2009 04 22 15 45 00 4085-99 P C5H8 ARL 14.173 -999.990 ... v1 2009 05 12 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 274659 UTA 2009 04 22 15 45 00 4086-99 P C5H8 ARL 18.399 -999.990 ... v1 2009 05 12 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 274660 UTA 2009 04 27 17 05 00 1633-99 P C5H8 ARL 8.483 -999.990 ... v1 2009 06 09 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 275296 UTA 2009 04 27 17 05 00 2348-99 P C5H8 ARL -999.990 -999.990 D.. v1 2009 06 09 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 275297 UTA 2009 05 03 21 34 00 643-99 P C5H8 ARL 11.194 -999.990 ... v1 2009 06 08 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 275294 UTA 2009 05 03 21 34 00 644-99 P C5H8 ARL 9.705 -999.990 ... v1 2009 06 08 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 275295 UTA 2009 05 09 19 05 00 267-99 P C5H8 ARL 332.110 -999.990 ... v1 2009 06 11 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 276035 UTA 2009 05 09 19 05 00 268-99 P C5H8 ARL 292.298 -999.990 ... v1 2009 06 11 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 276036 UTA 2009 05 14 19 50 00 55-99 P C5H8 ARL 337.167 -999.990 ... v1 2009 06 17 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 276033 UTA 2009 05 14 19 50 00 56-99 P C5H8 ARL 399.483 -999.990 ... v1 2009 06 17 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 276034 UTA 2009 05 20 22 00 00 1389-99 P C5H8 ARL 160.326 -999.990 P.. v1 2009 06 29 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 276960 UTA 2009 05 20 22 00 00 1390-99 P C5H8 ARL 118.229 -999.990 P.. v1 2009 06 29 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 276961 UTA 2009 05 27 17 55 00 1611-99 P C5H8 ARL 666.413 -999.990 ... v1 2009 06 29 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 276958 UTA 2009 05 27 17 55 00 1612-99 P C5H8 ARL 657.234 -999.990 ... v1 2009 06 29 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 276959 UTA 2009 06 02 21 00 00 3735-99 P C5H8 ARL 223.299 -999.990 ... v1 2009 07 14 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 277805 UTA 2009 06 02 21 00 00 3736-99 P C5H8 ARL 221.866 -999.990 ... v1 2009 07 14 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 277806 UTA 2009 06 09 00 00 00 2511-99 P C5H8 ARL -999.990 -999.990 D.. v1 2009 07 10 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 277803 UTA 2009 06 09 00 00 00 2512-99 P C5H8 ARL -999.990 -999.990 D.. v1 2009 07 10 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 277804 UTA 2009 06 16 17 10 00 1071-99 P C5H8 ARL 271.822 -999.990 ... v1 2009 07 23 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 278506 UTA 2009 06 16 17 10 00 1072-99 P C5H8 ARL 259.694 -999.990 ... v1 2009 07 23 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 278507 UTA 2009 06 22 22 10 00 427-99 P C5H8 ARL 231.152 -999.990 P.. v1 2009 07 23 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 278504 UTA 2009 06 22 22 10 00 428-99 P C5H8 ARL 155.599 -999.990 P.. v1 2009 07 23 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 278505 UTA 2009 06 29 01 10 00 3291-99 P C5H8 ARL 925.915 -999.990 ... v1 2009 07 24 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 279276 UTA 2009 06 29 01 10 00 3292-99 P C5H8 ARL 809.701 -999.990 ... v1 2009 07 24 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 279277 UTA 2009 07 04 23 30 00 2681-99 P C5H8 ARL 30.159 -999.990 ... v1 2009 07 27 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 279274 UTA 2009 07 04 23 30 00 2682-99 P C5H8 ARL 45.699 -999.990 ... v1 2009 07 27 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 279275 UTA 2009 07 11 16 45 00 643-99 P C5H8 ARL 34.327 -999.990 ... v1 2009 08 10 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 280299 UTA 2009 07 11 16 45 00 644-99 P C5H8 ARL 32.439 -999.990 ... v1 2009 08 10 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 280300 UTA 2009 07 18 00 15 00 2333-99 P C5H8 ARL 1557.124 -999.990 ... v1 2009 08 13 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 280297 UTA 2009 07 18 00 15 00 2334-99 P C5H8 ARL 1655.204 -999.990 ... v1 2009 08 13 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 280298 UTA 2009 07 23 18 00 00 3919-99 P C5H8 ARL -999.990 -999.990 A.. v1 2009 08 17 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 280873 UTA 2009 07 23 18 00 00 3920-99 P C5H8 ARL -999.990 -999.990 A.. v1 2009 08 17 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 280874 UTA 2009 07 29 22 40 00 453-99 P C5H8 ARL -999.990 -999.990 A.. v1 2009 08 17 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 280872 UTA 2009 07 29 22 40 00 454-99 P C5H8 ARL -999.990 -999.990 A.. v1 2009 08 17 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 280871 UTA 2009 08 05 16 12 00 131-99 P C5H8 ARL 22.419 -999.990 ... v1 2009 09 02 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 281706 UTA 2009 08 05 16 12 00 132-99 P C5H8 ARL 16.038 -999.990 ... v1 2009 09 02 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 281707 UTA 2009 08 13 02 05 00 611-99 P C5H8 ARL 50.900 -999.990 ... v1 2009 09 02 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 281704 UTA 2009 08 13 02 05 00 612-99 P C5H8 ARL 46.893 -999.990 ... v1 2009 09 02 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 281705 UTA 2009 08 18 17 30 00 71-99 P C5H8 ARL 172.157 -999.990 ... v1 2009 09 03 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 282479 UTA 2009 08 18 17 30 00 72-99 P C5H8 ARL 164.245 -999.990 ... v1 2009 09 03 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 282480 UTA 2009 08 24 19 55 00 4059-99 P C5H8 ARL 11.120 -999.990 ... v1 2009 09 03 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 282477 UTA 2009 08 24 19 55 00 4060-99 P C5H8 ARL 9.707 -999.990 ... v1 2009 09 03 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 282478 UTA 2009 09 01 22 55 00 3635-99 P C5H8 ARL 19.346 -999.990 ... v1 2009 09 25 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 283537 UTA 2009 09 01 22 55 00 3636-99 P C5H8 ARL 20.799 -999.990 ... v1 2009 09 25 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 283538 UTA 2009 09 09 20 30 00 1121-99 P C5H8 ARL 306.314 -999.990 ... v1 2009 09 25 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 283535 UTA 2009 09 09 20 30 00 1122-99 P C5H8 ARL 369.384 -999.990 ... v1 2009 09 25 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 283536 UTA 2009 09 14 20 05 00 2871-99 P C5H8 ARL -999.990 -999.990 D.. v1 2009 10 04 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 284110 UTA 2009 09 14 20 05 00 2872-99 P C5H8 ARL -999.990 -999.990 D.. v1 2009 10 04 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 284111 UTA 2009 09 21 16 45 00 441-99 P C5H8 ARL 26.352 -999.990 ... v1 2009 10 04 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 284108 UTA 2009 09 21 16 45 00 442-99 P C5H8 ARL 24.156 -999.990 ... v1 2009 10 04 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 284109 UTA 2009 09 29 21 35 00 163-99 P C5H8 ARL 31.120 -999.990 ... v1 2009 10 21 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 285090 UTA 2009 09 29 21 35 00 164-99 P C5H8 ARL 33.065 -999.990 ... v1 2009 10 21 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 285091 UTA 2009 10 08 00 30 00 553-99 P C5H8 ARL 27.518 -999.990 ... v1 2009 10 21 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 285088 UTA 2009 10 08 00 30 00 554-99 P C5H8 ARL 21.676 -999.990 ... v1 2009 10 21 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 285089 UTA 2009 10 13 14 50 00 2397-99 P C5H8 ARL -999.990 -999.990 D.. v1 2009 11 12 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 285647 UTA 2009 10 13 14 50 00 2398-99 P C5H8 ARL -999.990 -999.990 D.. v1 2009 11 12 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 285648 UTA 2009 10 19 19 35 00 4015-99 P C5H8 ARL 213.201 -999.990 ... v1 2009 11 13 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 285645 UTA 2009 10 19 19 35 00 4016-99 P C5H8 ARL 163.812 -999.990 ... v1 2009 11 13 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 285646 UTA 2009 10 26 15 20 00 1243-99 P C5H8 ARL -999.990 -999.990 D.. v1 2009 12 11 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 286343 UTA 2009 10 26 15 20 00 1244-99 P C5H8 ARL -999.990 -999.990 D.. v1 2009 12 11 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 286344 UTA 2009 11 02 22 20 00 2341-99 P C5H8 ARL -999.990 -999.990 D.. v1 2009 12 09 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 286341 UTA 2009 11 02 22 20 00 2342-99 P C5H8 ARL -999.990 -999.990 D.. v1 2009 12 09 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 286342 UTA 2009 11 09 22 10 00 4085-99 P C5H8 ARL -999.990 -999.990 D.. v1 2009 12 10 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 287104 UTA 2009 11 09 22 10 00 4086-99 P C5H8 ARL -999.990 -999.990 D.. v1 2009 12 10 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 287105 UTA 2009 11 16 22 45 00 385-99 P C5H8 ARL -999.990 -999.990 D.. v1 2009 12 10 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 287102 UTA 2009 11 16 22 45 00 386-99 P C5H8 ARL -999.990 -999.990 D.. v1 2009 12 10 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 287103 UTA 2009 11 24 22 05 00 3755-99 P C5H8 ARL -999.990 -999.990 D.. v1 2010 01 05 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 287849 UTA 2009 11 24 22 05 00 3756-99 P C5H8 ARL -999.990 -999.990 D.. v1 2010 01 05 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 287850 UTA 2009 11 30 20 45 00 881-99 P C5H8 ARL -999.990 -999.990 D.. v1 2010 01 06 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 287847 UTA 2009 11 30 20 45 00 882-99 P C5H8 ARL -999.990 -999.990 D.. v1 2010 01 06 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 287848 UTA 2009 12 07 23 05 00 321-99 P C5H8 ARL -999.990 -999.990 D.. v1 2010 01 27 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 288509 UTA 2009 12 07 23 05 00 322-99 P C5H8 ARL -999.990 -999.990 D.. v1 2010 01 27 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 288510 UTA 2009 12 13 23 00 00 3485-99 P C5H8 ARL -999.990 -999.990 D.. v1 2010 01 25 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 288507 UTA 2009 12 13 23 00 00 3486-99 P C5H8 ARL -999.990 -999.990 D.. v1 2010 01 25 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 288508 UTA 2009 12 20 23 30 00 1165-99 P C5H8 ARL 9.787 -999.990 ... v1 2010 02 05 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 289043 UTA 2009 12 20 23 30 00 1166-99 P C5H8 ARL 9.183 -999.990 ... v1 2010 02 05 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 289044 UTA 2009 12 29 17 50 00 4015-99 P C5H8 ARL 8.212 -999.990 ... v1 2010 02 05 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 289041 UTA 2009 12 29 17 50 00 4016-99 P C5H8 ARL -999.990 -999.990 D.. v1 2010 02 05 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 289042 UTA 2010 01 06 21 10 00 317-99 P C5H8 ARL -999.990 -999.990 D.. v1 2010 02 18 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 289831 UTA 2010 01 06 21 10 00 318-99 P C5H8 ARL -999.990 -999.990 D.. v1 2010 02 18 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 289832 UTA 2010 01 13 23 50 00 711-99 P C5H8 ARL -999.990 -999.990 D.. v1 2010 02 18 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 289829 UTA 2010 01 13 23 50 00 712-99 P C5H8 ARL -999.990 -999.990 D.. v1 2010 02 18 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 289830 UTA 2010 01 19 18 10 00 2181-99 P C5H8 ARL 10.501 -999.990 ... v1 2010 03 09 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 290495 UTA 2010 01 19 18 10 00 2182-99 P C5H8 ARL 19.533 -999.990 ... v1 2010 03 09 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 290496 UTA 2010 01 28 00 50 00 3943-99 P C5H8 ARL 8.131 -999.990 ... v1 2010 03 09 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 290493 UTA 2010 01 28 00 50 00 3944-99 P C5H8 ARL 9.132 -999.990 ... v1 2010 03 09 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 290494 UTA 2010 02 04 00 50 00 2775-99 P C5H8 ARL 35.010 -999.990 ... v1 2010 03 13 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 291430 UTA 2010 02 04 00 50 00 2776-99 P C5H8 ARL 29.898 -999.990 ... v1 2010 03 13 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 291431 UTA 2010 02 10 21 10 00 3023-99 P C5H8 ARL 23.980 -999.990 ... v1 2010 03 13 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 291428 UTA 2010 02 10 21 10 00 3024-99 P C5H8 ARL 14.053 -999.990 ... v1 2010 03 13 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 291429 UTA 2010 02 15 21 45 00 3163-99 P C5H8 ARL 17.623 -999.990 ... v1 2010 04 02 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 292265 UTA 2010 02 15 21 45 00 3164-99 P C5H8 ARL 18.356 -999.990 ... v1 2010 04 02 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 292266 UTA 2010 02 22 00 20 00 2577-99 P C5H8 ARL -999.990 -999.990 D.. v1 2010 03 31 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 292263 UTA 2010 02 22 00 20 00 2578-99 P C5H8 ARL 22.489 -999.990 ... v1 2010 03 31 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 292264 UTA 2010 02 28 23 55 00 1723-99 P C5H8 ARL 8.830 -999.990 ... v1 2010 04 06 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 292772 UTA 2010 02 28 23 55 00 1724-99 P C5H8 ARL -999.990 -999.990 D.. v1 2010 04 06 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 292773 UTA 2010 03 08 22 00 00 5081-99 P C5H8 ARL 11.723 -999.990 ... v1 2010 04 06 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 292770 UTA 2010 03 08 22 00 00 5082-99 P C5H8 ARL 14.478 -999.990 ... v1 2010 04 06 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 292771 UTA 2010 03 18 21 15 00 1187-99 P C5H8 ARL 28.046 -999.990 ... v1 2010 05 10 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 293547 UTA 2010 03 18 21 15 00 1188-99 P C5H8 ARL 23.945 -999.990 ... v1 2010 05 10 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 293548 UTA 2010 03 24 19 55 00 5159-99 P C5H8 ARL 8.884 -999.990 ... v1 2010 04 20 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 293549 UTA 2010 03 24 19 55 00 5160-99 P C5H8 ARL 12.280 -999.990 ... v1 2010 04 20 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 293550 UTA 2010 03 29 16 55 00 755-99 P C5H8 ARL 18.286 -999.990 ... v1 2010 04 29 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 294253 UTA 2010 03 29 16 55 00 756-99 P C5H8 ARL -999.990 -999.990 D.. v1 2010 04 29 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 294254 UTA 2010 04 03 15 25 00 3013-99 P C5H8 ARL 11.010 -999.990 ... v1 2010 04 29 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 294251 UTA 2010 04 03 15 25 00 3014-99 P C5H8 ARL 14.734 -999.990 ... v1 2010 04 29 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 294252 UTA 2010 04 09 17 15 00 981-99 P C5H8 ARL 34.955 -999.990 ... v1 2010 04 28 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 295046 UTA 2010 04 09 17 15 00 982-99 P C5H8 ARL 25.827 -999.990 ... v1 2010 04 28 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 295047 UTA 2010 04 15 21 50 00 4879-99 P C5H8 ARL 58.371 -999.990 P.. v1 2010 04 28 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 295044 UTA 2010 04 15 21 50 00 4880-99 P C5H8 ARL 23.208 -999.990 P.. v1 2010 04 28 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 295045 UTA 2010 04 21 02 10 00 107-99 P C5H8 ARL 30.853 -999.990 ... v1 2010 05 25 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 295938 UTA 2010 04 21 02 10 00 1753-99 P C5H8 ARL 41.897 -999.990 ... v1 2010 05 25 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 295939 UTA 2010 04 28 02 45 00 1561-99 P C5H8 ARL 18.740 -999.990 P.. v1 2010 06 22 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 295940 UTA 2010 04 28 02 45 00 2734-99 P C5H8 ARL 36.450 -999.990 P.. v1 2010 06 22 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 295941 UTA 2010 05 03 22 10 00 1079-99 P C5H8 ARL 37.298 -999.990 ... v1 2010 06 08 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 296819 UTA 2010 05 03 22 10 00 1080-99 P C5H8 ARL 26.826 -999.990 ... v1 2010 06 08 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 296820 UTA 2010 05 12 23 10 00 4197-99 P C5H8 ARL 58.097 -999.990 ... v1 2010 06 03 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 296821 UTA 2010 05 12 23 10 00 4198-99 P C5H8 ARL 74.765 -999.990 ... v1 2010 06 03 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 296822 UTA 2010 05 18 00 10 00 129-99 P C5H8 ARL 22.415 -999.990 ... v1 2010 06 23 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 297578 UTA 2010 05 18 00 10 00 130-99 P C5H8 ARL 23.848 -999.990 ... v1 2010 06 23 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 297579 UTA 2010 05 25 23 20 00 401-99 P C5H8 ARL 50.688 -999.990 P.. v1 2010 06 14 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 297580 UTA 2010 05 25 23 20 00 402-99 P C5H8 ARL 30.499 -999.990 P.. v1 2010 06 14 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 297581 UTA 2010 06 02 17 05 00 3303-99 P C5H8 ARL -999.990 -999.990 C.. v1 2010 06 21 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 298408 UTA 2010 06 02 17 05 00 3304-99 P C5H8 ARL 92.367 -999.990 ... v1 2010 06 21 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 298409 UTA 2010 06 08 19 20 00 3421-99 P C5H8 ARL 175.699 -999.990 ... v1 2010 06 21 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 298406 UTA 2010 06 08 19 20 00 3422-99 P C5H8 ARL 181.850 -999.990 ... v1 2010 06 21 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 298407 UTA 2010 06 16 20 40 00 3797-99 P C5H8 ARL 27.293 -999.990 ... v1 2010 07 05 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 299360 UTA 2010 06 16 20 40 00 3798-99 P C5H8 ARL 24.905 -999.990 ... v1 2010 07 05 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 299361 UTA 2010 06 23 22 50 00 4801-99 P C5H8 ARL 296.960 -999.990 ... v1 2010 07 05 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 299358 UTA 2010 06 23 22 50 00 4802-99 P C5H8 ARL 249.517 -999.990 ... v1 2010 07 05 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 299359 UTA 2010 06 30 16 35 00 201-99 P C5H8 ARL 37.094 -999.990 ... v1 2010 07 16 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 300130 UTA 2010 06 30 16 35 00 202-99 P C5H8 ARL 32.009 -999.990 ... v1 2010 07 16 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 300131 UTA 2010 07 07 23 30 00 1729-99 P C5H8 ARL 253.496 -999.990 ... v1 2010 07 23 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 300132 UTA 2010 07 07 23 30 00 1730-99 P C5H8 ARL 283.329 -999.990 ... v1 2010 07 23 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 300133 UTA 2010 09 15 16 15 00 3507-99 P C5H8 ARL 180.692 -999.990 P.. v1 2010 10 13 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 304838 UTA 2010 09 15 16 15 00 4929-99 P C5H8 ARL 133.086 -999.990 P.. v1 2010 10 13 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 304839 UTA 2010 09 22 15 20 00 3549-99 P C5H8 ARL 62.830 -999.990 ... v1 2010 10 26 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 304836 UTA 2010 09 22 15 20 00 3624-99 P C5H8 ARL 60.355 -999.990 ... v1 2010 10 26 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 304837 UTA 2010 09 30 22 35 00 811-99 P C5H8 ARL 302.401 -999.990 ... v1 2010 10 20 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 305685 UTA 2010 09 30 22 35 00 812-99 P C5H8 ARL 312.507 -999.990 ... v1 2010 10 20 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 305686 UTA 2010 10 06 16 55 00 3199-99 P C5H8 ARL 40.984 -999.990 ... v1 2010 10 20 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 305687 UTA 2010 10 06 16 55 00 3200-99 P C5H8 ARL 39.025 -999.990 ... v1 2010 10 20 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 305688 UTA 2010 10 13 15 50 00 2511-99 P C5H8 ARL 55.420 -999.990 ... v1 2010 11 02 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 306533 UTA 2010 10 13 15 50 00 2512-99 P C5H8 ARL 63.997 -999.990 ... v1 2010 11 02 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 306534 UTA 2010 10 20 20 00 00 441-99 P C5H8 ARL 169.657 -999.990 P.. v1 2010 11 18 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 306531 UTA 2010 10 20 20 00 00 442-99 P C5H8 ARL 98.594 -999.990 P.. v1 2010 11 18 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 306532 UTA 2010 10 27 00 20 00 1697-99 P C5H8 ARL 14.843 -999.990 ... v1 2010 11 12 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 307069 UTA 2010 10 27 00 20 00 2174-99 P C5H8 ARL 12.056 -999.990 ... v1 2010 11 12 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 307070 UTA 2010 11 02 20 15 00 1015-99 P C5H8 ARL 48.305 -999.990 ... v1 2010 11 16 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 307071 UTA 2010 11 02 20 15 00 1432-99 P C5H8 ARL 44.056 -999.990 ... v1 2010 11 16 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 307072 UTA 2010 11 09 18 35 00 5083-99 P C5H8 ARL 16.717 -999.990 ... v1 2010 11 29 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 308093 UTA 2010 11 09 18 35 00 5084-99 P C5H8 ARL 26.663 -999.990 ... v1 2010 11 29 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 308094 UTA 2010 11 16 20 50 00 5055-99 P C5H8 ARL 12.411 -999.990 ... v1 2010 11 30 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 308091 UTA 2010 11 16 20 50 00 5056-99 P C5H8 ARL 14.634 -999.990 ... v1 2010 11 30 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 308092 UTA 2010 11 22 17 10 00 2087-99 P C5H8 ARL 34.687 -999.990 ... v1 2010 12 29 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 309531 UTA 2010 11 22 17 10 00 2088-99 P C5H8 ARL 39.057 -999.990 ... v1 2010 12 29 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 309532 UTA 2010 12 06 20 00 00 3339-99 P C5H8 ARL 61.439 -999.990 ... v1 2010 12 29 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 309533 UTA 2010 12 06 20 00 00 3340-99 P C5H8 ARL 52.959 -999.990 ... v1 2010 12 29 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 309534 UTA 2010 12 14 21 35 00 3543-99 P C5H8 ARL 11.054 -999.990 ... v1 2011 01 14 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 310112 UTA 2010 12 14 21 35 00 3544-99 P C5H8 ARL 10.503 -999.990 ... v1 2011 01 14 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 310113 UTA 2010 12 23 22 20 00 2859-99 P C5H8 ARL 19.875 -999.990 ... v1 2011 01 14 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 310110 UTA 2010 12 23 22 20 00 2860-99 P C5H8 ARL 20.623 -999.990 ... v1 2011 01 14 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 310111 UTA 2010 12 29 23 15 00 317-99 P C5H8 ARL 20.814 -999.990 ... v1 2010 12 29 23 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 311080 UTA 2010 12 29 23 15 00 772-99 P C5H8 ARL 16.013 -999.990 ... v1 2010 12 29 23 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 311081 UTA 2011 01 11 22 05 00 1315-99 P C5H8 ARL 21.359 -999.990 ... v1 2011 01 11 22 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 311078 UTA 2011 01 11 22 05 00 3227-99 P C5H8 ARL 29.846 -999.990 ... v1 2011 01 11 22 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 311079 UTA 2011 01 18 17 10 00 5383-99 P C5H8 ARL -999.990 -999.990 D.. v1 2011 02 17 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 312190 UTA 2011 01 18 17 10 00 5384-99 P C5H8 ARL -999.990 -999.990 D.. v1 2011 02 17 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 312191 UTA 2011 01 28 00 10 00 5385-99 P C5H8 ARL -999.990 -999.990 D.. v1 2011 02 17 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 312188 UTA 2011 01 28 00 10 00 5386-99 P C5H8 ARL -999.990 -999.990 D.. v1 2011 02 17 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 312189 UTA 2011 01 31 22 40 00 1210-99 P C5H8 ARL -999.990 -999.990 D.. v1 2011 02 28 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 312896 UTA 2011 01 31 22 40 00 1837-99 P C5H8 ARL -999.990 -999.990 D.. v1 2011 02 28 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 312897 UTA 2011 02 07 22 30 00 2891-99 P C5H8 ARL -999.990 -999.990 D.. v1 2011 02 28 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 312898 UTA 2011 02 07 22 30 00 6156-66 P C5H8 ARL -999.990 -999.990 D.. v1 2011 02 28 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 312899 UTA 2011 02 15 00 20 00 2694-99 P C5H8 ARL -999.990 -999.990 D.. v1 2011 03 07 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 313528 UTA 2011 02 15 00 20 00 2933-99 P C5H8 ARL -999.990 -999.990 D.. v1 2011 03 07 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 313529 UTA 2011 02 22 17 40 00 4629-99 P C5H8 ARL -999.990 -999.990 D.. v1 2011 03 07 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 313526 UTA 2011 02 22 17 40 00 4694-99 P C5H8 ARL -999.990 -999.990 D.. v1 2011 03 07 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 313527 UTA 2011 02 26 18 35 00 4701-99 P C5H8 ARL -999.990 -999.990 D.. v1 2011 03 23 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 314116 UTA 2011 02 26 18 35 00 4702-99 P C5H8 ARL -999.990 -999.990 D.. v1 2011 03 23 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 314117 UTA 2011 03 07 23 20 00 5167-99 P C5H8 ARL -999.990 -999.990 D.. v1 2011 03 24 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 314114 UTA 2011 03 07 23 20 00 5168-99 P C5H8 ARL -999.990 -999.990 D.. v1 2011 03 24 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 314115 UTA 2011 03 13 23 00 00 2720-99 P C5H8 ARL -999.990 -999.990 D.. v1 2011 04 05 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 314901 UTA 2011 03 13 23 00 00 3833-99 P C5H8 ARL -999.990 -999.990 D.. v1 2011 04 05 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 314902 UTA 2011 03 21 00 30 00 1426-99 P C5H8 ARL -999.990 -999.990 D.. v1 2011 04 04 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 314899 UTA 2011 03 21 00 30 00 1470-99 P C5H8 ARL -999.990 -999.990 D.. v1 2011 04 04 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 314900 UTA 2011 03 28 00 20 00 1136-99 P C5H8 ARL 13.946 -999.990 ... v1 2011 04 12 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 315493 UTA 2011 03 28 00 20 00 589-99 P C5H8 ARL 14.857 -999.990 ... v1 2011 04 12 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 315492 UTA 2011 04 04 01 10 00 3600-99 P C5H8 ARL -999.990 -999.990 D.. v1 2011 04 12 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 315490 UTA 2011 04 04 01 10 00 4265-99 P C5H8 ARL 9.350 -999.990 ... v1 2011 04 12 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 315491 UTA 2011 04 11 15 45 00 2925-99 P C5H8 ARL -999.990 -999.990 D.. v1 2011 05 10 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 316558 UTA 2011 04 11 15 45 00 2926-99 P C5H8 ARL -999.990 -999.990 D.. v1 2011 05 10 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 316559 UTA 2011 04 16 22 30 00 3215-99 P C5H8 ARL 22.060 -999.990 ... v1 2011 05 11 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 316556 UTA 2011 04 16 22 30 00 3216-99 P C5H8 ARL 27.325 -999.990 ... v1 2011 05 11 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 316557 UTA 2011 04 25 15 15 00 6529-66 P C5H8 ARL 12.414 -999.990 ... v1 2011 05 23 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 317322 UTA 2011 04 25 15 15 00 6530-66 P C5H8 ARL -999.990 -999.990 D.. v1 2011 05 23 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 317323 UTA 2011 05 01 23 50 00 2391-99 P C5H8 ARL 14.219 -999.990 ... v1 2011 05 18 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 317320 UTA 2011 05 01 23 50 00 2392-99 P C5H8 ARL -999.990 -999.990 D.. v1 2011 05 18 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 317321 UTA 2011 05 09 16 50 00 1337-99 P C5H8 ARL -999.990 -999.990 D.. v1 2011 05 27 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 317914 UTA 2011 05 09 16 50 00 1754-99 P C5H8 ARL -999.990 -999.990 D.. v1 2011 05 27 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 317915 UTA 2011 05 15 21 20 00 2498-99 P C5H8 ARL 10.574 -999.990 ... v1 2011 05 27 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 317913 UTA 2011 05 15 21 20 00 510-99 P C5H8 ARL 12.640 -999.990 ... v1 2011 05 27 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 317912 UTA 2011 05 23 16 35 00 2910-99 P C5H8 ARL -999.990 -999.990 D.. v1 2011 06 28 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 318685 UTA 2011 05 23 16 35 00 912-99 P C5H8 ARL -999.990 -999.990 D.. v1 2011 06 28 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 318684 UTA 2011 05 31 01 20 00 4992-99 P C5H8 ARL 21.374 -999.990 ... v1 2011 06 16 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 318686 UTA 2011 05 31 01 20 00 6258-66 P C5H8 ARL 12.199 -999.990 ... v1 2011 06 16 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 318687 UTA 2011 06 06 16 00 00 1778-99 P C5H8 ARL -999.990 -999.990 D.. v1 2011 07 11 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 319254 UTA 2011 06 06 16 00 00 235-99 P C5H8 ARL -999.990 -999.990 D.. v1 2011 07 11 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 319255 UTA 2011 06 13 03 05 00 1835-99 P C5H8 ARL -999.990 -999.990 D.. v1 2011 07 11 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 319253 UTA 2011 06 13 03 05 00 2534-99 P C5H8 ARL -999.990 -999.990 D.. v1 2011 07 11 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 319252 UTA 2011 06 20 03 15 00 2929-99 P C5H8 ARL 10.787 -999.990 ... v1 2011 07 26 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 320118 UTA 2011 06 20 03 15 00 2930-99 P C5H8 ARL 15.145 -999.990 ... v1 2011 07 26 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 320119 UTA 2011 06 28 23 30 00 43-99 P C5H8 ARL 60.225 -999.990 ... v1 2011 07 27 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 320116 UTA 2011 06 28 23 30 00 44-99 P C5H8 ARL 50.251 -999.990 ... v1 2011 07 27 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 320117 UTA 2011 07 06 03 20 00 115-99 P C5H8 ARL 11.000 -999.990 ... v1 2011 08 12 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 321350 UTA 2011 07 06 03 20 00 116-99 P C5H8 ARL 11.841 -999.990 ... v1 2011 08 12 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 321351 UTA 2011 07 18 16 30 00 987-99 P C5H8 ARL 30.103 -999.990 ... v1 2011 08 12 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 321348 UTA 2011 07 18 16 30 00 988-99 P C5H8 ARL 27.671 -999.990 ... v1 2011 08 12 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 321349 UTA 2011 07 23 16 30 00 6139-66 P C5H8 ARL 447.784 -999.990 ... v1 2011 08 26 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 321771 UTA 2011 07 23 16 30 00 6140-66 P C5H8 ARL 506.645 -999.990 ... v1 2011 08 26 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 321772 UTA 2011 08 01 00 00 00 4889-99 P C5H8 ARL 492.764 -999.990 ... v1 2011 08 26 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 321773 UTA 2011 08 01 00 00 00 4890-99 P C5H8 ARL 409.202 -999.990 ... v1 2011 08 26 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 321774 UTA 2011 08 02 22 10 00 705-99 P C5H8 ARL 329.988 -999.990 P.. v1 2011 08 29 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 322302 UTA 2011 08 02 22 10 00 706-99 P C5H8 ARL 225.364 -999.990 P.. v1 2011 08 29 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 322303 UTA 2011 08 08 22 35 00 3339-99 P C5H8 ARL 2605.979 -999.990 P.. v1 2011 08 29 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 322304 UTA 2011 08 08 22 35 00 3340-99 P C5H8 ARL 1333.806 -999.990 P.. v1 2011 08 29 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 322305 UTA 2011 08 20 01 40 00 2341-99 P C5H8 ARL 371.470 -999.990 P.. v1 2011 09 12 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 323101 UTA 2011 08 20 01 40 00 2342-99 P C5H8 ARL 250.156 -999.990 P.. v1 2011 09 12 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 323102 UTA 2011 08 30 17 30 00 1825-99 P C5H8 ARL 23.212 -999.990 ... v1 2011 09 12 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 323099 UTA 2011 08 30 17 30 00 1826-99 P C5H8 ARL 22.649 -999.990 ... v1 2011 09 12 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 323100 UTA 2011 09 05 21 25 00 5189-99 P C5H8 ARL 40.906 -999.990 P.. v1 2011 10 04 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 323837 UTA 2011 09 05 21 25 00 5190-99 P C5H8 ARL 20.401 -999.990 P.. v1 2011 10 04 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 323838 UTA 2011 09 10 01 30 00 5359-99 P C5H8 ARL 25.431 -999.990 ... v1 2011 10 04 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 323839 UTA 2011 09 10 01 30 00 5360-99 P C5H8 ARL 17.227 -999.990 ... v1 2011 10 04 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 323840 UTA 2011 09 15 16 40 00 565-99 P C5H8 ARL 19.290 -999.990 P.. v1 2011 10 10 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 324391 UTA 2011 09 15 16 40 00 566-99 P C5H8 ARL 48.124 -999.990 P.. v1 2011 10 10 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 324392 UTA 2011 09 23 18 10 00 3267-99 P C5H8 ARL 301.563 -999.990 ... v1 2011 10 10 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 324389 UTA 2011 09 23 18 10 00 3268-99 P C5H8 ARL 272.371 -999.990 ... v1 2011 10 10 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 324390 UTA 2011 10 05 18 10 00 3977-99 P C5H8 ARL -999.990 -999.990 D.. v1 2011 11 09 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 325571 UTA 2011 10 05 18 10 00 5059-99 P C5H8 ARL -999.990 -999.990 D.. v1 2011 11 09 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 325572 UTA 2011 10 14 17 45 00 222-99 P C5H8 ARL 144.361 -999.990 ... v1 2011 11 09 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 325574 UTA 2011 10 14 17 45 00 304-99 P C5H8 ARL 121.448 -999.990 ... v1 2011 11 09 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 325573 UTA 2011 10 18 21 45 00 3631-99 P C5H8 ARL 36.439 -999.990 ... v1 2011 11 21 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 326177 UTA 2011 10 18 21 45 00 3710-99 P C5H8 ARL 34.774 -999.990 ... v1 2011 11 21 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 326176 UTA 2011 10 24 18 40 00 4268-99 P C5H8 ARL -999.990 -999.990 D.. v1 2011 11 21 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 326179 UTA 2011 10 24 18 40 00 665-99 P C5H8 ARL 9.648 -999.990 ... v1 2011 11 21 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 326178 UTA 2011 11 02 19 45 00 5041-99 P C5H8 ARL -999.990 -999.990 D.. v1 2011 12 09 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 326857 UTA 2011 11 02 19 45 00 5042-99 P C5H8 ARL -999.990 -999.990 D.. v1 2011 12 09 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 326858 UTA 2011 11 09 23 30 00 2409-99 P C5H8 ARL -999.990 -999.990 D.. v1 2011 12 09 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 326859 UTA 2011 11 09 23 30 00 2410-99 P C5H8 ARL -999.990 -999.990 D.. v1 2011 12 09 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 326860 UTA 2011 11 18 20 55 00 3367-99 P C5H8 ARL -999.990 -999.990 D.. v1 2011 12 28 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 327820 UTA 2011 11 18 20 55 00 3368-99 P C5H8 ARL -999.990 -999.990 D.. v1 2011 12 28 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 327821 UTA 2011 11 28 23 50 00 4473-99 P C5H8 ARL 13.093 -999.990 ... v1 2011 12 28 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 327822 UTA 2011 11 28 23 50 00 4474-99 P C5H8 ARL 10.332 -999.990 ... v1 2011 12 28 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 327823 UTA 2011 12 06 00 15 00 3003-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 01 20 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 328778 UTA 2011 12 06 00 15 00 5397-99 P C5H8 ARL 8.848 -999.990 ... v1 2012 01 20 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 328779 UTA 2011 12 17 20 20 00 1499-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 01 20 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 328781 UTA 2011 12 17 20 20 00 65-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 01 20 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 328780 UTA 2011 12 22 17 10 00 311-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 01 19 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 328868 UTA 2011 12 22 17 10 00 940-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 01 19 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 328869 UTA 2011 12 27 20 20 00 2604-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 01 19 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 328870 UTA 2011 12 27 20 20 00 926-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 01 19 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 328871 UTA 2012 01 03 21 20 00 3000-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 02 03 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 329635 UTA 2012 01 03 21 20 00 6129-66 P C5H8 ARL -999.990 -999.990 D.. v1 2012 02 03 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 329634 UTA 2012 01 09 18 05 00 3893-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 02 03 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 329636 UTA 2012 01 09 18 05 00 956-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 02 03 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 329637 UTA 2012 01 16 01 10 00 1477-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 02 12 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 330414 UTA 2012 01 16 01 10 00 1478-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 02 12 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 330415 UTA 2012 01 23 18 40 00 1577-99 P C5H8 ARL 10.635 -999.990 ... v1 2012 02 15 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 330416 UTA 2012 01 23 18 40 00 1578-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 02 15 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 330417 UTA 2012 01 30 17 00 00 4074-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 02 27 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 331186 UTA 2012 01 30 17 00 00 5191-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 02 27 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 331187 UTA 2012 02 07 01 00 00 1744-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 02 27 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 331188 UTA 2012 02 07 01 00 00 2616-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 02 27 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 331189 UTA 2012 02 16 01 20 00 3971-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 03 14 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 332107 UTA 2012 02 16 01 20 00 3972-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 03 14 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 332108 UTA 2012 02 21 20 00 00 3143-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 03 16 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 332105 UTA 2012 02 21 20 00 00 3144-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 03 16 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 332106 UTA 2012 02 27 21 35 00 4053-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 04 06 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 332696 UTA 2012 02 27 21 35 00 4334-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 04 06 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 332697 UTA 2012 03 06 01 40 00 4293-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 04 05 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 332698 UTA 2012 03 06 01 40 00 4950-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 04 05 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 332699 UTA 2012 03 11 21 35 00 3139-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 04 04 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 333143 UTA 2012 03 11 21 35 00 3554-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 04 04 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 333144 UTA 2012 03 17 20 20 00 2938-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 04 04 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 333146 UTA 2012 03 17 20 20 00 348-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 04 04 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 333145 UTA 2012 03 26 00 05 00 3801-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 04 19 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 333540 UTA 2012 03 26 00 05 00 3802-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 04 19 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 333541 UTA 2012 03 31 20 00 00 2800-99 P C5H8 ARL 8.496 -999.990 ... v1 2012 05 03 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 334140 UTA 2012 03 31 20 00 00 3445-99 P C5H8 ARL 9.280 -999.990 ... v1 2012 05 03 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 334139 UTA 2012 04 06 23 35 00 2920-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 05 03 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 334141 UTA 2012 04 06 23 35 00 4005-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 05 03 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 334142 UTA 2012 04 13 22 50 00 6139-66 P C5H8 ARL 13.188 -999.990 ... v1 2012 05 16 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 334607 UTA 2012 04 13 22 50 00 6140-66 P C5H8 ARL 11.241 -999.990 ... v1 2012 05 16 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 334608 UTA 2012 04 20 00 20 00 3721-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 05 16 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 334605 UTA 2012 04 20 00 20 00 3722-99 P C5H8 ARL 8.359 -999.990 ... v1 2012 05 16 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 334606 UTA 2012 04 26 20 40 00 2683-99 P C5H8 ARL 11.739 -999.990 ... v1 2012 06 01 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 335252 UTA 2012 04 26 20 40 00 2684-99 P C5H8 ARL 12.570 -999.990 ... v1 2012 06 01 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 335251 UTA 2012 05 02 22 25 00 1661-99 P C5H8 ARL 425.658 -999.990 ... v1 2012 05 31 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 335253 UTA 2012 05 02 22 25 00 1662-99 P C5H8 ARL 355.254 -999.990 ... v1 2012 05 31 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 335254 UTA 2012 05 11 21 00 00 1369-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 06 07 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 335855 UTA 2012 05 11 21 00 00 5356-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 06 07 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 335856 UTA 2012 05 18 02 15 00 4619-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 06 07 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 335853 UTA 2012 05 18 02 15 00 4913-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 06 07 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 335854 UTA 2012 05 29 19 35 00 5403-99 P C5H8 ARL 86.243 -999.990 ... v1 2012 07 28 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 336939 UTA 2012 05 29 19 35 00 5404-99 P C5H8 ARL 86.718 -999.990 ... v1 2012 07 28 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 336940 UTA 2012 06 05 01 55 00 5217-99 P C5H8 ARL 107.468 -999.990 P.. v1 2012 07 28 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 336941 UTA 2012 06 05 01 55 00 5218-99 P C5H8 ARL 50.854 -999.990 P.. v1 2012 07 28 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 336942 UTA 2012 06 13 03 35 00 4721-99 P C5H8 ARL 17.909 -999.990 ... v1 2012 07 28 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 337741 UTA 2012 06 13 03 35 00 6179-66 P C5H8 ARL 24.427 -999.990 ... v1 2012 07 28 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 337742 UTA 2012 06 20 01 50 00 191-99 P C5H8 ARL 144.571 -999.990 P.. v1 2012 08 03 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 337743 UTA 2012 06 20 01 50 00 974-99 P C5H8 ARL 98.515 -999.990 P.. v1 2012 08 03 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 337744 UTA 2012 07 02 01 35 00 2477-99 P C5H8 ARL 22.606 -999.990 P.. v1 2012 07 31 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 338077 UTA 2012 07 02 01 35 00 2478-99 P C5H8 ARL 109.678 -999.990 P.. v1 2012 07 31 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 338076 UTA 2012 07 06 16 05 00 2-99 P C5H8 ARL 173.626 -999.990 ... v1 2012 08 20 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 338612 UTA 2012 07 06 16 05 00 2462-99 P C5H8 ARL 171.453 -999.990 ... v1 2012 08 20 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 338613 UTA 2012 07 13 00 55 00 3037-99 P C5H8 ARL 172.947 -999.990 ... v1 2012 08 17 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 338610 UTA 2012 07 13 00 55 00 3550-99 P C5H8 ARL 145.135 -999.990 ... v1 2012 08 17 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 338611 UTA 2012 07 19 01 55 00 3813-99 P C5H8 ARL 65.985 -999.990 ... v1 2012 09 07 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 339176 UTA 2012 07 19 01 55 00 3814-99 P C5H8 ARL 54.435 -999.990 ... v1 2012 09 07 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 339177 UTA 2012 07 23 19 50 00 2839-99 P C5H8 ARL 13.403 -999.990 ... v1 2012 09 07 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 339174 UTA 2012 07 23 19 50 00 2840-99 P C5H8 ARL 11.703 -999.990 ... v1 2012 09 07 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 339175 UTA 2012 07 30 02 45 00 1797-99 P C5H8 ARL 107.249 -999.990 ... v1 2012 09 07 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 339575 UTA 2012 07 30 02 45 00 1798-99 P C5H8 ARL 108.858 -999.990 ... v1 2012 09 07 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 339576 UTA 2012 08 17 14 40 00 451-99 P C5H8 ARL 836.601 -999.990 ... v1 2012 09 19 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 340432 UTA 2012 08 17 14 40 00 4844-99 P C5H8 ARL 682.859 -999.990 ... v1 2012 09 19 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 340433 UTA 2012 08 23 23 30 00 2370-99 P C5H8 ARL 57.323 -999.990 ... v1 2012 10 15 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 340798 UTA 2012 08 23 23 30 00 2370-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 10 25 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 340798 UTA 2012 08 23 23 30 00 2456-99 P C5H8 ARL 48.849 -999.990 ... v1 2012 10 15 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 340799 UTA 2012 08 23 23 30 00 2456-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 10 25 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 340799 UTA 2012 08 29 00 10 00 3193-99 P C5H8 ARL 46.112 -999.990 ... v1 2012 10 15 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 340796 UTA 2012 08 29 00 10 00 3193-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 10 26 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 340796 UTA 2012 08 29 00 10 00 4849-99 P C5H8 ARL 29.975 -999.990 ... v1 2012 10 15 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 340797 UTA 2012 08 29 00 10 00 4849-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 10 26 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 340797 UTA 2012 09 06 16 35 00 3269-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 10 16 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 341308 UTA 2012 09 06 16 35 00 3270-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 10 16 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 341309 UTA 2012 09 10 17 05 00 4533-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 10 16 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 341306 UTA 2012 09 10 17 05 00 4534-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 10 16 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 341307 UTA 2012 09 24 15 00 00 3479-99 P C5H8 ARL 40.946 -999.990 ... v1 2012 10 17 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 342175 UTA 2012 09 24 15 00 00 3480-99 P C5H8 ARL 43.161 -999.990 ... v1 2012 10 17 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 342174 UTA 2012 09 27 16 55 00 1219-99 P C5H8 ARL 77.892 -999.990 ... v1 2012 10 31 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 342526 UTA 2012 09 27 16 55 00 2176-99 P C5H8 ARL 71.854 -999.990 ... v1 2012 10 31 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 342527 UTA 2012 10 05 16 55 00 1744-99 P C5H8 ARL 27.274 -999.990 ... v1 2012 11 09 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 342528 UTA 2012 10 05 16 55 00 4074-99 P C5H8 ARL 29.781 -999.990 ... v1 2012 11 09 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 342529 UTA 2012 10 10 19 00 00 1218-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 11 05 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 343046 UTA 2012 10 10 19 00 00 734-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 11 05 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 343045 UTA 2012 10 15 20 10 00 4071-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 11 06 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 343043 UTA 2012 10 15 20 10 00 4629-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 11 06 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 343044 UTA 2012 11 05 17 00 00 2975-99 P C5H8 ARL 18.697 -999.990 ... v1 2012 12 07 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 344107 UTA 2012 11 05 17 00 00 2976-99 P C5H8 ARL 10.663 -999.990 ... v1 2012 12 07 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 344108 UTA 2012 11 13 16 00 00 2321-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 12 31 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 344105 UTA 2012 11 13 16 00 00 2322-99 P C5H8 ARL -999.990 -999.990 D.. v1 2012 12 31 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 344106 UTA 2012 11 20 16 20 00 199-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 03 15 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 344961 UTA 2012 11 20 16 20 00 200-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 03 15 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 344962 UTA 2012 11 26 19 00 00 3339-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 03 13 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 344971 UTA 2012 11 26 19 00 00 3340-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 03 13 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 344972 UTA 2012 12 02 00 05 00 2437-99 P C5H8 ARL 8.897 -999.990 ... v1 2013 03 17 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 345080 UTA 2012 12 02 00 05 00 2438-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 03 17 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 345081 UTA 2012 12 08 23 55 00 2755-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 01 06 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 345078 UTA 2012 12 08 23 55 00 2756-99 P C5H8 ARL 9.323 -999.990 ... v1 2013 01 06 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 345079 UTA 2012 12 13 22 05 00 3147-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 03 11 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 345570 UTA 2012 12 13 22 05 00 3148-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 03 11 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 345571 UTA 2012 12 19 19 38 00 3111-99 P C5H8 ARL 12.210 -999.990 ... v1 2013 02 15 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 345742 UTA 2012 12 19 19 38 00 3112-99 P C5H8 ARL 14.981 -999.990 ... v1 2013 02 15 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 345743 UTA 2012 12 27 22 20 00 1561-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 03 13 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 346089 UTA 2012 12 27 22 20 00 2272-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 03 13 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 346090 UTA 2012 12 31 20 35 00 3210-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 02 23 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 346091 UTA 2012 12 31 20 35 00 6017-66 P C5H8 ARL -999.990 -999.990 D.. v1 2013 02 23 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 346092 UTA 2013 01 07 00 35 00 3985-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 01 31 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 346477 UTA 2013 01 07 00 35 00 3986-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 01 31 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 346478 UTA 2013 01 10 16 36 00 2197-99 P C5H8 ARL 29.205 -999.990 ... v1 2013 02 05 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 346469 UTA 2013 01 10 16 36 00 2198-99 P C5H8 ARL 26.930 -999.990 ... v1 2013 02 05 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 346470 UTA 2013 01 21 22 25 00 3852-99 P C5H8 ARL 18.664 -999.990 ... v1 2013 02 11 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 347089 UTA 2013 01 21 22 25 00 4613-99 P C5H8 ARL 16.996 -999.990 ... v1 2013 02 11 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 347090 UTA 2013 01 25 18 18 00 2534-99 P C5H8 ARL 16.974 -999.990 ... v1 2013 02 11 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 347088 UTA 2013 01 25 18 18 00 3609-99 P C5H8 ARL 17.207 -999.990 ... v1 2013 02 11 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 347087 UTA 2013 01 31 18 25 00 3075-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 02 21 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 347520 UTA 2013 01 31 18 25 00 3632-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 02 21 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 347521 UTA 2013 02 04 00 40 00 2300-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 02 20 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 347522 UTA 2013 02 04 00 40 00 3346-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 02 20 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 347523 UTA 2013 02 11 01 40 00 3179-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 03 07 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 348098 UTA 2013 02 11 01 40 00 3180-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 03 07 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 348097 UTA 2013 02 16 22 45 00 2321-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 03 07 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 348099 UTA 2013 02 16 22 45 00 2322-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 03 07 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 348100 UTA 2013 02 23 00 25 00 5337-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 03 20 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 348451 UTA 2013 02 23 00 25 00 5338-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 03 20 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 348452 UTA 2013 02 28 19 00 00 3177-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 03 20 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 348449 UTA 2013 02 28 19 00 00 3178-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 03 20 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 348450 UTA 2013 03 04 01 10 00 2197-99 P C5H8 ARL 11.734 -999.990 ... v1 2013 04 01 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 348737 UTA 2013 03 04 01 10 00 2198-99 P C5H8 ARL 14.046 -999.990 ... v1 2013 04 01 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 348738 UTA 2013 03 16 17 35 00 5245-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 04 04 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 349326 UTA 2013 03 16 17 35 00 5246-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 04 04 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 349327 UTA 2013 03 22 01 36 00 4703-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 04 04 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 349324 UTA 2013 03 22 01 36 00 4704-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 04 04 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 349325 UTA 2013 03 30 00 32 00 303-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 04 28 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 349959 UTA 2013 03 30 00 32 00 974-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 04 28 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 349960 UTA 2013 04 02 23 30 00 2555-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 04 26 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 349957 UTA 2013 04 02 23 30 00 4947-99 P C5H8 ARL 11.579 -999.990 ... v1 2013 04 26 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 349958 UTA 2013 04 08 19 20 00 1049-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 05 22 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 350583 UTA 2013 04 08 19 20 00 967-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 05 22 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 350582 UTA 2013 04 16 02 32 00 2389-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 05 22 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 350580 UTA 2013 04 16 02 32 00 3665-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 05 22 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 350581 UTA 2013 04 23 02 48 00 1855-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 06 13 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 351392 UTA 2013 04 23 02 48 00 2742-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 06 13 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 351393 UTA 2013 05 01 14 10 00 3734-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 06 18 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 351390 UTA 2013 05 01 14 10 00 4357-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 06 18 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 351391 UTA 2013 05 06 18 55 00 3057-99 P C5H8 ARL 9.599 -999.990 ... v1 2013 06 12 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 352080 UTA 2013 05 06 18 55 00 3628-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 06 12 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 352081 UTA 2013 05 13 17 25 00 4555-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 06 11 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 352082 UTA 2013 05 13 17 25 00 5069-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 06 11 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 352083 UTA 2013 05 20 17 30 00 1325-99 P C5H8 ARL 89.268 -999.990 ... v1 2013 06 14 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 352606 UTA 2013 05 20 17 30 00 264-99 P C5H8 ARL 96.045 -999.990 ... v1 2013 06 14 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 352605 UTA 2013 05 25 19 56 00 3297-99 P C5H8 ARL 17.308 -999.990 ... v1 2013 06 14 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 352603 UTA 2013 05 25 19 56 00 3961-99 P C5H8 ARL 13.210 -999.990 ... v1 2013 06 14 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 352604 UTA 2013 05 31 16 28 00 3453-99 P C5H8 ARL 74.547 -999.990 ... v1 2013 06 28 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 353271 UTA 2013 05 31 16 28 00 3454-99 P C5H8 ARL 73.838 -999.990 ... v1 2013 06 28 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 353272 UTA 2013 06 07 00 10 00 1951-99 P C5H8 ARL 604.031 -999.990 ... v1 2013 06 28 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 353269 UTA 2013 06 07 00 10 00 1952-99 P C5H8 ARL 673.180 -999.990 ... v1 2013 06 28 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 353270 UTA 2013 06 13 00 38 00 2316-99 P C5H8 ARL 12.266 -999.990 ... v1 2013 09 05 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 353779 UTA 2013 06 13 00 38 00 2794-99 P C5H8 ARL 10.881 -999.990 ... v1 2013 09 05 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 353780 UTA 2013 06 18 20 42 00 3533-99 P C5H8 ARL 46.995 -999.990 ... v1 2013 09 05 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 353778 UTA 2013 06 18 20 42 00 4595-99 P C5H8 ARL 43.889 -999.990 ... v1 2013 09 05 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 353777 UTA 2013 06 27 17 21 00 4191-99 P C5H8 ARL 1943.799 -999.990 P.. v1 2013 08 24 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 354431 UTA 2013 06 27 17 21 00 4192-99 P C5H8 ARL 2303.000 -999.990 P.. v1 2013 08 24 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 354432 UTA 2013 07 04 02 55 00 611-99 P C5H8 ARL 23.748 -999.990 ... v1 2013 08 24 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 354429 UTA 2013 07 04 02 55 00 612-99 P C5H8 ARL 30.024 -999.990 ... v1 2013 08 24 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 354430 UTA 2013 07 10 01 55 00 4985-99 P C5H8 ARL 332.765 -999.990 P.. v1 2013 08 29 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 355182 UTA 2013 07 10 01 55 00 4986-99 P C5H8 ARL 172.637 -999.990 P.. v1 2013 08 29 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 355183 UTA 2013 07 17 02 45 00 991-99 P C5H8 ARL 53.971 -999.990 ... v1 2013 09 10 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 355180 UTA 2013 07 17 02 45 00 992-99 P C5H8 ARL 53.181 -999.990 ... v1 2013 09 10 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 355181 UTA 2013 07 23 22 35 00 2425-99 P C5H8 ARL 3334.660 -999.990 ... v1 2013 09 18 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 355816 UTA 2013 07 23 22 35 00 937-99 P C5H8 ARL 3927.474 -999.990 ... v1 2013 09 18 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 355815 UTA 2013 07 30 03 40 00 3609-99 P C5H8 ARL 28.820 -999.990 ... v1 2013 09 18 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 355814 UTA 2013 07 30 03 40 00 4610-99 P C5H8 ARL 26.497 -999.990 ... v1 2013 09 18 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 355813 UTA 2013 08 04 21 40 00 1675-99 P C5H8 ARL 615.959 -999.990 ... v1 2013 08 30 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 356284 UTA 2013 08 04 21 40 00 1676-99 P C5H8 ARL 613.303 -999.990 ... v1 2013 08 30 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 356285 UTA 2013 08 12 15 18 00 4851-99 P C5H8 ARL 30.143 -999.990 ... v1 2013 09 20 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 356282 UTA 2013 08 12 15 18 00 4852-99 P C5H8 ARL 29.793 -999.990 ... v1 2013 09 20 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 356283 UTA 2013 08 20 02 44 00 1289-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 10 09 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 357091 UTA 2013 08 20 02 44 00 1290-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 10 09 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 357092 UTA 2013 08 26 01 55 00 4239-99 P C5H8 ARL 8.994 -999.990 ... v1 2013 10 09 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 357108 UTA 2013 08 26 01 55 00 4240-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 10 09 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 357109 UTA 2013 09 03 00 56 00 4557-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 10 22 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 357686 UTA 2013 09 03 00 56 00 4558-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 10 22 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 357687 UTA 2013 09 07 00 49 00 3393-99 P C5H8 ARL 70.991 -999.990 ... v1 2013 10 25 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 357684 UTA 2013 09 07 00 49 00 3394-99 P C5H8 ARL 76.273 -999.990 ... v1 2013 10 25 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 357685 UTA 2013 09 13 02 30 00 4136-99 P C5H8 ARL 41.417 -999.990 ... v1 2013 12 27 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 358203 UTA 2013 09 13 02 30 00 4992-99 P C5H8 ARL 43.717 -999.990 ... v1 2013 12 27 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 358204 UTA 2013 09 17 22 01 00 4751-99 P C5H8 ARL 19.845 -999.990 ... v1 2013 10 31 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 358201 UTA 2013 09 17 22 01 00 6098-66 P C5H8 ARL 12.079 -999.990 ... v1 2013 10 31 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 358202 UTA 2013 09 24 22 25 00 1059-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 11 06 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 358612 UTA 2013 09 24 22 25 00 1060-99 P C5H8 ARL 8.114 -999.990 ... v1 2013 11 06 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 358613 UTA 2013 09 30 01 42 00 1255-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 11 06 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 358610 UTA 2013 09 30 01 42 00 1256-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 11 06 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 358611 UTA 2013 10 06 00 10 00 4494-99 P C5H8 ARL 8.358 -999.990 ... v1 2013 11 15 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 358913 UTA 2013 10 06 00 10 00 4763-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 11 15 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 358914 UTA 2013 10 11 21 45 00 3545-99 P C5H8 ARL 9.622 -999.990 ... v1 2013 11 15 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 358911 UTA 2013 10 11 21 45 00 4775-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 11 15 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 358912 UTA 2013 10 17 20 50 00 4985-99 P C5H8 ARL 9.551 -999.990 ... v1 2013 11 13 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 359358 UTA 2013 10 17 20 50 00 4986-99 P C5H8 ARL 10.571 -999.990 ... v1 2013 11 13 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 359359 UTA 2013 10 23 17 00 00 5043-99 P C5H8 ARL 12.053 -999.990 ... v1 2013 11 22 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 359356 UTA 2013 10 23 17 00 00 5044-99 P C5H8 ARL 12.302 -999.990 ... v1 2013 11 22 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 359357 UTA 2013 11 04 21 35 00 5267-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 12 12 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 360273 UTA 2013 11 04 21 35 00 6264-66 P C5H8 ARL -999.990 -999.990 D.. v1 2013 12 12 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 360274 UTA 2013 11 11 17 55 00 545-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 12 13 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 360271 UTA 2013 11 11 17 55 00 6002-66 P C5H8 ARL -999.990 -999.990 D.. v1 2013 12 13 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 360272 UTA 2013 11 17 00 05 00 2991-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 08 28 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 360832 UTA 2013 11 23 19 40 00 1739-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 12 31 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 360830 UTA 2013 11 23 19 40 00 1747-99 P C5H8 ARL -999.990 -999.990 D.. v1 2013 12 31 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 360831 UTA 2013 11 30 00 25 00 2785-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 01 17 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 361437 UTA 2013 11 30 00 25 00 2786-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 01 17 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 361438 UTA 2013 12 02 23 05 00 3159-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 01 22 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 361435 UTA 2013 12 02 23 05 00 3160-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 01 22 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 361436 UTA 2013 12 09 18 10 00 677-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 01 27 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 361973 UTA 2013 12 09 18 10 00 678-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 01 27 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 361974 UTA 2013 12 14 23 32 00 4981-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 01 23 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 361971 UTA 2013 12 14 23 32 00 4982-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 01 23 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 361972 UTA 2013 12 21 22 45 00 1947-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 01 24 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 362502 UTA 2013 12 21 22 45 00 1948-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 01 24 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 362503 UTA 2013 12 31 17 15 00 1379-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 01 24 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 362500 UTA 2013 12 31 17 15 00 1380-99 P C5H8 ARL 8.700 -999.990 ... v1 2014 01 24 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 362501 UTA 2014 01 04 20 04 00 3251-99 P C5H8 ARL 10.448 -999.990 ... v1 2014 04 17 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 362950 UTA 2014 01 04 20 04 00 3252-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 04 17 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 362951 UTA 2014 01 11 00 55 00 2541-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 04 02 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 362948 UTA 2014 01 11 00 55 00 2542-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 04 02 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 362949 UTA 2014 02 01 22 03 00 4012-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 04 15 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 364454 UTA 2014 02 01 22 03 00 4535-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 04 15 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 364455 UTA 2014 02 12 18 42 00 3345-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 03 11 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 364456 UTA 2014 02 12 18 42 00 3839-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 03 11 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 364457 UTA 2014 02 14 18 05 00 4075-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 06 09 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 364596 UTA 2014 02 14 18 05 00 4996-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 06 09 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 364597 UTA 2014 02 18 18 10 00 1222-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 06 05 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 364594 UTA 2014 02 18 18 10 00 3791-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 06 05 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 364595 UTA 2014 03 02 23 55 00 4723-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 05 01 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 365629 UTA 2014 03 02 23 55 00 4724-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 05 01 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 365628 UTA 2014 03 07 19 05 00 643-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 04 30 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 365626 UTA 2014 03 07 19 05 00 644-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 04 30 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 365627 UTA 2014 03 15 20 25 00 2689-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 04 17 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 365940 UTA 2014 03 15 20 25 00 2690-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 04 17 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 365941 UTA 2014 03 21 00 55 00 3535-99 P C5H8 ARL 20.458 -999.990 ... v1 2014 04 16 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 365939 UTA 2014 03 21 00 55 00 3536-99 P C5H8 ARL 19.964 -999.990 ... v1 2014 04 16 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 365938 UTA 2014 03 26 02 30 00 6054-66 P C5H8 ARL -999.990 -999.990 D.. v1 2014 04 22 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 366484 UTA 2014 03 26 02 30 00 817-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 04 22 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 366485 UTA 2014 04 01 19 56 00 1989-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 04 22 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 366482 UTA 2014 04 01 19 56 00 3637-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 04 22 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 366483 UTA 2014 04 07 00 50 00 3465-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 09 16 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 366812 UTA 2014 04 07 00 50 00 6446-66 P C5H8 ARL -999.990 -999.990 D.. v1 2014 09 16 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 366813 UTA 2014 04 20 23 53 00 1284-99 P C5H8 ARL 59.924 -999.990 P.. v1 2014 08 06 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 367335 UTA 2014 04 20 23 53 00 1868-99 P C5H8 ARL 92.247 -999.990 P.. v1 2014 08 06 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 367336 UTA 2014 04 26 21 55 00 4424-99 P C5H8 ARL 9.867 -999.990 ... v1 2014 08 06 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 367333 UTA 2014 04 26 21 55 00 4984-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 08 06 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 367334 UTA 2014 04 29 19 33 00 4216-99 P C5H8 ARL 33.964 -999.990 ... v1 2014 09 14 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 367689 UTA 2014 04 29 19 33 00 4674-99 P C5H8 ARL 43.460 -999.990 ... v1 2014 09 14 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 367690 UTA 2014 05 05 02 10 00 1470-99 P C5H8 ARL 12.874 -999.990 ... v1 2014 09 14 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 367687 UTA 2014 05 05 02 10 00 948-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 09 14 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 367688 UTA 2014 05 12 01 35 00 1198-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 08 05 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 368522 UTA 2014 05 12 01 35 00 2078-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 08 05 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 368523 UTA 2014 05 16 19 39 00 100-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 07 29 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 368520 UTA 2014 05 16 19 39 00 4972-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 07 29 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 368521 UTA 2014 05 23 22 16 00 1507-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 09 15 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 369000 UTA 2014 05 23 22 16 00 1508-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 09 15 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 368999 UTA 2014 05 28 20 45 00 2245-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 09 15 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 368997 UTA 2014 05 28 20 45 00 2246-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 09 15 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 368998 UTA 2014 06 06 01 45 00 911-99 P C5H8 ARL 645.795 -999.990 ... v1 2014 09 11 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 369487 UTA 2014 06 06 01 45 00 912-99 P C5H8 ARL 602.032 -999.990 ... v1 2014 09 11 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 369488 UTA 2014 06 11 00 48 00 3503-99 P C5H8 ARL 22.106 -999.990 P.. v1 2014 09 11 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 369485 UTA 2014 06 11 00 48 00 3504-99 P C5H8 ARL 38.002 -999.990 P.. v1 2014 09 11 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 369486 UTA 2014 06 17 02 45 00 123-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 08 14 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 370107 UTA 2014 06 17 02 45 00 124-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 08 14 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 370108 UTA 2014 06 23 03 40 00 1729-99 P C5H8 ARL 14.399 -999.990 ... v1 2014 09 21 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 370103 UTA 2014 06 23 03 40 00 1730-99 P C5H8 ARL 13.841 -999.990 ... v1 2014 09 21 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 370104 UTA 2014 07 01 03 35 00 2359-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 09 22 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 370754 UTA 2014 07 01 03 35 00 4690-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 09 22 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 370755 UTA 2014 07 07 01 12 00 6917-66 P C5H8 ARL 2650.112 -999.990 ... v1 2014 08 04 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 370690 UTA 2014 07 07 01 12 00 787-99 P C5H8 ARL 2699.010 -999.990 ... v1 2014 08 04 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 370689 UTA 2014 07 11 17 09 00 1933-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 10 01 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 371261 UTA 2014 07 11 17 09 00 2632-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 10 01 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 371262 UTA 2014 07 18 13 45 00 4105-99 P C5H8 ARL 38.002 -999.990 ... v1 2014 09 26 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 371259 UTA 2014 07 18 13 45 00 4996-99 P C5H8 ARL 39.361 -999.990 ... v1 2014 09 26 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 371260 UTA 2014 07 23 16 50 00 4921-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 10 17 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 371641 UTA 2014 07 23 16 50 00 4922-99 P C5H8 ARL 38.959 -999.990 ... v1 2014 10 17 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 371642 UTA 2014 07 28 14 33 00 2949-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 09 03 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 372057 UTA 2014 07 28 14 33 00 2950-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 09 03 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 372058 UTA 2014 08 03 22 22 00 27-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 09 02 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 372443 UTA 2014 08 03 22 22 00 28-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 09 02 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 372444 UTA 2014 08 09 01 56 00 1387-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 09 02 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 372441 UTA 2014 08 09 01 56 00 1388-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 09 02 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 372442 UTA 2014 08 15 17 20 00 61-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 10 18 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 373156 UTA 2014 08 15 17 20 00 62-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 10 18 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 373157 UTA 2014 08 22 01 23 00 3711-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 10 18 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 373154 UTA 2014 08 22 01 23 00 3712-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 10 18 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 373155 UTA 2014 08 28 21 35 00 4920-99 P C5H8 ARL 121.879 -999.990 ... v1 2014 10 27 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 373733 UTA 2014 08 28 21 35 00 5128-99 P C5H8 ARL 149.232 -999.990 ... v1 2014 10 27 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 373734 UTA 2014 09 04 02 32 00 1191-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 10 27 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 373731 UTA 2014 09 04 02 32 00 3484-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 10 27 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 373732 UTA 2014 09 11 15 10 00 6197-66 P C5H8 ARL -999.990 -999.990 D.. v1 2014 11 10 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 374409 UTA 2014 09 11 15 10 00 6198-66 P C5H8 ARL -999.990 -999.990 D.. v1 2014 11 10 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 374410 UTA 2014 09 17 14 43 00 2669-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 11 10 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 374407 UTA 2014 09 17 14 43 00 2670-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 11 10 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 374408 UTA 2014 09 23 17 46 00 3401-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 11 14 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 375174 UTA 2014 09 23 17 46 00 3402-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 11 14 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 375175 UTA 2014 09 28 21 34 00 3471-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 11 14 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 375172 UTA 2014 09 28 21 34 00 3472-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 11 14 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 375173 UTA 2014 10 06 15 56 00 3017-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 11 18 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 375813 UTA 2014 10 06 15 56 00 3018-99 P C5H8 ARL 14.405 -999.990 ... v1 2014 11 18 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 375814 UTA 2014 10 10 22 36 00 2193-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 10 28 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 375900 UTA 2014 10 10 22 36 00 2194-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 10 28 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 375901 UTA 2014 10 15 21 50 00 3833-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 11 14 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 376310 UTA 2014 10 15 21 50 00 4199-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 11 14 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 376309 UTA 2014 10 22 00 05 00 1013-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 11 23 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 376316 UTA 2014 10 22 00 05 00 1141-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 11 23 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 376315 UTA 2014 10 29 20 58 00 1070-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 12 19 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 377271 UTA 2014 10 29 20 58 00 1699-99 P C5H8 ARL -999.990 -999.990 D.. v1 2014 12 19 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 377272 UTA 2014 11 03 23 35 00 3290-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 01 20 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 377530 UTA 2014 11 03 23 35 00 4490-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 01 20 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 377531 UTA 2014 11 08 23 10 00 3611-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 01 29 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 377889 UTA 2014 11 08 23 10 00 6184-66 P C5H8 ARL -999.990 -999.990 D.. v1 2015 01 29 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 377890 UTA 2014 11 14 20 12 00 1166-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 02 02 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 377887 UTA 2014 11 14 20 12 00 1772-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 02 02 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 377888 UTA 2014 11 20 23 10 00 129-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 01 24 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 378484 UTA 2014 11 20 23 10 00 130-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 01 24 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 378485 UTA 2014 11 27 00 44 00 143-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 01 24 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 378482 UTA 2014 11 27 00 44 00 144-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 01 24 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 378483 UTA 2014 12 01 23 30 00 4443-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 03 02 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 379001 UTA 2014 12 01 23 30 00 4444-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 03 02 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 379002 UTA 2014 12 07 23 20 00 4969-99 P C5H8 ARL 10.663 -999.990 ... v1 2015 02 11 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 378999 UTA 2014 12 07 23 20 00 4970-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 02 11 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 379000 UTA 2014 12 12 23 48 00 2047-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 02 18 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 379488 UTA 2014 12 12 23 48 00 2048-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 02 18 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 379489 UTA 2014 12 18 22 18 00 5031-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 02 18 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 379486 UTA 2014 12 18 22 18 00 5032-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 02 18 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 379487 UTA 2014 12 27 00 41 00 2923-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 03 20 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 380243 UTA 2014 12 27 00 41 00 2924-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 03 20 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 380244 UTA 2014 12 31 17 12 00 2167-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 02 17 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 380245 UTA 2014 12 31 17 12 00 2168-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 02 17 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 380246 UTA 2015 01 07 00 48 00 1354-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 04 15 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 380703 UTA 2015 01 07 00 48 00 6494-66 P C5H8 ARL -999.990 -999.990 D.. v1 2015 04 15 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 380704 UTA 2015 01 13 01 55 00 1966-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 04 15 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 380705 UTA 2015 01 13 01 55 00 2796-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 04 15 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 380706 UTA 2015 01 20 16 55 00 4097-99 P C5H8 ARL 13.714 -999.990 ... v1 2015 04 28 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 381482 UTA 2015 01 20 16 55 00 4098-99 P C5H8 ARL 16.971 -999.990 ... v1 2015 04 28 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 381483 UTA 2015 01 27 19 06 00 3069-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 04 29 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 381480 UTA 2015 01 27 19 06 00 3070-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 04 29 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 381481 UTA 2015 02 09 00 33 00 1070-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 03 26 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 382408 UTA 2015 02 09 00 33 00 1699-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 03 26 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 382409 UTA 2015 02 16 01 20 00 3025-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 03 26 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 382406 UTA 2015 02 16 01 20 00 3208-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 03 26 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 382407 UTA 2015 02 23 01 20 00 133-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 04 10 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 383009 UTA 2015 02 23 01 20 00 134-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 04 10 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 383010 UTA 2015 02 26 20 30 00 1885-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 04 10 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 383011 UTA 2015 02 26 20 30 00 1886-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 04 10 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 383012 UTA 2015 03 05 17 35 00 6717-66 P C5H8 ARL -999.990 -999.990 D.. v1 2015 05 06 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 383812 UTA 2015 03 05 17 35 00 6718-66 P C5H8 ARL -999.990 -999.990 D.. v1 2015 05 06 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 383813 UTA 2015 03 09 16 39 00 307-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 05 11 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 383815 UTA 2015 03 09 16 39 00 308-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 05 11 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 383814 UTA 2015 03 14 19 03 00 2013-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 05 15 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 384322 UTA 2015 03 14 19 03 00 6383-66 P C5H8 ARL -999.990 -999.990 D.. v1 2015 05 15 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 384323 UTA 2015 03 19 22 24 00 4141-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 05 15 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 384324 UTA 2015 03 19 22 24 00 5045-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 05 15 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 384325 UTA 2015 03 29 23 03 00 3463-99 P C5H8 ARL 47.666 -999.990 ... v1 2015 05 28 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 385336 UTA 2015 03 29 23 03 00 3464-99 P C5H8 ARL 34.320 -999.990 ... v1 2015 05 28 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 385337 UTA 2015 04 04 00 22 00 4593-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 05 29 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 385334 UTA 2015 04 04 00 22 00 4594-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 05 29 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 385335 UTA 2015 04 09 22 15 00 2019-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 06 05 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 385806 UTA 2015 04 09 22 15 00 2020-99 P C5H8 ARL 14.501 -999.990 ... v1 2015 06 05 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 385807 UTA 2015 04 14 16 45 00 3329-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 06 09 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 385834 UTA 2015 04 14 16 45 00 3330-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 06 09 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 385835 UTA 2015 04 21 17 02 00 1870-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 06 18 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 386575 UTA 2015 04 21 17 02 00 949-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 06 18 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 386576 UTA 2015 04 29 01 08 00 1432-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 06 28 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 386573 UTA 2015 04 29 01 08 00 5255-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 06 28 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 386574 UTA 2015 05 11 17 43 00 1477-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 07 19 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 387390 UTA 2015 05 11 17 43 00 486-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 07 19 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 387391 UTA 2015 05 14 20 36 00 4700-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 07 24 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 387388 UTA 2015 05 14 20 36 00 4851-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 07 24 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 387389 UTA 2015 05 20 23 19 00 6666-66 P C5H8 ARL -999.990 -999.990 D.. v1 2015 07 07 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 387973 UTA 2015 05 20 23 19 00 999-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 07 07 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 387974 UTA 2015 05 27 22 44 00 3978-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 07 07 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 387971 UTA 2015 05 27 22 44 00 4166-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 07 07 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 387972 UTA 2015 06 01 15 06 00 2921-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 07 29 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 388624 UTA 2015 06 01 15 06 00 4967-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 07 29 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 388625 UTA 2015 06 06 00 30 00 3257-99 P C5H8 ARL 98.569 -999.990 ... v1 2015 07 28 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 388626 UTA 2015 06 06 00 30 00 4091-99 P C5H8 ARL 105.437 -999.990 ... v1 2015 07 28 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 388627 UTA 2015 06 15 01 11 00 3273-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 08 14 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 390132 UTA 2015 06 15 01 11 00 3274-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 08 14 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 390133 UTA 2015 07 03 03 54 00 4985-99 P C5H8 ARL 18.258 -999.990 ... v1 2015 08 19 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 390130 UTA 2015 07 03 03 54 00 4986-99 P C5H8 ARL 13.265 -999.990 ... v1 2015 08 19 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 390131 UTA 2015 07 06 02 42 00 2711-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 08 21 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 390689 UTA 2015 07 06 02 42 00 2712-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 08 21 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 390690 UTA 2015 07 12 02 30 00 295-99 P C5H8 ARL 36.727 -999.990 ... v1 2015 08 25 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 390687 UTA 2015 07 12 02 30 00 296-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 08 25 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 390688 UTA 2015 07 14 01 10 00 2805-99 P C5H8 ARL 211.922 -999.990 ... v1 2015 08 31 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 391379 UTA 2015 07 14 01 10 00 2806-99 P C5H8 ARL 221.997 -999.990 ... v1 2015 08 31 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 391380 UTA 2015 07 20 02 34 00 3222-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 08 26 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 391377 UTA 2015 07 20 02 34 00 689-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 08 26 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 391378 UTA 2015 07 22 23 26 00 3683-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 09 01 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 391953 UTA 2015 07 22 23 26 00 3684-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 09 01 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 391954 UTA 2015 07 28 16 56 00 1339-99 P C5H8 ARL 221.758 -999.990 ... v1 2015 09 03 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 391951 UTA 2015 07 28 16 56 00 1340-99 P C5H8 ARL 218.550 -999.990 ... v1 2015 09 03 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 391952 UTA 2015 08 05 15 32 00 1136-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 09 19 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 392713 UTA 2015 08 05 15 32 00 255-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 09 19 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 392712 UTA 2015 08 12 15 55 00 411-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 09 21 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 392710 UTA 2015 08 12 15 55 00 440-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 09 21 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 392711 UTA 2015 08 25 00 42 00 1774-99 P C5H8 ARL 176.402 -999.990 P.. v1 2015 10 09 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 394011 UTA 2015 08 25 00 42 00 507-99 P C5H8 ARL 130.308 -999.990 P.. v1 2015 10 09 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 394012 UTA 2015 09 01 18 20 00 2915-99 P C5H8 ARL 17.970 -999.990 ... v1 2015 10 08 12 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 394010 UTA 2015 09 01 18 20 00 4511-99 P C5H8 ARL 13.459 -999.990 ... v1 2015 10 08 12 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 394009 UTA 2015 09 11 17 28 00 1478-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 10 18 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 394694 UTA 2015 09 11 17 28 00 5285-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 10 18 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 394695 UTA 2015 09 18 03 13 00 4055-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 10 26 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 394696 UTA 2015 09 18 03 13 00 4092-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 10 26 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 394697 UTA 2015 09 21 18 26 00 3585-99 P C5H8 ARL 93.682 -999.990 ... v1 2015 11 01 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 395625 UTA 2015 09 21 18 26 00 3586-99 P C5H8 ARL 116.286 -999.990 ... v1 2015 11 01 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 395626 UTA 2015 09 28 21 41 00 1507-99 P C5H8 ARL 302.529 -999.990 ... v1 2015 10 30 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 395623 UTA 2015 09 28 21 41 00 1508-99 P C5H8 ARL 253.244 -999.990 ... v1 2015 10 30 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 395624 UTA 2015 10 06 18 23 00 3339-99 P C5H8 ARL 66.819 -999.990 ... v1 2015 11 04 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 396555 UTA 2015 10 06 18 23 00 3340-99 P C5H8 ARL 62.733 -999.990 ... v1 2015 11 04 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 396556 UTA 2015 10 13 22 32 00 3251-99 P C5H8 ARL 89.243 -999.990 ... v1 2015 11 03 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 396429 UTA 2015 10 13 22 32 00 3252-99 P C5H8 ARL 93.570 -999.990 ... v1 2015 11 03 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 396430 UTA 2015 10 20 00 55 00 2119-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 11 10 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 396975 UTA 2015 10 20 00 55 00 2120-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 11 10 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 396976 UTA 2015 10 26 01 15 00 3741-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 11 10 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 396973 UTA 2015 10 26 01 15 00 3742-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 11 10 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 396974 UTA 2015 11 01 22 51 00 603-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 11 25 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 397820 UTA 2015 11 01 22 51 00 604-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 11 25 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 397821 UTA 2015 11 10 23 13 00 3841-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 12 11 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 397818 UTA 2015 11 10 23 13 00 3842-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 12 11 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 397819 UTA 2015 11 16 00 45 00 4525-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 12 18 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 398668 UTA 2015 11 16 00 45 00 967-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 12 18 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 398667 UTA 2015 11 23 22 05 00 1869-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 12 18 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 398468 UTA 2015 11 23 22 05 00 571-99 P C5H8 ARL -999.990 -999.990 D.. v1 2015 12 18 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 398469 UTA 2015 12 02 01 02 00 4389-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 01 25 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 399046 UTA 2015 12 02 01 02 00 949-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 01 25 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 399045 UTA 2015 12 07 17 24 00 1475-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 01 11 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 399416 UTA 2015 12 07 17 24 00 268-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 01 11 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 399415 UTA 2015 12 13 00 19 00 4913-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 01 12 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 399413 UTA 2015 12 13 00 19 00 4939-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 01 12 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 399414 UTA 2015 12 16 18 26 00 1828-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 02 03 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 399961 UTA 2015 12 16 18 26 00 353-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 02 03 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 399960 UTA 2015 12 22 22 42 00 2036-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 02 03 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 399958 UTA 2015 12 22 22 42 00 4844-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 02 03 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 399959 UTA 2016 01 01 23 55 00 229-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 02 15 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 400914 UTA 2016 01 01 23 55 00 230-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 02 15 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 400915 UTA 2016 01 08 16 53 00 4583-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 02 15 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 400912 UTA 2016 01 08 16 53 00 4584-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 02 15 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 400913 UTA 2016 01 13 22 06 00 3339-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 02 17 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 401468 UTA 2016 01 13 22 06 00 3340-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 02 17 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 401469 UTA 2016 01 20 18 55 00 5301-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 05 18 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 401466 UTA 2016 01 20 18 55 00 5302-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 05 18 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 401467 UTA 2016 02 02 00 21 00 3421-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 03 09 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 402311 UTA 2016 02 02 00 21 00 3422-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 03 09 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 402312 UTA 2016 02 09 17 18 00 165-99 P C5H8 ARL 14.510 -999.990 P.. v1 2016 03 14 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 402309 UTA 2016 02 09 17 18 00 166-99 P C5H8 ARL 8.636 -999.990 P.. v1 2016 03 14 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 402310 UTA 2016 02 15 18 32 00 570-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 03 31 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 402934 UTA 2016 02 15 18 32 00 915-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 03 31 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 402935 UTA 2016 02 20 21 49 00 1466-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 03 17 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 402936 UTA 2016 02 20 21 49 00 2293-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 03 17 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 402937 UTA 2016 02 24 17 22 00 3801-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 03 30 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 403363 UTA 2016 02 24 17 22 00 3802-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 03 30 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 403364 UTA 2016 03 01 04 18 00 1121-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 03 31 12 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 403361 UTA 2016 03 01 04 18 00 1122-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 03 31 12 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 403362 UTA 2016 03 04 00 39 00 1641-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 04 05 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 403707 UTA 2016 03 04 00 39 00 27-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 04 05 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 403708 UTA 2016 03 08 17 43 00 1702-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 04 02 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 403705 UTA 2016 03 08 17 43 00 1957-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 04 02 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 403706 UTA 2016 03 16 02 30 00 1065-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 04 17 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 404719 UTA 2016 03 16 02 30 00 114-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 04 17 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 404720 UTA 2016 03 21 19 29 00 1008-99 P C5H8 ARL 14.934 -999.990 ... v1 2016 04 22 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 404691 UTA 2016 03 21 19 29 00 3970-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 04 22 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 404692 UTA 2016 03 24 16 49 00 2420-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 04 20 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 405096 UTA 2016 03 24 16 49 00 361-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 04 20 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 405095 UTA 2016 03 30 22 02 00 3094-99 P C5H8 ARL 12.075 -999.990 ... v1 2016 04 15 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 405097 UTA 2016 03 30 22 02 00 5065-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 04 15 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 405098 UTA 2016 04 05 22 37 00 1740-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 05 20 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 405803 UTA 2016 04 05 22 37 00 469-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 05 20 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 405804 UTA 2016 04 11 18 47 00 4190-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 07 20 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 405805 UTA 2016 04 15 18 06 00 3963-99 P C5H8 ARL 8.171 -999.990 ... v1 2016 05 27 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 406268 UTA 2016 04 15 18 06 00 3964-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 05 27 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 406269 UTA 2016 04 21 19 27 00 809-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 05 27 12 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 406266 UTA 2016 04 21 19 27 00 810-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 05 27 12 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 406267 UTA 2016 04 28 16 20 00 1419-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 06 04 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 407014 UTA 2016 04 28 16 20 00 3194-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 06 04 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 407015 UTA 2016 05 05 20 02 00 1925-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 06 04 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 407012 UTA 2016 05 05 20 02 00 3978-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 06 04 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 407013 UTA 2016 05 09 19 12 00 4589-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 06 14 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 407713 UTA 2016 05 09 19 12 00 5188-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 06 14 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 407714 UTA 2016 05 15 01 22 00 2563-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 06 14 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 407711 UTA 2016 05 15 01 22 00 993-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 06 14 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 407712 UTA 2016 05 20 02 43 00 350-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 07 06 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 407951 UTA 2016 05 20 02 43 00 986-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 07 06 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 407952 UTA 2016 05 27 14 08 00 1325-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 06 28 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 407949 UTA 2016 05 27 14 08 00 3533-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 06 28 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 407950 UTA 2016 06 02 02 35 00 3024-99 P C5H8 ARL 69.398 -999.990 ... v1 2016 09 02 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 408897 UTA 2016 06 02 02 35 00 3053-99 P C5H8 ARL 82.359 -999.990 ... v1 2016 09 02 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 408898 UTA 2016 06 07 02 05 00 2660-99 P C5H8 ARL 25.078 -999.990 ... v1 2016 09 04 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 408895 UTA 2016 06 07 02 05 00 3851-99 P C5H8 ARL 18.404 -999.990 ... v1 2016 09 04 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 408896 UTA 2016 06 10 15 46 00 2241-99 P C5H8 ARL 11.439 -999.990 ... v1 2016 07 30 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 409485 UTA 2016 06 10 15 46 00 2242-99 P C5H8 ARL 12.571 -999.990 ... v1 2016 07 30 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 409486 UTA 2016 06 18 00 36 00 2965-99 P C5H8 ARL 21.943 -999.990 ... v1 2016 09 09 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 411179 UTA 2016 06 18 00 36 00 3914-99 P C5H8 ARL 19.575 -999.990 ... v1 2016 09 09 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 411180 UTA 2016 06 18 03 48 00 5209-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 07 13 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 409488 UTA 2016 06 18 03 48 00 5210-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 07 13 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 409487 UTA 2016 06 22 17 49 00 3800-99 P C5H8 ARL 30.491 -999.990 ... v1 2016 09 09 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 411178 UTA 2016 06 22 17 49 00 88-99 P C5H8 ARL 38.551 -999.990 ... v1 2016 09 09 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 411177 UTA 2016 06 24 14 44 00 3084-99 P C5H8 ARL 84.992 -999.990 ... v1 2016 08 29 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 409985 UTA 2016 06 24 14 44 00 4866-99 P C5H8 ARL 84.733 -999.990 ... v1 2016 08 29 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 409986 UTA 2016 07 01 03 12 00 4119-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 08 29 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 409983 UTA 2016 07 01 03 12 00 5039-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 08 29 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 409984 UTA 2016 07 07 21 54 00 3359-99 P C5H8 ARL 663.883 -999.990 ... v1 2016 09 29 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 410566 UTA 2016 07 07 21 54 00 3612-99 P C5H8 ARL 592.839 -999.990 ... v1 2016 09 29 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 410567 UTA 2016 07 11 03 05 00 2288-99 P C5H8 ARL 129.160 -999.990 ... v1 2016 09 02 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 410564 UTA 2016 07 11 03 05 00 690-99 P C5H8 ARL 123.778 -999.990 ... v1 2016 09 02 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 410565 UTA 2016 07 19 15 28 00 1441-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 09 15 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 411640 UTA 2016 07 19 15 28 00 2425-99 P C5H8 ARL 16.811 -999.990 ... v1 2016 09 15 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 411641 UTA 2016 07 25 21 01 00 716-99 P C5H8 ARL 2317.410 -999.990 P.. v1 2016 10 06 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 411553 UTA 2016 07 25 21 01 00 937-99 P C5H8 ARL 4995.167 -999.990 P.. v1 2016 10 06 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 411554 UTA 2016 07 31 15 12 00 3741-99 P C5H8 ARL 13.671 -999.990 ... v1 2016 10 31 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 412674 UTA 2016 07 31 15 12 00 3742-99 P C5H8 ARL 9.796 -999.990 ... v1 2016 10 31 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 412675 UTA 2016 08 06 01 18 00 3215-99 P C5H8 ARL 32.368 -999.990 ... v1 2016 09 16 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 412596 UTA 2016 08 06 01 18 00 3216-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 09 16 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 412597 UTA 2016 08 13 14 35 00 4658-99 P C5H8 ARL 119.372 -999.990 ... v1 2016 11 10 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 412776 UTA 2016 08 13 14 35 00 5571-99 P C5H8 ARL 92.992 -999.990 ... v1 2016 11 10 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 412777 UTA 2016 08 17 21 05 00 3400-99 P C5H8 ARL 76.366 -999.990 P.. v1 2016 11 10 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 412774 UTA 2016 08 17 21 05 00 5567-99 P C5H8 ARL 23.649 -999.990 P.. v1 2016 11 10 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 412775 UTA 2016 08 26 14 57 00 3831-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 10 20 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 413790 UTA 2016 08 26 14 57 00 3832-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 10 20 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 413791 UTA 2016 08 31 01 25 00 5715-99 P C5H8 ARL 15.998 -999.990 ... v1 2016 10 20 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 413792 UTA 2016 08 31 01 25 00 5716-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 10 20 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 413793 UTA 2016 09 08 00 20 00 1473-99 P C5H8 ARL 183.867 -999.990 ... v1 2016 10 23 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 414196 UTA 2016 09 08 00 20 00 4232-99 P C5H8 ARL 152.351 -999.990 ... v1 2016 10 23 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 414197 UTA 2016 09 22 01 48 00 702-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 11 16 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 414954 UTA 2016 09 22 01 48 00 830-99 P C5H8 ARL -999.990 -999.990 D.. v1 2016 11 16 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 414955 UTA 2016 09 28 18 19 00 3523-99 P C5H8 ARL 142.390 -999.990 ... v1 2016 11 16 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 414952 UTA 2016 09 28 18 19 00 4087-99 P C5H8 ARL 154.144 -999.990 ... v1 2016 11 16 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 414953 UTA 2016 09 30 16 51 00 2265-99 P C5H8 ARL -1.086 -999.990 D.. v1 2016 12 08 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 415218 UTA 2016 09 30 16 51 00 5415-99 P C5H8 ARL 0.041 -999.990 D.. v1 2016 12 08 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 415219 UTA 2016 10 04 23 42 00 109-99 P C5H8 ARL -1.275 -999.990 D.. v1 2016 12 08 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 415220 UTA 2016 10 04 23 42 00 482-99 P C5H8 ARL -2.403 -999.990 D.. v1 2016 12 08 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 415221 UTA 2016 10 12 17 58 00 4683-99 P C5H8 ARL 46.854 -999.990 P.. v1 2016 12 16 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 415645 UTA 2016 10 12 17 58 00 5145-99 P C5H8 ARL 19.000 -999.990 P.. v1 2016 12 16 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 415644 UTA 2016 10 14 16 07 00 2535-99 P C5H8 ARL -6.243 -999.990 D.. v1 2016 12 12 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 415646 UTA 2016 10 14 16 07 00 3011-99 P C5H8 ARL -6.243 -999.990 D.. v1 2016 12 12 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 415647 UTA 2016 10 24 22 58 00 1888-99 P C5H8 ARL -6.243 -999.990 D.. v1 2016 12 19 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 416575 UTA 2016 10 24 22 58 00 4080-99 P C5H8 ARL -6.243 -999.990 D.. v1 2016 12 19 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 416576 UTA 2016 10 30 00 25 00 4023-99 P C5H8 ARL -6.243 -999.990 D.. v1 2016 12 19 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 416578 UTA 2016 10 30 00 25 00 4285-99 P C5H8 ARL 9.059 -999.990 ... v1 2016 12 19 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 416577 UTA 2016 11 05 23 43 00 412-99 P C5H8 ARL 2.954 -999.990 D.. v1 2016 12 23 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 417069 UTA 2016 11 05 23 43 00 4473-99 P C5H8 ARL 1.947 -999.990 D.. v1 2016 12 23 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 417070 UTA 2016 11 09 17 08 00 2250-99 P C5H8 ARL -3.599 -999.990 D.. v1 2016 12 27 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 417071 UTA 2016 11 09 17 08 00 4036-99 P C5H8 ARL -3.190 -999.990 D.. v1 2016 12 27 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 417072 UTA 2016 11 20 21 46 00 4065-99 P C5H8 ARL -6.243 -999.990 D.. v1 2017 01 06 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 417685 UTA 2016 11 20 21 46 00 4237-99 P C5H8 ARL -6.243 -999.990 D.. v1 2017 01 06 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 417687 UTA 2016 11 28 00 57 00 4066-99 P C5H8 ARL -6.243 -999.990 D.. v1 2017 01 04 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 417686 UTA 2016 11 28 00 57 00 838-99 P C5H8 ARL -3.901 -999.990 D.. v1 2017 01 04 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 417688 UTA 2016 11 29 21 55 00 2830-99 P C5H8 ARL -6.243 -999.990 D.. v1 2017 02 04 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 418232 UTA 2016 11 29 21 55 00 2895-99 P C5H8 ARL -6.243 -999.990 D.. v1 2017 02 04 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 418233 UTA 2016 12 06 23 07 00 4592-99 P C5H8 ARL -6.243 -999.990 D.. v1 2017 02 06 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 418230 UTA 2016 12 06 23 07 00 5268-99 P C5H8 ARL -6.243 -999.990 D.. v1 2017 02 06 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 418231 UTA 2016 12 10 23 20 00 1081-99 P C5H8 ARL -6.243 -999.990 D.. v1 2017 02 09 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 418616 UTA 2016 12 10 23 20 00 5306-99 P C5H8 ARL -6.243 -999.990 D.. v1 2017 02 09 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 418617 UTA 2016 12 16 16 18 00 1003-99 P C5H8 ARL -6.243 -999.990 D.. v1 2017 02 16 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 418619 UTA 2016 12 16 16 18 00 424-99 P C5H8 ARL -6.243 -999.990 D.. v1 2017 02 16 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 418618 UTA 2016 12 22 18 45 00 1797-99 P C5H8 ARL -6.243 -999.990 D.. v1 2017 02 13 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 419171 UTA 2016 12 22 18 45 00 1798-99 P C5H8 ARL -6.243 -999.990 D.. v1 2017 02 13 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 419172 UTA 2016 12 29 20 48 00 2761-99 P C5H8 ARL -6.243 -999.990 D.. v1 2017 02 10 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 419173 UTA 2016 12 29 20 48 00 2762-99 P C5H8 ARL -6.243 -999.990 D.. v1 2017 02 10 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 419174