# number_of_header_lines: 70 # comment: # comment: ************ USE OF ESRL GMD DATA **************** # comment: # comment: These data are made freely available to the public and the # comment: scientific community in the belief that their wide dissemination # comment: will lead to greater understanding and new scientific insights. # comment: The availability of these data does not constitute publication # comment: of the data. NOAA relies on the ethics and integrity of the user to # comment: ensure that GML receives fair credit for their work. If the data # comment: are obtained for potential use in a publication or presentation, # comment: GML should be informed at the outset of the nature of this work. # comment: If the GML data are essential to the work, or if an important # comment: result or conclusion depends on the GML data, co-authorship # comment: may be appropriate. This should be discussed at an early stage in # comment: the work. Manuscripts using the GML data should be sent to GML # comment: for review before they are submitted for publication so we can # comment: ensure that the quality and limitations of the data are accurately # comment: represented. # comment: Please see accompanying README file, if available, for citation text. # comment: # comment: Every effort is made to produce the most accurate and precise # comment: measurements possible. However, we reserve the right to make # comment: corrections to the data based on recalibration of standard gases # comment: or for other reasons deemed scientifically justified. # comment: # comment: We are not responsible for results and conclusions based on use # comment: of these data without regard to this warning. # comment: # contact_parameter: IC5H12 ARL (Individual Flasks) # contact_name: John Mund # contact_telephone: (303) 497-5472 # contact_email: John.Mund@noaa.gov # comment: # comment: ************ COLLABORATORS *************** # comment: # comment: NOAA thanks the following collaborators without # comment: whom these measurements would not be possible. # comment: # collaborator_name: Beth Anderson/ NWS Cooperative Observer [NWS # collaborator_name: COOP] # comment: # comment: ************ RECIPROCITY AGREEMENT *************** # comment: # comment: Use of these data implies an agreement to reciprocate. # comment: Laboratories making similar measurements agree to make their # comment: own data available to the general public and to the scientific # comment: community in an equally complete and easily accessible form. # comment: Modelers are encouraged to make available to the community, # comment: upon request, their own tools used in the interpretation # comment: of the GML data, namely well documented model code, transport # comment: fields, and additional information necessary for other # comment: scientists to repeat the work and to run modified versions. # comment: Model availability includes collaborative support for new # comment: users of the models. # comment: # comment: ************ DATA DESCRIPTION *************** # comment: # description_site-code: uta # description_project-abbr: ccg_surface # description_strategy-abbr: flask # description_sample-constraints: date:1900-01-01,2016-12-31 # description_creation-time: 2021-05-04 10:13:52 # comment: # comment: ************ DATA DOCUMENTATION *************** # comment: # comment: Please refer to the species-specific README file in the # comment: appropriate directory folder at ftp://aftp.cmdl.noaa.gov/data/trace_gases/. # comment: # data_fields: sample_site_code sample_year sample_month sample_day sample_hour sample_minute sample_seconds sample_id sample_method parameter_formula analysis_group_abbr analysis_value analysis_uncertainty analysis_flag analysis_instrument analysis_year analysis_month analysis_day analysis_hour analysis_minute analysis_seconds sample_latitude sample_longitude sample_altitude sample_elevation sample_intake_height event_number UTA 2005 11 19 19 15 00 1528-99 P iC5H12 ARL 48.183 -999.990 ... v1 2005 12 15 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 209756 UTA 2005 11 26 21 20 00 1145-99 P iC5H12 ARL 58.635 -999.990 ... v1 2006 01 12 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 209757 UTA 2005 11 26 21 20 00 3656-99 P iC5H12 ARL 62.798 -999.990 ... v1 2006 01 12 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 209758 UTA 2005 12 06 23 45 00 3825-99 P iC5H12 ARL 54.279 -999.990 ... v1 2006 01 09 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 210634 UTA 2005 12 06 23 45 00 934-99 P iC5H12 ARL 47.163 -999.990 ... v1 2006 01 09 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 210635 UTA 2005 12 12 22 35 00 1649-99 P iC5H12 ARL 95.837 -999.990 ... v1 2006 01 14 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 210632 UTA 2005 12 12 22 35 00 2300-99 P iC5H12 ARL 105.404 -999.990 ... v1 2006 01 14 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 210633 UTA 2005 12 19 23 30 00 1795-99 P iC5H12 ARL 115.702 -999.990 P.. v1 2006 02 09 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 211167 UTA 2005 12 19 23 30 00 1796-99 P iC5H12 ARL 270.250 -999.990 P.. v1 2006 02 09 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 211168 UTA 2005 12 26 16 40 00 2135-99 P iC5H12 ARL 202.365 -999.990 .X. v1 2006 02 09 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 211165 UTA 2005 12 26 16 40 00 2136-99 P iC5H12 ARL -999.990 -999.990 C.. v1 2006 02 09 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 211166 UTA 2005 12 31 21 25 00 3547-99 P iC5H12 ARL 123.558 -999.990 ... v1 2006 02 10 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 211712 UTA 2005 12 31 21 25 00 4298-99 P iC5H12 ARL 110.817 -999.990 ... v1 2006 02 10 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 211713 UTA 2006 01 06 16 15 00 2556-99 P iC5H12 ARL 60.404 -999.990 ... v1 2006 02 11 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 211710 UTA 2006 01 06 16 15 00 2607-99 P iC5H12 ARL 56.875 -999.990 ... v1 2006 02 11 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 211711 UTA 2006 01 12 18 40 00 2803-99 P iC5H12 ARL 54.885 -999.990 ... v1 2006 02 20 10 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 212021 UTA 2006 01 12 18 40 00 2804-99 P iC5H12 ARL 40.356 -999.990 ... v1 2006 02 20 10 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 212022 UTA 2006 01 18 19 00 00 337-99 P iC5H12 ARL 56.192 -999.990 ... v1 2006 02 20 10 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 212019 UTA 2006 01 18 19 00 00 338-99 P iC5H12 ARL 60.490 -999.990 ... v1 2006 02 20 10 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 212020 UTA 2006 02 11 18 35 00 2477-99 P iC5H12 ARL 71.873 -999.990 ... v1 2006 03 12 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 213049 UTA 2006 02 11 18 35 00 2478-99 P iC5H12 ARL 76.100 -999.990 ... v1 2006 03 12 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 213050 UTA 2006 02 18 18 40 00 6215-66 P iC5H12 ARL 72.262 -999.990 ... v1 2006 04 07 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 213824 UTA 2006 02 18 18 40 00 6216-66 P iC5H12 ARL 80.914 -999.990 ... v1 2006 04 07 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 213825 UTA 2006 03 11 00 45 00 2521-99 P iC5H12 ARL 36.126 -999.990 ... v1 2006 04 22 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 214250 UTA 2006 03 11 00 45 00 2522-99 P iC5H12 ARL 35.358 -999.990 ... v1 2006 04 22 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 214251 UTA 2006 03 17 22 35 00 4111-99 P iC5H12 ARL 235.240 -999.990 .X. v1 2006 04 21 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 214248 UTA 2006 03 17 22 35 00 4112-99 P iC5H12 ARL 217.683 -999.990 .X. v1 2006 04 21 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 214249 UTA 2006 03 24 16 25 00 751-99 P iC5H12 ARL 42.701 -999.990 ... v1 2006 05 03 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 215128 UTA 2006 03 24 16 25 00 752-99 P iC5H12 ARL 40.266 -999.990 ... v1 2006 05 03 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 215129 UTA 2006 03 31 17 35 00 947-99 P iC5H12 ARL 266.590 -999.990 .X. v1 2006 05 03 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 215126 UTA 2006 03 31 17 35 00 948-99 P iC5H12 ARL 326.413 -999.990 .X. v1 2006 05 03 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 215127 UTA 2006 04 06 16 15 00 1805-99 P iC5H12 ARL 75.136 -999.990 ... v1 2006 05 17 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 215502 UTA 2006 04 06 16 15 00 1806-99 P iC5H12 ARL 61.439 -999.990 ... v1 2006 05 17 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 215503 UTA 2006 04 13 01 20 00 2331-99 P iC5H12 ARL -999.990 -999.990 D.. v1 2006 05 30 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 215496 UTA 2006 04 13 01 20 00 2332-99 P iC5H12 ARL -999.990 -999.990 D.. v1 2006 05 30 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 215497 UTA 2006 04 19 01 15 00 2905-99 P iC5H12 ARL 6.588 -999.990 ... v1 2006 06 14 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 216300 UTA 2006 04 19 01 15 00 2906-99 P iC5H12 ARL 7.819 -999.990 ... v1 2006 06 14 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 216301 UTA 2006 04 24 21 45 00 1573-99 P iC5H12 ARL 36.063 -999.990 ... v1 2006 06 11 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 216298 UTA 2006 04 24 21 45 00 1573-99 P iC5H12 ARL 7.252 -999.990 ... v1 2006 10 11 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 216298 UTA 2006 04 24 21 45 00 1574-99 P iC5H12 ARL 40.724 -999.990 ... v1 2006 06 11 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 216299 UTA 2006 04 24 21 45 00 1574-99 P iC5H12 ARL 7.301 -999.990 ... v1 2006 10 11 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 216299 UTA 2006 05 01 00 00 00 2573-99 P iC5H12 ARL 42.787 -999.990 ... v1 2006 06 03 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 216796 UTA 2006 05 01 00 00 00 2574-99 P iC5H12 ARL 46.697 -999.990 ... v1 2006 06 03 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 216797 UTA 2006 05 08 01 10 00 4011-99 P iC5H12 ARL 8.380 -999.990 ... v1 2006 06 03 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 216798 UTA 2006 05 08 01 10 00 4012-99 P iC5H12 ARL 10.217 -999.990 ... v1 2006 06 03 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 216799 UTA 2006 05 15 21 07 00 379-99 P iC5H12 ARL 73.692 -999.990 ... v1 2006 06 23 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 217441 UTA 2006 05 15 21 07 00 380-99 P iC5H12 ARL 112.733 -999.990 .X. v1 2006 06 23 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 217442 UTA 2006 05 22 17 35 00 343-99 P iC5H12 ARL 173.566 -999.990 .X. v1 2006 06 23 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 217439 UTA 2006 05 22 17 35 00 344-99 P iC5H12 ARL 170.118 -999.990 .X. v1 2006 06 23 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 217440 UTA 2006 05 29 22 25 00 927-99 P iC5H12 ARL 5.892 -999.990 ... v1 2006 08 02 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 218205 UTA 2006 06 13 19 35 00 601-99 P iC5H12 ARL 13.761 -999.990 ... v1 2006 07 25 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 218996 UTA 2006 06 13 19 35 00 602-99 P iC5H12 ARL 15.000 -999.990 ... v1 2006 07 25 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 218997 UTA 2006 06 24 22 40 00 1475-99 P iC5H12 ARL 8982.831 -999.990 P.. v1 2006 07 25 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 218994 UTA 2006 06 24 22 40 00 1475-99 P iC5H12 ARL 194.161 -999.990 .X. v1 2006 10 18 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 218994 UTA 2006 06 24 22 40 00 1476-99 P iC5H12 ARL 1279.546 -999.990 P.. v1 2006 07 25 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 218995 UTA 2006 06 24 22 40 00 1476-99 P iC5H12 ARL 160.429 -999.990 .X. v1 2006 10 18 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 218995 UTA 2006 07 31 00 35 00 3057-99 P iC5H12 ARL 236.545 -999.990 P.. v1 2006 09 27 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 220842 UTA 2006 07 31 00 35 00 3058-99 P iC5H12 ARL 492.317 -999.990 P.. v1 2006 09 27 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 220843 UTA 2006 08 04 16 00 00 4477-99 P iC5H12 ARL 55.366 -999.990 ... v1 2006 09 27 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 220844 UTA 2006 08 04 16 00 00 4478-99 P iC5H12 ARL 66.325 -999.990 ... v1 2006 09 27 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 220845 UTA 2006 08 13 02 35 00 3823-99 P iC5H12 ARL 19.772 -999.990 ... v1 2006 09 13 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 221002 UTA 2006 08 13 02 35 00 3824-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2006 09 13 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 221003 UTA 2006 08 20 15 50 00 3207-99 P iC5H12 ARL 555.634 -999.990 .X. v1 2006 09 19 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 221766 UTA 2006 08 20 15 50 00 3208-99 P iC5H12 ARL 970.886 -999.990 .X. v1 2006 09 19 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 221767 UTA 2006 09 04 22 50 00 1033-99 P iC5H12 ARL 77.527 -999.990 ... v1 2006 10 17 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 222626 UTA 2006 09 04 22 50 00 1033-99 P iC5H12 ARL 11.439 -999.990 ... v1 2006 11 22 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 222626 UTA 2006 09 04 22 50 00 4298-99 P iC5H12 ARL 77.366 -999.990 ... v1 2006 10 17 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 222627 UTA 2006 09 04 22 50 00 4298-99 P iC5H12 ARL 12.222 -999.990 ... v1 2006 11 22 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 222627 UTA 2006 09 12 23 10 00 4133-99 P iC5H12 ARL 87.018 -999.990 ... v1 2006 10 17 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 222628 UTA 2006 09 12 23 10 00 4133-99 P iC5H12 ARL 23.695 -999.990 ... v1 2006 11 22 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 222628 UTA 2006 09 12 23 10 00 5198-99 P iC5H12 ARL 69.670 -999.990 ... v1 2006 10 17 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 222629 UTA 2006 09 12 23 10 00 5198-99 P iC5H12 ARL 28.408 -999.990 ... v1 2006 11 22 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 222629 UTA 2006 09 18 15 35 00 6195-66 P iC5H12 ARL 22.589 -999.990 ... v1 2006 10 23 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 223339 UTA 2006 09 18 15 35 00 6196-66 P iC5H12 ARL 23.830 -999.990 ... v1 2006 10 23 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 223340 UTA 2006 09 25 16 00 00 1251-99 P iC5H12 ARL 264.679 -999.990 P.. v1 2006 10 23 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 223337 UTA 2006 09 25 16 00 00 1252-99 P iC5H12 ARL 169.955 -999.990 P.. v1 2006 10 23 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 223338 UTA 2006 10 02 01 05 00 6839-66 P iC5H12 ARL 45.366 -999.990 ... v1 2006 11 10 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 223800 UTA 2006 10 02 01 05 00 6840-66 P iC5H12 ARL 53.357 -999.990 ... v1 2006 11 10 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 223801 UTA 2006 10 07 23 55 00 2799-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2006 11 01 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 223802 UTA 2006 10 07 23 55 00 2800-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2006 11 01 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 223803 UTA 2006 10 15 23 00 00 6559-66 P iC5H12 ARL 126.420 -999.990 P.. v1 2006 11 13 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 224372 UTA 2006 10 15 23 00 00 6560-66 P iC5H12 ARL 84.812 -999.990 P.. v1 2006 11 13 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 224373 UTA 2006 10 21 21 30 00 3221-99 P iC5H12 ARL 889.250 -999.990 .X. v1 2006 11 13 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 224374 UTA 2006 10 21 21 30 00 3222-99 P iC5H12 ARL 1045.875 -999.990 .X. v1 2006 11 13 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 224375 UTA 2006 10 31 00 15 00 3441-99 P iC5H12 ARL 43.536 -999.990 ... v1 2006 12 10 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 225174 UTA 2006 10 31 00 15 00 3442-99 P iC5H12 ARL 41.654 -999.990 ... v1 2006 12 10 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 225175 UTA 2006 11 06 17 55 00 3163-99 P iC5H12 ARL 19.571 -999.990 ... v1 2006 12 10 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 225176 UTA 2006 11 06 17 55 00 3164-99 P iC5H12 ARL 14.934 -999.990 ... v1 2006 12 10 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 225177 UTA 2006 11 20 17 20 00 1445-99 P iC5H12 ARL 45.273 -999.990 ... v1 2006 12 14 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 225631 UTA 2006 11 20 17 20 00 1446-99 P iC5H12 ARL 37.557 -999.990 ... v1 2006 12 14 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 225632 UTA 2006 12 09 00 05 00 1953-99 P iC5H12 ARL 54.361 -999.990 ... v1 2007 02 19 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 226737 UTA 2006 12 09 00 05 00 1954-99 P iC5H12 ARL 60.227 -999.990 ... v1 2007 02 19 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 226738 UTA 2006 12 14 16 30 00 4075-99 P iC5H12 ARL 57.445 -999.990 ... v1 2007 02 14 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 226739 UTA 2006 12 14 16 30 00 4076-99 P iC5H12 ARL 75.953 -999.990 ... v1 2007 02 14 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 226740 UTA 2006 12 21 21 10 00 2037-99 P iC5H12 ARL 76.562 -999.990 ... v1 2007 02 21 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 227145 UTA 2006 12 21 21 10 00 2038-99 P iC5H12 ARL 74.622 -999.990 ... v1 2007 02 21 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 227146 UTA 2007 01 09 17 56 00 4617-99 P iC5H12 ARL 70.116 -999.990 ... v1 2007 03 02 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 228143 UTA 2007 01 09 17 56 00 4618-99 P iC5H12 ARL 70.633 -999.990 ... v1 2007 03 02 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 228144 UTA 2007 01 15 23 45 00 2923-99 P iC5H12 ARL 125.072 -999.990 ... v1 2007 04 17 12 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 228605 UTA 2007 01 15 23 45 00 2924-99 P iC5H12 ARL 116.542 -999.990 ... v1 2007 04 17 12 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 228606 UTA 2007 01 21 23 03 00 2914-99 P iC5H12 ARL 110.832 -999.990 ... v1 2007 05 01 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 228604 UTA 2007 01 21 23 03 00 2914-99 P iC5H12 ARL 104.147 -999.990 ... v1 2007 05 14 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 228604 UTA 2007 01 29 19 52 00 3223-99 P iC5H12 ARL 95.844 -999.990 P.. v1 2007 04 16 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 230019 UTA 2007 01 29 19 52 00 3224-99 P iC5H12 ARL 148.224 -999.990 P.. v1 2007 04 16 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 230020 UTA 2007 02 09 17 22 00 3201-99 P iC5H12 ARL 159.259 -999.990 ... v1 2007 04 16 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 230021 UTA 2007 02 09 17 22 00 3202-99 P iC5H12 ARL 206.449 -999.990 ... v1 2007 04 16 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 230022 UTA 2007 02 15 23 53 00 75-99 P iC5H12 ARL 143.346 -999.990 ... v1 2007 04 30 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 230465 UTA 2007 02 15 23 53 00 76-99 P iC5H12 ARL 164.386 -999.990 ... v1 2007 04 30 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 230466 UTA 2007 02 21 21 24 00 3275-99 P iC5H12 ARL 160.318 -999.990 ... v1 2007 05 03 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 230463 UTA 2007 02 21 21 24 00 3276-99 P iC5H12 ARL 135.346 -999.990 ... v1 2007 05 03 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 230464 UTA 2007 02 28 20 08 00 67-99 P iC5H12 ARL 94.514 -999.990 ... v1 2007 05 04 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 231019 UTA 2007 02 28 20 08 00 68-99 P iC5H12 ARL 89.988 -999.990 ... v1 2007 05 04 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 231020 UTA 2007 03 06 20 15 00 2473-99 P iC5H12 ARL 37.058 -999.990 ... v1 2007 05 01 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 231017 UTA 2007 03 06 20 15 00 2473-99 P iC5H12 ARL 40.716 -999.990 ... v1 2007 05 14 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 231017 UTA 2007 03 06 20 15 00 2474-99 P iC5H12 ARL 40.018 -999.990 ... v1 2007 05 01 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 231018 UTA 2007 03 06 20 15 00 2474-99 P iC5H12 ARL 41.236 -999.990 ... v1 2007 05 14 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 231018 UTA 2007 03 13 18 45 00 4165-99 P iC5H12 ARL 2315.819 -999.990 P.. v1 2007 04 30 12 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 231833 UTA 2007 03 13 18 45 00 4166-99 P iC5H12 ARL 815.502 -999.990 P.. v1 2007 04 30 12 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 231834 UTA 2007 03 19 21 11 00 943-99 P iC5H12 ARL 142.773 -999.990 P.. v1 2007 04 30 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 231831 UTA 2007 03 19 21 11 00 944-99 P iC5H12 ARL 77.863 -999.990 P.. v1 2007 04 30 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 231832 UTA 2007 03 26 19 33 00 233-99 P iC5H12 ARL 221.798 -999.990 P.. v1 2007 05 02 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 232435 UTA 2007 03 26 19 33 00 234-99 P iC5H12 ARL 312.141 -999.990 P.. v1 2007 05 02 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 232436 UTA 2007 04 02 02 25 00 49-99 P iC5H12 ARL 16.789 -999.990 ... v1 2007 05 02 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 232437 UTA 2007 04 02 02 25 00 50-99 P iC5H12 ARL 18.832 -999.990 ... v1 2007 05 02 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 232438 UTA 2007 04 16 01 20 00 3315-99 P iC5H12 ARL 33.517 -999.990 ... v1 2007 05 25 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 233094 UTA 2007 04 16 01 20 00 3316-99 P iC5H12 ARL 30.826 -999.990 ... v1 2007 05 25 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 233095 UTA 2007 04 21 19 34 00 133-99 P iC5H12 ARL 61.174 -999.990 ... v1 2007 05 22 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 233919 UTA 2007 04 21 19 34 00 134-99 P iC5H12 ARL 61.664 -999.990 ... v1 2007 05 22 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 233920 UTA 2007 04 27 15 00 00 2845-99 P iC5H12 ARL 20.208 -999.990 ... v1 2007 05 22 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 233917 UTA 2007 04 27 15 00 00 2846-99 P iC5H12 ARL 29.706 -999.990 ... v1 2007 05 22 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 233918 UTA 2007 05 03 17 00 00 3-99 P iC5H12 ARL 51.760 -999.990 ... v1 2007 06 13 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 234219 UTA 2007 05 03 17 00 00 4-99 P iC5H12 ARL 127.680 -999.990 ... v1 2007 06 13 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 234220 UTA 2007 05 10 02 15 00 4419-99 P iC5H12 ARL 133.422 -999.990 ... v1 2007 06 13 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 234217 UTA 2007 05 10 02 15 00 4420-99 P iC5H12 ARL 137.286 -999.990 ... v1 2007 06 13 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 234218 UTA 2007 05 17 15 50 00 2115-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2007 09 11 12 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 235340 UTA 2007 05 24 19 35 00 2343-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2007 08 01 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 235338 UTA 2007 05 24 19 35 00 2344-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2007 08 01 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 235339 UTA 2007 06 14 00 32 00 1801-99 P iC5H12 ARL 22.782 -999.990 ... v1 2007 07 22 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 237139 UTA 2007 06 14 00 32 00 1802-99 P iC5H12 ARL 22.806 -999.990 ... v1 2007 07 22 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 237140 UTA 2007 06 21 21 40 00 1447-99 P iC5H12 ARL 4133.072 -999.990 ... v1 2007 08 01 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 237153 UTA 2007 06 27 19 15 00 1977-99 P iC5H12 ARL 119.760 -999.990 ... v1 2007 08 16 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 237869 UTA 2007 06 27 19 15 00 1978-99 P iC5H12 ARL 159.305 -999.990 ... v1 2007 08 16 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 237870 UTA 2007 07 04 19 51 00 2013-99 P iC5H12 ARL 150.557 -999.990 ... v1 2007 08 23 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 237871 UTA 2007 07 04 19 51 00 2014-99 P iC5H12 ARL 182.054 -999.990 ... v1 2007 08 23 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 237872 UTA 2007 07 11 23 43 00 3459-99 P iC5H12 ARL 48.156 -999.990 ... v1 2007 08 14 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 238798 UTA 2007 07 11 23 43 00 3460-99 P iC5H12 ARL 48.293 -999.990 ... v1 2007 08 14 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 238799 UTA 2007 07 17 15 45 00 4383-99 P iC5H12 ARL 96.222 -999.990 ... v1 2007 08 26 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 238796 UTA 2007 07 17 15 45 00 4384-99 P iC5H12 ARL 93.886 -999.990 ... v1 2007 08 26 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 238797 UTA 2007 07 25 17 05 00 1250-99 P iC5H12 ARL 1145.863 -999.990 ... v1 2007 09 05 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 239601 UTA 2007 07 25 17 05 00 2323-99 P iC5H12 ARL 1160.534 -999.990 ... v1 2007 09 05 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 239602 UTA 2007 08 01 02 05 00 3670-99 P iC5H12 ARL 34.837 -999.990 ... v1 2007 09 05 12 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 239603 UTA 2007 08 01 02 05 00 4209-99 P iC5H12 ARL 33.145 -999.990 ... v1 2007 09 05 12 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 239604 UTA 2007 08 07 19 40 00 3755-99 P iC5H12 ARL 43.614 -999.990 ... v1 2007 09 07 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 240288 UTA 2007 08 07 19 40 00 3756-99 P iC5H12 ARL -999.990 -999.990 D.. v1 2007 09 07 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 240289 UTA 2007 08 19 23 31 00 4167-99 P iC5H12 ARL 25.525 -999.990 ... v1 2007 09 19 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 241119 UTA 2007 08 19 23 31 00 4168-99 P iC5H12 ARL 32.303 -999.990 ... v1 2007 09 19 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 241120 UTA 2007 08 27 17 40 00 3961-99 P iC5H12 ARL 51.739 -999.990 ... v1 2007 09 14 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 241117 UTA 2007 08 27 17 40 00 3962-99 P iC5H12 ARL 65.021 -999.990 ... v1 2007 09 14 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 241118 UTA 2007 09 04 21 20 00 3149-99 P iC5H12 ARL 78.842 -999.990 ... v1 2007 10 15 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 241926 UTA 2007 09 04 21 20 00 3150-99 P iC5H12 ARL 78.590 -999.990 ... v1 2007 10 15 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 241927 UTA 2007 09 12 02 01 00 1675-99 P iC5H12 ARL 355.467 -999.990 P.. v1 2007 10 15 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 241924 UTA 2007 09 12 02 01 00 1676-99 P iC5H12 ARL 28.579 -999.990 P.. v1 2007 10 15 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 241925 UTA 2007 09 18 00 55 00 2829-99 P iC5H12 ARL 113.616 -999.990 P.. v1 2007 10 22 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 242633 UTA 2007 09 18 00 55 00 2830-99 P iC5H12 ARL 28.372 -999.990 P.. v1 2007 10 22 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 242634 UTA 2007 09 24 15 40 00 2171-99 P iC5H12 ARL 40.688 -999.990 ... v1 2007 10 24 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 242631 UTA 2007 09 24 15 40 00 2172-99 P iC5H12 ARL 35.627 -999.990 ... v1 2007 10 24 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 242632 UTA 2007 10 10 17 25 00 893-99 P iC5H12 ARL 46.549 -999.990 P.. v1 2007 11 02 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 243768 UTA 2007 10 10 17 25 00 894-99 P iC5H12 ARL 75.046 -999.990 P.. v1 2007 11 02 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 243769 UTA 2007 10 17 22 55 00 3161-99 P iC5H12 ARL 38.514 -999.990 ... v1 2007 11 02 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 243766 UTA 2007 10 17 22 55 00 3162-99 P iC5H12 ARL 37.080 -999.990 ... v1 2007 11 02 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 243767 UTA 2007 10 24 00 05 00 2115-99 P iC5H12 ARL -999.990 -999.990 D.. v1 2007 11 26 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 244510 UTA 2007 10 24 00 05 00 4103-99 P iC5H12 ARL -999.990 -999.990 D.. v1 2007 11 26 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 244511 UTA 2007 10 29 23 10 00 4278-99 P iC5H12 ARL 36.623 -999.990 ... v1 2007 11 16 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 244509 UTA 2007 10 29 23 10 00 4829-99 P iC5H12 ARL 36.411 -999.990 ... v1 2007 11 16 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 244508 UTA 2007 11 07 16 32 00 67-99 P iC5H12 ARL 1664.891 -999.990 ... v1 2007 11 30 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 245350 UTA 2007 11 07 16 32 00 68-99 P iC5H12 ARL 2315.080 -999.990 ... v1 2007 11 30 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 245351 UTA 2007 11 14 00 05 00 3181-99 P iC5H12 ARL 55.360 -999.990 ... v1 2007 11 30 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 245348 UTA 2007 11 14 00 05 00 3182-99 P iC5H12 ARL 51.423 -999.990 ... v1 2007 11 30 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 245349 UTA 2007 11 19 21 24 00 3223-99 P iC5H12 ARL 45.208 -999.990 P.. v1 2007 12 18 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 245936 UTA 2007 11 19 21 24 00 3224-99 P iC5H12 ARL 68.462 -999.990 P.. v1 2007 12 18 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 245937 UTA 2007 11 27 22 19 00 4487-99 P iC5H12 ARL 41.134 -999.990 ... v1 2007 12 18 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 245934 UTA 2007 11 27 22 19 00 4488-99 P iC5H12 ARL 43.590 -999.990 ... v1 2007 12 18 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 245935 UTA 2007 12 03 21 55 00 675-99 P iC5H12 ARL 50.643 -999.990 ... v1 2008 02 08 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 246974 UTA 2007 12 03 21 55 00 676-99 P iC5H12 ARL 54.547 -999.990 ... v1 2008 02 08 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 246975 UTA 2007 12 10 17 25 00 3269-99 P iC5H12 ARL 156.106 -999.990 ... v1 2008 02 25 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 246972 UTA 2007 12 10 17 25 00 3270-99 P iC5H12 ARL 150.983 -999.990 ... v1 2008 02 25 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 246973 UTA 2007 12 17 23 52 00 3651-99 P iC5H12 ARL 53.544 -999.990 ... v1 2008 02 01 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 247578 UTA 2007 12 17 23 52 00 3652-99 P iC5H12 ARL 51.209 -999.990 ... v1 2008 02 01 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 247579 UTA 2007 12 23 21 55 00 4311-99 P iC5H12 ARL 52.508 -999.990 ... v1 2008 02 01 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 247576 UTA 2007 12 23 21 55 00 4312-99 P iC5H12 ARL 55.026 -999.990 ... v1 2008 02 01 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 247577 UTA 2007 12 31 20 06 00 3297-99 P iC5H12 ARL 81.578 -999.990 ... v1 2008 02 08 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 248217 UTA 2007 12 31 20 06 00 4299-99 P iC5H12 ARL 80.388 -999.990 ... v1 2008 02 08 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 248218 UTA 2008 01 06 23 35 00 2054-99 P iC5H12 ARL 78.446 -999.990 ... v1 2008 02 08 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 248215 UTA 2008 01 06 23 35 00 3816-99 P iC5H12 ARL 75.439 -999.990 ... v1 2008 02 08 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 248216 UTA 2008 01 22 23 10 00 4265-99 P iC5H12 ARL 103.885 -999.990 ... v1 2008 02 25 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 248795 UTA 2008 01 22 23 10 00 4266-99 P iC5H12 ARL 96.825 -999.990 ... v1 2008 02 25 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 248794 UTA 2008 01 28 18 13 00 4913-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2008 02 26 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 249377 UTA 2008 01 28 18 13 00 4914-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2008 02 26 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 249378 UTA 2008 02 03 23 05 00 4915-99 P iC5H12 ARL 52.010 -999.990 ... v1 2008 02 26 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 249379 UTA 2008 02 03 23 05 00 4916-99 P iC5H12 ARL 49.535 -999.990 ... v1 2008 02 26 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 249380 UTA 2008 02 11 23 02 00 2935-99 P iC5H12 ARL 42.747 -999.990 ... v1 2008 04 09 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 250076 UTA 2008 02 11 23 02 00 2936-99 P iC5H12 ARL 42.843 -999.990 ... v1 2008 04 09 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 250077 UTA 2008 02 18 23 20 00 5057-99 P iC5H12 ARL 66.217 -999.990 ... v1 2008 04 01 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 250074 UTA 2008 02 18 23 20 00 5058-99 P iC5H12 ARL 67.282 -999.990 ... v1 2008 04 01 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 250075 UTA 2008 03 03 18 12 00 1633-99 P iC5H12 ARL 100.916 -999.990 ... v1 2008 04 09 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 250920 UTA 2008 03 03 18 12 00 1634-99 P iC5H12 ARL 102.549 -999.990 ... v1 2008 04 09 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 250921 UTA 2008 03 10 01 15 00 1483-99 P iC5H12 ARL 42.159 -999.990 ... v1 2008 04 10 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 251509 UTA 2008 03 10 01 15 00 1484-99 P iC5H12 ARL 35.894 -999.990 ... v1 2008 04 10 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 251510 UTA 2008 03 16 00 16 00 577-99 P iC5H12 ARL 36.265 -999.990 ... v1 2008 04 10 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 251507 UTA 2008 03 16 00 16 00 578-99 P iC5H12 ARL 36.593 -999.990 ... v1 2008 04 10 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 251508 UTA 2008 03 31 20 05 00 4687-99 P iC5H12 ARL 43.679 -999.990 ... v1 2008 08 05 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 252323 UTA 2008 03 31 20 05 00 4688-99 P iC5H12 ARL 44.029 -999.990 ... v1 2008 08 05 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 252324 UTA 2008 04 08 00 24 00 3619-99 P iC5H12 ARL 15.502 -999.990 ... v1 2008 05 11 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 253069 UTA 2008 04 08 00 24 00 3620-99 P iC5H12 ARL 16.976 -999.990 ... v1 2008 05 11 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 253070 UTA 2008 04 14 02 30 00 17-99 P iC5H12 ARL 50.737 -999.990 ... v1 2008 05 29 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 253405 UTA 2008 04 14 02 30 00 18-99 P iC5H12 ARL 44.693 -999.990 ... v1 2008 05 29 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 253406 UTA 2008 05 06 02 10 00 3057-99 P iC5H12 ARL 31.624 -999.990 ... v1 2008 06 11 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 254750 UTA 2008 05 06 02 10 00 3058-99 P iC5H12 ARL 31.976 -999.990 ... v1 2008 06 11 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 254751 UTA 2008 05 14 17 16 00 2367-99 P iC5H12 ARL 77.419 -999.990 ... v1 2008 06 28 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 254748 UTA 2008 05 14 17 16 00 2368-99 P iC5H12 ARL 67.681 -999.990 ... v1 2008 06 28 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 254749 UTA 2008 06 02 20 05 00 3069-99 P iC5H12 ARL 130.081 -999.990 ... v1 2008 07 01 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 256017 UTA 2008 06 02 20 05 00 3070-99 P iC5H12 ARL 84.220 -999.990 ... v1 2008 07 01 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 256018 UTA 2008 06 02 23 45 00 1011-99 P iC5H12 ARL 461.103 -999.990 P.. v1 2008 08 08 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 257666 UTA 2008 06 02 23 45 00 1012-99 P iC5H12 ARL 923.981 -999.990 P.. v1 2008 08 08 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 257667 UTA 2008 06 09 16 35 00 4637-99 P iC5H12 ARL 33.905 -999.990 ... v1 2008 06 29 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 256015 UTA 2008 06 09 16 35 00 4638-99 P iC5H12 ARL 31.148 -999.990 ... v1 2008 06 29 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 256016 UTA 2008 06 20 00 55 00 4807-99 P iC5H12 ARL 22.778 -999.990 ... v1 2008 07 29 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 257072 UTA 2008 06 20 00 55 00 4808-99 P iC5H12 ARL 21.317 -999.990 ... v1 2008 07 29 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 257073 UTA 2008 06 25 21 35 00 2697-99 P iC5H12 ARL 137.012 -999.990 ... v1 2008 07 29 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 257070 UTA 2008 06 25 21 35 00 2698-99 P iC5H12 ARL 151.169 -999.990 ... v1 2008 07 29 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 257071 UTA 2008 07 09 19 05 00 2851-99 P iC5H12 ARL -999.990 -999.990 D.. v1 2008 08 02 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 257664 UTA 2008 07 09 19 05 00 2852-99 P iC5H12 ARL 21.755 -999.990 ... v1 2008 08 02 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 257665 UTA 2008 07 16 00 34 00 3739-99 P iC5H12 ARL 24.529 -999.990 ... v1 2008 09 23 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 258522 UTA 2008 07 16 00 34 00 3740-99 P iC5H12 ARL 25.626 -999.990 ... v1 2008 09 23 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 258523 UTA 2008 07 21 16 15 00 1055-99 P iC5H12 ARL 26.859 -999.990 ... v1 2008 09 24 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 258520 UTA 2008 07 21 16 15 00 1056-99 P iC5H12 ARL 26.636 -999.990 ... v1 2008 09 24 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 258521 UTA 2008 07 27 23 25 00 2029-99 P iC5H12 ARL 26.515 -999.990 ... v1 2008 09 22 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 258989 UTA 2008 07 27 23 25 00 2030-99 P iC5H12 ARL 25.116 -999.990 ... v1 2008 09 22 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 258990 UTA 2008 08 02 17 10 00 4589-99 P iC5H12 ARL 5290.097 -999.990 ... v1 2008 09 23 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 258988 UTA 2008 08 11 15 25 00 3151-99 P iC5H12 ARL 1609.538 -999.990 ... v1 2008 10 02 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 259940 UTA 2008 08 11 15 25 00 3152-99 P iC5H12 ARL 1299.591 -999.990 ... v1 2008 10 02 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 259941 UTA 2008 08 18 21 56 00 965-99 P iC5H12 ARL 34.574 -999.990 ... v1 2008 10 22 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 259938 UTA 2008 08 18 21 56 00 966-99 P iC5H12 ARL 33.990 -999.990 ... v1 2008 10 22 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 259939 UTA 2008 08 25 00 50 00 1213-99 P iC5H12 ARL 163.864 -999.990 P.. v1 2008 09 30 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 260787 UTA 2008 08 25 00 50 00 1214-99 P iC5H12 ARL 67.830 -999.990 P.. v1 2008 09 30 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 260788 UTA 2008 09 01 17 10 00 1507-99 P iC5H12 ARL 25.100 -999.990 ... v1 2008 10 02 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 260785 UTA 2008 09 01 17 10 00 1508-99 P iC5H12 ARL 31.567 -999.990 ... v1 2008 10 02 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 260786 UTA 2008 09 11 00 20 00 3999-99 P iC5H12 ARL 91.065 -999.990 ... v1 2008 11 10 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 261397 UTA 2008 09 11 00 20 00 4000-99 P iC5H12 ARL 68.005 -999.990 ... v1 2008 11 10 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 261398 UTA 2008 09 24 19 05 00 4751-99 P iC5H12 ARL 125.397 -999.990 ... v1 2008 10 31 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 262261 UTA 2008 09 24 19 05 00 4752-99 P iC5H12 ARL 108.457 -999.990 ... v1 2008 10 31 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 262262 UTA 2008 10 01 00 20 00 1169-99 P iC5H12 ARL 45.014 -999.990 ... v1 2009 01 07 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 262259 UTA 2008 10 01 00 20 00 1170-99 P iC5H12 ARL 52.569 -999.990 ... v1 2009 01 07 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 262260 UTA 2008 10 07 20 55 00 3065-99 P iC5H12 ARL 217.392 -999.990 ... v1 2008 12 02 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 262936 UTA 2008 10 07 20 55 00 3066-99 P iC5H12 ARL 246.368 -999.990 ... v1 2008 12 02 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 262937 UTA 2008 10 13 21 38 00 875-99 P iC5H12 ARL 292.823 -999.990 P.. v1 2008 12 02 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 262938 UTA 2008 10 13 21 38 00 876-99 P iC5H12 ARL 493.139 -999.990 P.. v1 2008 12 02 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 262939 UTA 2008 10 20 19 05 00 153-99 P iC5H12 ARL 32.291 -999.990 ... v1 2008 11 13 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 263624 UTA 2008 10 20 19 05 00 154-99 P iC5H12 ARL 28.659 -999.990 ... v1 2008 11 13 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 263625 UTA 2008 10 27 20 40 00 3483-99 P iC5H12 ARL 137.874 -999.990 ... v1 2008 11 13 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 263622 UTA 2008 10 27 20 40 00 3484-99 P iC5H12 ARL 118.334 -999.990 ... v1 2008 11 13 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 263623 UTA 2008 11 03 23 20 00 3455-99 P iC5H12 ARL 52.665 -999.990 ... v1 2008 12 19 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 264330 UTA 2008 11 03 23 20 00 3456-99 P iC5H12 ARL 46.301 -999.990 ... v1 2008 12 19 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 264331 UTA 2008 11 10 18 50 00 1031-99 P iC5H12 ARL 21.546 -999.990 ... v1 2008 12 19 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 264328 UTA 2008 11 10 18 50 00 1032-99 P iC5H12 ARL 16.899 -999.990 ... v1 2008 12 19 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 264329 UTA 2008 11 18 23 00 00 5041-99 P iC5H12 ARL 22.995 -999.990 ... v1 2008 12 16 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 265053 UTA 2008 11 18 23 00 00 5042-99 P iC5H12 ARL 28.124 -999.990 ... v1 2008 12 16 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 265054 UTA 2008 11 24 22 35 00 1331-99 P iC5H12 ARL 40.833 -999.990 ... v1 2008 12 16 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 265051 UTA 2008 11 24 22 35 00 1332-99 P iC5H12 ARL 54.756 -999.990 ... v1 2008 12 16 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 265052 UTA 2008 12 01 00 05 00 1793-99 P iC5H12 ARL 25.723 -999.990 ... v1 2009 01 02 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 265897 UTA 2008 12 01 00 05 00 1794-99 P iC5H12 ARL 26.507 -999.990 ... v1 2009 01 02 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 265896 UTA 2008 12 06 23 20 00 1491-99 P iC5H12 ARL 207.407 -999.990 ... v1 2008 12 30 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 265898 UTA 2008 12 06 23 20 00 1492-99 P iC5H12 ARL 174.392 -999.990 ... v1 2008 12 30 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 265899 UTA 2008 12 14 00 00 00 1433-99 P iC5H12 ARL 86.909 -999.990 ... v1 2009 02 13 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 266776 UTA 2008 12 14 00 00 00 1434-99 P iC5H12 ARL 86.943 -999.990 ... v1 2009 02 13 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 266777 UTA 2008 12 21 23 45 00 4471-99 P iC5H12 ARL 58.890 -999.990 ... v1 2009 01 13 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 266778 UTA 2008 12 21 23 45 00 4472-99 P iC5H12 ARL 60.900 -999.990 ... v1 2009 01 13 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 266779 UTA 2009 01 01 00 06 00 3873-99 P iC5H12 ARL 42.780 -999.990 ... v1 2009 02 10 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 267732 UTA 2009 01 01 00 06 00 3874-99 P iC5H12 ARL 50.144 -999.990 ... v1 2009 02 10 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 267733 UTA 2009 01 07 00 35 00 763-99 P iC5H12 ARL 53.526 -999.990 ... v1 2009 01 27 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 267770 UTA 2009 01 07 00 35 00 764-99 P iC5H12 ARL 57.675 -999.990 ... v1 2009 01 27 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 267771 UTA 2009 01 12 17 30 00 3483-99 P iC5H12 ARL 62.617 -999.990 ... v1 2009 02 16 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 268573 UTA 2009 01 12 17 30 00 3484-99 P iC5H12 ARL 63.746 -999.990 ... v1 2009 02 16 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 268574 UTA 2009 01 19 00 05 00 5033-99 P iC5H12 ARL 54.708 -999.990 ... v1 2009 02 16 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 268571 UTA 2009 01 19 00 05 00 5034-99 P iC5H12 ARL 55.593 -999.990 ... v1 2009 02 16 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 268572 UTA 2009 01 26 17 30 00 2737-99 P iC5H12 ARL 80.930 -999.990 ... v1 2009 03 11 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 269445 UTA 2009 01 26 17 30 00 2738-99 P iC5H12 ARL 79.621 -999.990 ... v1 2009 03 11 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 269446 UTA 2009 02 03 00 20 00 2079-99 P iC5H12 ARL 108.556 -999.990 ... v1 2009 03 11 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 269443 UTA 2009 02 03 00 20 00 2080-99 P iC5H12 ARL 85.410 -999.990 ... v1 2009 03 11 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 269444 UTA 2009 02 09 00 45 00 3917-99 P iC5H12 ARL 78.581 -999.990 P.. v1 2009 04 14 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 270307 UTA 2009 02 09 00 45 00 3918-99 P iC5H12 ARL 119.044 -999.990 P.. v1 2009 04 14 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 270308 UTA 2009 02 15 23 30 00 3959-99 P iC5H12 ARL 82.566 -999.990 ... v1 2009 04 14 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 270305 UTA 2009 02 15 23 30 00 3960-99 P iC5H12 ARL 70.117 -999.990 ... v1 2009 04 14 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 270306 UTA 2009 02 22 01 20 00 3101-99 P iC5H12 ARL 56.263 -999.990 ... v1 2009 04 17 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 270983 UTA 2009 02 22 01 20 00 3102-99 P iC5H12 ARL 55.512 -999.990 ... v1 2009 04 17 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 270984 UTA 2009 03 01 00 20 00 1491-99 P iC5H12 ARL 63.649 -999.990 ... v1 2009 04 17 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 270981 UTA 2009 03 01 00 20 00 1492-99 P iC5H12 ARL 60.249 -999.990 ... v1 2009 04 17 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 270982 UTA 2009 03 04 18 40 00 2759-99 P iC5H12 ARL 51.839 -999.990 ... v1 2009 04 06 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 272129 UTA 2009 03 04 18 40 00 2760-99 P iC5H12 ARL 56.434 -999.990 ... v1 2009 04 06 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 272130 UTA 2009 03 12 01 10 00 4127-99 P iC5H12 ARL 38.683 -999.990 ... v1 2009 04 04 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 272127 UTA 2009 03 12 01 10 00 4128-99 P iC5H12 ARL 41.229 -999.990 ... v1 2009 04 04 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 272128 UTA 2009 03 17 15 35 00 4639-99 P iC5H12 ARL 31.229 -999.990 ... v1 2009 04 21 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 272851 UTA 2009 03 17 15 35 00 4640-99 P iC5H12 ARL 37.790 -999.990 ... v1 2009 04 21 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 272852 UTA 2009 03 24 16 15 00 1125-99 P iC5H12 ARL 100.439 -999.990 P.. v1 2009 04 18 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 272849 UTA 2009 03 24 16 15 00 1126-99 P iC5H12 ARL 155.200 -999.990 P.. v1 2009 04 18 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 272850 UTA 2009 03 30 00 35 00 3296-99 P iC5H12 ARL 47.523 -999.990 ... v1 2009 05 01 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 273936 UTA 2009 03 30 00 35 00 3345-99 P iC5H12 ARL 43.914 -999.990 ... v1 2009 05 01 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 273937 UTA 2009 04 05 00 10 00 1496-99 P iC5H12 ARL 53.051 -999.990 ... v1 2009 05 01 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 273934 UTA 2009 04 05 00 10 00 1961-99 P iC5H12 ARL 52.843 -999.990 ... v1 2009 05 01 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 273935 UTA 2009 04 10 21 00 00 3477-99 P iC5H12 ARL 172.624 -999.990 P.. v1 2009 05 12 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 274657 UTA 2009 04 10 21 00 00 3478-99 P iC5H12 ARL 50.675 -999.990 P.. v1 2009 05 12 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 274658 UTA 2009 04 22 15 45 00 4085-99 P iC5H12 ARL 37.061 -999.990 P.. v1 2009 05 12 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 274659 UTA 2009 04 22 15 45 00 4086-99 P iC5H12 ARL 23.350 -999.990 P.. v1 2009 05 12 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 274660 UTA 2009 04 27 17 05 00 1633-99 P iC5H12 ARL 31.092 -999.990 ... v1 2009 06 09 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 275296 UTA 2009 04 27 17 05 00 2348-99 P iC5H12 ARL 34.814 -999.990 ... v1 2009 06 09 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 275297 UTA 2009 05 03 21 34 00 643-99 P iC5H12 ARL 26.576 -999.990 ... v1 2009 06 08 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 275294 UTA 2009 05 03 21 34 00 644-99 P iC5H12 ARL 26.705 -999.990 ... v1 2009 06 08 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 275295 UTA 2009 05 09 19 05 00 267-99 P iC5H12 ARL 33.782 -999.990 P.. v1 2009 06 11 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 276035 UTA 2009 05 09 19 05 00 268-99 P iC5H12 ARL 17.275 -999.990 P.. v1 2009 06 11 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 276036 UTA 2009 05 14 19 50 00 55-99 P iC5H12 ARL 2215.539 -999.990 P.. v1 2009 06 17 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 276033 UTA 2009 05 14 19 50 00 56-99 P iC5H12 ARL 3428.561 -999.990 P.. v1 2009 06 17 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 276034 UTA 2009 05 20 22 00 00 1389-99 P iC5H12 ARL 25.965 -999.990 ... v1 2009 06 29 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 276960 UTA 2009 05 20 22 00 00 1390-99 P iC5H12 ARL 19.881 -999.990 ... v1 2009 06 29 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 276961 UTA 2009 05 27 17 55 00 1611-99 P iC5H12 ARL 30.854 -999.990 ... v1 2009 06 29 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 276958 UTA 2009 05 27 17 55 00 1612-99 P iC5H12 ARL 30.496 -999.990 ... v1 2009 06 29 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 276959 UTA 2009 06 02 21 00 00 3735-99 P iC5H12 ARL 90.525 -999.990 ... v1 2009 07 14 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 277805 UTA 2009 06 02 21 00 00 3736-99 P iC5H12 ARL 126.443 -999.990 ... v1 2009 07 14 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 277806 UTA 2009 06 09 00 00 00 2511-99 P iC5H12 ARL 38.752 -999.990 P.. v1 2009 07 10 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 277803 UTA 2009 06 09 00 00 00 2512-99 P iC5H12 ARL 18.039 -999.990 P.. v1 2009 07 10 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 277804 UTA 2009 06 16 17 10 00 1071-99 P iC5H12 ARL 22.154 -999.990 P.. v1 2009 07 23 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 278506 UTA 2009 06 16 17 10 00 1072-99 P iC5H12 ARL 35.957 -999.990 P.. v1 2009 07 23 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 278507 UTA 2009 06 22 22 10 00 427-99 P iC5H12 ARL 20.839 -999.990 ... v1 2009 07 23 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 278504 UTA 2009 06 22 22 10 00 428-99 P iC5H12 ARL 22.434 -999.990 ... v1 2009 07 23 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 278505 UTA 2009 06 29 01 10 00 3291-99 P iC5H12 ARL 29.508 -999.990 ... v1 2009 07 24 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 279276 UTA 2009 06 29 01 10 00 3292-99 P iC5H12 ARL 27.152 -999.990 ... v1 2009 07 24 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 279277 UTA 2009 07 04 23 30 00 2681-99 P iC5H12 ARL 31.378 -999.990 ... v1 2009 07 27 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 279274 UTA 2009 07 04 23 30 00 2682-99 P iC5H12 ARL 42.135 -999.990 ... v1 2009 07 27 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 279275 UTA 2009 07 11 16 45 00 643-99 P iC5H12 ARL 144.000 -999.990 ... v1 2009 08 10 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 280299 UTA 2009 07 11 16 45 00 644-99 P iC5H12 ARL 141.764 -999.990 ... v1 2009 08 10 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 280300 UTA 2009 07 18 00 15 00 2333-99 P iC5H12 ARL 31.325 -999.990 ... v1 2009 08 13 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 280297 UTA 2009 07 18 00 15 00 2334-99 P iC5H12 ARL 25.046 -999.990 ... v1 2009 08 13 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 280298 UTA 2009 07 23 18 00 00 3919-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2009 08 17 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 280873 UTA 2009 07 23 18 00 00 3920-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2009 08 17 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 280874 UTA 2009 07 29 22 40 00 453-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2009 08 17 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 280872 UTA 2009 07 29 22 40 00 454-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2009 08 17 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 280871 UTA 2009 08 05 16 12 00 131-99 P iC5H12 ARL 121.883 -999.990 ... v1 2009 09 02 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 281706 UTA 2009 08 05 16 12 00 132-99 P iC5H12 ARL 95.596 -999.990 ... v1 2009 09 02 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 281707 UTA 2009 08 13 02 05 00 611-99 P iC5H12 ARL 26.258 -999.990 ... v1 2009 09 02 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 281704 UTA 2009 08 13 02 05 00 612-99 P iC5H12 ARL 24.856 -999.990 ... v1 2009 09 02 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 281705 UTA 2009 08 18 17 30 00 71-99 P iC5H12 ARL 32.745 -999.990 ... v1 2009 09 03 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 282479 UTA 2009 08 18 17 30 00 72-99 P iC5H12 ARL 28.574 -999.990 ... v1 2009 09 03 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 282480 UTA 2009 08 24 19 55 00 4059-99 P iC5H12 ARL 21.727 -999.990 ... v1 2009 09 03 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 282477 UTA 2009 08 24 19 55 00 4060-99 P iC5H12 ARL 21.499 -999.990 ... v1 2009 09 03 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 282478 UTA 2009 09 01 22 55 00 3635-99 P iC5H12 ARL 98.886 -999.990 ... v1 2009 09 25 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 283537 UTA 2009 09 01 22 55 00 3636-99 P iC5H12 ARL 120.574 -999.990 ... v1 2009 09 25 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 283538 UTA 2009 09 09 20 30 00 1121-99 P iC5H12 ARL 83.762 -999.990 ... v1 2009 09 25 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 283535 UTA 2009 09 09 20 30 00 1122-99 P iC5H12 ARL 64.545 -999.990 ... v1 2009 09 25 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 283536 UTA 2009 09 14 20 05 00 2871-99 P iC5H12 ARL 18.102 -999.990 ... v1 2009 10 04 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 284110 UTA 2009 09 14 20 05 00 2872-99 P iC5H12 ARL 21.849 -999.990 ... v1 2009 10 04 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 284111 UTA 2009 09 21 16 45 00 441-99 P iC5H12 ARL 27.699 -999.990 ... v1 2009 10 04 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 284108 UTA 2009 09 21 16 45 00 442-99 P iC5H12 ARL 23.874 -999.990 ... v1 2009 10 04 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 284109 UTA 2009 09 29 21 35 00 163-99 P iC5H12 ARL 33.665 -999.990 P.. v1 2009 10 21 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 285090 UTA 2009 09 29 21 35 00 164-99 P iC5H12 ARL 59.898 -999.990 P.. v1 2009 10 21 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 285091 UTA 2009 10 08 00 30 00 553-99 P iC5H12 ARL 45.500 -999.990 P.. v1 2009 10 21 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 285088 UTA 2009 10 08 00 30 00 554-99 P iC5H12 ARL 79.466 -999.990 P.. v1 2009 10 21 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 285089 UTA 2009 10 13 14 50 00 2397-99 P iC5H12 ARL 82.995 -999.990 ... v1 2009 11 12 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 285647 UTA 2009 10 13 14 50 00 2398-99 P iC5H12 ARL 93.034 -999.990 ... v1 2009 11 12 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 285648 UTA 2009 10 19 19 35 00 4015-99 P iC5H12 ARL 126.961 -999.990 P.. v1 2009 11 13 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 285645 UTA 2009 10 19 19 35 00 4016-99 P iC5H12 ARL 84.589 -999.990 P.. v1 2009 11 13 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 285646 UTA 2009 10 26 15 20 00 1243-99 P iC5H12 ARL 34.130 -999.990 ... v1 2009 12 11 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 286343 UTA 2009 10 26 15 20 00 1244-99 P iC5H12 ARL 34.240 -999.990 ... v1 2009 12 11 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 286344 UTA 2009 11 02 22 20 00 2341-99 P iC5H12 ARL 23.161 -999.990 ... v1 2009 12 09 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 286341 UTA 2009 11 02 22 20 00 2342-99 P iC5H12 ARL 20.945 -999.990 ... v1 2009 12 09 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 286342 UTA 2009 11 09 22 10 00 4085-99 P iC5H12 ARL 50.345 -999.990 ... v1 2009 12 10 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 287104 UTA 2009 11 09 22 10 00 4086-99 P iC5H12 ARL 38.465 -999.990 ... v1 2009 12 10 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 287105 UTA 2009 11 16 22 45 00 385-99 P iC5H12 ARL 49.923 -999.990 ... v1 2009 12 10 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 287102 UTA 2009 11 16 22 45 00 386-99 P iC5H12 ARL 45.919 -999.990 ... v1 2009 12 10 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 287103 UTA 2009 11 24 22 05 00 3755-99 P iC5H12 ARL 46.167 -999.990 ... v1 2010 01 05 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 287849 UTA 2009 11 24 22 05 00 3756-99 P iC5H12 ARL 56.005 -999.990 ... v1 2010 01 05 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 287850 UTA 2009 11 30 20 45 00 881-99 P iC5H12 ARL 56.000 -999.990 ... v1 2010 01 06 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 287847 UTA 2009 11 30 20 45 00 882-99 P iC5H12 ARL 50.378 -999.990 ... v1 2010 01 06 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 287848 UTA 2009 12 07 23 05 00 321-99 P iC5H12 ARL 220.297 -999.990 ... v1 2010 01 27 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 288509 UTA 2009 12 07 23 05 00 322-99 P iC5H12 ARL 221.507 -999.990 ... v1 2010 01 27 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 288510 UTA 2009 12 13 23 00 00 3485-99 P iC5H12 ARL 62.880 -999.990 ... v1 2010 01 25 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 288507 UTA 2009 12 13 23 00 00 3486-99 P iC5H12 ARL 59.105 -999.990 ... v1 2010 01 25 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 288508 UTA 2009 12 20 23 30 00 1165-99 P iC5H12 ARL 28.290 -999.990 ... v1 2010 02 05 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 289043 UTA 2009 12 20 23 30 00 1166-99 P iC5H12 ARL 26.051 -999.990 ... v1 2010 02 05 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 289044 UTA 2009 12 29 17 50 00 4015-99 P iC5H12 ARL 21.064 -999.990 ... v1 2010 02 05 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 289041 UTA 2009 12 29 17 50 00 4016-99 P iC5H12 ARL 20.779 -999.990 ... v1 2010 02 05 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 289042 UTA 2010 01 06 21 10 00 317-99 P iC5H12 ARL 25.710 -999.990 ... v1 2010 02 18 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 289831 UTA 2010 01 06 21 10 00 318-99 P iC5H12 ARL 28.244 -999.990 ... v1 2010 02 18 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 289832 UTA 2010 01 13 23 50 00 711-99 P iC5H12 ARL 12.945 -999.990 ... v1 2010 02 18 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 289829 UTA 2010 01 13 23 50 00 712-99 P iC5H12 ARL 8.982 -999.990 ... v1 2010 02 18 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 289830 UTA 2010 01 19 18 10 00 2181-99 P iC5H12 ARL 131.338 -999.990 ... v1 2010 03 09 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 290495 UTA 2010 01 19 18 10 00 2182-99 P iC5H12 ARL 131.412 -999.990 ... v1 2010 03 09 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 290496 UTA 2010 01 28 00 50 00 3943-99 P iC5H12 ARL 40.519 -999.990 ... v1 2010 03 09 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 290493 UTA 2010 01 28 00 50 00 3944-99 P iC5H12 ARL 44.838 -999.990 ... v1 2010 03 09 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 290494 UTA 2010 02 04 00 50 00 2775-99 P iC5H12 ARL 142.986 -999.990 ... v1 2010 03 13 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 291430 UTA 2010 02 04 00 50 00 2776-99 P iC5H12 ARL 114.736 -999.990 ... v1 2010 03 13 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 291431 UTA 2010 02 10 21 10 00 3023-99 P iC5H12 ARL 47.019 -999.990 ... v1 2010 03 13 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 291428 UTA 2010 02 10 21 10 00 3024-99 P iC5H12 ARL 43.051 -999.990 ... v1 2010 03 13 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 291429 UTA 2010 02 15 21 45 00 3163-99 P iC5H12 ARL 31.383 -999.990 ... v1 2010 04 02 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 292265 UTA 2010 02 15 21 45 00 3164-99 P iC5H12 ARL 29.935 -999.990 ... v1 2010 04 02 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 292266 UTA 2010 02 22 00 20 00 2577-99 P iC5H12 ARL 60.894 -999.990 ... v1 2010 03 31 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 292263 UTA 2010 02 22 00 20 00 2578-99 P iC5H12 ARL 59.023 -999.990 ... v1 2010 03 31 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 292264 UTA 2010 02 28 23 55 00 1723-99 P iC5H12 ARL 29.619 -999.990 ... v1 2010 04 06 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 292772 UTA 2010 02 28 23 55 00 1724-99 P iC5H12 ARL 31.782 -999.990 ... v1 2010 04 06 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 292773 UTA 2010 03 08 22 00 00 5081-99 P iC5H12 ARL 33.392 -999.990 ... v1 2010 04 06 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 292770 UTA 2010 03 08 22 00 00 5082-99 P iC5H12 ARL 24.343 -999.990 ... v1 2010 04 06 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 292771 UTA 2010 03 18 21 15 00 1187-99 P iC5H12 ARL 25.000 -999.990 ... v1 2010 05 10 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 293547 UTA 2010 03 18 21 15 00 1188-99 P iC5H12 ARL 28.241 -999.990 ... v1 2010 05 10 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 293548 UTA 2010 03 24 19 55 00 5159-99 P iC5H12 ARL 28.297 -999.990 ... v1 2010 04 20 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 293549 UTA 2010 03 24 19 55 00 5160-99 P iC5H12 ARL 31.606 -999.990 ... v1 2010 04 20 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 293550 UTA 2010 03 29 16 55 00 755-99 P iC5H12 ARL 30.677 -999.990 ... v1 2010 04 29 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 294253 UTA 2010 03 29 16 55 00 756-99 P iC5H12 ARL 32.599 -999.990 ... v1 2010 04 29 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 294254 UTA 2010 04 03 15 25 00 3013-99 P iC5H12 ARL 45.035 -999.990 ... v1 2010 04 29 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 294251 UTA 2010 04 03 15 25 00 3014-99 P iC5H12 ARL 37.415 -999.990 ... v1 2010 04 29 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 294252 UTA 2010 04 09 17 15 00 981-99 P iC5H12 ARL 34.506 -999.990 ... v1 2010 04 28 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 295046 UTA 2010 04 09 17 15 00 982-99 P iC5H12 ARL 33.568 -999.990 ... v1 2010 04 28 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 295047 UTA 2010 04 15 21 50 00 4879-99 P iC5H12 ARL 16.492 -999.990 ... v1 2010 04 28 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 295044 UTA 2010 04 15 21 50 00 4880-99 P iC5H12 ARL 16.817 -999.990 ... v1 2010 04 28 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 295045 UTA 2010 04 21 02 10 00 107-99 P iC5H12 ARL 36.162 -999.990 ... v1 2010 05 25 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 295938 UTA 2010 04 21 02 10 00 1753-99 P iC5H12 ARL 34.894 -999.990 ... v1 2010 05 25 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 295939 UTA 2010 04 28 02 45 00 1561-99 P iC5H12 ARL 18.586 -999.990 ... v1 2010 06 22 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 295940 UTA 2010 04 28 02 45 00 2734-99 P iC5H12 ARL 16.712 -999.990 ... v1 2010 06 22 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 295941 UTA 2010 05 03 22 10 00 1079-99 P iC5H12 ARL 30.251 -999.990 ... v1 2010 06 08 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 296819 UTA 2010 05 03 22 10 00 1080-99 P iC5H12 ARL 20.698 -999.990 ... v1 2010 06 08 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 296820 UTA 2010 05 12 23 10 00 4197-99 P iC5H12 ARL 28.223 -999.990 ... v1 2010 06 03 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 296821 UTA 2010 05 12 23 10 00 4198-99 P iC5H12 ARL 29.302 -999.990 ... v1 2010 06 03 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 296822 UTA 2010 05 18 00 10 00 129-99 P iC5H12 ARL 17.581 -999.990 P.. v1 2010 06 23 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 297578 UTA 2010 05 18 00 10 00 130-99 P iC5H12 ARL 27.628 -999.990 P.. v1 2010 06 23 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 297579 UTA 2010 05 25 23 20 00 401-99 P iC5H12 ARL 9.526 -999.990 ... v1 2010 06 14 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 297580 UTA 2010 05 25 23 20 00 402-99 P iC5H12 ARL 10.493 -999.990 ... v1 2010 06 14 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 297581 UTA 2010 06 02 17 05 00 3303-99 P iC5H12 ARL -999.990 -999.990 C.. v1 2010 06 21 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 298408 UTA 2010 06 02 17 05 00 3304-99 P iC5H12 ARL 321.442 -999.990 ... v1 2010 06 21 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 298409 UTA 2010 06 08 19 20 00 3421-99 P iC5H12 ARL 20.088 -999.990 ... v1 2010 06 21 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 298406 UTA 2010 06 08 19 20 00 3422-99 P iC5H12 ARL 22.739 -999.990 ... v1 2010 06 21 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 298407 UTA 2010 06 16 20 40 00 3797-99 P iC5H12 ARL 22.741 -999.990 ... v1 2010 07 05 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 299360 UTA 2010 06 16 20 40 00 3798-99 P iC5H12 ARL 18.741 -999.990 ... v1 2010 07 05 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 299361 UTA 2010 06 23 22 50 00 4801-99 P iC5H12 ARL 43.387 -999.990 ... v1 2010 07 05 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 299358 UTA 2010 06 23 22 50 00 4802-99 P iC5H12 ARL 29.981 -999.990 ... v1 2010 07 05 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 299359 UTA 2010 06 30 16 35 00 201-99 P iC5H12 ARL 49.872 -999.990 P.. v1 2010 07 16 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 300130 UTA 2010 06 30 16 35 00 202-99 P iC5H12 ARL 70.893 -999.990 P.. v1 2010 07 16 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 300131 UTA 2010 07 07 23 30 00 1729-99 P iC5H12 ARL 37.577 -999.990 P.. v1 2010 07 23 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 300132 UTA 2010 07 07 23 30 00 1730-99 P iC5H12 ARL 21.245 -999.990 P.. v1 2010 07 23 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 300133 UTA 2010 09 15 16 15 00 3507-99 P iC5H12 ARL 16.876 -999.990 ... v1 2010 10 13 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 304838 UTA 2010 09 15 16 15 00 4929-99 P iC5H12 ARL 18.153 -999.990 ... v1 2010 10 13 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 304839 UTA 2010 09 22 15 20 00 3549-99 P iC5H12 ARL 91.196 -999.990 ... v1 2010 10 26 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 304836 UTA 2010 09 22 15 20 00 3624-99 P iC5H12 ARL 92.622 -999.990 ... v1 2010 10 26 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 304837 UTA 2010 09 30 22 35 00 811-99 P iC5H12 ARL 12.263 -999.990 ... v1 2010 10 20 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 305685 UTA 2010 09 30 22 35 00 812-99 P iC5H12 ARL 12.220 -999.990 ... v1 2010 10 20 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 305686 UTA 2010 10 06 16 55 00 3199-99 P iC5H12 ARL 13.627 -999.990 ... v1 2010 10 20 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 305687 UTA 2010 10 06 16 55 00 3200-99 P iC5H12 ARL 10.584 -999.990 ... v1 2010 10 20 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 305688 UTA 2010 10 13 15 50 00 2511-99 P iC5H12 ARL 43.789 -999.990 ... v1 2010 11 02 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 306533 UTA 2010 10 13 15 50 00 2512-99 P iC5H12 ARL 31.761 -999.990 ... v1 2010 11 02 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 306534 UTA 2010 10 20 20 00 00 441-99 P iC5H12 ARL 17.593 -999.990 ... v1 2010 11 18 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 306531 UTA 2010 10 20 20 00 00 442-99 P iC5H12 ARL 14.660 -999.990 ... v1 2010 11 18 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 306532 UTA 2010 10 27 00 20 00 1697-99 P iC5H12 ARL 29.977 -999.990 ... v1 2010 11 12 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 307069 UTA 2010 10 27 00 20 00 2174-99 P iC5H12 ARL 31.466 -999.990 ... v1 2010 11 12 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 307070 UTA 2010 11 02 20 15 00 1015-99 P iC5H12 ARL 182.206 -999.990 P.. v1 2010 11 16 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 307071 UTA 2010 11 02 20 15 00 1432-99 P iC5H12 ARL 270.295 -999.990 P.. v1 2010 11 16 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 307072 UTA 2010 11 09 18 35 00 5083-99 P iC5H12 ARL 34.764 -999.990 ... v1 2010 11 29 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 308093 UTA 2010 11 09 18 35 00 5084-99 P iC5H12 ARL 34.693 -999.990 ... v1 2010 11 29 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 308094 UTA 2010 11 16 20 50 00 5055-99 P iC5H12 ARL 39.658 -999.990 ... v1 2010 11 30 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 308091 UTA 2010 11 16 20 50 00 5056-99 P iC5H12 ARL 34.581 -999.990 ... v1 2010 11 30 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 308092 UTA 2010 11 22 17 10 00 2087-99 P iC5H12 ARL 60.736 -999.990 ... v1 2010 12 29 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 309531 UTA 2010 11 22 17 10 00 2088-99 P iC5H12 ARL 68.391 -999.990 ... v1 2010 12 29 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 309532 UTA 2010 12 06 20 00 00 3339-99 P iC5H12 ARL 38.580 -999.990 ... v1 2010 12 29 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 309533 UTA 2010 12 06 20 00 00 3340-99 P iC5H12 ARL 36.774 -999.990 ... v1 2010 12 29 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 309534 UTA 2010 12 14 21 35 00 3543-99 P iC5H12 ARL 10.900 -999.990 ... v1 2011 01 14 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 310112 UTA 2010 12 14 21 35 00 3544-99 P iC5H12 ARL 14.552 -999.990 ... v1 2011 01 14 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 310113 UTA 2010 12 23 22 20 00 2859-99 P iC5H12 ARL 51.443 -999.990 ... v1 2011 01 14 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 310110 UTA 2010 12 23 22 20 00 2860-99 P iC5H12 ARL 48.548 -999.990 ... v1 2011 01 14 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 310111 UTA 2010 12 29 23 15 00 317-99 P iC5H12 ARL 76.301 -999.990 ... v1 2010 12 29 23 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 311080 UTA 2010 12 29 23 15 00 772-99 P iC5H12 ARL 75.086 -999.990 ... v1 2010 12 29 23 15 00 39.9018 -113.7181 1332.00 1327.00 5.00 311081 UTA 2011 01 11 22 05 00 1315-99 P iC5H12 ARL 81.321 -999.990 ... v1 2011 01 11 22 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 311078 UTA 2011 01 11 22 05 00 3227-99 P iC5H12 ARL 87.804 -999.990 ... v1 2011 01 11 22 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 311079 UTA 2011 01 18 17 10 00 5383-99 P iC5H12 ARL 56.566 -999.990 ... v1 2011 02 17 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 312190 UTA 2011 01 18 17 10 00 5384-99 P iC5H12 ARL 52.525 -999.990 ... v1 2011 02 17 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 312191 UTA 2011 01 28 00 10 00 5385-99 P iC5H12 ARL 33.293 -999.990 ... v1 2011 02 17 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 312188 UTA 2011 01 28 00 10 00 5386-99 P iC5H12 ARL 34.424 -999.990 ... v1 2011 02 17 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 312189 UTA 2011 01 31 22 40 00 1210-99 P iC5H12 ARL 44.404 -999.990 ... v1 2011 02 28 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 312896 UTA 2011 01 31 22 40 00 1837-99 P iC5H12 ARL 52.394 -999.990 ... v1 2011 02 28 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 312897 UTA 2011 02 07 22 30 00 2891-99 P iC5H12 ARL 57.515 -999.990 ... v1 2011 02 28 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 312898 UTA 2011 02 07 22 30 00 6156-66 P iC5H12 ARL 57.899 -999.990 ... v1 2011 02 28 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 312899 UTA 2011 02 15 00 20 00 2694-99 P iC5H12 ARL 43.621 -999.990 ... v1 2011 03 07 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 313528 UTA 2011 02 15 00 20 00 2933-99 P iC5H12 ARL 43.810 -999.990 ... v1 2011 03 07 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 313529 UTA 2011 02 22 17 40 00 4629-99 P iC5H12 ARL 63.247 -999.990 ... v1 2011 03 07 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 313526 UTA 2011 02 22 17 40 00 4694-99 P iC5H12 ARL 58.883 -999.990 ... v1 2011 03 07 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 313527 UTA 2011 02 26 18 35 00 4701-99 P iC5H12 ARL 71.751 -999.990 ... v1 2011 03 23 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 314116 UTA 2011 02 26 18 35 00 4702-99 P iC5H12 ARL 70.773 -999.990 ... v1 2011 03 23 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 314117 UTA 2011 03 07 23 20 00 5167-99 P iC5H12 ARL 45.072 -999.990 ... v1 2011 03 24 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 314114 UTA 2011 03 07 23 20 00 5168-99 P iC5H12 ARL 39.401 -999.990 ... v1 2011 03 24 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 314115 UTA 2011 03 13 23 00 00 2720-99 P iC5H12 ARL 47.869 -999.990 ... v1 2011 04 05 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 314901 UTA 2011 03 13 23 00 00 3833-99 P iC5H12 ARL 34.773 -999.990 ... v1 2011 04 05 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 314902 UTA 2011 03 21 00 30 00 1426-99 P iC5H12 ARL 19.884 -999.990 ... v1 2011 04 04 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 314899 UTA 2011 03 21 00 30 00 1470-99 P iC5H12 ARL 28.960 -999.990 ... v1 2011 04 04 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 314900 UTA 2011 03 28 00 20 00 1136-99 P iC5H12 ARL 37.505 -999.990 ... v1 2011 04 12 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 315493 UTA 2011 03 28 00 20 00 589-99 P iC5H12 ARL 34.424 -999.990 ... v1 2011 04 12 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 315492 UTA 2011 04 04 01 10 00 3600-99 P iC5H12 ARL 30.737 -999.990 ... v1 2011 04 12 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 315490 UTA 2011 04 04 01 10 00 4265-99 P iC5H12 ARL 35.232 -999.990 ... v1 2011 04 12 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 315491 UTA 2011 04 11 15 45 00 2925-99 P iC5H12 ARL 32.660 -999.990 ... v1 2011 05 10 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 316558 UTA 2011 04 11 15 45 00 2926-99 P iC5H12 ARL 34.135 -999.990 ... v1 2011 05 10 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 316559 UTA 2011 04 16 22 30 00 3215-99 P iC5H12 ARL 100.087 -999.990 ... v1 2011 05 11 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 316556 UTA 2011 04 16 22 30 00 3216-99 P iC5H12 ARL 70.723 -999.990 ... v1 2011 05 11 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 316557 UTA 2011 04 25 15 15 00 6529-66 P iC5H12 ARL 49.205 -999.990 ... v1 2011 05 23 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 317322 UTA 2011 04 25 15 15 00 6530-66 P iC5H12 ARL -999.990 -999.990 A.. v1 2011 05 23 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 317323 UTA 2011 05 01 23 50 00 2391-99 P iC5H12 ARL 35.243 -999.990 ... v1 2011 05 18 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 317320 UTA 2011 05 01 23 50 00 2392-99 P iC5H12 ARL 29.716 -999.990 ... v1 2011 05 18 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 317321 UTA 2011 05 09 16 50 00 1337-99 P iC5H12 ARL 23.373 -999.990 ... v1 2011 05 27 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 317914 UTA 2011 05 09 16 50 00 1754-99 P iC5H12 ARL 23.990 -999.990 ... v1 2011 05 27 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 317915 UTA 2011 05 15 21 20 00 2498-99 P iC5H12 ARL 34.679 -999.990 ... v1 2011 05 27 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 317913 UTA 2011 05 15 21 20 00 510-99 P iC5H12 ARL 44.217 -999.990 ... v1 2011 05 27 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 317912 UTA 2011 05 23 16 35 00 2910-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2011 06 28 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 318685 UTA 2011 05 23 16 35 00 912-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2011 06 28 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 318684 UTA 2011 05 31 01 20 00 4992-99 P iC5H12 ARL 113.597 -999.990 P.. v1 2011 06 16 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 318686 UTA 2011 05 31 01 20 00 6258-66 P iC5H12 ARL 72.427 -999.990 P.. v1 2011 06 16 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 318687 UTA 2011 06 06 16 00 00 1778-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2011 07 11 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 319254 UTA 2011 06 06 16 00 00 235-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2011 07 11 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 319255 UTA 2011 06 13 03 05 00 1835-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2011 07 11 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 319253 UTA 2011 06 13 03 05 00 2534-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2011 07 11 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 319252 UTA 2011 06 20 03 15 00 2929-99 P iC5H12 ARL 28.640 -999.990 ... v1 2011 07 26 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 320118 UTA 2011 06 20 03 15 00 2930-99 P iC5H12 ARL 26.119 -999.990 ... v1 2011 07 26 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 320119 UTA 2011 06 28 23 30 00 43-99 P iC5H12 ARL 19.365 -999.990 ... v1 2011 07 27 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 320116 UTA 2011 06 28 23 30 00 44-99 P iC5H12 ARL 19.499 -999.990 ... v1 2011 07 27 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 320117 UTA 2011 07 06 03 20 00 115-99 P iC5H12 ARL 24.310 -999.990 ... v1 2011 08 12 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 321350 UTA 2011 07 06 03 20 00 116-99 P iC5H12 ARL 29.656 -999.990 ... v1 2011 08 12 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 321351 UTA 2011 07 18 16 30 00 987-99 P iC5H12 ARL 25.308 -999.990 ... v1 2011 08 12 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 321348 UTA 2011 07 18 16 30 00 988-99 P iC5H12 ARL 21.017 -999.990 ... v1 2011 08 12 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 321349 UTA 2011 07 23 16 30 00 6139-66 P iC5H12 ARL 12.949 -999.990 ... v1 2011 08 26 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 321771 UTA 2011 07 23 16 30 00 6140-66 P iC5H12 ARL 17.065 -999.990 ... v1 2011 08 26 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 321772 UTA 2011 08 01 00 00 00 4889-99 P iC5H12 ARL 55.429 -999.990 ... v1 2011 08 26 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 321773 UTA 2011 08 01 00 00 00 4890-99 P iC5H12 ARL 54.199 -999.990 ... v1 2011 08 26 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 321774 UTA 2011 08 02 22 10 00 705-99 P iC5H12 ARL 69.501 -999.990 P.. v1 2011 08 29 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 322302 UTA 2011 08 02 22 10 00 706-99 P iC5H12 ARL 46.789 -999.990 P.. v1 2011 08 29 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 322303 UTA 2011 08 08 22 35 00 3339-99 P iC5H12 ARL 16.852 -999.990 ... v1 2011 08 29 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 322304 UTA 2011 08 08 22 35 00 3340-99 P iC5H12 ARL 16.116 -999.990 ... v1 2011 08 29 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 322305 UTA 2011 08 20 01 40 00 2341-99 P iC5H12 ARL 35.810 -999.990 ... v1 2011 09 12 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 323101 UTA 2011 08 20 01 40 00 2342-99 P iC5H12 ARL 28.950 -999.990 ... v1 2011 09 12 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 323102 UTA 2011 08 30 17 30 00 1825-99 P iC5H12 ARL 60.270 -999.990 ... v1 2011 09 12 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 323099 UTA 2011 08 30 17 30 00 1826-99 P iC5H12 ARL 64.270 -999.990 ... v1 2011 09 12 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 323100 UTA 2011 09 05 21 25 00 5189-99 P iC5H12 ARL 45.893 -999.990 ... v1 2011 10 04 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 323837 UTA 2011 09 05 21 25 00 5190-99 P iC5H12 ARL 41.617 -999.990 ... v1 2011 10 04 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 323838 UTA 2011 09 10 01 30 00 5359-99 P iC5H12 ARL 36.631 -999.990 ... v1 2011 10 04 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 323839 UTA 2011 09 10 01 30 00 5360-99 P iC5H12 ARL 36.359 -999.990 ... v1 2011 10 04 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 323840 UTA 2011 09 15 16 40 00 565-99 P iC5H12 ARL 25.796 -999.990 ... v1 2011 10 10 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 324391 UTA 2011 09 15 16 40 00 566-99 P iC5H12 ARL 31.010 -999.990 ... v1 2011 10 10 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 324392 UTA 2011 09 23 18 10 00 3267-99 P iC5H12 ARL 17.393 -999.990 ... v1 2011 10 10 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 324389 UTA 2011 09 23 18 10 00 3268-99 P iC5H12 ARL 17.748 -999.990 ... v1 2011 10 10 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 324390 UTA 2011 10 05 18 10 00 3977-99 P iC5H12 ARL 31.310 -999.990 ... v1 2011 11 09 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 325571 UTA 2011 10 05 18 10 00 5059-99 P iC5H12 ARL 33.584 -999.990 ... v1 2011 11 09 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 325572 UTA 2011 10 14 17 45 00 222-99 P iC5H12 ARL 19.817 -999.990 ... v1 2011 11 09 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 325574 UTA 2011 10 14 17 45 00 304-99 P iC5H12 ARL 19.350 -999.990 ... v1 2011 11 09 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 325573 UTA 2011 10 18 21 45 00 3631-99 P iC5H12 ARL 36.898 -999.990 ... v1 2011 11 21 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 326177 UTA 2011 10 18 21 45 00 3710-99 P iC5H12 ARL 29.259 -999.990 ... v1 2011 11 21 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 326176 UTA 2011 10 24 18 40 00 4268-99 P iC5H12 ARL 32.904 -999.990 ... v1 2011 11 21 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 326179 UTA 2011 10 24 18 40 00 665-99 P iC5H12 ARL 40.690 -999.990 ... v1 2011 11 21 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 326178 UTA 2011 11 02 19 45 00 5041-99 P iC5H12 ARL 41.293 -999.990 ... v1 2011 12 09 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 326857 UTA 2011 11 02 19 45 00 5042-99 P iC5H12 ARL 37.836 -999.990 ... v1 2011 12 09 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 326858 UTA 2011 11 09 23 30 00 2409-99 P iC5H12 ARL 37.049 -999.990 ... v1 2011 12 09 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 326859 UTA 2011 11 09 23 30 00 2410-99 P iC5H12 ARL 26.314 -999.990 ... v1 2011 12 09 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 326860 UTA 2011 11 18 20 55 00 3367-99 P iC5H12 ARL 27.560 -999.990 ... v1 2011 12 28 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 327820 UTA 2011 11 18 20 55 00 3368-99 P iC5H12 ARL 28.506 -999.990 ... v1 2011 12 28 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 327821 UTA 2011 11 28 23 50 00 4473-99 P iC5H12 ARL 78.014 -999.990 ... v1 2011 12 28 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 327822 UTA 2011 11 28 23 50 00 4474-99 P iC5H12 ARL 61.855 -999.990 ... v1 2011 12 28 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 327823 UTA 2011 12 06 00 15 00 3003-99 P iC5H12 ARL 78.551 -999.990 ... v1 2012 01 20 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 328778 UTA 2011 12 06 00 15 00 5397-99 P iC5H12 ARL 77.941 -999.990 ... v1 2012 01 20 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 328779 UTA 2011 12 17 20 20 00 1499-99 P iC5H12 ARL 49.020 -999.990 ... v1 2012 01 20 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 328781 UTA 2011 12 17 20 20 00 65-99 P iC5H12 ARL 52.838 -999.990 ... v1 2012 01 20 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 328780 UTA 2011 12 22 17 10 00 311-99 P iC5H12 ARL 118.683 -999.990 ... v1 2012 01 19 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 328868 UTA 2011 12 22 17 10 00 940-99 P iC5H12 ARL 118.615 -999.990 ... v1 2012 01 19 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 328869 UTA 2011 12 27 20 20 00 2604-99 P iC5H12 ARL 40.519 -999.990 ... v1 2012 01 19 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 328870 UTA 2011 12 27 20 20 00 926-99 P iC5H12 ARL 48.064 -999.990 ... v1 2012 01 19 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 328871 UTA 2012 01 03 21 20 00 3000-99 P iC5H12 ARL 52.068 -999.990 P.. v1 2012 02 03 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 329635 UTA 2012 01 03 21 20 00 6129-66 P iC5H12 ARL 106.633 -999.990 P.. v1 2012 02 03 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 329634 UTA 2012 01 09 18 05 00 3893-99 P iC5H12 ARL 325.167 -999.990 P.. v1 2012 02 03 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 329636 UTA 2012 01 09 18 05 00 956-99 P iC5H12 ARL 90.683 -999.990 P.. v1 2012 02 03 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 329637 UTA 2012 01 16 01 10 00 1477-99 P iC5H12 ARL 75.380 -999.990 ... v1 2012 02 12 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 330414 UTA 2012 01 16 01 10 00 1478-99 P iC5H12 ARL 77.190 -999.990 ... v1 2012 02 12 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 330415 UTA 2012 01 23 18 40 00 1577-99 P iC5H12 ARL 78.317 -999.990 ... v1 2012 02 15 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 330416 UTA 2012 01 23 18 40 00 1578-99 P iC5H12 ARL 79.267 -999.990 ... v1 2012 02 15 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 330417 UTA 2012 01 30 17 00 00 4074-99 P iC5H12 ARL 120.059 -999.990 ... v1 2012 02 27 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 331186 UTA 2012 01 30 17 00 00 5191-99 P iC5H12 ARL 116.453 -999.990 ... v1 2012 02 27 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 331187 UTA 2012 02 07 01 00 00 1744-99 P iC5H12 ARL 134.303 -999.990 ... v1 2012 02 27 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 331188 UTA 2012 02 07 01 00 00 2616-99 P iC5H12 ARL 134.661 -999.990 ... v1 2012 02 27 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 331189 UTA 2012 02 16 01 20 00 3971-99 P iC5H12 ARL -999.990 -999.990 D.. v1 2012 03 14 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 332107 UTA 2012 02 16 01 20 00 3972-99 P iC5H12 ARL -999.990 -999.990 D.. v1 2012 03 14 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 332108 UTA 2012 02 21 20 00 00 3143-99 P iC5H12 ARL 47.234 -999.990 ... v1 2012 03 16 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 332105 UTA 2012 02 21 20 00 00 3144-99 P iC5H12 ARL 48.635 -999.990 ... v1 2012 03 16 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 332106 UTA 2012 02 27 21 35 00 4053-99 P iC5H12 ARL 48.584 -999.990 ... v1 2012 04 06 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 332696 UTA 2012 02 27 21 35 00 4334-99 P iC5H12 ARL 52.210 -999.990 ... v1 2012 04 06 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 332697 UTA 2012 03 06 01 40 00 4293-99 P iC5H12 ARL 26.164 -999.990 ... v1 2012 04 05 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 332698 UTA 2012 03 06 01 40 00 4950-99 P iC5H12 ARL 24.621 -999.990 ... v1 2012 04 05 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 332699 UTA 2012 03 11 21 35 00 3139-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2012 04 04 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 333143 UTA 2012 03 11 21 35 00 3554-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2012 04 04 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 333144 UTA 2012 03 17 20 20 00 2938-99 P iC5H12 ARL 43.119 -999.990 ... v1 2012 04 04 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 333146 UTA 2012 03 17 20 20 00 348-99 P iC5H12 ARL 45.036 -999.990 ... v1 2012 04 04 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 333145 UTA 2012 03 26 00 05 00 3801-99 P iC5H12 ARL 95.863 -999.990 ... v1 2012 04 19 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 333540 UTA 2012 03 26 00 05 00 3802-99 P iC5H12 ARL 84.096 -999.990 ... v1 2012 04 19 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 333541 UTA 2012 03 31 20 00 00 2800-99 P iC5H12 ARL 89.574 -999.990 P.. v1 2012 05 03 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 334140 UTA 2012 03 31 20 00 00 3445-99 P iC5H12 ARL 215.048 -999.990 P.. v1 2012 05 03 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 334139 UTA 2012 04 06 23 35 00 2920-99 P iC5H12 ARL 28.833 -999.990 ... v1 2012 05 03 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 334141 UTA 2012 04 06 23 35 00 4005-99 P iC5H12 ARL 28.032 -999.990 ... v1 2012 05 03 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 334142 UTA 2012 04 13 22 50 00 6139-66 P iC5H12 ARL 32.595 -999.990 ... v1 2012 05 16 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 334607 UTA 2012 04 13 22 50 00 6140-66 P iC5H12 ARL 34.732 -999.990 ... v1 2012 05 16 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 334608 UTA 2012 04 20 00 20 00 3721-99 P iC5H12 ARL 16.375 -999.990 ... v1 2012 05 16 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 334605 UTA 2012 04 20 00 20 00 3722-99 P iC5H12 ARL 16.082 -999.990 ... v1 2012 05 16 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 334606 UTA 2012 04 26 20 40 00 2683-99 P iC5H12 ARL 29.242 -999.990 ... v1 2012 06 01 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 335252 UTA 2012 04 26 20 40 00 2684-99 P iC5H12 ARL 22.494 -999.990 ... v1 2012 06 01 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 335251 UTA 2012 05 02 22 25 00 1661-99 P iC5H12 ARL 27.753 -999.990 ... v1 2012 05 31 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 335253 UTA 2012 05 02 22 25 00 1662-99 P iC5H12 ARL 27.318 -999.990 ... v1 2012 05 31 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 335254 UTA 2012 05 11 21 00 00 1369-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2012 06 07 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 335855 UTA 2012 05 11 21 00 00 5356-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2012 06 07 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 335856 UTA 2012 05 18 02 15 00 4619-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2012 06 07 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 335853 UTA 2012 05 18 02 15 00 4913-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2012 06 07 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 335854 UTA 2012 05 29 19 35 00 5403-99 P iC5H12 ARL 185.054 -999.990 ... v1 2012 07 28 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 336939 UTA 2012 05 29 19 35 00 5404-99 P iC5H12 ARL 185.817 -999.990 ... v1 2012 07 28 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 336940 UTA 2012 06 05 01 55 00 5217-99 P iC5H12 ARL 171.382 -999.990 ... v1 2012 07 28 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 336941 UTA 2012 06 05 01 55 00 5218-99 P iC5H12 ARL 158.720 -999.990 ... v1 2012 07 28 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 336942 UTA 2012 06 13 03 35 00 4721-99 P iC5H12 ARL 20.688 -999.990 P.. v1 2012 07 28 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 337741 UTA 2012 06 13 03 35 00 6179-66 P iC5H12 ARL 43.597 -999.990 P.. v1 2012 07 28 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 337742 UTA 2012 06 20 01 50 00 191-99 P iC5H12 ARL 17.371 -999.990 ... v1 2012 08 03 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 337743 UTA 2012 06 20 01 50 00 974-99 P iC5H12 ARL 19.212 -999.990 ... v1 2012 08 03 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 337744 UTA 2012 07 02 01 35 00 2477-99 P iC5H12 ARL 27.274 -999.990 ... v1 2012 07 31 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 338077 UTA 2012 07 02 01 35 00 2478-99 P iC5H12 ARL 24.366 -999.990 ... v1 2012 07 31 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 338076 UTA 2012 07 06 16 05 00 2-99 P iC5H12 ARL 27.394 -999.990 ... v1 2012 08 20 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 338612 UTA 2012 07 06 16 05 00 2462-99 P iC5H12 ARL 28.877 -999.990 ... v1 2012 08 20 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 338613 UTA 2012 07 13 00 55 00 3037-99 P iC5H12 ARL 26.667 -999.990 ... v1 2012 08 17 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 338610 UTA 2012 07 13 00 55 00 3550-99 P iC5H12 ARL 26.382 -999.990 ... v1 2012 08 17 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 338611 UTA 2012 07 19 01 55 00 3813-99 P iC5H12 ARL 9.842 -999.990 P.. v1 2012 09 07 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 339176 UTA 2012 07 19 01 55 00 3814-99 P iC5H12 ARL 16.800 -999.990 P.. v1 2012 09 07 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 339177 UTA 2012 07 23 19 50 00 2839-99 P iC5H12 ARL 20.070 -999.990 ... v1 2012 09 07 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 339174 UTA 2012 07 23 19 50 00 2840-99 P iC5H12 ARL 20.763 -999.990 ... v1 2012 09 07 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 339175 UTA 2012 07 30 02 45 00 1797-99 P iC5H12 ARL 88.856 -999.990 P.. v1 2012 09 07 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 339575 UTA 2012 07 30 02 45 00 1798-99 P iC5H12 ARL 58.837 -999.990 P.. v1 2012 09 07 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 339576 UTA 2012 08 17 14 40 00 451-99 P iC5H12 ARL 46.921 -999.990 ... v1 2012 09 19 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 340432 UTA 2012 08 17 14 40 00 4844-99 P iC5H12 ARL 55.879 -999.990 ... v1 2012 09 19 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 340433 UTA 2012 08 23 23 30 00 2370-99 P iC5H12 ARL 61.673 -999.990 P.. v1 2012 10 15 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 340798 UTA 2012 08 23 23 30 00 2370-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2012 10 25 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 340798 UTA 2012 08 23 23 30 00 2456-99 P iC5H12 ARL 84.230 -999.990 P.. v1 2012 10 15 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 340799 UTA 2012 08 23 23 30 00 2456-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2012 10 25 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 340799 UTA 2012 08 29 00 10 00 3193-99 P iC5H12 ARL 46.028 -999.990 ... v1 2012 10 15 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 340796 UTA 2012 08 29 00 10 00 3193-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2012 10 26 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 340796 UTA 2012 08 29 00 10 00 4849-99 P iC5H12 ARL 44.811 -999.990 ... v1 2012 10 15 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 340797 UTA 2012 08 29 00 10 00 4849-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2012 10 26 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 340797 UTA 2012 09 06 16 35 00 3269-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2012 10 16 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 341308 UTA 2012 09 06 16 35 00 3270-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2012 10 16 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 341309 UTA 2012 09 10 17 05 00 4533-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2012 10 16 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 341306 UTA 2012 09 10 17 05 00 4534-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2012 10 16 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 341307 UTA 2012 09 24 15 00 00 3479-99 P iC5H12 ARL 34.668 -999.990 ... v1 2012 10 17 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 342175 UTA 2012 09 24 15 00 00 3480-99 P iC5H12 ARL 45.825 -999.990 ... v1 2012 10 17 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 342174 UTA 2012 09 27 16 55 00 1219-99 P iC5H12 ARL 30.636 -999.990 ... v1 2012 10 31 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 342526 UTA 2012 09 27 16 55 00 2176-99 P iC5H12 ARL 38.074 -999.990 ... v1 2012 10 31 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 342527 UTA 2012 10 05 16 55 00 1744-99 P iC5H12 ARL 34.459 -999.990 ... v1 2012 11 09 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 342528 UTA 2012 10 05 16 55 00 4074-99 P iC5H12 ARL 43.194 -999.990 ... v1 2012 11 09 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 342529 UTA 2012 10 10 19 00 00 1218-99 P iC5H12 ARL 30.904 -999.990 ... v1 2012 11 05 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 343046 UTA 2012 10 10 19 00 00 734-99 P iC5H12 ARL 28.534 -999.990 ... v1 2012 11 05 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 343045 UTA 2012 10 15 20 10 00 4071-99 P iC5H12 ARL 12.028 -999.990 ... v1 2012 11 06 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 343043 UTA 2012 10 15 20 10 00 4629-99 P iC5H12 ARL 10.342 -999.990 ... v1 2012 11 06 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 343044 UTA 2012 11 05 17 00 00 2975-99 P iC5H12 ARL 10.328 -999.990 ... v1 2012 12 07 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 344107 UTA 2012 11 05 17 00 00 2976-99 P iC5H12 ARL 10.624 -999.990 ... v1 2012 12 07 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 344108 UTA 2012 11 13 16 00 00 2321-99 P iC5H12 ARL 29.589 -999.990 ... v1 2012 12 31 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 344105 UTA 2012 11 13 16 00 00 2322-99 P iC5H12 ARL 36.952 -999.990 ... v1 2012 12 31 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 344106 UTA 2012 11 20 16 20 00 199-99 P iC5H12 ARL 108.075 -999.990 ... v1 2013 03 15 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 344961 UTA 2012 11 20 16 20 00 200-99 P iC5H12 ARL 91.859 -999.990 ... v1 2013 03 15 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 344962 UTA 2012 11 26 19 00 00 3339-99 P iC5H12 ARL 14.920 -999.990 P.. v1 2013 03 13 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 344971 UTA 2012 11 26 19 00 00 3340-99 P iC5H12 ARL 35.559 -999.990 P.. v1 2013 03 13 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 344972 UTA 2012 12 02 00 05 00 2437-99 P iC5H12 ARL 39.493 -999.990 ... v1 2013 03 17 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 345080 UTA 2012 12 02 00 05 00 2438-99 P iC5H12 ARL 46.493 -999.990 ... v1 2013 03 17 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 345081 UTA 2012 12 08 23 55 00 2755-99 P iC5H12 ARL 58.661 -999.990 ... v1 2013 01 06 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 345078 UTA 2012 12 08 23 55 00 2756-99 P iC5H12 ARL 59.692 -999.990 ... v1 2013 01 06 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 345079 UTA 2012 12 13 22 05 00 3147-99 P iC5H12 ARL 59.361 -999.990 ... v1 2013 03 11 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 345570 UTA 2012 12 13 22 05 00 3148-99 P iC5H12 ARL 48.939 -999.990 ... v1 2013 03 11 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 345571 UTA 2012 12 19 19 38 00 3111-99 P iC5H12 ARL 67.583 -999.990 ... v1 2013 02 15 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 345742 UTA 2012 12 19 19 38 00 3112-99 P iC5H12 ARL 77.444 -999.990 ... v1 2013 02 15 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 345743 UTA 2012 12 27 22 20 00 1561-99 P iC5H12 ARL 48.826 -999.990 ... v1 2013 03 13 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 346089 UTA 2012 12 27 22 20 00 2272-99 P iC5H12 ARL 48.911 -999.990 ... v1 2013 03 13 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 346090 UTA 2012 12 31 20 35 00 3210-99 P iC5H12 ARL 54.972 -999.990 ... v1 2013 02 23 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 346091 UTA 2012 12 31 20 35 00 6017-66 P iC5H12 ARL 65.657 -999.990 ... v1 2013 02 23 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 346092 UTA 2013 01 07 00 35 00 3985-99 P iC5H12 ARL 51.901 -999.990 ... v1 2013 01 31 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 346477 UTA 2013 01 07 00 35 00 3986-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2013 01 31 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 346478 UTA 2013 01 10 16 36 00 2197-99 P iC5H12 ARL 57.935 -999.990 ... v1 2013 02 05 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 346469 UTA 2013 01 10 16 36 00 2198-99 P iC5H12 ARL 57.565 -999.990 ... v1 2013 02 05 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 346470 UTA 2013 01 21 22 25 00 3852-99 P iC5H12 ARL 11.593 -999.990 P.. v1 2013 02 11 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 347089 UTA 2013 01 21 22 25 00 4613-99 P iC5H12 ARL 22.514 -999.990 P.. v1 2013 02 11 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 347090 UTA 2013 01 25 18 18 00 2534-99 P iC5H12 ARL 14.125 -999.990 ... v1 2013 02 11 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 347088 UTA 2013 01 25 18 18 00 3609-99 P iC5H12 ARL 18.268 -999.990 ... v1 2013 02 11 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 347087 UTA 2013 01 31 18 25 00 3075-99 P iC5H12 ARL 188.810 -999.990 ... v1 2013 02 21 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 347520 UTA 2013 01 31 18 25 00 3632-99 P iC5H12 ARL 176.315 -999.990 ... v1 2013 02 21 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 347521 UTA 2013 02 04 00 40 00 2300-99 P iC5H12 ARL 14.732 -999.990 ... v1 2013 02 20 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 347522 UTA 2013 02 04 00 40 00 3346-99 P iC5H12 ARL 9.861 -999.990 ... v1 2013 02 20 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 347523 UTA 2013 02 11 01 40 00 3179-99 P iC5H12 ARL 109.784 -999.990 ... v1 2013 03 07 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 348098 UTA 2013 02 11 01 40 00 3180-99 P iC5H12 ARL 103.793 -999.990 ... v1 2013 03 07 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 348097 UTA 2013 02 16 22 45 00 2321-99 P iC5H12 ARL 27.700 -999.990 ... v1 2013 03 07 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 348099 UTA 2013 02 16 22 45 00 2322-99 P iC5H12 ARL 35.531 -999.990 ... v1 2013 03 07 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 348100 UTA 2013 02 23 00 25 00 5337-99 P iC5H12 ARL 49.282 -999.990 ... v1 2013 03 20 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 348451 UTA 2013 02 23 00 25 00 5338-99 P iC5H12 ARL 53.080 -999.990 ... v1 2013 03 20 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 348452 UTA 2013 02 28 19 00 00 3177-99 P iC5H12 ARL 57.803 -999.990 ... v1 2013 03 20 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 348449 UTA 2013 02 28 19 00 00 3178-99 P iC5H12 ARL 60.432 -999.990 ... v1 2013 03 20 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 348450 UTA 2013 03 04 01 10 00 2197-99 P iC5H12 ARL 11.377 -999.990 ... v1 2013 04 01 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 348737 UTA 2013 03 04 01 10 00 2198-99 P iC5H12 ARL 13.907 -999.990 ... v1 2013 04 01 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 348738 UTA 2013 03 16 17 35 00 5245-99 P iC5H12 ARL 7.288 -999.990 P.. v1 2013 04 04 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 349326 UTA 2013 03 16 17 35 00 5246-99 P iC5H12 ARL 13.991 -999.990 P.. v1 2013 04 04 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 349327 UTA 2013 03 22 01 36 00 4703-99 P iC5H12 ARL 18.702 -999.990 ... v1 2013 04 04 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 349324 UTA 2013 03 22 01 36 00 4704-99 P iC5H12 ARL 21.479 -999.990 ... v1 2013 04 04 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 349325 UTA 2013 03 30 00 32 00 303-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2013 04 28 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 349959 UTA 2013 03 30 00 32 00 974-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2013 04 28 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 349960 UTA 2013 04 02 23 30 00 2555-99 P iC5H12 ARL 22.549 -999.990 ... v1 2013 04 26 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 349957 UTA 2013 04 02 23 30 00 4947-99 P iC5H12 ARL 15.609 -999.990 ... v1 2013 04 26 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 349958 UTA 2013 04 08 19 20 00 1049-99 P iC5H12 ARL 24.247 -999.990 ... v1 2013 05 22 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 350583 UTA 2013 04 08 19 20 00 967-99 P iC5H12 ARL 31.851 -999.990 ... v1 2013 05 22 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 350582 UTA 2013 04 16 02 32 00 2389-99 P iC5H12 ARL 21.898 -999.990 ... v1 2013 05 22 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 350580 UTA 2013 04 16 02 32 00 3665-99 P iC5H12 ARL 20.660 -999.990 ... v1 2013 05 22 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 350581 UTA 2013 04 23 02 48 00 1855-99 P iC5H12 ARL 39.991 -999.990 P.. v1 2013 06 13 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 351392 UTA 2013 04 23 02 48 00 2742-99 P iC5H12 ARL 14.283 -999.990 P.. v1 2013 06 13 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 351393 UTA 2013 05 01 14 10 00 3734-99 P iC5H12 ARL 19.295 -999.990 ... v1 2013 06 18 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 351390 UTA 2013 05 01 14 10 00 4357-99 P iC5H12 ARL 26.928 -999.990 ... v1 2013 06 18 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 351391 UTA 2013 05 06 18 55 00 3057-99 P iC5H12 ARL 16.084 -999.990 ... v1 2013 06 12 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 352080 UTA 2013 05 06 18 55 00 3628-99 P iC5H12 ARL 14.455 -999.990 ... v1 2013 06 12 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 352081 UTA 2013 05 13 17 25 00 4555-99 P iC5H12 ARL -999.990 -999.990 C.. v1 2013 06 11 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 352082 UTA 2013 05 13 17 25 00 5069-99 P iC5H12 ARL -999.990 -999.990 C.. v1 2013 06 11 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 352083 UTA 2013 05 20 17 30 00 1325-99 P iC5H12 ARL 11.838 -999.990 ... v1 2013 06 14 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 352606 UTA 2013 05 20 17 30 00 264-99 P iC5H12 ARL 14.798 -999.990 ... v1 2013 06 14 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 352605 UTA 2013 05 25 19 56 00 3297-99 P iC5H12 ARL 45.026 -999.990 ... v1 2013 06 14 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 352603 UTA 2013 05 25 19 56 00 3961-99 P iC5H12 ARL 49.299 -999.990 ... v1 2013 06 14 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 352604 UTA 2013 05 31 16 28 00 3453-99 P iC5H12 ARL 18.682 -999.990 ... v1 2013 06 28 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 353271 UTA 2013 05 31 16 28 00 3454-99 P iC5H12 ARL 18.497 -999.990 ... v1 2013 06 28 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 353272 UTA 2013 06 07 00 10 00 1951-99 P iC5H12 ARL 38.385 -999.990 P.. v1 2013 06 28 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 353269 UTA 2013 06 07 00 10 00 1952-99 P iC5H12 ARL 146.993 -999.990 P.. v1 2013 06 28 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 353270 UTA 2013 06 13 00 38 00 2316-99 P iC5H12 ARL 4.636 -999.990 ... v1 2013 09 05 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 353779 UTA 2013 06 13 00 38 00 2794-99 P iC5H12 ARL 7.785 -999.990 ... v1 2013 09 05 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 353780 UTA 2013 06 18 20 42 00 3533-99 P iC5H12 ARL 28.346 -999.990 ... v1 2013 09 05 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 353778 UTA 2013 06 18 20 42 00 4595-99 P iC5H12 ARL 28.486 -999.990 ... v1 2013 09 05 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 353777 UTA 2013 06 27 17 21 00 4191-99 P iC5H12 ARL 8.297 -999.990 ... v1 2013 08 24 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 354431 UTA 2013 06 27 17 21 00 4192-99 P iC5H12 ARL 9.420 -999.990 ... v1 2013 08 24 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 354432 UTA 2013 07 04 02 55 00 611-99 P iC5H12 ARL 9.796 -999.990 P.. v1 2013 08 24 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 354429 UTA 2013 07 04 02 55 00 612-99 P iC5H12 ARL 16.812 -999.990 P.. v1 2013 08 24 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 354430 UTA 2013 07 10 01 55 00 4985-99 P iC5H12 ARL 23.555 -999.990 ... v1 2013 08 29 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 355182 UTA 2013 07 10 01 55 00 4986-99 P iC5H12 ARL 18.246 -999.990 ... v1 2013 08 29 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 355183 UTA 2013 07 17 02 45 00 991-99 P iC5H12 ARL 28.346 -999.990 ... v1 2013 09 10 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 355180 UTA 2013 07 17 02 45 00 992-99 P iC5H12 ARL 40.196 -999.990 ... v1 2013 09 10 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 355181 UTA 2013 07 23 22 35 00 2425-99 P iC5H12 ARL 4.841 -999.990 ... v1 2013 09 18 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 355816 UTA 2013 07 23 22 35 00 937-99 P iC5H12 ARL 4.439 -999.990 ... v1 2013 09 18 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 355815 UTA 2013 07 30 03 40 00 3609-99 P iC5H12 ARL 4.570 -999.990 ... v1 2013 09 18 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 355814 UTA 2013 07 30 03 40 00 4610-99 P iC5H12 ARL 4.458 -999.990 ... v1 2013 09 18 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 355813 UTA 2013 08 04 21 40 00 1675-99 P iC5H12 ARL 75.545 -999.990 ... v1 2013 08 30 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 356284 UTA 2013 08 04 21 40 00 1676-99 P iC5H12 ARL 72.019 -999.990 ... v1 2013 08 30 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 356285 UTA 2013 08 12 15 18 00 4851-99 P iC5H12 ARL 33.000 -999.990 ... v1 2013 09 20 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 356282 UTA 2013 08 12 15 18 00 4852-99 P iC5H12 ARL 31.612 -999.990 ... v1 2013 09 20 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 356283 UTA 2013 08 20 02 44 00 1289-99 P iC5H12 ARL 7.495 -999.990 ... v1 2013 10 09 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 357091 UTA 2013 08 20 02 44 00 1290-99 P iC5H12 ARL 6.804 -999.990 ... v1 2013 10 09 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 357092 UTA 2013 08 26 01 55 00 4239-99 P iC5H12 ARL 9.294 -999.990 ... v1 2013 10 09 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 357108 UTA 2013 08 26 01 55 00 4240-99 P iC5H12 ARL 8.645 -999.990 ... v1 2013 10 09 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 357109 UTA 2013 09 03 00 56 00 4557-99 P iC5H12 ARL 15.533 -999.990 ... v1 2013 10 22 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 357686 UTA 2013 09 03 00 56 00 4558-99 P iC5H12 ARL 11.061 -999.990 ... v1 2013 10 22 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 357687 UTA 2013 09 07 00 49 00 3393-99 P iC5H12 ARL 21.037 -999.990 ... v1 2013 10 25 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 357684 UTA 2013 09 07 00 49 00 3394-99 P iC5H12 ARL 24.612 -999.990 ... v1 2013 10 25 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 357685 UTA 2013 09 13 02 30 00 4136-99 P iC5H12 ARL 32.872 -999.990 ... v1 2013 12 27 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 358203 UTA 2013 09 13 02 30 00 4992-99 P iC5H12 ARL 32.756 -999.990 ... v1 2013 12 27 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 358204 UTA 2013 09 17 22 01 00 4751-99 P iC5H12 ARL 34.813 -999.990 ... v1 2013 10 31 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 358201 UTA 2013 09 17 22 01 00 6098-66 P iC5H12 ARL 28.748 -999.990 ... v1 2013 10 31 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 358202 UTA 2013 09 24 22 25 00 1059-99 P iC5H12 ARL 7.386 -999.990 ... v1 2013 11 06 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 358612 UTA 2013 09 24 22 25 00 1060-99 P iC5H12 ARL 8.881 -999.990 ... v1 2013 11 06 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 358613 UTA 2013 09 30 01 42 00 1255-99 P iC5H12 ARL 29.405 -999.990 ... v1 2013 11 06 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 358610 UTA 2013 09 30 01 42 00 1256-99 P iC5H12 ARL 35.395 -999.990 ... v1 2013 11 06 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 358611 UTA 2013 10 06 00 10 00 4494-99 P iC5H12 ARL 92.943 -999.990 ... v1 2013 11 15 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 358913 UTA 2013 10 06 00 10 00 4763-99 P iC5H12 ARL 88.876 -999.990 ... v1 2013 11 15 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 358914 UTA 2013 10 11 21 45 00 3545-99 P iC5H12 ARL 9.300 -999.990 ... v1 2013 11 15 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 358911 UTA 2013 10 11 21 45 00 4775-99 P iC5H12 ARL 12.238 -999.990 ... v1 2013 11 15 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 358912 UTA 2013 10 17 20 50 00 4985-99 P iC5H12 ARL 23.900 -999.990 ... v1 2013 11 13 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 359358 UTA 2013 10 17 20 50 00 4986-99 P iC5H12 ARL 19.781 -999.990 ... v1 2013 11 13 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 359359 UTA 2013 10 23 17 00 00 5043-99 P iC5H12 ARL 16.033 -999.990 ... v1 2013 11 22 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 359356 UTA 2013 10 23 17 00 00 5044-99 P iC5H12 ARL 17.905 -999.990 ... v1 2013 11 22 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 359357 UTA 2013 11 04 21 35 00 5267-99 P iC5H12 ARL 27.295 -999.990 ... v1 2013 12 12 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 360273 UTA 2013 11 04 21 35 00 6264-66 P iC5H12 ARL 27.991 -999.990 ... v1 2013 12 12 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 360274 UTA 2013 11 11 17 55 00 545-99 P iC5H12 ARL 20.399 -999.990 ... v1 2013 12 13 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 360271 UTA 2013 11 11 17 55 00 6002-66 P iC5H12 ARL 15.207 -999.990 ... v1 2013 12 13 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 360272 UTA 2013 11 17 00 05 00 2991-99 P iC5H12 ARL 37.025 -999.990 ... v1 2014 08 28 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 360832 UTA 2013 11 23 19 40 00 1739-99 P iC5H12 ARL 74.060 -999.990 ... v1 2013 12 31 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 360830 UTA 2013 11 23 19 40 00 1747-99 P iC5H12 ARL 69.782 -999.990 ... v1 2013 12 31 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 360831 UTA 2013 11 30 00 25 00 2785-99 P iC5H12 ARL 65.995 -999.990 ... v1 2014 01 17 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 361437 UTA 2013 11 30 00 25 00 2786-99 P iC5H12 ARL 72.546 -999.990 ... v1 2014 01 17 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 361438 UTA 2013 12 02 23 05 00 3159-99 P iC5H12 ARL 16.499 -999.990 ... v1 2014 01 22 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 361435 UTA 2013 12 02 23 05 00 3160-99 P iC5H12 ARL 14.093 -999.990 ... v1 2014 01 22 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 361436 UTA 2013 12 09 18 10 00 677-99 P iC5H12 ARL 76.289 -999.990 ... v1 2014 01 27 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 361973 UTA 2013 12 09 18 10 00 678-99 P iC5H12 ARL 74.047 -999.990 ... v1 2014 01 27 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 361974 UTA 2013 12 14 23 32 00 4981-99 P iC5H12 ARL 22.555 -999.990 ... v1 2014 01 23 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 361971 UTA 2013 12 14 23 32 00 4982-99 P iC5H12 ARL 19.305 -999.990 ... v1 2014 01 23 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 361972 UTA 2013 12 21 22 45 00 1947-99 P iC5H12 ARL 38.014 -999.990 ... v1 2014 01 24 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 362502 UTA 2013 12 21 22 45 00 1948-99 P iC5H12 ARL 39.208 -999.990 ... v1 2014 01 24 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 362503 UTA 2013 12 31 17 15 00 1379-99 P iC5H12 ARL 29.175 -999.990 ... v1 2014 01 24 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 362500 UTA 2013 12 31 17 15 00 1380-99 P iC5H12 ARL 32.037 -999.990 ... v1 2014 01 24 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 362501 UTA 2014 01 04 20 04 00 3251-99 P iC5H12 ARL 79.204 -999.990 ... v1 2014 04 17 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 362950 UTA 2014 01 04 20 04 00 3252-99 P iC5H12 ARL -999.990 -999.990 D.. v1 2014 04 17 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 362951 UTA 2014 01 11 00 55 00 2541-99 P iC5H12 ARL 64.477 -999.990 ... v1 2014 04 02 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 362948 UTA 2014 01 11 00 55 00 2542-99 P iC5H12 ARL 62.069 -999.990 ... v1 2014 04 02 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 362949 UTA 2014 02 01 22 03 00 4012-99 P iC5H12 ARL 41.611 -999.990 ... v1 2014 04 15 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 364454 UTA 2014 02 01 22 03 00 4535-99 P iC5H12 ARL 43.519 -999.990 ... v1 2014 04 15 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 364455 UTA 2014 02 12 18 42 00 3345-99 P iC5H12 ARL 26.867 -999.990 ... v1 2014 03 11 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 364456 UTA 2014 02 12 18 42 00 3839-99 P iC5H12 ARL 29.567 -999.990 ... v1 2014 03 11 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 364457 UTA 2014 02 14 18 05 00 4075-99 P iC5H12 ARL 14.703 -999.990 ... v1 2014 06 09 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 364596 UTA 2014 02 14 18 05 00 4996-99 P iC5H12 ARL 12.313 -999.990 ... v1 2014 06 09 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 364597 UTA 2014 02 18 18 10 00 1222-99 P iC5H12 ARL 28.644 -999.990 ... v1 2014 06 05 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 364594 UTA 2014 02 18 18 10 00 3791-99 P iC5H12 ARL 32.528 -999.990 ... v1 2014 06 05 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 364595 UTA 2014 03 02 23 55 00 4723-99 P iC5H12 ARL 36.647 -999.990 ... v1 2014 05 01 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 365629 UTA 2014 03 02 23 55 00 4724-99 P iC5H12 ARL 36.463 -999.990 ... v1 2014 05 01 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 365628 UTA 2014 03 07 19 05 00 643-99 P iC5H12 ARL 18.954 -999.990 ... v1 2014 04 30 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 365626 UTA 2014 03 07 19 05 00 644-99 P iC5H12 ARL 24.768 -999.990 ... v1 2014 04 30 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 365627 UTA 2014 03 15 20 25 00 2689-99 P iC5H12 ARL 227.907 -999.990 ... v1 2014 04 17 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 365940 UTA 2014 03 15 20 25 00 2690-99 P iC5H12 ARL 231.444 -999.990 ... v1 2014 04 17 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 365941 UTA 2014 03 21 00 55 00 3535-99 P iC5H12 ARL 24.518 -999.990 ... v1 2014 04 16 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 365939 UTA 2014 03 21 00 55 00 3536-99 P iC5H12 ARL 21.574 -999.990 ... v1 2014 04 16 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 365938 UTA 2014 03 26 02 30 00 6054-66 P iC5H12 ARL 15.241 -999.990 ... v1 2014 04 22 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 366484 UTA 2014 03 26 02 30 00 817-99 P iC5H12 ARL 14.389 -999.990 ... v1 2014 04 22 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 366485 UTA 2014 04 01 19 56 00 1989-99 P iC5H12 ARL 23.532 -999.990 ... v1 2014 04 22 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 366482 UTA 2014 04 01 19 56 00 3637-99 P iC5H12 ARL 21.806 -999.990 ... v1 2014 04 22 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 366483 UTA 2014 04 07 00 50 00 3465-99 P iC5H12 ARL 16.859 -999.990 ... v1 2014 09 16 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 366812 UTA 2014 04 07 00 50 00 6446-66 P iC5H12 ARL 19.164 -999.990 ... v1 2014 09 16 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 366813 UTA 2014 04 20 23 53 00 1284-99 P iC5H12 ARL 16.588 -999.990 P.. v1 2014 08 06 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 367335 UTA 2014 04 20 23 53 00 1868-99 P iC5H12 ARL 30.786 -999.990 P.. v1 2014 08 06 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 367336 UTA 2014 04 26 21 55 00 4424-99 P iC5H12 ARL 32.579 -999.990 ... v1 2014 08 06 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 367333 UTA 2014 04 26 21 55 00 4984-99 P iC5H12 ARL 27.609 -999.990 ... v1 2014 08 06 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 367334 UTA 2014 04 29 19 33 00 4216-99 P iC5H12 ARL 13.598 -999.990 ... v1 2014 09 14 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 367689 UTA 2014 04 29 19 33 00 4674-99 P iC5H12 ARL 11.039 -999.990 ... v1 2014 09 14 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 367690 UTA 2014 05 05 02 10 00 1470-99 P iC5H12 ARL 21.039 -999.990 ... v1 2014 09 14 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 367687 UTA 2014 05 05 02 10 00 948-99 P iC5H12 ARL 19.058 -999.990 ... v1 2014 09 14 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 367688 UTA 2014 05 12 01 35 00 1198-99 P iC5H12 ARL 17.113 -999.990 ... v1 2014 08 05 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 368522 UTA 2014 05 12 01 35 00 2078-99 P iC5H12 ARL 20.887 -999.990 ... v1 2014 08 05 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 368523 UTA 2014 05 16 19 39 00 100-99 P iC5H12 ARL 83.761 -999.990 P.. v1 2014 07 29 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 368520 UTA 2014 05 16 19 39 00 4972-99 P iC5H12 ARL 165.517 -999.990 P.. v1 2014 07 29 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 368521 UTA 2014 05 23 22 16 00 1507-99 P iC5H12 ARL 14.716 -999.990 ... v1 2014 09 15 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 369000 UTA 2014 05 23 22 16 00 1508-99 P iC5H12 ARL 14.023 -999.990 ... v1 2014 09 15 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 368999 UTA 2014 05 28 20 45 00 2245-99 P iC5H12 ARL 24.037 -999.990 ... v1 2014 09 15 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 368997 UTA 2014 05 28 20 45 00 2246-99 P iC5H12 ARL 20.818 -999.990 ... v1 2014 09 15 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 368998 UTA 2014 06 06 01 45 00 911-99 P iC5H12 ARL -999.990 -999.990 D.. v1 2014 09 11 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 369487 UTA 2014 06 06 01 45 00 912-99 P iC5H12 ARL 9.598 -999.990 ... v1 2014 09 11 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 369488 UTA 2014 06 11 00 48 00 3503-99 P iC5H12 ARL 30.490 -999.990 ... v1 2014 09 11 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 369485 UTA 2014 06 11 00 48 00 3504-99 P iC5H12 ARL 31.926 -999.990 ... v1 2014 09 11 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 369486 UTA 2014 06 17 02 45 00 123-99 P iC5H12 ARL 24.372 -999.990 ... v1 2014 08 14 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 370107 UTA 2014 06 17 02 45 00 124-99 P iC5H12 ARL 23.972 -999.990 ... v1 2014 08 14 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 370108 UTA 2014 06 23 03 40 00 1729-99 P iC5H12 ARL 14.753 -999.990 P.. v1 2014 09 21 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 370103 UTA 2014 06 23 03 40 00 1730-99 P iC5H12 ARL 9.566 -999.990 P.. v1 2014 09 21 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 370104 UTA 2014 07 01 03 35 00 2359-99 P iC5H12 ARL 10.831 -999.990 ... v1 2014 09 22 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 370754 UTA 2014 07 01 03 35 00 4690-99 P iC5H12 ARL 10.485 -999.990 ... v1 2014 09 22 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 370755 UTA 2014 07 07 01 12 00 6917-66 P iC5H12 ARL 23.995 -999.990 P.. v1 2014 08 04 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 370690 UTA 2014 07 07 01 12 00 787-99 P iC5H12 ARL 59.798 -999.990 P.. v1 2014 08 04 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 370689 UTA 2014 07 11 17 09 00 1933-99 P iC5H12 ARL 16.425 -999.990 ... v1 2014 10 01 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 371261 UTA 2014 07 11 17 09 00 2632-99 P iC5H12 ARL 14.938 -999.990 ... v1 2014 10 01 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 371262 UTA 2014 07 18 13 45 00 4105-99 P iC5H12 ARL 38.222 -999.990 P.. v1 2014 09 26 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 371259 UTA 2014 07 18 13 45 00 4996-99 P iC5H12 ARL 59.496 -999.990 P.. v1 2014 09 26 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 371260 UTA 2014 07 23 16 50 00 4921-99 P iC5H12 ARL -999.990 -999.990 D.. v1 2014 10 17 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 371641 UTA 2014 07 23 16 50 00 4922-99 P iC5H12 ARL 242.420 -999.990 ... v1 2014 10 17 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 371642 UTA 2014 07 28 14 33 00 2949-99 P iC5H12 ARL 14.725 -999.990 ... v1 2014 09 03 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 372057 UTA 2014 07 28 14 33 00 2950-99 P iC5H12 ARL 19.566 -999.990 ... v1 2014 09 03 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 372058 UTA 2014 08 03 22 22 00 27-99 P iC5H12 ARL 19.372 -999.990 ... v1 2014 09 02 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 372443 UTA 2014 08 03 22 22 00 28-99 P iC5H12 ARL 21.524 -999.990 ... v1 2014 09 02 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 372444 UTA 2014 08 09 01 56 00 1387-99 P iC5H12 ARL 20.319 -999.990 ... v1 2014 09 02 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 372441 UTA 2014 08 09 01 56 00 1388-99 P iC5H12 ARL 21.219 -999.990 ... v1 2014 09 02 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 372442 UTA 2014 08 15 17 20 00 61-99 P iC5H12 ARL 20.485 -999.990 ... v1 2014 10 18 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 373156 UTA 2014 08 15 17 20 00 62-99 P iC5H12 ARL 22.356 -999.990 ... v1 2014 10 18 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 373157 UTA 2014 08 22 01 23 00 3711-99 P iC5H12 ARL 19.529 -999.990 ... v1 2014 10 18 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 373154 UTA 2014 08 22 01 23 00 3712-99 P iC5H12 ARL 22.550 -999.990 ... v1 2014 10 18 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 373155 UTA 2014 08 28 21 35 00 4920-99 P iC5H12 ARL 10.448 -999.990 ... v1 2014 10 27 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 373733 UTA 2014 08 28 21 35 00 5128-99 P iC5H12 ARL 13.030 -999.990 ... v1 2014 10 27 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 373734 UTA 2014 09 04 02 32 00 1191-99 P iC5H12 ARL 21.672 -999.990 ... v1 2014 10 27 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 373731 UTA 2014 09 04 02 32 00 3484-99 P iC5H12 ARL 20.356 -999.990 ... v1 2014 10 27 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 373732 UTA 2014 09 11 15 10 00 6197-66 P iC5H12 ARL 18.893 -999.990 ... v1 2014 11 10 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 374409 UTA 2014 09 11 15 10 00 6198-66 P iC5H12 ARL 17.409 -999.990 ... v1 2014 11 10 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 374410 UTA 2014 09 17 14 43 00 2669-99 P iC5H12 ARL 27.553 -999.990 ... v1 2014 11 10 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 374407 UTA 2014 09 17 14 43 00 2670-99 P iC5H12 ARL 19.805 -999.990 ... v1 2014 11 10 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 374408 UTA 2014 09 23 17 46 00 3401-99 P iC5H12 ARL 19.377 -999.990 ... v1 2014 11 14 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 375174 UTA 2014 09 23 17 46 00 3402-99 P iC5H12 ARL 22.028 -999.990 ... v1 2014 11 14 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 375175 UTA 2014 09 28 21 34 00 3471-99 P iC5H12 ARL 25.972 -999.990 ... v1 2014 11 14 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 375172 UTA 2014 09 28 21 34 00 3472-99 P iC5H12 ARL 26.172 -999.990 ... v1 2014 11 14 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 375173 UTA 2014 10 06 15 56 00 3017-99 P iC5H12 ARL 377.656 -999.990 P.. v1 2014 11 18 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 375813 UTA 2014 10 06 15 56 00 3018-99 P iC5H12 ARL 205.037 -999.990 P.. v1 2014 11 18 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 375814 UTA 2014 10 10 22 36 00 2193-99 P iC5H12 ARL 23.178 -999.990 ... v1 2014 10 28 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 375900 UTA 2014 10 10 22 36 00 2194-99 P iC5H12 ARL 24.166 -999.990 ... v1 2014 10 28 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 375901 UTA 2014 10 15 21 50 00 3833-99 P iC5H12 ARL 25.563 -999.990 ... v1 2014 11 14 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 376310 UTA 2014 10 15 21 50 00 4199-99 P iC5H12 ARL 36.279 -999.990 ... v1 2014 11 14 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 376309 UTA 2014 10 22 00 05 00 1013-99 P iC5H12 ARL 15.423 -999.990 ... v1 2014 11 23 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 376316 UTA 2014 10 22 00 05 00 1141-99 P iC5H12 ARL 13.312 -999.990 ... v1 2014 11 23 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 376315 UTA 2014 10 29 20 58 00 1070-99 P iC5H12 ARL 15.892 -999.990 ... v1 2014 12 19 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 377271 UTA 2014 10 29 20 58 00 1699-99 P iC5H12 ARL 16.038 -999.990 ... v1 2014 12 19 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 377272 UTA 2014 11 03 23 35 00 3290-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2015 01 20 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 377530 UTA 2014 11 03 23 35 00 4490-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2015 01 20 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 377531 UTA 2014 11 08 23 10 00 3611-99 P iC5H12 ARL 13.454 -999.990 ... v1 2015 01 29 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 377889 UTA 2014 11 08 23 10 00 6184-66 P iC5H12 ARL 13.464 -999.990 ... v1 2015 01 29 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 377890 UTA 2014 11 14 20 12 00 1166-99 P iC5H12 ARL 76.849 -999.990 ... v1 2015 02 02 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 377887 UTA 2014 11 14 20 12 00 1772-99 P iC5H12 ARL 95.717 -999.990 ... v1 2015 02 02 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 377888 UTA 2014 11 20 23 10 00 129-99 P iC5H12 ARL 7.512 -999.990 P.. v1 2015 01 24 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 378484 UTA 2014 11 20 23 10 00 130-99 P iC5H12 ARL 17.024 -999.990 P.. v1 2015 01 24 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 378485 UTA 2014 11 27 00 44 00 143-99 P iC5H12 ARL 104.828 -999.990 ... v1 2015 01 24 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 378482 UTA 2014 11 27 00 44 00 144-99 P iC5H12 ARL 97.804 -999.990 ... v1 2015 01 24 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 378483 UTA 2014 12 01 23 30 00 4443-99 P iC5H12 ARL 51.094 -999.990 ... v1 2015 03 02 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 379001 UTA 2014 12 01 23 30 00 4444-99 P iC5H12 ARL 52.122 -999.990 ... v1 2015 03 02 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 379002 UTA 2014 12 07 23 20 00 4969-99 P iC5H12 ARL 45.972 -999.990 P.. v1 2015 02 11 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 378999 UTA 2014 12 07 23 20 00 4970-99 P iC5H12 ARL 21.401 -999.990 P.. v1 2015 02 11 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 379000 UTA 2014 12 12 23 48 00 2047-99 P iC5H12 ARL 23.858 -999.990 ... v1 2015 02 18 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 379488 UTA 2014 12 12 23 48 00 2048-99 P iC5H12 ARL 27.472 -999.990 ... v1 2015 02 18 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 379489 UTA 2014 12 18 22 18 00 5031-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2015 02 18 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 379486 UTA 2014 12 18 22 18 00 5032-99 P iC5H12 ARL 75.104 -999.990 ... v1 2015 02 18 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 379487 UTA 2014 12 27 00 41 00 2923-99 P iC5H12 ARL 91.343 -999.990 ... v1 2015 03 20 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 380243 UTA 2014 12 27 00 41 00 2924-99 P iC5H12 ARL 76.000 -999.990 ... v1 2015 03 20 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 380244 UTA 2014 12 31 17 12 00 2167-99 P iC5H12 ARL 228.057 -999.990 ... v1 2015 02 17 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 380245 UTA 2014 12 31 17 12 00 2168-99 P iC5H12 ARL 176.264 -999.990 ... v1 2015 02 17 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 380246 UTA 2015 01 07 00 48 00 1354-99 P iC5H12 ARL 147.362 -999.990 ... v1 2015 04 15 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 380703 UTA 2015 01 07 00 48 00 6494-66 P iC5H12 ARL 159.806 -999.990 ... v1 2015 04 15 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 380704 UTA 2015 01 13 01 55 00 1966-99 P iC5H12 ARL 95.877 -999.990 ... v1 2015 04 15 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 380705 UTA 2015 01 13 01 55 00 2796-99 P iC5H12 ARL 83.281 -999.990 ... v1 2015 04 15 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 380706 UTA 2015 01 20 16 55 00 4097-99 P iC5H12 ARL 73.816 -999.990 ... v1 2015 04 28 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 381482 UTA 2015 01 20 16 55 00 4098-99 P iC5H12 ARL 109.537 -999.990 ... v1 2015 04 28 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 381483 UTA 2015 01 27 19 06 00 3069-99 P iC5H12 ARL 3.981 -999.990 P.. v1 2015 04 29 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 381480 UTA 2015 01 27 19 06 00 3070-99 P iC5H12 ARL 63.201 -999.990 P.. v1 2015 04 29 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 381481 UTA 2015 02 09 00 33 00 1070-99 P iC5H12 ARL 37.343 -999.990 ... v1 2015 03 26 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 382408 UTA 2015 02 09 00 33 00 1699-99 P iC5H12 ARL 31.399 -999.990 ... v1 2015 03 26 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 382409 UTA 2015 02 16 01 20 00 3025-99 P iC5H12 ARL 52.751 -999.990 ... v1 2015 03 26 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 382406 UTA 2015 02 16 01 20 00 3208-99 P iC5H12 ARL 36.498 -999.990 ... v1 2015 03 26 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 382407 UTA 2015 02 23 01 20 00 133-99 P iC5H12 ARL 117.248 -999.990 ... v1 2015 04 10 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 383009 UTA 2015 02 23 01 20 00 134-99 P iC5H12 ARL 106.459 -999.990 ... v1 2015 04 10 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 383010 UTA 2015 02 26 20 30 00 1885-99 P iC5H12 ARL 33.040 -999.990 ... v1 2015 04 10 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 383011 UTA 2015 02 26 20 30 00 1886-99 P iC5H12 ARL 29.314 -999.990 ... v1 2015 04 10 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 383012 UTA 2015 03 05 17 35 00 6717-66 P iC5H12 ARL 43.295 -999.990 ... v1 2015 05 06 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 383812 UTA 2015 03 05 17 35 00 6718-66 P iC5H12 ARL 54.709 -999.990 ... v1 2015 05 06 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 383813 UTA 2015 03 09 16 39 00 307-99 P iC5H12 ARL 184.448 -999.990 ... v1 2015 05 11 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 383815 UTA 2015 03 09 16 39 00 308-99 P iC5H12 ARL 169.981 -999.990 ... v1 2015 05 11 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 383814 UTA 2015 03 14 19 03 00 2013-99 P iC5H12 ARL 35.505 -999.990 ... v1 2015 05 15 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 384322 UTA 2015 03 14 19 03 00 6383-66 P iC5H12 ARL 36.914 -999.990 ... v1 2015 05 15 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 384323 UTA 2015 03 19 22 24 00 4141-99 P iC5H12 ARL 26.367 -999.990 ... v1 2015 05 15 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 384324 UTA 2015 03 19 22 24 00 5045-99 P iC5H12 ARL 21.286 -999.990 ... v1 2015 05 15 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 384325 UTA 2015 03 29 23 03 00 3463-99 P iC5H12 ARL 45.657 -999.990 P.. v1 2015 05 28 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 385336 UTA 2015 03 29 23 03 00 3464-99 P iC5H12 ARL 24.714 -999.990 P.. v1 2015 05 28 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 385337 UTA 2015 04 04 00 22 00 4593-99 P iC5H12 ARL 43.895 -999.990 ... v1 2015 05 29 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 385334 UTA 2015 04 04 00 22 00 4594-99 P iC5H12 ARL 34.162 -999.990 ... v1 2015 05 29 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 385335 UTA 2015 04 09 22 15 00 2019-99 P iC5H12 ARL 27.795 -999.990 ... v1 2015 06 05 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 385806 UTA 2015 04 09 22 15 00 2020-99 P iC5H12 ARL 25.648 -999.990 ... v1 2015 06 05 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 385807 UTA 2015 04 14 16 45 00 3329-99 P iC5H12 ARL 74.543 -999.990 ... v1 2015 06 09 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 385834 UTA 2015 04 14 16 45 00 3330-99 P iC5H12 ARL 60.629 -999.990 ... v1 2015 06 09 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 385835 UTA 2015 04 21 17 02 00 1870-99 P iC5H12 ARL 29.171 -999.990 ... v1 2015 06 18 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 386575 UTA 2015 04 21 17 02 00 949-99 P iC5H12 ARL 26.405 -999.990 ... v1 2015 06 18 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 386576 UTA 2015 04 29 01 08 00 1432-99 P iC5H12 ARL 49.886 -999.990 P.. v1 2015 06 28 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 386573 UTA 2015 04 29 01 08 00 5255-99 P iC5H12 ARL 74.752 -999.990 P.. v1 2015 06 28 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 386574 UTA 2015 05 11 17 43 00 1477-99 P iC5H12 ARL 64.152 -999.990 ... v1 2015 07 19 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 387390 UTA 2015 05 11 17 43 00 486-99 P iC5H12 ARL 65.373 -999.990 ... v1 2015 07 19 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 387391 UTA 2015 05 14 20 36 00 4700-99 P iC5H12 ARL 41.910 -999.990 ... v1 2015 07 24 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 387388 UTA 2015 05 14 20 36 00 4851-99 P iC5H12 ARL 37.178 -999.990 ... v1 2015 07 24 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 387389 UTA 2015 05 20 23 19 00 6666-66 P iC5H12 ARL 36.494 -999.990 ... v1 2015 07 07 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 387973 UTA 2015 05 20 23 19 00 999-99 P iC5H12 ARL 35.900 -999.990 ... v1 2015 07 07 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 387974 UTA 2015 05 27 22 44 00 3978-99 P iC5H12 ARL 36.095 -999.990 ... v1 2015 07 07 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 387971 UTA 2015 05 27 22 44 00 4166-99 P iC5H12 ARL 29.805 -999.990 ... v1 2015 07 07 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 387972 UTA 2015 06 01 15 06 00 2921-99 P iC5H12 ARL 60.907 -999.990 ... v1 2015 07 29 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 388624 UTA 2015 06 01 15 06 00 4967-99 P iC5H12 ARL 57.406 -999.990 ... v1 2015 07 29 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 388625 UTA 2015 06 06 00 30 00 3257-99 P iC5H12 ARL 39.012 -999.990 ... v1 2015 07 28 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 388626 UTA 2015 06 06 00 30 00 4091-99 P iC5H12 ARL 41.824 -999.990 ... v1 2015 07 28 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 388627 UTA 2015 06 15 01 11 00 3273-99 P iC5H12 ARL 26.575 -999.990 ... v1 2015 08 14 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 390132 UTA 2015 06 15 01 11 00 3274-99 P iC5H12 ARL 34.413 -999.990 ... v1 2015 08 14 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 390133 UTA 2015 07 03 03 54 00 4985-99 P iC5H12 ARL 37.007 -999.990 ... v1 2015 08 19 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 390130 UTA 2015 07 03 03 54 00 4986-99 P iC5H12 ARL 37.810 -999.990 ... v1 2015 08 19 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 390131 UTA 2015 07 06 02 42 00 2711-99 P iC5H12 ARL 28.513 -999.990 ... v1 2015 08 21 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 390689 UTA 2015 07 06 02 42 00 2712-99 P iC5H12 ARL 30.689 -999.990 ... v1 2015 08 21 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 390690 UTA 2015 07 12 02 30 00 295-99 P iC5H12 ARL 58.907 -999.990 P.. v1 2015 08 25 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 390687 UTA 2015 07 12 02 30 00 296-99 P iC5H12 ARL 35.154 -999.990 P.. v1 2015 08 25 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 390688 UTA 2015 07 14 01 10 00 2805-99 P iC5H12 ARL 262.195 -999.990 P.. v1 2015 08 31 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 391379 UTA 2015 07 14 01 10 00 2806-99 P iC5H12 ARL 347.159 -999.990 P.. v1 2015 08 31 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 391380 UTA 2015 07 20 02 34 00 3222-99 P iC5H12 ARL 45.283 -999.990 ... v1 2015 08 26 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 391377 UTA 2015 07 20 02 34 00 689-99 P iC5H12 ARL 50.898 -999.990 ... v1 2015 08 26 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 391378 UTA 2015 07 22 23 26 00 3683-99 P iC5H12 ARL 31.271 -999.990 ... v1 2015 09 01 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 391953 UTA 2015 07 22 23 26 00 3684-99 P iC5H12 ARL 28.201 -999.990 ... v1 2015 09 01 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 391954 UTA 2015 07 28 16 56 00 1339-99 P iC5H12 ARL 34.224 -999.990 ... v1 2015 09 03 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 391951 UTA 2015 07 28 16 56 00 1340-99 P iC5H12 ARL 33.869 -999.990 ... v1 2015 09 03 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 391952 UTA 2015 08 05 15 32 00 1136-99 P iC5H12 ARL 49.215 -999.990 ... v1 2015 09 19 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 392713 UTA 2015 08 05 15 32 00 255-99 P iC5H12 ARL 54.794 -999.990 ... v1 2015 09 19 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 392712 UTA 2015 08 12 15 55 00 411-99 P iC5H12 ARL 83.294 -999.990 ... v1 2015 09 21 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 392710 UTA 2015 08 12 15 55 00 440-99 P iC5H12 ARL 91.318 -999.990 ... v1 2015 09 21 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 392711 UTA 2015 08 25 00 42 00 1774-99 P iC5H12 ARL 91.257 -999.990 ... v1 2015 10 09 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 394011 UTA 2015 08 25 00 42 00 507-99 P iC5H12 ARL 103.812 -999.990 ... v1 2015 10 09 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 394012 UTA 2015 09 01 18 20 00 2915-99 P iC5H12 ARL 112.941 -999.990 P.. v1 2015 10 08 12 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 394010 UTA 2015 09 01 18 20 00 4511-99 P iC5H12 ARL 63.059 -999.990 P.. v1 2015 10 08 12 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 394009 UTA 2015 09 11 17 28 00 1478-99 P iC5H12 ARL 11.595 -999.990 ... v1 2015 10 18 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 394694 UTA 2015 09 11 17 28 00 5285-99 P iC5H12 ARL 12.979 -999.990 ... v1 2015 10 18 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 394695 UTA 2015 09 18 03 13 00 4055-99 P iC5H12 ARL 27.529 -999.990 ... v1 2015 10 26 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 394696 UTA 2015 09 18 03 13 00 4092-99 P iC5H12 ARL 26.682 -999.990 ... v1 2015 10 26 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 394697 UTA 2015 09 21 18 26 00 3585-99 P iC5H12 ARL 24.956 -999.990 ... v1 2015 11 01 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 395625 UTA 2015 09 21 18 26 00 3586-99 P iC5H12 ARL 25.892 -999.990 ... v1 2015 11 01 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 395626 UTA 2015 09 28 21 41 00 1507-99 P iC5H12 ARL 27.727 -999.990 ... v1 2015 10 30 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 395623 UTA 2015 09 28 21 41 00 1508-99 P iC5H12 ARL 24.762 -999.990 ... v1 2015 10 30 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 395624 UTA 2015 10 06 18 23 00 3339-99 P iC5H12 ARL 30.061 -999.990 ... v1 2015 11 04 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 396555 UTA 2015 10 06 18 23 00 3340-99 P iC5H12 ARL 30.492 -999.990 ... v1 2015 11 04 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 396556 UTA 2015 10 13 22 32 00 3251-99 P iC5H12 ARL 26.023 -999.990 ... v1 2015 11 03 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 396429 UTA 2015 10 13 22 32 00 3252-99 P iC5H12 ARL 25.457 -999.990 ... v1 2015 11 03 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 396430 UTA 2015 10 20 00 55 00 2119-99 P iC5H12 ARL 40.051 -999.990 ... v1 2015 11 10 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 396975 UTA 2015 10 20 00 55 00 2120-99 P iC5H12 ARL 42.286 -999.990 ... v1 2015 11 10 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 396976 UTA 2015 10 26 01 15 00 3741-99 P iC5H12 ARL 63.185 -999.990 ... v1 2015 11 10 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 396973 UTA 2015 10 26 01 15 00 3742-99 P iC5H12 ARL 52.759 -999.990 ... v1 2015 11 10 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 396974 UTA 2015 11 01 22 51 00 603-99 P iC5H12 ARL 22.108 -999.990 ... v1 2015 11 25 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 397820 UTA 2015 11 01 22 51 00 604-99 P iC5H12 ARL 26.098 -999.990 ... v1 2015 11 25 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 397821 UTA 2015 11 10 23 13 00 3841-99 P iC5H12 ARL 39.319 -999.990 ... v1 2015 12 11 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 397818 UTA 2015 11 10 23 13 00 3842-99 P iC5H12 ARL 44.917 -999.990 ... v1 2015 12 11 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 397819 UTA 2015 11 16 00 45 00 4525-99 P iC5H12 ARL 21.882 -999.990 ... v1 2015 12 18 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 398668 UTA 2015 11 16 00 45 00 967-99 P iC5H12 ARL 24.873 -999.990 ... v1 2015 12 18 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 398667 UTA 2015 11 23 22 05 00 1869-99 P iC5H12 ARL 24.061 -999.990 ... v1 2015 12 18 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 398468 UTA 2015 11 23 22 05 00 571-99 P iC5H12 ARL 24.419 -999.990 ... v1 2015 12 18 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 398469 UTA 2015 12 02 01 02 00 4389-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2016 01 25 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 399046 UTA 2015 12 02 01 02 00 949-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2016 01 25 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 399045 UTA 2015 12 07 17 24 00 1475-99 P iC5H12 ARL 55.737 -999.990 ... v1 2016 01 11 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 399416 UTA 2015 12 07 17 24 00 268-99 P iC5H12 ARL 57.607 -999.990 ... v1 2016 01 11 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 399415 UTA 2015 12 13 00 19 00 4913-99 P iC5H12 ARL 74.196 -999.990 ... v1 2016 01 12 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 399413 UTA 2015 12 13 00 19 00 4939-99 P iC5H12 ARL 63.580 -999.990 ... v1 2016 01 12 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 399414 UTA 2015 12 16 18 26 00 1828-99 P iC5H12 ARL 87.808 -999.990 ... v1 2016 02 03 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 399961 UTA 2015 12 16 18 26 00 353-99 P iC5H12 ARL 91.909 -999.990 ... v1 2016 02 03 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 399960 UTA 2015 12 22 22 42 00 2036-99 P iC5H12 ARL 76.577 -999.990 ... v1 2016 02 03 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 399958 UTA 2015 12 22 22 42 00 4844-99 P iC5H12 ARL 79.483 -999.990 ... v1 2016 02 03 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 399959 UTA 2016 01 01 23 55 00 229-99 P iC5H12 ARL 62.426 -999.990 P.. v1 2016 02 15 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 400914 UTA 2016 01 01 23 55 00 230-99 P iC5H12 ARL 84.073 -999.990 P.. v1 2016 02 15 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 400915 UTA 2016 01 08 16 53 00 4583-99 P iC5H12 ARL 113.895 -999.990 ... v1 2016 02 15 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 400912 UTA 2016 01 08 16 53 00 4584-99 P iC5H12 ARL 116.073 -999.990 ... v1 2016 02 15 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 400913 UTA 2016 01 13 22 06 00 3339-99 P iC5H12 ARL 54.151 -999.990 ... v1 2016 02 17 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 401468 UTA 2016 01 13 22 06 00 3340-99 P iC5H12 ARL 55.698 -999.990 ... v1 2016 02 17 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 401469 UTA 2016 01 20 18 55 00 5301-99 P iC5H12 ARL 80.594 -999.990 ... v1 2016 05 18 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 401466 UTA 2016 01 20 18 55 00 5302-99 P iC5H12 ARL 78.000 -999.990 ... v1 2016 05 18 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 401467 UTA 2016 02 02 00 21 00 3421-99 P iC5H12 ARL 60.593 -999.990 ... v1 2016 03 09 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 402311 UTA 2016 02 02 00 21 00 3422-99 P iC5H12 ARL 59.553 -999.990 ... v1 2016 03 09 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 402312 UTA 2016 02 09 17 18 00 165-99 P iC5H12 ARL 114.717 -999.990 P.. v1 2016 03 14 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 402309 UTA 2016 02 09 17 18 00 166-99 P iC5H12 ARL 72.301 -999.990 P.. v1 2016 03 14 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 402310 UTA 2016 02 15 18 32 00 570-99 P iC5H12 ARL 23.823 -999.990 ... v1 2016 03 31 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 402934 UTA 2016 02 15 18 32 00 915-99 P iC5H12 ARL 28.040 -999.990 ... v1 2016 03 31 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 402935 UTA 2016 02 20 21 49 00 1466-99 P iC5H12 ARL 32.009 -999.990 ... v1 2016 03 17 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 402936 UTA 2016 02 20 21 49 00 2293-99 P iC5H12 ARL 33.035 -999.990 ... v1 2016 03 17 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 402937 UTA 2016 02 24 17 22 00 3801-99 P iC5H12 ARL 122.951 -999.990 ... v1 2016 03 30 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 403363 UTA 2016 02 24 17 22 00 3802-99 P iC5H12 ARL 106.743 -999.990 ... v1 2016 03 30 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 403364 UTA 2016 03 01 04 18 00 1121-99 P iC5H12 ARL 55.310 -999.990 ... v1 2016 03 31 12 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 403361 UTA 2016 03 01 04 18 00 1122-99 P iC5H12 ARL 71.239 -999.990 ... v1 2016 03 31 12 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 403362 UTA 2016 03 04 00 39 00 1641-99 P iC5H12 ARL 24.602 -999.990 ... v1 2016 04 05 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 403707 UTA 2016 03 04 00 39 00 27-99 P iC5H12 ARL 25.606 -999.990 ... v1 2016 04 05 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 403708 UTA 2016 03 08 17 43 00 1702-99 P iC5H12 ARL 106.027 -999.990 ... v1 2016 04 02 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 403705 UTA 2016 03 08 17 43 00 1957-99 P iC5H12 ARL -999.990 -999.990 D.. v1 2016 04 02 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 403706 UTA 2016 03 16 02 30 00 1065-99 P iC5H12 ARL 48.062 -999.990 ... v1 2016 04 17 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 404719 UTA 2016 03 16 02 30 00 114-99 P iC5H12 ARL 50.186 -999.990 ... v1 2016 04 17 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 404720 UTA 2016 03 21 19 29 00 1008-99 P iC5H12 ARL 178.429 -999.990 ... v1 2016 04 22 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 404691 UTA 2016 03 21 19 29 00 3970-99 P iC5H12 ARL 190.642 -999.990 ... v1 2016 04 22 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 404692 UTA 2016 03 24 16 49 00 2420-99 P iC5H12 ARL 47.266 -999.990 ... v1 2016 04 20 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 405096 UTA 2016 03 24 16 49 00 361-99 P iC5H12 ARL 53.726 -999.990 ... v1 2016 04 20 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 405095 UTA 2016 03 30 22 02 00 3094-99 P iC5H12 ARL 45.557 -999.990 ... v1 2016 04 15 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 405097 UTA 2016 03 30 22 02 00 5065-99 P iC5H12 ARL 44.363 -999.990 ... v1 2016 04 15 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 405098 UTA 2016 04 05 22 37 00 1740-99 P iC5H12 ARL 33.677 -999.990 ... v1 2016 05 20 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 405803 UTA 2016 04 05 22 37 00 469-99 P iC5H12 ARL 36.332 -999.990 ... v1 2016 05 20 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 405804 UTA 2016 04 11 18 47 00 4190-99 P iC5H12 ARL 45.529 -999.990 ... v1 2016 07 20 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 405805 UTA 2016 04 15 18 06 00 3963-99 P iC5H12 ARL 37.118 -999.990 ... v1 2016 05 27 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 406268 UTA 2016 04 15 18 06 00 3964-99 P iC5H12 ARL 38.865 -999.990 ... v1 2016 05 27 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 406269 UTA 2016 04 21 19 27 00 809-99 P iC5H12 ARL 57.642 -999.990 ... v1 2016 05 27 12 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 406266 UTA 2016 04 21 19 27 00 810-99 P iC5H12 ARL 57.642 -999.990 ... v1 2016 05 27 12 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 406267 UTA 2016 04 28 16 20 00 1419-99 P iC5H12 ARL 72.317 -999.990 ... v1 2016 06 04 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 407014 UTA 2016 04 28 16 20 00 3194-99 P iC5H12 ARL 67.444 -999.990 ... v1 2016 06 04 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 407015 UTA 2016 05 05 20 02 00 1925-99 P iC5H12 ARL 52.509 -999.990 ... v1 2016 06 04 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 407012 UTA 2016 05 05 20 02 00 3978-99 P iC5H12 ARL 46.509 -999.990 ... v1 2016 06 04 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 407013 UTA 2016 05 09 19 12 00 4589-99 P iC5H12 ARL 44.522 -999.990 ... v1 2016 06 14 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 407713 UTA 2016 05 09 19 12 00 5188-99 P iC5H12 ARL 45.726 -999.990 ... v1 2016 06 14 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 407714 UTA 2016 05 15 01 22 00 2563-99 P iC5H12 ARL 32.948 -999.990 ... v1 2016 06 14 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 407711 UTA 2016 05 15 01 22 00 993-99 P iC5H12 ARL 30.400 -999.990 ... v1 2016 06 14 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 407712 UTA 2016 05 20 02 43 00 350-99 P iC5H12 ARL 37.640 -999.990 ... v1 2016 07 06 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 407951 UTA 2016 05 20 02 43 00 986-99 P iC5H12 ARL 37.927 -999.990 ... v1 2016 07 06 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 407952 UTA 2016 05 27 14 08 00 1325-99 P iC5H12 ARL 38.239 -999.990 ... v1 2016 06 28 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 407949 UTA 2016 05 27 14 08 00 3533-99 P iC5H12 ARL 38.148 -999.990 ... v1 2016 06 28 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 407950 UTA 2016 06 02 02 35 00 3024-99 P iC5H12 ARL 134.697 -999.990 P.. v1 2016 09 02 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 408897 UTA 2016 06 02 02 35 00 3053-99 P iC5H12 ARL 85.632 -999.990 P.. v1 2016 09 02 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 408898 UTA 2016 06 07 02 05 00 2660-99 P iC5H12 ARL 56.580 -999.990 ... v1 2016 09 04 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 408895 UTA 2016 06 07 02 05 00 3851-99 P iC5H12 ARL 54.827 -999.990 ... v1 2016 09 04 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 408896 UTA 2016 06 10 15 46 00 2241-99 P iC5H12 ARL 90.989 -999.990 P.. v1 2016 07 30 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 409485 UTA 2016 06 10 15 46 00 2242-99 P iC5H12 ARL 154.159 -999.990 P.. v1 2016 07 30 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 409486 UTA 2016 06 18 00 36 00 2965-99 P iC5H12 ARL 38.831 -999.990 ... v1 2016 09 09 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 411179 UTA 2016 06 18 00 36 00 3914-99 P iC5H12 ARL 34.758 -999.990 ... v1 2016 09 09 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 411180 UTA 2016 06 18 03 48 00 5209-99 P iC5H12 ARL 46.732 -999.990 ... v1 2016 07 13 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 409488 UTA 2016 06 18 03 48 00 5210-99 P iC5H12 ARL 45.105 -999.990 ... v1 2016 07 13 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 409487 UTA 2016 06 22 17 49 00 3800-99 P iC5H12 ARL 143.195 -999.990 P.. v1 2016 09 09 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 411178 UTA 2016 06 22 17 49 00 88-99 P iC5H12 ARL 202.541 -999.990 P.. v1 2016 09 09 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 411177 UTA 2016 06 24 14 44 00 3084-99 P iC5H12 ARL 33.139 -999.990 ... v1 2016 08 29 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 409985 UTA 2016 06 24 14 44 00 4866-99 P iC5H12 ARL 32.655 -999.990 ... v1 2016 08 29 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 409986 UTA 2016 07 01 03 12 00 4119-99 P iC5H12 ARL 37.049 -999.990 ... v1 2016 08 29 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 409983 UTA 2016 07 01 03 12 00 5039-99 P iC5H12 ARL 36.325 -999.990 ... v1 2016 08 29 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 409984 UTA 2016 07 07 21 54 00 3359-99 P iC5H12 ARL 50.390 -999.990 ... v1 2016 09 29 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 410566 UTA 2016 07 07 21 54 00 3612-99 P iC5H12 ARL 33.290 -999.990 ... v1 2016 09 29 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 410567 UTA 2016 07 11 03 05 00 2288-99 P iC5H12 ARL 81.095 -999.990 P.. v1 2016 09 02 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 410564 UTA 2016 07 11 03 05 00 690-99 P iC5H12 ARL 54.610 -999.990 P.. v1 2016 09 02 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 410565 UTA 2016 07 19 15 28 00 1441-99 P iC5H12 ARL 53.030 -999.990 ... v1 2016 09 15 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 411640 UTA 2016 07 19 15 28 00 2425-99 P iC5H12 ARL 56.286 -999.990 ... v1 2016 09 15 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 411641 UTA 2016 07 25 21 01 00 716-99 P iC5H12 ARL 204.685 -999.990 P.. v1 2016 10 06 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 411553 UTA 2016 07 25 21 01 00 937-99 P iC5H12 ARL 385.319 -999.990 P.. v1 2016 10 06 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 411554 UTA 2016 07 31 15 12 00 3741-99 P iC5H12 ARL 42.381 -999.990 ... v1 2016 10 31 12 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 412674 UTA 2016 07 31 15 12 00 3742-99 P iC5H12 ARL 43.559 -999.990 ... v1 2016 10 31 12 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 412675 UTA 2016 08 06 01 18 00 3215-99 P iC5H12 ARL 111.991 -999.990 P.. v1 2016 09 16 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 412596 UTA 2016 08 06 01 18 00 3216-99 P iC5H12 ARL 47.970 -999.990 P.. v1 2016 09 16 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 412597 UTA 2016 08 13 14 35 00 4658-99 P iC5H12 ARL 1308.980 -999.990 ... v1 2016 11 10 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 412776 UTA 2016 08 13 14 35 00 5571-99 P iC5H12 ARL 1303.822 -999.990 ... v1 2016 11 10 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 412777 UTA 2016 08 17 21 05 00 3400-99 P iC5H12 ARL 30.911 -999.990 ... v1 2016 11 10 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 412774 UTA 2016 08 17 21 05 00 5567-99 P iC5H12 ARL 45.757 -999.990 ... v1 2016 11 10 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 412775 UTA 2016 08 26 14 57 00 3831-99 P iC5H12 ARL 105.495 -999.990 ... v1 2016 10 20 00 09 00 39.9018 -113.7181 1332.00 1327.00 5.00 413790 UTA 2016 08 26 14 57 00 3832-99 P iC5H12 ARL 66.159 -999.990 ... v1 2016 10 20 00 10 00 39.9018 -113.7181 1332.00 1327.00 5.00 413791 UTA 2016 08 31 01 25 00 5715-99 P iC5H12 ARL 50.964 -999.990 ... v1 2016 10 20 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 413792 UTA 2016 08 31 01 25 00 5716-99 P iC5H12 ARL 49.615 -999.990 ... v1 2016 10 20 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 413793 UTA 2016 09 08 00 20 00 1473-99 P iC5H12 ARL 33.122 -999.990 ... v1 2016 10 23 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 414196 UTA 2016 09 08 00 20 00 4232-99 P iC5H12 ARL 33.208 -999.990 ... v1 2016 10 23 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 414197 UTA 2016 09 22 01 48 00 702-99 P iC5H12 ARL 31.679 -999.990 ... v1 2016 11 16 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 414954 UTA 2016 09 22 01 48 00 830-99 P iC5H12 ARL 31.219 -999.990 ... v1 2016 11 16 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 414955 UTA 2016 09 28 18 19 00 3523-99 P iC5H12 ARL 31.384 -999.990 P.. v1 2016 11 16 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 414952 UTA 2016 09 28 18 19 00 4087-99 P iC5H12 ARL 55.189 -999.990 P.. v1 2016 11 16 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 414953 UTA 2016 09 30 16 51 00 2265-99 P iC5H12 ARL 60.989 -999.990 ... v1 2016 12 08 00 05 00 39.9018 -113.7181 1332.00 1327.00 5.00 415218 UTA 2016 09 30 16 51 00 5415-99 P iC5H12 ARL 74.115 -999.990 ... v1 2016 12 08 00 06 00 39.9018 -113.7181 1332.00 1327.00 5.00 415219 UTA 2016 10 04 23 42 00 109-99 P iC5H12 ARL 40.518 -999.990 ... v1 2016 12 08 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 415220 UTA 2016 10 04 23 42 00 482-99 P iC5H12 ARL 40.879 -999.990 ... v1 2016 12 08 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 415221 UTA 2016 10 12 17 58 00 4683-99 P iC5H12 ARL 39.592 -999.990 ... v1 2016 12 16 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 415645 UTA 2016 10 12 17 58 00 5145-99 P iC5H12 ARL 36.790 -999.990 ... v1 2016 12 16 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 415644 UTA 2016 10 14 16 07 00 2535-99 P iC5H12 ARL 61.907 -999.990 ... v1 2016 12 12 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 415646 UTA 2016 10 14 16 07 00 3011-99 P iC5H12 ARL 58.425 -999.990 ... v1 2016 12 12 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 415647 UTA 2016 10 24 22 58 00 1888-99 P iC5H12 ARL 76.195 -999.990 ... v1 2016 12 19 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 416575 UTA 2016 10 24 22 58 00 4080-99 P iC5H12 ARL 67.163 -999.990 ... v1 2016 12 19 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 416576 UTA 2016 10 30 00 25 00 4023-99 P iC5H12 ARL 153.316 -999.990 ... v1 2016 12 19 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 416578 UTA 2016 10 30 00 25 00 4285-99 P iC5H12 ARL 159.822 -999.990 ... v1 2016 12 19 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 416577 UTA 2016 11 05 23 43 00 412-99 P iC5H12 ARL 81.941 -999.990 ... v1 2016 12 23 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 417069 UTA 2016 11 05 23 43 00 4473-99 P iC5H12 ARL 76.153 -999.990 ... v1 2016 12 23 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 417070 UTA 2016 11 09 17 08 00 2250-99 P iC5H12 ARL 98.157 -999.990 ... v1 2016 12 27 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 417071 UTA 2016 11 09 17 08 00 4036-99 P iC5H12 ARL 90.000 -999.990 ... v1 2016 12 27 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 417072 UTA 2016 11 20 21 46 00 4065-99 P iC5H12 ARL 218.111 -999.990 ... v1 2017 01 06 00 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 417685 UTA 2016 11 20 21 46 00 4237-99 P iC5H12 ARL 229.302 -999.990 ... v1 2017 01 06 00 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 417687 UTA 2016 11 28 00 57 00 4066-99 P iC5H12 ARL 55.889 -999.990 P.. v1 2017 01 04 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 417686 UTA 2016 11 28 00 57 00 838-99 P iC5H12 ARL 78.183 -999.990 P.. v1 2017 01 04 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 417688 UTA 2016 11 29 21 55 00 2830-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2017 02 04 00 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 418232 UTA 2016 11 29 21 55 00 2895-99 P iC5H12 ARL -999.990 -999.990 A.. v1 2017 02 04 00 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 418233 UTA 2016 12 06 23 07 00 4592-99 P iC5H12 ARL 46.402 -999.990 ... v1 2017 02 06 12 01 00 39.9018 -113.7181 1332.00 1327.00 5.00 418230 UTA 2016 12 06 23 07 00 5268-99 P iC5H12 ARL 42.304 -999.990 ... v1 2017 02 06 12 02 00 39.9018 -113.7181 1332.00 1327.00 5.00 418231 UTA 2016 12 10 23 20 00 1081-99 P iC5H12 ARL 9.839 -999.990 ... v1 2017 02 09 12 07 00 39.9018 -113.7181 1332.00 1327.00 5.00 418616 UTA 2016 12 10 23 20 00 5306-99 P iC5H12 ARL 11.345 -999.990 ... v1 2017 02 09 12 08 00 39.9018 -113.7181 1332.00 1327.00 5.00 418617 UTA 2016 12 16 16 18 00 1003-99 P iC5H12 ARL 186.617 -999.990 ... v1 2017 02 16 00 12 00 39.9018 -113.7181 1332.00 1327.00 5.00 418619 UTA 2016 12 16 16 18 00 424-99 P iC5H12 ARL 197.983 -999.990 ... v1 2017 02 16 00 11 00 39.9018 -113.7181 1332.00 1327.00 5.00 418618 UTA 2016 12 22 18 45 00 1797-99 P iC5H12 ARL 96.254 -999.990 ... v1 2017 02 13 12 03 00 39.9018 -113.7181 1332.00 1327.00 5.00 419171 UTA 2016 12 22 18 45 00 1798-99 P iC5H12 ARL 88.351 -999.990 ... v1 2017 02 13 12 04 00 39.9018 -113.7181 1332.00 1327.00 5.00 419172 UTA 2016 12 29 20 48 00 2761-99 P iC5H12 ARL 26.833 -999.990 ... v1 2017 02 10 00 13 00 39.9018 -113.7181 1332.00 1327.00 5.00 419173 UTA 2016 12 29 20 48 00 2762-99 P iC5H12 ARL 26.567 -999.990 ... v1 2017 02 10 00 14 00 39.9018 -113.7181 1332.00 1327.00 5.00 419174